Lining construction method and its construction equipment for irregular cross-section culvert

Info

Publication number
JP3035466B2
JP3035466B2 JP7091650A JP9165095A JP3035466B2 JP 3035466 B2 JP3035466 B2 JP 3035466B2 JP 7091650 A JP7091650 A JP 7091650A JP 9165095 A JP9165095 A JP 9165095A JP 3035466 B2 JP3035466 B2 JP 3035466B2
Authority
JP
Japan
Prior art keywords
shaped member
roller
lining
frame
joining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP7091650A
Other languages
Japanese (ja)
Other versions
JPH08261363A (en
Inventor
直機 北橋
康 北山
栄器 秋元
浜夫 山城
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sekisui Chemical Co Ltd
Original Assignee
Sekisui Chemical Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sekisui Chemical Co Ltd filed Critical Sekisui Chemical Co Ltd
Priority to JP7091650A priority Critical patent/JP3035466B2/en
Priority to TW84111132A priority patent/TW301682B/zh
Priority to MYPI95003912A priority patent/MY111858A/en
Publication of JPH08261363A publication Critical patent/JPH08261363A/en
Application granted granted Critical
Publication of JP3035466B2 publication Critical patent/JP3035466B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Lining Or Joining Of Plastics Or The Like (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】イ.発明の目的 (1) 産業上の利用分野 この発明は、下水道管、上水道管及びガス管等の既設の
管渠において、円形の一般断面に限定されず、矩形ある
いは卵形等の異形断面をなす管渠に対し、その管渠の内
面にライニング層を施工するライニング施工方法及びそ
の方法の実施に使用されるライニング施工装置に関し、
更に詳しくは、長尺の板状体よりなる帯状部材を螺旋状
に捲回して形成された管状体いわゆるライニング管を矩
形断面の管渠内に挿入してなされるライニング施工方法
及びそのライニング施工装置に関する。
A. Object of the Invention (1) Field of Industrial Application The present invention is not limited to a circular general cross-section, but has an irregular cross-section such as a rectangular or oval shape in existing sewers such as sewer pipes, water pipes, and gas pipes. For a culvert, a lining construction method for constructing a lining layer on the inner surface of the culvert and a lining construction device used for carrying out the method,
More specifically, a lining construction method and a lining construction apparatus which are formed by inserting a so-called lining pipe formed by spirally winding a band-shaped member formed of a long plate-like body into a duct having a rectangular cross section, and the lining construction apparatus About.

【0002】(2) 従来の技術 一般の円形断面を有する管渠におけるライニング施工技
術の一態様として、例えば、特公平2−312136号
公報が公知である。すなわち、この従来技術において
は、管渠の人孔に設置された製管機より出発し、連続的
に供給される帯状部材を螺旋状に捲回して形成したライ
ニング管を既設管渠内に回転動すなわちスラスト力を伴
って送り込んで行くものである。しかしながら、この従
来技術によっては、ライニング管が長尺になるにつれ、
その重量が増大することに加え、該ライニング管の外面
と管渠の管壁との摩擦抵抗が増大し、大きなスラスト力
を要することになる。また、大径になるにつれ単位長さ
当たりの重量も増大することは同様であり、更に大きな
スラスト力を要することになる。このため、必要なスラ
スト力を得るため動力設備が大型化し、設備費用が嵩む
ものとなる。従って、この従来技術においては長尺化・
大径化に問題がある。更にまた、この従来技術において
は管渠の曲がりに対処することができないことも問題点
の一つである。
(2) Prior Art As an example of a lining construction technique for a general sewer having a circular cross section, Japanese Patent Publication No. 2-312136 is known. That is, in this prior art, a lining pipe formed by spirally winding a continuously supplied strip-shaped member, starting from a pipe-making machine installed in a manhole of a sewer, is rotated into an existing sewer. It is fed with movement, that is, thrust force. However, according to this conventional technique, as the lining tube becomes longer,
In addition to the increase in weight, the frictional resistance between the outer surface of the lining pipe and the pipe wall of the sewer increases, and a large thrust force is required. Similarly, as the diameter increases, the weight per unit length also increases, and a greater thrust force is required. For this reason, the power equipment increases in size to obtain the necessary thrust force, and the equipment cost increases. Therefore, in this prior art, the length is increased.
There is a problem with increasing the diameter. Furthermore, one of the problems with this conventional technique is that it is impossible to cope with the bending of the sewer.

【0003】そこで、本出願人においては、この問題を
解決すべく、先に特開平5−169539号(以下、先
願技術という)をもって、管渠内において帯状体を螺旋
状に巻回し、相互に隣接する帯状体の側縁部同士を係合
させることにより螺旋管を製造して該螺旋管により管路
内周面をライニングする管路内周面のライニング施工法
を提案した。これによれば、製管されるランニング管の
前方に新たに供給される帯状部材をもってライニング管
を付加形成するものであるので、長尺のライニング管の
製作を実現することができる。しかしながら、この先願
技術においては、製管部位における製管ローラを取り付
ける枠体が剛直となっており、円形断面の管渠への適用
に限定されている。すなわち、矩形断面の管渠に対して
は、直角状の角部に枠体が十分に届かないばかりでな
く、角部での接合が不安定となり、その適用に限界があ
る。
In order to solve this problem, the applicant of the present invention disclosed in Japanese Patent Application Laid-Open No. Hei 5-169439 (hereinafter referred to as the prior art) to spirally wind a band-shaped body in a pipe. A spiral pipe is manufactured by engaging the side edges of the strips adjacent to the pipe, and a lining construction method of the pipe inner peripheral surface is proposed in which the spiral pipe is used to line the inner peripheral surface of the pipe. According to this, since the lining pipe is additionally formed with the band-shaped member newly supplied in front of the running pipe to be manufactured, the production of a long lining pipe can be realized. However, in this prior application, the frame for mounting the pipe-forming roller at the pipe-forming site is rigid, and is limited to application to a pipe with a circular cross section. That is, for a duct with a rectangular cross section, not only does the frame not sufficiently reach the right-angled corner, but also the joining at the corner becomes unstable, and its application is limited.

【0004】(3) 発明が解決しようとする課題 本発明はこの先願技術を更に発展させたものであり、円
形の一般断面に限定されず、矩形あるいは卵形等の異形
断面をなす管渠にも対応できる異形断面管渠内における
ライニング施工技術を提供することを目的とする。
(3) Problems to be Solved by the Invention The present invention is a further development of the prior application technology, and is not limited to a general circular cross section, but is applied to a duct having a rectangular or oval or other irregular cross section. It is an object of the present invention to provide a lining construction technique in a pipe with a modified cross section that can also deal with the problem.

【0005】ロ.発明の構成 (1) 問題点を解決するための手段 本発明の異形断面管渠内におけるライニング施工方法及
びその施工装置は上記目的を達成するため、次の構成を
採る。すなわち、第1番目の発明は異形断面管渠内にお
けるライニング施工方法に係り、請求項1に記載のとお
り、異形断面管渠内において、両側縁部に接合部が形成
された長尺の帯状部材を連続的に供給するとともに螺旋
状に捲回し、相接する接合部相互を接合させて形成され
た管状体を残置させ、この既に形成された管状体の前方
に新たに供給される帯状部材をもってライニング管を付
加形成する方法であって、所定の幅と横剛性とを有し、
リンク機構をもって屈撓自在とされ各リンク体の中折れ
が防止された成形フレーム回りに前記帯状部材の内面に
当接する案内ローラが装着され、かつ、この成形フレー
ムに、既に形成された管状体の端縁部において、帯状部
材の外面に当接する外面ローラと帯状部材の内面に当接
する内面ローラとの2つのローラからなる接合ローラ部
を配し、前記接合ローラ部でのローラを回転駆動させる
とともに、既に形成された管状体と新たに供給される帯
状部材との接合部相互の位置において前記2つの外面及
び内面ローラで挟着する、ことを特徴とする。第2番目
の発明は第1番目の発明を実施する施工装置であって、
請求項2に記載のとおり、異形断面管渠内において、両
側縁部に接合部が形成された長尺の帯状部材を連続的に
供給して螺旋状に捲回し、相接する継手相互を係合させ
て形成して管状体を付加形成するライニング施工装置で
あって、所定の幅と横剛性とを有し、リンク機構をもっ
て屈撓自在にして各リンク体の中折れが防止された成形
フレーム、前記成形フレーム回りに装着され、前記管状
体の内面に当接する案内ローラ、前記成形フレームを介
して取り付けられ、前記既に形成された管状体と新たに
供給される帯状部材との接合部相互の位置に配されると
ともに帯状部材を挟着する外面ローラと内面ローラとか
らなる接合機構部、からなることを特徴とする。なお、
叙上の第1・第2番目の発明は円形断面管への適用を除
外するものではない。
[0005] b. Configuration of the Invention (1) Means for Solving the Problems The lining installation method and the installation device in the modified cross-section culvert according to the present invention employ the following configurations in order to achieve the above object. That is, the first invention relates to a lining construction method in a modified cross-section culvert, and as described in claim 1, in a modified cross-section culvert, a long strip-shaped member having joints formed at both side edges. Continuously supplied and spirally wound, leaving the tubular body formed by joining the mutually joining joints to each other, and holding the band-shaped member newly supplied in front of the already formed tubular body. A method for additionally forming a lining tube, having a predetermined width and a lateral rigidity,
A guide roller abutting on the inner surface of the band-shaped member is mounted around a forming frame in which the link mechanism is bendable and each link body is prevented from being bent in the middle, and the forming frame is provided with a tubular member already formed. At the edge portion, a joining roller portion composed of two rollers, an outer roller contacting the outer surface of the band-shaped member and an inner roller contacting the inner surface of the band-shaped member, is arranged, and the roller at the joining roller portion is driven to rotate. The two outer surfaces and the inner surface rollers sandwich the joint between the already formed tubular body and the newly supplied band-shaped member. The second invention is a construction device for implementing the first invention,
As described in claim 2, a long strip-shaped member having joints formed on both side edges is continuously supplied and spirally wound in a pipe with a modified cross-section to engage the joints that are in contact with each other. What is claimed is: 1. A lining construction apparatus for forming a tubular body by adding and forming a tubular body, wherein the forming frame has a predetermined width and a lateral rigidity, and is flexibly bendable by a link mechanism, thereby preventing each link body from being bent. A guide roller mounted around the forming frame and abutting on the inner surface of the tubular body, attached via the forming frame, and connected to each other at the joint between the already formed tubular body and the newly supplied band-shaped member. And a joining mechanism portion comprising an outer roller and an inner roller which are arranged at the position and sandwich the band-shaped member. In addition,
The first and second inventions described above do not exclude the application to a circular cross-section tube.

【0006】第3番目の発明は更に別の異形断面管渠内
におけるライニング施工方法に係り、請求項3に記載の
とおり、異形断面管渠内において、両側縁部に接合部が
形成された長尺の帯状部材を連続的に供給するとともに
螺旋状に捲回し、相接する接合部相互を接合させて形成
された管状体を残置させ、この既に形成された管状体の
前方に新たに供給される帯状部材をもってライニング管
を付加形成する方法であって、所定の幅と横剛性とを有
し、リンク機構をもって屈撓自在の成形フレーム回りに
前記帯状部材の内面に当接する案内ローラが装着され、
かつ、この成形フレームに、既に形成された管状体の端
縁部において、帯状部材の外面に当接する外面ローラと
帯状部材の内面に当接する内面ローラとの2つのローラ
からなる接合ローラ部を配し、前記接合ローラ部でのロ
ーラを回転駆動させるとともに、既に形成された管状体
と新たに供給される帯状部材との接合部相互の位置にお
いて前記2つの外面及び内面ローラで挟着し、前記成形
フレームを該成形フレームの内側に配され、剛性を保持
するとともに異形断面形状に合致した形状をなす規制フ
レーム回りに回転させることを特徴とする。第4番目の
発明は第3番目の発明を実施する施工装置であって、請
求項4に記載のとおり、異形断面管渠内において、両側
縁部に接合部が形成された長尺の帯状部材を連続的に供
給して螺旋状に捲回し、相接する継手相互を係合させて
形成して管状体を付加形成するライニング施工装置であ
って、所定の幅と横剛性とを有し、リンク機構をもって
屈撓自在の成形フレーム、前記成形フレーム回りに装着
され、前記管状体の内面に当接する案内ローラ、前記成
形フレームを介して取り付けられ、前記既に形成された
管状体と新たに供給される帯状部材との接合部相互の位
置に配されるとともに帯状部材を挟着する外面ローラと
内面ローラとからなる接合機構部、前記成形フレームの
内側に配され、剛性を保持するとともに異形断面形状の
案内軌道を有し、前記成形フレームの移動を規制する規
制フレーム、からなることを特徴とする。
A third aspect of the present invention relates to a lining construction method in still another modified cross-section culvert. As described in claim 3, in the modified cross-section culvert, a long section having joints formed at both side edges is provided. The strip-shaped member is continuously supplied and spirally wound, leaving the tubular body formed by joining the mutually joining joints together, and is newly supplied in front of the already formed tubular body. A method of additionally forming a lining tube with a belt-shaped member having a predetermined width and a lateral rigidity, and a guide roller is provided around a forming frame which can be flexibly bent with a link mechanism and is brought into contact with an inner surface of the band-shaped member. ,
In addition, a joining roller portion composed of two rollers, an outer roller contacting the outer surface of the band-shaped member and an inner roller contacting the inner surface of the band-shaped member, is provided at the edge of the already formed tubular body. Then, while rotating the roller in the joining roller portion, the two outer surface and the inner surface rollers are sandwiched between the joining portion between the already formed tubular body and the newly supplied band-shaped member, and The molding frame is disposed inside the molding frame, and is rotated around a regulating frame which maintains rigidity and has a shape conforming to the irregular cross-sectional shape. A fourth invention is a construction apparatus for carrying out the third invention, and as described in claim 4, a long strip-shaped member having joints formed at both side edges in a pipe having a modified cross section. A lining construction device that continuously supplies and spirally winds, forms a tubular body by forming the joints that are in contact with each other, and has a predetermined width and lateral rigidity, A bending frame that can be bent with a link mechanism, a guide roller that is mounted around the molding frame and abuts against the inner surface of the tubular body, is attached via the molding frame, and is newly supplied with the already formed tubular body. A joining mechanism portion comprising an outer roller and an inner roller sandwiching the band-shaped member and arranged at the mutual position of the joining portion with the band-shaped member, and arranged inside the forming frame, maintaining rigidity and having a modified cross-sectional shape Guide rail The a, characterized by comprising the regulatory frame, for restricting the movement of the forming frame.

【0007】(2) 作用 第1番目の異形断面管渠内におけるライニング施工方法
の発明において、成形フレームは異形断面管渠の断面に
適合する形状・周長が選択される。帯状部材の閉合部位
で接合ローラ部の外面ローラ及び内面ローラの挟着作用
により相接する接合部の相互は係合される。接合ローラ
部は常に閉合部位に位置し、新たに供給される帯状部材
とともに所定のピッチで管軸方向に前進する。これによ
り、本施工装置は全体的に公転し、帯状部材は連続的に
閉合されてライニング管が形成される。このライニング
管の形成において、成形フレームは屈撓自在となってお
り、かつ、中折れが防止されているので、管渠の内周に
沿って形成され、異形断面に適合する。外面ローラと帯
状部材の外面に形成された凹溝とが係合する態様にあっ
ては、確実な送りが得られる。第2番目の発明の異形断
面管渠内におけるライニング施工装置において、成形フ
レームは異形断面管渠の断面に適合する形状・周長が選
択される
(2) Operation In the first invention of the method of lining the inside of the modified cross-section culvert, a shape and a perimeter suitable for the cross-section of the modified cross-section culvert are selected. At the closed portion of the belt-shaped member, the joining portions that are in contact with each other by the pinching action of the outer roller and the inner roller of the joining roller portion are engaged with each other. The joining roller portion is always located at the closed portion, and advances in the pipe axis direction at a predetermined pitch together with the newly supplied band-shaped member. As a result, the construction apparatus revolves as a whole, and the belt-shaped members are continuously closed to form a lining pipe. In the formation of this lining tube, the forming frame is bendable and prevented from being bent, so that it is formed along the inner periphery of the sewer and conforms to the irregular cross section. In a mode in which the outer roller and the groove formed on the outer surface of the belt-shaped member are engaged, reliable feeding can be obtained. In the second aspect of the present invention, the shape and perimeter of the molding frame are selected so as to conform to the cross section of the modified cross-section culvert.

【0008】第3番目の発明の異形断面管渠内における
ライニング施工方法において、規制フレームは異形断面
管渠の断面に適合する形状・周長が選択される。成形フ
レームの接合ローラ部により新たに供給される帯状部材
が閉合し、ライニング管が形成される。また、該成形フ
レームは規制フレームにより移動が強制され、帯状部材
を塑性変形させ、規制フレームの形状に合致する異形断
面のライニング管が形成される。第4番目の発明の異形
断面管渠内におけるライニング施工装置において、規制
フレームは異形断面管渠の断面に適合する形状・周長が
選択される。
In a third aspect of the present invention, in the lining construction method in a modified sectional culvert, a shape and a perimeter suitable for a section of the irregular sectional culvert are selected for the regulating frame. The band-shaped member newly supplied by the joining roller portion of the forming frame is closed, and a lining tube is formed. In addition, the molding frame is forced to move by the regulating frame, and the band-shaped member is plastically deformed, so that a lining tube having a modified cross section conforming to the shape of the regulating frame is formed. In the fourth aspect of the present invention, the shape and perimeter of the regulating frame are selected so as to conform to the cross section of the modified cross-section culvert.

【0009】(3) 実施例 本発明の異形断面管渠におけるライニング施工方法及び
その施工装置の実施例を図面に基づいて説明する。 (第1実施例)図1〜図12は本発明の異形断面管渠用
ライニング施工装置の一実施例(第1実施例)を示す。
本実施例においては、異形断面として矩形断面の管渠へ
の適用例を示す。すなわち、図1及び図2・図3は本ラ
イニング施工装置Sの全体の概略を示し、図4〜図12
は本ライニング施工装置Sの各部の構成を示す。また、
図19〜図21は帯状部材の各態様を示す。これらの図
において、Pは矩形断面をなす管渠、Rはライニング管
を示す。なお、本装置Sの進行方向(矢印イ)をもっ
て、前部、後部とする。
(3) Embodiment An embodiment of a method and an apparatus for lining a pipe with a modified cross section according to the present invention will be described with reference to the drawings. (First Embodiment) FIGS. 1 to 12 show one embodiment (first embodiment) of a lining construction apparatus for a modified sectional duct according to the present invention.
In the present embodiment, an example of application to a duct having a rectangular cross section as a modified cross section will be described. That is, FIGS. 1, 2 and 3 schematically show the entire lining construction apparatus S, and FIGS.
Shows the configuration of each part of the lining construction apparatus S. Also,
19 to 21 show the respective aspects of the belt-shaped member. In these figures, P indicates a sewer having a rectangular cross section, and R indicates a lining pipe. Note that the forward direction and the rear direction are defined as the traveling direction (arrow A) of the present apparatus S.

【0010】帯状部材100,120,140 図19は本実施例のライニング施工において使用される
帯状部材の一例を示す。帯状部材100は本体が一定厚
さの平板状をなし、その外面の長手方向に適宜数(図例
では7)の突条102が連続的に縦設される。突条10
2に先端部にはフランジ102aが形成される。突条1
02の相互間は溝104もしくは溝空間を形成する。内
面106は実質的に平滑に形成される。帯状部材100
の両側には互いに内外に重合して係合する接合部100
A,100Bが形成される。すなわち、前縁側接合部1
00Aはその前端部の突条102Aの基部が膨径され、
その内面側より凹溝110が縦設され、更にこの突条1
02Aより張出し部112が連設される。後縁側接合部
100Bは後端部の突条102Bより張出し部114が
張設され、該張出し部114の端部寄りに前記前縁側接
合部100Aの凹溝110に係合する凸条116が縦設
される。接合時において、相隣れる帯状部材100の前
縁部と後縁部とが重なり合い、前縁側接合部100Aに
後縁側接合部100Bが後記する接合ローラ部の外面ロ
ーラと内面ローラとの挟着作用を受けて、凹溝110内
に凸条116が、また、突条102Bのフランジ102
a内に張出し部112の端部がそれぞれ嵌り込み、接合
される。この場合、主たる係合は凹溝110と凸条11
6とによりなされ、張出し部112と突条102Bとは
従たる係合をなすものであり、従って、場合によっては
従たる係合は省略されうる。更に、本実施例では張出し
部112,114の当接部分にはシール材118が介装
され、接合性を高める。なお、接合部100A,100
Bにおける嵌合係合で十分であれば、当該シール材11
8を省略することができる。帯状部材は合成樹脂の素材
をもって作成され、特に成形性の観点から押出し形成に
より連続的に成形できる塩化ビニール(PVC)樹脂が
好適である。しかし金属製による成形を妨げるものでは
ない。
[0010] strips 100, 120, 140 Figure 19 shows an example of the belt-shaped member used in the lining of the present embodiment. The belt-shaped member 100 has a main body in the shape of a flat plate having a constant thickness, and an appropriate number (seven in the illustrated example) of ridges 102 are continuously provided in the longitudinal direction of the outer surface thereof. Ridge 10
2, a flange 102a is formed at the tip. Ridge 1
02 form a groove 104 or a groove space. The inner surface 106 is formed substantially smooth. Belt member 100
On both sides of the joint 100 are overlapped and engaged with each other
A, 100B are formed. That is, the leading edge side joint 1
The base of the ridge 102A at the front end of 00A is expanded,
A concave groove 110 is provided vertically from the inner side, and
The overhang portion 112 is provided continuously from 02A. The trailing edge side joining portion 100B has a projecting portion 114 extending from the rear end protruding portion 102B. Near the end of the projecting portion 114, a ridge 116 engaging with the concave groove 110 of the leading edge side joining portion 100A is formed vertically. Is established. At the time of joining, the leading edge and the trailing edge of the adjacent belt-shaped members 100 overlap, and the trailing edge joining portion 100B sandwiches the outer roller and the inner roller of the joining roller portion described later on the leading edge joining portion 100A. As a result, the ridges 116 are formed in the grooves 110 and the flanges 102 of the ridges 102B.
The ends of the protruding portions 112 are fitted into and joined to each other. In this case, the main engagement is the groove 110 and the ridge 11
6, the overhang portion 112 and the ridge 102B make a secondary engagement, and therefore, the secondary engagement may be omitted in some cases. Further, in the present embodiment, a sealing material 118 is interposed at the abutting portions of the overhanging portions 112 and 114 to enhance the joining property. Note that the joints 100A, 100
If the fitting engagement at B is sufficient, the sealing material 11
8 can be omitted. The belt-shaped member is made of a synthetic resin material. In particular, a vinyl chloride (PVC) resin that can be continuously formed by extrusion from the viewpoint of moldability is preferable. However, this does not hinder metal molding.

【0011】図20は帯状部材の他の態様を示す。この
帯状部材120は、外面の長手方向に適宜数の台形状の
突条122が連続的に縦設され、突条122の間は谷部
124に形成される。突条122及び谷部124は幅方
向に等しいピッチをなす。突条122の内部には適宜中
空部が形成され、帯状部材の剛性化並びに軽量化を図り
うる。内面126は実質的に平滑に形成される。帯状部
材120の両側には互いに内外に重合して係合する接手
部120A,120Bが形成される。すなわち、外側接
合部120Aの突条は突条122と同形に形成されその
内面には丸形凹溝130が縦設され、また、張出し部1
32は谷部124の幅よりも若干長くされている。内側
接合部120Bはその張出し部134の長さをほぼ谷部
124よりも長めの長さにされ、該張出し部134の端
部に前記外側接合部120Aの丸形凹溝130に係合す
る丸形凸条136が縦設されるとともに、その付け根部
の突条122には切込み凹溝138が縦設されている。
接合時において、外側接合部120Aに内側接合部12
0Bが接合ローラ部の外面ローラと内面ローラとにより
押圧され、丸形凹溝130に丸形凸条136が、また、
切込み凹溝138に張出し部132の端部がそれぞれ嵌
り込み、接合される。
FIG. 20 shows another embodiment of the belt-like member. In this band-shaped member 120, an appropriate number of trapezoidal ridges 122 are continuously provided vertically in the longitudinal direction of the outer surface, and a valley 124 is formed between the ridges 122. The ridges 122 and the valleys 124 have the same pitch in the width direction. A hollow portion is appropriately formed inside the ridge 122, so that the band-shaped member can be made rigid and lightweight. The inner surface 126 is formed to be substantially smooth. Joint portions 120A and 120B are formed on both sides of the belt-shaped member 120 so as to overlap and engage with each other. That is, the ridge of the outer joint 120A is formed in the same shape as the ridge 122, the inner surface of which is provided with the circular groove 130 in the vertical direction.
32 is slightly longer than the width of the valley 124. The inner joint portion 120B has a length of the overhang portion 134 substantially longer than that of the valley portion 124, and the end of the overhang portion 134 has a round shape which engages with the round groove 130 of the outer joint portion 120A. A convex ridge 136 is provided vertically, and a cut groove 138 is provided vertically in the ridge 122 at the base thereof.
At the time of joining, the inner joining portion 12 is attached to the outer joining portion 120A.
0B is pressed by the outer roller and the inner roller of the joining roller portion, and a round ridge 136 is formed in the round groove 130;
The ends of the projections 132 are fitted into the cut grooves 138 and joined.

【0012】図21は更に他の帯状部材の態様を示す。
このものは主材(主帯状部材)140と嵌合材150と
の組み合わせよりなり、主材140は突条142及び溝
144を有し、その両端部には接合部140A,140
Bが形成され、該接合部140A,140Bに嵌合溝1
46が形成される。また、嵌合材150は主材140の
嵌合溝146に弾圧的に嵌填まり込む嵌合突条152を
有する。接合時において、相並べられた主材140の接
合部140A,140B間に跨って嵌合材150が接合
される。
FIG. 21 shows still another embodiment of the belt-like member.
This is composed of a combination of a main material (main band-shaped member) 140 and a fitting material 150. The main material 140 has a ridge 142 and a groove 144, and has joints 140A, 140 at both ends.
B is formed, and fitting grooves 1 are formed in the joints 140A and 140B.
46 are formed. In addition, the fitting member 150 has a fitting ridge 152 that is elastically fitted into the fitting groove 146 of the main member 140. At the time of joining, the fitting material 150 is joined across the joining portions 140A and 140B of the main material 140 arranged side by side.

【0013】ライニング施工装置S(図1〜図12参
照) 図1〜図12を参照して、本実施例のライニング施工装
置Sの構成を説明する。図1〜図3に示されるように、
このライニング施工装置Sは、所定幅を有し複数のリ
ンク体により構成されるリンク機構をもって屈撓自在の
環状体をなす成形フレーム1、該成形フレーム1のリ
ンク機構の各軸部に配される複数の案内ローラ2、該
成形フレーム1の相対向する2箇所に取り付けられ、外
面ローラ3と内面ローラ4とを含む主・副の接合機構部
5(主接合機構部5A、副接合機構部5B)、の主要部
からなる。 なお、図1及び図2は本装置Sの製管途中
のポジション1を示し、図3はポジション2を示す。
Lining Apparatus S (See FIGS. 1 to 12) The configuration of the lining apparatus S of this embodiment will be described with reference to FIGS. As shown in FIGS.
This lining construction apparatus S is arranged on a forming frame 1 which forms a bendable annular body with a link mechanism having a predetermined width and constituted by a plurality of link bodies, and each shaft portion of the link mechanism of the forming frame 1. A plurality of guide rollers 2, a main / sub joining mechanism 5 (a main joining mechanism 5 </ b> A, a sub joining mechanism 5 </ b> B) attached to two opposing portions of the molding frame 1 and including an outer roller 3 and an inner roller 4. ), The main part of. 1 and 2 show position 1 in the middle of the pipe making of the apparatus S, and FIG. 3 shows position 2.

【0014】以下、各部の細部構造を説明する。成形フレーム1 (図1〜図7参照) 成形フレーム1は、所要の幅をもって環状体をなし、リ
ンク機構をもって外径方向へは屈撓自在となっており、
かつ横剛性を有する。しかして、この環状体は複数のリ
ンク体が連なったリンク連鎖をなすものであって、本実
施例では24個のリンク体のリンク連鎖からなるが、そ
の数に限定されるものではない。もっと詳しくは、各リ
ンク体は、図4・図5に示されるように、所要長さの棒
状をなす軸部10と、該軸部10の前後の両端部におい
て、相隣り合う軸部10間に軸受11を介して回転可能
に連結される板状のリンクアーム12と、からなる。リ
ンクアーム12の相互は180°を基準に、外折れが可
能とされるが、中折れは防止される。このため、中折れ
防止機構が設けられるものであって、図6にその一例を
示す。すなわち、一方のリンクアーム12(I)の端部
には主ストッパー14が突設され、他のリンクアーム1
2(II)には先のリンクアーム12(I)側に突設す
るストッパー受け15が固設されてなり、これらの主ス
トッパー14とストッパー受け15との当接により中折
れが阻止される。16は外折れの角度(α)を規制する
副ストッパーである。
The detailed structure of each part will be described below. Forming frame 1 (refer to FIGS. 1 to 7) The forming frame 1 forms an annular body with a required width, and is flexibly bendable in the outer diameter direction with a link mechanism.
And it has lateral rigidity. In this embodiment, the annular body forms a link chain in which a plurality of link bodies are connected. In the present embodiment, the ring body includes a link chain of 24 link bodies, but the number is not limited. More specifically, as shown in FIGS. 4 and 5, each link body has a rod-shaped shaft portion 10 of a required length, and a pair of adjacent shaft portions 10 at both front and rear ends of the shaft portion 10. And a plate-like link arm 12 that is rotatably connected via a bearing 11. The outer sides of the link arms 12 can be bent on the basis of 180 °, but the center arms are prevented from being bent. For this reason, a folding mechanism is provided, an example of which is shown in FIG. That is, the main stopper 14 is protruded from the end of one link arm 12 (I), and the other
A stopper receiver 15 protruding from the link arm 12 (I) side is fixed to 2 (II), and the main stopper 14 and the stopper receiver 15 abut against each other to prevent the center bend. Reference numeral 16 denotes a sub-stopper that regulates the angle (α) of the outer bend.

【0015】案内ローラ2(図1〜図5、図7参照) 案内ローラ2は、成形フレーム1の各軸部10に回転自
在に装着される。該案内ローラ2は本実施例では軸部1
0に一体に取り付けられたものとなっているが、軸受を
介して取り付ける態様もある。ローラ本体は硬質の合成
樹脂体あるいは金属体よりなり、帯状部材100の内面
に当接する。標準の案内ローラ2(2a)はリンク体の
内幅一杯の長さを有するが、後記する接合機構部5の所
要数(通常は1)の前方部の案内ローラ2(2b)は帯
状部材100の幅だけ短くされる(図7参照)。
Guide roller 2 (see FIGS. 1 to 5 and FIG. 7) The guide roller 2 is rotatably mounted on each shaft 10 of the molding frame 1. The guide roller 2 is a shaft 1 in this embodiment.
Although it is attached integrally to the shaft 0, there is also a mode in which it is attached via a bearing. The roller body is made of a hard synthetic resin body or a metal body, and contacts the inner surface of the belt-shaped member 100. The standard guide roller 2 (2a) has a length that is the full width of the inside of the link body. (See FIG. 7).

【0016】接合機構部5(図1〜図3、図7〜12参
照) 接合機構部5は、主・副の接合機構部5A,5Bが対と
なり、成形フレーム1の対角位置に装着される。該接合
機構部5は、内面ローラ3と外面ローラ4とが組となっ
た接合ローラ部20を主体とし、かつ、これらのローラ
3,4の同期回転を図る歯車機構21を収めた箱体2
2、及び該箱体22に取り付けられローラ3,4の回転
駆動源としての油圧モータ23を含み、主接合機構部5
Aは螺旋状に捲回される帯状部材100の接合部、すな
わち当該帯状部材100が最初に閉合する位置に対応し
て配される。なお、内面ローラ3は案内ローラ2と同様
に成形フレーム1の軸部10に装着される。
Joining mechanism 5 (see FIGS. 1 to 3 and FIGS. 7 to 12) The joining mechanism 5 is a pair of main and auxiliary joining mechanisms 5A and 5B, and is mounted at a diagonal position of the molding frame 1. You. The joining mechanism 5 mainly includes a joining roller 20 in which the inner roller 3 and the outer roller 4 are combined, and a box body 2 containing a gear mechanism 21 for rotating the rollers 3 and 4 synchronously.
2 and a hydraulic motor 23 attached to the box 22 and serving as a rotational drive source for the rollers 3 and 4.
A is arranged corresponding to the joining portion of the band-shaped member 100 wound spirally, that is, the position where the band-shaped member 100 first closes. The inner roller 3 is mounted on the shaft 10 of the molding frame 1 in the same manner as the guide roller 2.

【0017】(接合ローラ部20)(図8参照) 接合ローラ部20は、内面ローラ3と外面ローラ4とが
互いに管軸方向に相並んで、かつ、両ローラ3,4の間
に帯状部材100を挟着するように所定の間隔を保って
配される。そして、これらのローラ3,4は歯車機構の
駆動軸に連動して、回転駆動される。図8に基づいて接
合ローラ部20の詳細構造を説明する。図8は接合ロー
ラ部20の内面及び外面の2つのローラ3,4を拡大し
て示すとともに、これらのローラ3,4と帯状部材10
0との対応関係を示す。図示されるように、本実施例で
はこれらのローラ3,4は帯状部材100の複数(本実
施例では3)スパンにわたって配される。また、Hは帯
状部材100相互の最初の閉合部を示す。主接合機構部
5Aはこの最初の閉合部Hに対応して配される。従っ
て、この主接合機構部5Aの前方の案内ロール2(2
b)は帯状部材100の1スパン分だけ短くされ、帯状
部材の引込みを可能とする。内面ローラ3は円筒状をな
し、帯状部材100の内面に密着し、閉合部Hを含め、
外面ローラ4をもって外方から押圧される帯状部材10
0を支持する。なお、内面ローラ3の前端部には拡径部
3aが形成され、かつ該拡径部3aに帯状部材100の
内面の溝110に係合する鍔3bが突設されるものであ
るが、適宜省略されうる。外面ローラ4は円筒本体25
に所定間隔をもって複数の輪状鍔部26が形成されてな
り、これらの輪状鍔部26は帯状部材100の突条10
2間の溝104に嵌まり込む。また、円筒本体25の外
周は帯状部材100の突条102の外面に圧接される。
該円筒本体25の外面にはローレット加工が施され、帯
状部材100との滑りを防ぐ。また、その一部25aは
小径にされ、突条102から外れる。輪状鍔部26に付
き、閉合部Hに対応する2個一対の輪状鍔部26aはそ
の周側部が帯状部材100に当接する。他の輪状鍔部2
6については格別当接する必要はなく、突条102間の
溝104に嵌まり込むことが肝要である。なお、図8の
対応は帯状部材120,140に付いても本質的な差異
はない。帯状部材140に付いては、閉合部位Hに嵌合
材150が位置する。
(Joining Roller Section 20) (See FIG. 8) The joining roller section 20 includes an inner roller 3 and an outer roller 4 which are arranged side by side in the tube axis direction, and a belt-like member between the two rollers 3, 4. 100 are arranged at predetermined intervals so as to sandwich them. These rollers 3 and 4 are driven to rotate in conjunction with the drive shaft of the gear mechanism. The detailed structure of the joining roller unit 20 will be described with reference to FIG. FIG. 8 is an enlarged view of the two rollers 3 and 4 on the inner surface and the outer surface of the joining roller portion 20, and the rollers 3 and 4 and the belt-shaped member 10 are shown.
The correspondence with 0 is shown. As illustrated, in the present embodiment, these rollers 3 and 4 are arranged over a plurality of (3 in the present embodiment) spans of the belt-shaped member 100. H indicates a first closed portion between the belt-shaped members 100. The main joining mechanism 5A is arranged corresponding to the first closing portion H. Therefore, the guide roll 2 (2) in front of the main joining mechanism 5A
b) is shortened by one span of the band-shaped member 100, and allows the band-shaped member to be retracted. The inner roller 3 has a cylindrical shape, is in close contact with the inner surface of the belt-shaped member 100,
Belt member 10 pressed from outside by outer roller 4
Supports 0. In addition, an enlarged diameter portion 3a is formed at the front end of the inner roller 3, and a flange 3b that engages with the groove 110 on the inner surface of the belt-shaped member 100 is protruded from the enlarged diameter portion 3a. Can be omitted. The outer roller 4 is a cylindrical body 25
Are formed at predetermined intervals, and these annular flanges 26 are formed on the ridges 10 of the belt-shaped member 100.
It fits into the groove 104 between the two. The outer periphery of the cylindrical body 25 is pressed against the outer surface of the ridge 102 of the belt-shaped member 100.
The outer surface of the cylindrical body 25 is knurled to prevent slippage with the band-shaped member 100. In addition, a part 25a of the part has a small diameter and comes off the ridge 102. A pair of two annular flanges 26 a corresponding to the closing portion H are attached to the annular flange 26, and the peripheral sides of the pair of annular flanges 26 a contact the belt-shaped member 100. Other annular collar 2
It is not necessary to make special contact with 6, and it is important to fit into the groove 104 between the ridges 102. It should be noted that the correspondence in FIG. 8 is not essentially different even if the belt-like members 120 and 140 are attached. With respect to the band-shaped member 140, the fitting member 150 is located at the closing position H.

【0018】(箱体22)(図9、図10参照) 箱体22は、剛性を保持し、上部分22Aと下部分22
Bとに分かれ、側部のピン軸部材28により上下部分2
2A,22Bは枢着され、このピン部材28回りに上部
分22Aは開放可能とされる。箱体22は上下部分22
A,22Bにわたってその前後面により歯車機構21の
軸部の保持をなす。また、箱体22の下部分22Bにお
いて、後面部を介して成形フレーム1のリンクアーム1
2に固定され、前面部は油圧モータ23の取付け部に供
される。箱体22の他の側面には上部分22Aを下部分
22Bへ閉合する閉合装置29が取り付けられる。図示
するものはその一例であって、上部分22Aから突設さ
れたリブ30に連結棒31が枢着され、また、下部分2
2Bにはリブ30と同位相で二又状の受棚32が突設さ
れ、連結棒31はこの受棚32の凹部に入り込む。連結
棒31にはコイルばね33及びその下部のねじ部に螺合
するナット34が順次装着され、ナット34の締込みを
もってコイルばね33を受棚32の下面に押し付けるよ
うにされている。これにより、コイルばね33の弾性に
より上部分22Aの締付け力が適宜に調整される。
(Box 22) (See FIGS. 9 and 10) The box 22 maintains rigidity, and has an upper portion 22A and a lower portion 22.
B and upper and lower portions 2 by the pin shaft member 28 on the side.
2A and 22B are pivotally connected, and the upper portion 22A can be opened around the pin member 28. The box body 22 is an upper and lower part 22
A shaft portion of the gear mechanism 21 is held by the front and rear surfaces of A and 22B. In the lower portion 22B of the box 22, the link arm 1 of the molding frame 1 is interposed via the rear surface.
2 and the front part is provided to a mounting part of the hydraulic motor 23. A closing device 29 for closing the upper portion 22A to the lower portion 22B is attached to the other side surface of the box 22. The one shown in the figure is an example, in which a connecting rod 31 is pivotally attached to a rib 30 projecting from the upper part 22A, and the lower part 2
A bifurcated receiving shelf 32 protrudes from 2 </ b> B in the same phase as the rib 30, and the connecting rod 31 enters a concave portion of the receiving shelf 32. A coil spring 33 and a nut 34 that is screwed into a screw portion below the coil spring 33 are sequentially mounted on the connecting rod 31, and the coil spring 33 is pressed against the lower surface of the receiving shelf 32 by tightening the nut 34. Thereby, the tightening force of the upper portion 22A is appropriately adjusted by the elasticity of the coil spring 33.

【0019】(歯車機構21及び油圧モータ23)(図
9参照) 歯車機構21は、箱体22の前後壁にわたって回転自在
に架け渡された2つの軸部36,37を有し、第1の軸
部36には歯車38が固設され、第2の軸部37には歯
車38に噛合する歯車39が固設される。第1の軸部3
6は内面ローラ3に接続され、第2の軸部37は外面ロ
ーラ4に接続される。なお、これらの歯数を調整するこ
とにより軸部36,37の回転数を調整することができ
る。本実施例では2つの軸部36,37は回転軸受をも
って支持固定されてなるが、すべり軸受を用いることは
自由である。更に、第2の軸部37に間隔保持用のスペ
ーサローラ40が回転自在に取り付けられる。該スペー
サローラ40はその外周を管渠Pの内壁面に当接する。
なお、該スペーサローラ40は適宜の径とされるととも
に、省略することも可能である。油圧モータ23は、そ
の駆動軸23aを第1の軸部33に連結して箱体22の
前面に取り付けられる。該油圧モータ33には、該油圧
モータ23に油を送るイン側配管41aと、該油圧モー
タ23から油を排出するアウト側配管41bとが接続さ
れる。更に、これらの配管41は、箱体22に取り付け
られる回転継手42(図1参照)に接続され、該回転継
手42には外部の圧力源に連なる配管43が接続され
る。この回転継手42を介することにより、回転動作を
伴う油圧モータ23側の配管41と、回転動作のない外
部側配管43との間の作動流体の授受をなす。この歯車
機構21・油圧モータ23により、油圧モータ23の駆
動力は第1の軸部36に伝達され、かつ、歯車機構21
を介して第2の軸部37に伝達される。軸部36と軸部
37とは互いに逆回転となる。
(Gear Mechanism 21 and Hydraulic Motor 23) (See FIG. 9) The gear mechanism 21 has two shaft portions 36 and 37 rotatably bridged over the front and rear walls of the box 22. A gear 38 is fixed to the shaft portion 36, and a gear 39 that meshes with the gear 38 is fixed to the second shaft portion 37. First shaft 3
6 is connected to the inner roller 3, and the second shaft 37 is connected to the outer roller 4. The number of rotations of the shafts 36 and 37 can be adjusted by adjusting the number of teeth. In this embodiment, the two shaft portions 36 and 37 are supported and fixed with a rotary bearing, but a sliding bearing can be used freely. Further, a spacer roller 40 for maintaining a gap is rotatably attached to the second shaft portion 37. The outer periphery of the spacer roller 40 contacts the inner wall surface of the pipe P.
The spacer roller 40 has an appropriate diameter and can be omitted. The hydraulic motor 23 is attached to the front surface of the box 22 by connecting the drive shaft 23 a to the first shaft 33. The hydraulic motor 33 is connected to an in-side pipe 41a for sending oil to the hydraulic motor 23 and an out-side pipe 41b for discharging oil from the hydraulic motor 23. Further, these pipes 41 are connected to a rotary joint 42 (see FIG. 1) attached to the box body 22, and a pipe 43 connected to an external pressure source is connected to the rotary joint 42. By passing through the rotary joint 42, the working fluid is exchanged between the pipe 41 on the hydraulic motor 23 side that rotates and the external pipe 43 that does not rotate. By the gear mechanism 21 and the hydraulic motor 23, the driving force of the hydraulic motor 23 is transmitted to the first shaft 36 and the gear mechanism 21
Is transmitted to the second shaft portion 37 via the The shaft 36 and the shaft 37 rotate in opposite directions.

【0020】この接合機構部5のライニング管Rへの取
付けは、箱体22の上部分22Aを開放し、外面ローラ
4の輪状鍔部26を帯状部材100の突条102のピッ
チに合致させ、かつ、閉合部Hに輪状鍔部26aを位置
させ、しかる後、上部分22Aを下部分22Bに閉合
し、閉合装置29を閉鎖し、そのナット34を締め込ん
でなす。
When the joining mechanism 5 is attached to the lining pipe R, the upper portion 22A of the box body 22 is opened, and the annular flange 26 of the outer roller 4 matches the pitch of the ridge 102 of the belt-like member 100. The annular collar 26a is located at the closing portion H, and thereafter, the upper portion 22A is closed to the lower portion 22B, the closing device 29 is closed, and the nut 34 is tightened.

【0021】接合機構部5は上記のように箱体22を介
して成形フレーム1のリンクアーム12に固定されるも
のであるが、この接合機構部5の箱体22が常に軸部1
0に対して直角になる姿勢保持の手段が講じられうる。
図11及び図12はその姿勢保持機構Iの一態様を示
す。この姿勢保持機構Iは、一端がそれぞれリンクアー
ム12にピン軸55を介して枢着され、他端が1つのピ
ン軸56に枢着されるV字状をなす2つのステイ57
と、このピン軸56の先端に回転自在に取り付けられる
こま体58と、箱体22の後面部に固定され、前記こま
体58を径方向に案内移動させる溝59aを有する案内
体59と、からなる。この構成により、接合機構部5を
挟んだ両リンクアーム12が内方へ折れ曲がったとき、
ステイ57も軸部10とピン軸56を対称軸としてV形
の角度を狭めるとともに、ピン軸56は内方へ移動す
る。ピン軸56の端部のこま体58は案内体59の溝5
9aに案内されて移動する。これにより、軸部10とピ
ン軸56とに保持される箱体22はその姿勢を軸部10
に対して常時直角を保つ。
The joining mechanism 5 is fixed to the link arm 12 of the molding frame 1 via the box 22 as described above, but the box 22 of the joining mechanism 5 is always
Means for holding the attitude at right angles to zero can be taken.
11 and 12 show one mode of the posture holding mechanism I. This posture holding mechanism I has two V-shaped stays 57 each having one end pivotally connected to the link arm 12 via a pin shaft 55 and the other end pivotally connected to one pin shaft 56.
A top body 58 rotatably attached to the tip of the pin shaft 56, and a guide body 59 fixed to the rear surface of the box body 22 and having a groove 59a for guiding and moving the top body 58 in the radial direction. Become. With this configuration, when both link arms 12 sandwiching the joining mechanism 5 are bent inward,
The stay 57 also narrows the angle of the V-shape with the axis 10 and the pin shaft 56 as symmetry axes, and the pin shaft 56 moves inward. The top body 58 at the end of the pin shaft 56 is
It is guided by 9a and moves. Thereby, the box body 22 held by the shaft 10 and the pin shaft 56 changes its posture to the shaft 10.
Maintain a right angle at all times.

【0022】案内ローラ2を組み込んだ成形フレーム1
は、矩形断面管渠P内に装入されたとき、管渠Pの角部
での丸みを存して全体として矩形状を保持する。
Forming frame 1 incorporating guide roller 2
When inserted into a sewer P having a rectangular cross section, it retains a rectangular shape as a whole with roundness at the corners of the sewer P.

【0023】ポジション1,2 図1及び図2はライニング管Rの製管途中のポジション
1を示し、図3はポジション2を示す。すなわち、ポジ
ション1は接合機構部5が矩形断面管渠Pの内壁に接す
る状態を指し、ポジション2は接合機構部5が矩形断面
管渠Pの角部に至り、内壁面から離れる状態を指し、4
辺が管渠Pの内面に接する。
Positions 1 and 2 FIGS. 1 and 2 show position 1 in the middle of the production of the lining tube R, and FIG. That is, position 1 refers to a state in which the joining mechanism 5 contacts the inner wall of the rectangular cross-section culvert P, position 2 refers to a state in which the joining mechanism 5 reaches the corner of the rectangular cross-section culvert P and separates from the inner wall surface, 4
The side contacts the inner surface of the sewer P.

【0024】管渠P内のライニング施工 本実施例のライニング施工装置Sを使用してなされる地
下埋設管渠内のライニング施工方法を説明するととも
に、併せて本実施例装置Sの作用を説明する。図13は
そのライニング施工工事の概要を示す。本実施例方法で
は地下埋設管渠として下水道管渠への適用例を示す。図
において、Q1は上流側人孔、Q2は下流側人孔であ
る。図13に示されるように、地上部においては、上流
側人孔Q1側では帯状部材100を巻き付けた回転台付
き巻出し装置Tが配され、下流側人孔Q2側では油圧駆
動源Gが配される。工事は上流側から下流側に沿ってな
される。
Lining Construction in Sewer P A description will be given of a lining construction method in an underground buried sewer performed using the lining construction equipment S of this embodiment, and also the operation of the apparatus S of this embodiment. . FIG. 13 shows an outline of the lining work. In the method of this embodiment, an example of application to a sewer sewer as an underground sewer is shown. In the figure, Q1 is an upstream human hole, and Q2 is a downstream human hole. As shown in FIG. 13, on the ground portion, an unwinding device T with a turntable around which the belt-shaped member 100 is wound is disposed on the upstream human hole Q1 side, and a hydraulic drive source G is disposed on the downstream human hole Q2 side. Is done. Construction will be done from upstream to downstream.

【0025】以下、工程順に説明する。 (1) 本ライニング施工装置Sを人孔Q1を介して更生の
対象となる管渠P内に搬入する。すなわち、本施工装置
Sの成形フレーム1は屈撓自在となっており、人孔Q1
内への搬入は容易であり、また、人孔Qの開口部が小さ
く、通常の屈撓範囲で対処されない場合には、外折れ角
度(α)を規定する副ストッパー16を一時的に取り外
すことにより容易になされる。また、接合機構部5はこ
の成形フレーム1に取付け可能となっており、現場での
取付けも容易である。本施工装置Sの周長は、矩形管渠
Pの内壁面の周長より若干小さな長さとされる。なお、
本施工装置Sの周長は案内ロール2の最外径の包絡線の
長さをもって決められる。
The steps will be described below in the order of the steps. (1) The lining construction device S is carried into the culvert P to be rehabilitated through the human hole Q1. That is, the molding frame 1 of the present construction apparatus S is bendable, and the human hole Q1 is formed.
It is easy to carry it in, and when the opening of the human hole Q is small and cannot be dealt with within the normal bending range, the auxiliary stopper 16 that defines the external bending angle (α) is temporarily removed. Is made easier. Further, the joining mechanism 5 can be attached to the molding frame 1 and can be easily attached on site. The circumference of the construction device S is slightly smaller than the circumference of the inner wall surface of the rectangular pipe P. In addition,
The circumference of the construction apparatus S is determined by the length of the outermost diameter envelope of the guide roll 2.

【0026】(2) 帯状部材100を人孔Q1内に引き込
み、人孔Q1内において帯状部材100を手作業にて数
回(3回程度)捲回し、ライニング管(これを開始用ラ
イニング管という)Roを作製する。この開始用ライニ
ング管Roの内面の周長は本施工装置Sの周長に等し
い。また、この開始用ライニング管Roは帯状部材10
0の弾性により強制力の加わらない自然状態で円形を保
持する。
(2) The belt-like member 100 is drawn into the human hole Q1, and the belt-like member 100 is manually wound several times (about three times) in the human hole Q1 to form a lining pipe (this is called a starting lining pipe). ) Produce Ro. The circumference of the inner surface of the starting lining pipe Ro is equal to the circumference of the construction apparatus S. The starting lining tube Ro is connected to the belt-shaped member 10.
The circularity is maintained in a natural state where no forcing force is applied by the elasticity of zero.

【0027】(3) この開始用ライニング管Roの内側に
本施工装置Sを組み込み、該開始用ライニング管Roの
前縁において、本ライニング施工装置Sの接合機構部5
を所定状態に設置する。すなわち、接合ローラ部20の
内面ローラ3と外面ローラ4とをライニング管Roの閉
合部に配するものであり、外面ローラ4の輪状鍔部26
を帯状部材100の溝104に嵌め込み、特に輪状鍔部
26aを閉合部Hに正確に当接する。また、内面ローラ
3の鍔3bを帯状部材100の凹溝110に係合させ
る。
(3) The main construction apparatus S is incorporated inside the start lining pipe Ro, and the joining mechanism 5 of the main lining construction apparatus S is provided at the front edge of the start lining pipe Ro.
Is set in a predetermined state. That is, the inner roller 3 and the outer roller 4 of the joining roller portion 20 are arranged at the closing portion of the lining pipe Ro.
Is fitted into the groove 104 of the belt-shaped member 100, and in particular, the annular flange 26 a accurately abuts on the closing portion H. Further, the flange 3 b of the inner roller 3 is engaged with the concave groove 110 of the belt-shaped member 100.

【0028】(4) この状態の開始用ライニング管Roを
組み付けた本施工装置Sを矩形管渠P内に引き入れる。
このとき、円形をなすライニング管Roは矩形管渠Pよ
り拘束力を受けて矩形管渠Pの内壁面に沿う矩形状に変
形する。そして、本施工装置Sもその成形フレーム1の
リンク体によりこの変形に追従する。この引込みは、図
3に示すポジション2の状態で行うことが好適である
が、図2に示すポジション1を除外するものではない。
ポジション1での引込み操作において、適宜の引張り材
(例えばタイロッド)を使用して本成形フレーム1の対
辺相互を強制的に中心方向に引張り込むことは好適な一
便宜手段である。
(4) The construction apparatus S with the starting lining pipe Ro in this state assembled is drawn into the rectangular pipe P.
At this time, the lining pipe Ro having a circular shape receives a restraining force from the rectangular pipe P and is deformed into a rectangular shape along the inner wall surface of the rectangular pipe P. And this construction apparatus S also follows this deformation by the link body of the molding frame 1. This retraction is preferably performed in the state of position 2 shown in FIG. 3, but does not exclude position 1 shown in FIG.
In the retraction operation at the position 1, forcibly pulling the opposite sides of the main molding frame 1 in the center direction by using an appropriate tension member (for example, a tie rod) is a preferable expedient.

【0029】(5) 接合機構部5の内外面ローラ3,4を
回転駆動し、内面ローラ3と外面ローラ4との挟着力を
もって、帯状部材100の閉合部Hにおいて、その継手
構造により開始用ライニング管Roに連なって新たに供
給される帯状部材100は接合される。同時に、外面ロ
ーラ4の輪状鍔部26と帯状部材100の溝104との
係合案内作用により、本施工装置Sの全体は管周方向に
公転し、かつ管軸方向に前進する。これにより帯状部材
100は螺旋状に捲回され、ライニング管Rが施工され
る。
(5) The inner and outer rollers 3 and 4 of the joining mechanism 5 are driven to rotate, and a clamping force between the inner roller 3 and the outer roller 4 is used at the closing portion H of the belt-shaped member 100 by the joint structure for starting. The belt-shaped member 100 newly supplied in connection with the lining pipe Ro is joined. At the same time, the entire construction apparatus S revolves in the pipe circumferential direction and moves forward in the pipe axis direction by the engagement and guiding action between the annular flange portion 26 of the outer roller 4 and the groove 104 of the belt-shaped member 100. Thereby, the belt-shaped member 100 is spirally wound, and the lining pipe R is constructed.

【0030】(5A)この工程において、接合機構部5が管
渠Pの1辺の内壁面に当接する状態にあるとき(ポジシ
ョン1)、その壁面にあるライニング管Rはその内壁面
から離れ、隣りの辺のライニング管Rはその内壁面に当
接し、偏平状の矩形状をなす。接合機構部5が管渠Pの
他の辺に移行する途中において角部に至るとき(ポジシ
ョン2)、ライニング管Rは角部を除いて各内壁面に当
接し、矩形状をなす。そして、接合機構部5が管渠Pの
他の辺の内壁面に当接する状態に至るとき、当該辺にあ
るライニング管Rはその内壁面から離れ、隣りの辺のラ
イニング管Rはその内壁面に当接し、偏平状の矩形状と
なる。この繰り返しをなし、ライニング管Rは形成され
てゆく。
(5A) In this step, when the joining mechanism 5 is in contact with the inner wall of one side of the sewer P (position 1), the lining pipe R on the wall separates from the inner wall, The lining pipe R on the adjacent side is in contact with the inner wall surface and has a flat rectangular shape. When the joining mechanism unit 5 reaches the corner part on the way to the other side of the sewer P (position 2), the lining pipe R abuts on each inner wall surface except for the corner part, and forms a rectangular shape. When the joining mechanism 5 comes into contact with the inner wall surface of the other side of the culvert P, the lining tube R on the side is separated from the inner wall surface, and the lining tube R on the adjacent side is separated from the inner wall surface. A flat rectangular shape. By repeating this, the lining tube R is formed.

【0031】(5B)なおまた、この工程において、帯状部
材100は地上部に配された巻出し装置Tより順次供給
される。該巻出し装置Tは、図13にその構成の一例を
示すように、人孔Q1の開口部周りに配された円形軌状
200上に転子202を介して回転台204が回転自在
に配備され、この回転台204に帯状部材100を繰出
し自在に巻き付けた巻胴206が回転自在に支持されて
なる。これにより、円形軌条200に沿う回転台204
の水平面での回転と巻胴206の鉛直面での回転とが合
成される。製管動作に伴い帯状部材100はねじれ回転
をなすが、巻出し装置Tにおいてはこの回転に同期して
回転台204をもってこれに追従する。
(5B) In this step, the belt-shaped member 100 is sequentially supplied from the unwinding device T disposed on the ground. As shown in FIG. 13, the unwinding device T is provided with a turntable 204 rotatably via a trochanter 202 on a circular rail 200 arranged around the opening of the human hole Q1. A winding drum 206 around which the belt-shaped member 100 is wound so as to be able to be extended freely is supported on the rotary table 204 so as to be rotatable. Thereby, the turntable 204 along the circular rail 200
In the horizontal plane and the rotation of the winding drum 206 in the vertical plane are synthesized. The strip-shaped member 100 makes a torsional rotation in accordance with the pipe-forming operation, and the unwinding device T follows the rotation with the turntable 204 in synchronization with the rotation.

【0032】(6) 施工装置Sの前進に伴い、本施工装置
Sの後に残置されたランニング管Rはその弾性により4
辺が管渠Pの内壁面に密着する状態となる。
(6) With the advance of the construction device S, the running pipe R left behind the construction device S becomes 4
The side comes into close contact with the inner wall surface of the pipe P.

【0033】(7) 管渠Pの全長にライニング管Rが施工
されると、管渠Pとライニング管Rとの間隙にセメント
ミルクが充填されその固結を待って本実施例は完了す
る。
(7) When the lining pipe R is constructed over the entire length of the culvert P, the gap between the culvert P and the lining pipe R is filled with cement milk, and the solidification thereof is completed.

【0034】(第1実施例の効果)本実施例の異形断面
管渠内のライニング施工は叙上の態様をもって実施され
るものであるので、以下の効果を発揮する。本実施例に
よれば、製管されたライニング管Rはそのまま管渠P内
に残置されるので、ライニング管の径及び製管距離に制
約されず、長大なライニング施工を実施できる。また、
曲がりをもつライニング管Rを作成でき、管渠Pに曲が
り部が存する場合にも対応可能となる。更に、外面ロー
ラ4の輪状鍔部26と帯状部材100の溝104との係
合案内作用により、本装置Sは所定のピッチで案内さ
れ、確実にライニング管Rが製管される。更に、本実施
例によれば、異形管に対処して当該異形管の管壁に当接
してライニング管と管壁との間隙が可及的小さなライニ
ング管の施工が実現できる。
(Effects of the First Embodiment) Since the lining work in the pipe of irregular cross-section according to the present embodiment is performed in the manner described above, the following effects are exhibited. According to the present embodiment, the produced lining pipe R is left in the sewer P as it is, so that a long lining work can be performed without being restricted by the diameter of the lining pipe and the pipe production distance. Also,
The lining pipe R having a bend can be created, and it is possible to cope with a case where a bend exists in the sewer P. Further, the device S is guided at a predetermined pitch by the engagement guide action between the annular flange portion 26 of the outer roller 4 and the groove 104 of the belt-shaped member 100, so that the lining pipe R is reliably formed. Further, according to the present embodiment, it is possible to implement a lining pipe in which the gap between the lining pipe and the pipe wall is as small as possible in contact with the deformed pipe and in contact with the pipe wall of the deformed pipe.

【0035】(第2実施例)図14〜図18は本発明の
矩形断面管渠内のライニング施工方法を実施するライニ
ング施工装置の他の実施例(第2実施例)を示す。Vは
そのライニング施工装置を示す。これらの図において、
先の実施例と同等の部材に付いては同一の符号が付され
ている。
(Second Embodiment) FIGS. 14 to 18 show another embodiment (a second embodiment) of a lining construction apparatus for carrying out the lining construction method in a duct with a rectangular cross section according to the present invention. V indicates the lining construction device. In these figures,
The same reference numerals are given to members equivalent to those in the previous embodiment.

【0036】帯状部材140,160 図22は本実施例のライニング施工において使用される
帯状部材の一例を示す。この帯状部材160において
は、図19で示す帯状部材100の適宜の突条102間
に金属製(通常は鋼製)の断面W字形(V字形,U字形
でも可)をなす塑性変形機能材としての塑性変形材17
0を装着したものである。この塑性変形材170の塑性
変形に追従して帯状部材160は変形する。図23は本
実施例の帯状部材の他の例を示す。この帯状部材180
においては、図21で示す帯状部材120の適宜の突条
122内に金属製(通常は鋼製)の塑性変形機能材とし
ての塑性線材190を装入したものである。この塑性線
材190の塑性変形に追従して帯状部材180は変形す
る。
Band members 140 and 160 FIG. 22 shows an example of the band members used in the lining work of this embodiment. In the belt-shaped member 160, a metal (usually steel) cross-section W-shaped (V-shaped or U-shaped) plastic deformation functional material is formed between appropriate ridges 102 of the band-shaped member 100 shown in FIG. Plastic deformation material 17
0 is attached. The belt-shaped member 160 is deformed following the plastic deformation of the plastically deformable material 170. FIG. 23 shows another example of the belt-shaped member of this embodiment. This belt-like member 180
In FIG. 21, a metal (usually steel) plastic wire 190 as a plastically deformable material is inserted into an appropriate ridge 122 of a belt-like member 120 shown in FIG. The belt-like member 180 is deformed following the plastic deformation of the plastic wire 190.

【0037】ライニング施工装置U 図14〜図18に示されるように、このライニング施工
装置Vは、所定幅を有しリンク機構をもって屈撓自在
の環状体をなす成形フレーム1、該成形フレーム1の
リンク機構の各軸部に配される複数の案内ローラ2、
該成形フレーム1の相対向する2箇所に取り付けられ、
外面ローラ3と内面ローラ4とを含む主・副の接合機構
部5(主接合機構部5A、副接合機構部5B)、及び、
前記成形フレーム1の内側に所定間隔を保持して配さ
れる矩形形状をなす規制フレーム6、更には、前記成
形フレーム1と規制フレーム6とに架け渡される案内子
7、の主要部からなる。換言すれば、本実施例のランニ
ング施工装置Vは、先の第1実施例のランニング施工装
置Sに規制フレーム6と案内子7とを付加したものであ
る。
[0037] As shown in lining apparatus U FIGS. 14 18, the lining device V, forming frame 1 forming a flexure freely annular body with a link mechanism having a predetermined width, the molding of the frame 1 A plurality of guide rollers 2 arranged on each shaft of the link mechanism;
Attached to two opposite locations of the molding frame 1,
A main / sub joining mechanism 5 (main joining mechanism 5A, sub joining mechanism 5B) including an outer roller 3 and an inner roller 4;
It comprises a rectangular regulating frame 6 disposed inside the forming frame 1 at a predetermined interval, and a main part of a guide 7 bridged between the forming frame 1 and the regulating frame 6. In other words, the running construction apparatus V of the present embodiment is obtained by adding the restriction frame 6 and the guide 7 to the running construction apparatus S of the first embodiment.

【0038】以下、各部の細部構造を説明する。成形フレーム1・案内ローラ2 成形フレーム1並びに案内ローラ2は、先の第1実施例
のものに準じる。すなわち、成形フレーム1は、所要の
幅をもって環状体をなし、リンク機構をもって外径方向
へは屈撓自在となっており、かつ横剛性を有する。ま
た、案内ローラ2は、成形フレーム1の各軸部10に回
転自在に装着される。
Hereinafter, the detailed structure of each part will be described. Forming Frame 1 and Guide Roller 2 The forming frame 1 and the guide roller 2 are the same as those in the first embodiment. That is, the molding frame 1 forms an annular body with a required width, is flexibly bendable in the outer radial direction with a link mechanism, and has lateral rigidity. The guide roller 2 is rotatably mounted on each shaft portion 10 of the molding frame 1.

【0039】接合機構部5 接合機構部5は、第1実施例に準じる。従って、本実施
例においても主・副の接合機構部5A,5Bが対とな
り、成形フレーム1の対角位置に装着され、内面ローラ
3と外面ローラ4とが組となった接合ローラ部20、こ
れらのローラ3,4の同期回転を図る歯車機構21を収
めた箱体22、及び該箱体22に取り付けられローラ
3,4の回転駆動源としての油圧モータ23を有する。
帯状部材140に対応する接合機構部5において、外面
ローラ4は塑性変形材の輪状鍔部26が省略される。
Joining mechanism 5 The joining mechanism 5 conforms to the first embodiment. Therefore, also in the present embodiment, the main / sub bonding mechanism portions 5A and 5B are paired, are mounted at diagonal positions of the forming frame 1, and the bonding roller portion 20, in which the inner roller 3 and the outer roller 4 are paired, It has a box 22 containing a gear mechanism 21 for synchronously rotating these rollers 3 and 4, and a hydraulic motor 23 attached to the box 22 and serving as a rotation drive source for the rollers 3 and 4.
In the joining mechanism 5 corresponding to the band-shaped member 140, the outer roller 4 does not have the annular flange 26 made of a plastically deformable material.

【0040】規制フレーム6(図16・図17参照) 規制フレーム6は、大きな剛性をもって全体形状が矩形
をなす。本実施例では中空の溝52を有する型鋼が使用
され、該溝52は外方に向けて開口する。なお、該規制
フレーム6は分割体をもって組み立てられる。
Control Frame 6 (See FIGS. 16 and 17) The control frame 6 has a large rigidity and a rectangular overall shape. In the present embodiment, a mold steel having a hollow groove 52 is used, and the groove 52 opens outward. The restriction frame 6 is assembled with a divided body.

【0041】案内子7(図16〜図18参照) 案内子7は、成形フレーム1と規制フレーム7とに介装
され、成形フレーム1の移動を規制フレーム7の軌道に
従って案内する。もっと詳しくは、該案内子7は、2叉
状をなす本体の両端において成形フレーム1の軸部10
に枢着される軸受け54を有し、本体の中央部よりロー
ラ保持体55が外方へ向けて延設され、該ローラ保持体
55には両側にローラ56を取り付けた回転軸57を回
転自在に保持する。そして、このローラ56は規制フレ
ーム6の溝52内に装着され、その内壁に沿って転動す
る。
Guide 7 (See FIGS. 16 to 18) The guide 7 is interposed between the forming frame 1 and the regulating frame 7, and guides the movement of the forming frame 1 along the trajectory of the regulating frame 7. More specifically, the guide element 7 is provided at both ends of a bifurcated main body with the shaft portions 10 of the molding frame 1.
A roller holder 55 extends outward from the center of the main body, and a rotatable shaft 57 having rollers 56 attached to both sides of the roller holder 55 is rotatable. To hold. The roller 56 is mounted in the groove 52 of the regulating frame 6 and rolls along the inner wall.

【0042】以上の構成により、案内ローラ2及び接合
機構部5を組み付けた成形フレーム1は、管断面に対し
同一位相を保つ規制フレーム6の形状に沿って進行す
る。
With the above configuration, the forming frame 1 in which the guide roller 2 and the joining mechanism 5 are assembled advances along the shape of the regulating frame 6 which keeps the same phase with respect to the cross section of the tube.

【0043】管渠P内のライニング施工 第2実施例のライニング施工装置Vを使用して実施され
る地下埋設管渠内のライニング施工方法を説明する。本
施工装置Vの矩形管渠Pへの搬入において、規制フレー
ム6は管渠Pの内周長に対応した大きさのものが選ばれ
る。本規制フレーム6は分割体よりなり、該分割体を人
孔Q1に搬入した後、所定の矩形状に組み立てられる。
本施工装置Vを人孔Q1内で組み立てる。帯状部材14
0を人孔Q1内に引き込み、開始用ライニング管Roを
本施工装置Vを使用して作成する。該開始用ライニング
管Roは矩形状に形成され、この開始を管渠P内に引き
入れる。本施工装置Vの接合機構部5の駆動により、案
内ローラ2及び接合機構部5を組み付けた成形フレーム
1は、規制フレーム6の形状に沿って進行する。規制フ
レーム6の角部において、接合機構部5の接合ローラ部
20は案内子7を介して帯状部材140を内方へ折り込
む。また、このとき、規制フレーム6は常時同一位相状
態を保つ。すなわち、図14の状態のように接合機構部
5が上下にあるとき、また、接合機構部5が側方に移動
したとき、既に形成されたライニング管Rの自己保持力
により、本施工装置Vは矩形状を維持する。
[0043] describing the Kanmizo lining method in underground sewer which is implemented using a lining device V for lining a second embodiment of the P. When the construction apparatus V is carried into the rectangular sewer P, a regulation frame 6 having a size corresponding to the inner peripheral length of the sewer P is selected. The restriction frame 6 is composed of a divided body. After the divided body is carried into the human hole Q1, it is assembled into a predetermined rectangular shape.
The construction apparatus V is assembled in the human hole Q1. Band member 14
0 is drawn into the human hole Q1, and a starting lining pipe Ro is created using the present construction apparatus V. The start lining pipe Ro is formed in a rectangular shape, and the start is drawn into the sewer P. By driving the joining mechanism unit 5 of the construction apparatus V, the forming frame 1 in which the guide roller 2 and the joining mechanism unit 5 are assembled advances along the shape of the regulating frame 6. At the corner of the regulating frame 6, the joining roller 20 of the joining mechanism 5 folds the belt-shaped member 140 inward via the guide 7. At this time, the regulation frames 6 always maintain the same phase. That is, when the joining mechanism 5 is up and down as in the state of FIG. 14 and when the joining mechanism 5 is moved to the side, the self-holding force of the lining pipe R already formed causes the present construction apparatus V Maintains a rectangular shape.

【0044】(第2実施例の効果)本実施例の異形断面
管渠内のライニング施工は叙上の態様をもって実施され
るものであるので、以下の効果を発揮する。本実施例に
よれば、製管されたライニング管Rはそのまま管渠P内
に残置されるので、ライニング管の径及び製管距離に制
約されず、長大なライニング施工を実施できる。また、
曲がりをもつライニング管Rを作成でき、管渠Pに曲が
り部が存する場合にも対応可能となる。更に、外面ロー
ラ3の輪状鍔部26と帯状部材100の溝104との係
合案内作用により、本装置Sは所定のピッチで案内さ
れ、確実にライニング管Rが製管される。更に、本実施
例によれば、既設の異形断面管と相似のライニング管が
施工できるばかりでなく、非相似のライニング管も施工
でき(例えば円形断面内での矩形状)、異形断面への適
用性が更に向上する。
(Effects of the Second Embodiment) Since the lining work in the pipe with a modified cross section of the present embodiment is performed in the manner described above, the following effects are exhibited. According to the present embodiment, the produced lining pipe R is left in the sewer P as it is, so that a long lining work can be performed without being restricted by the diameter of the lining pipe and the pipe production distance. Also,
The lining pipe R having a bend can be created, and it is possible to cope with a case where a bend exists in the sewer P. Further, the device S is guided at a predetermined pitch by the engagement and guiding action between the annular flange portion 26 of the outer roller 3 and the groove 104 of the belt-shaped member 100, and the lining pipe R is reliably formed. Further, according to the present embodiment, not only can a lining pipe similar to an existing modified cross-section pipe be constructed, but also a non-similar lining pipe can be constructed (for example, a rectangular shape in a circular cross section), and application to a modified cross section is possible. The properties are further improved.

【0045】本発明は叙上の実施例にのみ限定されるも
のではなく、本発明の基本的技術思想の範囲内で種々設
計変更が可能である。すなわち、以下の態様は本発明の
技術的範囲内に包含される。 成形フレーム1において各案内ローラ2はその軸部1
0をリンクアーム12の中間位置に取り付けてもよい。 接合機構部5において、副接合機構部5Bは少なくと
も内面ローラ3と外面ローラ4とを要し、駆動機構を省
略できる。あるいはまた、副接合機構部5Bを省略して
もよい。 接合機構部5において、油圧駆動に限定されるもので
はなく、空気圧モータあるいは電動モータを採用するこ
とができる。空気圧モータを採るとき、回転継手42の
採用に変わりがないが、電動モータを採るとき、回転継
手に替えて回転ブラシを採る。 あるいはまた、手動機
構を除外するものではなく、歯車機構21を介してハン
ドル操作をもってローラ3,4を駆動する。
The present invention is not limited to only the above-described embodiments, and various design changes can be made within the scope of the basic technical concept of the present invention. That is, the following embodiments are included in the technical scope of the present invention. In the forming frame 1, each guide roller 2 has its shaft 1
0 may be attached to the intermediate position of the link arm 12. In the joining mechanism 5, the sub-joining mechanism 5B requires at least the inner roller 3 and the outer roller 4, and the drive mechanism can be omitted. Alternatively, the sub-joining mechanism 5B may be omitted. The joining mechanism 5 is not limited to the hydraulic drive, but may be a pneumatic motor or an electric motor. When a pneumatic motor is used, the rotary joint 42 is still used, but when an electric motor is used, a rotary brush is used instead of the rotary joint. Alternatively, the rollers 3 and 4 are driven by a handle operation via the gear mechanism 21 without excluding the manual mechanism.

【0046】ハ.発明の効果 本発明に共通してその管渠内のライニング施工方法及び
その施工装置によれば、製管されたライニング管はその
まま管渠内に残置されるので、ライニング管の径及び製
管距離に制約されず、長大なライニング施工を実施でき
る。また、曲がりをもつライニング管を作成でき、管渠
に曲がり部が存する場合にも対応可能となる。更にま
た、矩形断面の管渠において角部での成形が可能とな
り、円形の一般断面に限定されず、矩形あるいは卵形等
の異形断面をなす管渠への対応が可能となる。そして、
請求項1及び請求項2の発明によれば、異形管に対処し
て当該異形管の管壁に当接してライニング管と管壁との
間隙が可及的小さなライニング管の施工が実現できる。
また、請求項3及び請求項4の発明によれば、既設の異
形断面管と相似のライニング管が施工できるばかりでな
く、非相似のライニング管も施工でき(例えば円形断面
内での矩形状)、異形断面への適用性が更に向上する。
請求項5の発明によれば、接合ローラ部の外面ローラは
T形リブに案内され、所望のピッチで前進する。請求項
6の発明によれば、帯状部材の塑性変形を簡単な手段で
実現できる。請求項8の発明によれば、成形フレームの
送りを確実になすことができる。
C. EFFECT OF THE INVENTION According to the lining construction method and the construction apparatus in the sewer common to the present invention, the produced lining pipe is left in the sewer as it is, so the diameter of the lining pipe and the pipe making distance Lining construction can be performed without being restricted by the above. In addition, a lining pipe having a bend can be created, and it is possible to cope with a case where a bend exists in a sewer. Furthermore, it is possible to form the corners of a duct having a rectangular cross section, and it is possible to cope with a duct having a rectangular or oval shaped cross section without being limited to a circular general cross section. And
According to the first and second aspects of the present invention, it is possible to implement a lining pipe in which the gap between the lining pipe and the pipe wall is as small as possible by contacting the deformed pipe and contacting the pipe wall of the deformed pipe.
According to the third and fourth aspects of the present invention, not only can a lining pipe similar to an existing deformed cross-section pipe be constructed, but also a non-similar lining pipe can be constructed (for example, a rectangular shape in a circular cross section). Further, the applicability to irregular cross sections is further improved.
According to the fifth aspect of the invention, the outer roller of the joining roller portion is guided by the T-shaped rib and advances at a desired pitch. According to the invention of claim 6, plastic deformation of the belt-shaped member can be realized by simple means. According to the eighth aspect of the present invention, it is possible to reliably feed the molding frame.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の管渠内のライニング施工装置の一実施
例(第1実施例)全体を示す縦断面図(図2のI−I腺
断面図)。
FIG. 1 is a longitudinal sectional view (II gland sectional view of FIG. 2) showing an entire embodiment (first embodiment) of a lining construction apparatus in a sewer according to the present invention.

【図2】その正面図(図1のII方向矢視図)。FIG. 2 is a front view thereof (a view taken in the direction of arrow II in FIG. 1).

【図3】その正面図。FIG. 3 is a front view thereof.

【図4】成形フレームの一部断面平面図。FIG. 4 is a partial cross-sectional plan view of a molding frame.

【図5】図4のV方向矢視図。FIG. 5 is a view in the direction of the arrow V in FIG. 4;

【図6】成形フレームのリンク体の構造図。FIG. 6 is a structural view of a link body of a molding frame.

【図7】接合機構部の平面図。FIG. 7 is a plan view of a joining mechanism.

【図8】接合機構部の接合ローラ部の構成図。FIG. 8 is a configuration diagram of a joining roller unit of the joining mechanism unit.

【図9】図7のIX−IX線断面図。FIG. 9 is a sectional view taken along line IX-IX of FIG. 7;

【図10】図9のX方向矢視図。FIG. 10 is a view as seen in the direction of the arrow X in FIG. 9;

【図11】接合機構部の別の取付け態様図。FIG. 11 is another mounting aspect diagram of the joining mechanism.

【図12】図11のXXII-XII線断面図。FIG. 12 is a sectional view taken along line XXII-XII of FIG. 11;

【図13】施工工事の要領図FIG. 13: Outline of construction work

【図14】本発明の管渠内のライニング施工装置の他の
実施例(第2実施例)全体を示す正面図。
FIG. 14 is a front view showing the entirety of another embodiment (second embodiment) of the inside of a sewer lining construction apparatus of the present invention.

【図15】図12のXV−XV線断面図。FIG. 15 is a sectional view taken along line XV-XV in FIG. 12;

【図16】施工装置の一部拡大側面図。FIG. 16 is a partially enlarged side view of the construction apparatus.

【図17】図14のXVII−XVII線断面図。FIG. 17 is a sectional view taken along line XVII-XVII in FIG. 14;

【図18】案内子の斜視図。FIG. 18 is a perspective view of a guide.

【図19】本発明で使用される帯状部材の一態様図。FIG. 19 is a view showing one embodiment of a belt-shaped member used in the present invention.

【図20】本発明で使用される帯状部材の他の態様図。FIG. 20 is another view of the belt-shaped member used in the present invention.

【図21】本発明で使用される帯状部材の更に他の態様
図。
FIG. 21 is a view showing still another embodiment of the belt-shaped member used in the present invention.

【図22】本発明で使用される帯状部材の一態様図。FIG. 22 is a view of one embodiment of a belt-shaped member used in the present invention.

【図23】本発明で使用される帯状部材の他の態様図。FIG. 23 is a view showing another embodiment of the belt-shaped member used in the present invention.

【符号の説明】[Explanation of symbols]

P…管渠、R…ライニング管、S,U…ライニング施工
装置、1…成形フレーム、2…案内ローラ、3…内面ロ
ーラ、4…外面ローラ、5…接合機構部、6…規制フレ
ーム、7…案内子、10…軸部、12…リンクアーム、
100,120,140,160,180…帯状部材、
102,122,142…突条、104,124,14
4…溝(谷部)、170,190…塑性変形機能材
P: sewer, R: lining pipe, S, U: lining construction device, 1: forming frame, 2 ... guide roller, 3 ... inner roller, 4 ... outer roller, 5 ... joining mechanism, 6 ... regulating frame, 7 ... Guide, 10 ... Shaft, 12 ... Link arm,
100, 120, 140, 160, 180...
102, 122, 142 ... ridge, 104, 124, 14
4: Groove (valley), 170, 190: plastically deformable material

───────────────────────────────────────────────────── フロントページの続き (72)発明者 秋元 栄器 埼玉県入間市牛沢町7−7 (72)発明者 山城 浜夫 埼玉県狭山市笹井213−10狭山グリーン ハイツ5−402 (56)参考文献 特開 平4−103337(JP,A) 特開 平2−41231(JP,A) 特公 平3−48392(JP,B2) 特公 平5−32538(JP,B2) (58)調査した分野(Int.Cl.7,DB名) F16L 1/024 B29C 63/30 ──────────────────────────────────────────────────続 き Continued on the front page (72) Inventor Eiki Akimoto 7-7 Ushizawa-machi, Iruma-shi, Saitama (72) Inventor Hamao Yamashiro 213-10 Sasai Green Heights 5-402 Sayama Green Heights 5-402 (56) Reference Document JP-A-4-103337 (JP, A) JP-A-2-41231 (JP, A) JP-B 3-48392 (JP, B2) JP-B 5-32538 (JP, B2) (58) Field (Int.Cl. 7 , DB name) F16L 1/024 B29C 63/30

Claims (8)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 異形断面管渠内において、両側縁部に接
合部が形成された長尺の帯状部材を連続的に供給すると
ともに螺旋状に捲回し、相接する接合部相互を接合させ
て形成された管状体を残置させ、この既に形成された管
状体の前方に新たに供給される帯状部材をもってライニ
ング管を付加形成する方法であって、 所定の幅と横剛性とを有し、リンク機構をもって屈撓自
在とされるとともに各リンク体の中折れが防止された成
形フレーム回りに前記帯状部材の内面に当接する案内ロ
ーラが装着され、かつ、この成形フレームに、既に形成
された管状体の端縁部において、帯状部材の外面に当接
する外面ローラと帯状部材の内面に当接する内面ローラ
との2つのローラからなる接合ローラ部を配し、前記接
合ローラ部でのローラを回転駆動させるとともに、既に
形成された管状体と新たに供給される帯状部材との接合
部相互の位置において前記2つの外面及び内面ローラで
挟着する、ことを特徴とする異形断面管渠内のライニン
グ施工方法。
1. A long strip-shaped member having joints formed on both side edges is continuously supplied and spirally wound in a deformed cross-section culvert to join mutually joined joints. A method in which a formed tubular body is left, and a lining tube is additionally formed with a band-shaped member newly supplied in front of the already formed tubular body, having a predetermined width and lateral rigidity, and a link. A guide roller is mounted around the forming frame, which is made to be flexible by a mechanism and in which each link body is prevented from being bent, and a tubular body already formed on the forming frame is provided. At the edge of the belt, a joining roller portion composed of two rollers, an outer roller contacting the outer surface of the band member and an inner roller contacting the inner surface of the band member, is arranged, and the roller at the joining roller portion is rotationally driven. Lining work in a pipe with a modified cross-section, characterized in that it is sandwiched between the two outer and inner rollers at the position of the joint between the already formed tubular body and the newly supplied strip-shaped member. Method.
【請求項2】 異形断面管渠内において、両側縁部に接
合部が形成された長尺の帯状部材を連続的に供給して螺
旋状に捲回し、相接する継手相互を係合させて形成して
管状体を付加形成するライニング施工装置であって、 所定の幅と横剛性とを有し、リンク機構をもって屈撓自
在とされるとともに各リンク体の中折れが防止された成
形フレーム、 前記成形フレーム回りに装着され、前記管状体の内面に
当接する案内ローラ、 前記成形フレームを介して取り付けられ、前記既に形成
された管状体と新たに供給される帯状部材との接合部相
互の位置に配されるとともに帯状部材を挟着する外面ロ
ーラと内面ローラとからなる接合機構部、からなること
を特徴とする異形断面管渠内のライニング施工装置。
2. A long strip-shaped member having joints formed on both side edges is continuously supplied and spirally wound in a deformed cross-section culvert, so that joints that are in contact with each other are engaged with each other. A lining construction apparatus for forming and adding a tubular body, having a predetermined width and a lateral rigidity, and having a link mechanism capable of flexing and preventing bending of each link body, A guide roller mounted around the forming frame and abutting against the inner surface of the tubular body; a position of a joint between the already formed tubular body and a newly supplied strip-shaped member mounted via the forming frame; A lining construction apparatus in a pipe with a modified cross section, characterized by comprising a joining mechanism portion comprising an outer roller and an inner roller which are disposed on the belt and sandwich the band-shaped member.
【請求項3】 異形断面管渠内において、両側縁部に接
合部が形成された長尺の帯状部材を連続的に供給すると
ともに螺旋状に捲回し、相接する接合部相互を接合させ
て形成された管状体を残置させ、この既に形成された管
状体の前方に新たに供給される帯状部材をもってライニ
ング管を付加形成する方法であって、 所定の幅と横剛性とを有し、リンク機構をもって屈撓自
在の成形フレーム回りに前記帯状部材の内面に当接する
案内ローラが装着され、かつ、この成形フレームに、既
に形成された管状体の端縁部において、帯状部材の外面
に当接する外面ローラと帯状部材の内面に当接する内面
ローラとの2つのローラからなる接合ローラ部を配し、
前記接合ローラ部でのローラを回転駆動させるととも
に、既に形成された管状体と新たに供給される帯状部材
との接合部相互の閉合部において前記2つの外面及び内
面ローラで挟着し、 前記成形フレームを該成形フレームの内側に配され、剛
性を保持するとともに異形断面形状に合致した形状をな
す規制フレーム回りに回転させる、ことを特徴とする異
形断面管渠内のライニング施工方法。
3. A long strip-shaped member having joints formed on both side edges is continuously supplied and spirally wound in a deformed cross-section culvert to join mutually joined joints. A method in which a formed tubular body is left, and a lining tube is additionally formed with a band-shaped member newly supplied in front of the already formed tubular body, having a predetermined width and lateral rigidity, and a link. A guide roller is mounted around the flexible frame around the bending frame with a mechanism, and abuts against the outer surface of the belt-shaped member at the edge of the tubular body already formed on the frame. Arranging a joining roller portion composed of two rollers, an outer roller and an inner roller abutting on the inner surface of the belt-shaped member,
While the roller in the joining roller portion is driven to rotate, it is sandwiched between the two outer surface and inner surface rollers at a portion where the joining portion between the already formed tubular body and the newly supplied band-shaped member is mutually closed, A lining construction method in a pipe with a modified cross section, wherein the frame is arranged inside the molding frame, and is rotated around a regulating frame that has rigidity and conforms to the modified cross section.
【請求項4】 異形断面管渠内において、両側縁部に接
合部が形成された長尺の帯状部材を連続的に供給して螺
旋状に捲回し、相接する継手相互を係合させて形成して
管状体を付加形成するライニング施工装置であって、 所定の幅と横剛性とを有し、リンク機構をもって屈撓自
在の成形フレーム、 前記成形フレーム回りに装着され、前記管状体の内面に
当接する案内ローラ、 前記成形フレームを介して取り付けられ、前記既に形成
された管状体と新たに供給される帯状部材との接合部相
互の閉合部に配されるとともに帯状部材を挟着する外面
ローラと内面ローラとからなる接合機構部、 前記成形フレームの内側に配され、剛性を保持するとと
もに異形断面形状の案内軌道を有し、前記成形フレーム
の移動を規制する規制フレーム、からなることを特徴と
する異形断面管渠内のライニング施工装置。
4. A long strip-shaped member having joints formed on both side edges is continuously supplied and spirally wound in the deformed cross-section culvert, and the joints that are in contact with each other are engaged with each other. A lining application device for forming and adding a tubular body, comprising: a forming frame having a predetermined width and a lateral rigidity and capable of bending with a link mechanism; being mounted around the forming frame, an inner surface of the tubular body An outer surface which is attached to the joining portion between the already formed tubular body and the newly supplied band-shaped member, and is disposed between the joined portions of the tubular member and the newly supplied band-shaped member, and which sandwiches the band-shaped member. A joining mechanism portion comprising a roller and an inner roller; a regulating frame disposed inside the molding frame, having a guide track having an irregular cross-sectional shape while maintaining rigidity, and regulating movement of the molding frame. Lining apparatus in irregular cross section sewer characterized and.
【請求項5】帯状部材の外面に複数のT形リブが形成さ
れるとともに、接合ローラ部の外面ローラはこのT形リ
ブの間に嵌まり込む請求項1又は請求項3に記載の異形
断面管渠内のライニング施工方法。
5. The modified cross section according to claim 1, wherein a plurality of T-shaped ribs are formed on an outer surface of the belt-shaped member, and an outer roller of the joining roller portion is fitted between the T-shaped ribs. How to apply lining in sewer.
【請求項6】帯状部材に塑性変形機能材が装入されてな
る請求項3に記載の異形断面管渠内のライニング施工方
法。
6. The method of claim 3, wherein a plastically deformable material is inserted into the belt-like member.
【請求項7】異形断面管渠はボックスカルバートである
請求項1又は請求項3に記載の異形断面管渠内のライニ
ング施工方法。
7. The method according to claim 1 or 3, wherein the modified cross-section culvert is a box culvert.
【請求項8】成形フレームと規制フレームとの間に介装
され、前記成形フレームに固設されるとともに前記規制
フレームの案内軌条に沿って移動する案内子を有する請
求項4に記載の異形断面管渠内のライニング施工装置。
8. The modified cross-section according to claim 4, further comprising a guide interposed between the forming frame and the regulating frame, the guide being fixed to the forming frame and moving along a guide rail of the regulating frame. Lining construction equipment in sewers.
JP7091650A 1994-08-25 1995-03-24 Lining construction method and its construction equipment for irregular cross-section culvert Expired - Lifetime JP3035466B2 (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
JP7091650A JP3035466B2 (en) 1995-03-24 1995-03-24 Lining construction method and its construction equipment for irregular cross-section culvert
TW84111132A TW301682B (en) 1994-08-25 1995-10-19
MYPI95003912A MY111858A (en) 1995-01-26 1995-12-18 A method of and an apparatus for linig a pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7091650A JP3035466B2 (en) 1995-03-24 1995-03-24 Lining construction method and its construction equipment for irregular cross-section culvert

Publications (2)

Publication Number Publication Date
JPH08261363A JPH08261363A (en) 1996-10-11
JP3035466B2 true JP3035466B2 (en) 2000-04-24

Family

ID=14032399

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7091650A Expired - Lifetime JP3035466B2 (en) 1994-08-25 1995-03-24 Lining construction method and its construction equipment for irregular cross-section culvert

Country Status (1)

Country Link
JP (1) JP3035466B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010101114A (en) * 2008-10-27 2010-05-06 Sekisui Chem Co Ltd Device for manufacturing regeneration pipe and method for manufacturing regeneration pipe

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE69841657D1 (en) * 1997-01-22 2010-06-24 Sekisui Chemical Co Ltd DEVICE FOR INSIDE APPAREL OF PIPE PIECES
JP4313037B2 (en) 2000-12-12 2009-08-12 足立建設工業株式会社 Lining method in pipe tub with simultaneous injection of backfilling material
JP4746185B2 (en) * 2001-01-19 2011-08-10 足立建設工業株式会社 Lining construction method in pipe
JP4625207B2 (en) * 2001-08-02 2011-02-02 積水化学工業株式会社 In-pipe lining construction method and lining pipe making apparatus used therefor
JP5268773B2 (en) * 2009-05-13 2013-08-21 積水化学工業株式会社 Rehabilitation pipe manufacturing method
JP5507972B2 (en) * 2009-11-17 2014-05-28 積水化学工業株式会社 Rehabilitation pipe making machine
JP6358695B2 (en) * 2014-03-05 2018-07-18 芦森工業株式会社 Liner induction jig and liner induction method
EP3153299B1 (en) 2014-06-04 2023-03-15 Sekisui Chemical Co., Ltd. Pipe-making machine

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010101114A (en) * 2008-10-27 2010-05-06 Sekisui Chem Co Ltd Device for manufacturing regeneration pipe and method for manufacturing regeneration pipe

Also Published As

Publication number Publication date
JPH08261363A (en) 1996-10-11

Similar Documents

Publication Publication Date Title
AU2007335419B2 (en) Pipe producing apparatus and existing pipe rehabilitating method employing the same
WO1996006296A1 (en) Method of lining pipe and apparatus therefor
JP3035466B2 (en) Lining construction method and its construction equipment for irregular cross-section culvert
JP2009149049A (en) Rehabilitation of existing pipes
WO1998032997A1 (en) Lining device for inside of free section duct
JP5329370B2 (en) Spiral winding pipe making equipment
JP3072015B2 (en) Lining construction equipment in sewer
JP3216760B2 (en) Lining construction equipment in sewer
JP4674082B2 (en) Lining method for existing pipe and pipe making machine
JP3386893B2 (en) Method and apparatus for lining lining in sewer
JP2010023350A (en) Tube forming apparatus and method for forming tubular body using the tube forming apparatus
JP3601230B2 (en) Lining construction device and method for lining in sewer with perimeter adjustment mechanism
JP2003191329A (en) Apparatus for conducting lining in sewer
JP3026546B2 (en) Method and apparatus for lining in sewer
JP4891210B2 (en) Positioning mechanism of restriction frame in spiral wound pipe making apparatus having restriction frame, and lining construction method using the apparatus
JP3898862B2 (en) Lining construction method in pipe and auxiliary equipment for construction
JP3163054B2 (en) Lining construction device for culvert and lining construction method in culvert
JP3258254B2 (en) Lining construction equipment for irregular cross-section pipes
KR100308780B1 (en) Method and apparatus for lining construction in pipeline
JP3790624B2 (en) Lining method in pipes with perimeter adjustment
JP3035471B2 (en) Lining equipment in sewer
JP3749609B2 (en) Lining pipe construction method in pipe
JP7088781B2 (en) Rehabilitation method and pipe making equipment for existing pipes
JP5596436B2 (en) Apparatus for correcting curl wrinkle of band member with reinforcing material and method for producing rehabilitation pipe
JP6644826B2 (en) Construction apparatus for lining in sewer with feed roller and method of constructing lining pipe in sewer by the construction apparatus

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080218

Year of fee payment: 8

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090218

Year of fee payment: 9

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100218

Year of fee payment: 10

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100218

Year of fee payment: 10

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110218

Year of fee payment: 11

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120218

Year of fee payment: 12

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130218

Year of fee payment: 13

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140218

Year of fee payment: 14

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term