Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP3028050B2 - Wall reinforcement framing method - Google Patents
[go: Go Back, main page]

JP3028050B2 - Wall reinforcement framing method - Google Patents

Wall reinforcement framing method

Info

Publication number
JP3028050B2
JP3028050B2 JP7133563A JP13356395A JP3028050B2 JP 3028050 B2 JP3028050 B2 JP 3028050B2 JP 7133563 A JP7133563 A JP 7133563A JP 13356395 A JP13356395 A JP 13356395A JP 3028050 B2 JP3028050 B2 JP 3028050B2
Authority
JP
Japan
Prior art keywords
streak
lightning
shear reinforcement
type shear
reinforcement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP7133563A
Other languages
Japanese (ja)
Other versions
JPH08326320A (en
Inventor
義則 石川
行正 荻原
英司 西山
達也 阿部
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP7133563A priority Critical patent/JP3028050B2/en
Publication of JPH08326320A publication Critical patent/JPH08326320A/en
Application granted granted Critical
Publication of JP3028050B2 publication Critical patent/JP3028050B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、耐力壁、地中連続壁等
の厚みのある鉄筋コンクリート壁の壁筋を地上で組み立
てる壁筋の地組方法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of laying a wall reinforcement of a thick reinforced concrete wall such as a load-bearing wall or an underground continuous wall on the ground.

【0002】[0002]

【従来の技術】厚みのある鉄筋コンクリート壁の従来の
配筋は、図7に示すように、横筋1と縦筋2との格子体
相互を壁の厚さ方向に拘束する剪断補強筋3は、左右端
を折り曲げたフック3aを設けたものであり、これは1
本ずつ短い単品として形成されている。
2. Description of the Related Art As shown in FIG. 7, a conventional reinforcing bar for a thick reinforced concrete wall is a shear reinforcing bar 3 for restraining a lattice member of a horizontal bar 1 and a vertical bar 2 in a thickness direction of the wall. A hook 3a having bent left and right ends is provided.
Each book is formed as a short unit.

【0003】[0003]

【発明が解決しようとする課題】このように剪断補強筋
3が1本ずつ短い単品として形成されているので、その
数量が多くなり、組立の作業工程も多く、多くの人手が
必要である。
As described above, since the shear reinforcing bars 3 are formed one by one as a short piece, the number thereof is increased, the number of assembling work steps is increased, and a large number of labor is required.

【0004】そして、前記壁筋を床にて先行地組する場
合、剪断補強筋3だけでは手際よく配筋できないために
別に「ウマ」とよぶ何らかの治具が必要であった。
[0004] When the wall reinforcement is laid on the floor on the floor, it is not possible to arrange the reinforcement with only the shear reinforcement 3, so a jig called “equine” is required.

【0005】さらに、前記のごとく剪断補強筋3が短い
単品であるため、多くの結束個所が必要であり、作業治
具の種類によっては治具と鉄筋との結束も必要であり、
結束個所が非常に多くなる。
Further, as described above, since the shear reinforcing bar 3 is a single piece, a large number of binding points are required, and depending on the type of working jig, it is necessary to bind the jig and the reinforcing bar.
The number of binding places is very large.

【0006】本発明の目的は前記従来例の不都合を解消
し、組立における作業性がよく、結束個所も低減するの
で人工数が大幅に削減でき、治具も不必要である壁筋の
地組方法を提供することにある。
SUMMARY OF THE INVENTION An object of the present invention is to solve the disadvantages of the prior art, to improve workability in assembling and to reduce the number of binding points, so that the number of man-made objects can be greatly reduced and a jig is unnecessary. It is to provide a method.

【0007】[0007]

【課題を解決するための手段】本発明は前記目的を達成
するため、下側の横筋とその上になる上側の縦筋とをピ
ッチ通りに並べ、さらにその上に稲妻型剪断補強筋を寝
かせた状態で所定の割付け通りに並べ、この稲妻型剪断
補強筋の谷部先端を通るように下側の縦筋を配筋し、稲
妻型剪断補強筋を起こして稲妻型剪断補強筋の谷部先端
と下側の縦筋とを結束し、次に、前記上側の縦筋を持ち
上げて稲妻型剪断補強筋の山部先端と結束し、また、下
側の横筋と下側の縦筋をその交差部で結束し、上側の横
筋を前記上側の縦筋の上に並べ、その交差部を結束する
ことを要旨とするものである。
According to the present invention, in order to attain the above object, a lower horizontal streak and an upper vertical streak are arranged at a pitch, and a lightning-type shear reinforcement is laid thereon. The lightning-type shear reinforcement is laid out as specified, and the lower longitudinal muscle is arranged so as to pass through the valley tip of the lightning-type shear reinforcement, and the lightning-type shear reinforcement is raised to raise the lightning-type shear reinforcement. Bound the tip and the lower longitudinal streak, and then lift the upper longitudinal streak and bind it to the tip of the lightning-type shear reinforcement, and also connect the lower horizontal streak and the lower longitudinal streak to The gist of the present invention is to bind at the intersection, arrange the upper horizontal streaks on the upper vertical streak, and bind the intersection.

【0008】[0008]

【作用】本発明によれば、稲妻型剪断補強筋は単品でな
く連続性のあるものなので、結束個所の低減、加工にか
かる人工数の低減になる。
According to the present invention, the lightning-type shear reinforcement is not a single product but a continuous one, so that the number of binding points and the number of man-hours required for processing are reduced.

【0009】また、従来必要とされたウマが不要であ
り、より結束個所が少なくてすむ。
Further, the horse required conventionally is not required, and the number of binding parts is reduced.

【0010】[0010]

【実施例】以下、図面について本発明の実施例を詳細に
説明する。図1〜図6は本発明の壁筋の地組方法の各工
程を示す斜視図である。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Embodiments of the present invention will be described below in detail with reference to the drawings. 1 to 6 are perspective views showing each step of the method for laying a wall reinforcement according to the present invention.

【0011】まず、図1に示すように、床に壁の縦筋、
横筋の配筋位置と後述の稲妻型剪断補強筋4の配筋位置
を墨出し、地組状態で下側に位置する下側の横筋1aと
その上になる上側の縦筋2bとを前記墨にあわせてピッ
チ通りに並べる。その際、上側の縦筋2bは下側の横筋
1aの上に重ねて直交するように置かれる。また、この
状態では結束はしない。
First, as shown in FIG.
The arrangement position of the horizontal streaks and the arrangement position of the lightning-type shear reinforcement 4 to be described later are marked out, and the lower horizontal streak 1a located on the lower side in the ground state and the upper vertical streak 2b located above the lower streak are referred to as black. Arrange according to the pitch. At that time, the upper vertical streak 2b is placed on the lower horizontal streak 1a so as to be orthogonal to the lower horizontal streak 1a. In this state, no binding is performed.

【0012】次いで図2に示すように、さらにその上に
巾止め筋として、波形もしくはジグザグに連続的に形成
した稲妻型剪断補強筋4を寝かせた状態で所定の位置
(所定の割付け通り)に並べる。この状態でも結束はし
ない。
Next, as shown in FIG. 2, a lightning-type shear reinforcement 4 continuously formed in a corrugated or zigzag shape as a width stop is further laid thereon at a predetermined position (predetermined allocation). Line up. No binding is performed in this state.

【0013】図3に示すように、この稲妻型剪断補強筋
4の谷部4aの先端を通るように下側の縦筋2aをこの
稲妻型剪断補強筋4の上に載せて配筋する。
As shown in FIG. 3, a lower vertical bar 2a is placed on the lightning-type shear reinforcement 4 so as to pass through the tip of a valley 4a of the lightning-type shear reinforcement 4, and is arranged.

【0014】図4に示すようにこの稲妻型剪断補強筋4
を起こして谷部4aの先端と下側の縦筋2aとを結束線
で結束し、次に、前記上側の縦筋2bを矢印で示すよう
に稲妻型剪断補強筋4の山部4b内で持ち上げて山部4
bの先端と結束する。
As shown in FIG. 4, this lightning-type shear reinforcement 4
Is caused and the tip of the valley 4a and the lower longitudinal streak 2a are bound by a binding line, and then the upper longitudinal streak 2b is set in the crest 4b of the lightning type shear reinforcement 4 as shown by an arrow. Lift up the mountain 4
b.

【0015】また、立体化を保持するため図5に示すよ
うに下側の横筋1aと下側の縦筋2aをその交差部で結
束する。
As shown in FIG. 5, the lower horizontal streak 1a and the lower vertical streak 2a are bound at the intersection thereof to maintain three-dimensionality.

【0016】さらに、上側の横筋1bを前記上側の縦筋
2bの上に直交するように並べ、その交差部を結束す
る。
Further, the upper horizontal streaks 1b are arranged so as to be orthogonal to the upper vertical streaks 2b, and their intersections are bound.

【0017】[0017]

【発明の効果】以上述べたように本発明のプレハブ壁筋
およびその組立方法は、組立における作業性がよく、結
束個所も低減するので人工数が大幅に削減でき、治具も
必要ないので安価ですむものである。
As described above, the prefabricated wall rebar and the method of assembling the same according to the present invention have good workability in assembling, and reduce the number of tied parts, so that the number of man-made can be greatly reduced. That is all.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の壁筋の地組方法の第1工程を示す斜視
図である。
FIG. 1 is a perspective view showing a first step of a method for laying a wall streak according to the present invention.

【図2】本発明の壁筋の地組方法の第2工程を示す斜視
図である。
FIG. 2 is a perspective view showing a second step of the method for laying a wall streak according to the present invention.

【図3】本発明の壁筋の地組方法の第3工程を示す斜視
図である。
FIG. 3 is a perspective view showing a third step of the method of laying a wall streak according to the present invention.

【図4】本発明の壁筋の地組方法の第4工程を示す斜視
図である。
FIG. 4 is a perspective view showing a fourth step of the method for laying a wall streak according to the present invention.

【図5】本発明の壁筋の地組方法の第5工程を示す斜視
図である。
FIG. 5 is a perspective view showing a fifth step of the method of laying a wall reinforcement according to the present invention.

【図6】本発明の壁筋の地組方法の第6工程を示す斜視
図である。
FIG. 6 is a perspective view showing a sixth step of the method of laying a wall streak according to the present invention.

【図7】従来例を示す平面図である。FIG. 7 is a plan view showing a conventional example.

【符号の説明】[Explanation of symbols]

1…横筋 1a…下側の横筋 1b…上側の横筋 2…縦筋 2a…下側の縦筋 2b…上側の縦筋 3…剪断補強筋 3a…フック 4…稲妻型剪断補強筋 4a…谷部 4b…山部 DESCRIPTION OF SYMBOLS 1 ... Horizontal streak 1a ... Lower horizontal streak 1b ... Upper horizontal streak 2 ... Vertical streak 2a ... Lower vertical streak 2b ... Upper longitudinal streak 3 ... Shear reinforcement 3a ... Hook 4 ... Lightning type shear reinforcement 4a ... Valley 4b ... Yamabe

フロントページの続き (72)発明者 阿部 達也 東京都港区元赤坂一丁目2番7号 鹿島 建設株式会社内 (58)調査した分野(Int.Cl.7,DB名) E04G 21/12 105 E04C 5/04 Continued on the front page (72) Inventor Tatsuya Abe Kashima Construction Co., Ltd. 1-2-7 Moto-Akasaka, Minato-ku, Tokyo (58) Field surveyed (Int. Cl. 7 , DB name) E04G 21/12 105 E04C 5/04

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 下側の横筋とその上になる上側の縦筋と
をピッチ通りに並べ、さらにその上に稲妻型剪断補強筋
を寝かせた状態で所定の割付け通りに並べ、この稲妻型
剪断補強筋の谷部先端を通るように下側の縦筋を配筋
し、稲妻型剪断補強筋を起こして稲妻型剪断補強筋の谷
部先端と下側の縦筋とを結束し、次に、前記上側の縦筋
を持ち上げて稲妻型剪断補強筋の山部先端と結束し、ま
た、下側の横筋と下側の縦筋をその交差部で結束し、上
側の横筋を前記上側の縦筋の上に並べ、その交差部を結
束することを特徴とした壁筋の地組方法。
1. A horizontal streak on the lower side and a vertical streak on the lower side thereof are arranged in accordance with a pitch, and further, a lightning-type shear reinforcement is laid thereon in a predetermined arrangement in a state of being laid down. Arrange the lower longitudinal muscle so that it passes through the valley tip of the reinforcement, raise the lightning-type shear reinforcement, tie the valley tip of the lightning-type shear reinforcement with the lower vertical muscle, and then Lifting the upper longitudinal streak and tying it to the tip of the lightning-type shear reinforcement, tying the lower lateral streak and the lower longitudinal streak at the intersection thereof, and joining the upper transverse streak to the upper longitudinal streak. A method of laying a wall muscle, which is arranged on a streak and ties the intersection.
JP7133563A 1995-05-31 1995-05-31 Wall reinforcement framing method Expired - Lifetime JP3028050B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7133563A JP3028050B2 (en) 1995-05-31 1995-05-31 Wall reinforcement framing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7133563A JP3028050B2 (en) 1995-05-31 1995-05-31 Wall reinforcement framing method

Publications (2)

Publication Number Publication Date
JPH08326320A JPH08326320A (en) 1996-12-10
JP3028050B2 true JP3028050B2 (en) 2000-04-04

Family

ID=15107735

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7133563A Expired - Lifetime JP3028050B2 (en) 1995-05-31 1995-05-31 Wall reinforcement framing method

Country Status (1)

Country Link
JP (1) JP3028050B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106638463B (en) * 2017-01-24 2019-01-11 中交第二航务工程局有限公司 A kind of construction method of crossbeam reinforcing bar binding support frame

Also Published As

Publication number Publication date
JPH08326320A (en) 1996-12-10

Similar Documents

Publication Publication Date Title
US5678372A (en) System for building construction using preformed, reinforced concrete panels
JP3028050B2 (en) Wall reinforcement framing method
JP2979113B2 (en) Prefabricated wall reinforcement and method of assembling the same
CN115075284A (en) Non-split heads construction method for adding waterproof plate reinforcing steel bars to independent column bases in frame structure foundation
JP2996795B2 (en) How to assemble underground beams
JP2810937B2 (en) Cloth reinforcement frame reinforcement method of cloth foundation reinforcement
JP2918427B2 (en) Building foundation and its construction method
JP3002704B2 (en) Rebar joint structure
JPH0643236Y2 (en) Formwork for slope protection construction
JPH0714432Y2 (en) Foundation frame
JP2538528B2 (en) Slope stabilization method
CA2269492A1 (en) Method for the reinforcement of reinforced concrete and reinforcement for use thereof
JP2545129B2 (en) Underground beam construction method
JPH0632996Y2 (en) Stirrup muscle
JP2599331Y2 (en) Reinforcement structure
JP2582190Y2 (en) Pre-bar arrangement of total foundation
JP2568987B2 (en) Support member for reinforcing steel assembly and bridge construction method using the same
CN114961276A (en) Construction method of frame structure beamed floor slab with two-way upper reinforced steel bar without horse bench
JP3199501B2 (en) Reinforcing method of reinforcing steel wire mesh used for concrete structures
JP2651322B2 (en) Construction method of wall type rigid frame structure
JPH0643235Y2 (en) Formwork for slope protection construction
JPS58138861A (en) Pre-assembled reinforcement method
JPS6334932B2 (en)
JPS628295Y2 (en)
JPH0759840B2 (en) Reinforcing bar arrangement method and reinforcing bar coupling tool