JP3049583B2 - Composite jack device for lifting and lifting - Google Patents
Composite jack device for lifting and liftingInfo
- Publication number
- JP3049583B2 JP3049583B2 JP5005255A JP525593A JP3049583B2 JP 3049583 B2 JP3049583 B2 JP 3049583B2 JP 5005255 A JP5005255 A JP 5005255A JP 525593 A JP525593 A JP 525593A JP 3049583 B2 JP3049583 B2 JP 3049583B2
- Authority
- JP
- Japan
- Prior art keywords
- jack
- column
- lock pin
- wall
- building
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000002131 composite material Substances 0.000 title claims description 22
- 239000011295 pitch Substances 0.000 claims description 7
- 230000001174 ascending effect Effects 0.000 claims description 6
- 238000009434 installation Methods 0.000 claims description 5
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims description 4
- 229910000831 Steel Inorganic materials 0.000 description 17
- 239000010959 steel Substances 0.000 description 17
- 239000000463 material Substances 0.000 description 11
- 238000000034 method Methods 0.000 description 10
- 238000010276 construction Methods 0.000 description 7
- 230000008602 contraction Effects 0.000 description 4
- 238000003466 welding Methods 0.000 description 4
- 238000010586 diagram Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Description
【0001】[0001]
【産業上の利用分野】この発明は、プッシュアップ工法
等による建物の建築における屋根架構、床組架構その他
の重量資材類の揚重、運搬に使用されるほか、各種の製
造業分野における重量資材類の昇降、運搬の作業にも使
用される押し上げ及び引き上げ用(又は押し下げ及び引
き下げ用を含む。以下同じ)複合ジャッキ装置に関す
る。BACKGROUND OF THE INVENTION The present invention is used for lifting and transporting roof frames, floor frames and other heavy materials in the construction of buildings by a push-up method and the like, and also for heavy materials in various manufacturing fields. The present invention relates to a composite jack device for lifting and raising (or including lowering and lowering; the same applies hereinafter) which is also used for lifting and lowering and transporting kinds.
【0002】[0002]
【従来の技術】従来、例えば建築のプッシュアップ工
法、リフトアップ工法の実施において、床組架構や屋根
架構等の重量物の揚重に使用されるジャッキ装置は、種
々公知であり、広く実用に供されている。例えば、特開
平2−128038号公報に記載されたジャッキ装置
は、支柱に設けた昇降自在な鞘管に屋根架構を取付け、
同支柱の上下方向に設けられた外側突起に反力受台を掛
け止め、前記反力受台の上にジャッキを支持せしめ、同
ジャッキの出力端を前記鞘管に止着し、ジャッキの伸縮
動作と反力受台に対する負荷の盛り替え作業とによって
屋根架構のリフトアップを行う構成とされている。2. Description of the Related Art Conventionally, in the implementation of push-up method and lift-up method of construction, various types of jack devices used for lifting heavy objects such as floor frames and roof frames are known and widely used. Has been provided. For example, in a jack device described in Japanese Patent Application Laid-Open No. 2-128038, a roof frame is attached to a vertically movable sheath tube provided on a support,
The reaction force receiver is hung on the outer projection provided in the vertical direction of the support, the jack is supported on the reaction force receiver, and the output end of the jack is fixed to the sheath tube, and the jack expands and contracts. The roof frame is lifted up by the operation and the work of changing the load on the reaction force receiving table.
【0003】また、本出願人による特願平4−1126
90号に係るジャッキ装置は、図9に例示したように、
複数の垂直な昇降用のジャッキ2を連結した架台3,4
を上下に備え、この架台3,4には支柱1に当接するガ
イドローラ5、及び支柱1に反力をとる上下部のロック
ピン装置6,7が設置され、前記昇降用のジャッキ2の
有効ストローク以内のピッチで支柱1に設けられている
反力受部8に対して前記ロックピン装置6,7が反力を
とって昇降動作する構成とされている。Further, Japanese Patent Application No. 4-1126 filed by the present applicant has been disclosed.
The jack device according to No. 90, as exemplified in FIG.
Stands 3 and 4 connecting a plurality of vertical lifting jacks 2
A guide roller 5 abutting on the column 1 and lock pin devices 6 and 7 on the upper and lower portions for taking a reaction force on the column 1 are installed on the frames 3 and 4 to enable the jack 2 for lifting and lowering to be effective. The lock pin devices 6 and 7 take up a reaction force with respect to a reaction force receiving portion 8 provided on the support column 1 at a pitch within a stroke, and move up and down.
【0004】[0004]
【本発明が解決しようとする課題】上記した特開平2−
128038号公報に記載されたジャッキ装置は、ジャ
ッキとその反力受台及び支柱に対する鞘管及び被揚重物
の支持部が個々バラバラな構成であるため、ジャッキに
おける負荷の盛り替え作業が個別的となって運転の自動
化を図りがたい。[Problems to be solved by the present invention]
In the jack device disclosed in Japanese Patent No. 128038, since the jack and the supporting portions of the sheath tube and the load-bearing object with respect to the reaction force receiving pedestal and the support column are individually different, the work of changing the load on the jack is individual. It is difficult to automate driving.
【0005】また、上記した特願平4−112690号
のジャッキ装置は、昇降動作の自動化や自動制御を可能
とし、設置、解体の作業も比較的容易で、被揚重物の押
し上げ及び引き上げはもとより、押し下げ及び引き下げ
の複合動作も可能である。しかし、ジャッキ2の数が多
く、各ジャッキ2への油圧配管も複雑となり、設備自体
の複雑化や設備コストの上昇を招いている。とりわけ、
図9に例示したように、駆動階又はその直下レベルで外
装工事をしようとすると、架台3、4が外壁21と干渉
を起こして外装工事の施工を制限されてしまい、上述し
たプッシュアップ工法等の利点が十分に生かされない。The jack device disclosed in Japanese Patent Application No. 4-112690 enables automation and automatic control of lifting and lowering operations, and is relatively easy to install and disassemble. Of course, a combined operation of pushing down and pulling down is also possible. However, the number of jacks 2 is large, and hydraulic piping to each jack 2 is also complicated, leading to complication of the equipment itself and an increase in equipment cost. Above all,
As illustrated in FIG. 9, if the exterior work is performed on the driving floor or a level directly below the drive floor, the mounts 3 and 4 interfere with the outer wall 21, and the execution of the exterior work is restricted. Is not fully exploited.
【0006】従って、本発明の目的は、ジャッキの昇降
動作の自動化と自動制御及び設置・解体の作業を容易に
するだけでなく、併せて外装工事(外壁工事)を駆動階
のレベルでも並行して行なえる構成に改良した、押し上
げ引き上げ用複合ジャッキ装置を提供することである。Accordingly, an object of the present invention is not only to facilitate the operation of automation and automatic control of the lifting and lowering operation of the jack, but also to facilitate the work of installation and dismantling, and also to carry out exterior construction (outer wall construction) at the level of the driving floor. It is an object of the present invention to provide a composite jack device for lifting and raising, which has been improved to a configuration capable of performing the lifting operation.
【0007】[0007]
【課題を解決するための手段】上記の課題を解決するた
めの手段として、第1の本発明に係る押し上げ引き上げ
用複合ジャッキ装置は、支柱1を伝い支柱に反力をとっ
て昇降動作するジャッキ装置において、ジャッキ2は建
物の外壁21から見て支柱1よりも内側の位置に偏って
垂直に1又は複数設置され、架台3,4は前記建物の外
壁21側の平面形状を同外壁21の内側に納まって昇降
可能な形状とされていると共に前記ジャッキ2のシリン
ダ2aの下端を連結した下側架台4及び出力軸2bの上
端を連結した上側架台3とで構成され、前記上下の架台
3,4には支柱1に当接して拘束力を発揮するガイドロ
ーラ5が複数設置されていること、及び前記上下の架台
3,4における前記ジャッキ2の設置側に、支柱1に反
力をとる上部ロックピン装置6及び下部ロックピン装置
7が設置され、支柱1の上下方向に前記ジャッキ2の有
効ストローク以内のピッチで複数設けられた反力受部8
に前記上、下部のロックピン装置6,7のロックピン6
a,7aが掛け止められることを特徴とする。According to a first aspect of the present invention, there is provided a composite jack device for lifting and lifting according to the first aspect of the present invention, wherein the jack moves upward and downward by receiving a reaction force on the column and passing the column. In the apparatus, one or a plurality of jacks 2 are installed vertically at a position deviated from the outer wall 21 of the building toward the inner side of the support 1, and the gantry 3, 4 has a planar shape on the side of the outer wall 21 of the building. The upper and lower pedestals 3 have a shape that can be moved up and down while being accommodated inside, and are composed of a lower pedestal 4 to which a lower end of a cylinder 2a of the jack 2 is connected and an upper pedestal 3 to which an upper end of an output shaft 2b is connected. , 4 are provided with a plurality of guide rollers 5 that abut against the column 1 to exert a binding force, and a reaction force is applied to the column 1 on the upper and lower mounts 3, 4 on the installation side of the jack 2. Upper lock Pins 6 and the lower lock pin 7 is installed, the reaction force receiving portion provided with a plurality at a pitch of less than the effective stroke of the jack 2 in the vertical direction of the post 1 8
The lock pins 6 of the upper and lower lock pin devices 6 and 7
a, 7a are latched.
【0008】また、第2の発明は、その構成の大部分を
上記第1の発明と共通にするが、架台はジャッキ2のシ
リンダ2aの下端を連結した下側架台4のみを備え、支
柱1に当接して拘束力を発揮するガイドローラ5が前記
下側架台4に複数設置され、前記ジャッキ2の出力軸2
bの上端を連結した上部ロックピン装置6は駆動階20
に直接連結されている点が異なることを特徴とする。In the second invention, most of the structure is common to that of the first invention. However, the base is provided with only the lower base 4 to which the lower end of the cylinder 2a of the jack 2 is connected. A plurality of guide rollers 5 are provided on the lower gantry 4 so as to abut on the lower shaft 4.
The upper lock pin device 6 connected to the upper end of the drive floor 20
Is characterized in that it is directly connected to
【0009】上記第1の発明はまた、ジャッキ2の位置
とは反対側で支柱1よりも建物の外壁21寄りの位置に
設けられた係合部23に係合する係合ピン24が、上側
架台3及び下側架台4に水平方向に進退可能に備えられ
ていることを特徴とする。更に、上記第2の発明は、ジ
ャッキ2の位置とは反対側で支柱1よりも建物の外壁2
1寄り位置に設けられた係合部23に係合する係合ピン
24が、下側架台4に水平方向に進退可能に備えられて
いることを特徴とする。According to the first aspect of the present invention, the engaging pin 24 for engaging with the engaging portion 23 provided on the side opposite to the position of the jack 2 and closer to the outer wall 21 of the building than the column 1 is located on the upper side. The gantry 3 and the lower gantry 4 are provided so as to be able to advance and retreat in the horizontal direction. Further, the second aspect of the present invention is the outer wall 2 of the building on the opposite side of the position of the jack 2 than the column 1.
The lower gantry 4 is provided with an engaging pin 24 that engages with the engaging portion 23 provided at the one-side position so as to be able to advance and retreat in the horizontal direction.
【0010】[0010]
【作用】下部ロックピン装置7を駆動させてそのロック
ピン7aを支柱1の反力受部8の上に掛け止め(図4
A)、支柱1より内側に位置するジャッキ2を伸長動作
させると、偏荷重によって、下側架台4がバランスを失
いかけるが、このとき係合ピン24が支柱1のリブ22
の係合孔23に係合してバランスを保てる。係合ピン2
4及びリブ22を設けない場合でも、ガイドローラ5が
支柱1の側面に当接した摩擦抵抗(拘束力)によって下
側架台4のバランスを保てる。ジャッキ2の伸長動作で
上昇された上側架台3の上に建物の梁とか床のごとき被
揚重体20が載置されていると、それは押し上げられる
(図4B)。逆に、上部ロックピン装置6を駆動させて
そのロックピン6aを支柱1の反力受部8の上に掛け止
め、ジャッキ2を収縮動作させると、やはり偏荷重によ
って上側架台3がバランスを失いかけるが、このとき係
合ピン24を支柱1のリブ22の係合孔23に係合させ
ることによってバランスが保たれる。勿論、ガイドロー
ラ5の働きのみによっても同様にバランスが保たれる。
前記ジャッキ2の収縮動作で下側架台4が上昇される結
果、前記下側架台4に結合した被揚重体は引き上げられ
る。その後、下部ロックピン装置7を支柱1に掛け止め
て反力をとり、上部ロックピン装置6を解除して負荷を
盛り替えることにより上昇の一工程が終了する。The lower lock pin device 7 is driven to lock the lock pin 7a on the reaction force receiving portion 8 of the column 1 (FIG. 4).
A) When the jack 2 located on the inner side of the column 1 is extended, the lower gantry 4 loses its balance due to the unbalanced load. At this time, the engaging pin 24 is moved to the rib 22 of the column 1.
The balance can be maintained by engaging with the engagement holes 23 of the. Engagement pin 2
Even when the ribs 4 and the ribs 22 are not provided, the balance of the lower gantry 4 can be maintained by the frictional resistance (restraint force) of the guide roller 5 abutting on the side surface of the column 1. When the lifted body 20 such as a building beam or a floor is placed on the upper gantry 3 raised by the extension operation of the jack 2, it is pushed up (FIG. 4B). Conversely, when the upper lock pin device 6 is driven to lock the lock pin 6a on the reaction force receiving portion 8 of the support column 1 and the jack 2 contracts, the upper base 3 also loses balance due to the uneven load. At this time, the balance is maintained by engaging the engaging pin 24 with the engaging hole 23 of the rib 22 of the column 1 at this time. Of course, the balance is similarly maintained only by the function of the guide roller 5.
As a result of the lower gantry 4 being lifted by the contraction operation of the jack 2, the lifted body coupled to the lower gantry 4 is lifted. Thereafter, the lower lock pin device 7 is hung on the column 1 to take a reaction force, the upper lock pin device 6 is released, and the load is changed, thereby completing one step of ascending.
【0011】架台3、4の平面形状が、ジャッキ2を設
置していない外壁21側を外壁21の内側に納まって昇
降可能な形状としているので、駆動階近辺のレベルでも
外壁21の取付けその他の外装工事の遂行に一切支障が
ない。また、上側架台を駆動階20と一体化させた結
果、ジャッキ装置自体の軽量化を可能にする。Since the mounts 3 and 4 have a plan shape in which the outer wall 21 on which the jack 2 is not installed is housed inside the outer wall 21 and can be raised and lowered, the outer wall 21 can be mounted at a level near the driving floor and other conditions. There is no hindrance to the execution of exterior work. Moreover, as a result of integrating the upper frame with the drive floor 20, the weight of the jack device itself can be reduced.
【0012】[0012]
【実施例】以下に、本発明の実施例を図面に基いて説明
する。図1〜図3に示した複合ジャッキ装置は、建物の
外壁21の側から見て、昇降動作の反力要素とされる垂
直な支柱1(これは通常、建築される建物の本設柱であ
る。)よりも内側に垂直に配置された2基のジャッキ2
のシリンダ2aの下端が、下側架台4の上向きのブラケ
ット11へヒンジピン12で連結され、他方、出力軸2
bの上端は上側架台3の下向きのブラケット14へやは
りヒンジピン12で連結されている(図2)。本実施例
の場合、ジャッキ2は2基であるため、ジャッキ用油圧
配管は従来の4基構造に比して半減される。上下の架台
3,4は、支柱1を中心として内側鋼材15に外側鋼材
16を組み合わせた構成であるが、建物の外壁21側の
外側鋼材16の平面形状は、図1の場合は建物のコーナ
部の外壁21の形状に合わせて同外壁の内側に納まって
昇降可能な山形状に形成されている。この構成により、
架台は被揚重物を載せ易く、かつ必要十分な強度と剛性
を有するだけでなく、図1に示した建物の外壁21のコ
ーナ部分において同建物の外壁21の取付けその他の外
装工事の施工が駆動階のレベルでも容易に可能となって
いる。Embodiments of the present invention will be described below with reference to the drawings. The composite jack device shown in FIGS. 1 to 3 is a vertical pillar 1 (which is usually a main pillar of a building to be constructed) which is a reaction force element of a lifting operation when viewed from the outer wall 21 of the building. There are two jacks 2 arranged vertically inside
The lower end of the cylinder 2a is connected to an upward bracket 11 of the lower gantry 4 by a hinge pin 12, while the output shaft 2
The upper end of b is also connected to the downward bracket 14 of the upper base 3 by the hinge pin 12 (FIG. 2). In the case of the present embodiment, since there are two jacks 2, the hydraulic piping for jacks is halved as compared with the conventional four-pipe structure. The upper and lower pedestals 3 and 4 have a configuration in which an inner steel material 15 and an outer steel material 16 are combined with the support 1 as a center, but the outer steel material 16 on the outer wall 21 side of the building has a planar shape in FIG. According to the shape of the outer wall 21 of the section, it is formed into a mountain shape that can be accommodated inside the outer wall and can be raised and lowered. With this configuration,
The gantry not only has the strength and rigidity necessary for carrying the load to be lifted, but also has sufficient strength and rigidity. In addition, the mounting of the outer wall 21 of the building at the corner portion of the outer wall 21 of the building shown in FIG. It is easily possible at the driving floor level.
【0013】上側架台3における外側鋼材16の下面及
び下側架台4における外側鋼材16の上面に、支柱1の
直角2辺の側面に適度な摩擦抵抗を発生して当接するよ
うに45°方向に傾けられた2個を一組とするガイドロ
ーラ5が、同ガイドローラ5を支柱1の対角線方向に進
退させる支持腕17を備えた駆動部(油圧シリンダ)1
0と共に設置されている。前記駆動部10による支持腕
17の進退移動により、ガイドローラ5は支柱1の水平
断面の大きさや形状(円形、角型など)にも対処可能で
ある。The lower surface of the outer steel material 16 on the upper gantry 3 and the upper surface of the outer steel material 16 on the lower gantry 4 are oriented in a 45 ° direction so as to generate appropriate frictional resistance on the side surfaces of two right-angled sides of the support column 1. A drive unit (hydraulic cylinder) 1 having a support arm 17 for moving the guide roller 5 in a diagonal direction of the column 1 with a guide roller 5 having a pair of two inclined rollers.
It is installed with 0. The guide roller 5 can cope with the size and shape (circular, square, etc.) of the horizontal section of the column 1 by the advancing and retracting movement of the support arm 17 by the driving unit 10.
【0014】上下の架台3,4の内側鋼材15の略中央
部には、支柱1に鋼片を溶接するなどして設けられた反
力受部8に反力をとる上部ロックピン装置6及び下部ロ
ックピン装置7が、各々水平方向の内向きに(つまり、
支柱1に向かって)設置されている。図示したロックピ
ン装置6,7は、ロックピン6a,7aを内向きのシリ
ンダの中にスライド可能に収納せしめた構成である。前
記ロックピン6a,7aの後端面に形成された傾斜面
に、駆動部としてのクランプジャッキ9のくさび形ブロ
ック9aが横向きにスライド可能に組み合わされてい
る。前記くさび形ブロック9aが前進するとロック状態
となり、後退するとロック解除状態となる。An upper lock pin device 6 for taking a reaction force to a reaction force receiving portion 8 provided by welding a steel piece to the column 1, etc., is provided at a substantially central portion of the inner steel material 15 of the upper and lower mounts 3, 4. Each of the lower lock pin devices 7 is directed inward in the horizontal direction (that is,
(Toward column 1). The illustrated lock pin devices 6 and 7 have a configuration in which the lock pins 6a and 7a are slidably housed in an inward cylinder. A wedge-shaped block 9a of a clamp jack 9 as a driving unit is slidably combined with an inclined surface formed on the rear end surfaces of the lock pins 6a and 7a in a laterally slidable manner. When the wedge-shaped block 9a moves forward, it becomes locked, and when it retreats, it becomes unlocked.
【0015】従って、前記ロックピン6a,7aが係脱
可能である限り、支柱1の反力受部8は凹部又は凸部の
いずれであってもよい。本実施例の場合、支柱1には、
ロックピン装置6,7のロックピン6a,7aが進退し
てくる角部の上下方向に、シリンダ2の最大有効ストロ
ーク(約1000mm)を前提とするピッチ(約100
0mmピッチ)で支柱1に鋼片を溶接で固定した反力受
部8が設けられている。Therefore, as long as the lock pins 6a and 7a can be disengaged, the reaction force receiving portion 8 of the column 1 may be either a concave portion or a convex portion. In the case of the present embodiment,
The pitch (approximately 100 mm) is assumed in the vertical direction of the corner where the lock pins 6a, 7a of the lock pin devices 6, 7 advance and retreat, based on the maximum effective stroke (approximately 1000 mm) of the cylinder 2.
A reaction force receiving portion 8 in which a steel slab is fixed to the column 1 by welding at a pitch of 0 mm) is provided.
【0016】また、シリンダ2が設置された位置とは反
対側(つまり、建物の外壁21の側)の支柱1の角部に
は、図1及び図3Aに示したとおり、支柱1に沿って上
下方向にリブ22が溶接で一体的に設けられ、このリブ
22の反力受部となる位置に係合孔23が等ピッチで設
けられいる。この係合孔23に係合する係合ピン24
は、図1に示した押えジャッキ25と共に進退自在に外
側鋼材16の上に設置されている。従って、ロックピン
装置6,7が支柱1の内側にのみ設置され、ジャッキ2
の伸縮動作に伴う偏荷重によって上下の架台3,4が不
安定な状態になっても、前記係合ピン24が前記係合孔
23へ係合することによって必要十分な反力が得られ、
バランスを保って安定な昇降ができる。また、リブ22
及び係合孔23を支柱1に設ける代わりに、図3Bに示
したように、反力受部8と同様に溶接で固定した鋼片2
6を設け、該鋼片26の下面に係合ピン24を係合させ
てバランスのための反力を取るようにしてもよい。さら
に、係合ピン24,係合孔23及び鋼片26を全部省略
しても、前記ガイドローラ5を支柱1の側面へ適度な摩
擦抵抗を発生するように当接させることによっても相当
な拘束力が得られ、ジャッキ2の伸縮動作の際の架台
3,4のアンバランスを防ぎ十分に安定な昇降動作を実
現することができる。As shown in FIGS. 1 and 3A, the corners of the column 1 on the side opposite to the position where the cylinder 2 is installed (that is, on the side of the outer wall 21 of the building) are arranged along the column 1 as shown in FIGS. Ribs 22 are integrally provided in the vertical direction by welding, and engagement holes 23 are provided at equal pitches at positions of the ribs 22 to be reaction force receiving portions. An engagement pin 24 that engages with the engagement hole 23
Is mounted on the outer steel material 16 so as to be able to advance and retreat together with the presser jack 25 shown in FIG. Therefore, the lock pin devices 6, 7 are installed only inside the column 1, and the jack 2
Even if the upper and lower pedestals 3 and 4 become unstable due to the unbalanced load caused by the expansion and contraction operation, the necessary and sufficient reaction force can be obtained by the engagement of the engagement pin 24 with the engagement hole 23,
Stable ascent and descent can be maintained while maintaining balance. The rib 22
3B, instead of providing the support holes 1 and the engaging holes 23, the steel slab 2 fixed by welding in the same manner as the reaction force receiving portion 8 as shown in FIG.
6 may be provided, and the engagement pin 24 may be engaged with the lower surface of the steel slab 26 to take a reaction force for balance. Further, even if the engaging pin 24, the engaging hole 23 and the steel piece 26 are all omitted, the guide roller 5 is brought into contact with the side surface of the column 1 so as to generate an appropriate frictional resistance. A force is obtained, and unbalance of the gantry 3 and 4 during the expansion and contraction operation of the jack 2 can be prevented, and a sufficiently stable lifting operation can be realized.
【0017】上述した複合ジャッキ装置の使用法は、予
め工場加工としてガイドローラ5及びロックピン装置
6,7が設置された鋼材15,16を現場へ搬入し、支
柱1を中心として組立てるボルト締め等の方法によって
上下の架台3,4を組立て、上下架台3,4の間に、2
基のジャッキ2を組み入れて連結することにより簡単に
設置の作業ができる。勿論、逆の手順を実行することに
より解体の作業も容易にできる。この複合ジャッキ装置
は、前述した設置の準備が終了した後に、例えば図4A
のように上側架台3の上に建物の床組架構又は屋根架構
などの被揚重体20を載せ、まず下部ロック装置7を駆
動させ、そのロックピン7aを支柱1の反力受部8の上
に掛止め、係合ピン24を係合孔23に係合させて上昇
準備を行う。次に、ジャッキ2を伸長動作させて被揚重
体20の押し上げが行われる(図4B)。このとき下側
架台4はバランス良く安定した状態を保ち、上側架台3
もガイドローラ5の案内作用により横振れ等を生ずるこ
となく円滑に安定した上昇動作をする。図5Aのように
ジャッキ2がその有効ストローク一杯まで伸びきった段
階で、上部ロックピン装置6を駆動させてそのロックピ
ン6aを支柱1の反力受部8の上に掛け止めることによ
り負荷の盛り替えが行われる。即ち、ジャッキ2をわず
かに収縮動作させると、負荷の全部を上部ロックピン装
置6で支持し、下部ロックピン装置7は無負荷状態とな
るから、この段階で駆動部たるクランプジャッキ9を後
退させてロックピン7aが反力受部8から外され、係合
ピン24は係合孔23より引き抜かれる。その後にジャ
ッキ2を収縮動作させると、下側架台4が上昇される
(図5B)。従って、この下側架台4に被揚重物が結合
されておれば、それは引き上げられる。ジャッキ2がそ
の有効ストロークの全部を収縮動作した段階で、下側架
台4の下部ロックピン装置7を働かせて支柱1の反力受
部8に反力をとり、更に係合ピン24を係合孔23へ係
合させるる(図5C)と、再び図4Aと同様な状態に戻
り、1工程の上昇(ジャッキ2の伸縮)を終了したこと
になる。また、上述した複合ジャッキ装置の動作の間
は、図1と図3Aに示したように、上下の架台3,4に
おける外側鋼材16は建物の外壁21に近接しているか
ら同外壁21の取付けその他の外装工事の施工に支障が
ない。The method of using the above-described composite jack device is as follows. The steel materials 15 and 16 on which the guide roller 5 and the lock pin devices 6 and 7 are installed are transported to the site as factory processing in advance, and bolts or the like assembled around the column 1 are used. Assemble the upper and lower mounts 3 and 4 by the method described in
Installation work can be easily performed by incorporating and connecting the base jack 2. Of course, the disassembly operation can be facilitated by executing the reverse procedure. After the above-described preparation for installation is completed, the composite jack device is, for example, shown in FIG.
The lifted body 20 such as a floor frame or a roof frame of a building is placed on the upper frame 3 as described above, and the lower lock device 7 is driven first, and the lock pin 7a is placed on the reaction force receiving portion 8 of the column 1. The engaging pin 24 is engaged with the engaging hole 23 to prepare for ascending. Next, the jack 2 is extended and the lifted body 20 is pushed up (FIG. 4B). At this time, the lower gantry 4 maintains a well-balanced and stable state, and the upper gantry 3
Also, the guide roller 5 smoothly and stably moves up without causing lateral vibration due to the guiding action of the guide roller 5. As shown in FIG. 5A, when the jack 2 has been fully extended to its effective stroke, the upper lock pin device 6 is driven to lock the lock pin 6a on the reaction force receiving portion 8 of the column 1 to reduce the load. Assortment is performed. That is, when the jack 2 is slightly contracted, the entire load is supported by the upper lock pin device 6, and the lower lock pin device 7 is in a no-load state. At this stage, the clamp jack 9 serving as the driving unit is retracted. As a result, the lock pin 7 a is removed from the reaction force receiving portion 8, and the engagement pin 24 is pulled out from the engagement hole 23. Thereafter, when the jack 2 is contracted, the lower gantry 4 is raised (FIG. 5B). Therefore, if the object to be lifted is connected to the lower frame 4, it is lifted. At the stage where the jack 2 has contracted the entire effective stroke, the lower lock pin device 7 of the lower gantry 4 is actuated to take a reaction force on the reaction force receiving portion 8 of the column 1 and further engage the engagement pin 24. When the hole 23 is engaged (FIG. 5C), the state returns to the state similar to that of FIG. 4A, and the ascending of one process (extension and contraction of the jack 2) is completed. Also, during the operation of the above-described composite jack device, as shown in FIGS. 1 and 3A, since the outer steel material 16 on the upper and lower mounts 3, 4 is close to the outer wall 21 of the building, the outer wall 21 is attached. There is no problem in the construction of other exterior works.
【0018】上述した複合ジャッキ装置がプッシュアッ
プ工法などに使用される場合には、図6に示した建物平
面図の水平X−Y方向のそれぞれの方向に向かってジャ
ッキ2が各支柱1に設置される。このため、個々のジャ
ッキ装置は支柱1の一側を偏荷重状態でジャッキアップ
するが、建物全体としては正反対側にもジャッキ装置が
対称的に配置されているため、X−Y方向にバランスを
とって駆動階をプッシュアップすることになる。When the above-described composite jack device is used in a push-up method or the like, jacks 2 are installed on the columns 1 in the horizontal XY directions of the building plan view shown in FIG. Is done. For this reason, each jack device jacks up one side of the column 1 under an eccentric load state, but since the jack devices are symmetrically arranged on the opposite side as a whole building, the balance in the XY direction is balanced. This will push up the driving floor.
【0019】以上に説明した複合ジャッキ装置の上昇工
程(従って、下降工程も同様)は、図示を省略した油圧
回路で制御されるが、ジャッキ2が2基であるために油
圧回路の大幅な簡略化が可能である。図7は、建物の外
壁21が直線状である部分の支柱1に複合ジャッキ装置
が設置された場合を示した平面図である。内側鋼材15
とジャッキ2及びロックピン装置6,7が外壁21から
見て支柱1より内側に位置し、外側鋼材16の平面形状
は直線状の外壁21の内側に納まって昇降可能な形状と
されている。従って、図1に示したコーナ部分の場合と
同様に、外壁21の取付けその他の外装工事の施工に一
切支障がない。The ascending step (therefore, the descending step) of the composite jack device described above is controlled by a hydraulic circuit (not shown). However, since there are two jacks 2, the hydraulic circuit is greatly simplified. Is possible. FIG. 7 is a plan view showing a case where the composite jack device is installed on the column 1 where the outer wall 21 of the building is straight. Inner steel 15
The jack 2 and the lock pin devices 6 and 7 are located inside the support column 1 when viewed from the outer wall 21, and the outer steel member 16 has a planar shape that fits inside the linear outer wall 21 and can be raised and lowered. Therefore, similarly to the case of the corner portion shown in FIG. 1, there is no hindrance to the mounting of the outer wall 21 and other construction work.
【0020】図8に示した複合ジャッキ装置は、上側架
台3を駆動階20と一体的に構成とした実施例を示して
いる。ジャッキ2の出力軸2b及び上部ロックピン装置
6が駆動階20に連結され、外側鋼材16も極力小さく
構成され、係合ピン24を省略した構成である。このた
め、ジャッキ2のプッシュアップ動作時における下側架
台4のアンバランスはローラガイド5によって安定化さ
れる。上側架台3がないために、ジャッキ装置自体の軽
量化と設備コスト及び組立・解体コストの低減が可能で
ある。なお、上記実施例と同様に係合ピン24を支柱1
に設けた係合孔23に係合する構成のジャッキ装置を採
用することもできる。The composite jack device shown in FIG. 8 shows an embodiment in which the upper gantry 3 is formed integrally with the driving floor 20. The output shaft 2b of the jack 2 and the upper lock pin device 6 are connected to the drive floor 20, the outer steel member 16 is also made as small as possible, and the engagement pin 24 is omitted. Therefore, the unbalance of the lower gantry 4 during the push-up operation of the jack 2 is stabilized by the roller guide 5. Since the upper base 3 is not provided, it is possible to reduce the weight of the jack device itself and to reduce equipment costs and assembly / disassembly costs. The engaging pin 24 is connected to the support 1 in the same manner as in the above embodiment.
It is also possible to employ a jack device configured to engage with the engagement hole 23 provided in the above.
【0021】[0021]
【本発明が奏する効果】本発明に係る押し上げ引き上げ
用複合ジャッキ装置は、建築に限らず多様な用途に適用
できると共に、ジャッキ装置の設置、解体の作業が容易
で、全自動化をはかれる上に、建物の外壁21の取付
け、その他の外装工事の施工が容易に可能であり、建築
の効率化に寄与できる。[Effects of the present invention] The composite jack device for lifting and lifting according to the present invention can be applied not only to construction but also to various uses, and it is easy to install and disassemble the jack device, and to achieve full automation. It is possible to easily attach the outer wall 21 of the building and perform other exterior work, which contributes to the efficiency of the building.
【図1】建物のコーナ部分に配置された複合ジャッキ装
置を示した平面図である。FIG. 1 is a plan view showing a composite jack device arranged at a corner of a building.
【図2】複合ジャッキ装置の立面図である。FIG. 2 is an elevational view of the composite jack device.
【図3】Aは複合ジャッキ装置の左半分を断面とした立
面図であり、Bは係合ピン部分の部分図である。FIG. 3A is an elevational view of a cross section of the left half of the composite jack device, and FIG. 3B is a partial view of an engagement pin portion.
【図4】A、Bはジャッキの工程図である。4A and 4B are process diagrams of a jack.
【図5】A〜Cはジャッキの工程図である。FIGS. 5A to 5C are process diagrams of the jack.
【図6】複合ジャッキ装置が設置された建物の平面図で
ある。FIG. 6 is a plan view of a building in which the composite jack device is installed.
【図7】建物の直線状に辺部に配置されたジャッキ装置
の平面図である。FIG. 7 is a plan view of a jack device linearly arranged on a side of a building.
【図8】ジャッキ装置の異なる実施例を示した立面図で
ある。FIG. 8 is an elevation view showing a different embodiment of the jack device.
【図9】従来のジャッキ装置の使用状態を示した平面図
である。FIG. 9 is a plan view showing a use state of a conventional jack device.
1 支柱 2 ジャッキ 3,4 架台 5 ガイドローラ 6,7 ロックピン装置 8 反力受部 23 係合孔 24 係合ピン 21 外壁 DESCRIPTION OF SYMBOLS 1 Support 2 Jack 3,4 Stand 5 Guide roller 6,7 Lock pin device 8 Reaction force receiving part 23 Engagement hole 24 Engagement pin 21 Outer wall
───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.7,DB名) E04G 21/14 E04B 1/35 ──────────────────────────────────────────────────続 き Continued on the front page (58) Field surveyed (Int.Cl. 7 , DB name) E04G 21/14 E04B 1/35
Claims (4)
るジャッキ装置において、 ジャッキは建物の外壁から見て支柱よりも内側の位置に
偏って垂直に1又は複数設置され、架台は前記建物の外
壁側の平面形状を同外壁の内側に納まって昇降可能な形
状とされていると共に前記ジャッキのシリンダ下端を連
結した下側架台及び出力軸の上端を連結した上側架台と
で構成され、前記上下の架台には支柱に当接して拘束力
を発揮するガイドローラが複数設置されていること、前
記上下の架台における前記ジャッキの設置側に、支柱に
反力をとる上部ロックピン装置及び下部ロックピン装置
が設置され、支柱の上下方向に前記ジャッキの有効スト
ローク以内のピッチで複数設けられた反力受部に前記上
下部のロックピン装置のロックピンが掛け止められるこ
とを特徴とする、押し上げ引き上げ用複合ジャッキ装
置。1. A jack device which moves up and down by receiving a reaction force on a support column along a support column, wherein one or a plurality of jacks are vertically installed at a position inside the support column as viewed from the outer wall of the building, and the gantry is mounted on the support. It has a lower frame connecting the lower end of the cylinder of the jack and an upper frame connecting the upper end of the output shaft, and has a plane shape on the outer wall side of the building that is housed inside the outer wall and has a shape capable of ascending and descending, The upper and lower pedestals are provided with a plurality of guide rollers that abut against a column to exert a binding force, and an upper lock pin device and a lower portion that take a reaction force on the column on the installation side of the jack in the upper and lower gantry. A lock pin device is installed, and a lock pin of the lock pin device of the upper and lower portions is hooked on a plurality of reaction force receiving portions provided at a pitch within the effective stroke of the jack in the vertical direction of the support. A composite jack device for lifting and lifting.
るジャッキ装置において、 ジャッキは建物の外壁から見て支柱よりも内側の位置に
偏って垂直に1又は複数設置され、架台としては前記建
物の外壁側の平面形状を建物の外壁の内側に納まって昇
降可能な形状とされていると共に前記ジャッキのシリン
ダ下端を連結した下側架台を備え、支柱に当接して拘束
力を発揮するガイドローラが前記下側架台に複数設置さ
れ、支柱に反力をとる下部ロックピン装置は前記下側架
台の前記ジャッキを設置した側に設置されていること、
前記ジャッキの出力軸の上端を連結した上部ロックピン
装置は駆動階と連結されていること、支柱の上下方向に
前記ジャッキの有効ストローク以内のピッチで複数設け
られた反力受部に前記上,下部のロックピン装置のロッ
クピンが掛け止められることを特徴とする、押し上げ引
き上げ用複合ジャッキ装置。2. A jack device which moves up and down by taking a reaction force on a support column along a support column, wherein one or a plurality of jacks are vertically installed at a position inside the support column as viewed from an outer wall of the building, and the jack is used as a stand. A flat shape on the outer wall side of the building is housed inside the outer wall of the building so as to be capable of ascending and descending, and has a lower pedestal connecting the lower end of the cylinder of the jack, and exerts a binding force by abutting a support. A plurality of guide rollers are installed on the lower gantry, and a lower lock pin device that takes a reaction force on a column is installed on a side of the lower gantry where the jack is installed,
The upper lock pin device connected to the upper end of the output shaft of the jack is connected to the driving floor, and the upper and lower reaction force receiving portions provided at a plurality of pitches within the effective stroke of the jack in the vertical direction of the support post. A composite jack device for lifting and lifting, wherein a lock pin of a lower lock pin device is latched.
物の外壁寄り位置に設けられた係合部に係合する係合ピ
ンは、上側架台及び下側架台に水平方向に進退可能に設
置されていることを特徴とする、請求項1に記載した押
し上げ引き上げ用複合ジャッキ装置。3. An engaging pin which engages with an engaging portion provided on the opposite side of the position of the jack and closer to the outer wall of the building than the column is capable of moving forward and backward in the upper and lower frames. The push-pull composite jack device according to claim 1, wherein the composite jack device is provided.
物の外壁寄り位置に設けられた係合部に係合する係合ピ
ンは、下側架台に水平方向に進退可能に設置されている
ことを特徴とする、請求項2に記載した押し上げ引き上
げ用複合ジャッキ装置。4. An engaging pin which engages with an engaging portion provided on the opposite side to the position of the jack and closer to the outer wall of the building than the column is installed on the lower frame so as to be able to advance and retreat in the horizontal direction. 3. The composite jack device according to claim 2, wherein:
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP5005255A JP3049583B2 (en) | 1993-01-14 | 1993-01-14 | Composite jack device for lifting and lifting |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP5005255A JP3049583B2 (en) | 1993-01-14 | 1993-01-14 | Composite jack device for lifting and lifting |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH06212803A JPH06212803A (en) | 1994-08-02 |
| JP3049583B2 true JP3049583B2 (en) | 2000-06-05 |
Family
ID=11606120
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP5005255A Expired - Fee Related JP3049583B2 (en) | 1993-01-14 | 1993-01-14 | Composite jack device for lifting and lifting |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3049583B2 (en) |
Families Citing this family (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US6808338B2 (en) * | 2003-03-04 | 2004-10-26 | David Zingerman | Method and system for lifting of the massive constructions |
| CN106049886B (en) * | 2016-07-28 | 2018-08-21 | 武汉卡特工业股份有限公司 | A kind of push-and-pull rod heavy duty promotion and downward putting device |
| CN106759925B (en) * | 2017-03-24 | 2019-04-23 | 上海同罡建筑工程有限公司 | A structure jacking device and structure jacking method |
| CN112081249B (en) * | 2020-08-03 | 2021-11-12 | 上海建工一建集团有限公司 | Roof integral jacking system and roof integral jacking method |
| CN112081250B (en) * | 2020-08-03 | 2021-11-12 | 上海建工一建集团有限公司 | House integral lifting system and house integral lifting method |
| CN112962985B (en) * | 2021-02-23 | 2022-06-21 | 上海中森建筑与工程设计顾问有限公司 | Guide positioning device for assembly type building component and construction method |
-
1993
- 1993-01-14 JP JP5005255A patent/JP3049583B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JPH06212803A (en) | 1994-08-02 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN108625606B (en) | Steel construction location conveying scaffold | |
| JP6508958B2 (en) | Demolition system and demolition method | |
| JP3049583B2 (en) | Composite jack device for lifting and lifting | |
| JP2001130870A (en) | Method and apparatus for supporting a climbing crane | |
| CN114439252A (en) | Main arch supporting device for hoisting large-span steel structure roof | |
| JP3389839B2 (en) | Girder installation method and girder centering adjustment device | |
| JP6508959B2 (en) | Demolition system and demolition method | |
| JP2729017B2 (en) | Elevator car gantry | |
| CN1128307C (en) | Construction method for laying main beam and main beam centering adjusting device | |
| JP2890341B2 (en) | Method and apparatus for lifting up top-level frame for structure construction | |
| JP3079329B2 (en) | Push-up method with composite jack for push-pull | |
| JP4456745B2 (en) | Work floor | |
| CN223459186U (en) | A steel structure column unloading support device | |
| CN117988573B (en) | Steel frame structure for mounting prefabricated wall surface | |
| JP3111854B2 (en) | Elevating guide mechanism of jumping scaffold for building construction | |
| JP3179814B2 (en) | Column and beam construction method and apparatus | |
| JP2754196B2 (en) | Lifting equipment for building structures | |
| JP2020186548A (en) | How to install the elevating scaffolding | |
| JP2592980B2 (en) | Construction method of steel frame material for high-rise structure | |
| JPH0791904B2 (en) | Push-up device | |
| JP2525250Y2 (en) | Tower climbing equipment for tower cranes | |
| JP3279290B2 (en) | Rebar prefab vertical composition device | |
| JP2936366B2 (en) | Composite jack device for lifting and lifting | |
| JP3119982B2 (en) | Self-elevating construction equipment | |
| JP3002054U (en) | Tower crane with multiple main columns as tower mast |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080331 Year of fee payment: 8 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090331 Year of fee payment: 9 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100331 Year of fee payment: 10 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100331 Year of fee payment: 10 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110331 Year of fee payment: 11 |
|
| LAPS | Cancellation because of no payment of annual fees |