JP3056949B2 - Structure of cut slope and its construction method - Google Patents
Structure of cut slope and its construction methodInfo
- Publication number
- JP3056949B2 JP3056949B2 JP6132398A JP13239894A JP3056949B2 JP 3056949 B2 JP3056949 B2 JP 3056949B2 JP 6132398 A JP6132398 A JP 6132398A JP 13239894 A JP13239894 A JP 13239894A JP 3056949 B2 JP3056949 B2 JP 3056949B2
- Authority
- JP
- Japan
- Prior art keywords
- retaining wall
- ground
- slope
- anchor
- earth
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A10/00—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
- Y02A10/23—Dune restoration or creation; Cliff stabilisation
Landscapes
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Description
【0001】[0001]
【産業上の利用分野】本発明は、軟岩を含む地山に形成
される切土斜面の構造およびその構築方法に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a structure of a cut slope formed on a ground including soft rock and a method of constructing the same.
【0002】[0002]
【従来の技術】従来、地山の一部を切り取られ露出した
斜面への複数のアンカー部材の打ち込み、前記斜面への
枠部材の配置、前記枠部材の前記アンカー部材への固
定、および、前記斜面に連なる小段の形成を地山の上部
から下部に向けて繰り返し行なうことにより、切土斜面
を構築することが行なわれている。2. Description of the Related Art Heretofore, a plurality of anchor members have been driven into a slope that has been partially cut off and exposed to the ground, a frame member has been arranged on the slope, the frame member has been fixed to the anchor member, and It has been practiced to form a cut slope by repeatedly forming a small step following the slope from the top to the bottom of the ground.
【0003】[0003]
【発明が解決しようとする課題】ところで、第三紀の砂
岩、泥岩等の軟岩を含む地山に長大な斜面を形成すべく
切土を行なうと、切土斜面から地山の緩みが進行して表
層崩壊が起こり、さらに、前記長大斜面から隔たった深
い位置に滑り面が生じる。前記アンカー部材では、地山
の緩みの進行を阻止することができず、また、前記滑り
面に沿って移動する風化土塊に対する抑止工として有効
に作用せず、あるいは、切取りに伴う地山の応力開放の
ために前記アンカー部材が地山から抜け出すおそれがあ
る。本発明の目的は、軟岩を含む地山の深い位置に滑り
面を生じさせないで、または応力開放を抑制することに
より斜面の安定を図り、地山の崩壊を確実に防ぐ切土斜
面の構造およびその構築方法を提供することにある。When cutting is performed to form a long slope on a ground containing soft rocks such as sandstone and mudstone of the Tertiary period, loosening of the ground proceeds from the cut slope. Surface collapse occurs, and a slip surface is formed at a deep position separated from the long slope. In the anchor member, the progress of the loosening of the ground cannot be prevented, and the anchor member does not effectively act as a deterrent against the weathered soil mass moving along the sliding surface, or the stress of the ground due to the cutting. There is a risk that the anchor member may fall out of the ground due to opening. An object of the present invention is to avoid the occurrence of a slip surface at a deep position in the ground including soft rock, or to stabilize the slope by suppressing stress release, and to prevent the collapse of the ground by reliably reducing the structure of the cut slope. It is to provide a construction method.
【0004】[0004]
【課題を解決するための手段】本発明に係る、斜面を有
する、軟岩を含む地山に形成される切土斜面の構造は、
前記地山の斜面から前記地山中に鉛直またはほぼ鉛直に
設置されかつ複数のアンカー部材により前記地山に定着
された多段の土留め壁と、前記地山の一部の切取りによ
り土留め壁相互間に形成された小段とを含み、下段の土
留め壁の前記アンカー部材が、前記下段の土留め壁とそ
の上段の土留め壁と前記地山とに穿孔された穴に挿入さ
れ該穴がグラウトで充填されたアンカーボルトと、前記
下段の土留め壁から突出する前記アンカーボルトの先端
に螺合されたナットとからなる。また、本発明に係る、
斜面を有する、軟岩を含む地山に切土斜面を構築する方
法は、前記斜面から前記地山中への鉛直またはほぼ鉛直
な土留め壁の設置と、前記土留め壁の複数のアンカー部
材による前記地山への定着と、前記土留め壁の谷側にお
ける前記地山の一部を切取っての小段の形成とからなる
工程を前記地山の斜面の上部から下部へ向けて順次に行
なうことを含み、下段の土留め壁はその上段の土留め壁
と部分的に対向するように設置し、前記下段の土留め壁
の前記アンカー部材による地山への定着は、前記下段の
土留め壁とその上段の土留め壁と前記地山とに穿孔され
た穴にアンカーボルトを挿入しまた前記穴にグラウトを
充填し、前記下段の土留め壁から突出する前記アンカー
ボルトの先端にナットを螺合することにより行う。According to the present invention, the structure of the cut slope formed on the ground including the soft rock, which has the slope,
A multi-stage retaining wall installed vertically or almost vertically in the ground from the slope of the ground and fixed to the ground by a plurality of anchor members, and a retaining wall formed by cutting a part of the ground. The anchor member of the lower retaining wall is inserted into a hole formed in the lower retaining wall, the upper retaining wall and the ground, and the hole is inserted into the hole. An anchor bolt filled with grout and a nut screwed to a tip of the anchor bolt protruding from the lower retaining wall. Further, according to the present invention,
A method for constructing a cut slope on a ground including soft rock, which has a slope, comprises installing a vertical or almost vertical earth retaining wall from the slope into the earth, and using a plurality of anchor members of the earth retaining wall. A step of fixing to the ground and forming a small step by cutting a part of the ground on the valley side of the retaining wall is sequentially performed from the upper part to the lower part of the slope of the ground. The lower retaining wall is installed so as to partially oppose the upper retaining wall, and the lower retaining wall is fixed to the ground by the anchor member, and the lower retaining wall is fixed to the lower retaining wall. An anchor bolt is inserted into a hole drilled in the upper retaining wall and the ground, and the hole is filled with grout. It is performed by combining.
【0005】[0005]
【発明の作用および効果】本発明によれば、軟岩を含む
地山の斜面に沿って多段に設置された鉛直またはほぼ鉛
直な土留め壁がその後背に位置する地山をその上部から
下部にわたって次々に拘束し、切取りに伴う応力開放に
よる地山の緩みを抑制することから、前記土留め壁を前
記後背の地山に定着するアンカー部材が前記地山から抜
け出すおそれはない。さらに、前記土留め壁による地山
の拘束により、切取りに伴う応力開放、スレーキング、
膨潤等が抑制されることから、軟岩を含む地山に特有の
崩壊を確実に防止することができる。According to the present invention, a vertical or substantially vertical earth retaining wall provided in multiple steps along the slope of a ground containing soft rock extends from the top to the bottom of the ground located behind it. Since the ground member is restrained one after another and the loosening of the ground due to the release of the stress caused by the cutting is suppressed, there is no possibility that the anchor member fixing the retaining wall to the ground on the rear side comes off from the ground. Further, due to the restraint of the ground by the retaining wall, stress release accompanying cutting, slaking,
Since swelling and the like are suppressed, collapse peculiar to the ground including soft rock can be reliably prevented.
【0006】本発明によれば、土留め壁の設置、前記土
留め壁の地山への定着および小段の形成からなる工程を
地山の上部から下方へ向けて段階的に適用することによ
り、改良された切土斜面を構築することができる。ま
た、本発明によれば、地山の斜面に沿って鉛直またはほ
ぼ鉛直な土留め壁を多段に設置し、前記土留め壁の後背
の地山をその上部から下部にわたって次々に拘束するこ
とにより、急斜面の切土法面を構築することができ、こ
れにより、斜面切土により生じる土砂の量を大幅に低減
することができる。さらに、切土により新たに生じた用
地を有効に利用することができる。さらに、前記用地に
盛土して、植生を施すことにより、周辺環境と調和した
景観をつくることができる。According to the present invention, the steps of installing the retaining wall, fixing the retaining wall to the ground, and forming a small step are applied stepwise from the upper part of the ground to the lower part. Cut slopes can be constructed. According to the present invention, a vertical or almost vertical earth retaining wall is installed in multiple stages along the slope of the earth, and the earth behind the earth retaining wall is restrained one after another from its upper part to its lower part. Thus, a cut slope having a steep slope can be constructed, whereby the amount of sediment generated by the slope cut can be significantly reduced. Furthermore, the land newly generated by the cut can be effectively used. Further, embankment on the site and vegetation can create a landscape in harmony with the surrounding environment.
【0007】[0007]
【実施例】図1に示すように、本発明に係る切土法面1
0の構造は、軟岩、特に第三紀の砂岩、泥岩等を含む軟
岩の地山12中に鉛直に設置された多段の土留め壁14
と、各段の土留め壁14を地山12に定着する複数のア
ンカー部材16と、土留め壁14の相互間に形成された
小段18とを含む。DESCRIPTION OF THE PREFERRED EMBODIMENTS As shown in FIG. 1, a cut slope 1 according to the present invention.
The structure of No. 0 is a multi-stage retaining wall 14 installed vertically in a soft rock ground 12 containing soft rocks, especially tertiary sandstone, mudstone and the like.
And a plurality of anchor members 16 for fixing the retaining wall 14 of each step to the ground 12, and small steps 18 formed between the retaining walls 14.
【0008】多段の土留め壁14は互いに平行な地中連
続壁または柱列杭からなり、それぞれ地山12の斜面1
9から該地山中を図1の紙面に直角な方向へ伸びる。こ
れに代えて、土留め壁14は地山12の山側へわずかに
傾斜するように、すなわちほぼ鉛直に設置してもよい。[0008] The multi-stage retaining wall 14 is composed of an underground continuous wall or a column row pile parallel to each other.
From 9 extends through the ground in a direction perpendicular to the plane of the paper of FIG. Alternatively, the retaining wall 14 may be installed so as to be slightly inclined toward the mountain side of the ground 12, that is, substantially vertically.
【0009】各アンカー部材16は、土留め壁14の上
端部を貫通して地山12中を下方に向けて伸びる。アン
カー部材16は、土留め壁14および地山12に穿孔さ
れた穴にアンカーボルトを挿入しまた前記穴にグラウト
を充填し、土留め壁14から突出する前記アンカーボル
トの先端にナットを螺合することにより設置する。Each anchor member 16 extends downward through the ground 12 through the upper end of the retaining wall 14. The anchor member 16 inserts an anchor bolt into a hole formed in the retaining wall 14 and the ground 12, fills the hole with grout, and screws a nut to a tip of the anchor bolt projecting from the retaining wall 14. Install by doing.
【0010】最上段の土留め壁14に関するアンカー部
材16の設置後、土留め壁14の谷側における地山12
の一部を掘削し、予め定められた高さ位置に小段18を
形成する。掘削により切り取られた地山部分を想像線で
示す。After the anchor member 16 is installed on the uppermost retaining wall 14, the ground 12 on the valley side of the retaining wall 14.
Is excavated to form a small step 18 at a predetermined height position. The ground part cut out by excavation is indicated by imaginary lines.
【0011】次に、切取りにより形成された小段18か
ら下方へ伸びる次段の土留め壁14を地山12中に構築
し、アンカー部材16を設置する。下段の土留め壁14
は、その上段の土留め壁14と部分的に相対している。
下段の土留め壁14と、先に形成された上段の土留め壁
14との間の距離は、切土による地山の緩みが急増しな
いように地山の物理・力学特性および設計土留め壁強
度、アンカー強度等を考慮して定める。Next, the next retaining wall 14 extending downward from the small step 18 formed by cutting is constructed in the ground 12 and the anchor member 16 is installed. Lower retaining wall 14
Is partially opposed to the upper retaining wall 14.
The distance between the lower retaining wall 14 and the upper retaining wall 14 formed earlier is determined by the physical and mechanical characteristics of the ground and the designed retaining wall so that the loosening of the ground due to the cut does not increase rapidly. Determined in consideration of strength, anchor strength, etc.
【0012】その後、前記したと同様にして、前記下段
の土留め壁14の他のアンカー部材16による地山12
への定着および小段18の形成を実行する。Thereafter, in the same manner as described above, the ground 12 is fixed by the other anchor members 16 of the lower retaining wall 14.
And forming the step 18 are performed.
【0013】土留め壁14の設置、地山12へのアンカ
ー部材16による土留め壁14の定着および小段18の
形成からなる工程を地山12の上部から下部に向けて順
次に、すなわち段階的に行なうことにより、切土斜面1
0が構築される。The steps of installing the retaining wall 14, fixing the retaining wall 14 to the ground 12 by the anchor member 16 and forming the small steps 18 are sequentially performed from the upper part to the lower part of the ground 12, that is, stepwise. To cut slope 1
0 is constructed.
【0014】地山12に定着された下段の土留め壁14
およびアンカー部材16により、前記上段の土留め壁1
4の後背または背面側における切土による地山の緩みが
抑制される。The lower retaining wall 14 fixed to the ground 12
And the anchor member 16, the upper retaining wall 1
4 loosening of the ground due to the cut on the back or back side is suppressed.
【図1】切土斜面の概略的な縦断面図である。FIG. 1 is a schematic longitudinal sectional view of a cut slope.
10 切土法面 12 軟岩地山 14 土留め壁 16 アンカー部材 18 小段 19 斜面 DESCRIPTION OF SYMBOLS 10 Cut slope 12 Soft rock ground 14 Retaining wall 16 Anchor member 18 Small step 19 Slope
───────────────────────────────────────────────────── フロントページの続き (72)発明者 宇野 定雄 東京都新宿区津久戸町2番1号 株式会 社熊谷組東京本社内 (72)発明者 田邉 大次郎 東京都新宿区津久戸町2番1号 株式会 社熊谷組東京本社内 (56)参考文献 特開 昭50−56704(JP,A) (58)調査した分野(Int.Cl.7,DB名) E02D 17/20 ──────────────────────────────────────────────────続 き Continuing on the front page (72) Inventor Sadao Uno 2-1 Tsukudo-cho, Shinjuku-ku, Tokyo Stock Company Kumagaya Gumi Tokyo Head Office (72) Inventor Daijiro Tanabe 2-1 Tsukudo-cho, Shinjuku-ku, Tokyo Stock Company Kumagaya Gumi Tokyo headquarters (56) References JP-A-50-56704 (JP, A) (58) Fields investigated (Int. Cl. 7 , DB name) E02D
Claims (2)
面から前記地山中に鉛直またはほぼ鉛直に設置されかつ
複数のアンカー部材により前記地山に定着された多段の
土留め壁であって下段の土留め壁の前記アンカー部材
が、前記下段の土留め壁とその上段の土留め壁と前記地
山とに穿孔された穴に挿入され該穴がグラウトで充填さ
れたアンカーボルトと、前記下段の土留め壁から突出す
る前記アンカーボルトの先端に螺合されたナットとから
なる多段の土留め壁と、前記地山の一部の切取りにより
土留め壁相互間に形成された小段とを含む、切土斜面の
構造。1. A multi-stage retaining wall which is installed vertically or almost vertically from a slope of a ground containing soft rock and has a slope, and is fixed to the ground by a plurality of anchor members. The anchor member of the lower retaining wall is inserted into a hole drilled in the lower retaining wall, the upper retaining wall and the ground, and the hole is filled with grout; and A multi-stage retaining wall composed of a nut screwed to the tip of the anchor bolt protruding from the lower retaining wall, and a small step formed between the retaining walls by cutting a part of the ground. Including, the structure of the cut slope.
面から前記地山中への鉛直またはほぼ鉛直な土留め壁の
設置と、前記土留め壁の複数のアンカー部材による前記
地山への定着と、前記土留め壁の谷側における前記地山
の一部を切取っての小段の形成とからなる工程を前記地
山の斜面の上部から下部へ向けて順次に行なうことを含
み、下段の土留め壁はその上段の土留め壁と部分的に対
向するように設置し、前記下段の土留め壁の前記アンカ
ー部材による地山への定着は、前記下段の土留め壁とそ
の上段の土留め壁と前記地山とに穿孔された穴にアンカ
ーボルトを挿入しまた前記穴にグラウトを充填し、前記
下段の土留め壁から突出する前記アンカーボルトの先端
にナットを螺合することにより行う、切土斜面の構築方
法。2. A vertical or substantially vertical earth retaining wall is provided from the slope of the ground including soft rock, which has a slope, into the ground, and a plurality of anchor members of the earth retaining wall are used to attach the earth to the ground. Fixing, and forming a small step by cutting a part of the ground on the valley side of the earth retaining wall, sequentially including from the upper part to the lower part of the slope of the ground, The retaining wall is installed so as to partially face the upper retaining wall, and the anchoring of the lower retaining wall to the ground by the anchor member is performed by the lower retaining wall and the upper retaining wall. By inserting an anchor bolt into a hole drilled in the retaining wall and the ground, filling the hole with grout, and screwing a nut to a tip of the anchor bolt protruding from the lower retaining wall. How to build a cut slope.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP6132398A JP3056949B2 (en) | 1994-05-24 | 1994-05-24 | Structure of cut slope and its construction method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP6132398A JP3056949B2 (en) | 1994-05-24 | 1994-05-24 | Structure of cut slope and its construction method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH07317079A JPH07317079A (en) | 1995-12-05 |
| JP3056949B2 true JP3056949B2 (en) | 2000-06-26 |
Family
ID=15080466
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP6132398A Expired - Fee Related JP3056949B2 (en) | 1994-05-24 | 1994-05-24 | Structure of cut slope and its construction method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3056949B2 (en) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105421462B (en) * | 2015-11-04 | 2018-05-25 | 广西交通规划勘察设计研究院有限公司 | The construction and guard method of ultimate soft rock ground |
| CN109487801B (en) * | 2018-09-18 | 2021-01-19 | 上海二十冶建设有限公司 | Advanced dynamic slope supporting method |
| CN112854245A (en) * | 2021-03-17 | 2021-05-28 | 山东大学 | Classification design method for earth rock foundation pit support based on depth and medium-stroke fossil rock burial depth |
-
1994
- 1994-05-24 JP JP6132398A patent/JP3056949B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JPH07317079A (en) | 1995-12-05 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR100969996B1 (en) | Two-row Thumb Pile Crust Using Earth Anchor | |
| US7708502B2 (en) | System and method for stabilizing landslides and steep slopes | |
| US20210164186A1 (en) | Interlocking stabilization system for stabilizing slope, unrestrained earth or the like | |
| KR100971198B1 (en) | Two-row Thumb Pile Soil Method Using Soil Nailing | |
| EP0070659A1 (en) | Retaining wall and in situ method of construction | |
| JP3886261B2 (en) | Slope stabilization method and slope independent pressure receiving device | |
| US3903662A (en) | Method of securing structural support elements in soil | |
| JP3056949B2 (en) | Structure of cut slope and its construction method | |
| JP2743264B2 (en) | Retaining wall construction | |
| KR102724785B1 (en) | Landscape retaining wall structure | |
| JP7115817B2 (en) | Reinforced soil wall using large sandbags and retaining method using large sandbags | |
| JP3323752B2 (en) | Slope stabilization method | |
| KR100995503B1 (en) | Two-row thumb pile earth block structure with work path and earth block construction method | |
| KR100764019B1 (en) | Vegetable soil wall installation structure and its construction method | |
| JP3072403B2 (en) | Buttress type retaining digging method | |
| JP3015935B2 (en) | Drilling equipment for foundation ground | |
| JP4889692B2 (en) | Anchor plate installation method and anchor plate installation structure | |
| JP7672367B2 (en) | Connection method between the support pile and the tendon | |
| JP2000160572A (en) | Natural ground reinforcing construction method | |
| AU2021388877B2 (en) | Protective structure and method for dissipating tensile load applied to a support cable in a support cable arrangement of the protective structure | |
| JPH0874260A (en) | Cut slope reinforcement method using leaning type retaining wall | |
| JPH0663234B2 (en) | Yamadome method | |
| JPS62197520A (en) | Stabilization of cut ground | |
| KR20240022083A (en) | Construction Method of EARTH RETAINING STRUCTURE Supported by Multiple Piles | |
| JPH0529731B2 (en) |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20000404 |
|
| LAPS | Cancellation because of no payment of annual fees |