JP3036616B2 - Oil depot shipping control device - Google Patents
Oil depot shipping control deviceInfo
- Publication number
- JP3036616B2 JP3036616B2 JP5315017A JP31501793A JP3036616B2 JP 3036616 B2 JP3036616 B2 JP 3036616B2 JP 5315017 A JP5315017 A JP 5315017A JP 31501793 A JP31501793 A JP 31501793A JP 3036616 B2 JP3036616 B2 JP 3036616B2
- Authority
- JP
- Japan
- Prior art keywords
- hatch
- oil
- control device
- lorry
- data
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Loading And Unloading Of Fuel Tanks Or Ships (AREA)
- Filling Or Discharging Of Gas Storage Vessels (AREA)
Description
【0001】[0001]
【産業上の利用分野】本発明は、複数のハッチを有し、
ローリの前方に位置する第1のハッチ群は底弁を介して
第1の共通管に接続され、後方に位置する第2のハッチ
群は底弁を介して第2の共通管に接続され、第1および
第2の共通管はそれぞれ元弁を介してホース接続カップ
リングに連結され、そして第1および第2の共通管は仕
切弁を介して互いに接続されているローリに荷積を割り
付ける油槽所の出荷制御装置に関する。This invention has a plurality of hatches,
A first group of hatches located in front of the lorry is connected to a first common pipe via a bottom valve, and a second group of hatches located rearward is connected to a second common pipe via a bottom valve; The first and second common pipes are each connected to a hose connection coupling via a main valve, and the first and second common pipes are oil tanks for assigning a load to lorries connected to each other via a gate valve. Related to a shipping control device.
【0002】[0002]
【従来の技術】前記のローリは配送先である給油所にお
いて第1および第2の共通管からそれぞれ同時に荷卸し
作業をそれぞれ行うことができるので荷卸し作業を能率
化することができる。しかしながらそのためには油槽所
において荷積をするときに、あらかじめ積荷みの振り分
けをしなければならない。2. Description of the Related Art The above-mentioned lorries can simultaneously perform unloading operations from a first and a second common pipe at a delivery station to which the lorry is delivered, respectively, so that the unloading operations can be streamlined. However, for that purpose, when loading at an oil depot, it is necessary to sort the cargo in advance.
【0003】このようにすれば1台のローリが複数の給
油所において荷卸しする場合に効果的である。[0003] This arrangement is effective when one lorry unloads at a plurality of gas stations.
【0004】また、周知の通り、ローリに前回荷積みし
た油種と今回荷積みする油種とが同じ場合、および前回
が第二種石油類(灯油、軽油)で今回が第一種石油類
(ガソリン)である場合は、ローリに荷積みするに際し
てガスパージは不要であるが前回が第一種石油類で今回
が第二種石油類である場合には爆発の危険があるので荷
積み前にあらかじめガスパージをし、ローリのハッチ内
のガソリンベーパを排出させねばならない。このガスパ
ージ作業は通常5〜6分を要するので、なるべく例えば
同種の油を荷積するようにして、ガスパージを行なわな
いのが好ましい。しかしながら配送先である給油所での
共通管による同時荷卸し作業を優先することによりある
程度のハッチをガスパージすることは避けられない。[0004] As is well known, when the type of oil previously loaded on the lorry is the same as the type of oil loaded this time, and the last time is the second type petroleum (kerosene and light oil) and this time is the first type petroleum If it is (gasoline), gas loading is not required when loading the lorry, but if the previous time was Class 1 petroleum and this time it was Class 2 petroleum, there is a danger of explosion. The gas must be purged in advance and the gasoline vapor in the lorry hatch must be discharged. Since this gas purging operation usually requires 5 to 6 minutes, it is preferable not to perform gas purging by loading, for example, the same type of oil as much as possible. However, it is inevitable that a certain number of hatches are gas-purged by giving priority to simultaneous unloading work using a common pipe at a delivery station serving as a delivery destination.
【0005】[0005]
【発明が解決しようとする課題】したがって、本発明の
目的は、第1および第2の共通管による同時荷卸しをで
きる限り可能とし、かつガスパージを最小限に止めるこ
とができる油槽所の出荷制御装置を提供するにある。SUMMARY OF THE INVENTION Accordingly, it is an object of the present invention to control the shipment of an oil depot in which the simultaneous unloading by the first and second common pipes can be performed as much as possible and the gas purge can be minimized. In providing the device.
【0006】[0006]
【課題を解決するための手段】本発明によれば、ローリ
の前方に位置する第1のハッチ群は底弁を介して第1の
共通管に接続され、後方に位置する第2のハッチ群は底
弁を介して第2の共通管に接続され、第1および第2の
共通管はそれぞれ元弁を介してホース接続カップリング
に連結され、そして第1および第2の共通管は仕切弁を
介して互いに接続されているローリに荷積を割り付ける
油槽所の出荷制御装置において、事務所に設けた親機と
その親機と信号線で接続された複数の子機とよりなり、
子機は制御装置とカードリーダライタとキーボードと表
示機とプリンタを備え、親機は各ハッチ容量と第1およ
び第2のハッチ群とを含むローリのタンクデータを記憶
するタンクデータ記憶手段と、前回の各ハッチの油種を
記憶する前回の積荷データ記憶手段と今回の荷卸先と油
種と油量とを入力する積荷データ入力手段と、荷卸先別
に積荷を第1および第2のハッチ群に割り付ける割付手
段と、前回の油種と今回割付けられた油種とによりガス
パージの要不要を判断するガスパージ判断手段と、その
ガスパージ判断手段でガスパージが必要とするハッチ数
を最小とするように再割付をする再割付手段とを備え、
自動的に割付けられた荷積データはキーボードによって
修正でき、積荷データは記憶されプリンタでプリントさ
れるようになっている。According to the present invention, a first group of hatches located in front of a lorry is connected to a first common pipe via a bottom valve, and a second group of hatches located behind. Is connected to a second common pipe via a bottom valve, the first and second common pipes are each connected to a hose connection coupling via a main valve, and the first and second common pipes are gate valves. In the shipping control device of the oil depot to allocate the load to the lorries connected to each other through, a master unit provided in the office and a plurality of slave units connected by signal lines with the master unit,
A slave unit including a control device, a card reader / writer, a keyboard, a display unit, and a printer, and the master unit storing tank data of a lorry including each hatch capacity and the first and second hatch groups; Previous load data storage means for storing the oil type of each previous hatch, load data input means for inputting the current unloading destination, oil type and oil amount, and first and second hatch groups for loading by destination. Allocating means, a gas purge determining means for determining whether gas purging is necessary or not based on the previous oil type and the presently allocated oil type, and re-setting so that the number of hatches required for gas purging is minimized. And reallocation means for performing allocation.
The automatically assigned load data can be modified by a keyboard, and the load data is stored and printed on a printer.
【0007】[0007]
【作用効果の説明】したがって、ローリが油槽所に入所
すると制御装置にはあらかじめそのローリの車番に対応
してタンクデータ(各ハッチの容量、第1および第2の
ハッチ群)と前回の積荷データが記憶されている。そし
て油槽所のキーボードのテンキー又は配送センタのコン
ピュータ等の積荷データ入力手段によって積荷データを
入力すると割付手段は積荷を第1および第2のハッチ群
に割付けて給油所において同時に前後から荷御し可能に
なるようにし、またガスパージの要不要を判断する。そ
してローリの運転者は事務所から積荷データをもらいそ
のデータに従って荷積み作業を行う。このように本発明
によれば給油所に荷卸しする際に第1および第2の共通
管を同時に使用できるように荷積みでき、またガスパー
ジに要する時間を最小限にすることができるので荷積み
および荷卸し作業が能率化することができる。[Explanation of the operation and effect] Therefore, when the lorry enters the oil depot, the control device preliminarily stores the tank data (capacity of each hatch, the first and second hatch groups) corresponding to the vehicle number of the lorry and the previous load. Data is stored. Then, when the cargo data is inputted by the cargo data input means such as the numeric keypad of the oil depot's keyboard or the computer of the distribution center, the allocating means allocates the cargo to the first and second hatch groups and can simultaneously load the gas at the gas station from the front and rear. And it is determined whether gas purging is necessary or not. The driver of Rori receives the load data from the office and carries out the loading operation according to the data. As described above, according to the present invention, the first and second common pipes can be loaded so that they can be used simultaneously at the time of unloading to a gas station, and the time required for gas purging can be minimized. And unloading work can be streamlined.
【0008】[0008]
【0009】[0009]
【実施例】以下図面を参照して本発明の実施例を説明す
る。Embodiments of the present invention will be described below with reference to the drawings.
【0010】図1において、全体を符号Rで示すローリ
は図示の例では6つのハッチH1〜H6を有しており、
前方に位置する3つのハッチ群H1、H2、H3はそれ
ぞれ底弁V1、V2、V3を介して第1の共通管T1に
接続され、その第1の共通管T1は元弁A1を介して第
1のホース接続カップリングC1に連結されている。そ
して後方に位置する3つのハッチ群H4、H5、H6は
それぞれ底弁V4、V5、V6を介して第2の共通管T
2に接続され、その第2の共通管T2は元弁A2を介し
て第2のホース接続カップリングC2に連結されてい
る。これらの第1の共通管T1と第2の共通管T2とは
仕切弁Bを介して相互に接続されている。In FIG. 1, a lorry, generally indicated by the symbol R, has six hatches H1 to H6 in the illustrated example.
The three hatch groups H1, H2, H3 located forward are connected to the first common pipe T1 via bottom valves V1, V2, V3, respectively, and the first common pipe T1 is connected to the first common pipe T1 via the main valve A1. One hose connection coupling C1. The three hatch groups H4, H5, H6 located rearward are connected to the second common pipe T via bottom valves V4, V5, V6, respectively.
2, the second common pipe T2 of which is connected via a main valve A2 to a second hose connection coupling C2. The first common pipe T1 and the second common pipe T2 are connected to each other via a gate valve B.
【0011】したがって、前方の第1のハッチ群H1〜
H3の油と後方の第2のハッチ群H4〜H6とは同時に
第1および第2のホース接続カップリングC1、C2を
介して荷卸しできるし、また場合によっては前方のハッ
チ群H1〜H3の油を仕切弁Bを介して第2のホース接
続カップリングC2から荷卸しできるし、さらに後方の
ハッチ群H4〜H6の油を仕切弁Bを介して第1のホー
ス接続カップリングC1から荷卸しすることもできる。Therefore, the front first hatch groups H1 to H1
The oil of H3 and the rear second hatch groups H4-H6 can be simultaneously unloaded via the first and second hose connection couplings C1, C2, and in some cases, the front hatch groups H1-H3. The oil can be unloaded from the second hose connection coupling C2 via the gate valve B, and the oil of the rear hatch group H4 to H6 can be unloaded from the first hose connection coupling C1 via the gate valve B. You can also.
【0012】図2はタンクローリRが荷積みする油槽所
Aの平面図を示し、出入口Gには事務所Oが設けられ、
そして適数のラックR1、R2には各種の油(例えばハ
イオクガソリン、レギュラーガソリン、軽油、灯油等)
を給油するための公知のローディングアームL1、L
2、L3、L4が設けられている。そして事務所Oには
全体を符号1で示す出荷制御装置が設けられている。FIG. 2 is a plan view of an oil tank station A to be loaded by the tank lorry R. An office O is provided at an entrance G,
Various kinds of oil (for example, high-octane gasoline, regular gasoline, light oil, kerosene, etc.) are provided in an appropriate number of racks R1, R2.
Loading arms L1, L for refueling
2, L3 and L4 are provided. The office O is provided with a shipping control device indicated by reference numeral 1 as a whole.
【0013】図3は事務所Oに設けた出荷制御装置の全
体のブロック図である。すなわち事務所Oには全体を符
号2で示す親機と、複数(図示の例では2台)の子機3
a、3b、とが設けられており、親機2と子機3a、3
bとはそれぞれ信号線Lにより接続されている。FIG. 3 is an overall block diagram of the shipping control device provided in the office O. That is, the office O has a master unit indicated by reference numeral 2 and a plurality of (two in the illustrated example) slave units 3.
a, 3b are provided, and the master unit 2 and the slave units 3a, 3b are provided.
b are connected by signal lines L, respectively.
【0014】なお、子機3a、3bは実質的に同じ構成
を具備しているので、子機3aについてのみ説明し、子
機3aに対応する構成はサフィックスbを付して図示す
る。Since the slave units 3a and 3b have substantially the same configuration, only the slave unit 3a will be described, and the configuration corresponding to the slave unit 3a is illustrated with a suffix b.
【0015】子機3aは、それ自体周知のもので制御装
置20aとその制御装置20aに入出力するカードリー
ダライタ21aおよびキーボード22aと制御装置20
aから出力される表示器23aおよびプリンタ24aと
から成っている。The slave unit 3a is of a type known per se and includes a control unit 20a, a card reader / writer 21a and a keyboard 22a for inputting and outputting to and from the control unit 20a.
a and a printer 24a.
【0016】タンクデータ記憶手段4には各ローリのハ
ッチ容量、第1、第2のハッチ群H1、H2、H3・H
4、H5、H6が記憶されており、また積荷データ記憶
手段5には前回の各ハッチの油種が記憶されている。ま
た積荷データ入力手段6から今回の積荷データが入力さ
れる。The tank data storage means 4 has a hatch capacity of each lorry, first and second hatch groups H1, H2, H3.H
4, H5 and H6 are stored, and the cargo data storage means 5 stores the last oil type of each hatch. The current load data is input from the load data input means 6.
【0017】この積荷データ入力手段6は親機2のテン
キーで入力する場合、あるいは配送センタのコンピュー
タである場合もある。そして積荷データの一例は図4に
示す通りである。The load data input means 6 may be input by using the numeric keypad of the parent machine 2, or may be a computer of a delivery center. An example of the cargo data is as shown in FIG.
【0018】すなわち車番1234のローリがトリップ
3においてA給油所(SS)およびB給油所(SS)の
2カ所に配送するものとし、A給油所ではレギュラー6
kl、軽油4klを必要とし、B給油所ではレギュラ4
klハイオク2kl、灯油2klを必要とするものとす
る。したがって、レギュラ合計で10klハイオクは2
kl軽油は4kl、灯油は2klを荷積みする。That is, it is assumed that the lorry of the car number 1234 is delivered to two locations of the A service station (SS) and the B service station (SS) in the trip 3, and the regular 6 is used at the A service station.
kl and light oil 4kl are required.
It is assumed that 2 kl of kl high octane and 2 kl of kerosene are required. Therefore, 10kl high oct in total regular is 2
Kl gas oil loads 4 kl and kerosene loads 2 kl.
【0019】そこで、荷積データ入力手段6からの入力
信号があると、タンクデータ記憶手段4に記憶されてい
る車番1234のタンクデータが入力され、さらに前回
の積荷の油種が積荷データ記憶手段5から入力する。そ
して荷積可否判断手段7は大きいハッチと多い量との組
合わせから順にみて全てが荷積み可能であるか否かを判
断し不可である場合は報知機8に信号を送り報知する。
例えば図4の場合は、可能であるから、割付手段9は多
い量の荷卸先すなわち図4の例では、A給油所の方から
割付け作業を行う。その例が図5に示されている。Therefore, when there is an input signal from the loading data input means 6, the tank data of the car number 1234 stored in the tank data storage means 4 is input, and the oil type of the previous loading is stored in the loading data. Input from means 5. Then, the loading possibility determination means 7 determines whether or not all can be loaded in order from the combination of the large hatch and the large amount. If the loading is not possible, a signal is sent to the annunciator 8 to notify.
For example, in the case of FIG. 4, it is possible, so the allocating means 9 performs the allocating operation from a large amount of unloading destinations, that is, from the service station A in the example of FIG. An example is shown in FIG.
【0020】図5において、ハッチ番号1〜6(H1〜
H6に当る)とその各容量(ハッチH1は4kl、ハッ
チH2は2kl、ハッチH3は2kl、ハッチH4は2
kl、ハッチH5は4kl、ハッチH6は4kl)およ
び第1のハッチ群H1〜H3は第1の共通管T1に接続
されており、第2のハッチ群H4〜H6は第2の共通管
T2に接続されていることが、タンクデータ記憶手段4
から入力され、前回の油種すなわち前荷がハッチH1は
レギュラ、ハッチH2はレギュラ、ハッチH3は軽油、
ハッチH4はハイオク、ハッチH5は灯油、ハッチH6
は軽油であることが積荷データ記憶手段5から入力され
る。In FIG. 5, hatch numbers 1 to 6 (H1 to
H6) and their respective capacities (the hatch H1 is 4 kl, the hatch H2 is 2 kl, the hatch H3 is 2 kl, and the hatch H4 is 2 kl.
kl, the hatch H5 is 4 kl, the hatch H6 is 4 kl) and the first hatch groups H1 to H3 are connected to the first common pipe T1, and the second hatch groups H4 to H6 are connected to the second common pipe T2. The connection means that the tank data storage means 4
The previous oil type, ie, the preload is hatch H1 regular, hatch H2 regular, hatch H3 light oil,
Hatch H4 is high octave, Hatch H5 is kerosene, Hatch H6
Is input from the cargo data storage means 5 as light oil.
【0021】その結果、割付手段9は多い量すなわちA
給油所の分から前後に割付けるが、まずハッチH1にレ
ギュラ4klを、ハッチH4にレギュラ2klを、そし
てハッチH5に軽油4klを割付け、次にB給油所に対
してはハッチH6にレギュラ4klハッチH2にハイオ
ク2kl、そしてハッチH3に灯油2klを割付ける。As a result, the allocating means 9 stores a large amount, ie, A
First, regular 4 kl is assigned to hatch H1, regular 2 kl is assigned to hatch H4, and light oil 4 kl is assigned to hatch H5. Then, regular 4 kl hatch H2 is assigned to hatch H6 for hatch H6. 2 kl of high octane and 2 kl of kerosene to hatch H3.
【0022】そして各ハッチの前回の油種と今回割り付
けられた油種とを比較してガスパージ判断手段10はこ
の場合はガスパージが不必要であると判断する。しかし
油種を比較した結果前回が第一石油類で、今回が第二石
油類である場合はガスパージを必要と判断する。Then, the gas purge determining means 10 determines that the gas purge is unnecessary in this case by comparing the last oil type of each hatch with the currently assigned oil type. However, as a result of comparing oil types, if the last time is the first petroleum and the current time is the second petroleum, it is determined that gas purging is necessary.
【0023】さて図5の例ではガスパージが不要である
から、問題がないが、本発明の実施に際して、ガスパー
ジが必要と判断された場合は、第1のハッチ群H1〜H
3だけ、又は第2のハッチ群H4〜H6だけのなかで油
種を移動させればガスパージが不要になるか、さらには
ハッチ群のなかだけではガスパージが必要な場合は、ハ
ッチ群間の移動が必要かどうかを再割付手段11が判断
する。例えば図5の例でハッチH2に灯油をそしてハッ
チH3にハイオクを割付けられた場合はハッチH2のガ
スパージが必要になるので再割付手段11はこれを図5
のように移動するのである。なお、ハッチ群間で割付を
移動する場合には、ガスパージの有無よりも同時荷卸し
の可否が優先されて割付けられる。In the example shown in FIG. 5, there is no problem because gas purging is not required. However, when it is determined that gas purging is necessary in the practice of the present invention, the first hatch groups H1 to H
If the oil type is moved only in the third hatch group or only in the second hatch group H4 to H6, the gas purging becomes unnecessary. Further, when the gas purging is required only in the hatch group, the movement between the hatch groups is performed. Is determined by the reallocation means 11. For example, when kerosene is assigned to the hatch H2 and high octane is assigned to the hatch H3 in the example of FIG. 5, a gas purge of the hatch H2 is required.
It moves like. When the allocation is moved between the hatch groups, the possibility of simultaneous unloading is given priority over the presence or absence of gas purge.
【0024】出荷制御装置1はこの状態で待機し、ロー
リRの運転者は事務所Oの子機(例えば子機3a)のカ
ードリーダライタ21aに車番カードを読み込ますと、
図5に示す積荷データが表示器23aに表示される。こ
のように割付けされた積荷データはキーボード22aに
より修正できる。すなわち運転者は荷卸先の実情に応じ
て修正できる。そしてキーボード22aの設定釦を押す
とその修正したように積荷データが車番カードおよび出
荷制御装置に記憶され、プリンタ24aからプリントア
ウトされる。そして積荷データ記憶手段5には今回の積
荷データが更新記憶される。運転者はプリンタ24aか
らプリントアウトされた積荷データ(例えば図5)に基
づいてラックR1又はR2において給油を受ける。The shipment control device 1 stands by in this state, and when the driver of Rori R reads the car number card into the card reader / writer 21a of the slave unit (for example, the slave unit 3a) of the office O,
The cargo data shown in FIG. 5 is displayed on the display 23a. The cargo data thus allocated can be corrected by the keyboard 22a. That is, the driver can make corrections according to the actual situation of the destination. Then, when the setting button of the keyboard 22a is pressed, the cargo data is stored in the vehicle number card and the shipping control device as corrected, and is printed out from the printer 24a. The current load data is updated and stored in the load data storage means 5. The driver receives refueling in the rack R1 or R2 based on the cargo data (for example, FIG. 5) printed out from the printer 24a.
【0025】このように本発明によれば割付が適正に行
われ、ガスパージが最小限ですむので、荷積みおよび荷
卸し効率が向上する。As described above, according to the present invention, the allocation is performed properly and the gas purge is minimized, so that the loading and unloading efficiency is improved.
【0026】[0026]
【発明の効果】以上の通り本発明によれば、下記のすぐ
れた効果を奏する。 (a) 再割付手段によりガスパージを必要とするハッ
チを最小にでき、荷積み作業効率が向上する。 (b) 積荷データ記憶手段とタンクデータ記憶手段と
荷積データ入力手段のデータから同時に2本の共通管か
ら荷卸しができる。 (c) 荷積データをキーボードにより修正できるの
で、運転者が給油所の注油口の配置等から荷積データを
修正でき、便利である。 (d) プリントされた積荷データに基づいてラックで
荷積み作業をするので作業も楽である。As described above, according to the present invention, the following excellent effects can be obtained. (A) A hatch requiring gas purging can be minimized by the re-assignment means, and the loading work efficiency is improved. (B) Unloading can be performed simultaneously from two common pipes based on the data of the load data storage means, the tank data storage means, and the load data input means. (C) Since the loading data can be corrected using the keyboard, the driver can correct the loading data based on the arrangement of the lubrication port of the gas station, which is convenient. (D) Since the loading operation is performed on the rack based on the printed load data, the operation is also easy.
【図1】本発明に実施されるローリの側面説明図。FIG. 1 is an explanatory side view of a lorry implemented in the present invention.
【図2】本発明を実施する油槽所の平面図。FIG. 2 is a plan view of an oil depot for implementing the present invention.
【図3】本発明を実施する出荷制御装置の一例を示すブ
ロック図。FIG. 3 is a block diagram illustrating an example of a shipping control device that implements the present invention.
【図4】届け先と油種と油量とを示す積荷データの一例
の図。FIG. 4 is a diagram illustrating an example of cargo data indicating a destination, an oil type, and an oil amount;
【図5】ローリの各ハッチ毎の容量と前回の油種と今回
の油種と数量とガスパージの要、不要を示す積荷データ
の図。FIG. 5 is a diagram of load data showing the capacity of each hatch of the lorry, the previous oil type, the current oil type and quantity, and the necessity and necessity of gas purging.
A1、A2・・・元弁 R・・・ローリ H1、H2、H3、H4、H5、H6・・・ハッチ T1・・・第1の共通管 T2・・・第2の共通管 B・・・仕切弁 1・・・出荷制御装置 2・・・親機 3a、3b・・・子機 4・・・タンクデータの記憶手段 5・・・積荷データ記憶手段 6・・・積荷データ入力手段 7・・・荷積可否判断手段 8・・・報知機 9・・・割付手段 10・・・ガスパージ判断手段 20a、20b・・・子機の制御装置 21a、21b・・・カードリーダライタ 22a、22b・・・キーボード 23a、23b・・・表示器 24a、24b・・・プリンタ A1, A2: main valve R: lorry H1, H2, H3, H4, H5, H6: hatch T1: first common pipe T2: second common pipe B: Gate valve 1 ... Shipping control device 2 ... Master unit 3a, 3b ... Slave unit 4 ... Storage means for tank data 5 ... Load data storage means 6 ... Load data input means 7 .. Loading permission / non-permission determining means 8 ・ ・ ・ Announcer 9 ・ ・ ・ Allocating means 10 ・ ・ ・ Gas purge determining means 20a, 20b ・ ・ ・ Control devices 21a, 21b ・ ・ ・ Card reader / writers 22a, 22b ・..Keyboards 23a and 23b ... Display devices 24a and 24b ... Printers
───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.7,DB名) B67D 5/04 B67D 5/06 B67D 5/30 B67D 5/32 B67D 5/60 ──────────────────────────────────────────────────続 き Continued on the front page (58) Field surveyed (Int.Cl. 7 , DB name) B67D 5/04 B67D 5/06 B67D 5/30 B67D 5/32 B67D 5/60
Claims (1)
は底弁を介して第1の共通管に接続され、後方に位置す
る第2のハッチ群は底弁を介して第2の共通管に接続さ
れ、第1および第2の共通管はそれぞれ元弁を介してホ
ース接続カップリングに連結され、そして第1および第
2の共通管は仕切弁を介して互いに接続されているロー
リに荷積を割り付ける油槽所の出荷制御装置において、
事務所に設けた親機とその親機と信号線で接続された複
数の子機とよりなり、子機は制御装置とカードリーダラ
イタとキーボードと表示機とプリンタを備え、親機は各
ハッチ容量と第1および第2のハッチ群とを含むローリ
のタンクデータを記憶するタンクデータ記憶手段と、前
回の各ハッチの油種を記憶する前回の積荷データ記憶手
段と今回の荷卸先と油種と油量とを入力する積荷データ
入力手段と、荷卸先別に積荷を第1および第2のハッチ
群に割り付ける割付手段と、前回の油種と今回割付けら
れた油種とによりガスパージの要不要を判断するガスパ
ージ判断手段と、そのガスパージ判断手段でガスパージ
が必要とするハッチ数を最小とするように再割付をする
再割付手段とを備え、自動的に割付けられた荷積データ
はキーボードによって修正でき、積荷データは記憶され
プリンタでプリントされることを特徴とする油槽所の出
荷制御装置。1. A first group of hatches located in front of a lorry is connected to a first common pipe via a bottom valve, and a second group of hatches located rearward is connected to a second common pipe via a bottom valve. Connected to a pipe, the first and second common pipes are each connected to a hose connection coupling via a main valve, and the first and second common pipes are connected to lorries connected to each other via a gate valve. In a shipping control device at an oil depot to assign loads,
It consists of a master unit provided in the office and a plurality of slave units connected to the master unit by signal lines.The slave unit includes a control device, a card reader / writer, a keyboard, a display unit, and a printer. Tank data storage means for storing the tank data of the lorry including the capacity and the first and second hatch groups; previous load data storage means for storing the last oil type of each hatch; Data input means for inputting the load and oil amount, allocating means for allocating the load to the first and second hatch groups for each unloading destination, and necessity of gas purging by the previous oil type and the currently allocated oil type. A gas purging judgment means for judging and a reallocation means for reallocation so as to minimize the number of hatches required for gas purging by the gas purge judging means. You can modify Te, cargo data is shipped controller oil bases, characterized in that it is printed in stored printer.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP5315017A JP3036616B2 (en) | 1993-12-15 | 1993-12-15 | Oil depot shipping control device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP5315017A JP3036616B2 (en) | 1993-12-15 | 1993-12-15 | Oil depot shipping control device |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH07172499A JPH07172499A (en) | 1995-07-11 |
| JP3036616B2 true JP3036616B2 (en) | 2000-04-24 |
Family
ID=18060428
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP5315017A Expired - Lifetime JP3036616B2 (en) | 1993-12-15 | 1993-12-15 | Oil depot shipping control device |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3036616B2 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103552971A (en) * | 2013-11-06 | 2014-02-05 | 江苏丽天石化码头有限公司 | Piping exchange station used for oil depot tank field cargo access system |
-
1993
- 1993-12-15 JP JP5315017A patent/JP3036616B2/en not_active Expired - Lifetime
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103552971A (en) * | 2013-11-06 | 2014-02-05 | 江苏丽天石化码头有限公司 | Piping exchange station used for oil depot tank field cargo access system |
| CN103552971B (en) * | 2013-11-06 | 2016-08-24 | 江苏丽天石化码头有限公司 | Piping exchange station for the incoming and outgoing system of the oil depot tank area |
Also Published As
| Publication number | Publication date |
|---|---|
| JPH07172499A (en) | 1995-07-11 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US5125783A (en) | Automatic conveyance system | |
| US20020059121A1 (en) | System and method for remote warehouse management | |
| JP3036616B2 (en) | Oil depot shipping control device | |
| US6510874B2 (en) | Distribution system for gases | |
| JP6747806B2 (en) | Hatch allocation system | |
| JPH0223103A (en) | Goods distribution equipment | |
| JP3354830B2 (en) | Portable equipment for transportation business | |
| US11866321B1 (en) | Fuel supply chain management system and method for integration of retail gas station, carrier tank trucks, and fuel terminal storage truck racks | |
| EP1139307A2 (en) | Distribution system for gases | |
| JPS61115895A (en) | Liquid feeder | |
| JPS61104999A (en) | Mixed oil prevention device | |
| JPH07172493A (en) | Tank lorry | |
| JP2019006489A (en) | Unloading system | |
| JP4170036B2 (en) | Tank truck shipping management system | |
| US1190822A (en) | Means for loading and unloading merchandise. | |
| JP2587081B2 (en) | Liquid supply device | |
| JPH04294794A (en) | Load display device of tank rolly | |
| JP2001301897A (en) | Unloading system for tank trucks | |
| JPH05174291A (en) | Car allocation plan supporting system | |
| JPH1191900A (en) | Shipping system | |
| JPS58193299A (en) | Lubricating device | |
| JPH04267796A (en) | Lorry delivery system | |
| SU1129139A1 (en) | Data device for rack storage | |
| JPH04154598A (en) | Liquid feeding device | |
| JPH06156593A (en) | Shipping device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090225 Year of fee payment: 9 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100225 Year of fee payment: 10 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100225 Year of fee payment: 10 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110225 Year of fee payment: 11 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110225 Year of fee payment: 11 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120225 Year of fee payment: 12 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130225 Year of fee payment: 13 |
|
| EXPY | Cancellation because of completion of term |