Refurbishment method of blast furnace hearthInfo
- Publication number
- JP3025829B2 JP3025829B2 JP6895994A JP6895994A JP3025829B2 JP 3025829 B2 JP3025829 B2 JP 3025829B2 JP 6895994 A JP6895994 A JP 6895994A JP 6895994 A JP6895994 A JP 6895994A JP 3025829 B2 JP3025829 B2 JP 3025829B2
- Authority
- JP
- Japan
- Prior art keywords
- brick
- carbon
- slit
- iron
- furnace
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P10/00—Technologies related to metal processing
- Y02P10/20—Recycling
Landscapes
- Blast Furnaces (AREA)
Description
【0001】[0001]
【産業上の利用分野】本発明は、溶鉱炉の炉底煉瓦を解
体して補修する溶鉱炉の改修工法に係り、特に、溶鉱炉
の炉底煉瓦を発破によって解体する際に最底部に施工さ
れたカーボン煉瓦への衝撃を回避できるように改良した
溶鉱炉炉底の改修工法に関するものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of refurbishment of a blast furnace for disassembling and repairing a bottom brick of a blast furnace, and more particularly, to a method of refining a bottom furnace brick of a blast furnace by blasting the bottom brick. The present invention relates to a method for repairing a blast furnace furnace bottom that has been improved so as to avoid impact on bricks.
【0002】[0002]
【従来の技術】図4は、高炉の吹き止め後の内部状況を
示す縦断面図である。図示されているように、高炉20
の外観を区画形成する鉄皮21の内面には、周知の如
く、側壁と炉底に煉瓦22が施工されている。通常、炉
底24には冷却向上を狙って高熱伝導率のカーボン煉瓦
25が円板状に縦積され、さらに、その上に断熱性の高
いカーボン内設煉瓦26が円板状に平積されている。2. Description of the Related Art FIG. 4 is a vertical sectional view showing an internal state of a blast furnace after blowing. As shown, the blast furnace 20
As is well known, bricks 22 are constructed on the side walls and the furnace bottom on the inner surface of the steel shell 21 which defines the appearance of the steel shell 21. Normally, carbon bricks 25 having high thermal conductivity are vertically stacked in a disc shape on the furnace bottom 24 for the purpose of improving cooling, and further, a carbon brick 26 having high heat insulation properties is flatly stacked in a disc shape thereon. ing.
【0003】このように煉瓦22が施工された高炉20
内で製造された熔銑は、炉底24の近傍の炉側に開口さ
れた出銑口(図示せず)から出銑樋(図示せず)により
出銑される。この出銑口の開口位置は、出銑樋を傾斜さ
せて設ける関係上、炉底24よりも高く設定されている
ため、吹き止め後炉底24には熔銑が残留し、残銑27
や混銑塊28として固化することになる。[0003] The blast furnace 20 on which the bricks 22 are constructed as described above.
The hot metal produced in the furnace is tapped by a tapping gutter (not shown) from a taphole (not shown) opened on the furnace side near the furnace bottom 24. The opening position of this tap hole is set higher than the furnace bottom 24 because the tapping gutter is provided at an angle, so that the hot metal remains in the furnace bottom 24 after blowing, and
Or the solid metal lump 28 is solidified.
【0004】約10年〜20年毎に行われる高炉の改修
工事においては、この残銑27や混銑塊28が解体除去
されると共に、高炉20の内部に施工された煉瓦22が
解体され再施工される。これら残銑27,混銑塊28及
び炉底煉瓦22′の解体には、通常、発破工法が採用さ
れている。In the refurbishment work of the blast furnace performed every about 10 to 20 years, the residual iron 27 and the mixed iron ingot 28 are dismantled and removed, and the bricks 22 constructed inside the blast furnace 20 are dismantled and reconstructed. Is done. A blasting method is usually employed for dismantling the residual iron 27, the mixed iron lump 28 and the hearth brick 22 '.
【0005】従来、この発破工法は、炉側の鉄皮21の
一部をガスバーナ等で切断し、側方から炉底24の残銑
27や混銑塊28に穿孔機またはジェットランスにより
約50〜80mm径の発破孔(図示せず)を形成した
後、この発破孔内に発破をかけて残銑27や混銑塊28
を破砕する。その後、残銑27や混銑塊28の破砕片
や、これと同時に崩れた煉瓦片を掻き出して除去する
が、その際、さらにブルドーザ等でカーボン内設煉瓦2
6及びカーボン煉瓦25を機械的に壊したり、或いはこ
れら炉底煉瓦22′にも発破をかけて解体していた。Conventionally, in this blasting method, a part of the steel shell 21 on the furnace side is cut with a gas burner or the like, and the residual iron 27 or the mixed iron ingot 28 on the furnace bottom 24 is cut from the side by a punch or jet lance for about 50 to 50 minutes. After forming a blast hole (not shown) having a diameter of 80 mm, blasting is performed in the blast hole, and the residual iron 27 and the mixed
Crush. Thereafter, the crushed pieces of the residual iron 27 and the mixed iron ingot 28 and the broken pieces of the bricks at the same time are scraped out and removed.
6 and the carbon brick 25 were mechanically broken, or the hearth bricks 22 'were blasted and dismantled.
【0006】[0006]
【発明が解決しようとする課題】ところで、従来の発破
工法は、残銑27,混銑塊28及びカーボン内設煉瓦2
6のみならず、カーボン煉瓦25をも破砕して解体除去
していた。最近では、操業技術や耐火物技術が進歩発展
し、炉底煉瓦22′、特に最底部のカーボン煉瓦25が
熔損されず、無傷な状態で高炉20が吹き止めされる。
品質面から見れば、このカーボン煉瓦25は再利用に十
分耐え得るにもかかわらず、従来の発破工法は炉底煉瓦
22′全体に損傷を与える解体工法であるため、カーボ
ン内設煉瓦26のみならずカーボン煉瓦25をも新たに
施工しなければならないという問題があった。By the way, the conventional blasting method uses the remaining iron 27, the mixed iron ingot 28 and the carbon brick 2
Not only 6 but also the carbon brick 25 was crushed and dismantled and removed. Recently, the operating technology and refractory technology have progressed and developed, and the blast furnace 20 has been blown off intact without breaking the bottom brick 22 ', especially the carbon brick 25 at the bottom.
From the viewpoint of quality, the conventional blasting method is a demolition method that damages the entire furnace bottom brick 22 ', although the carbon brick 25 can sufficiently withstand reuse. In addition, there is a problem that the carbon brick 25 must be newly constructed.
【0007】また、このカーボン煉瓦25は、40〜5
0万円/tonと高価であり、高炉20の炉底24には
1700〜1800ton程度の量が使用されるため、
改修費用が増大するという問題があった。The carbon brick 25 has a size of 40 to 5
Because it is expensive at 100,000 yen / ton, and about 1700-1800 ton is used for the bottom 24 of the blast furnace 20,
There was a problem that the repair cost increased.
【0008】本発明の目的は、上記課題に鑑み、溶鉱炉
炉底に施工されたカーボン煉瓦を再利用することがで
き、改修費用を大幅に低減することができる溶鉱炉炉底
の改修工法を提供することにある。In view of the above problems, an object of the present invention is to provide a method for repairing a blast furnace hearth in which carbon bricks constructed on the blast furnace bottom can be reused and repair costs can be greatly reduced. It is in.
【0009】[0009]
【課題を解決するための手段】上記目的を達成すべく第
1の発明に係る溶鉱炉炉底の改修工法は、カーボン煉瓦
上にカーボン内設煉瓦で構成される炉底煉瓦が施工され
た炉底に残留固化した残銑や混銑塊に発破孔を形成し、
これに発破をかけて破砕した残銑や混銑塊の破砕片及び
煉瓦片を掻き出して除去した後、炉底煉瓦を再施工する
溶鉱炉炉底の改修工法において、溶鉱炉を吹き止めした
後残銑又は混銑塊の下に位置する、上記炉底煉瓦に炉径
方向に沿ってスリットを形成した後、上記発破孔に発破
をかけるようにしたものである。According to a first aspect of the present invention, there is provided a method for repairing a furnace bottom of a blast furnace according to the first aspect of the present invention. Blast holes are formed in the solidified residual iron and mixed iron ingot,
After scraping and removing crushed pieces of iron and mixed iron ingots and brick pieces by blasting the blast furnace, in the refurbishment method of the blast furnace bottom where the furnace bottom brick is reconstructed, After a slit is formed along the furnace radial direction in the hearth brick located below the mixed iron ingot, the blast hole is blasted.
【0010】また、第2の発明に係る溶鉱炉炉底の改修
工法は、カーボン煉瓦上にカーボン内設煉瓦で構成され
る炉底煉瓦が施工された炉底に残留固化した残銑や混銑
塊に発破孔を形成し、これに発破をかけて破砕した残銑
や混銑塊の破砕片及び煉瓦片を掻き出して除去した後、
炉底煉瓦を再施工する溶鉱炉炉底の改修工法において、
溶鉱炉を吹き止めした後残銑又は混銑塊の下に位置す
る、上記カーボン内設煉瓦に炉径方向に沿ってスリット
を形成した後、上記発破孔に発破をかけてスリット上方
の残銑,混銑塊及びカーボン内設煉瓦を破砕し、これら
残銑や混銑塊の破砕片及び煉瓦片を除去した後、スリッ
ト下に残したカーボン内設煉瓦上に新たにカーボン内設
煉瓦を施工するようにしたものである。[0010] The method for repairing the furnace bottom of the blast furnace according to the second aspect of the present invention is a method for repairing residual iron or mixed iron ingot that has solidified on the furnace bottom where the furnace bottom brick composed of carbon bricks has been constructed on carbon bricks. After forming a blast hole and blasting it, scraping and removing crushed pieces of iron and mixed iron crushed pieces and brick pieces,
In the refurbishment method of the blast furnace hearth where the furnace bottom brick is reconstructed,
After the blast furnace is blown out, after forming a slit along the furnace radial direction in the above carbon-inside brick located below the residual iron or the mixed iron ingot, the blast hole is blasted and the residual iron or mixed iron above the slit is blasted. After crushing the lump and the carbon brick, removing the crushed pieces and the brick pieces of the residual iron and the mixed iron lump, a new carbon brick was constructed on the carbon brick left under the slit. Things.
【0011】さらに、第3の発明に係る溶鉱炉炉底の改
修工法は、カーボン煉瓦上にカーボン内設煉瓦で構成さ
れる炉底煉瓦が施工された炉底に残留固化した残銑や混
銑塊に発破孔を形成し、これに発破をかけて破砕した残
銑や混銑塊の破砕片及び煉瓦片を掻き出して除去した
後、炉底煉瓦を再施工する溶鉱炉炉底の改修工法におい
て、溶鉱炉を吹き止めした後残銑又は混銑塊の下に位置
する、上記カーボン内設煉瓦に炉径方向に沿ってスリッ
トを形成した後、上記発破孔に発破をかけてスリット上
方の残銑,混銑塊及びカーボン内設煉瓦を破砕し、これ
ら残銑や混銑塊の破砕片及び煉瓦片を除去した後、スリ
ット下に残したカーボン内設煉瓦を機械的に壊して露出
したカーボン煉瓦上に新たにカーボン内設煉瓦を施工す
るようにしたものである。Further, the method for repairing the furnace bottom of the blast furnace according to the third aspect of the present invention is a method for repairing residual iron or mixed iron ingot that has solidified on the furnace bottom where the furnace bottom brick composed of carbon bricks has been constructed on carbon bricks. A blast hole is formed, and after blasting the blast hole to scrape out and remove crushed pieces and brick pieces of crushed residual iron and mixed iron lump, the blast furnace is blown in the blast furnace bottom refurbishment method of reconstructing the furnace bottom brick. After stopping, after forming a slit along the furnace radial direction in the above carbon internal brick located below the residual iron or mixed iron ingot, the blast hole is blasted and the residual iron, mixed iron ingot and carbon above the slit are blasted. After crushing the internal brick and removing the crushed pieces and brick pieces of the remaining iron and mixed iron lump, the carbon internal brick left under the slit is mechanically broken and a new carbon is installed on the exposed carbon brick. The brick was constructed That.
【0012】そして、第4の発明に係る溶鉱炉炉底の改
修工法は、カーボン煉瓦上にカーボン内設煉瓦で構成さ
れる炉底煉瓦が施工された炉底に残留固化した残銑や混
銑塊に発破孔を形成し、これに発破をかけて破砕した残
銑や混銑塊の破砕片及び煉瓦片を掻き出して除去した
後、炉底煉瓦を再施工する溶鉱炉炉底の改修工法におい
て、溶鉱炉を吹き止めした後残銑又は混銑塊の下に位置
する、上記カーボン煉瓦に炉径方向に沿ってスリットを
形成した後、上記発破孔に発破をかけてスリット上方の
残銑,混銑塊,カーボン内設煉瓦及びカーボン煉瓦を破
砕し、これら残銑や混銑塊の破砕片及び煉瓦片を除去し
た後、スリット下に残したカーボン煉瓦上に新たにカー
ボン内設煉瓦を施工するようにしたものである。[0012] The method for repairing the furnace bottom of the blast furnace according to the fourth invention is a method for refining residual iron or mixed iron lump remaining on the furnace bottom where the furnace bottom brick composed of carbon in-built bricks is constructed on carbon bricks. A blast hole is formed, and after blasting the blast hole to scrape out and remove crushed pieces and brick pieces of crushed residual iron and mixed iron lump, the blast furnace is blown in the blast furnace bottom refurbishment method of reconstructing the furnace bottom brick. After stopping, after forming a slit along the furnace radial direction in the carbon brick located below the residual iron or mixed iron ingot, blast the blast hole to set up the residual iron, mixed iron ingot, and carbon inside the slit. After crushing bricks and carbon bricks, removing these crushed pieces of iron and mixed iron lump and brick pieces, a new carbon-inside brick is constructed on the carbon bricks left under the slit.
【0013】またさらに、第5の発明に係る溶鉱炉炉底
の改修工法は、カーボン煉瓦上にカーボン内設煉瓦で構
成される炉底煉瓦が施工された炉底に残留固化した残銑
や混銑塊に発破孔を形成し、これに発破をかけて破砕し
た残銑や混銑塊の破砕片及び煉瓦片を掻き出して除去し
た後、炉底煉瓦を再施工する溶鉱炉炉底の改修工法にお
いて、溶鉱炉を吹き止めした後残銑又は混銑塊の下に位
置する、上記カーボン煉瓦に炉径方向に沿ってスリット
を形成した後、上記発破孔に発破をかけてスリット上方
の残銑,混銑塊,カーボン内設煉瓦及びカーボン煉瓦を
破砕し、これら残銑や混銑塊の破砕片及び煉瓦片を除去
した後、スリット下に残したカーボン煉瓦上に新たにカ
ーボン煉瓦を平積みし、その上に新たにカーボン内設煉
瓦を施工するようにしたものである。[0013] Still further, according to a fifth aspect of the present invention, there is provided a method of repairing a blast furnace furnace bottom, wherein the solidified residual iron or mixed iron ingot remains in the furnace bottom where the furnace bottom brick composed of carbon bricks is constructed on carbon bricks. A blast hole is formed in the blast furnace, and after scraping and removing crushed pieces of iron and mixed iron lump and brick pieces by blasting the blast hole, the blast furnace is refurbished to rebuild the furnace bottom brick. After blowing, a slit is formed along the furnace radial direction in the carbon brick located below the residual iron or mixed iron ingot, and then the blast hole is blasted to cause residual iron, mixed iron ingot, and carbon inside the slit. After crushing the construction brick and carbon brick, removing the crushed pieces and brick pieces of the remaining iron and mixed iron lump, a new carbon brick is laid flat on the carbon brick left under the slit, and a new carbon Like installing an internal brick One in which the.
【0014】[0014]
【作用】第1の発明に係る溶鉱炉炉底の改修工法の構成
によれば、溶鉱炉を吹き止めしたとき、残銑又は混銑塊
の下には炉底煉瓦が略健全な状態で残る。そして、この
炉底煉瓦に炉径方向に沿ってスリットを形成した後、上
記発破孔に発破がかけられるので、スリットにより残銑
又は混銑塊と完全に縁切りされた自由面が形成され、こ
の自由面によって発破衝撃が吸収され、スリット上方の
残銑,混銑塊及び炉底煉瓦が破砕することになる。According to the construction of the blast furnace hearth repair method according to the first aspect of the invention, when the blast furnace is blown off, the bottom brick remains in a substantially healthy state below the residual iron or the mixed iron ingot. Then, after forming a slit in the furnace bottom brick along the furnace radial direction, the blasting hole is blasted, so that the slit forms a free surface completely cut off from the residual iron or the mixed iron lump, and the free surface is formed. The blasting impact is absorbed by the surface, and the residual iron, the mixed iron lump and the hearth brick above the slit are crushed.
【0015】上記炉底煉瓦は、最底部に施工されたカー
ボン煉瓦と、その上に施工されたカーボン内設煉瓦とか
ら成る。従って、カーボン内設煉瓦にスリットを形成す
ると、スリット上方の残銑,混銑塊及びカーボン内設煉
瓦が破砕し、スリット下に残ったカーボン内設煉瓦及び
カーボン煉瓦が流用可能になる。一方、カーボン煉瓦に
スリットを形成すると、スリット上方の残銑,混銑塊
及,カーボン内設煉瓦及びカーボン煉瓦が破砕し、スリ
ット下に残ったカーボン煉瓦が流用可能になるものであ
る。The above-mentioned furnace bottom brick is composed of a carbon brick placed on the bottom and an internal carbon brick placed thereon. Therefore, if a slit is formed in the carbon brick, the remaining pig iron, the mixed metal lump and the carbon brick above the slit are crushed, and the carbon brick and the carbon brick remaining below the slit can be diverted. On the other hand, when the slit is formed in the carbon brick, the remaining pig iron, the mixed metal lump, the carbon internal brick and the carbon brick above the slit are crushed, and the carbon brick remaining under the slit can be diverted.
【0016】また、第2の発明に係る溶鉱炉炉底の改修
工法の構成によれば、上述したように、溶鉱炉を吹き止
めしたとき、残銑又は混銑塊の下には炉底煉瓦が略健全
な状態で残る。次に、上記カーボン内設煉瓦に炉径方向
に沿ってスリットを形成した後、上記発破孔に発破がか
けられるので、スリットにより発破衝撃が吸収され、ス
リット上方の残銑,混銑塊及びカーボン内設煉瓦が破砕
されることになる。そして、これら残銑や混銑塊の破砕
片及び煉瓦片を除去すると、スリット下には流用可能な
カーボン内設煉瓦及びカーボン煉瓦が残る。Further, according to the construction of the blast furnace hearth repair method according to the second aspect of the present invention, as described above, when the blast furnace is blown off, the bottom brick is substantially sound under the residual iron or the mixed iron ingot. It remains in a state. Next, after a slit is formed along the furnace radial direction in the carbon-containing brick, the blasting hole is blasted, so that the blasting impact is absorbed by the slit, and the residual iron, mixed iron lump and carbon inside the slit are absorbed above the slit. The brick will be crushed. Then, when the crushed pieces and the brick pieces of the residual iron and the mixed iron lump are removed, the carbon built-in brick and the carbon brick which can be diverted remain under the slit.
【0017】従って、スリット下に残したカーボン内設
煉瓦上に新たにカーボン内設煉瓦を施工すれば、カーボ
ン煉瓦の再利用により、材料費用が低減されると共に、
その工事費用が低減されるものである。Therefore, if a new carbon brick is constructed on the carbon brick left under the slit, the material cost can be reduced by reusing the carbon brick,
The construction cost is reduced.
【0018】さらに、第3の発明に係る溶鉱炉炉底の改
修工法の構成によれば、第2の発明と同様に、溶鉱炉を
吹き止めし、上記カーボン内設煉瓦に炉径方向に沿って
スリットを形成した後、上記発破孔に発破をかけるの
で、スリットにより発破衝撃が吸収され、スリット上方
の残銑,混銑塊及びカーボン内設煉瓦が破砕し、これら
残銑や混銑塊の破砕片及び煉瓦片を除去すると、スリッ
ト下には流用可能なカーボン内設煉瓦及びカーボン煉瓦
が残る。Further, according to the construction of the method for repairing the furnace bottom of the blast furnace according to the third invention, the blast furnace is blown off and a slit is formed in the carbon-inside brick along the furnace radial direction, as in the second invention. After forming the blast, the blasting holes are blasted, so that the blasting impact is absorbed by the slits, the residual iron, the mixed iron lump and the carbon-internal brick above the slits are crushed, and the crushed pieces of the residual iron and the mixed iron lump and the bricks When the pieces are removed, carbon internal bricks and carbon bricks which can be diverted remain under the slits.
【0019】スリット下に残ったカーボン内設煉瓦は基
本的には流用可能であるが、熱履歴により変質し易いの
で、第3の発明にあっては、スリット下に残したカーボ
ン内設煉瓦を機械的に壊して露出したカーボン煉瓦上に
新たにカーボン内設煉瓦を施工する。従って、カーボン
煉瓦の再利用により、材料費用及び工事費用が低減され
るだけでなく、より高い安全性及び信頼性が確保される
ものである。Although the carbon-inside bricks left under the slits can be basically diverted, the carbon-inside bricks left under the slits are used in the third aspect of the present invention because they are easily deteriorated by heat history. A new carbon brick is constructed on the exposed carbon brick that has been mechanically broken. Therefore, reuse of carbon bricks not only reduces material costs and construction costs, but also ensures higher safety and reliability.
【0020】そして、第4の発明に係る溶鉱炉炉底の改
修工法の構成によれば、上述したように、溶鉱炉を吹き
止めしたとき、残銑又は混銑塊の下には炉底煉瓦が略健
全な状態で残る。次に、上記カーボン煉瓦に炉径方向に
沿ってスリットを形成した後で、上記発破孔に発破がか
けられるので、スリットにより発破衝撃が吸収され、ス
リット上方の残銑,混銑塊,カーボン内設煉瓦及びカー
ボン煉瓦が破砕されることになる。そして、これら残銑
や混銑塊の破砕片及び煉瓦片を除去すると、スリット下
には流用可能なカーボン煉瓦が残る。この場合、カーボ
ン煉瓦の再利用量を多くするため、スリットをカーボン
煉瓦の上面近傍に形成することが好ましい。According to the construction of the blast furnace bottom repair method according to the fourth aspect of the present invention, as described above, when the blast furnace is blown off, the bottom brick is substantially sound under the residual iron or the mixed iron ingot. It remains in a state. Next, after a slit is formed in the carbon brick along the furnace radial direction, the blasting hole is blasted, so that the blasting impact is absorbed by the slit, and residual iron, mixed iron lump, and carbon inside the slit are absorbed above the slit. Bricks and carbon bricks will be crushed. Then, when the crushed pieces and brick pieces of the residual iron and the mixed iron lump are removed, carbon bricks that can be diverted remain under the slits. In this case, in order to increase the amount of reuse of the carbon brick, it is preferable to form the slit near the upper surface of the carbon brick.
【0021】従って、スリット下に残したカーボン煉瓦
上に新たにカーボン内設煉瓦を施工すれば、カーボン煉
瓦の大部分の再利用により、材料費用が低減されると共
に、その工事費用が低減される。また、カーボン煉瓦は
Hiアルミナ煉瓦等から成るカーボン内設煉瓦よりも切
削性に優れるので、この点からも工事費用が低減される
ものである。Accordingly, if a new carbon brick is constructed on the carbon brick left under the slit, the material cost is reduced and the construction cost is reduced by reusing most of the carbon brick. . In addition, since the carbon brick is more excellent in the machinability than the carbon brick made of Hi-alumina brick or the like, the construction cost is also reduced from this point.
【0022】またさらに、第5の発明に係る溶鉱炉炉底
の改修工法の構成によれば、第4の発明と同様に、溶鉱
炉を吹き止めし、上記カーボン煉瓦に炉径方向に沿って
スリットを形成した後、上記発破孔に発破をかけるの
で、スリットにより発破衝撃が吸収され、スリット上方
の残銑,混銑塊,カーボン内設煉瓦及びカーボン煉瓦が
破砕し、これら残銑や混銑塊の破砕片及び煉瓦片を除去
すると、スリット下には流用可能なカーボン煉瓦が残
る。第5の発明にあっては、スリット下に残したカーボ
ン煉瓦上に新たにカーボン煉瓦を平積みし、その上に新
たにカーボン内設煉瓦を施工するので、スリットはカー
ボン煉瓦の上面から平積み厚に相当する位置に形成する
ことが好ましい。Further, according to the construction of the method for repairing the furnace bottom of the blast furnace according to the fifth invention, the blast furnace is blown off and a slit is formed in the carbon brick along the furnace radial direction as in the fourth invention. After being formed, the blasting holes are blasted, so that the blasting impact is absorbed by the slits, and the residual iron, the mixed iron lump, the carbon built-in brick and the carbon brick above the slits are crushed, and the crushed pieces of the residual iron and the mixed iron lump are formed. When the brick pieces are removed, carbon bricks that can be diverted remain under the slit. According to the fifth aspect of the present invention, a new carbon brick is laid flat on the carbon brick left under the slit, and a new carbon brick is constructed thereon. Therefore, the slit is laid flat from the upper surface of the carbon brick. It is preferable to form at a position corresponding to the thickness.
【0023】従って、カーボン煉瓦の大部分の再利用に
より、材料費用及び工事費用が低減されると共に、カー
ボン煉瓦の優れた切削性の点から工事費用が低減される
だけでなく、新たにカーボン煉瓦を平積みするので、よ
り高い安全性及び信頼性が確保されるものである。Therefore, by reusing most of the carbon brick, not only the material cost and the construction cost are reduced, but also the construction cost is reduced due to the excellent machinability of the carbon brick. , So that higher safety and reliability are ensured.
【0024】[0024]
【実施例】以下、本発明に係る溶鉱炉炉底の改修工法の
好適実施例を添付図面に基づいて詳細に説明する。本発
明に係る溶鉱炉炉底の改修工法の第1の実施例を説明す
る。図1に示すように、高炉1の炉底2には、カーボン
煉瓦3が円板状に縦積みされており、その上にはHiア
ルミナ煉瓦等から成るカーボン内設煉瓦4が円板状に平
積みされている。カーボン煉瓦3の厚さは約1500〜
1800mmであり、カーボン内設煉瓦4の厚さは約5
00〜700mm、または小割煉瓦を施工したものとな
っている。この炉底2には吹き止めしたとき残銑5や一
部に混銑塊(図示せず)が残留固化する。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Preferred embodiments of the blast furnace furnace repairing method according to the present invention will be described below in detail with reference to the accompanying drawings. A first embodiment of the blast furnace hearth repair method according to the present invention will be described. As shown in FIG. 1, carbon bricks 3 are vertically stacked in a disc shape on a furnace bottom 2 of a blast furnace 1, and a carbon built-in brick 4 made of a Hi alumina brick or the like is disc-shaped thereon. They are stacked flat. The thickness of the carbon brick 3 is about 1500-
1800 mm, and the thickness of the carbon internal brick 4 is about 5
100 to 700 mm or small bricks are constructed. In the furnace bottom 2, when blown off, the residual iron 5 and a part of the mixed iron lump (not shown) are solidified.
【0025】次に、炉底に残留固化した残銑5や混銑塊
に、発破孔6を形成する。具体的には、炉側の鉄皮(図
示せず)の一部をガスバーナ等で切断し、側方から炉底
2の残銑5や混銑塊に穿孔機またはジェットランス(図
示せず)により約50〜80mm径の発破孔6を形成す
る。Next, blast holes 6 are formed in the residual iron 5 and the mixed iron ingot solidified at the furnace bottom. Specifically, a part of the steel shell (not shown) on the furnace side is cut with a gas burner or the like, and the remaining iron 5 or the mixed iron lump on the furnace bottom 2 is punched from the side by a punch or a jet lance (not shown). A blast hole 6 having a diameter of about 50 to 80 mm is formed.
【0026】そして、上記カーボン内設煉瓦4に炉径方
向に沿ってスリット7を形成した後、上記発破孔6に発
破をかける。具体的には、このスリット7は、カーボン
内設煉瓦4の下面から約150〜200mmの位置に形
成する。After the slit 7 is formed in the carbon brick 4 along the furnace radial direction, the blast hole 6 is blasted. Specifically, this slit 7 is formed at a position of about 150 to 200 mm from the lower surface of the brick 4 built in carbon.
【0027】スリット7の形成には、先端にビットを有
するロッドをモータによって回転させながらハンマによ
りその後端を叩打するようなトンネル掘削用のスロット
開孔機(図示せず)や、図2に示すようなワイヤソー8
を採用する。スロット開孔機を使用する場合には、炉側
の鉄皮の一部をガスバーナ等で切断し、側方からカーボ
ン内設煉瓦4の所定の位置にスリット7となるような連
続孔を形成する。The slit 7 is formed by a slot drilling machine for tunnel excavation (not shown) in which a rod having a bit at the tip is rotated by a motor and the trailing end is hit with a hammer, or as shown in FIG. Like wire saw 8
Is adopted. When a slot opening machine is used, a part of the steel shell on the furnace side is cut with a gas burner or the like, and a continuous hole is formed at a predetermined position of the carbon brick 4 from a side at a predetermined position. .
【0028】一方、ワイヤソー8を使用する場合には、
図2に示したように、先ず、炉側の鉄皮のA部をガスバ
ーナ等で切断してその内部にワイヤ9を入れ込む。次
に、切断したA部の鉄皮を溶接し、順次周方向に沿って
鉄皮のB部及びC部、D部及びE部を切断してその内部
にワイヤ9を入れ込む。そして、駆動装置10を回転し
て、徐々にカーボン内設煉瓦4の中心部へと連続的にス
リット7を形成する。カーボン内設煉瓦4は、残銑5に
比べて軟らかいため、ワイヤソー8による連続切断が施
工上有利である。尚、上記ワイヤ9としては、例えば、
ダイヤモンドワイヤを採用する。On the other hand, when the wire saw 8 is used,
As shown in FIG. 2, first, part A of the steel shell on the furnace side is cut with a gas burner or the like, and the wire 9 is inserted into the inside. Next, the cut A portion of the steel shell is welded, the B portion and the C portion, the D portion, and the E portion of the steel shell are sequentially cut along the circumferential direction, and the wire 9 is inserted therein. Then, the driving device 10 is rotated to gradually form the slits 7 gradually toward the central portion of the carbon brick 4. Since the carbon built-in brick 4 is softer than the residual pig iron 5, continuous cutting by the wire saw 8 is advantageous in construction. In addition, as said wire 9, for example,
Adopt diamond wire.
【0029】スリット7を炉径方向の全面に形成する
と、スリット7よりも上方の解体物がその重みで落ち込
むため、スリット7が潰される前に切断を中止し、スリ
ット7をある程度形成する毎に、上記発破孔6に装薬し
発破をかける。すると、スリット7上方の残銑5,混銑
塊及びカーボン内設煉瓦4が破砕される。If the slit 7 is formed on the entire surface in the furnace radial direction, the disassembled material above the slit 7 falls due to its weight. Therefore, the cutting is stopped before the slit 7 is crushed, and every time the slit 7 is formed to some extent. The blast hole 6 is charged and blasted. Then, the remaining pig iron 5, the mixed iron lump and the carbon built-in brick 4 above the slit 7 are crushed.
【0030】次に、これら残銑5や混銑塊の破砕片や、
これと同時に崩れた煉瓦片をブルドーザ等で掻き出して
除去する。スリット7上方のカーボン内設煉瓦4が壊れ
ていない場合には、ブルドーザ等で機械的に壊して掻き
出し除去する。以上の方法を繰り返し、炉底全面に渡っ
てスリット7より上方の残銑5や混銑塊の破砕片および
煉瓦片を除去する。Next, crushed pieces of the residual iron 5 and the mixed iron lump,
At the same time, the broken brick pieces are scraped out with a bulldozer or the like and removed. If the carbon built-in brick 4 above the slit 7 is not broken, it is mechanically broken with a bulldozer or the like and scraped off. The above method is repeated to remove the remaining iron 5 and the crushed pieces and the brick pieces of the mixed iron lump above the slit 7 over the entire furnace bottom.
【0031】その後、スリット7下に残した約150〜
200mmのカーボン内設煉瓦4上に、新たに約500
〜700mmのカーボン内設煉瓦4を平積みすることに
より、炉底2の改修工事が完了するものである。After that, about 150 to
Approximately 500 new on 200 mm carbon brick 4
The refurbishment of the furnace bottom 2 is completed by stacking the carbon in-built bricks 4 of ~ 700 mm.
【0032】次に、第1の実施例における作用を述べ
る。溶鉱炉1を吹き止めしたとき、残銑5又は混銑塊の
下にカーボン煉瓦3及びカーボン内設煉瓦4が略健全な
状態で残った場合、このカーボン内設煉瓦4に、その炉
径方向に沿ってスリット7を形成し、上記発破孔6に発
破がかけられると、スリット7により残銑5又は混銑塊
と完全に縁切りされた自由面が形成されることになり、
この自由面によって発破衝撃が吸収される。Next, the operation of the first embodiment will be described. When the blast furnace 1 is blown off and the carbon brick 3 and the carbon-containing brick 4 remain in a substantially healthy state under the residual iron 5 or the mixed pig iron lump, the carbon brick 3 is placed along the furnace radial direction along the furnace radial direction. When the blast hole 6 is blasted by forming a slit 7, the slit 7 forms a free surface completely cut off from the residual iron 5 or the mixed metal lump,
The blasting impact is absorbed by this free surface.
【0033】その後、約150〜200mmのカーボン
内設煉瓦4上に新たに約500〜700mmのカーボン
内設煉瓦4を施工するので、カーボン煉瓦3を確実に再
利用することができ、カーボン煉瓦3の材料費用を低減
することができる。また、カーボン煉瓦3の撤去工事及
び据付工事を行う必要がないので、工事費用を低減する
ことができ、且つ、溶鉱炉の補修期間を著しく短縮でき
るので、改修費用を全体として大幅に低減することがで
きる。さらに、スリット7により自由面を形成して発破
をかけるので、装薬量をも削減できるものである。Thereafter, a new carbon brick 4 of about 500-700 mm is newly constructed on the carbon brick 4 of about 150-200 mm, so that the carbon brick 3 can be reused without fail. Material cost can be reduced. Also, since it is not necessary to perform the removal work and the installation work of the carbon brick 3, the construction cost can be reduced, and the repair period of the blast furnace can be significantly shortened, so that the repair cost can be greatly reduced as a whole. it can. Further, since the free surface is formed by the slit 7 and blasting is performed, the amount of charge can be reduced.
【0034】次に、本発明に係る溶鉱炉炉底の改修工法
の第2の実施例を説明する。第2の実施例の溶鉱炉炉底
の改修工法は、第1の実施例と同様に、カーボン内設煉
瓦4に炉径方向に沿ってスリット7を形成した後、上記
発破孔6に発破をかけてスリット7の上方の残銑5,混
銑塊及びカーボン内設煉瓦4を破砕し、スリット7下に
流用可能な約150〜200mmのカーボン内設煉瓦4
及びカーボン煉瓦3を残す。Next, a description will be given of a second embodiment of the blast furnace hearth repair method according to the present invention. In the refurbishment method of the blast furnace furnace bottom of the second embodiment, similarly to the first embodiment, after forming a slit 7 in the carbon inner brick 4 along the furnace radial direction, the blast hole 6 is blasted. To crush the remaining iron 5 above the slit 7, the mixed iron lump and the carbon brick 4, and to divert the carbon brick 4 of about 150 to 200 mm under the slit 7.
And the carbon brick 3 is left.
【0035】特に、第2の実施例にあっては、これら残
銑5や混銑塊の破砕片及び煉瓦片をブルドーザ等で掻き
出して除去した後、スリット7下に残したカーボン内設
煉瓦4を機械的に壊す。一般に、カーボン内設煉瓦4は
熱履歴を受け玄武岩のように硬くなっているが、スリッ
ト7下に残したカーボン内設煉瓦4の厚さは、約150
〜200mmであるので、ピックハンマ等で叩打するこ
とにより、簡単に壊すことができる。In particular, in the second embodiment, after the remaining iron 5 and the crushed pieces of the mixed iron ingot and the brick pieces are scraped out with a bulldozer or the like and removed, the carbon built-in brick 4 left under the slit 7 is removed. Break mechanically. In general, the carbon brick 4 is hardened like basalt due to the heat history, but the thickness of the carbon brick 4 left under the slit 7 is about 150.
Since it is about 200 mm, it can be easily broken by hitting with a pick hammer or the like.
【0036】そして、カーボン内設煉瓦4を壊した煉瓦
片を掻き出して除去し、露出したカーボン煉瓦3上に新
たに約500〜700mmのカーボン内設煉瓦4を平積
みすることにより、炉底2の改修工事が完了するもので
ある。Then, the brick pieces having broken the carbon built-in brick 4 are scraped out and removed, and the carbon built-in brick 4 of about 500 to 700 mm is newly piled on the exposed carbon brick 3 to flatten the furnace bottom 2. The renovation work is completed.
【0037】第2の実施例は第1の実施例と基本的には
同様の作用効果を奏するが、特に第2の実施例にあって
は、スリット7下に残した約150〜200mmのカー
ボン内設煉瓦4を機械的に壊している。この薄いカーボ
ン内設煉瓦4は基本的には流用可能であるが、熱履歴に
より変質し易いので、本実施例ではこのカーボン内設煉
瓦4を壊して露出したカーボン煉瓦3上に新たに約50
0〜700mmのカーボン内設煉瓦4を施工する。従っ
て、カーボン煉瓦3を再利用することにより、カーボン
煉瓦3の材料費用及び工事費用を低減して溶鉱炉の改修
費用を大幅に低減することができるだけでなく、変質し
易いカーボン内設煉瓦4を除去することにより、高い安
全性及び信頼性を確保することができる。また、薄く残
したカーボン内設煉瓦4を破壊する前は、このカーボン
内設煉瓦4によりブルドーザの走行からカーボン煉瓦3
が保護されるので、その損傷を防止することができるも
のである。The second embodiment has basically the same operation and effect as the first embodiment. In particular, in the second embodiment, the carbon of about 150 to 200 mm left under the slit 7 is used. The internal brick 4 is mechanically broken. Although the thin carbon brick 4 can basically be diverted, it is easily deteriorated due to the heat history. Therefore, in this embodiment, about 50 new carbon bricks 4 are added to the exposed carbon brick 3 by breaking the carbon brick 4.
A carbon brick 4 of 0 to 700 mm is constructed. Therefore, by reusing the carbon brick 3, not only the material cost and the construction cost of the carbon brick 3 can be reduced and the repair cost of the blast furnace can be significantly reduced, but also the carbon built-in brick 4 which is easily deteriorated is removed. By doing so, high safety and reliability can be ensured. Before destroying the carbon-inside brick 4 that has been left thin, the carbon-inside brick 4 is used to drive the carbon brick 3 from the running of the bulldozer.
Is protected, so that the damage can be prevented.
【0038】次に、本発明に係る溶鉱炉炉底の改修工法
の第3の実施例を説明する。第3の実施例の溶鉱炉炉底
の改修工法は、第1及び第2の実施例と同様に、先ず、
溶鉱炉1を吹き止めした後、炉底に残留固化した残銑5
や混銑塊に、発破孔6を形成する。Next, a description will be given of a third embodiment of the blast furnace hearth repair method according to the present invention. The blast furnace bottom repair method of the third embodiment is similar to the first and second embodiments.
After the blast furnace 1 has been blown off, the residual iron 5
A blast hole 6 is formed in the molten iron mass.
【0039】そして、カーボン煉瓦3に炉径方向に沿っ
てスリット17を形成した後、上記発破孔6に発破をか
ける。このように、カーボン煉瓦3にスリット17を形
成する場合は、第1及び第2の実施例のようにカーボン
内設煉瓦4にスリット7を形成する場合に比べて、切削
性が良く、平滑な面を出し易いので、後工程を行い易
い。具体的には、このスリット17は、カーボン煉瓦3
の上面から約150〜200mmの位置に形成する。ス
リット7の形成には、上述したように、トンネル掘削用
のスロット開孔機(図示せず)や、図2に示したような
ワイヤソー8を採用する。また、スリット17が潰され
るのを防止するため、スリット17をある程度形成する
毎に、上記発破孔6に装薬し発破をかける。すると、ス
リット17上方の残銑5,混銑塊,カーボン内設煉瓦4
及びカーボン煉瓦3が破砕される。After the slit 17 is formed in the carbon brick 3 along the furnace radial direction, the blast hole 6 is blasted. As described above, when the slits 17 are formed in the carbon brick 3, compared with the case where the slits 7 are formed in the carbon brick 4 as in the first and second embodiments, the cutability is good and the smoothness is improved. Since a surface is easily formed, a post-process can be easily performed. Specifically, the slit 17 is formed in the carbon brick 3
Is formed at a position of about 150 to 200 mm from the upper surface of the substrate. As described above, a slot opening machine (not shown) for tunnel excavation or a wire saw 8 as shown in FIG. 2 is used for forming the slit 7. In order to prevent the slit 17 from being crushed, the blast hole 6 is charged and blasted every time the slit 17 is formed to some extent. Then, the remaining iron 5 above the slit 17, the mixed iron lump, the carbon brick 4
And the carbon brick 3 is crushed.
【0040】次に、これら残銑5や混銑塊の破砕片や、
これと同時に崩れた煉瓦片をブルドーザ等で掻き出して
除去する。スリット17上方のカーボン内設煉瓦4及び
カーボン煉瓦3が壊れていない場合には、ブルドーザ等
で機械的に壊したり、或いはカーボン内設煉瓦4にも上
記発破孔6を形成し装薬量を少なくして発破をかけ破砕
除去する。Next, crushed pieces of the residual iron 5 and the mixed iron lump,
At the same time, the broken brick pieces are scraped out with a bulldozer or the like and removed. If the carbon brick 4 and the carbon brick 3 above the slit 17 are not broken, they are mechanically broken with a bulldozer or the like, or the blast holes 6 are formed in the carbon brick 4 to reduce the charge amount. To blast and crush and remove.
【0041】破砕片及び煉瓦片を除去すると、スリット
17下に残した約1300〜1650mmのカーボン煉
瓦3が露出し、その上に新たに約500〜700mmの
カーボン内設煉瓦4を平積みすることにより、炉底2の
改修工事が完了するものである。When the crushed pieces and the brick pieces are removed, the carbon bricks 3 of about 1300 to 1650 mm left under the slit 17 are exposed, and the carbon bricks 4 of about 500 to 700 mm are newly piled on the bricks. As a result, the repair work on the hearth 2 is completed.
【0042】第3の実施例は第1及び第2の実施例と基
本的には同様の作用効果を奏するが、特に第3の実施例
にあっては、スリット17をカーボン煉瓦にその炉径方
向に沿って形成している。従って、スリット17により
発破衝撃が吸収されるので、スリット17の上方の残銑
5,混銑塊,カーボン内設煉瓦4及び約150〜200
mmのカーボン煉瓦3は破砕するが、スリット17の下
方の約1300〜1650mmのカーボン煉瓦3は破砕
しない。そして、これら残銑5や混銑塊の破砕片及び煉
瓦片を除去すると、スリット17下には流用可能な約1
300〜1650mmのカーボン煉瓦3が残る。第3の
実施例において、スリット17をカーボン煉瓦3の上面
から約150〜200mmの位置に形成するのは、カー
ボン煉瓦3の再利用量を多くするためである。Although the third embodiment has basically the same operation and effect as the first and second embodiments, particularly in the third embodiment, the slit 17 is formed in the carbon brick by the furnace diameter. It is formed along the direction. Accordingly, the blasting impact is absorbed by the slit 17, so that the remaining pig iron 5, the mixed metal lump, the carbon-internal brick 4, and the approximately 150 to 200
mm carbon brick 3 is crushed, but the carbon brick 3 of about 1300-1650 mm below the slit 17 is not crushed. When the remaining iron 5 and the crushed pieces and brick pieces of the mixed iron lump are removed, about 1
The carbon brick 3 of 300 to 1650 mm remains. In the third embodiment, the reason why the slit 17 is formed at a position of about 150 to 200 mm from the upper surface of the carbon brick 3 is to increase the amount of reuse of the carbon brick 3.
【0043】従って、スリット17下に残した約130
0〜1650mmのカーボン煉瓦3上に新たに約500
〜700mmのカーボン内設煉瓦4を平積みするので、
カーボン煉瓦3の大部分を再利用することができ、カー
ボン煉瓦3の材料費用を低減することができる。また、
カーボン煉瓦3の撤去工事及び据付工事を行う必要がな
いので、工事費用を低減することができ、且つ、高炉の
補修期間を著しく短縮できるので、改修費用を全体とし
て大幅に低減することができる。さらに、スリット17
により自由面を形成して発破をかけるので、装薬量をも
削減できる。そして、カーボン煉瓦3はHiアルミナ煉
瓦等から成るカーボン内設煉瓦4よりも切削性に優れて
いるので、この点からも工事費用を低減することができ
るものである。Therefore, about 130
Approximately 500 new on carbon brick 3 of 0-1650 mm
Because the carbon brick 4 of ~ 700mm is piled up flat,
Most of the carbon brick 3 can be reused, and the material cost of the carbon brick 3 can be reduced. Also,
Since it is not necessary to perform the removal work and the installation work of the carbon bricks 3, the construction cost can be reduced, and the repair period of the blast furnace can be significantly shortened, so that the repair cost can be largely reduced as a whole. Further, the slit 17
As a result, a free surface is formed and blasting is performed, so that the amount of charge can be reduced. Since the carbon brick 3 has better machinability than the carbon brick 4 made of Hi alumina brick or the like, the construction cost can be reduced from this point as well.
【0044】次に、本発明に係る溶鉱炉炉底の改修工法
の第4の実施例を説明する。第4の実施例の溶鉱炉炉底
の改修工法は、第3の実施例と同様に、カーボン煉瓦3
に炉径方向に沿ってスリット17を形成した後、上記発
破孔6に発破をかける。但し、第4の実施例にあって
は、スリット17をカーボン煉瓦3の上面から約500
〜700mmの位置に形成する。従って、スリット17
の上方の残銑5,混銑塊,カーボン内設煉瓦4及び約5
00〜700mmのカーボン煉瓦3が破砕し、スリット
17下には流用可能な約800〜1100mmのカーボ
ン煉瓦3が残る。Next, a description will be given of a fourth embodiment of the blast furnace hearth repair method according to the present invention. The refurbishment method of the blast furnace bottom of the fourth embodiment is similar to that of the third embodiment.
After forming a slit 17 along the furnace radial direction, the blast hole 6 is blasted. However, in the fourth embodiment, the slit 17 is set to about 500 m from the upper surface of the carbon brick 3.
It is formed at a position of about 700 mm. Therefore, the slit 17
Pig iron 5, mixed iron lump, carbon brick 4 and about 5
The carbon brick 3 of 00 to 700 mm is crushed, and the carbon brick 3 of about 800 to 1100 mm that can be diverted remains under the slit 17.
【0045】特に、第4の実施例にあっては、これら残
銑5や混銑塊の破砕片及び煉瓦片をブルドーザ等で掻き
出して除去した後、スリット17下に残した約800〜
1100mmのカーボン煉瓦3上に新たに約500〜7
00mmのカーボン煉瓦3を平積みし、その上に新たに
約500〜700mmのカーボン内設煉瓦4を平積みす
ることにより、炉底2の改修工事が完了するものであ
る。In particular, in the fourth embodiment, the remaining iron 5 and the crushed pieces and the brick pieces of the mixed iron ingot are scraped out with a bulldozer or the like and then removed to remove about 800 to 800 mm remaining under the slit 17.
Approximately 500-7 new on 1100mm carbon brick 3
The refurbishment work of the furnace bottom 2 is completed by flat-laying the 00 mm carbon bricks 3 and further flatly laminating about 500 to 700 mm of carbon built-in bricks 4 thereon.
【0046】第4の実施例は第1乃至第3の実施例と基
本的には同様の作用効果を奏するが、特に第4の実施例
にあっては、スリット17下に残した約800〜110
0mmのカーボン煉瓦3上に新たに約500〜700m
mのカーボン煉瓦3を平積みし、その上に新たに約50
0〜700mmのカーボン内設煉瓦4を平積みするの
で、カーボン煉瓦3の大部分を再利用することにより、
カーボン煉瓦3の材料費用及び工事費用を低減して溶鉱
炉の改修費用を大幅に低減することができるだけでな
く、変質し易いカーボン内設煉瓦4を除去すると共に安
全代として約500〜700mmのカーボン煉瓦3の上
部部分を除去し、且つ、新たに約500〜700mmの
カーボン煉瓦3を平積みすることにより、極めて高い安
全性及び信頼性を確保することができるものである。The fourth embodiment has basically the same operation and effect as those of the first to third embodiments. However, in the fourth embodiment, in particular, about 800 to 110
About 500-700m newly on 0mm carbon brick 3
m carbon bricks 3 are stacked flat, and about 50 new
Since the carbon bricks 4 of 0 to 700 mm are laid flat, most of the carbon bricks 3 are reused,
Not only can the material cost and construction cost of the carbon brick 3 be reduced to significantly reduce the cost of refurbishment of the blast furnace, but also the carbon brick 4 that is easily deteriorated is removed and a carbon brick of about 500 to 700 mm is used as a safety margin. By removing the upper portion of 3 and newly stacking the carbon brick 3 of about 500 to 700 mm, extremely high safety and reliability can be secured.
【0047】以上の実施例は溶鉱炉1を例に採って説明
したが、炉底の炉底煉瓦構造が同様の構成であれば、他
の形式の溶鉱炉にも採用できることは言うまでもない。Although the above embodiment has been described taking the blast furnace 1 as an example, it goes without saying that the blast furnace 1 can be applied to other types of blast furnace as long as the furnace bottom brick structure has the same structure.
【0048】[0048]
【発明の効果】以上述べたように、本発明に係る溶鉱炉
炉底の改修工法によれば、溶鉱炉炉底に施工されたカー
ボン煉瓦を再利用することができ、改修費用を大幅に低
減することができるという優れた効果を発揮する。As described above, according to the blast furnace hearth repair method according to the present invention, the carbon bricks installed in the blast furnace bottom can be reused, and the repair cost can be greatly reduced. The effect is excellent.
【図1】本発明に係る溶鉱炉炉底の改修工法の第1及び
第2の実施例において、カーボン内設煉瓦にスリットを
形成した状態を示す概略側断面図である。FIG. 1 is a schematic side sectional view showing a state in which a slit is formed in a carbon brick in first and second embodiments of the blast furnace furnace repairing method according to the present invention.
【図2】本実施例の溶鉱炉炉底の改修工法において、ワ
イヤソーによりスリットを形成する状態を示す概略平面
図である。FIG. 2 is a schematic plan view showing a state in which a slit is formed by a wire saw in the method of repairing the furnace bottom of the blast furnace of the present embodiment.
【図3】本発明に係る溶鉱炉炉底の改修工法の第3及び
第4の実施例において、カーボン煉瓦にスリットを形成
した状態を示す概略側断面図である。FIG. 3 is a schematic sectional side view showing a state in which a slit is formed in a carbon brick in third and fourth embodiments of the blast furnace furnace repairing method according to the present invention.
【図4】溶鉱炉の吹き止め後の内部状況を示す概略側断
面図である。FIG. 4 is a schematic side sectional view showing an internal state of the blast furnace after blowing.
1 溶鉱炉 2 炉底 3 カーボン煉瓦 4 カーボン内設煉瓦 5 残銑 6 発破孔 7 スリット 8 ワイヤソー 9 ワイヤ 10 駆動装置 A,B,C,D 鉄皮切断位置 17 スリット 20 溶鉱炉 21 鉄皮 22 煉瓦 22′ 炉底煉瓦 23 側壁煉瓦 24 炉底 25 カーボン煉瓦 26 カーボン内設煉瓦 27 残銑 28 混銑塊 DESCRIPTION OF SYMBOLS 1 Blast furnace 2 Furnace bottom 3 Carbon brick 4 Carbon brick inside brick 5 Residual iron 6 Blast hole 7 Slit 8 Wire saw 9 Wire 10 Driving device A, B, C, D Steel shell cutting position 17 Slit 20 Blast furnace 21 Steel shell 22 Brick 22 ' Hearth brick 23 Side wall brick 24 Hearth 25 Carbon brick 26 Carbon built brick 27 Residual iron 28 Mixed iron lump
───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.7,DB名) C21B 7/00,7/06 F27D 1/16 ──────────────────────────────────────────────────続 き Continued on the front page (58) Field surveyed (Int. Cl. 7 , DB name) C21B 7/00, 7/06 F27D 1/16
Claims (5)
される炉底煉瓦が施工された炉底に残留固化した残銑や
混銑塊に発破孔を形成し、これに発破をかけて破砕した
残銑や混銑塊の破砕片及び煉瓦片を掻き出して除去した
後、炉底煉瓦を再施工する溶鉱炉炉底の改修工法におい
て、 溶鉱炉を吹き止めした後残銑又は混銑塊の下に位置す
る、上記炉底煉瓦に炉径方向に沿ってスリットを形成し
た後、上記発破孔に発破をかけるようにしたことを特徴
とする溶鉱炉炉底の改修工法。Claims 1. A blast hole is formed in a solidified residual iron or mixed iron ingot at a furnace bottom where a furnace bottom brick composed of carbon-inside brick is constructed on a carbon brick, and the blast hole is blasted and crushed. After scraping off and removing crushed pieces and brick pieces of residual iron and mixed iron ingot, in the blast furnace bottom rehabilitation method of reconstructing the furnace bottom brick, after the blast furnace is blown, it is located under the residual iron or mixed iron ingot. A method of repairing a blast furnace hearth, wherein a slit is formed in the furnace bottom brick in a furnace radial direction, and then the blast hole is blasted.
される炉底煉瓦が施工された炉底に残留固化した残銑や
混銑塊に発破孔を形成し、これに発破をかけて破砕した
残銑や混銑塊の破砕片及び煉瓦片を掻き出して除去した
後、炉底煉瓦を再施工する溶鉱炉炉底の改修工法におい
て、 溶鉱炉を吹き止めした後残銑又は混銑塊の下に位置す
る、上記カーボン内設煉瓦に炉径方向に沿ってスリット
を形成した後、上記発破孔に発破をかけてスリット上方
の残銑,混銑塊及びカーボン内設煉瓦を破砕し、これら
残銑や混銑塊の破砕片及び煉瓦片を除去した後、スリッ
ト下に残したカーボン内設煉瓦上に新たにカーボン内設
煉瓦を施工するようにしたことを特徴とする溶鉱炉炉底
の改修工法。2. A blast hole is formed in the solidified residual iron or mixed iron ingot at the hearth where the hearth brick composed of carbon-inside brick is constructed on the carbon brick, and the blast hole is blasted and crushed. After scraping off and removing crushed pieces and brick pieces of residual iron and mixed iron ingot, in the blast furnace bottom rehabilitation method of reconstructing the furnace bottom brick, after the blast furnace is blown, it is located under the residual iron or mixed iron ingot. After forming a slit along the radial direction of the furnace on the carbon-containing brick, the blasting hole is blasted to crush the residual iron, the mixed iron lump and the carbon-containing brick above the slit. A method for refurbishment of a blast furnace furnace, characterized in that after removing crushed pieces and brick pieces, a new carbon built-in brick is constructed on the carbon built-in brick left under the slit.
される炉底煉瓦が施工された炉底に残留固化した残銑や
混銑塊に発破孔を形成し、これに発破をかけて破砕した
残銑や混銑塊の破砕片及び煉瓦片を掻き出して除去した
後、炉底煉瓦を再施工する溶鉱炉炉底の改修工法におい
て、 溶鉱炉を吹き止めした後残銑又は混銑塊の下に位置す
る、上記カーボン内設煉瓦に炉径方向に沿ってスリット
を形成した後、上記発破孔に発破をかけてスリット上方
の残銑,混銑塊及びカーボン内設煉瓦を破砕し、これら
残銑や混銑塊の破砕片及び煉瓦片を除去した後、スリッ
ト下に残したカーボン内設煉瓦を機械的に壊して露出し
たカーボン煉瓦上に新たにカーボン内設煉瓦を施工する
ようにしたことを特徴とする溶鉱炉炉底の改修工法。3. A blast hole is formed in the solidified residual iron or mixed iron ingot at the hearth where the hearth brick composed of carbon-inside brick is constructed on the carbon brick, and the blast hole is blasted and crushed. After scraping off and removing crushed pieces and brick pieces of residual iron and mixed iron ingot, in the blast furnace bottom rehabilitation method of reconstructing the furnace bottom brick, after the blast furnace is blown, it is located under the residual iron or mixed iron ingot. After forming a slit along the radial direction of the furnace on the carbon-containing brick, the blasting hole is blasted to crush the residual iron, the mixed iron lump and the carbon-containing brick above the slit. A blast furnace furnace characterized in that after removing crushed pieces and brick pieces, the carbon built-in brick left under the slit is mechanically broken and a new carbon built-in brick is constructed on the exposed carbon brick. Bottom repair method.
される炉底煉瓦が施工された炉底に残留固化した残銑や
混銑塊に発破孔を形成し、これに発破をかけて破砕した
残銑や混銑塊の破砕片及び煉瓦片を掻き出して除去した
後、炉底煉瓦を再施工する溶鉱炉炉底の改修工法におい
て、 溶鉱炉を吹き止めした後残銑又は混銑塊の下に位置す
る、上記カーボン煉瓦に炉径方向に沿ってスリットを形
成した後、上記発破孔に発破をかけてスリット上方の残
銑,混銑塊,カーボン内設煉瓦及びカーボン煉瓦を破砕
し、これら残銑や混銑塊の破砕片及び煉瓦片を除去した
後、スリット下に残したカーボン煉瓦上に新たにカーボ
ン内設煉瓦を施工するようにしたことを特徴とする溶鉱
炉炉底の改修工法。4. A blast hole is formed in solidified residual iron or mixed iron lump at a furnace bottom where a furnace bottom brick composed of carbon-inside brick is constructed on a carbon brick, and the blast hole is blasted and crushed. After scraping off and removing crushed pieces and brick pieces of residual iron and mixed iron ingot, in the blast furnace bottom rehabilitation method of reconstructing the furnace bottom brick, after the blast furnace is blown, it is located under the residual iron or mixed iron ingot. After forming a slit in the carbon brick along the furnace radial direction, the blasting hole is blasted to crush the residual iron, the mixed iron ingot, the carbon built-in brick, and the carbon brick above the slit. A method for refurbishment of a blast furnace bottom, characterized in that after removing crushed pieces and brick pieces of the above, a new carbon-inside brick is constructed on the carbon brick left under the slit.
される炉底煉瓦が施工された炉底に残留固化した残銑や
混銑塊に発破孔を形成し、これに発破をかけて破砕した
残銑や混銑塊の破砕片及び煉瓦片を掻き出して除去した
後、炉底煉瓦を再施工する溶鉱炉炉底の改修工法におい
て、 溶鉱炉を吹き止めした後残銑又は混銑塊の下に位置す
る、上記カーボン煉瓦に炉径方向に沿ってスリットを形
成した後、上記発破孔に発破をかけてスリット上方の残
銑,混銑塊,カーボン内設煉瓦及びカーボン煉瓦を破砕
し、これら残銑や混銑塊の破砕片及び煉瓦片を除去した
後、スリット下に残したカーボン煉瓦上に新たにカーボ
ン煉瓦を平積みし、その上に新たにカーボン内設煉瓦を
施工するようにしたことを特徴とする溶鉱炉炉底の改修
工法。5. A blast hole is formed in the solidified residual iron or mixed iron ingot at the hearth where the hearth brick made of carbon-inside brick is constructed on the carbon brick, and the blast hole is blasted and crushed. After scraping off and removing crushed pieces and brick pieces of residual iron and mixed iron ingot, in the blast furnace bottom rehabilitation method of reconstructing the furnace bottom brick, after the blast furnace is blown, it is located under the residual iron or mixed iron ingot. After forming a slit in the carbon brick along the furnace radial direction, the blasting hole is blasted to crush the residual iron, the mixed iron ingot, the carbon built-in brick, and the carbon brick above the slit. A blast furnace characterized in that after removing crushed pieces and brick pieces of the above, a new carbon brick is laid flat on the carbon brick left under the slit, and a carbon built-in brick is newly constructed thereon. Furnace bottom repair method.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP6895994A JP3025829B2 (en) | 1994-03-15 | 1994-03-15 | Refurbishment method of blast furnace hearth |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP6895994A JP3025829B2 (en) | 1994-03-15 | 1994-03-15 | Refurbishment method of blast furnace hearth |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH07252513A JPH07252513A (en) | 1995-10-03 |
| JP3025829B2 true JP3025829B2 (en) | 2000-03-27 |
Family
ID=13388728
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP6895994A Expired - Fee Related JP3025829B2 (en) | 1994-03-15 | 1994-03-15 | Refurbishment method of blast furnace hearth |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3025829B2 (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN116103454B (en) * | 2023-01-04 | 2025-04-22 | 上海宝冶冶金工程有限公司 | A method for overhauling a blast furnace hearth in a confined space |
-
1994
- 1994-03-15 JP JP6895994A patent/JP3025829B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JPH07252513A (en) | 1995-10-03 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN109680111B (en) | A kind of partial removal method of residual iron of blast furnace | |
| JP3110684B2 (en) | Dismantling method of blast furnace bottom | |
| JP3025829B2 (en) | Refurbishment method of blast furnace hearth | |
| CN101268202A (en) | Removal method of residual iron in blast furnace | |
| RU2163642C1 (en) | Method of repair of blast-furnace lining | |
| CN113758257A (en) | On-line repairing method for furnace lining of molten metal smelting furnace | |
| JP7846339B2 (en) | Hearth tapping method | |
| CN102134621B (en) | Blast furnace iron notch patching method | |
| CN100516236C (en) | Method for Removing Condensed and Residual Iron in Blast Furnace Bottom | |
| EP0519553B1 (en) | Method of repair of the refractory lining of the wall of a shaft furnace | |
| JP3272923B2 (en) | Repair method of blast furnace wall | |
| JP3328789B2 (en) | Blast furnace gutter dismantling device and blast furnace gutter dismantling method | |
| RU2815310C1 (en) | Method of blast furnace main chute protective cover lining | |
| JPH09272905A (en) | Method for repairing sidewall bricks at the bottom of a blast furnace | |
| JP3858358B2 (en) | Dismantling method of blast furnace hearth contents | |
| JP2020084213A (en) | Blast furnace gutter cover structure | |
| JPH03291311A (en) | Method for removing residual iron in blast furnace | |
| JPS6116402B2 (en) | ||
| KR100727109B1 (en) | Converter raw material removal device | |
| JP3940182B2 (en) | Alternative stave for cooling panel blast furnace | |
| JPS5938719Y2 (en) | Demolition equipment for fireproof lining materials | |
| JP2005008908A (en) | Method for repairing outer steel shell in blast furnace | |
| JPH03291319A (en) | Method for removing residual pig and refractory brick in blast furnace | |
| JP2571492Y2 (en) | Electric furnace brick bottom structure | |
| JPH044364B2 (en) |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 19991116 |
|
| LAPS | Cancellation because of no payment of annual fees |