Construction method of foundation with foundation for building

Info

Publication number
JP2997986B2
JP2997986B2 JP6244662A JP24466294A JP2997986B2 JP 2997986 B2 JP2997986 B2 JP 2997986B2 JP 6244662 A JP6244662 A JP 6244662A JP 24466294 A JP24466294 A JP 24466294A JP 2997986 B2 JP2997986 B2 JP 2997986B2
Authority
JP
Japan
Prior art keywords
base
foundation
concrete
rising portion
attachment member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP6244662A
Other languages
Japanese (ja)
Other versions
JPH0882005A (en
Inventor
益弘 飯田
Original Assignee
株式会社エイビーシー技建
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社エイビーシー技建 filed Critical 株式会社エイビーシー技建
Priority to JP6244662A priority Critical patent/JP2997986B2/en
Publication of JPH0882005A publication Critical patent/JPH0882005A/en
Application granted granted Critical
Publication of JP2997986B2 publication Critical patent/JP2997986B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、建築物、特に、ツーバ
イフォー住宅(枠組壁工法)における土台付き基礎の構
築方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of constructing a foundation with a base in a building, in particular, a two-by-four house (frame wall method).

【0002】[0002]

【従来の技術】従来、ツーバイフォー住宅は、図4に示
すように、栗石1を被覆して形成された捨コンクリート
層2の上に座部3aと立上り部3bを有する断面ほぼ逆
T字形の鉄筋コンクリート製の基礎3が構築され、該基
礎3の上に土台4が設置されている。前記基礎3は、概
ね下半部が土5に埋入され、室内側には防湿フィルム6
を介して防湿コンクリート層7が設けられている。基礎
3の立上り部3bにはアンカーボルト8が埋入されてお
り、該立上り部3bの頂面に形成された天端モルタル層
9からアンカーボルト8の上端部8aを突出せしめてい
る。
2. Description of the Related Art Conventionally, as shown in FIG. 4, a two-by-four house is a reinforced concrete having a substantially inverted T-shaped cross section having a seat portion 3a and a rising portion 3b on a discarded concrete layer 2 formed by covering a chestnut stone 1. A foundation 3 made of steel is constructed, and a base 4 is placed on the foundation 3. The base 3 is generally buried in the lower half in the soil 5 and has a moisture-proof film 6 on the indoor side.
A moisture-proof concrete layer 7 is provided through the base. An anchor bolt 8 is embedded in a rising portion 3b of the foundation 3, and an upper end portion 8a of the anchor bolt 8 protrudes from a top mortar layer 9 formed on the top surface of the rising portion 3b.

【0003】前記アンカーボルト8は、基礎3の長手方
向に所定間隔をおいて多数本が列設されている。そこ
で、基礎3を構築した後、土台4を設置するに際して
は、土台4に孔4aを穿孔し、該孔4aにアンカーボル
ト8の上端部8aを挿通せしめながら土台4を天端モル
タル層9の上に設置し、ナットを締結する。尚、符号1
0は根太、11は床板である。
A large number of the anchor bolts 8 are arranged at predetermined intervals in the longitudinal direction of the foundation 3. Therefore, when the base 4 is installed after the foundation 3 is constructed, a hole 4a is formed in the base 4 and the base 4 is attached to the top mortar layer 9 while the upper end 8a of the anchor bolt 8 is inserted through the hole 4a. Install on top and fasten nuts. Note that reference numeral 1
0 is a joist and 11 is a floorboard.

【0004】前記基礎3は、図5に示す工程を経て構築
される。即ち、先ず、図5(A)に示すように、捨コン
クリート層2の上で組付けた一対の仮枠12、12間に
おいて配筋を行うと共にコンクリートを打設し、養生せ
しめることにより基礎3の座部3aを形成し、仮枠1
2、12を取り外す。
The foundation 3 is constructed through the steps shown in FIG. That is, first, as shown in FIG. 5 (A), reinforcement is provided between a pair of temporary frames 12 and 12 assembled on the discarded concrete layer 2 and concrete is cast and cured to cure the foundation 3. Of the temporary frame 1
Remove 2,12.

【0005】次いで、図5(B)に示すように、前記座
部3aの上で組付けた一対の仮枠13、13間において
配筋を行うと共にコンクリートを打設することにより基
礎3の立上り部3bを形成する。この際、立上り部3b
にアンカーボルト8を埋入せしめ、養生後、仮枠13、
13を取り外す。
Next, as shown in FIG. 5 (B), reinforcement is provided between the pair of temporary frames 13 and 13 assembled on the seat portion 3a, and concrete is poured into the temporary frames 13 so that the foundation 3 rises. The part 3b is formed. At this time, the rising portion 3b
An anchor bolt 8 is embedded in the temporary frame 13 after curing.
13 is removed.

【0006】ところで、立上り部3bは、図6(A)に
示すように、天端14を波打ち状或いは凹凸状の粗面と
しており、土台4の底面の全面を水平に支持するために
適しないから、前述のような天端モルタル層9を形成し
なければならない。このため、図6(A)に示すよう
に、立上り部3bの両側面に逃げ墨15を打ち、所定寸
法幅の板16を逃げ墨15に沿って添設する。立上り部
3bの両側面に添設された板16、16は、図5(C)
に示すように、仮止め治具17によりクランプされて立
上り部3bに固定される。そこで、板16、16の頂端
一杯までモルタルを塗り均すことにより、天端モルタル
層9を形成し、板16、16を取り外すことにより基礎
3の構築作業を完了し、その後、前記天端モルタル層9
の上に土台4を設置する。
As shown in FIG. 6 (A), the rising portion 3b has a wavy or uneven rough surface at the top end 14 and is not suitable for horizontally supporting the entire bottom surface of the base 4. Therefore, the top mortar layer 9 as described above must be formed. For this reason, as shown in FIG. 6A, the relief black 15 is hit on both sides of the rising portion 3 b, and a plate 16 having a predetermined width is attached along the relief black 15. The plates 16, 16 attached to both sides of the rising portion 3b are shown in FIG.
As shown in (1), it is clamped by the temporary fixing jig 17 and fixed to the rising portion 3b. Therefore, the top end mortar layer 9 is formed by spreading the mortar to the top of the plates 16, 16 to fill the entire top end, and the construction work of the foundation 3 is completed by removing the plates 16, 16. Layer 9
The base 4 is set on the.

【0007】[0007]

【発明が解決しようとする課題】上記従来技術では、基
礎3を完成するまでの施工上、天端モルタル層9を形成
することが不可欠であり、作業工程が煩雑である。即
ち、前述のように、立上り部3bを形成した後、逃げ墨
15の墨出し作業と、板16、16の添設作業と、モル
タル塗り作業及び均し作業を必要とする。このため、工
期短縮や、コストダウンを図ることが困難である。
In the above prior art, it is indispensable to form the top mortar layer 9 in the construction until the foundation 3 is completed, and the work process is complicated. That is, as described above, after forming the rising portion 3b, it is necessary to perform the work of marking out the escape black ink 15, the work of attaching the plates 16, 16, the mortar painting work, and the smoothing work. For this reason, it is difficult to reduce the construction period and cost.

【0008】また、基礎3の立上り部3bに対し直接に
土台4を支承せしめるのではなく、該土台4を脆弱な天
端モルタル層9に支承せしめるので、重荷重が作用する
とき天端モルタル層9がひび割れする虞れがある。しか
も、もしも、天端モルタル層9の表面が水平なフラット
でなく、波打ち状であったり、傾斜して形成されている
と、後に設置した土台4自体が建築物の荷重を好適に支
持することができず、品質上の問題を生じる。
In addition, since the base 4 is not directly supported on the rising portion 3b of the foundation 3 but is supported by the fragile top mortar layer 9, the top mortar layer is subjected to a heavy load. 9 may be cracked. In addition, if the surface of the top mortar layer 9 is not horizontal and flat, but is wavy or inclined, the base 4 itself installed later suitably supports the load of the building. Cannot be performed, which causes quality problems.

【0009】しかも、前述のように、基礎3を構築する
際にアンカーボルト8を植設し、その後に土台4を設置
する構成であるから、土台4を設置するに先立ち該土台
4に孔4aを穿孔するに際し、該孔4aをアンカーボル
ト8の位置に対応させながら測定しつつ穿孔しなければ
ならず、作業が困難である。換言すれば、多数本のアン
カーボルト8は、設計上は、基礎3の長手方向に所定間
隔寸法の下に植設されるが、実際の現場ではその間隔寸
法に若干の誤差を生じることが不可避であり、このた
め、土台4に形成すべき孔4aの位置を現場で測定し確
認しながら穿孔作業を行わなければならない。
Further, as described above, the anchor 4 is planted when the foundation 3 is constructed, and then the base 4 is installed. Therefore, the holes 4a are formed in the base 4 before the base 4 is installed. When drilling a hole, the hole 4a must be drilled while measuring while corresponding to the position of the anchor bolt 8, which is difficult to perform. In other words, many anchor bolts 8 are planted below the predetermined interval in the longitudinal direction of the foundation 3 by design, but it is inevitable that a slight error occurs in the interval at the actual site. Therefore, the drilling operation must be performed while measuring and confirming the position of the hole 4a to be formed in the base 4 on site.

【0010】[0010]

【課題を解決するための手段】 本発明は、上記課題を
解決した土台付き基礎の構築方法を提供するものであ
り、その手段として構成したところは、一対の仮枠3
3、33間の打設空間にコンクリートを打設して基礎立
上り部23bを形成するに際し:アンカーボルト28を
垂設した土台24を室外側に位置する仮枠33の内側面
に添え部材34を介して仮止めすることにより、該土台
24と添え部材31の底面を面一とした状態で前記打設
空間の室外側寄りに配置し固定すると共に、土台24の
室内側に位置して打設空間の上部開口Uを開放せしめる
工程と;その後、前記上部開口よりコンクリートを打設
し打設空間内に充填せしめると共に、該コンクリートを
前記上部開口Uの近傍において土台24底面よりも上位
に盛上るように充填せしめる工程と;打設されたコンク
リートを養生せしめ、前記アンカーボルト28を埋入し
且つ土台24の底部を支持する基礎23の立上り部23
bを形成せしめる工程とから成り、その後、前記添え部
材31と共に仮枠33、33を取外すことにより、土台
24の底部を支持する基礎立上り部23bを形成せしめ
ると共に、該基礎立上り部23bの室外側部位37の頂
面に、土台24の底面から面一状態で室外側に水平面と
して延びる外壁代36を形成せしめる点にある。
Means for Solving the Problems The present invention provides a method of constructing a foundation with a base, which solves the above-mentioned problems.
When concrete is cast in the casting space between 3 and 33 to form the foundation rising portion 23b: The base 24 on which the anchor bolts 28 are suspended is attached to the inner surface of the temporary frame 33 located outside the room. By temporarily fixing the base 24, the base 24 and the auxiliary member 31 are placed near the outdoor side of the placement space and fixed in a state where the bottom surface of the auxiliary member 31 is flush with the base 24, and the base 24 is positioned on the indoor side of the base 24 and driven. A step of opening the upper opening U of the space; after that, concrete is poured from the upper opening and filled into the casting space, and the concrete rises above the bottom surface of the base 24 near the upper opening U. Upright portion 23 of the foundation 23 for curing the poured concrete, curing the anchor bolt 28 and supporting the bottom of the base 24.
b), and then removing the temporary frames 33, 33 together with the attachment member 31 to form a base.
Forming a base rising portion 23b supporting the bottom of the base 24;
And the top of the outdoor portion 37 of the base rising portion 23b.
On the surface, a horizontal surface on the outdoor side in a state flush with the bottom of the base 24
This is to form an outer wall margin 36 that extends .

【0011】[0011]

【0012】[0012]

【実施例】以下図面に基づいて本発明の1実施例を詳述
する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below in detail with reference to the drawings.

【0013】図1は、本発明方法によりツーバイフォー
住宅において構築した土台付き基礎を示している。栗石
21を被覆して形成された捨コンクリート22の上に
は、座部23aと立上り部23bを有する断面ほぼL字
形の鉄筋コンクリート製の基礎23が構築され、該基礎
23の上に土台24が設置されている。基礎23は、約
3分の1が土25に埋入され、室内側には防湿フィルム
26を介して防湿コンクリート層27が設けられてい
る。基礎23の立上り部23bの頂部において、室外側
寄りに位置してアンカーボルト28が埋入されており、
該アンカーボルト28の上端部28aは土台24の孔2
4aに挿通され、ナットを締結している。このアンカー
ボルト28は基礎23及び土台24の長手方向に所定間
隔をおいて多数本が列設されている。尚、符号30は根
太、31は床板である。
FIG. 1 shows a foundation with a foundation built in a two-by-four house according to the method of the invention. A base 23 made of reinforced concrete having a substantially L-shaped cross section having a seat portion 23a and a rising portion 23b is constructed on a discarded concrete 22 formed by covering the chestnut stone 21, and a base 24 is installed on the base 23. Have been. About one third of the foundation 23 is buried in the soil 25, and a moisture-proof concrete layer 27 is provided on the indoor side via a moisture-proof film 26. At the top of the rising portion 23b of the foundation 23, an anchor bolt 28 is embedded near the outdoor side,
The upper end 28a of the anchor bolt 28 is
4a, and the nut is fastened. A large number of the anchor bolts 28 are arranged at predetermined intervals in the longitudinal direction of the foundation 23 and the base 24. Reference numeral 30 denotes a joist and reference numeral 31 denotes a floor plate.

【0014】前記土台付き基礎は、図2に示す工程を経
て構築される。
The foundation with the base is constructed through the steps shown in FIG.

【0015】先ず、図2(A)に示すように、捨コンク
リート層22の上で組付けた一対の仮枠32、32間に
おいて配筋を行うと共にコンクリートを打設し、養生せ
しめることにより基礎23の座部23aを形成し、仮枠
32、32を取り外す。
First, as shown in FIG. 2 (A), reinforcement is provided between a pair of temporary frames 32, 32 assembled on the discarded concrete layer 22, and concrete is cast and cured to cure the foundation. 23 are formed, and the temporary frames 32, 32 are removed.

【0016】次に、図2(B)に示すように、前記座部
23aの上で組付けた一対の仮枠33、33間により上
部に開口Uを有する打設空間Sを区成する。この打設空
間Sは、図5(B)に示した従来技術よりも幅広であ
り、座部23aの室内側端部に沿って内側の仮枠33が
配置される。尚、仮枠33、33は、周知のセパレータ
金具等により固定される。
Next, as shown in FIG. 2B, a casting space S having an opening U at an upper portion is defined between the pair of temporary frames 33, 33 assembled on the seat portion 23a. This casting space S is wider than the prior art shown in FIG. 5B, and the inner temporary frame 33 is arranged along the indoor side end of the seat 23a. The temporary frames 33 are fixed by a well-known separator metal fitting or the like.

【0017】基礎23の立上り部23bを形成するに先
立ち、土台24には予めアンカーボルト28が垂設され
る。即ち、土台24の長手方向に設計値に基づく寸法に
従って間隔をおいて孔24aを穿孔し、各孔24aにア
ンカーボルト28を挿通せしめナットを締結することに
より、各アンカーボルト28を土台24から下向きに垂
設する。
Prior to forming the rising portion 23b of the foundation 23, an anchor bolt 28 is suspended from the base 24 in advance. That is, holes 24a are drilled at intervals in the longitudinal direction of the base 24 in accordance with the dimensions based on the design values, the anchor bolts 28 are inserted through the holes 24a, and the nuts are fastened. Vertically.

【0018】そこで、前記アンカーボルト28付きの土
台24を前記打設空間Sの開口Uに臨ましめ、室外側寄
りに配置し固定する。従って、土台24の他側、即ち、
室内側では前記開口Uが開放されたままにされている。
図示実施例において、室外側に位置する仮枠33の内側
面には前記開口Uに向けて側方から臨む添え部材34が
設けられており、該添え部材34を介して土台24がボ
ルトその他の固定手段により仮枠33に仮止めされる。
Then, the base 24 with the anchor bolts 28 faces the opening U of the casting space S, and is arranged and fixed near the outdoor side. Therefore, the other side of the base 24, that is,
On the indoor side, the opening U is left open.
In the illustrated embodiment, an attachment member 34 facing the opening U from the side is provided on the inner side surface of the temporary frame 33 located on the outdoor side. It is temporarily fixed to the temporary frame 33 by the fixing means.

【0019】その後、前記開口UよりコンクリートCを
打設し、打設空間S内に充填せしめると共に、該コンク
リートCを前記開口Uの近傍において土台24の底面よ
りも上位に盛上るように充填せしめる。即ち、打設空間
Sに充填されたコンクリートCは、図3に示すように、
土台24の底面から所定寸法Dだけ上位に盛上る隆起部
35を有する。
Thereafter, concrete C is poured from the opening U and filled in the casting space S, and the concrete C is filled so as to rise above the bottom surface of the base 24 near the opening U. . That is, the concrete C filled in the casting space S is, as shown in FIG.
It has a raised portion 35 that rises upward from the bottom surface of the base 24 by a predetermined dimension D.

【0020】この状態で、前記コンクリートCを養生せ
しめると、図3に示すように、隆起部35の自重による
下向き荷重DNを受けて、土台24の下方には上向きの
流動力UPが作用する。このため、コンクリートCは土
台24の下面に密着せしめられながら養生され、土台2
4の下方に巣を生じることはなく充填度が高く、しか
も、土台24を一体化した立上り部23bを形成する。
尚、土台24の室外側には添え部材34が配置されてい
るので、そこからコンクリートCが溢出することはな
い。
When the concrete C is cured in this state, as shown in FIG. 3, it receives a downward load DN due to its own weight of the raised portion 35, and an upward fluid force UP acts below the base 24. For this reason, the concrete C is cured while being brought into close contact with the lower surface of the base 24,
There is no nest below 4 and the filling degree is high, and further, a rising portion 23b in which the base 24 is integrated is formed.
In addition, since the auxiliary member 34 is disposed outside the room of the base 24, the concrete C does not overflow therefrom.

【0021】 その後、前記添え部材34と共に仮枠3
3、33を取り外せば、図2(C)に示すような土台2
4付き基礎23が完成する。図示したように、前記添え
部材34の底面は、土台24の底面と面一に配置されて
いたので、形成された基礎23の立上り部23bは、土
台24の室外側に位置して外壁代36を形成する。
After that, the temporary frame 3 together with the attachment member 34
By removing 3, 33, the base 2 as shown in FIG.
The foundation 23 with 4 is completed. As shown in the drawing, the bottom surface of the attachment member 34 is arranged flush with the bottom surface of the base 24, so that the rising portion 23 b of the formed base 23 is located outside the base 24 and the outer wall margin 36. To form

【0022】[0022]

【発明の効果】本発明によれば、基礎23の立上り部2
3bを形成するに際し、土台24を打設空間Sに配置し
た状態でコンクリートCを打設し、土台24を一体的に
備えた立上り部23bを形成するものであるから、基礎
23を構成する立上り部23bにより直接に土台24を
支持するため強固であり、高品質の土台付き基礎を提供
することができる。
According to the present invention, the rising portion 2 of the foundation 23 is provided.
When forming the base 3b, the concrete C is cast in a state where the base 24 is placed in the setting space S, and the rising portion 23b integrally provided with the base 24 is formed. Since the base 24 is directly supported by the portion 23b, a strong and high-quality base with a base can be provided.

【0023】そして、従来技術のような天端モルタル層
9を形成するためのモルタル塗り作業及び均し作業、並
びにそれに伴う逃げ墨15の墨出し作業等が不要である
から、工期の大幅な短縮と、著しいコストダウンが可能
になる。
Since the mortar coating operation and the leveling operation for forming the top mortar layer 9 as in the prior art, and the associated blacking-out operation of the relief ink 15 are not required, the construction period is greatly reduced. Thus, a significant cost reduction can be achieved.

【0024】しかも、基礎23を構築するに先立ち、予
め土台24にアンカーボルト28をセットできるので、
従来のような厳格な寸法測定を行う必要はなく、穿孔す
る孔24aの位置決めを容易に行うことができる。
Further, since the anchor bolt 28 can be set on the base 24 before the foundation 23 is constructed,
It is not necessary to perform strict dimension measurement as in the related art, and the hole 24a to be drilled can be easily positioned.

【0025】 更に、本発明によれば、アンカーボルト
28付きの土台24をセットした打設空間Sにコンクリ
ートCを打設するに際し、打設空間Sの上部開口Uに近
傍してコンクリートCを土台24の底面よりも上位に盛
上るように充填せしめるものであるから、養生中、盛上
げられた隆起部35の自重による下向き荷重DNにより
土台24の下方にコンクリートCの上向き流動力UPを
作用せしめ、その結果、巣のない立上り部23bを得る
ことができると共に、立上り部23bを土台24の下面
の全面に好適に密着せしめた荷重強度の高い土台付き基
礎を提供することができる。
Further, according to the present invention, when the concrete C is poured into the placing space S in which the base 24 with the anchor bolts 28 is set, the concrete C is placed near the upper opening U of the placing space S. Since the filling is performed so as to rise above the bottom surface of the concrete 24, during the curing, the upward flow force UP of the concrete C is applied below the base 24 by the downward load DN caused by the weight of the raised ridge 35, and As a result, it is possible to obtain the rising portion 23b without a nest, and to provide a foundation with a high load strength in which the rising portion 23b is suitably brought into close contact with the entire lower surface of the base 24.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明方法の1実施例により構築した土台付き
基礎を用いた建築物を示す断面図である。
FIG. 1 is a sectional view showing a building using a foundation with a base constructed according to an embodiment of the method of the present invention.

【図2】本発明方法の1実施例を示しており、(A)は
基礎の座部を形成するための工程を示す断面図、(B)
は基礎の立上り部を形成するための工程を示す断面図、
(C)は形成後の土台付き基礎を示す断面図である。
FIG. 2 shows one embodiment of the method of the present invention, wherein (A) is a cross-sectional view showing steps for forming a base seat, (B)
Is a cross-sectional view showing a process for forming the rising portion of the foundation,
(C) is sectional drawing which shows the foundation with a base after formation.

【図3】本発明方法の1実施例における基礎の立上り部
を形成する際の作用を示す断面斜視図である。
FIG. 3 is a cross-sectional perspective view showing an operation when forming a rising portion of a foundation in one embodiment of the method of the present invention.

【図4】従来方法により構築した土台付き基礎を用いた
建築物を示す断面図である。
FIG. 4 is a cross-sectional view showing a building using a foundation with a base constructed by a conventional method.

【図5】従来方法を示しており、(A)は基礎の座部を
形成するための工程を示す断面図、(B)は基礎の基礎
の立上り部を形成するための工程を示す断面図、(C)
は立上り部に天端モルタル層を形成するための工程を示
す断面図である。
5A and 5B show a conventional method, in which FIG. 5A is a cross-sectional view showing a process for forming a seat portion of a foundation, and FIG. 5B is a cross-sectional view showing a process for forming a rising portion of the foundation. , (C)
FIG. 4 is a cross-sectional view showing a process for forming a top mortar layer at a rising portion.

【図6】従来方法における天端モルタル層を形成するた
めの工程を示しており、(A)は逃げ墨の墨出し作業を
示す断面斜視図、(B)は天端モルタル塗り作業を示す
断面斜視図である。
6A and 6B show a process for forming a top mortar layer in a conventional method, in which FIG. 6A is a cross-sectional perspective view showing an operation for printing out the escape black ink, and FIG. It is a perspective view.

【符号の説明】[Explanation of symbols]

23 基礎 23a 座部 23b 立上り部 24 土台 24a 孔 28 アンカーボルト 28a 上端部 32 仮枠 33 仮枠 34 添え部材 35 隆起部 REFERENCE SIGNS LIST 23 foundation 23a seat 23b rising part 24 base 24a hole 28 anchor bolt 28a upper end 32 temporary frame 33 temporary frame 34 attachment member 35 ridge

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 一対の仮枠33、33間の打設空間にコ
ンクリートを打設して基礎立上り部23bを形成するに
際し: アンカーボルト28を垂設した土台24を室外側に位置
する仮枠33の内側面に添え部材34を介して仮止めす
ることにより、該土台24と添え部材31の底面を面一
とした状態で前記打設空間の室外側寄りに配置し固定す
ると共に、土台24の室内側に位置して打設空間の上部
開口Uを開放せしめる工程と; その後、前記上部開口よりコンクリートを打設し打設空
間内に充填せしめると共に、該コンクリートを前記上部
開口Uの近傍において土台24底面よりも上位に盛上る
ように充填せしめる工程と; 打設されたコンクリートを養生せしめ、前記アンカーボ
ルト28を埋入し且つ土台24の底部を支持する基礎2
3の立上り部23bを形成せしめる工程とから成り、 その後、前記添え部材31と共に仮枠33、33を取外
すことにより、土台24の底部を支持する基礎立上り部
23bを形成せしめると共に、該基礎立上り部23bの
室外側部位37の頂面に、土台24の底面から面一状態
で室外側に水平面として延びる外壁代36を形成せしめ
ことを特徴とする建築物における土台付き基礎の構築
方法。
When a concrete is cast in a space between a pair of temporary frames 33, 33 to form a foundation rising portion 23b: a temporary frame in which an anchor bolt 28 is suspended is positioned outside the room. By temporarily fixing the inner surface of the base 33 via the attachment member 34 via the attachment member 34, the base 24 and the attachment member 31 are arranged and fixed near the outdoor side of the casting space with the bottom surfaces of the attachment member 31 flush with each other. A step of opening the upper opening U of the casting space located on the indoor side of the vehicle; then, casting concrete from the upper opening and filling the casting space, and placing the concrete in the vicinity of the upper opening U. A step of filling so as to rise above the bottom of the base 24; curing the cast concrete, embedding the anchor bolts 28, and supporting the bottom of the base 24;
3) forming a rising portion 23b, and then removing the temporary frames 33, 33 together with the attachment member 31, thereby forming a base rising portion for supporting the bottom of the base 24.
23b, and the base rising portion 23b is formed.
The top surface of the outdoor portion 37 is flush with the bottom surface of the base 24.
To form an outer wall allowance 36 extending as a horizontal surface outside the room
How to build a foundation with a foundation in the building, characterized in that that.
JP6244662A 1994-09-12 1994-09-12 Construction method of foundation with foundation for building Expired - Lifetime JP2997986B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP6244662A JP2997986B2 (en) 1994-09-12 1994-09-12 Construction method of foundation with foundation for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP6244662A JP2997986B2 (en) 1994-09-12 1994-09-12 Construction method of foundation with foundation for building

Publications (2)

Publication Number Publication Date
JPH0882005A JPH0882005A (en) 1996-03-26
JP2997986B2 true JP2997986B2 (en) 2000-01-11

Family

ID=17122092

Family Applications (1)

Application Number Title Priority Date Filing Date
JP6244662A Expired - Lifetime JP2997986B2 (en) 1994-09-12 1994-09-12 Construction method of foundation with foundation for building

Country Status (1)

Country Link
JP (1) JP2997986B2 (en)

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58108007U (en) * 1982-01-20 1983-07-22 ミサワホ−ム株式会社 Anchor bolt embedded structure

Also Published As

Publication number Publication date
JPH0882005A (en) 1996-03-26

Similar Documents

Publication Publication Date Title
JP5576207B2 (en) Installation foundation and its construction method
US20090178353A1 (en) Method and apparatus for setting support columns within a foundation
JP4641328B1 (en) Seismic isolation device mounting method and mounting structure
US6435760B1 (en) Quick re-install bumper guard system and method
JP3899366B1 (en) Boxing formwork and boxing method using the same
KR100787178B1 (en) Lightweight steel frame base plate and construction method
JP2997986B2 (en) Construction method of foundation with foundation for building
JP2619781B2 (en) Method and apparatus for installing handrails in concrete buildings
KR102787345B1 (en) Outdoor air conditioner equipment base construction method using precast concrete member
US6921501B2 (en) Method of forming a circumferentially closed concrete wall having the same cross-section over the entire height thereof
KR100450113B1 (en) Structure for molding a stairs of building
JP2022045148A (en) Form for temporary opening
JP2000129953A (en) Fitting method of base isolation device to foundation
US4355927A (en) Piling structure and methods
JP3000448B2 (en) Construction method of protruding independent stairs
JP7535269B2 (en) Manhole cover frame
JP2979122B2 (en) How to install anchor bolts for seismic isolation devices
JP2950393B2 (en) Side groove
JPH0988083A (en) Grout filling method for the lower end of column base and mold for forming the grout filling recess used for it
JP3133356B2 (en) Handrail mounting method
JP2001182013A (en) Precast concrete reaction wall body for bridge and bridge support device using this wall body and installing method therefor
JP2002364139A (en) Steel stair mounting hardware, mounting device and mounting method
KR200268236Y1 (en) Structure for molding a stairs of building
JP4145733B2 (en) Exterior wall construction method
EP0974436B1 (en) Method for manufacturing a facade and assembly of section elements for use in the method