JP2989412B2 - Tunnel junction segment and tunnel connection method - Google Patents
[go: Go Back, main page]

JP2989412B2 - Tunnel junction segment and tunnel connection method - Google Patents

Tunnel junction segment and tunnel connection method

Info

Publication number
JP2989412B2
JP2989412B2 JP5052274A JP5227493A JP2989412B2 JP 2989412 B2 JP2989412 B2 JP 2989412B2 JP 5052274 A JP5052274 A JP 5052274A JP 5227493 A JP5227493 A JP 5227493A JP 2989412 B2 JP2989412 B2 JP 2989412B2
Authority
JP
Japan
Prior art keywords
tunnel
steel plate
segment
shield
tunnels
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP5052274A
Other languages
Japanese (ja)
Other versions
JPH06264693A (en
Inventor
彰男 志関
幸司 多田
徹 谷口
雅弘 中川
裕次 舘川
誠 請川
雅一 福若
高志 平本
秀幸 小林
修身 橋本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Steel Corp
Toda Corp
Original Assignee
Toda Corp
Kawasaki Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toda Corp, Kawasaki Steel Corp filed Critical Toda Corp
Priority to JP5052274A priority Critical patent/JP2989412B2/en
Publication of JPH06264693A publication Critical patent/JPH06264693A/en
Application granted granted Critical
Publication of JP2989412B2 publication Critical patent/JP2989412B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)
  • Lining And Supports For Tunnels (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明はトンネル内をライニング
するためのトンネル接合用セグメント及びトンネル接続
方法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a segment for a tunnel junction and a tunnel connection for lining a tunnel.
It is about the method.

【0002】[0002]

【従来の技術】近年、都市部における地下鉄道等の構築
は開削工法にかわってシールド工法が多用されるように
なっている。このようなシールド工法により地下鉄道の
駅部等の大断面を構築する場合はルーフシールド工法、
かんざし桁工法、円形多連シールド工法等の各種の工法
が用いられている。しかし、これらの工法はいずれもト
ンネルの断面が円形であり、それによる種々の問題があ
る。そこで、本願出願人は上記の問題を解決するため
に、特願平4−104039号等の工法を開発した。
2. Description of the Related Art In recent years, a shield method has been frequently used in the construction of a subway or the like in an urban area in place of a digging method. When constructing a large section such as a subway station by such a shield method, the roof shield method,
Various construction methods, such as a bridge girder construction method and a circular multiple shield construction method, are used. However, all of these construction methods have a circular cross section of the tunnel, which causes various problems. In order to solve the above problem, the applicant of the present application has developed a method such as Japanese Patent Application No. 4-104039.

【0003】これは、図9に示すように、断面矩形のシ
ールドトンネルを側面で接続するものであり、並列状に
近接させて構築したシールドトンネル20間に山留鋼板
30を架け渡して地山を掘削し、その掘削空間40内に
鉄筋コンクリートを覆工してシールドトンネル20相互
を接続するものである。
[0003] As shown in Fig. 9, a shield tunnel having a rectangular cross section is connected on the side, and a ground steel plate 30 is hung between shield tunnels 20 constructed in parallel and closely adjacent to each other. Is excavated, and reinforced concrete is lined in the excavation space 40 to connect the shield tunnels 20 to each other.

【0004】[0004]

【発明が解決しようとする課題】しかし、上記の工法に
おいては、並列状に構築されたシールドトンネル間に山
留鋼板を掛け渡す必要があるため、この掛け渡し作業が
非常に困難なものであった。本発明は上記のような問題
点に鑑みてなされたものであり、その目的は、並列状に
構築されたシールドトンネル間への山留鋼板の掛け渡し
作業を容易に行うことができるトンネル接合用セグメン
ト及びトンネル接続方法を提供することである。
However, in the above-mentioned construction method, it is necessary to hang the steel plate between the shield tunnels constructed in parallel, so that the tying work is very difficult. Was. The present invention has been made in view of the above-described problems, and an object of the present invention is to provide a tunnel joining device capable of easily performing a work of passing a steel plate between shield tunnels constructed in parallel . Segment
And a tunnel connection method.

【0005】[0005]

【課題を解決するための手段】以上の課題を解決するた
めの手段は、請求項1が、並列かつ近接して構築された
断面矩形のシールドトンネルを接合するために用いられ
るセグメントであって、該セグメントにトンネルの長さ
方向に沿って山留鋼板挿入部が開口され、該山留鋼板挿
入部が前記山留鋼板の圧入力で破断可能な閉塞板で閉塞
されたことを特徴とする。 また請求項2が、並列かつ近
接して構築された断面矩形のシールドトンネルを接合す
るために用いられるセグメントであって、該セグメント
にトンネルの長さ方向に沿って山留鋼板挿入部が開口さ
れ、該山留鋼板挿入部の前面側がテープで閉塞されると
ともに、山留鋼板挿入部の裏面側には取外自在なカバー
を備えたボックスが設けられ、該ボックス内にグリスが
封入されたことを特徴とする。 また請求項3が、並列か
つ近接した断面矩形のトンネルにセグメントを覆工する
とともに、前記トンネルの対向面の上下部には、該トン
ネルの長さ方向に沿って山留鋼板挿入部が設けられたセ
グメントを覆工してシールドトンネルを構築する工程
と、一方のトンネルの山留鋼板挿入部から他方のトンネ
ルの山留鋼板挿入部にかけて山留鋼板を掛け渡してシー
ルドトンネル間の上下に山留鋼板を掛け渡す工程と、前
記山留鋼板が掛け渡されたシールドトンネル間の地山を
掘削する工程とからなることを特徴とする。
Means for solving the above problems are as follows. Claim 1 is constructed in parallel and close to each other.
Used to join shield tunnels with rectangular cross sections
Segment, the length of the tunnel
The fastening part is opened along the direction, and the fastening part is opened.
The entrance is closed with a closing plate that can be broken by press-fitting of the retaining steel plate
It is characterized by having been done. Claim 2 is parallel and near.
Join a shield tunnel with a rectangular cross section constructed in contact
Segment that is used for
The insertion part of the steel plate is opened along the length of the tunnel.
When the front side of the steel plate insertion part is closed with tape,
Both are removable covers on the back side of the insertion part
Is provided with grease in the box.
It is characterized by being enclosed. Claim 3 is parallel.
Lining a segment in a tunnel with a rectangular cross section
At the top and bottom of the opposing surface of the tunnel,
A section with a steel plate insert along the length of the
Of building a shield tunnel by lining the cement
And the other tunnel
The steel plate over the steel plate insertion part of the
Before and after passing the steel plate up and down between the tunnels
The ground between the shield tunnels where the steel plate was hung
And a step of excavating.

【0006】[0006]

【作用】而して、セグメント本体に設けた山留鋼板挿入
部にシールドトンネルの内側から山留鋼鈑を挿入するこ
とにより、山留鋼鈑をシールドトンネル間に容易に掛け
渡すことができる。
By inserting the steel plate from the inside of the shield tunnel into the steel plate insertion portion provided in the segment body, the steel plate can be easily bridged between the shield tunnels.

【0007】[0007]

【実施例】以下、本発明の一実施例を図面に基づいて説
明する。図1は本発明の第1実施例のセグメントの斜視
図、図2は同断面図、図3の(1)は山留鋼板挿入部の
正面図、同図の(2)は山留鋼板挿入部を開放した正面
図、同図の(3)は山留鋼板挿入部に山留鋼板を挿入し
た正面図、図6の(1)及び(2)は隣接したシールド
トンネル間に山留鋼板鋼を掛け渡した断面図である。
An embodiment of the present invention will be described below with reference to the drawings. FIG. 1 is a perspective view of a segment according to a first embodiment of the present invention, FIG. 2 is a sectional view of the same, FIG. 3 (1) is a front view of a retaining steel plate insertion portion, and FIG. The front view with the part opened, (3) is a front view in which the buckled steel plate is inserted into the buckled steel plate insertion part, and (1) and (2) in FIG. 6 are the buckled steel plate between adjacent shield tunnels. FIG.

【0008】本発明の第1実施例のセグメント1は鋼製
セグメントであり、周面にフランジ1aが突設され、こ
のフランジ1aにはセグメント同士を接続するためのボ
ルト孔1bを備えるとともに、前面に山留鋼板挿入部2
を備えている。この山留鋼板挿入部2は開口部3がトン
ネルの軸方向に沿って開口され、該開口部3に閉塞板4
が嵌合されてボルト5で接合されている。
The segment 1 according to the first embodiment of the present invention is a steel segment, and has a flange 1a protruding from a peripheral surface thereof. The flange 1a has a bolt hole 1b for connecting the segments and a front surface. Yamadome steel plate insertion part 2
It has. An opening 3 is opened along the axial direction of the tunnel.
Are fitted and joined by bolts 5.

【0009】このボルト5は、図3の(1)に示すよう
に、閉塞板4から補強フランジ4aにかけて連通してナ
ット5aにより仮止めされている。したがって、同図の
(2)に示すように、閉塞板4側のナット5aを外して
ボルト5を引き抜くことにより、閉塞板4を開口部3か
ら取り外すことができる。そして、同図の(3)に示す
ように、開放された開口部3から山留鋼板6を地山へ圧
入した後、その間隙部にモルタル7を充填して再び閉塞
する。
As shown in FIG. 3A, the bolt 5 communicates from the closing plate 4 to the reinforcing flange 4a and is temporarily fixed by a nut 5a. Therefore, as shown in (2) of the figure, by removing the nut 5a on the closing plate 4 side and pulling out the bolt 5, the closing plate 4 can be removed from the opening 3. Then, as shown in (3) of the figure, after the steel plate 6 is press-fitted into the ground through the opened opening 3, the gap is filled with mortar 7 and closed again.

【0010】図4に示すものは、本発明のセグメント1
を用いてシールドトンネル8を覆工したものであり、本
発明のセグメント1同士及びその他のセグメント9とは
それぞれボルト接合されている。また本発明のセグメン
ト1はシールドトンネル8の上下部に組み立てられるこ
とにより、シールドトンネル8の軸方向に沿って山留鋼
板挿入部2が連続的に形成される。
FIG. 4 shows a segment 1 of the present invention.
The segments 1 of the present invention are bolted to each other and to the other segments 9. In addition, the segment 1 of the present invention is assembled at the upper and lower portions of the shield tunnel 8, so that the steel plate insertion portion 2 is continuously formed along the axial direction of the shield tunnel 8.

【0011】次に、これらのセグメント1を使用して構
築したシールドトンネル8を接合する場合について説明
する。これは図5に示すような矩形状のシールド掘進機
10で、適宜間隔をもって削孔した立坑間に並列かつ近
接したトンネルを掘削し、そこに鋼製セグメントを覆工
して断面矩形のシールドトンネル8を構築する。このシ
ールドトンネル8は、図6の(1)に示すように、トン
ネル8の対向面のみに本発明のセグメント1を連続的に
覆工し、残りは通常のセグメント9を覆工して構築され
る。
Next, the case where the shield tunnel 8 constructed by using these segments 1 is joined will be described. This is a rectangular shield excavator 10 as shown in FIG. 5, where tunnels are juxtaposed in parallel and close to each other between shafts drilled at appropriate intervals, and steel segments are wrapped there. Build 8. As shown in (1) of FIG. 6, the shield tunnel 8 is constructed by continuously covering the segment 1 of the present invention only on the facing surface of the tunnel 8 and covering the normal segment 9 for the rest. You.

【0012】そして、これらのシールドトンネル8を構
築したら、これら両トンネル8の上下部における山留鋼
板挿入部2の閉塞板4を取り外して開口部3を開放す
る。そして、一方のシールドトンネル8の開口部3から
他方のシールドトンネル8の開口部3にかけて山留鋼板
6を圧入して掛け渡し、開口部3をモルタル7で閉塞す
る。次に、シールドトンネル8間に山留鋼板6を掛け渡
した後、一方の立坑側から他方に向けて地山11の掘削
を行う。この場合、必要に応じて地盤改良を施して止水
し、工事の安全性を図る。
When these shield tunnels 8 are constructed, the closing plate 4 of the buckling steel plate insertion portion 2 at the upper and lower portions of both tunnels 8 is removed to open the opening 3. The steel plate 6 is press-fitted from the opening 3 of one shield tunnel 8 to the opening 3 of the other shield tunnel 8 and bridged, and the opening 3 is closed with a mortar 7. Next, after spanning the steel plate 6 between the shield tunnels 8, the ground 11 is excavated from one shaft to the other. In this case, if necessary, the ground will be improved and the water will be stopped to improve the safety of the construction.

【0013】図6の(2)は近接して構築したシールド
トンネル8の一方が小さい場合の接合について説明する
ものである。この場合は大きいシールドトンネル8を本
発明のセグメントで構築することにより、前記と同様の
方法でシールドトンネル8間に山留鋼板6を掛け渡すも
のであり、該山留鋼板6の一端は小さいシールドトンネ
ル8の上下にそれぞれ載置される。
FIG. 6 (2) illustrates the joining in the case where one of the shield tunnels 8 constructed close to each other is small. In this case, by constructing a large shield tunnel 8 with the segments of the present invention, the steel plate 6 is bridged between the shield tunnels 8 in the same manner as described above, and one end of the steel plate 6 has a small shield. They are placed above and below the tunnel 8, respectively.

【0014】図7は第2実施例のセグメントの断面図で
あり、これは開口部3を山留鋼板6の圧入力で破断可能
な閉塞板4で閉塞し、該閉塞板4を主桁12aで補強し
て形成したものである。この閉塞板4はプラスチック材
及び硬質紙等で形成され、その内側が取外自在な主桁1
2aで補強されると共に、該主桁12aも上下の主桁1
2bで補強されている。そして、山留鋼板6を掛け渡す
場合は、前記主桁12aを取り外して閉塞板4の上から
山留鋼板6を押圧すると、その押圧力で閉塞板4が破断
されて地山11に圧入される。またこの山留鋼板6のそ
の他の掛け渡しは、前記の第1実施例と同様の方法で掛
け渡される。
FIG. 7 is a sectional view of a segment of the second embodiment, in which the opening 3 is closed by a closing plate 4 which can be broken by press-fitting of a steel plate 6 and the closing plate 4 is closed by a main girder 12a. It is formed by reinforcing with. The closing plate 4 is formed of a plastic material, hard paper, or the like, and has a detachable main girder 1 inside.
2a, and the main girder 12a is also
2b. In the case of bridging the retaining steel plate 6, when the main girder 12a is removed and the retaining steel plate 6 is pressed from above the closing plate 4, the closing plate 4 is broken by the pressing force and pressed into the ground 11. You. Further, the other bridging of the ridged steel plate 6 is performed in the same manner as in the first embodiment.

【0015】図8は第3実施例のセグメント1の断面図
であり、これは山留鋼板挿入部2がテープ13で閉塞さ
れた開口部3の内側に、取外自在なカバー14を備えた
ボックス15を設け、該ボックス15内にグリス16を
封入して形成されたものである。前記テープ13及びグ
リス16は裏込材の浸入を防止するためのものであり、
ボックス15のカバー14はボルト14aで固定されて
いる。そして、山留鋼板6を掛け渡す場合は、前記カバ
ー14を取り外してボックス15内に山留鋼板6を押圧
すると、その押圧力でテープ13が破断されて地山11
に圧入される。またその他の山留鋼板6の掛け渡しは、
前記の第1実施例と同様の方法で掛け渡される。
FIG. 8 is a sectional view of the segment 1 of the third embodiment. The segment 1 is provided with a removable cover 14 inside the opening 3 in which the steel plate insertion portion 2 is closed with the tape 13. A box 15 is provided, and grease 16 is sealed in the box 15. The tape 13 and the grease 16 are for preventing penetration of the backing material,
The cover 14 of the box 15 is fixed with bolts 14a. When the steel plate 6 is to be wrapped around, the cover 14 is removed and the steel plate 6 is pressed into the box 15.
Press-fit. In addition, bridging of the other steel plate 6
It is bridged in the same manner as in the first embodiment.

【0016】[0016]

【発明の効果】セグメント本体にトンネルの長さ方向
沿って開口される山留鋼板挿入部を設けたことにより、
近接して構築したシーリドトンネル間へ山留鋼板を容易
に掛け渡すことができる。
According to the present invention, since the segment main body is provided with a retaining steel plate insertion portion which is opened along the length direction of the tunnel,
Close to between sea Lido tunnel was constructed the YamaTome steel plate can be passed easily over.

【0017】山留鋼板挿入部の開口部に山留鋼板の圧入
力で破断可能な閉塞板を閉塞したことにより、山留鋼板
の地山への挿入を容易に行うことができる。
Since the closing plate that can be broken by press-fitting the fastening steel plate is closed at the opening of the insertion portion of the fastening steel plate, the fastening steel plate can be easily inserted into the ground.

【0018】山留鋼板挿入部はテープで閉塞された開口
部の内側に、取外自在なカバーを備えたボックスを設
け、該ボックス内にグリスが封入されたことにより、裏
込材の浸入を防止できると共に鋼矢板のスライドを容易
に行うことができる。
The insertion portion of the retaining steel plate is provided with a box provided with a removable cover inside the opening closed by the tape, and the box is filled with grease to prevent penetration of the backing material. It is possible to prevent the sliding and to easily slide the steel sheet pile.

【図面の簡単な説明】[Brief description of the drawings]

【図1】セグメントの斜視図である。FIG. 1 is a perspective view of a segment.

【図2】セグメントの断面図である。FIG. 2 is a sectional view of a segment.

【図3】(1)〜(3)は山留鋼板挿入部の一部省略正
面図である。
FIGS. 3 (1) to (3) are partially omitted front views of an insertion portion of a retaining steel plate.

【図4】シールドトンネルの斜視図である。FIG. 4 is a perspective view of a shield tunnel.

【図5】シールド掘進機の正面図である。FIG. 5 is a front view of the shield machine.

【図6】(1)及び(2)は覆工したシールドトンネル
の断面図である。
FIGS. 6 (1) and (2) are cross-sectional views of a shield tunnel that has been lining.

【図7】第2実施例のセグメントの山留鋼板挿入部の断
面図である。
FIG. 7 is a cross-sectional view of an insertion portion of a ridged steel plate of a segment according to a second embodiment.

【図8】第3実施例のセグメントの山留鋼板挿入部の断
面図である。
FIG. 8 is a cross-sectional view of a portion of the segment retaining steel plate insertion portion of the third embodiment.

【図9】従来の接合工法を示すシールドトンネルの断面
図である。
FIG. 9 is a sectional view of a shield tunnel showing a conventional joining method.

【符号の説明】[Explanation of symbols]

1 セグメント 2 山留鋼板挿入部 3 開口部 4 閉塞板 8 シールドトンネル 12a、12b 主桁 13 テープ 14 カバー 15 ボックス 16 グリス DESCRIPTION OF SYMBOLS 1 Segment 2 Insert part of steel plate 3 Opening 4 Closure plate 8 Shield tunnel 12a, 12b Main girder 13 Tape 14 Cover 15 Box 16 Grease

───────────────────────────────────────────────────── フロントページの続き (72)発明者 谷口 徹 東京都中央区京橋1−7−1 戸田建設 株式会社内 (72)発明者 中川 雅弘 東京都中央区京橋1−7−1 戸田建設 株式会社内 (72)発明者 舘川 裕次 東京都中央区京橋1−7−1 戸田建設 株式会社内 (72)発明者 請川 誠 東京都中央区京橋1−7−1 戸田建設 株式会社内 (72)発明者 福若 雅一 東京都千代田区内幸町2丁目2番3号 川崎製鉄株式会社 東京本社内 (72)発明者 平本 高志 東京都千代田区内幸町2丁目2番3号 川崎製鉄株式会社 東京本社内 (72)発明者 小林 秀幸 東京都千代田区内幸町2丁目2番3号 川崎製鉄株式会社 東京本社内 (72)発明者 橋本 修身 東京都千代田区内幸町2丁目2番3号 川崎製鉄株式会社 東京本社内 (56)参考文献 特開 平4−309693(JP,A) 特公 昭50−37448(JP,B2) 特公 昭55−44839(JP,B2) (58)調査した分野(Int.Cl.6,DB名) E21D 11/04 E21D 9/04 E21D 9/06 301 ────────────────────────────────────────────────── ─── Continued on the front page (72) Inventor Toru Taniguchi 1-7-1 Kyobashi, Chuo-ku, Tokyo Toda Construction Co., Ltd. (72) Inventor Masahiro Nakagawa 1-7-1 Kyobashi, Chuo-ku, Tokyo Toda Construction Co., Ltd. (72) Inventor Yuji Tategawa 1-7-1 Kyobashi, Chuo-ku, Tokyo Toda Construction Co., Ltd. (72) Inventor Makoto Enkawa 1-7-1 Kyobashi, Chuo-ku, Tokyo Toda Construction Co., Ltd. (72) Inventor Masakazu Fukuwaka 2-3-2 Uchisaiwaicho, Chiyoda-ku, Tokyo Kawasaki Steel Corporation Tokyo headquarters (72) Inventor Takashi Hiramoto 2-3-2 Uchisaiwaicho, Chiyoda-ku Tokyo Tokyo headquarters (72) Inventor Hideyuki Kobayashi 2-3-2 Uchisaiwai-cho, Chiyoda-ku, Tokyo Kawasaki Steel Corporation Tokyo Main Office (72) Inventor Osamu Hashimoto 2-Uchisaiwai-cho, Chiyoda-ku, Tokyo No.2-3 Kawasaki Steel Corporation Tokyo Head Office (56) References JP-A-4-309693 (JP, A) JP-B-50-37448 (JP, B2) JP-B-55-44839 (JP, B2) (58) Field surveyed (Int.Cl. 6 , DB name) E21D 11/04 E21D 9/04 E21D 9/06 301

Claims (4)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 並列かつ近接して構築された断面矩形の
シールドトンネルを接合するために用いられるセグメン
トであって、該セグメントにトンネルの長さ方向に沿っ
て山留鋼板挿入部が開口され、該山留鋼板挿入部が前記
山留鋼板の圧入力で破断可能な閉塞板で閉塞されたこと
を特徴とするトンネル接合用セグメント。
1. A rectangular cross-section constructed in parallel and close to
Segments used to join shield tunnels
Along the length of the tunnel
The mountain retaining steel plate insertion portion is opened, and the mountain retaining steel plate insertion portion is
Blocked by a closing plate that can be broken by press-fitting of a steel plate
A segment for a tunnel junction characterized by the following.
【請求項2】 並列かつ近接して構築された断面矩形の
シールドトンネルを接合するために用いられるセグメン
トであって、該セグメントにトンネルの長さ方向に沿っ
て山留鋼板挿入部が開口され、該山留鋼板挿入部の前面
側がテープで閉塞されるとともに、山留鋼板挿入部の裏
面側には取外自在なカバーを備えたボックスが設けら
れ、該ボックス内にグリスが封入されたことを特徴とす
るトンネル接合用セグメント。
2. A rectangular cross section constructed in parallel and close to each other.
Segments used to join shield tunnels
Along the length of the tunnel
The steel plate insertion part is opened, and the front surface of the steel plate insertion part is opened.
Side is closed with tape, and the back of the
On the front side, a box with a removable cover is provided.
Grease is enclosed in the box.
For tunnel junction.
【請求項3】 並列かつ近接した断面矩形のトンネルに
セグメントを覆工するとともに、前記トンネルの対向面
の上下部には、該トンネルの長さ方向に沿って山留鋼板
挿入部が設けられたセグメントを覆工してシールドトン
ネルを構築する工程と、一方のトンネルの山留鋼板挿入
部から他方のトンネルの山留鋼板挿入部にかけて山留鋼
板を掛け渡してシールドトンネル間の上下に山留鋼板を
掛け渡す工程と、前記山留鋼板が掛け渡されたシールド
トンネル間の地山を掘削する工程とからなることを特徴
とするトンネル接続方法。
3. A tunnel having a rectangular cross section which is parallel and close to each other.
Lining the segment and facing the tunnel
At the top and bottom, along the length of the tunnel,
Lining the segment where the insertion part was provided and shielding ton
Tunnel construction process and insertion of steel plate at one tunnel
From the part to the other part of the tunnel
Hang the steel plate up and down between the shield tunnels
Spanning step and the shield over which the stake steel sheet is spanned
Excavating the ground between tunnels
And the tunnel connection method.
【請求項4】 請求項3において、前記山留鋼板を掛け
渡す工程の後に、山留鋼板が挿入された山留鋼板挿入部
にモルタルを充填することを特徴とするトンネル接続方
法。
4. The method according to claim 3, wherein the steel plate is hung.
After the passing process, the buckled steel plate insertion part where the buckled steel plate is inserted
Connection method characterized by filling mortar into the surface
Law.
JP5052274A 1993-03-12 1993-03-12 Tunnel junction segment and tunnel connection method Expired - Lifetime JP2989412B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP5052274A JP2989412B2 (en) 1993-03-12 1993-03-12 Tunnel junction segment and tunnel connection method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP5052274A JP2989412B2 (en) 1993-03-12 1993-03-12 Tunnel junction segment and tunnel connection method

Publications (2)

Publication Number Publication Date
JPH06264693A JPH06264693A (en) 1994-09-20
JP2989412B2 true JP2989412B2 (en) 1999-12-13

Family

ID=12910209

Family Applications (1)

Application Number Title Priority Date Filing Date
JP5052274A Expired - Lifetime JP2989412B2 (en) 1993-03-12 1993-03-12 Tunnel junction segment and tunnel connection method

Country Status (1)

Country Link
JP (1) JP2989412B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5775838B2 (en) * 2012-03-08 2015-09-09 大成建設株式会社 Tunnel construction method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5037448B2 (en) 2008-08-07 2012-09-26 Necパーソナルコンピュータ株式会社 Display device, electronic device and control program
JP5544839B2 (en) 2009-11-24 2014-07-09 コーア株式会社 Resistance value adjustment method for resistors

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5037448B2 (en) 2008-08-07 2012-09-26 Necパーソナルコンピュータ株式会社 Display device, electronic device and control program
JP5544839B2 (en) 2009-11-24 2014-07-09 コーア株式会社 Resistance value adjustment method for resistors

Also Published As

Publication number Publication date
JPH06264693A (en) 1994-09-20

Similar Documents

Publication Publication Date Title
US4585678A (en) Steel sheet pile, sheet pile assembly thereof and the method of constructing the assembly
JP3705903B2 (en) Earth anchor combined earth retaining structure
JP2989412B2 (en) Tunnel junction segment and tunnel connection method
JP3628411B2 (en) segment
JP2935941B2 (en) segment
JP2989413B2 (en) Tunnel junction segment, tunnel junction structure and tunnel connection method
JP3233859B2 (en) Tunnel connection method
JP3131119B2 (en) How to stop water at a pipe propulsion wellhead
JP2670486B2 (en) Structure of tubular wall for digging hole lining
JP3709227B2 (en) Invasion prevention method for backfill material of submerged box joint
JP2891915B2 (en) Tunnel connection method and tunnel connection segment
JP2554933B2 (en) Composite section shield method
JP4197383B2 (en) Underground continuous wall
JP2849360B2 (en) Shaft casing in propulsion method
JP2698317B2 (en) Tunnel connection method and tunnel connection segment
JPH09268588A (en) Seismic retrofitting method for submerged tunnel
JP3494253B2 (en) Concrete box for underground structure construction
JPH0640715Y2 (en) Joint structure between branch segment and branch support in tubular wall for lining
JP3211670B2 (en) Segment with earth retaining plate
JPH078634Y2 (en) Cylindrical wall for lining drill holes
JPH06158980A (en) Method and device for starting shield machine and arriving method and device for the same
JP4191536B2 (en) How to construct a confluence of shield tunnels
JP3240264B2 (en) Segment piece for tunnel connection and tunnel connection method
JP2777540B2 (en) Tunnel connection method and tunnel connection segment
SU887753A1 (en) Sealing gasket for extension joints of concrete structures