JP3045481B2 - Construction method of cast-in-place concrete pile - Google Patents
Construction method of cast-in-place concrete pileInfo
- Publication number
- JP3045481B2 JP3045481B2 JP9026944A JP2694497A JP3045481B2 JP 3045481 B2 JP3045481 B2 JP 3045481B2 JP 9026944 A JP9026944 A JP 9026944A JP 2694497 A JP2694497 A JP 2694497A JP 3045481 B2 JP3045481 B2 JP 3045481B2
- Authority
- JP
- Japan
- Prior art keywords
- pile
- concrete
- cast
- waterproof sheet
- cage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Piles And Underground Anchors (AREA)
Description
【0001】[0001]
【発明の属する技術分野】本発明は、杭基礎工のひとつ
である場所打ちコンクリート杭の施工方法に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing a cast-in-place concrete pile which is one of pile foundation works.
【0002】[0002]
【従来の技術】周知のように、場所打ちコンクリート杭
は、予め工場等で製作された杭を地盤中に設置して基礎
とする既製杭に対し、機械或いは人力により地盤を掘削
した孔内に鉄筋を挿入し、その孔内にコンクリートを打
設して築造する現場造成杭のことである。ところで、砂
層や砂礫層等の帯水層付近の現場、例えば、図5に示す
ように、帯水層Bを挟んで上下に不透水層A,Cが形成
されている地盤において、前述したような場所打ちコン
クリート杭を造成する場合は、コンクリートを打設する
杭孔30の孔壁保護のために、地盤にケーシング1を建
て込んでから前記杭孔30を掘削した後、鉄筋40,4
0,40,…を建て込み、コンクリートを打設して杭の
造成を行ったりしていた。また、掘削した孔30にベン
トナイト水溶液もしくは清水をたたえて孔壁保護を図り
ながらコンクリートを打設して杭の造成を行っていた。2. Description of the Related Art As is well known, cast-in-place concrete piles are prepared by placing piles manufactured in advance in a factory or the like in the ground and placing them in a hole where the ground has been excavated by a machine or human power with respect to a pre-made pile. This is an on-site construction pile in which a reinforcing bar is inserted and concrete is poured into the hole to build it. By the way, as described above, in a site near an aquifer such as a sand layer and a gravel layer, for example, as shown in FIG. 5, in a ground where impermeable layers A and C are formed vertically above and below an aquifer B. When constructing a cast-in-place concrete pile, in order to protect the hole wall of the pile hole 30 for placing concrete, the casing 1 is erected and then the pile hole 30 is excavated.
They built 0, 40, ..., and poured concrete to build piles. Further, piles were formed by pouring concrete into the excavated hole 30 while pouring a bentonite aqueous solution or fresh water to protect the hole wall.
【0003】[0003]
【発明が解決しようとする課題】しかしながら、上述し
たような砂層や砂礫層等の帯水層B付近の現場における
従来の場所打ちコンクリート杭の施工方法にあっては、
ケーシング1を使用して杭を造成した場合、コンクリー
トの打設を終えて、前記孔壁30aの保護に使用したケ
ーシング1を引き抜いた後、以下のような問題が生じ
る。すなわち、打設したコンクリートの初期硬化が完了
していない場合に、前記ケーシングの引き抜きを行って
しまうと、前記帯水層Bに打設したコンクリート成分が
漏出し、前記帯水層B中の水分と混合してしまい、土壌
を汚染するばかりか、杭基礎となる打設したコンクリー
トの品質が完全に確保されないという問題点があった。
また、上記と同様な現場において、前記孔壁の保護にベ
ントナイト水溶液を使用して行った場合は、当該ベント
ナイト水溶液が地中に混入した時点で土壌汚染と見られ
てしまう恐れがある。However, in the conventional method of constructing a cast-in-place concrete pile at a site near the aquifer B such as a sand layer or a gravel layer as described above,
When a pile is formed using the casing 1, the following problems occur after the casting of the concrete is completed and the casing 1 used for protecting the hole wall 30a is pulled out. In other words, if the concrete has been cast and the initial hardening has not been completed, if the casing is pulled out, the concrete component poured into the aquifer B leaks out and the water content in the aquifer B is reduced. Not only pollutes the soil, but also does not completely ensure the quality of the cast concrete used as the pile foundation.
Further, in the same site as described above, if the bentonite aqueous solution is used to protect the pore wall, soil contamination may be seen when the bentonite aqueous solution enters the ground.
【0004】本発明の課題は、打設したコンクリートを
地中に漏出させずに、この打設したコンクリートの品質
を確実に確保する場所打ちコンクリート杭の施工方法を
提供することである。An object of the present invention is to provide a method of constructing a cast-in-place concrete pile which ensures the quality of the poured concrete without leaking the poured concrete into the ground.
【0005】[0005]
【課題を解決するための手段】以上の課題を解決すべ
く、本発明の請求項1の場所打ちコンクリート杭の施工
方法は、地盤を掘削して杭用の杭孔を形成し、この杭孔
に鉄筋籠を建て込んだ後、コンクリートを打設してコン
クリート杭を造成する場所打ちコンクリート杭の施工方
法であって、前記鉄筋籠の外周の少なくとも一部に予め
防水シートをスペーサを介して巻装しておき、且つ前記
スペーサは、コンクリートを打設した際のコンクリート
の被り厚さを確保するように、建て込まれる鉄筋籠の外
周から突出した状態で外周に複数配設されているものと
し、 前記防水シートをスペーサを介して外周に巻装して
なる鉄筋籠を前記杭孔に建て込んで前記コンクリートを
打設することを特徴としている。SUMMARY OF THE INVENTION In order to solve the above-mentioned problems, a method of constructing a cast-in-place concrete pile according to the present invention is to excavate the ground to form a pile hole for a pile, and A method for constructing a cast-in-place concrete pile in which a concrete pile is formed by casting concrete after the reinforcing cage has been built in, wherein a waterproof sheet is wound in advance on at least a part of the outer periphery of the reinforcing cage through a spacer . Dressed and said
Spacer is used when concrete is cast
Outside the reinforced cage, so as to ensure the thickness of
A plurality of which are arranged on the outer circumference in a state protruding from the circumference
And it is characterized in that pouring the concrete in built up a reinforcing bar cage made by winding the outer periphery of the waterproof sheet via a spacer to the pile hole.
【0006】地盤を掘削して杭孔を形成する場合、当該
杭孔の掘削孔壁は、その孔壁の崩壊を防止するために、
ケーシングを建て込むことによって保護されているもの
である。そして、このケーシングは、掘削した杭孔にコ
ンクリートを打設した後、引き抜かれる。なお、前記孔
杭の掘削に用いられる方法や掘削機械の種類、排土の方
法等は、オールケーシング(ベノト)工法、アースドリ
ル工法、リバースサーキュレーション工法等といったよ
うな場所打ち杭工法の様々な種類に応じて対応する掘削
方法の、どのような方法で行われてもよい。When excavating the ground to form a pile hole, the excavation hole wall of the pile hole is formed in order to prevent collapse of the hole wall.
It is protected by embedding a casing. Then, the casing is pulled out after placing concrete in the excavated pile hole. The method used for drilling the hole pile, the type of excavating machine, the method of earth removal, etc. are various types of cast-in-place pile method such as all casing (Venoto) method, earth drill method, reverse circulation method and the like. It may be performed by any method of the corresponding excavation method.
【0007】前記防水シートは、非透水性のものである
ならば、ビニール等、どのようなもので構成されていて
もよく、例えば、ゴム製のシート等が好適である。ま
た、この防水シートは、スペーサを介して前記鉄筋籠の
外周を巻装した状態であるならば、どのように取り付け
られてもよい。例えば、前記鉄筋籠を所定の長さ、幅の
防水シートで巻装し、前記防水シートの下端および上端
において、前記鉄筋籠に番線で結束する等の構成が挙げ
られる。[0007] The waterproof sheet may be made of any material such as vinyl as long as it is impermeable to water. For example, a rubber sheet is suitable. The waterproof sheet may be attached in any manner as long as the outer periphery of the reinforcing rod cage is wound around via a spacer . For example, a configuration is possible in which the rebar basket is wound with a waterproof sheet having a predetermined length and width, and the lower and upper ends of the waterproof sheet are bound to the rebar basket by a number line.
【0008】なお、前記防水シートがゴムシートの場
合、コンクリートを打設した際、打設したコンクリート
の内圧で当該ゴムシートが孔壁側に伸びるので、前記鉄
筋篭と前記防水シートの結束部分はできるだけ少なくす
る。このように前記ゴムシートが孔壁側に伸びることに
よって、造成するコンクリート杭の品質は向上し、より
安定した支持力を有する基礎となる。In the case where the waterproof sheet is a rubber sheet, when the concrete is poured, the rubber sheet extends toward the hole wall due to the internal pressure of the poured concrete. Use as little as possible. Since the rubber sheet extends toward the hole wall in this manner, the quality of the concrete pile to be formed is improved, and the foundation becomes a foundation having more stable supporting force.
【0009】また、鉄筋篭の外周に予め巻装される防水
シートは、当該鉄筋篭の外周の全体、またはその一部分
など、鉄筋篭の外周をどのように巻装してもよく、その
巻装箇所は任意である。例えば、掘削して杭孔を形成す
る地盤が、帯水層の上下に不透水層を有する地盤である
場合には、前記防水シートは、鉄筋篭をその地盤に建て
込んだ際の前記帯水層の部分に対応する位置に配置され
るように、前記鉄筋篭に巻装することが好適である。こ
れは、上下の不透水層にかかるように前記防水シートを
前記鉄筋篭に巻装するようにすることである。また、前
記コンクリートは、通常、トレミー管を前記杭孔に挿入
し、このトレミー管を通じて、掘削した杭孔の下方より
打設される。[0009] The waterproof sheet pre-wound on the outer periphery of the reinforced basket may be wrapped around the outer periphery of the reinforced basket, such as the entire outer periphery of the reinforced basket or a part thereof. The location is optional. For example, when the ground to be formed by excavation to form a pile hole is a ground having an impermeable layer above and below an aquifer, the waterproof sheet is used for the aquifer when a reinforced cage is built in the ground. It is preferable to wind the reinforcing bar so as to be arranged at a position corresponding to the layer portion. This means that the waterproof sheet is wound around the rebar basket so as to cover the upper and lower impermeable layers. In addition, the concrete is usually put into the pile hole from below the excavated pile hole by inserting a tremy tube into the pile hole.
【0010】請求項1記載の発明によれば、地盤を掘削
して形成した杭用の杭孔に、外周に予め防水シートをス
ペーサを介して巻装した鉄筋籠を建て込んだ後、コンク
リートを打設してコンクリート杭を造成するので、前記
スペーサを介して前記防水シートを予め巻装した鉄筋籠
を建て込んだ前記杭孔に前記コンクリートを打設して
も、外周に前記防水シートが巻装されている部分におい
て鉄筋籠の内側と外側とを仕切ることになり、その内側
のコンクリートは、前記防水シートによって遮断され、
外側である地中に漏出することがない。According to the first aspect of the present invention, a waterproof sheet is previously placed on the outer periphery of a pile hole for a pile formed by excavating the ground .
After that built up the rebar cage that wound through the pacer, because to Da設the concrete to construct a concrete pile, said
Even if the concrete is cast into the pile hole in which the reinforcing rod cage in which the waterproof sheet is wound in advance through a spacer is inserted, the inside and the outside of the reinforcing rod basket in the portion where the waterproof sheet is wound on the outer periphery. And concrete inside is blocked by the tarpaulin,
It does not leak into the outside ground.
【0011】したがって、コンクリートを打設した後
で、前記杭孔の孔壁を保護しているケーシングを引き抜
いた際、打設したコンクリートの初期硬化が完了してい
なくても、前記鉄筋篭の内側からコンクリート成分が地
中へ漏出することはなく、土壌の汚染を防ぐと共に、未
硬化のコンクリートを保護して打設したコンクリート杭
の品質を確実に確保することができる。[0011] Therefore, when the casing that protects the hole wall of the pile hole is pulled out after the concrete has been cast, even if the initial hardening of the cast concrete has not been completed, the inside of the rebar cage is not required. The concrete component does not leak into the ground from the ground, preventing soil contamination, protecting uncured concrete, and ensuring the quality of the cast concrete pile.
【0012】特に、帯水層を有する地盤に場所打ちコン
クリート杭による杭基礎を造成する場合、鉄筋籠を建て
込んだ杭孔へのコンクリートの打設を終えて、前記孔壁
の保護に使用したケーシングを引き抜いた後、打設した
コンクリートの初期硬化が完了していない場合でも、地
中に打設したコンクリート成分が当該鉄筋籠の外側に漏
出し、地中(特に帯水層)に含まれた水分と混合するこ
とがないので、漏出する前記コンクリート成分によって
土壌を汚染することがないとともに、杭基礎となる打設
したコンクリートの品質が完全に確保される。また、前
記スペーサは、コンクリートを打設した際のコンクリー
トの被り厚さを確保するように、建て込まれる鉄筋籠の
外周から突出した状態で外周に複数配設されているの
で、コンクリートを打設した際のコンクリートの被り厚
さを確保することができる。 本発明の請求項2の場所打
ちコンクリート杭の施工方法は、請求項1記載の場所打
ちコンクリート杭の施工方法において、 前記防水シート
はゴム製のシートであり、該防水シートの上端部は、杭
頭に相当する部分から番線にて吊り下げられており、ま
た、該防水シートの下端部は、当該防水シートの下端部
に位置するスペーサに番線結束することを特徴としてい
る。 請求項2記載の発明によれば、前記鉄筋籠とゴム製
の前記防水シートの結束部分ができるだけ少なく構成さ
れ、このゴム製の防水シートを有する鉄筋籠を建て込ん
だ後にコンクリートを打設した際、打設したコンクリー
トの内圧で前記防水シートが孔壁側に伸びて、掘削した
杭孔内において一層コンクリートが充填されることにな
り、造成するコンクリート杭の品質の向上に繋がり、よ
り安定した支持力を有するコンクリート杭基礎となる。
また、前記防水シートを有する前記鉄筋籠2を前記杭孔
に挿入した際に、その挿入時の摩擦等によって、当該防
水シートの下端部が、まくり上がらないようになる。 本
発明の請求項3の場所打ちコンクリート杭の施工方法
は、請求項1または2記載の場所打ちコンクリート杭の
施工方法において、 複数のスペーサのうち前記鉄筋籠の
主筋の延在方向に延在する一列に、前記主筋の延在方向
に伸びる断面L字形状のガイドアングルを取り付け、前
記防水シートの一端部を、前記ガイドアングルの一面で
ある表面部で接着し、前記鉄筋籠を巻いた他端部を接着
された前記防水シートの一端部のうえから重ねるように
接着することを特徴としている。 請求項3記載の発明に
よれば、前記防水シートの一端部を、前記ガイドアング
ルの一面である表面部で接着し、前記鉄筋籠を巻いた他
端部を接着された前記防水シートの一端部のうえから重
ねるように接着され、鉄筋籠の外周には前記防水シート
が巻装された状態になる。 [0012] In particular, in the case of constructing a pile foundation with a cast-in-place concrete pile on the ground having an aquifer, the concrete was poured into a pile hole in which a steel cage was built, and the concrete was used to protect the hole wall. Even after the casing has been pulled out, even if the initial hardening of the cast concrete has not been completed, the concrete component cast into the ground leaks out of the steel cage and is contained in the ground (especially aquifer). Since the concrete component does not mix with the water, the leaked concrete component does not contaminate the soil, and the quality of the cast concrete used as the pile foundation is completely ensured. Also before
The spacer is used for concrete when casting concrete.
Of the reinforcing steel cage to be built
There are multiple pieces arranged on the outer circumference so that they protrude from the outer circumference
The thickness of the concrete when casting concrete
Can be assured. Claim 2 of the present invention
The construction method of the concrete pile is the cast-in-place method according to claim 1.
In the method for constructing a concrete pile, the waterproof sheet
Is a rubber sheet, and the upper end of the waterproof sheet is
It is suspended from the part corresponding to the head with a track,
The lower end of the tarpaulin is the lower end of the tarpaulin.
It is characterized in that it is bound to the spacer located at
You. According to the invention described in claim 2, the rebar basket and the rubber cage
The binding portion of the waterproof sheet is configured as small as possible.
The reinforced basket with this rubber tarpaulin
When concrete is cast after the concrete
The waterproof sheet extended to the hole wall side by the internal pressure of
Concrete will be filled further in the pile hole.
The quality of the concrete pile to be created.
It becomes a concrete pile foundation with stable bearing capacity.
Further, the reinforcing rod cage 2 having the waterproof sheet is connected to the pile hole.
When it is inserted into the
The lower end of the water sheet will not roll up. Book
Construction method of cast-in-place concrete pile according to claim 3 of the invention
Is the cast-in-place concrete pile according to claim 1 or 2.
In the construction method, of the plurality of spacers,
In a row extending in the extending direction of the main muscle, the extending direction of the main muscle is
Attach an L-shaped guide angle that extends to the front
One end of the waterproof sheet, one side of the guide angle
Glue at one surface and glue the other end around the reinforced cage
Over the one end of the waterproof sheet
It is characterized by bonding. The invention according to claim 3
According to one embodiment, one end of the waterproof sheet is attached to the guide ang.
Glued on the surface which is one side of the
Weight is applied on one end of the waterproof sheet to which the end is adhered.
Glued so that the waterproof sheet is
Is wound.
【0013】[0013]
【発明の実施の形態】以下、図1〜図4を参照して本発
明に係る場所打ちコンクリート杭の施工方法の実施の形
態を詳細に説明する。ここでは、帯水層が含まれている
地層に場所打ちコンクリート杭が打設される場合につい
て説明する。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the method for constructing a cast-in-place concrete pile according to the present invention will be described below in detail with reference to FIGS. Here, a case will be described in which a cast-in-place concrete pile is driven into a stratum including an aquifer.
【0014】図1〜図4は、本発明を適用した場所打ち
コンクリート杭の施工方法の一実施の形態を示す図であ
る。FIG. 1 to FIG. 4 are views showing one embodiment of a method for constructing a cast-in-place concrete pile to which the present invention is applied.
【0015】まず、構成を説明する。1はケーシング、
2は鉄筋篭、3は防水シートであるゴムシート、20、
21は、前記鉄筋篭2が有する主筋及び帯筋、22はス
ペーサ、23はガイドアングル、30は杭用の杭孔、3
0aは前記杭孔30の孔壁である。First, the configuration will be described. 1 is a casing,
2 is a steel cage, 3 is a rubber sheet as a waterproof sheet, 20,
Reference numeral 21 denotes a main reinforcing bar and a stirrup of the rebar cage 2, 22 denotes a spacer, 23 denotes a guide angle, 30 denotes a pile hole for a pile,
Reference numeral 0a denotes a hole wall of the pile hole 30.
【0016】図1は、本発明の場所打ちコンクリート杭
の施工方法の一実施の形態を説明する縦断面図であり、
この図における場所打ち杭を施工する地盤は、不透水層
である地層A及びCと、前記不透水層A及びCに挟まれ
た地層である帯水層Bからなる。図2は、本発明の場所
打ちコンクリート杭の施工方法の一実施の形態に使用す
る、図1の鉄筋篭の平面図、図3は、図2のX部分の拡
大図、図4は、図3のD−D線断面図である。FIG. 1 is a longitudinal sectional view for explaining an embodiment of the method for constructing a cast-in-place concrete pile according to the present invention.
The ground on which the cast-in-place pile in this figure is constructed includes strata A and C, which are impermeable layers, and aquifer B, which is a stratum sandwiched between the impermeable layers A and C. FIG. 2 is a plan view of the reinforced cage shown in FIG. 1 used in the embodiment of the method for constructing a cast-in-place concrete pile of the present invention, FIG. 3 is an enlarged view of a portion X in FIG. 2, and FIG. 3 is a sectional view taken along line DD of FIG.
【0017】図1に示すように、この地盤には、当該地
盤を鉛直方向に掘削して形成された杭孔30が形成され
ており、前記杭孔30には、防水シート3を予め外周に
巻装してなる鉄筋篭2が建て込まれている。前記杭孔3
0の孔壁30aは、掘削時に崩壊しないように当該地盤
に建て込まれたケーシング1によって保護されている。As shown in FIG. 1, a pile hole 30 formed by excavating the ground in the vertical direction is formed in the ground, and the waterproof sheet 3 is previously formed on the outer periphery of the pile hole 30. A reinforced steel cage 2 wound around is built. The pile hole 3
The 0-hole wall 30a is protected by the casing 1 built on the ground so as not to collapse during excavation.
【0018】また、このケーシング1は、不透水層Aか
らCに跨って建て込まれており、前記不透水層A及びC
に挟まれた帯水層Bに多く含まれている水分が、前記杭
孔30内側に侵入することを防ぎ、コンクリート杭の打
設作業を容易にしたものとなっている。The casing 1 is built over the water-impermeable layers A to C, and the water-impermeable layers A and C
The water contained in the aquifer B sandwiched between the holes is prevented from entering the inside of the pile hole 30 to facilitate the work of placing the concrete pile.
【0019】なお、図示していないが、この杭孔30
は、下方へ所定の深度まで掘削されているものであり、
前記杭孔30に建て込まれた鉄筋篭2は、掘削された所
定の深度まで前記鉄筋篭2の先端部が到達するように、
建て込まれていることは勿論である。Although not shown, this pile hole 30 is not shown.
Is excavated downward to a predetermined depth,
The reinforced cage 2 built in the pile hole 30 is such that the tip of the reinforced cage 2 reaches a predetermined excavated depth.
It is, of course, built.
【0020】前記鉄筋篭2は、杭孔30方向(縦方向)
に配筋された複数の主筋20、20,…,20に、帯筋
21,21,…,21を所定の間隔で前記主筋20,2
0,…,20と直交方向(横方向)に結束または溶接に
よって取り付け(図示省略。)、組み立て略篭状に形成
されたものであり、その外周にスペーサ22,22,2
2,22が複数配設されている。なお、これらのスペー
サ22,22,22,…は、コンクリートを打設した際
のコンクリートの被り厚さを確保するために用いられる
ものであり、建て込まれる鉄筋篭の外周から突出した状
態で設けられているものであり、前述したような作用を
及ぼす形状であるならば、それらの形状はどの様な形状
でも良い。The reinforced cage 2 is arranged in the pile hole 30 direction (vertical direction).
, 21 are arranged at predetermined intervals at the main bars 20, 20,.
It is attached (not shown) by bundling or welding in the direction (lateral direction) orthogonal to 0,..., 20 and formed into a substantially cage-like shape, and spacers 22, 22, 2,
2, 22 are provided in plurality. These spacers 22, 22, 22,... Are used to secure the covering thickness of the concrete when the concrete is cast, and are provided so as to protrude from the outer periphery of the reinforcing steel cage to be built. And any shape may be used as long as the shape exerts the action as described above.
【0021】この実施の形態における、これら複数のス
ペーサ22,22,…の配置は、外周に等間隔に4箇所
設けられ、かつ、その4箇所設けられているスペーサ2
2,22,22,22から、縦方向(主筋20の延在方
向)にそれぞれ外周上に列となるように所定の間隔に位
置するものである。このように、主筋20、20…の延
在方向に所定の間隔で4列に配設されたスペーサ22,
22,22,22のうちの1列(図2に示すX部分)
に、縦方向にL型形状のガイドアングル23が、溶接に
よって取り付けられている。In this embodiment, the plurality of spacers 22, 22,... Are arranged at four locations on the outer periphery at equal intervals, and the spacers 2 provided at the four locations are provided.
From 2,22,22,22, they are located at predetermined intervals so as to form a row on the outer periphery in the vertical direction (extending direction of the main bar 20). As described above, the spacers 22, which are arranged in four rows at predetermined intervals in the extending direction of the main bars 20, 20,.
One row of 22, 22, 22 (X part shown in FIG. 2)
An L-shaped guide angle 23 is attached in the longitudinal direction by welding.
【0022】このガイドアングル23は、図4に示すよ
うに、前記鉄筋篭2を構成する前記主筋20のうちのひ
とつである前記主筋20aに一端部22aを溶接され、
かつ、前記主筋20aに直交して設けられている前記帯
筋21,21の間から外方に他端部22bが突出するよ
うに設けられた前記スペーサ22,22,22の前記他
端部22bにおいて、両者の面同士が当接した状態で結
合している。ここで、スペーサ22,22,22,22
は、前記主筋20,20aに溶接されているものとした
がこれに限らず、所定の位置の帯筋21,21…に溶接
して取り付けても良い。また、前記スペーサ22の前記
鉄筋篭2に対する取付は溶接としたが、固着させるもの
であるなら、これに限らず、結束やボルトなどによって
取り付けられても良い。このガイドアングル23を介し
て、その鉄筋篭2の杭頭部の外周には、図2から図4に
示すように、防水シート3が巻装された状態になってい
る。As shown in FIG. 4, one end 22a of the guide angle 23 is welded to the main reinforcement 20a which is one of the main reinforcements 20 constituting the rebar cage 2,
The other ends 22b of the spacers 22, 22, 22 are provided such that the other ends 22b protrude outward from between the strips 21, 21 provided orthogonal to the main bars 20a. In the above, both surfaces are connected in a state of contact with each other. Here, the spacers 22, 22, 22, 22
Are welded to the main bars 20, 20a. However, the present invention is not limited to this, and they may be attached by welding to the band bars 21, 21,... At predetermined positions. Further, the spacer 22 is attached to the reinforcing bar 2 by welding, but is not limited to this as long as it is to be fixed, and may be attached by bundling, bolts, or the like. As shown in FIGS. 2 to 4, the waterproof sheet 3 is wound around the outer periphery of the pile head of the reinforced cage 2 via the guide angle 23.
【0023】前記防水シート3は、この実施の形態で
は、ゴム製のシートが用いられており、図3に示すよう
に、前記ガイドアングル23のL型を形成している一面
の表面部23aにおいて、前記防水シート3の主筋方向
の一端部31が接着されており、前記防水シート3を前
記鉄筋篭2の外周に沿って覆うように巻いた状態にし
て、当該防水シート3の他端部32を重ねるように接着
している。In this embodiment, a rubber sheet is used as the waterproof sheet 3. As shown in FIG. 3, the waterproof sheet 3 has a surface portion 23 a forming an L-shape of the guide angle 23. One end 31 of the waterproof sheet 3 in the main reinforcement direction is adhered, and the waterproof sheet 3 is wound so as to cover the outer periphery of the reinforcing bar cage 2. Are glued together.
【0024】また、この巻装された防水シート3の上端
部3aは、当該防水シート3が下方にずり落ちないよう
に前記主筋の上部、つまり、杭頭に相当する部分の主筋
20,20,…から番線にて吊り下げられており、ま
た、当該記防水シート3の下端部3bは、当該防水シー
ト3の下端部3bに位置する4箇所のスペーサ22,2
2,22,22に番線結束されている。(図示省略。)
これは、前記防水シート3を有する前記鉄筋篭2を前記
杭孔30に挿入した際に、その挿入時の摩擦等によっ
て、当該防水シート3の下端部3bが、まくり上がらな
いようにするためである。The upper end 3a of the wrapped waterproof sheet 3 is located above the main reinforcement, that is, the main reinforcement 20, 20, which corresponds to the pile head, so that the waterproof sheet 3 does not slip down. .., And the lower end 3 b of the waterproof sheet 3 is provided at four locations located at the lower end 3 b of the waterproof sheet 3.
No. 2, 22, 22 are bound. (Not shown)
This is to prevent the lower end portion 3b of the waterproof sheet 3 from rolling up due to friction or the like when the reinforced cage 2 having the waterproof sheet 3 is inserted into the pile hole 30 due to friction at the time of insertion. is there.
【0025】つまり、この実施の形態における前記防水
シート3と前記鉄筋篭2とは、番線によって吊設された
状態となっている上端部3aと番線結束された下端部3
b及び前記ガイドアングル23との接着部分23aとで
しか支持されていないものとなっている。That is, the waterproof sheet 3 and the reinforcing bar 2 in this embodiment are connected to an upper end 3a suspended by a wire and a lower end 3 bound to the wire.
b and the bonding portion 23a with the guide angle 23.
【0026】このように、前記鉄筋篭2と前記防水シー
ト3の結束部分はできるだけ少なく構成されているの
は、本実施の形態において、前記防水シート3がゴム製
のシートであり、この防水シート3を有する鉄筋篭2を
建て込んだ後にコンクリートを打設した際、打設したコ
ンクリートの内圧でゴム製の防水シート3が孔壁30a
側に伸びて、造成するコンクリート杭の品質の向上に繋
がり、より安定した支持力を有するコンクリート杭基礎
となるからである。As described above, the binding portion between the rebar basket 2 and the waterproof sheet 3 is made as small as possible. In this embodiment, the waterproof sheet 3 is a rubber sheet. When the concrete is cast after the reinforced basket 2 having the concrete 3 is built, the rubber waterproof sheet 3 is formed by the internal pressure of the concrete that has been cast.
This is because it extends to the side and leads to the improvement of the quality of the concrete pile to be formed, and becomes a concrete pile foundation having more stable bearing capacity.
【0027】次に、この防水シート3を有する鉄筋篭2
の組立について説明する。Next, the reinforced cage 2 having the waterproof sheet 3
Will be described.
【0028】まず、前述したような複数の主筋20,2
0,20,…及び帯筋21,21,21,…を縦横に取
り付けて略篭状に形成される前記鉄筋篭2の組立時に、
スペーサ22,22,…を前記杭頭部の帯筋21,2
1,21,21から取付始め、後に前記防水シート3が
卷かれる部分の下端部3bの位置にもスペーサ22,2
2,22,22を取り付ける。このように前記鉄筋篭2
の外周に等間隔に取り付けられた前記スペーサ22,2
2,22,22のうちの前記主筋20の延在方向に延在
する一列に、前記主筋20の延在方向に伸びる断面L型
形状のガイドアングル23を溶接によって取り付けてか
ら、前記ガイドアングル23が設けられた箇所(杭頭部
に相当する鉄筋篭2の一部)での鉄筋篭2の外周に前記
防水シート3を巻き付ける。First, a plurality of main bars 20, 2 as described above are used.
., And the reinforcing bars 21, 21, 21,...
The spacers 22, 22,...
At the lower end 3b of the portion where the waterproof sheet 3 is wound later, the spacers 22 and 2 are attached.
Attach 2,22,22. In this way, the reinforced cage 2
Spacers 22, 2 attached at equal intervals to the outer periphery of
A guide angle 23 having an L-shaped cross section extending in the direction in which the main bar 20 extends is attached to one of the rows 2, 22, 22 extending in the direction in which the main bar 20 extends by welding. The waterproof sheet 3 is wound around the outer periphery of the reinforced cage 2 at the location where the is provided (part of the reinforced cage 2 corresponding to the pile head).
【0029】次に、巻き付けた防水シート3の一端部3
1を、図3に示すように、このガイドアングル23のL
型を形成している一面である表面部23aで接着し、前
記鉄筋籠2を巻いた他端部32を接着された前記防水シ
ート3の一端部31のうえから重ねるように接着する。Next, one end 3 of the wound waterproof sheet 3
1 as shown in FIG.
Adhesion is performed at the surface portion 23a which is one surface forming the mold, and the other end portion 32 around which the reinforcing rod cage 2 is wound is adhered so as to overlap the one end portion 31 of the waterproof sheet 3 to which the adhesion is applied.
【0030】そして、この巻装された防水シート3の上
端部3aを、当該防水シート3が下方にずり落ちないよ
うに前記主筋20の上部から番線にて吊り下げるととも
に、前記防水シート3の下端部3bを、当該防水シート
3の下端部3bに位置するスペーサ22,22,22,
22に番線で結束して組み立てるものである。The upper end 3a of the wrapped waterproof sheet 3 is suspended from the upper part of the main bar 20 by a number line so that the waterproof sheet 3 does not slide down. The spacer 3 is located at the lower end 3 b of the waterproof sheet 3.
22 is assembled by binding with a line.
【0031】次に、上述したような前記防水シート3を
有する鉄筋篭2を用いた本発明の実施の形態の場所打ち
コンクリート杭の施工方法についてを説明する。Next, a method for constructing a cast-in-place concrete pile according to an embodiment of the present invention using the reinforced cage 2 having the waterproof sheet 3 as described above will be described.
【0032】まず、前記帯水層Bを有する地盤をアース
ドリル機等の掘削用の機械によって、先行堀りを行い、
掘削した孔壁30aの崩壊を保護するためにケーシング
1を鉛直に建て込んでから、杭用の杭孔30を形成す
る。この杭用の杭孔30の掘削方法は、どの様に掘削さ
れても良い。そして、掘削した杭孔30に、上述したよ
うに形成された前記防水シート3を有する鉄筋篭2を前
記アースドリル機といったクレーン機能を有する機械等
によってつり上げて、建て込む。この際、前記鉄筋篭2
の建て込みは、建て込まれる前記鉄筋篭2の鉛直性に注
意しながら建て込む。なお、予め前記防水シート3は、
鉄筋篭2において任意の位置に巻装されているものであ
り、ここでは、杭頭に相当する位置の前記鉄筋篭2の外
周に設けられているものである。このように前記鉄筋篭
2を建て込むと、前記ケーシング1の内側空間におい
て、帯水層Bと対応する位置に、建て込んだ前記防水シ
ート2を外周に巻装してなる前記鉄筋篭2の杭頭が、配
置する状態となる。First, the ground having the aquifer B is preliminarily dug by a drilling machine such as an earth drill.
In order to protect the collapse of the excavated hole wall 30a, the casing 1 is erected vertically, and then the pile holes 30 for the piles are formed. The method of excavating the pile hole 30 for the pile may be any method. Then, the reinforced cage 2 having the waterproof sheet 3 formed as described above is lifted and built into the excavated pile hole 30 by a machine having a crane function such as the earth drill machine. At this time, the reinforced cage 2
The erection is performed while paying attention to the verticality of the reinforcing bar 2 to be erected. The waterproof sheet 3 is
It is wound at an arbitrary position in the reinforced cage 2 and is provided here on the outer periphery of the reinforced cage 2 at a position corresponding to the pile head. When the reinforced cage 2 is erected in this manner, the reinforced cage 2 is wound around the outer periphery of the laid waterproof sheet 2 at a position corresponding to the aquifer B in the inner space of the casing 1. The pile head is ready to be placed.
【0033】そして、内部に前記鉄筋篭2が建て込まれ
た前記杭孔30に、トレミー管を挿入して、当該杭孔3
0の下方からコンクリートの打設を行う。このようにコ
ンクリートの打設を行うと、前記鉄筋篭2の外周を巻装
しているゴム製の防水シート3は、打設したコンクリー
トの内圧により、孔壁30a側に伸びる。この防水シー
ト3の孔壁側への伸びによって、掘削した杭孔30内に
おいて一層コンクリートが充填されることになり、造成
するコンクリート杭の品質の向上し、より安定した支持
力を有するコンクリート杭基礎となる。上述したコンク
リートの打設が終了した後、前記孔壁30a保護に使用
したケーシング1を当該杭孔30から引き抜いて、場所
打ちコンクリート杭を造成する。Then, a tremy tube is inserted into the pile hole 30 in which the reinforcing cage 2 is built, and the pile hole 3 is inserted.
Concrete is poured from below 0. When concrete is cast in this manner, the rubber waterproof sheet 3 wound around the outer periphery of the reinforced cage 2 extends toward the hole wall 30a due to the internal pressure of the cast concrete. Due to the extension of the waterproof sheet 3 toward the hole wall, the concrete is further filled in the excavated pile hole 30, the quality of the concrete pile to be formed is improved, and the concrete pile foundation having more stable supporting force is provided. Becomes After the above-described concrete placement is completed, the casing 1 used for protecting the hole wall 30a is pulled out from the pile hole 30 to form a cast-in-place concrete pile.
【0034】このような本発明に係る場所打ちコンクリ
ート杭の施工方法の実施の形態によれば、地盤を掘削し
て形成した杭用の杭孔30に、外周に予め防水シート3
を巻装した鉄筋篭2を建て込んだ後、コンクリートを打
設してコンクリート杭を造成するので、前記防水シート
3を予め巻装した鉄筋篭2を建て込んだ前記杭孔30に
前記コンクリートを打設しても、外周に前記防水シート
3が巻装されている部分において鉄筋篭2の内側と外側
とを仕切ることになり、その内側のコンクリートは、前
記防水シート3によって遮断され、外側である地中に漏
出することがない。According to the embodiment of the method for constructing a cast-in-place concrete pile according to the present invention, the pile sheet 30 formed by excavating the ground has a waterproof sheet 3
After the reinforcement basket 2 is wound, concrete is cast and a concrete pile is formed. Therefore, the concrete is placed in the pile hole 30 in which the reinforcement basket 2 on which the waterproof sheet 3 is wound in advance is built. Even if it is cast, the inside of the reinforced basket 2 is separated from the outside at the portion where the waterproof sheet 3 is wound around the outer periphery, and the concrete inside is blocked by the waterproof sheet 3 and the outside is Does not leak into certain grounds.
【0035】したがって、帯水層Bを有する地盤に場所
打ちコンクリート杭による杭基礎を造成する場合、鉄筋
篭2を建て込んだ杭孔30へのコンクリートの打設を終
えて、前記孔壁30aを保護しているケーシング1を引
き抜いた後、打設したコンクリートの初期硬化が完了し
ていない場合でも、前記鉄筋篭2の内側からコンクリー
ト成分が地中へ漏出することはなく、地中に打設したコ
ンクリート成分が当該鉄筋篭2の外側に漏出し、地中、
特に帯水層Bに、含まれた水分と混合することがない。
その結果、漏出する前記コンクリート成分によって土壌
を汚染することがないとともに、未硬化のコンクリート
を保護して、杭基礎となる打設したコンクリート杭の品
質を確実に確保することができる。Therefore, when constructing a pile foundation with a cast-in-place concrete pile on the ground having the aquifer B, after the concrete is poured into the pile hole 30 in which the reinforced cage 2 is built, the hole wall 30a is removed. After the protective casing 1 is pulled out, even if the initial hardening of the cast concrete has not been completed, the concrete component does not leak into the ground from the inside of the reinforced cage 2 and is poured into the ground. Concrete component leaked to the outside of the reinforced cage 2,
In particular, it does not mix with the water contained in the aquifer B.
As a result, the soil is not contaminated by the leaking concrete component, the uncured concrete is protected, and the quality of the cast concrete pile serving as a pile foundation can be reliably ensured.
【0036】なお、鉄筋篭2の外周に予め巻装される防
水シート3は、本実施の形態では、杭頭部の巻装される
ものとしたが、これに限らず、当該鉄筋篭2の外周の全
体、またはその他の一部分など、鉄筋篭2の外周をどの
ように巻装してもよく、また、その巻装箇所は任意であ
る。その他、具体的な細部構造等についても適宜に変更
可能であることは勿論である。In the present embodiment, the waterproof sheet 3 previously wound on the outer periphery of the reinforcing cage 2 is wound on the pile head, but is not limited thereto. The outer periphery of the reinforcing bar 2 may be wound in any manner, such as the entire outer periphery or another part thereof, and the winding location is arbitrary. In addition, it is needless to say that specific detailed structures and the like can be appropriately changed.
【0037】[0037]
【発明の効果】以上のように、請求項1記載の発明に係
る場所打ちコンクリート杭の施工方法によれば、外周に
前記防水シートを巻装してなる鉄筋籠を杭孔に建て込
み、コンクリートを打設した後に、前記杭孔の孔壁を保
護しているケーシングを引き抜いた際、打設したコンク
リートの初期硬化が完了していなくても、前記鉄筋籠の
内側からコンクリート成分が地中へ漏出するのを防止し
て、土壌の汚染を防ぐと共に、未硬化のコンクリートを
保護して打設したコンクリート杭の品質を確実に確保す
ることができる。また、前記スペーサは、コンクリート
を打設した際のコンクリートの被り厚さを確保するよう
に、建て込まれる鉄筋籠の外周から突出した状態で外周
に複数配設されているので、コンクリートを打設した際
のコンクリートの被り厚さを確保することができる。 請
求項2記載の発明によれば、前記鉄筋籠とゴム製の前記
防水シートの結束部分ができるだけ少なく構成され、こ
のゴム製の防水シートを有する鉄筋籠を建て込んだ後に
コンクリートを打設した際、打設したコンクリートの内
圧で前記防水シートが孔壁側に伸びて、掘削した杭孔内
において一層コンクリートが充填されることになり、造
成するコンクリート杭の品質の向上に繋がり、より安定
した支持力を有するコンクリート杭基礎となる。また、
前記防水シートを有する前記鉄筋籠2を前記杭孔に挿入
した際に、その挿入時の摩擦等によって、当該防水シー
トの下端部が、まくり上がらないようになる。 請求項3
記載の発明によれば、前記防水シートの一端部を、前記
ガイドアングルの一面である表面部で接着し、前記鉄筋
籠を巻いた他端部を接着された前記防水シートの一端部
のうえから重ねるように接着され、鉄筋籠の外周には前
記防水シートが巻装された状態になる。 As described above, according to the method for constructing a cast-in-place concrete pile according to the first aspect of the present invention, a reinforcing steel basket having the waterproof sheet wound around the outer periphery is built into the pile hole, and the concrete is piled up. After casting, when the casing that protects the hole wall of the pile hole is pulled out, even if the initial hardening of the cast concrete has not been completed, the concrete component enters the ground from the inside of the reinforced cage. Leakage can be prevented, soil contamination can be prevented, and uncured concrete can be protected to ensure the quality of the cast concrete pile. Further, the spacer is made of concrete.
To ensure the concrete covering thickness when placing
At the outer periphery of the reinforcing bar cage
When concrete is cast,
It is possible to ensure the concrete covering thickness. Contract
According to the invention as set forth in claim 2, the rebar basket and the rubber cage
The binding part of the tarpaulin is made as small as possible.
After building a reinforced cage with rubber tarpaulin
When concrete is cast, the concrete
The waterproof sheet extends to the hole wall side by pressure, and the excavated pile hole
The concrete will be further filled in
Improve the quality of the concrete pile to be formed and make it more stable
It becomes the concrete pile foundation with the improved bearing capacity. Also,
Insert the reinforcing bar cage 2 having the waterproof sheet into the pile hole
When the waterproof seal is inserted,
So that the lower end of the gate does not roll up. Claim 3
According to the described invention, one end of the waterproof sheet is
Adhere at the surface that is one side of the guide angle,
One end of the waterproof sheet with the other end wound with a basket adhered
Glued on top of each other, with the front
The waterproof sheet is wound.
【図1】本発明の場所打ちコンクリート杭の施工方法の
一実施の形態を説明する縦断面図である。FIG. 1 is a longitudinal sectional view for explaining one embodiment of a method for constructing a cast-in-place concrete pile of the present invention.
【図2】本発明の場所打ちコンクリート杭の施工方法の
一実施の形態に使用する、図1の鉄筋篭の平面図であ
る。FIG. 2 is a plan view of the reinforced cage of FIG. 1 used in one embodiment of the method for constructing a cast-in-place concrete pile according to the present invention.
【図3】図2のX部分の拡大図である。FIG. 3 is an enlarged view of a portion X in FIG. 2;
【図4】図3のD−D線断面図である。FIG. 4 is a sectional view taken along line DD of FIG. 3;
【図5】帯水層Bが形成されている地盤において、従来
の場所打ちコンクリート杭の施工方法を説明する縦断面
図である。FIG. 5 is a longitudinal sectional view illustrating a conventional method of constructing a cast-in-place concrete pile on the ground where the aquifer B is formed.
【符号の説明】 1 ケーシング 2 鉄筋篭 3 防水シート 30 杭孔 30a 孔壁[Description of Signs] 1 casing 2 reinforced cage 3 waterproof sheet 30 pile hole 30a hole wall
フロントページの続き (72)発明者 樫野 裕茂 東京都墨田区緑1−6−11−202 株式 会社裕建内 (56)参考文献 特開 昭63−60319(JP,A) 実開 平6−35326(JP,U) (58)調査した分野(Int.Cl.7,DB名) E02D 5/34 - 5/44 Continuation of front page (72) Inventor Hiroshi Kashino 1-6-11-202 Midori, Sumida-ku, Tokyo Yukenai Co., Ltd. (56) References JP-A-63-60319 (JP, A) 35326 (JP, U) (58) Field surveyed (Int. Cl. 7 , DB name) E02D 5/34-5/44
Claims (3)
打ちコンクリート杭の施工方法であって、 前記鉄筋籠の外周の少なくとも一部に予め防水シートを
スペーサを介して巻装しておき、且つ前記スペーサは、コンクリートを打設した際のコン
クリートの被り厚さを確保するように、建て込まれる鉄
筋籠の外周から突出した状態で外周に複数配設されてい
るものとし、 前記 防水シートをスペーサを介して外周に巻装してなる
鉄筋籠を前記杭孔に建て込んで前記コンクリートを打設
することを特徴とする場所打ちコンクリート杭の施工方
法。1. A method of constructing a cast-in-place concrete pile, in which a ground hole is formed by excavating the ground to form a pile hole for a pile, a reinforcing cage is built in the pile hole, and then concrete is poured to form a concrete pile. A waterproof sheet is previously applied to at least a part of the outer periphery of the reinforcing rod cage.
It is wound around via a spacer , and the spacer is used as a component when concrete is cast.
Iron to be built in, so as to secure the thickness of the cleat
A plurality of braces are arranged on the outer periphery in a state protruding from the outer periphery.
Shall and then, the construction method of in-place concrete piles characterized by pouring the concrete in built up a reinforcing bar cage made by winding the outer periphery of the waterproof sheet via a spacer to the pile hole.
施工方法において、 前記防水シートはゴム製のシートであり、該防水シート
の上端部は、杭頭に相当する部分から番線にて吊り下げ
られており、また、該防水シートの下端部は、当該防水
シートの下端部に位置するスペーサに番線結束すること
を特徴とする場所打ちコンクリート杭の施工方法。 2. The cast-in-place concrete pile according to claim 1,
In the construction method, the waterproof sheet is a rubber sheet, and the waterproof sheet
Is suspended from the part corresponding to the pile head with a track.
The lower end of the waterproof sheet is
Bundling to the spacer located at the lower end of the sheet
Construction method of cast-in-place concrete pile characterized by the following.
ート杭の施工方法において、 複数のスペーサのうち前記鉄筋籠の主筋の延在方向に延
在する一列に、前記主筋の延在方向に伸びる断面L字形
状のガイドアングルを取り付け、 前記防水シートの一端部を、前記ガイドアングルの一面
である表面部で接着し、前記鉄筋籠を巻いた他端部を接
着された前記防水シートの一端部のうえから重ねるよう
に接着することを特徴とする場所打ちコンクリート杭の
施工方法。 3. A cast-in-place concrete according to claim 1 or 2.
In the method for constructing a port pile, the plurality of spacers extend in a direction in which main bars of the reinforcing bar extend.
L-shaped cross section extending in the extending direction of the main bar in a row
Attach one end of the waterproof sheet to one side of the guide angle
And the other end wound with the reinforcing cage is connected.
Put on top of one end of the waterproof sheet
Of cast-in-place concrete piles characterized by being glued to
Construction method.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP9026944A JP3045481B2 (en) | 1997-02-10 | 1997-02-10 | Construction method of cast-in-place concrete pile |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP9026944A JP3045481B2 (en) | 1997-02-10 | 1997-02-10 | Construction method of cast-in-place concrete pile |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH10219680A JPH10219680A (en) | 1998-08-18 |
| JP3045481B2 true JP3045481B2 (en) | 2000-05-29 |
Family
ID=12207273
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP9026944A Expired - Fee Related JP3045481B2 (en) | 1997-02-10 | 1997-02-10 | Construction method of cast-in-place concrete pile |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3045481B2 (en) |
Families Citing this family (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106948606A (en) * | 2017-03-30 | 2017-07-14 | 中建四局第五建筑工程有限公司 | Cover type artificial digging pile aperture means of defence and its device |
| JP7195613B2 (en) * | 2019-09-10 | 2022-12-26 | 株式会社E・C・S | Insulation material used in cast-in-place pile construction method, core material provided with same, and construction method for cast-in-place pile |
| CN112144515A (en) * | 2020-09-30 | 2020-12-29 | 河北昊锐基础工程有限公司 | A kind of construction method of anti-collapse hole of rotary excavation pile |
| CN113445488A (en) * | 2021-07-16 | 2021-09-28 | 中铁六局集团有限公司 | Method for treating underground pipeline or karst cave |
| CN113463770B (en) * | 2021-08-10 | 2025-06-10 | 中铁二局第四工程有限公司 | Embedded part and application method thereof |
| CN115506338A (en) * | 2022-09-07 | 2022-12-23 | 苏州交通工程集团有限公司 | Construction process of bridge underwater cast-in-place bored pile |
| CN115538423A (en) * | 2022-10-11 | 2022-12-30 | 山东省路桥集团有限公司 | Concrete pouring construction device and construction method for drilled pile to penetrate through karst cave section |
-
1997
- 1997-02-10 JP JP9026944A patent/JP3045481B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JPH10219680A (en) | 1998-08-18 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP2837128B2 (en) | Construction method of cast-in-place concrete pile | |
| KR102009077B1 (en) | Earth retaining wall construction method using castinplace concrete pile of impermeable peristyle type | |
| JP3045481B2 (en) | Construction method of cast-in-place concrete pile | |
| CN110144899A (en) | A deformation control structure and construction method of a foundation pit adjacent to a shallow foundation building for an underground parking lot in soft ground | |
| JP2005002671A (en) | Underpinning method and viaduct | |
| CN105421488B (en) | The construction method of sole plate support replacement in the combined fender construction system of underground | |
| JP3930954B2 (en) | Construction method of structure | |
| JP5480744B2 (en) | Foundation for structure and its construction method | |
| KR200362565Y1 (en) | Earth Retaining Wall Structure Using Precast Concrete Pile and Construction Method Thereof | |
| JP2001329545A (en) | Bridge pier foundation construction method and floor slab for bridge pier | |
| JPS5847823A (en) | Construction of in-place concrete pile | |
| JPS5936058B2 (en) | How to construct a structure using underground continuous walls | |
| CN113818430A (en) | Construction method of geological cement mixing pile with water-rich layer and sludge | |
| JP3091859B2 (en) | Piling method for shafts with openings at the top | |
| JPH1129927A (en) | Foundation pile to prevent land subsidence due to old tire blocks. | |
| KR20010007973A (en) | Net bag type pile construction method of weak ground | |
| JP3700121B2 (en) | Water blocking wall under culvert and its construction method | |
| JPS6018769B2 (en) | Construction method of underground structure | |
| JPH116164A (en) | Underground structure construction method | |
| JP7419169B2 (en) | How to build underground structures | |
| JPH0726569A (en) | Pile foundation construction method for structures subjected to uneven earth pressure | |
| JPS601451B2 (en) | Water stop mountain stop wall construction method using Benoto pile excavator | |
| JPH03228921A (en) | Execution method for concrete foundation work | |
| JPH0310200Y2 (en) | ||
| JPH11172708A (en) | Method for forming pile penetrating existing underground structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080317 Year of fee payment: 8 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090317 Year of fee payment: 9 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090317 Year of fee payment: 9 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100317 Year of fee payment: 10 |
|
| LAPS | Cancellation because of no payment of annual fees |