JP3007516B2 - Supply pipe blockage method - Google Patents
[go: Go Back, main page]

JP3007516B2 - Supply pipe blockage method - Google Patents

Supply pipe blockage method

Info

Publication number
JP3007516B2
JP3007516B2 JP5228603A JP22860393A JP3007516B2 JP 3007516 B2 JP3007516 B2 JP 3007516B2 JP 5228603 A JP5228603 A JP 5228603A JP 22860393 A JP22860393 A JP 22860393A JP 3007516 B2 JP3007516 B2 JP 3007516B2
Authority
JP
Japan
Prior art keywords
supply pipe
pig
lubricant
leading
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP5228603A
Other languages
Japanese (ja)
Other versions
JPH0783379A (en
Inventor
齋藤  健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tokyo Gas Co Ltd
Original Assignee
Tokyo Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyo Gas Co Ltd filed Critical Tokyo Gas Co Ltd
Priority to JP5228603A priority Critical patent/JP3007516B2/en
Publication of JPH0783379A publication Critical patent/JPH0783379A/en
Application granted granted Critical
Publication of JP3007516B2 publication Critical patent/JP3007516B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L55/00Devices or appurtenances for use in, or in connection with, pipes or pipe systems
    • F16L55/10Means for stopping flow in pipes or hoses

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Pipe Accessories (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、都市ガス本管から需要
家のガスメータの所に至る配管、すなわち供給管(供内
管)の閉塞方法に適用される。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention is applied to a method of closing a pipe from a city gas main pipe to a gas meter of a customer, that is, a supply pipe (service pipe).

【0002】[0002]

【従来の技術】都市ガスを需要家に供給する場合には、
通常道路の地下に埋設された本管に取り出し部(サービ
スチー)を設けてこの取り出し部から需要家の敷地内に
供給管を配管するという方法が採られる。
2. Description of the Related Art When supplying city gas to consumers,
A method is generally adopted in which a take-out section (service team) is provided in a main pipe buried under the basement of a road, and a supply pipe is piped from the take-out section to a customer's premises.

【0003】このような供給管は、需要家がガスを使用
する限り使用されるが、例えば家屋の取り壊しとこの敷
地が別の目的に使用されるようになり、ガスの供給が不
必要になった場合には、安全のために供給管を閉塞して
しまうことが行われている。この閉塞方法には、現在次
の2つの方法がある。
[0003] Such a supply pipe is used as long as a customer uses gas. For example, when a house is demolished and this site is used for another purpose, gas supply becomes unnecessary. In such a case, the supply pipe is closed for safety. At present, there are the following two blocking methods.

【0004】a.元整理工法(図3) この工法は、供給管20の取り出し箇所21を掘削し、
供給管20を撤去した後、本管22のサービスチー23
の分岐部24をプラグで閉塞する工法である。
A. Original arrangement method (Fig. 3) This method excavates the take-out point 21 of the supply pipe 20,
After removing the supply pipe 20, the service team 23 of the main pipe 22
Is a method of closing the branch portion 24 with a plug.

【0005】b.樹脂充填工法(図4) この工法は、供給管30の長さを測定して全体の内容積
を求め、この内容積に相当する樹脂Pを圧縮ボンベ3
1、樹脂タンク32を利用して供給管30から本管33
のサービスチー34のところまで充填して固化閉塞する
工法である。
B. Resin filling method (FIG. 4) In this method, the length of the supply pipe 30 is measured to determine the entire internal volume, and the resin P corresponding to the internal volume is supplied to the compression cylinder 3.
1. The main pipe 33 is connected from the supply pipe 30 using the resin tank 32.
This is a method of filling and solidifying and closing up to the service tee 34.

【0006】[0006]

【発明が解決しようとする課題】しかし、上記従来例に
おいては、次のような欠点がある。
However, the above conventional example has the following disadvantages.

【0007】a.元整理工法の場合、道路を掘削するた
め経費が高くなり、又交通止めや工事中騒音が発生する
ことから、周辺の住民に苦痛を与えることになる。
A. In the case of the former rearranging method, excavation of roads increases costs, and traffic stops and noises are generated during construction.

【0008】b.樹脂充填工法の場合、供給管の内容積
の算出は管の長さ×管の標準断面積で行われるが、供給
管30路内には標準とは違った異径管35、エルボ3
6、スリーブ37等が存在することが多いため、算出し
た内容積と実際の内容積に誤差が生じることがある。こ
のため、樹脂量が多い場合には本管33側に樹脂Pが流
れ込んでこの本管33内を閉塞したり、本管33内の抵
抗38となる。一方、樹脂量が少ないと十分な閉塞が行
われなくなる。又、供給管30内全体に樹脂Pを充填す
ると、この樹脂Pの使用量が多くなり、コストがかかる
と共に供給管が劣化していた場合には、充填圧で亀裂や
折損が生じて工法が採用できない場合もある。
B. In the case of the resin filling method, the inner volume of the supply pipe is calculated by the length of the pipe × the standard cross-sectional area of the pipe.
6. Since the sleeve 37 and the like often exist, an error may occur between the calculated internal volume and the actual internal volume. Therefore, when the amount of resin is large, the resin P flows into the main pipe 33 to block the inside of the main pipe 33 or to become a resistance 38 in the main pipe 33. On the other hand, if the amount of resin is small, sufficient blocking will not be performed. Further, when the entirety of the supply pipe 30 is filled with the resin P, the amount of the resin P used increases, and the cost is increased. If the supply pipe is deteriorated, cracks or breakage occur due to the filling pressure, and the construction method becomes difficult. It may not be possible to adopt it

【0009】本発明の目的は、供給管の閉塞方法におい
て、上記したa、bの問題点を解消することである。
An object of the present invention is to solve the above-mentioned problems a and b in a method of closing a supply pipe.

【0010】[0010]

【課題を解決するための手段】本発明に係る供給管の閉
塞方法は次のとおりである。
A method of closing a supply pipe according to the present invention is as follows.

【0011】a.閉塞対称となる供給管の内径より僅か
に大きい直径の高弾性先頭ピグと後方ピグ及び自重で垂
れない粘度を有する潤滑材を用意する、 b.音波を利用してあらかじめ供給管の入口からサービ
スチーの処までの長さを求め、この長さと供給管の内径
から内容積を算出し、更にこの内容積から潤滑材の容積
を差し引くと共に安全率を乗じて求めた分量の水を容れ
た計量器とこの水を供給管内に圧送するためのポンプを
用意する、 c.そして、先ず先頭ピグを供給管内に挿入し、次に潤
滑材を充填し、次に後方ピグを挿入して先頭ピグと後方
ピグ間に潤滑材を保持させる、 d.後方ピグの後方から前記ポンプを利用して水圧をか
けることにより、先頭ピグ、潤滑材、後方ピグを供給管
内に送入する、 e.前記水量の減少と水圧の変化を監視し、水量がほぼ
無くなり、水圧が一定値以上を示したときに先頭ピグが
サービスチーの処に到達したものと判断してポンプの駆
動を止め、先頭ピグと潤滑材、後方ピグをそのまま供給
管内に残すことにより供給管を閉塞する、 f.ことを特徴とする供給管の閉塞方法。
A. Providing a highly elastic leading and trailing pig with a diameter slightly larger than the inner diameter of the supply pipe to be closed symmetrically, and a lubricant having a viscosity that does not drip under its own weight, b. Using sound waves, determine the length from the inlet of the supply pipe to the location of the service tee in advance, calculate the internal volume from this length and the inner diameter of the supply pipe, and then subtract the volume of the lubricant from this internal volume, and set the safety factor. A meter containing a quantity of water determined by multiplying by water and a pump for pumping the water into a supply pipe, c. Then, first insert the leading pig into the supply pipe, then fill the lubricant, then insert the rear pig to hold the lubricant between the leading pig and the rear pig, d. Pumping the leading pig, lubricating material and the rear pig into the supply pipe by applying water pressure using the pump from behind the rear pig, e. The decrease in the water amount and the change in the water pressure are monitored. Block the supply tube by leaving the lubrication material and the rear pig intact in the supply tube, f. A method for closing a supply pipe, characterized in that:

【0012】[0012]

【作用】敷地内供給管の先端から先頭ピグ、潤滑材、後
方ピグの順に挿入し、更に供給管には計量器からポンプ
を経由して延長したホースを接続して作業の準備を終わ
る。後は、ポンプを駆動して後方ピグに水圧をかける
と、この水圧により後方ピグが押され、これにより潤滑
材、先頭ピグが押されて供給管内に送入される。
[Function] Insert the top pig, lubricant, and rear pig from the tip of the on-site supply pipe in order, and connect the hose extended from the measuring instrument via the pump to the supply pipe to complete the preparation for work. Thereafter, when the pump is driven to apply water pressure to the rear pig, the water pressure pushes the rear pig, whereby the lubricant and the leading pig are pressed and fed into the supply pipe.

【0013】後方ピグは水圧を受け止め、潤滑材は後方
ピグの滑りを助け、先頭ピグはガスを止め、かつ垂直部
においては重力による落下を防ぎながら供給管内を進行
し、やがてサービスチーの処に到達する。このとき、水
圧が急激に上昇すると共に計量器内の水が微量になるか
無くなるので、ポンプの駆動を止める。このようにし
て、先頭ピグと潤滑材、後方ピグをそのまま供給管内に
残すことにより、供給管は閉塞されてしまう。この結
果、本管側から供給管側にガスが流れ込んだり、逆に供
給管側から空気や水が本管内に流入することはない。な
お、潤滑材としては、通常の潤滑材以外に、流動性を有
し、一定時間経過後に固化する樹脂を利用してもよい。
The rear pig receives the water pressure, the lubricating material assists the rear pig in sliding, the front pig stops the gas, and in the vertical part, moves in the supply pipe while preventing the fall by gravity. To reach. At this time, the driving of the pump is stopped because the water pressure rises rapidly and the amount of water in the measuring instrument becomes small or disappears. In this way, the supply pipe is closed by leaving the leading pig, the lubricant, and the rear pig as they are in the supply pipe. As a result, gas does not flow from the main pipe side to the supply pipe side, and conversely, air and water do not flow into the main pipe side from the supply pipe side. As the lubricant, a resin that has fluidity and solidifies after a certain period of time may be used in addition to a normal lubricant.

【0014】[0014]

【実施例】図1に基づいて本発明に係る閉塞方法の実施
例を説明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of a closing method according to the present invention will be described with reference to FIG.

【0015】この図において、1は本管、2は閉塞対象
供給管、3は本管と供給管2の分岐部に取り付けられた
サービスチー、4は立ち上がり管、5は立ち上がり管4
に取り付けられた挿入具、6は手動ポンプ、7は挿入具
5とポンプ6間を結ぶホース、8は水を容れた計量器、
9は一次圧力計、10は二次圧力計、11はガバナーで
ある。
In this figure, 1 is a main pipe, 2 is a supply pipe to be closed, 3 is a service tee attached to a branch of the main pipe and the supply pipe 2, 4 is a riser pipe, and 5 is a riser pipe 4.
6 is a manual pump, 7 is a hose connecting the insert 5 and the pump 6, 8 is a measuring instrument containing water,
9 is a primary pressure gauge, 10 is a secondary pressure gauge, and 11 is a governor.

【0016】図2において、Aは先頭ピグ、Bは後方ピ
グにして、実施例の場合、先頭ピグAは天然ゴム、後方
ピグBはシリコン製であって、供給管2の最小内径より
も大きい直径の球体であって、ともに高弾性を有する。
Cは潤滑材にして、この潤滑材Cは最小限垂れない程度
の粘度を有することが使用条件である。
In FIG. 2, A is a leading pig and B is a trailing pig. In this embodiment, the leading pig A is made of natural rubber, the trailing pig B is made of silicon, and is larger than the minimum inner diameter of the supply pipe 2. It is a sphere with a diameter and both have high elasticity.
The use condition is that C is a lubricating material, and the lubricating material C has a viscosity that does not drip at a minimum.

【0017】次に、作業例を説明する。Next, a working example will be described.

【0018】a.先ず、音波を利用して供給管2の立ち
上がり管4からサービスチー3までの距離を求め、この
距離と供給管2の直径から内容積を算出し、更にこの内
容積から使用する潤滑材Cの容積を差し引くと共に安全
率を乗じて求めた分量の水を計量器8に用意する。
A. First, the distance from the riser pipe 4 of the supply pipe 2 to the service tee 3 is determined using sound waves, the internal volume is calculated from this distance and the diameter of the supply pipe 2, and the lubricant C to be used is further calculated from the internal volume. An amount of water obtained by subtracting the volume and multiplying by the safety factor is prepared in the measuring device 8.

【0019】b.次に、先頭ピグAを挿入具5を外した
状態で立ち上がり管4内に挿入し、次に潤滑材Cを充填
し、次に後方ピグBを挿入して先頭ピグと後方ピグ間に
潤滑材を保持させ、挿入具4を取り付けると共にこれに
ホース7を接続する。
B. Next, the leading pig A is inserted into the riser pipe 4 with the insertion tool 5 removed, and then the lubricating material C is filled in. Then, the rear pig B is inserted to insert the lubricating material between the leading pig and the rear pig. , And the insertion tool 4 is attached, and the hose 7 is connected to the insertion tool 4.

【0020】c.次に、ポンプ6を駆動して後方ピグB
の後方から水圧をかけることにより、先頭ピグA、潤滑
材C、後方ピグBを供給管2内に送入する。
C. Next, the pump 6 is driven to move the rear pig B
The front pig A, the lubricant C, and the rear pig B are fed into the supply pipe 2 by applying a water pressure from the rear.

【0021】d.次に、前記水圧の変化を二次圧力計1
0で監視し、又水量の減少を監視しながら水圧が一定値
以上を示し、同時に水量がほぼ無くなったときに先頭ピ
グAが供給管2の先端側であってサービスチー3の処に
到達したものと判断してポンプ6の駆動を止める。
D. Next, the change in the water pressure was measured using a secondary pressure gauge 1.
While monitoring at 0 and monitoring the decrease in water volume, the water pressure showed a certain value or more, and at the same time, when the water volume was almost exhausted, the leading pig A reached the front end side of the supply pipe 2 and reached the place of Service Q3. Then, the drive of the pump 6 is stopped.

【0022】e.このようにして、先頭ピグAと潤滑材
C、後方ピグBをそのまま供給管2の先端の所に残すこ
とにより、供給管2の先端部分を閉塞する。この状況は
図2に示されている。
E. In this way, the leading end of the supply pipe 2 is closed by leaving the leading pig A, the lubricant C, and the rear pig B at the leading end of the supply pipe 2 as they are. This situation is shown in FIG.

【0023】f.次に、立ち上がり管4から挿入具5を
取り外し、必要に応じてこの立ち上がり管4を撤去した
り、供給管2の一部を押し潰したりして作業を終了す
る。
F. Next, the insertion tool 5 is removed from the riser pipe 4, and the riser pipe 4 is removed if necessary, or a part of the supply pipe 2 is crushed to complete the operation.

【0024】[0024]

【発明の効果】本発明は以上のように、先頭ピグ、潤滑
材、後方ピグを供給管内に水圧で送入し、これを供給管
の先端の処に止めて残し、供給管を閉塞するため、次の
効果を奏する。
As described above, according to the present invention, the leading pig, the lubricating material, and the rear pig are fed into the supply pipe by hydraulic pressure, and this is stopped at the tip of the supply pipe and left to close the supply pipe. Has the following effects.

【0025】a.道路を掘削する必要がない。よって、
交通止め、工事中騒音の問題が解消すると共に掘削費が
無いので工事費を大巾に低減できる。
A. There is no need to excavate the road. Therefore,
The problem of traffic stoppages and noise during construction is eliminated, and construction costs can be greatly reduced because there is no excavation cost.

【0026】b.潤滑材を使用することにより、管内の
状況にかかわらず後方ピグを円滑に送入することができ
る。
B. The use of the lubricating material allows the rear pig to be fed smoothly regardless of the conditions inside the pipe.

【0027】c.配管全体に樹脂を充填しないので、こ
の経費を削減できる。
C. Since the entire pipe is not filled with resin, this cost can be reduced.

【0028】d.劣化した供給管の場合でも、潤滑材に
よりピグはスムーズに移動するため、大きな内圧がかか
らない。よって、管に亀裂が生じたり折損したりするこ
ともない。
D. Even in the case of a deteriorated supply pipe, the pig moves smoothly due to the lubricant, so that a large internal pressure is not applied. Thus, there is no crack or breakage in the tube.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の閉塞方法の説明図。FIG. 1 is an explanatory diagram of a closing method of the present invention.

【図2】閉塞状況の説明図。FIG. 2 is an explanatory diagram of a closed state.

【図3】元整理工法の説明図。FIG. 3 is an explanatory view of an original arrangement method.

【図4】樹脂充填工法の説明図。FIG. 4 is an explanatory view of a resin filling method.

【符号の説明】[Explanation of symbols]

1 本管 2 供給管 3 サービスチー 4 立ち上がり管 5 挿入具 6 ポンプ 7 ホース 8 計量器 9 一次圧力計 10 二次圧力計 11 ガバナー A 先頭ピグ B 後方ピグ C 潤滑材 DESCRIPTION OF SYMBOLS 1 Main pipe 2 Supply pipe 3 Service tee 4 Rise pipe 5 Insert 6 Pump 7 Hose 8 Measuring instrument 9 Primary pressure gauge 10 Secondary pressure gauge 11 Governor A First pig B Rear pig C Lubricant

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 a.閉塞対称となる供給管の内径より僅
かに大きい直径の高弾性先頭ピグと後方ピグ及び自重で
垂れない粘度を有する潤滑材を用意する、 b.音波を利用してあらかじめ供給管の入口からサービ
スチーの処までの長さを求め、この長さと供給管の内径
から内容積を算出し、更にこの内容積から潤滑材の容積
を差し引くと共に安全率を乗じて求めた分量の水を容れ
た計量器とこの水を供給管内に圧送するためのポンプを
用意する、 c.そして、先ず先頭ピグを供給管内に挿入し、次に潤
滑材を充填し、次に後方ピグを挿入して先頭ピグと後方
ピグ間に潤滑材を保持させる、 d.後方ピグの後方から前記ポンプを利用して水圧をか
けることにより、先頭ピグ、潤滑材、後方ピグを供給管
内に送入する、 e.前記水量の減少と水圧の変化を監視し、水量がほぼ
無くなり、水圧が一定値以上を示したときに先頭ピグが
供給管の先端であってサービスチーの処に到達したもの
と判断してポンプの駆動を止め、先頭ピグと潤滑材、後
方ピグをそのまま供給管内に残すことにより供給管を閉
塞する、 f.ことを特徴とする供給管の閉塞方法。
1. A method comprising: a. Providing a highly elastic leading and trailing pig with a diameter slightly larger than the inner diameter of the supply pipe to be closed symmetrically, and a lubricant having a viscosity that does not drip under its own weight, b. Using the sound wave, determine the length from the inlet of the supply pipe to the service tee in advance, calculate the internal volume from this length and the inner diameter of the supply pipe, and then subtract the volume of the lubricant from this internal volume, and set the safety factor. A meter containing a quantity of water determined by multiplying by water and a pump for pumping the water into a supply pipe, c. Then, first insert the leading pig into the supply pipe, then fill the lubricant, then insert the rear pig to hold the lubricant between the leading pig and the rear pig, d. Pumping the leading pig, lubricating material and the rear pig into the supply pipe by applying water pressure using the pump from behind the rear pig, e. The decrease in the water amount and the change in the water pressure are monitored, and when the water amount is almost exhausted and the water pressure shows a certain value or more, it is determined that the leading pig is the tip of the supply pipe and has reached the place of the service team and the pump Block the supply pipe by stopping the driving of the supply pipe and leaving the leading pig, the lubricant, and the rear pig in the supply pipe as they are. F. A method for closing a supply pipe, characterized in that:
JP5228603A 1993-09-14 1993-09-14 Supply pipe blockage method Expired - Fee Related JP3007516B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP5228603A JP3007516B2 (en) 1993-09-14 1993-09-14 Supply pipe blockage method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP5228603A JP3007516B2 (en) 1993-09-14 1993-09-14 Supply pipe blockage method

Publications (2)

Publication Number Publication Date
JPH0783379A JPH0783379A (en) 1995-03-28
JP3007516B2 true JP3007516B2 (en) 2000-02-07

Family

ID=16878944

Family Applications (1)

Application Number Title Priority Date Filing Date
JP5228603A Expired - Fee Related JP3007516B2 (en) 1993-09-14 1993-09-14 Supply pipe blockage method

Country Status (1)

Country Link
JP (1) JP3007516B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102525406B1 (en) * 2023-01-13 2023-04-24 최정수 A fluid supply pipe closing device and a closing method using it

Also Published As

Publication number Publication date
JPH0783379A (en) 1995-03-28

Similar Documents

Publication Publication Date Title
JP3007516B2 (en) Supply pipe blockage method
EP0945668A3 (en) Fluid pressure testing
CN2112152U (en) Borehole two-end seal leakage detector
KR890004622B1 (en) Method and device for filling cracks
JP2945105B2 (en) How to line the inside of a pipe
JP2782305B2 (en) Resin injection and transfer equipment in the existing pipe lining repair method
CN105650345B (en) The construction method and detection device that push pipe outer wall sludge lubricant cover shapes in a kind of loose overburden
US5468091A (en) Inserting linings into pipes
JP3215731B2 (en) Non-drilling cutoff method for unused supply pipes
JP2900212B2 (en) Repair method for inner lining of existing piping
JP2773000B2 (en) Leakage prevention method for unused supply pipes
JP2796576B2 (en) Repair method for inner lining of existing piping
JP4332258B2 (en) Filling method for filling material in piping
JPH06226201A (en) Partial repair method for the leaked part of the main branch
JP2782308B2 (en) Hydraulic flow control device for pipe inner lining repair method
JP2821539B2 (en) Resin lining repair method for internal pipes with narrow portions
CA2806070C (en) Method, kit and system for injecting grout into a borehole, method of deploying a tube into a borehole for grout injection and leader for use in a grout injection system
JPS6344892B2 (en)
JP3161627B2 (en) Inner pipe lining method using ice pig
JP2781908B2 (en) Existing piping lining device
JP2002349755A (en) Grout filling method around buried pipe
JPH04371271A (en) Method for repairing lining of existing supply inner pipe
JP3430300B2 (en) Water stoppage method for buried water retention pipe
JPH06304526A (en) Control method of forcibly feeding resin to existing piping
JP2781909B2 (en) Existing piping lining device

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees