JP3064260B2 - Connection structure of metal shingles - Google Patents
Connection structure of metal shinglesInfo
- Publication number
- JP3064260B2 JP3064260B2 JP9357200A JP35720097A JP3064260B2 JP 3064260 B2 JP3064260 B2 JP 3064260B2 JP 9357200 A JP9357200 A JP 9357200A JP 35720097 A JP35720097 A JP 35720097A JP 3064260 B2 JP3064260 B2 JP 3064260B2
- Authority
- JP
- Japan
- Prior art keywords
- metal
- piece
- roof
- cap
- rafter
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000002184 metal Substances 0.000 title claims description 125
- 239000000725 suspension Substances 0.000 claims description 21
- 238000006073 displacement reaction Methods 0.000 claims description 16
- 230000000149 penetrating effect Effects 0.000 claims 1
- 238000010276 construction Methods 0.000 description 7
- 238000005452 bending Methods 0.000 description 3
- 230000008595 infiltration Effects 0.000 description 1
- 238000001764 infiltration Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
Landscapes
- Roof Covering Using Slabs Or Stiff Sheets (AREA)
Description
【0001】[0001]
【発明の属する技術分野】本発明は、金属屋根板の接続
構造に関し、詳しくは、金属屋根板を葺設する場合の棟
軒方向の直線性を出すための施工を容易におこなえなが
ら接続強度及び接続箇所の水密性を大幅に高め、且つ、
既設の屋根をそのままにして新しい金属屋根板を簡単に
葺設することができ、屋根の葺替えを容易におこなえる
ようにしようとする技術に係るものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a connection structure for metal shingles, and more particularly, to a structure for connecting a metal shingle with straightness in the direction of a ridge in a wing eaves direction while easily performing a construction for achieving a straightness in a ridge direction. Dramatically enhances the watertightness of the connection points, and
The present invention relates to a technique for easily laying a new metal shingle while leaving an existing roof as it is, and making it possible to easily replace the roof.
【0002】[0002]
【従来の技術】従来、屋根の棟軒方向とは直交する方向
に金属屋根板を接続する場合に、図5に示すように、母
屋aにタイトフレームbを取付け、このタイトフレーム
bに吊子8aを介して金属屋根板1aを取付け、隣接す
る金属屋根板1bの接続部1cを被せて金属屋根板1
a,1bを接続するものである。2. Description of the Related Art Conventionally, when a metal shingle is connected in a direction orthogonal to the direction of the roof eaves, a tight frame b is attached to a purlin a as shown in FIG. 8a, the metal roof shingle 1a is attached, and the connection part 1c of the adjacent metal roof shingle 1b is covered.
a and 1b are connected.
【0003】[0003]
【発明が解決しようとする課題】ところが、このような
構成においては、タイトフレームbを母屋aに対して直
線状に取付けるのが難しく、タイトフレームbが棟軒方
向に対して直交する方向において直線性が出ていない場
合が多く、このように、タイトフレームbが棟軒方向に
直交する方向に対してずれる場合には、金属屋根板1a
を棟軒方向に直線性を出して施工するのが困難となるも
のである。又、タイトフレームbは棟軒方向に間隔が隔
てられていて、金属屋根板1a,1bの接続強度を高め
難く、更に、金属屋根板1a,1bの接続箇所から容易
に雨水が浸入しやすいものである。However, in such a configuration, it is difficult to mount the tight frame b in a straight line with the purlin a, and the tight frame b is In many cases, when the tight frame b is displaced with respect to the direction perpendicular to the eaves direction, the metal shingle 1a
It is difficult to construct the building with linearity in the direction of the eaves. In addition, the tight frame b is spaced apart in the direction of the eaves, so that it is difficult to increase the connection strength of the metal shingles 1a, 1b, and furthermore, it is easy for rainwater to easily penetrate from the connection portion of the metal shingles 1a, 1b. It is.
【0004】一方、従来の瓦棒葺き屋根を金属屋根に葺
替えるのに際しては、既設の屋根材を剥がしておこなう
のであり、屋根の葺替えの手数が大幅に増え、コストも
大幅に高くなるものとなっていた。本発明はこのような
問題を解消しようとするものであり、金属屋根板を葺設
する場合の棟軒方向の直線性を出すための施工を容易に
おこなえながら接続強度及び接続箇所の水密性を大幅に
高めることができ、且つ、既設の屋根をそのままにして
新しい金属屋根板を簡単に葺設することができ、屋根の
葺替えを容易におこなえる金属屋根板の接続構造を提供
することを課題とする。[0004] On the other hand, when a conventional roof tile roof is replaced with a metal roof, the existing roof material is peeled off, and the number of steps required to replace the roof is greatly increased, and the cost is significantly increased. Had become. The present invention is intended to solve such a problem, and it is possible to easily perform the construction for obtaining linearity in the direction of the eaves in the case of laying a metal shingle while improving the connection strength and the watertightness of the connection portion. It is an object of the present invention to provide a connection structure of a metal roof shingle which can be greatly increased, and a new metal shingle can be easily laid while keeping an existing roof as it is, and the roof can be easily replaced. I do.
【0005】[0005]
【課題を解決するための手段】請求項1においては、屋
根の棟軒方向とは直交する方向に金属屋根板1,1を接
続する構造であって、屋根下地9に取付けられた断面略
逆U字状で棟軒方向に長い金属垂木2の頂面部3に棟軒
方向の全長にわたって芯出し溝7を形成し、金属垂木2
の両側部外面を受面4,4とし、金属屋根板1の両端部
に接続片5,5を起立させて形成し、接続片5に被受面
6を形成し、接続片5の上端から外方に略U字状の弾性
受片5aを形成し、キャップ12の両下端部には略逆U
字状の弾性変位片12aを折り曲げて形成し、受面4に
被受面6を面接させ、芯出し溝7に嵌合させるとともに
棟軒方向に間隔を隔てて金属垂木2の頂面部3の上に吊
子8を載置し、吊子8及び金属垂木2を貫通する固定具
23を屋根下地9に固定し、吊子8の両側部の逆U字状
の保持部10にて接続片5の弾性受片5aを保持するこ
とで被受面6を受面4に圧接し、かつ、弾性受片5aに
弾性変位片12aを弾接させることで弾性変位片12a
を接続片5に弾接させて被受面6を受面4に弾接させ、
吊子8から延出したキャップ支持片11にキャップ12
を支持して成ることを特徴とするものである。According to a first aspect of the present invention, there is provided a structure for connecting metal shingles 1 and 1 in a direction orthogonal to the direction of the eaves of a roof, wherein a cross section attached to a roof base 9 is substantially reversed. A centering groove 7 is formed on the top surface 3 of the U-shaped metal rafter 2 that is long in the eaves direction over the entire length in the eaves direction.
The outer surfaces of both sides of the metal roof plate 1 are formed as receiving surfaces 4 and 4, and connection pieces 5 and 5 are formed upright at both ends of the metal roofing plate 1. A receiving surface 6 is formed on the connection piece 5. Outer U-shaped elastic
A receiving piece 5a is formed, and both lower ends of the cap 12 are substantially inverted U
The resiliently displaceable piece 12a is bent and formed, and the receiving surface 4 is brought into contact with the receiving surface 6, is fitted into the centering groove 7, and the top surface 3 of the metal rafter 2 is spaced apart in the ridge direction. Fixing device on which the suspension 8 is placed and which penetrates the suspension 8 and the metal rafter 2
23 is fixed to the roof foundation 9, and the elastic receiving piece 5a of the connecting piece 5 is held by the inverted U-shaped holding portions 10 on both sides of the hanging member 8 .
With this, the receiving surface 6 is pressed against the receiving surface 4 and the elastic receiving piece 5a is
The elastic displacement piece 12a is elastically contacted with the elastic displacement piece 12a.
Is elastically contacted with the connecting piece 5 to make the received surface 6 elastically contact with the receiving surface 4,
The cap 12 is attached to the cap support piece 11 extending from the suspender 8.
Is supported.
【0006】請求項2においては、吊子8とキャップ支
持片11とを別体に形成し、吊子8に芯出し用溝13を
形成し、芯出し用溝13にキャップ支持片11を嵌合さ
せて成ることを特徴とするものである。 In the present invention, the hanging member 8 and the cap supporting piece 11 are formed separately, the centering groove 13 is formed in the hanging member 8, and the cap supporting piece 11 is fitted in the centering groove 13. It is characterized by being combined .
【0007】請求項3においては、既設の屋根の瓦棒1
4を覆って金属垂木2を屋根下地9に取付け、金属垂木
2に既設の屋根の上面で棟軒方向とは直交する方向に金
属屋根板1,1を接続して成ることを特徴とするもので
ある。 (作用) 請求項1においては、断面略逆U字状の金属垂木2の左
右の受面4,4に金属屋根板1,1の被受面6を当接さ
せて金属垂木2と金属屋根板1,1との位置決めをおこ
なうことができ、又、金属垂木2の頂面に形成した芯出
し溝7に棟軒方向に間隔を隔てて配した複数の吊子8…
の位置決めをおこなうことができ、このように、金属垂
木2に金属屋根板1,1と吊子8…の位置決めをおこな
うことができ、したがって、金属垂木2を棟軒方向に直
線性を出して取付けておけば、吊子8…によって金属屋
根板1,1を直線性を出して接続することができ、金属
屋根板1,1を直線性を出しておこなう施工を容易にお
こなえながら、このような接続は棟軒方向の全長にわた
っておこなわれるのであり、金属屋根板1,1の接続強
度及び接続箇所の水密性を大幅に高めることができる。
更に、吊子8の保持部10で金属屋根板1の弾性受片5
aを保持して被受面6を金属垂木2の受面4に圧接する
ことができ、又、弾性受片5aをキャップ12の弾性変
位片12aに弾接して弾性変位片12aによって接続片
5を押して被受面6を受面4に圧接することができ、金
属屋根板1の被受面6を金属垂木2の受面4に強力に圧
接させることができ、金属屋根板1,1の接続強度を高
めることができ、且つ、接続箇所の水密性を大幅に高め
ることができる。 In the third aspect , the roof rod 1 of the existing roof is provided.
4, a metal rafter 2 is attached to a roof base 9 and a metal roof plate 1, 1 is connected to the metal rafter 2 in a direction perpendicular to the eaves direction on the upper surface of the existing roof. It is. (Action) In claim 1, the receiving surfaces 6 of the metal roof plates 1, 1 are brought into contact with the left and right receiving surfaces 4, 4 of the metal rafter 2 having a substantially inverted U-shaped cross section, so that the metal rafter 2 and the metal roof A plurality of hangers 8 can be positioned with respect to the plates 1 and 1 and arranged in a centering groove 7 formed on the top surface of the metal rafter 2 at intervals in the ridge eaves direction.
Can be positioned, and thus the metal roofing plates 1, 1 and the hangers 8 can be positioned on the metal rafter 2, so that the metal rafter 2 can be straightened in the direction of the eaves. If installed, the metal roof slats 1 and 1 can be connected with linearity by means of the hooks 8..., And the construction of the metal roof slabs 1 and 1 with linearity can be easily performed. The connection is made over the entire length in the direction of the eaves, so that the connection strength of the metal shingles 1 and 1 and the watertightness of the connection points can be greatly increased.
Further, the elastic receiving piece 5 of the metal roof plate 1 is held by the holding portion 10 of the suspension 8.
Pressing the receiving surface 6 against the receiving surface 4 of the metal rafter 2 while holding a
Also, the elastic receiving piece 5a can be elastically deformed by the cap 12.
Connecting piece by elastic displacement piece 12a
5, the receiving surface 6 can be pressed against the receiving surface 4 by pressing
The receiving surface 6 of the metal roof plate 1 is strongly pressed against the receiving surface 4 of the metal rafter 2.
Can be in contact with each other, increasing the connection strength of the metal shingles 1,1
And greatly enhances the watertightness of the connection points
Can be
【0008】請求項2においては、吊子8を金属垂木2
の芯出し溝7に嵌合するとともに吊子8の芯出し用溝1
3にキャップ支持片11を嵌合させることで、結果とし
て、キャップ支持片11の芯出しを金属垂木2に基いて
おこなうことができ、キャップ支持片11にキャップ1
2を取付けることで、キャップ12を棟軒方向に直線性
を出しておこなう施工も容易におこなえる。[0008] In the second aspect, the hanging member 8 is connected to the metal rafter 2.
And the centering groove 1 of the suspension 8
As a result, the centering of the cap supporting piece 11 can be performed based on the metal rafter 2 by fitting the cap supporting piece 11 to the cap supporting piece 11.
By attaching 2, the construction in which the cap 12 is straightened in the direction of the eave can be easily performed.
【0009】[0009]
【0010】請求項3においては、断面略逆U字状の金
属垂木2にて既設の屋根の瓦棒14を覆うことができ、
既設の屋根はそのままで既設の屋根の上から屋根下地9
に固定した金属垂木2に金属屋根板1,1を接続でき、
屋根の葺替えを容易におこなえ、葺替えコストを低減す
ることができる。According to the third aspect, the roofing tile rod 14 can be covered with the metal rafter 2 having a substantially inverted U-shaped cross section.
Roof base 9 from the existing roof with the existing roof as it is
Metal roofing plates 1 and 1 can be connected to a metal rafter 2 fixed to
The roof can be easily replaced, and the replacement cost can be reduced.
【0011】[0011]
【発明の実施の形態】〔実施の形態1〕図1は断面図を
示している。図2(a)は金属垂木の側面図、同図
(b)は吊子の側面図、同図(c)はキャップ支持片の
側面図である。図3はキャップの側面図である。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS First Embodiment FIG. 1 is a sectional view. 2A is a side view of a metal rafter, FIG. 2B is a side view of a hook, and FIG. 2C is a side view of a cap supporting piece. FIG. 3 is a side view of the cap.
【0012】図2(a)は金属垂木2を示し、金属垂木
2は両脚部16,16を略鉛直方向に曲げた断面略逆U
字状にプレス成形したものであり、脚部16の外面に棟
軒方向に直線状に伸びる受面4,4を形成している。脚
部16の下端には押さえ片15を形成している。金属垂
木2の頂面部3に棟軒方向の全長にわたって芯出し溝7
を凹入させて形成している。芯出し溝7の底面部7aは
押さえ片15と略平行となり、底面部7aの両側に傾斜
側壁7b,7bを形成し、傾斜側壁7bの上端から上面
部7cを押さえ片15に略平行に形成している。このよ
うな芯出し溝7の形状は変更することができる。FIG. 2 (a) shows a metal rafter 2, which has a substantially U-shaped cross section obtained by bending both legs 16, 16 in a substantially vertical direction.
The receiving surfaces 4 and 4 are formed on the outer surface of the leg portion 16 and extend linearly in the direction of the eaves. A holding piece 15 is formed at a lower end of the leg 16. A centering groove 7 is provided on the top surface 3 of the metal rafter 2 over the entire length in the eave direction.
Are recessed. The bottom surface portion 7a of the centering groove 7 is substantially parallel to the holding piece 15, the inclined side walls 7b, 7b are formed on both sides of the bottom surface portion 7a, and the upper surface portion 7c is formed substantially parallel to the holding piece 15 from the upper end of the inclined side wall 7b. doing. The shape of such a centering groove 7 can be changed.
【0013】図2(b)は吊子8を示し、吊子8の底部
外面が芯出し溝7に合致する形状にプレス成形したもの
である。吊子8の表面には芯出し用溝13を形成してい
る。吊子8の両側部には逆U字状の保持部10を形成し
ている。図2(c)はキャップ支持片11を示し、下方
部分の外面は芯出し用溝13に合致する係合部17を形
成している。キャップ支持片11の両側端の上端には支
持部分18を形成している。ところで、キャップ支持片
11を吊子8に一体的に形成してもよく、又、別体に形
成したキャップ支持片11を吊子8に一体化してもよい
ものである。FIG. 2B shows the suspension 8, which is formed by press-molding the bottom outer surface of the suspension 8 into a shape matching the centering groove 7. A centering groove 13 is formed on the surface of the suspension 8. An inverted U-shaped holding portion 10 is formed on both sides of the suspension 8. FIG. 2C shows the cap support piece 11, and the outer surface of the lower portion forms an engaging portion 17 that matches the centering groove 13. Support portions 18 are formed at the upper ends of both ends of the cap support piece 11. By the way, the cap support piece 11 may be formed integrally with the hook 8, or the cap support piece 11 formed separately may be integrated with the hook 8.
【0014】図3はキャップ12を示し、棟軒方向の全
長にわたる長尺なものであり、全体形状は略逆U字状に
形成されている。キャップ12の両端の下部には略逆U
字状の弾性変位片12aを曲げて形成している。弾性変
位片12aには受片12bを形成している。金属屋根板
1は、平坦部19の両側に上方に接続片5を起立させて
いる。接続片5は下部から急傾斜部20と緩傾斜部21
と垂直に起立した垂直部22とから構成していて、垂直
部22の外面が被受面6となっている。垂直部22の上
部には内方に略U字状に曲げた弾性受片5aを形成して
いる。FIG. 3 shows the cap 12 which is long over the entire length in the direction of the eave and has an overall inverted U-shape. A substantially inverted U is provided at a lower portion of both ends of the cap 12.
The U-shaped elastic displacement piece 12a is formed by bending. A receiving piece 12b is formed on the elastic displacement piece 12a. The metal shingle 1 has the connection pieces 5 standing upright on both sides of the flat portion 19. The connecting piece 5 has a steep slope 20 and a gentle slope 21 from the bottom.
And an upright vertical part 22, and the outer surface of the vertical part 22 is the receiving surface 6. At the upper part of the vertical portion 22, an elastic receiving piece 5a bent inward into a substantially U-shape is formed.
【0015】しかして、断面略逆U字状の金属垂木2を
屋根下地9に棟軒方向とは直交する方向に間隔を隔てて
配し、金属垂木2の押さえ片15を屋根下地9(本実施
の形態では、既設の屋根板)の上に載せる。次に、金属
屋根板1の接続片5の被受面6を金属垂木2の受面4に
面接させる。金属垂木2の頂面に形成した芯出し溝7に
棟軒方向に間隔を隔てて吊子8…を載置する。又、キャ
ップ支持片11を吊子8の芯出し用溝13に係合させて
キャップ支持片11を吊子8に載置する。次に、ドリル
部を先端に備えたボルト23をねじ込んで、金属垂木2
に吊子8及びキャップ支持片11を取付ける。Thus, the metal rafters 2 having a substantially inverted U-shaped cross section are arranged on the roof base 9 at an interval in a direction perpendicular to the direction of the eaves. In the embodiment, it is mounted on an existing roof plate). Next, the receiving surface 6 of the connection piece 5 of the metal roof plate 1 is brought into contact with the receiving surface 4 of the metal rafter 2. On the centering groove 7 formed on the top surface of the metal rafter 2, suspenders 8 are placed at intervals in the direction of the eaves. Further, the cap support piece 11 is engaged with the centering groove 13 of the suspender 8 and the cap support piece 11 is placed on the suspender 8. Next, a bolt 23 having a drill portion at its tip is screwed into the metal rafter 2
The suspension 8 and the cap support piece 11 are attached to the fin.
【0016】この場合、吊子8の保持部10にて金属屋
根板1の弾性受片5aを保持して金属垂木2の左右の受
面4,4に金属屋根板1,1の被受面6,6を当接させ
て金属垂木2と金属屋根板1,1との位置決めをおこな
って金属屋根板1,1を金属垂木2に接続する。次に、
キャップ12の弾性変位片12aを金属屋根板1の弾性
受片5aの下面側に弾接させるとともにキャップ12の
下端部を緩傾斜部21に弾接させ、又、キャップ12の
主体部をキャップ支持片11の支持部分18にて受け
て、キャップ12をキャップ支持片11を介して吊子8
に取付けるのである。In this case, the elastic receiving piece 5a of the metal roof plate 1 is held by the holding portion 10 of the hanging member 8, and the left and right receiving surfaces 4, 4 of the metal rafter 2 are placed on the receiving surfaces of the metal roof plate 1, 1. The metal rafters 2 and the metal roofing plates 1 and 1 are positioned by bringing the metal rafters 6 and 6 into contact with each other, and the metal roofing plates 1 and 1 are connected to the metal rafters 2. next,
The elastic displacement piece 12a of the cap 12 is elastically contacted with the lower surface side of the elastic receiving piece 5a of the metal roof plate 1, and the lower end of the cap 12 is elastically contacted with the gentle inclined portion 21, and the main part of the cap 12 is supported by the cap. The cap 12 is received by the support portion 18 of the piece 11 and the cap 12 is
It is attached to.
【0017】このようにして、断面略逆U字状の金属垂
木2の左右の受面4,4に金属屋根板1,1の被受面
6,6を当接させて金属垂木2と金属屋根板1,1との
位置決めをおこない、又、金属垂木2の頂面に形成した
芯出し溝7に棟軒方向に間隔を隔てて配した複数の吊子
8…の位置決めをおこなうのであり、金属垂木2に金属
屋根板1,1と吊子8…の位置決めをおこなうのであ
る。したがって、金属垂木2を棟軒方向に直線性を出し
て取付けておけば、吊子8…によって金属屋根板1,1
を直線性を出して接続することができ、金属屋根板1,
1を直線性を出しておこなう施工を容易におこなえるの
であり、金属垂木2に金属屋根板1を強固に取付けるこ
とができるのである。In this manner, the receiving surfaces 6, 6 of the metal roof plates 1, 1 are brought into contact with the left and right receiving surfaces 4, 4 of the metal rafter 2 having a substantially inverted U-shaped cross section, so that the metal rafter 2 and the metal rafter 2 The positioning is performed with respect to the roof slats 1 and 1, and the positioning of the plurality of suspensions 8 arranged at intervals in the ridge eaves direction in the centering groove 7 formed on the top surface of the metal rafter 2. The metal rafters 2 are positioned with respect to the metal shingles 1, 1 and the hangers 8. Therefore, if the metal rafters 2 are installed with linearity in the direction of the eaves, the metal roof plates 1, 1
Can be connected in a straight line,
1 can be easily performed in a linear manner, and the metal roof plate 1 can be firmly attached to the metal rafter 2.
【0018】更に、吊子8を金属垂木2の芯出し溝7に
嵌合するとともに吊子8の芯出し用溝13にキャップ支
持片11を嵌合させることで、結果として、キャップ支
持片11の芯出しを金属垂木2に基いておこなうことが
でき、キャップ支持片11にキャップ12を取付けるこ
とで、キャップ12を棟軒方向に直線性を出しておこな
う施工も容易におこなえるのである。Further, the suspension 8 is fitted into the centering groove 7 of the metal rafter 2 and the cap supporting piece 11 is fitted into the centering groove 13 of the suspension rafter 2. The centering can be performed based on the metal rafters 2. By attaching the cap 12 to the cap support piece 11, it is possible to easily perform the construction in which the cap 12 is straightened in the direction of the eaves.
【0019】又、吊子8の保持部10で金属屋根板1の
弾性受片5aを保持して被受面6を金属垂木2の受面4
に圧接するのであり、更に、弾性受片5aをキャップ1
2の弾性変位片12aに弾接して弾性変位片12aによ
って接続片5を押して被受面6を受面4に圧接するので
あり、金属屋根板1の被受面6を金属垂木2の受面4に
強力に圧接させるのであり、金属屋根板1,1の接続強
度を高めるのである。併せて、接続箇所の水密性を大幅
に高めるのである。この場合、キャップ12の弾性変位
片12aと金属屋根板1の接続片5との間には、水切り
空間Sが形成されて、接続片5を雨水が伝い登るのを阻
止して、接続箇所への雨水の浸入を阻止するようにして
いる。Also, the elastic receiving piece 5a of the metal roof plate 1 is held by the holding portion 10 of the hanging member 8, and the receiving surface 6 is changed to the receiving surface 4 of the metal rafter 2.
The elastic receiving piece 5a is further pressed against the cap 1.
The elastic displacement piece 12a presses the connection piece 5 by the elastic displacement piece 12a and presses the receiving surface 6 against the receiving surface 4 by pressing the receiving surface 6 of the metal roof plate 1 with the receiving surface of the metal rafter 2 4, the connection strength of the metal shingles 1, 1 is increased. At the same time, the watertightness of the connection point is greatly improved. In this case, a drainage space S is formed between the elastic displacement piece 12a of the cap 12 and the connection piece 5 of the metal roof plate 1, and prevents rainwater from flowing up the connection piece 5 to the connection point. To prevent infiltration of rainwater.
【0020】ところで、本実施の形態においては、既設
の屋根の上に新設の金属屋根板1…を葺設するものであ
る。即ち、既設の屋根の瓦棒14の上方に断面略逆U字
状の金属垂木2を付設して瓦棒14を覆い、既設の屋根
はそのままで既設の屋根の上から屋根下地9に固定した
金属垂木2に金属屋根板1,1を接続でき、屋根の葺替
えを容易におこなえ、葺替えコストを低減することがで
きるのである。In the present embodiment, a new metal roof plate 1 is laid on an existing roof. That is, a metal rafter 2 having a substantially inverted U-shaped cross section is attached to the roof bar 14 of the existing roof to cover the roof bar 14, and the roof is fixed to the roof base 9 from the existing roof as it is. The metal roof boards 1 and 1 can be connected to the metal rafters 2 and the roof can be easily replaced, and the replacement cost can be reduced.
【0021】〔実施の形態2〕図4は実施の形態2の全
体断面図を示している。但し、本実施の形態の基本構成
は図1に示す実施の形態と共通であり、共通する部分に
ついては同一の符号を付して説明は省略する。本実施の
形態においては、キャップ12を弧状に形成したもので
ある。この場合、キャップ12はキャップ支持片11の
支持受片18,18にて支持されながら吊子8の保持部
10,10に弾接していて、キャップ12の支持力を高
めている。又、キャップ支持片11は角型のキャップ1
2用のものと兼用している。[Second Embodiment] FIG. 4 is an overall sectional view of a second embodiment. However, the basic configuration of this embodiment is the same as that of the embodiment shown in FIG. 1, and the common parts are denoted by the same reference numerals and description thereof is omitted. In the present embodiment, the cap 12 is formed in an arc shape. In this case, the cap 12 resiliently contacts the holding portions 10 of the suspender 8 while being supported by the support receiving pieces 18 of the cap support piece 11, thereby increasing the support force of the cap 12. The cap support piece 11 is a square cap 1.
Also used for 2
【0022】[0022]
【発明の効果】請求項1においては、屋根下地に取付け
られた断面略逆U字状で棟軒方向に長い金属垂木の頂面
部に棟軒方向の全長にわたって芯出し溝を形成し、金属
垂木の両側部外面を受面とし、金属屋根板の両端部に接
続片を起立させて形成し、接続片に被受面を形成し、受
面に被受面を面接させ、芯出し溝に嵌合させるとともに
棟軒方向に間隔を隔てて金属垂木の頂面部の上に吊子を
載置し、吊子及び金属垂木を貫通する固定具を屋根下地
に固定し、吊子の両側部の逆U字状の保持部にて接続片
の上端部を保持し、吊子から延出したキャップ支持片に
キャップを支持しているから、断面略逆U字状の金属垂
木の左右の受面に金属屋根板の被受面を当接させて金属
垂木と金属屋根板との位置決めをおこなうことができ、
又、金属垂木の頂面に形成した芯出し溝に棟軒方向に間
隔を隔てて配した複数の吊子の位置決めをおこなうこと
ができ、このように、金属垂木に金属屋根板と吊子の位
置決めをおこなうことができ、したがって、金属垂木を
棟軒方向に直線性を出して取付けておけば、吊子によっ
て金属屋根板を直線性を出して接続することができ、金
属屋根板を直線性を出しておこなう施工を容易におこな
え、且つ、このような接続は棟軒方向の全長にわたって
おこなわれるのであり、金属屋根板の接続強度及び接続
箇所の水密性を大幅に高めることができるという利点が
ある。更に、接続片の上端から外方に略U字状の弾性受
片を形成し、キャップの両下端部には略逆U字状の弾性
変位片を折り曲げて形成し、保持部にて接続片の上端部
を押さえて保持することで被受面を受面に圧接し、弾性
受片に弾性変位片を弾接させ、弾性変位片を接続片に弾
接させて被受面を受面に弾接させてあるから、吊子の保
持部で金属屋根板の弾性受片を保持して被受面を金属垂
木の受面に圧接することができ、又、弾性受片をキャッ
プの弾性変位片に弾接して弾性変位片によって接続片を
押して被受面を受面に圧接することができ、金属屋根板
の被受面を金属垂木の受面に強力に圧接させることがで
き、金属屋根板の接続強度を高めることができ、且つ、
接続箇所の水密性を大幅に高めることができるという利
点がある。 According to the first aspect of the present invention, a centering groove is formed on a top surface of a metal rafter having a substantially inverted U-shaped cross section attached to a roof base and extending in a ridge direction over the entire length in the ridge direction. The outer surfaces of both sides are the receiving surfaces, the connecting pieces are formed upright at both ends of the metal roof plate, the receiving surface is formed on the connecting pieces, the receiving surface is in contact with the receiving surface, and the centering groove is fitted. Place the suspension on the top of the metal rafter with a gap in the direction of the eaves, fix the suspension and the fixture that penetrates the metal rafter to the roof base, and reverse the sides of the suspension. Since the upper end of the connecting piece is held by the U-shaped holding portion and the cap is supported by the cap supporting piece extending from the hook, the cap is supported on the left and right receiving surfaces of the metal rafter having a substantially inverted U-shaped cross section. The metal rafter and the metal roof plate can be positioned by contacting the receiving surface of the metal roof plate,
In addition, it is possible to position a plurality of suspension members arranged at intervals in the direction of the eaves in the centering groove formed on the top surface of the metal rafter. Positioning can be performed, so if a metal rafter is installed with linearity in the direction of the eaves, it can be connected with a metal roof shingle by means of a hanger, and the metal roof shingle can be straightened. The construction has the advantage that the connection is made over the entire length of the building eaves, and the connection strength of the metal shingle and the watertightness of the connection point can be greatly increased. is there. Further, a substantially U-shaped elastic receiving member is provided outwardly from the upper end of the connection piece.
A piece is formed, and both lower ends of the cap have a substantially inverted U-shaped elasticity.
The displacement piece is formed by bending it, and the upper end of the connection piece is
By pressing and holding, the receiving surface is pressed against the receiving surface,
The elastic displacement piece is elastically contacted with the receiving piece, and the elastic displacement piece is elastically
Since the receiving surface is in elastic contact with the receiving surface,
Hold the elastic receiving piece of the metal roof plate with the
It can be pressed against the wooden receiving surface, and the elastic
Elastic contact with the elastic displacement piece of the
Pressing can press the receiving surface against the receiving surface,
The receiving surface of the metal rafter can be strongly pressed against the receiving surface of the metal rafter.
Can increase the connection strength of the metal shingle, and
The advantage that the watertightness of the connection point can be greatly improved
There is a point.
【0023】請求項2においては、吊子とキャップ支持
片とを別体に形成し、吊子に芯出し用溝を形成し、芯出
し用溝にキャップ支持片を嵌合させてあるから、吊子を
金属垂木の芯出し溝に嵌合するとともに吊子の芯出し用
溝にキャップ支持片を嵌合させることで、結果として、
キャップ支持片の芯出しを金属垂木に基いておこなうこ
とができ、キャップ支持片にキャップを取付けること
で、キャップを棟軒方向に直線性を出しておこなう施工
も容易におこなえるという利点がある。According to the second aspect, the hanging member and the cap supporting piece are formed separately, the centering groove is formed in the hanging member, and the cap supporting piece is fitted in the centering groove. By fitting the suspension into the centering groove of the metal rafter and fitting the cap support piece into the centering groove of the suspension, as a result,
The centering of the cap support piece can be performed based on a metal rafter, and by attaching the cap to the cap support piece, there is an advantage that the construction in which the cap is straightened in the direction of the eaves can be easily performed.
【0024】[0024]
【0025】請求項3においては、既設の屋根の瓦棒を
覆って金属垂木を屋根下地に取付け、金属垂木に既設の
屋根の上面で棟軒方向とは直交する方向に金属屋根板を
接続してあるから、断面略逆U字状の金属垂木にて既設
の屋根の瓦棒を覆うことができ、既設の屋根はそのまま
で既設の屋根の上から屋根下地に固定した金属垂木に金
属屋根板を接続でき、屋根の葺替えを容易におこなえ、
葺替えコストを低減することができるという利点があ
る。According to a third aspect of the present invention, a metal rafter is attached to a roof foundation so as to cover a tile rod of an existing roof, and a metal roof plate is connected to the metal rafter on a top surface of the existing roof in a direction orthogonal to a ridge direction. Therefore, the roof tiles of the existing roof can be covered with a metal rafter having a substantially inverted U-shaped cross section, and the metal roof plate is fixed to the metal rafter fixed to the roof base from the existing roof while leaving the existing roof as it is. Can be connected and the roof can be easily replaced,
There is an advantage that the cost of roofing can be reduced.
【図1】本発明の実施の一形態を示す断面図である。FIG. 1 is a cross-sectional view showing one embodiment of the present invention.
【図2】(a)は金属垂木の側面図、(b)は吊子の側
面図、(c)はキャップ支持片の側面図である。2A is a side view of a metal rafter, FIG. 2B is a side view of a hook, and FIG. 2C is a side view of a cap supporting piece.
【図3】キャップの側面図である。FIG. 3 is a side view of the cap.
【図4】実施の形態2を示し、(a)は断面図、(b)
はキャップの側面図である。4A and 4B show a second embodiment, in which FIG. 4A is a cross-sectional view and FIG.
Is a side view of the cap.
【図5】従来例の破断した斜視図である。FIG. 5 is a cutaway perspective view of a conventional example.
1 金属屋根板 2 金属垂木 3 頂面部 4 受面 5 接続片 6 被受面 7 芯出し溝 8 吊子 9 屋根下地 10 保持部 11 キャップ支持片 12 キャップ 13 芯出し用溝 14 瓦棒 REFERENCE SIGNS LIST 1 metal roof plate 2 metal rafter 3 top surface 4 receiving surface 5 connecting piece 6 receiving surface 7 centering groove 8 suspension 9 roof base 10 holding portion 11 cap support piece 12 cap 13 centering groove 14 tile rod
───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.7,DB名) E04D 3/00 - 3/40 ──────────────────────────────────────────────────続 き Continued on the front page (58) Field surveyed (Int.Cl. 7 , DB name) E04D 3/00-3/40
Claims (3)
屋根板を接続する構造であって、屋根下地に取付けられ
た断面略逆U字状で棟軒方向に長い金属垂木の頂面部に
棟軒方向の全長にわたって芯出し溝を形成し、金属垂木
の両側部外面を受面とし、金属屋根板の両端部に接続片
を起立させて形成し、接続片に被受面を形成し、接続片
の上端から外方に略U字状の弾性受片を形成し、キャッ
プの両下端部には略逆U字状の弾性変位片を折り曲げて
形成し、受面に被受面を面接させ、芯出し溝に嵌合させ
るとともに棟軒方向に間隔を隔てて金属垂木の頂面部の
上に吊子を載置し、吊子及び金属垂木を貫通する固定具
を屋根下地に固定し、吊子の両側部の逆U字状の保持部
にて接続片の弾性受片を保持することで被受面を受面に
圧接し、かつ、弾性受片に弾性変位片を弾接させること
で弾性変位片を接続片に弾接させて被受面を受面に弾接
させ、吊子から延出したキャップ支持片にキャップを支
持して成ることを特徴とする金属屋根板の接続構造。1. A structure in which a metal shingle is connected in a direction orthogonal to a direction of a ridge of a roof, and a top surface of a metal rafter that is attached to a roof base and has a substantially inverted U-shaped cross section and is long in the direction of a ridge. A centering groove is formed over the entire length of the eaves in the eaves direction, the outer surfaces of both sides of the metal rafter are used as receiving surfaces, connection pieces are formed upright at both ends of the metal roof plate, and a receiving surface is formed on the connection pieces. , Connection piece
A substantially U-shaped elastic receiving piece is formed outward from the upper end of the
At the both lower ends of the loop, a substantially inverted U-shaped elastic displacement piece is bent.
Formed, the receiving surface is in contact with the receiving surface, fitted in the centering groove, and the suspension is placed on the top of the metal rafter at an interval in the eaves direction, and the suspension and the metal rafter are removed. Fix the penetrating fixture to the base of the roof, and hold the elastic receiving piece of the connecting piece with the inverted U-shaped holding parts on both sides of the hook to make the receiving surface a receiving surface.
Pressing and elastically contacting the elastic displacement piece with the elastic receiving piece
To make the elastic displacement piece elastically contact the connecting piece and make the received surface elastically contact the receiving surface.
A metal roof shingle connection structure, wherein a cap is supported by a cap support piece extending from a hook.
し、吊子に芯出し用溝を形成し、芯出し用溝にキャップ
支持片を嵌合させて成ることを特徴とする請求項1記載
の金属屋根板の接続構造。2. The hanging member and the cap supporting piece are formed separately, a centering groove is formed in the hanging member, and the cap supporting piece is fitted into the centering groove. Item 2. A connection structure for a metal shingle according to Item 1.
根下地に取付け、金属垂木に既設の屋根の上面で棟軒方
向とは直交する方向に金属屋根板を接続して成ることを
特徴とする請求項1記載の金属屋根板の接続構造。3. A metal rafter covering a roof tile of an existing roof.
Attached to the groundwork, metal rafters on the top of the existing roof
That the metal shingles are connected in a direction orthogonal to the
The connection structure for a metal shingle according to claim 1, wherein:
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP9357200A JP3064260B2 (en) | 1997-12-25 | 1997-12-25 | Connection structure of metal shingles |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP9357200A JP3064260B2 (en) | 1997-12-25 | 1997-12-25 | Connection structure of metal shingles |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH11181971A JPH11181971A (en) | 1999-07-06 |
| JP3064260B2 true JP3064260B2 (en) | 2000-07-12 |
Family
ID=18452906
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP9357200A Expired - Fee Related JP3064260B2 (en) | 1997-12-25 | 1997-12-25 | Connection structure of metal shingles |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3064260B2 (en) |
-
1997
- 1997-12-25 JP JP9357200A patent/JP3064260B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JPH11181971A (en) | 1999-07-06 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US5577360A (en) | Slate mounting system | |
| JP3064260B2 (en) | Connection structure of metal shingles | |
| JP2633003B2 (en) | Thatched roof structure | |
| JPS6023377Y2 (en) | building surface structure | |
| JP2898255B2 (en) | Roof | |
| JPH0718817Y2 (en) | Mounting structure for metal roof plate | |
| JPH01304248A (en) | Roofing structure of building | |
| JPH01207555A (en) | Longitudinally thatched roofing construction | |
| JP3042756B2 (en) | Flat enclosure | |
| JP2000154619A (en) | Fixed structure of corner ridge tile and draining board used for this | |
| KR200187234Y1 (en) | Main ridge flashing construction of building roof | |
| JPH08312071A (en) | Panel supporting member | |
| JPS61200249A (en) | Inlaid outer enclosure | |
| JP3083477U (en) | Rafter mounting bracket | |
| JPS6143876Y2 (en) | ||
| JP2017043926A (en) | Verge structure | |
| JPS6020742Y2 (en) | Substructure of ridge ridge | |
| JPS61134461A (en) | Fixing of batten | |
| JP3206249B2 (en) | Roofing structure using flat roof tiles | |
| JPH01299946A (en) | Longitudinal thatching of bar-shaped slate roof | |
| JPH0340965Y2 (en) | ||
| JPH0538178Y2 (en) | ||
| JPH05187099A (en) | Thatched roof | |
| JPH1054113A (en) | Roof plate | |
| JPS6023544A (en) | Traverse covering outer enclosure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20000404 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| LAPS | Cancellation because of no payment of annual fees |