JP3074945B2 - Pipe replacement method and pipe replacement device in roving machine - Google Patents
[go: Go Back, main page]

JP3074945B2 - Pipe replacement method and pipe replacement device in roving machine - Google Patents

Pipe replacement method and pipe replacement device in roving machine

Info

Publication number
JP3074945B2
JP3074945B2 JP04192526A JP19252692A JP3074945B2 JP 3074945 B2 JP3074945 B2 JP 3074945B2 JP 04192526 A JP04192526 A JP 04192526A JP 19252692 A JP19252692 A JP 19252692A JP 3074945 B2 JP3074945 B2 JP 3074945B2
Authority
JP
Japan
Prior art keywords
bobbin
roving machine
rail
arm
empty
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP04192526A
Other languages
Japanese (ja)
Other versions
JPH0641827A (en
Inventor
寿男 森下
克己 中根
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toyota Industries Corp
Original Assignee
Toyota Industries Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toyota Industries Corp filed Critical Toyota Industries Corp
Priority to JP04192526A priority Critical patent/JP3074945B2/en
Publication of JPH0641827A publication Critical patent/JPH0641827A/en
Application granted granted Critical
Publication of JP3074945B2 publication Critical patent/JP3074945B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Spinning Or Twisting Of Yarns (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は上部支持式のフライヤを
装備した粗紡機における管替方法及び管替装置に関する
ものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a pipe changing method and a pipe changing apparatus for a roving machine equipped with a top-supported flyer.

【0002】[0002]

【従来の技術】近年、粗紡機では生産性の向上を図るた
めに、高速化及びラージパッケージ化の傾向が著しい。
従って、満ボビンをボビンレールから取出す玉揚作業
と、代わって空ボビンをボビンホイールに挿入する作業
は、作業者にとってかなりの重労働(特に玉揚作業)と
なるばかりでなく、作業に要する時間が長くなって粗紡
機の稼動効率を低下させることになる。このため玉揚作
業及びその後の空ボビン供給をも含めた管替作業の自動
化について種々の提案がなされている。
2. Description of the Related Art In recent years, there has been a remarkable tendency in roving machines to achieve higher speeds and large packages in order to improve productivity.
Therefore, the doffing operation of removing the full bobbin from the bobbin rail and the operation of inserting an empty bobbin into the bobbin wheel instead require not only a considerable amount of labor (especially doffing operation) but also the time required for the operation. This will increase the operating efficiency of the roving machine. For this reason, various proposals have been made regarding automation of the pipe replacement operation including the doffing operation and the subsequent supply of the empty bobbin.

【0003】従来、この種の管替装置として例えば、特
公昭63−61414号公報には図31〜図33に示す
装置が提案されている。この管替装置80は粗紡機81
の前方にその機台全長にわたって配設されている。管替
装置80は粗紡機81のボビンと対向して千鳥状に配置
された管替腕82と、管替腕82を前進、後退させる管
替腕前後動機構83と、管替腕82を昇降動させる管替
腕昇降機構84とを備えている。管替腕前後動機構83
は管替腕昇降機構84に連結された管替ヘッド85に装
備されている。管替腕82の下方には、粗紡機81のボ
ビン前後間隔と同一で且つ粗紡機81の各ボビンと対向
する位置にそれぞれ前後2個ずつペッグ86aが並設さ
れたぺッグコンベア86が配設されている。管替ヘッド
85の上面はカバーで覆われ、図31に実線で示すよう
に管替腕82が最下降位置に配置された状態では、カバ
ーがペッグコンベア86を覆って踏台として使用可能と
なっている。
[0003] Conventionally, for example, Japanese Patent Publication No. 63-61414 has proposed an apparatus shown in FIGS. The pipe changer 80 is a roving machine 81
In front of the entire length of the machine. The tube changing device 80 includes a tube changing arm 82 arranged in a zigzag manner facing the bobbin of the roving machine 81, a tube changing arm longitudinal movement mechanism 83 for moving the tube changing arm 82 forward and backward, and raising and lowering the tube changing arm 82. And a tube replacement arm elevating mechanism 84 for moving. Replacement arm longitudinal movement mechanism 83
Is mounted on a replacement head 85 connected to a replacement arm lifting mechanism 84. Below the transfer arm 82, a peg conveyor 86 in which two front and rear pegs 86a are arranged at the same position as the front and rear bobbin intervals of the roving frame 81 and opposed to each bobbin of the roving frame 81 is arranged. ing. The upper surface of the tube replacement head 85 is covered with a cover, and in a state where the tube replacement arm 82 is located at the lowest position as shown by a solid line in FIG. 31, the cover can be used as a step over the peg conveyor 86. I have.

【0004】この装置で管替え作業を行う場合は、満管
となる前に管替ヘッド85が図31に鎖線で示すように
最上昇位置に配置される。その状態でペッグコンベア8
6が駆動されるとともにその一端で空ボビンが順次ぺッ
グ86a上に供給され、図32(a)に示すように粗紡
機81の各満ボビンFと対向する位置に空ボビンEが配
置される。そして、満管により粗紡機81が停止した
後、管替腕前後動機構83及び管替腕昇降機構84の作
動により満ボビンFがボビンレール87上からペッグコ
ンベア86上へ玉揚され、ペッグコンベア86上の空ボ
ビンEがボビンレール87上に載置される。
When a pipe replacement operation is performed by this apparatus, the pipe replacement head 85 is arranged at the highest position as indicated by a chain line in FIG. Peg conveyor 8 in that state
6 is driven, and at one end, empty bobbins are sequentially supplied onto the pegs 86a. As shown in FIG. 32 (a), empty bobbins E are arranged at positions facing each full bobbin F of the roving machine 81. You. Then, after the roving machine 81 is stopped due to full filling, the full bobbin F is doffed from the bobbin rail 87 onto the peg conveyor 86 by the operation of the tube exchanging arm longitudinal movement mechanism 83 and the tube exchanging arm elevating mechanism 84, and the peg conveyor The empty bobbin E on 86 is placed on the bobbin rail 87.

【0005】又、特開昭58−119562号公報には
図34に示す装置が提案されている。この装置は粗紡機
81の上方に機台長手方向(紙面に垂直方向)と直交す
るようにレール88が配設され、レール88に沿って移
動可能にクレーン89が設けられている。クレーン89
には粗紡機81の全長とほぼ同じ長さの搬送レール9
0,91が機台と平行に延び、かつ昇降装置92,93
によりそれぞれ独立して昇降可能に設けられている。搬
送レール90,91にはボビンハンガ94が粗紡機81
のボビンピッチで1列に列設されたキャリッジ(図示せ
ず)が配設されている。又、粗紡機81の前側には管替
機95が図34に示す待機位置と、当該位置から前進し
た粗紡機81に近接する作業位置との間を移動可能に配
置されている。
Japanese Patent Application Laid-Open No. 58-119562 proposes an apparatus shown in FIG. In this apparatus, a rail 88 is disposed above a roving machine 81 so as to be orthogonal to the machine base longitudinal direction (perpendicular to the paper surface), and a crane 89 is provided movably along the rail 88. Crane 89
Has a transport rail 9 having substantially the same length as the entire length of the roving machine 81.
0, 91 extend parallel to the machine base, and elevating devices 92, 93
Are provided so as to be independently movable up and down. A bobbin hanger 94 is provided on the transport rails 90 and 91 by the roving machine 81.
The carriages (not shown) are arranged in one row at the bobbin pitch. On the front side of the roving machine 81, a tube changing machine 95 is disposed so as to be movable between a standby position shown in FIG. 34 and a working position close to the roving machine 81 advanced from the position.

【0006】そして、管替え作業時には第1の搬送レー
ル90が待機位置の管替機95の管替腕82と対向する
位置にクレーン89が移動配置される。この状態で管替
機95が作業位置に前進移動して、ボビンレール87上
の満ボビンFを管替腕82に吊架した後、待機位置まで
後退するとともに管替腕82を1列に配列する。次に昇
降装置92が作動して第1の搬送レール90が下降す
る。そして、満ボビンFがボビンハンガ94に吊架され
た後、搬送レール90が上昇して元の位置に復帰する。
次にボビンハンガ94に空ボビンEが吊架された第2の
搬送レール91が管替腕82の先端と対向する位置まで
クレーン89が移動され、昇降装置93が作動して第2
の搬送レール91が下降する。そして、空ボビンEが管
替腕82に受け渡された後、第2の搬送レール91が上
昇して元の位置に復帰する。次に管替機95が作業位置
に移動し、空ボビンEをボビンレール87上に載置した
後、待機位置に復帰して管替作業が完了する。
At the time of the pipe change operation, the crane 89 is moved and arranged at a position where the first transfer rail 90 faces the pipe change arm 82 of the pipe changer 95 at the standby position. In this state, the refilling machine 95 moves forward to the working position, suspends the full bobbin F on the bobbin rail 87 on the refilling arm 82, then retreats to the standby position and arranges the refilling arm 82 in a line. I do. Next, the elevating device 92 operates to lower the first transport rail 90. Then, after the full bobbin F is hung on the bobbin hanger 94, the transport rail 90 rises and returns to the original position.
Next, the crane 89 is moved to a position where the second transfer rail 91 on which the empty bobbin E is suspended on the bobbin hanger 94 is opposed to the tip of the replacement arm 82, and the elevating device 93 is operated to operate the second crane 89.
Is lowered. Then, after the empty bobbin E is transferred to the replacement arm 82, the second transport rail 91 rises and returns to the original position. Next, the refilling machine 95 moves to the work position, places the empty bobbin E on the bobbin rail 87, and then returns to the standby position to complete the refilling work.

【0007】[0007]

【発明が解決しようとする課題】特公昭63−6141
4号公報に記載の装置では、管替ヘッド85の上面がカ
バーで覆われて管替作業時以外は踏台として使用可能で
あり、管替ヘッド85の上面を作業通路として使用でき
る。しかし、管替作業時以外にも、粗紡機81が満管に
近づき空ボビンEをぺッグコンベア86でボビンホイー
ルと対応する位置に搬入する間及び、ぺッグコンベア8
6上に玉揚げされた満ボビンFの搬出が完了するまでの
間は管替ヘッド85がその下方を空ボビンEあるいは満
ボビンFが通過可能な位置まで上昇している。従って、
その間は管替ヘッド85が邪魔になって粗紡機81の再
起動時の粗糸の自動巻付けミスの修復作業や粗糸切れ補
修作業ができないという問題がある。そして、空ボビン
Eの搬入及び満ボビンFの搬出に要する時間は管替作業
時間よりずっと長い。
[Problems to be Solved by the Invention] JP-B-63-6141
In the device described in Japanese Patent Application Publication No. 4 (1994), the upper surface of the tube replacement head 85 is covered with a cover and can be used as a stepping plate except during tube replacement work, and the upper surface of the tube replacement head 85 can be used as a work passage. However, besides the time of the pipe change operation, while the roving machine 81 approaches the full tube and carries the empty bobbin E to the position corresponding to the bobbin wheel by the peg conveyor 86, and the peg conveyor 8
Until the unloading of the full bobbin F doffed on 6 is completed, the refilling head 85 has moved up to a position where the empty bobbin E or the full bobbin F can pass below. Therefore,
During that time, there is a problem that the pipe replacement head 85 hinders the operation of repairing a mistake in automatic winding of roving when the roving machine 81 is restarted and the work of repairing roving breakage. The time required to carry in the empty bobbin E and carry out the full bobbin F is much longer than the time required for the pipe replacement operation.

【0008】又、管替え作業時にぺッグコンベア86を
管替腕前後動機構83及び管替腕昇降機構84の作動と
連係して往復作動させることにより、ぺッグコンベア8
6のぺッグ86aに装着された空ボビンE又は満ボビン
Fと、管替腕82に吊架された満ボビンF又は空ボビン
Eとが干渉しないようにしている。例えば、図32
(a)に示すように管替腕82がボビンレール87上の
満ボビンFを吊架した状態から、管替腕前後動機構83
が作動されて後列の管替腕82に吊架された満ボビンF
がぺッグコンベア86の中央と対応する位置まで移動さ
れる。その状態でぺッグコンベア86が図32(b)の
左方へぺッグ86aの1ピッチ分移動された後、再び管
替腕前後動機構83が作動されて各満ボビンFがぺッグ
コンベア86のぺッグ86aと対向する位置に配置され
た図33の状態となる。又、ぺッグコンベア86上の空
ボビンEをボビンレール87上に載置する場合も、管替
腕前後動機構83が間欠的に作動されるとともにぺッグ
コンベア86が駆動される。
[0008] In addition, by performing reciprocating operation of the peg conveyor 86 in conjunction with the operation of the exchanging arm back and forth movement mechanism 83 and the evacuation arm raising and lowering mechanism 84 during the pipe changing operation, the peg conveyor 8 can be moved.
The empty bobbin E or the full bobbin F attached to the peg 86a of No. 6 does not interfere with the full bobbin F or the empty bobbin E suspended from the replacement arm 82. For example, FIG.
As shown in (a), the pipe replacement arm 82 is suspended from the full bobbin F on the bobbin rail 87, and then the pipe replacement arm longitudinal movement mechanism 83
Is activated and the full bobbin F suspended from the pipe replacement arm 82 in the rear row
Is moved to a position corresponding to the center of the peg conveyor 86. In this state, the peg conveyor 86 is moved to the left in FIG. 32 (b) by one pitch of the peg 86a, and then the replacement arm back-and-forth movement mechanism 83 is actuated again, so that each full bobbin F is moved to the peg conveyor 86. The state shown in FIG. 33 is arranged at a position facing the pea 86a. Also, when the empty bobbin E on the peg conveyor 86 is placed on the bobbin rail 87, the pipe replacement arm longitudinal movement mechanism 83 is intermittently operated and the peg conveyor 86 is driven.

【0009】ところが、管替腕82が満ボビンFをぺッ
グコンベア86のぺッグ86a上に載置する際、満ボビ
ンFが傾いた状態で載置される場合がある。その場合、
空ボビンEと満ボビンFとの隙間が僅かなため、管替腕
82に空ボビンEを吊架してボビンレール87上まで移
動させる際に、空ボビンEが当該満ボビンFと接触し、
空ボビンEが管替腕82から脱落してトラブルとなると
いう問題がある。
However, when the replacement arm 82 places the full bobbin F on the peg 86a of the peg conveyor 86, the full bobbin F may be placed in an inclined state. In that case,
Since the gap between the empty bobbin E and the full bobbin F is small, the empty bobbin E comes into contact with the full bobbin F when suspending the empty bobbin E on the replacement arm 82 and moving it on the bobbin rail 87,
There is a problem that the empty bobbin E falls off the replacement arm 82 and causes a trouble.

【0010】一方、特開昭58−119562号公報の
装置では、管替え作業時以外は管替機95が待機位置に
配置され、粗紡機81と管替機95との間には作業通路
が確保される。しかし、管替機の配置スペースの他に作
業通路としての余分なスペースを確保する必要があると
いう問題がある。又、満ボビンF及び空ボビンEの搬送
用にそれぞれ独立した搬送レール90,91を設ける必
要があり装置が大型化するという問題がある。
On the other hand, in the apparatus disclosed in Japanese Patent Application Laid-Open No. 58-119562, the exchanging machine 95 is arranged at a standby position except during the exchanging operation, and a work passage is provided between the roving machine 81 and the exchanging machine 95. Secured. However, there is a problem that it is necessary to secure an extra space as a work passage in addition to the arrangement space for the refilling machine. In addition, it is necessary to provide independent transfer rails 90 and 91 for transferring the full bobbin F and the empty bobbin E, and there is a problem that the apparatus becomes large.

【0011】本発明は前記の問題点に鑑みてなされたも
のであって、その目的は管替装置と粗紡機との間に作業
通路用のスペースを確保しなくても、粗紡機の運転時に
は常に粗紡機機台の前側で作業が可能な状態となり、機
台再起動時の粗糸の自動巻付けミスの修復作業や粗糸切
れ補修作業等を支障なく行うことができ、しかも満ボビ
ンF及び空ボビンEの搬送用にそれぞれ独立した搬送レ
ールを設ける必要のない粗紡機の管替方法及び管替装置
を提供することにある。
SUMMARY OF THE INVENTION The present invention has been made in view of the above-mentioned problems, and has as its object the purpose of operating a roving machine even when a space for a work passage is not provided between the re-pitching device and the roving machine. It is always possible to work on the front side of the roving machine stand, and it is possible to perform the work of repairing the automatic winding of the roving yarn when the machine is restarted and the repair work of the roving yarn breakage without any trouble. It is another object of the present invention to provide a roving machine tube changing method and a tube changing device that do not need to provide independent transfer rails for transferring an empty bobbin E.

【0012】[0012]

【課題を解決するための手段】前記の目的を達成するた
め請求項1に記載の管替方法では、上部支持式のフライ
ヤを装備した粗紡機の前側に、粗紡機のボビンホイール
ピッチと同じピッチで配設した管替腕を粗紡機に対して
前進、後退させる管替腕前後動手段と、管替腕を昇降さ
せる管替腕昇降手段とを備えた管替装置を配設し、粗紡
機の上方において粗紡機に沿って配設したレール上に、
少なくとも粗紡機1台分の空ボビンをボビンホイールピ
ッチと同じピッチで吊架したボビンハンガを備えたボビ
ン搬送体を待機させ、管替装置の作動によりボビン搬送
体上の空ボビンをボビンハンガから取り外すとともに前
記管替腕の移動範囲と対向する所定位置に配設されたぺ
ッグ上に一時的に移載し、次にボビンレール上の満ボビ
ンを管替腕に吊架して粗紡機の前側に移動させるととも
に空ボビンが取り外されたボビンハンガに吊架し、次に
前記ぺッグ上に一時的に移載した空ボビンをボビンレー
ル上のボビンホイールに装着するようにした。
According to a first aspect of the present invention, there is provided a pipe replacement method, wherein the same pitch as the bobbin wheel pitch of the roving machine is provided on the front side of the roving machine equipped with an upper supporting flyer. A roving machine provided with a pipe changing arm for moving the pipe changing arm forward and backward with respect to the roving machine, and a pipe changing arm elevating means for raising and lowering the pipe changing arm; On the rails arranged along the roving machine above
A bobbin carrier provided with a bobbin hanger in which at least one roving bobbin is hung at the same pitch as the bobbin wheel pitch is made to stand by. Temporarily transfer on a peg arranged at a predetermined position opposite to the movement range of the arm, and then move the full bobbin on the bobbin rail to the transfer arm and move it to the front side of the roving machine At the same time, the empty bobbin was suspended on a bobbin hanger from which the empty bobbin was removed, and then the empty bobbin temporarily transferred onto the above-mentioned peg was mounted on a bobbin wheel on a bobbin rail.

【0013】又、請求項2に記載の管替方法では、上部
支持式のフライヤを装備した粗紡機の前側に、粗紡機の
ボビンホイールピッチと同じピッチで配設した管替腕を
粗紡機に対して前進、後退させる管替腕前後動手段と、
管替腕を昇降させる管替腕昇降手段とを備えた管替装置
を配設し、粗紡機の上方において粗紡機に沿って配設し
たレール上に、少なくとも粗紡機1台分の空ボビンをボ
ビンホイールピッチと同じピッチで吊架したボビンハン
ガを備えたボビン搬送体を待機させ、管替装置の作動に
よりボビンレール上の満ボビンを管替腕に吊架して粗紡
機の前側に移動させるとともに前記管替腕の移動範囲と
対向する所定位置に配設されたぺッグ上に一時的に移載
し、次にボビン搬送体上の空ボビンをボビンハンガから
取り外すとともに満ボビンが取り外されたボビンレール
上のボビンホイールに装着し、次に前記ぺッグ上に一時
的に移載した満ボビンを空ボビンが取り外されたボビン
ハンガに吊架するようにした。
[0013] According to a second aspect of the present invention, in the roving machine, a rotatable arm provided at the same pitch as the bobbin wheel pitch of the roving machine is provided in front of the roving machine equipped with an upper supporting flyer. A replacement arm forward and backward moving means for moving forward and backward,
A pipe replacement device having a pipe replacement arm elevating means for raising and lowering the pipe replacement arm is provided, and an empty bobbin for at least one roving machine is provided on a rail provided along the roving machine above the roving machine. A bobbin carrier with a bobbin hanger suspended at the same pitch as the bobbin wheel pitch is made to stand by, and a full bobbin on the bobbin rail is suspended by the operation of the tube changing device and moved to the front side of the roving machine while being hung on the tube changing arm. On the bobbin rail from which the bobbin rail is removed, the empty bobbin on the bobbin transporter is removed from the bobbin hanger, and the bobbin rail is removed from the bobbin rail. The bobbin wheel was mounted on the bobbin wheel, and then the full bobbin temporarily transferred on the above-mentioned peg was suspended on the bobbin hanger from which the empty bobbin was removed.

【0014】又、請求項3に記載の管替装置では上部支
持式のフライヤを装備した粗紡機の上方において粗紡機
に沿って配設されたレールと、前記レールに沿って移動
可能に配設され、少なくとも粗紡機のボビンホイールと
同数のボビンハンガをボビンホイールピッチと同じピッ
チで吊架したボビン搬送体と、粗紡機の前側に粗紡機の
ボビンホイールピッチと同じピッチで配設され、ボビン
を保持可能な多数の管替腕と、前記管替腕を粗紡機に対
して前進、後退させる管替腕前後動手段と、前記管替腕
を管替腕前後動手段とともに昇降させる昇降手段と、前
記管替腕の移動範囲と対向する所定位置にボビンホイー
ルピッチと同じピッチで配設され、前記搬送体から取り
外された空ボビン又はボビンレールから取り出された満
ボビンを一時的に載置するためのぺッグとを備えた。
According to a third aspect of the present invention, there is provided a tube changing device which is provided along a roving machine above a roving machine equipped with an upper support type flyer, and which is movable along the rail. A bobbin carrier in which at least the same number of bobbin hangers as the bobbin wheels of the roving machine are suspended at the same pitch as the bobbin wheel pitch, and a bobbin wheel is disposed at the front side of the roving machine at the same pitch as the bobbin wheel pitch of the roving machine. A large number of possible replacement arms, forward and backward movement means for moving the replacement arm relative to the roving machine, lifting means for raising and lowering the replacement arm together with the replacement arm forward and backward movement means, The bobbin wheel is arranged at the same pitch as the bobbin wheel pitch at a predetermined position facing the moving range of the replacement arm, and temporarily removes the empty bobbin removed from the carrier or the full bobbin removed from the bobbin rail. And a peg for location.

【0015】[0015]

【作用】請求項1に記載の発明では、管替え作業の開始
前に粗紡機の上方にボビン搬送体が待機し、ボビン搬送
体に装備されたボビンハンガには少なくとも粗紡機1台
分の空ボビンがボビンホイールピッチと同じピッチで吊
架される。その状態で管替装置が作動され、ボビン搬送
体上の空ボビンがボビンハンガから取り外されて管替腕
に吊架される。そして、管替腕が移動されて管替腕の移
動範囲と対向する所定位置に配設されたぺッグ上に空ボ
ビンが一時的に移載される。次に管替腕が移動されてボ
ビンレール上の満ボビンが管替腕に吊架されるとともに
粗紡機の前側に移送された後、空ボビンが取り外された
ボビンハンガに吊架される。次に前記ぺッグ上に一時的
に移載された空ボビンが再び管替腕に吊架されるととも
にボビンレール上に移送された後、ボビンホイールに装
着される。
According to the first aspect of the present invention, the bobbin carrier stands by above the roving machine before the start of the pipe replacement operation, and the bobbin hanger mounted on the bobbin carrier has at least one empty bobbin for the roving machine. Are suspended at the same pitch as the bobbin wheel pitch. In this state, the pipe replacement device is operated, and the empty bobbin on the bobbin carrier is removed from the bobbin hanger and suspended on the pipe replacement arm. Then, the replacement arm is moved, and the empty bobbin is temporarily transferred to a peg provided at a predetermined position facing the moving range of the replacement arm. Next, the transfer arm is moved, and the full bobbin on the bobbin rail is suspended by the transfer arm and transferred to the front side of the roving machine. Thereafter, the empty bobbin is suspended on the removed bobbin hanger. Next, the empty bobbin temporarily transferred on the above-mentioned peg is again suspended on the replacement arm and transferred onto the bobbin rail, and then mounted on the bobbin wheel.

【0016】請求項2に記載の発明では、管替え作業の
開始前に粗紡機の上方にボビン搬送体が待機し、ボビン
搬送体に装備されたボビンハンガには少なくとも粗紡機
1台分の空ボビンがボビンホイールピッチと同じピッチ
で吊架される。その状態で管替装置が作動され、ボビン
レール上の満ボビンが管替腕に吊架される。そして、管
替腕が移動されて満ボビンが粗紡機の前側に移送された
後、管替腕の移動範囲と対向する所定位置に配設された
ぺッグ上に満ボビンが一時的に移載される。次に管替腕
が移動されてボビン搬送体上の空ボビンがボビンハンガ
から取り外されて管替腕に吊架される。そして、管替腕
が移動されて空ボビンがボビンレール上に移送された
後、満ボビンが取り外されたボビンホイールに装着され
る。次に前記ぺッグ上に一時的に移載された満ボビンが
管替腕に吊架された後、空ボビンが取り外されたボビン
ハンガに吊架される。
According to the second aspect of the present invention, the bobbin carrier stands by above the roving machine before the start of the pipe change operation, and the bobbin hanger mounted on the bobbin carrier has at least one empty bobbin for the roving machine. Are suspended at the same pitch as the bobbin wheel pitch. In this state, the pipe replacement device is operated, and the full bobbin on the bobbin rail is suspended from the pipe replacement arm. Then, after the replacement arm is moved and the full bobbin is transferred to the front side of the roving machine, the full bobbin is temporarily transferred to a peg disposed at a predetermined position facing the moving range of the replacement arm. Will be posted. Next, the replacement arm is moved, and the empty bobbin on the bobbin carrier is removed from the bobbin hanger and suspended on the replacement arm. Then, after the replacement arm is moved and the empty bobbin is transferred onto the bobbin rail, it is mounted on the bobbin wheel from which the full bobbin has been removed. Next, after the full bobbin temporarily transferred on the above-mentioned peg is suspended on the replacement arm, the empty bobbin is suspended on the removed bobbin hanger.

【0017】[0017]

【実施例】【Example】

(実施例1)以下、本発明を具体化した第1実施例を図
1〜図17に従って説明する。図1、図7等に示すよう
に、上部支持式のフライヤ1を装備した粗紡機2のボビ
ンレール3上にはボビンホイール4が前後2列に千鳥状
に配設されている。粗紡機2の前側上方には1本の支持
レール5が粗紡機2の長手方向と平行に配設されてい
る。支持レール5には1台の粗紡機2のボビンホイール
4と同数のボビンハンガ6を備えたボビン搬送体7が走
行自在に装備されている。支持レール5はボビン搬送体
7を精紡工程等に導く搬送レール(図示せず)に接続さ
れている。ボビン搬送体7は下面に1個のボビンハンガ
6が吊下されるとともに、外側面にコロ8が回転自在に
取り付けられた支持部材9をリンク10で連結すること
により形成されている。ボビン搬送体7は支持レール5
内に導入された状態では、各ボビンハンガ6がボビンレ
ール3上のボビンホイール4と同じピッチPで千鳥状に
配置されるようになっている。
(Embodiment 1) Hereinafter, a first embodiment of the present invention will be described with reference to FIGS. As shown in FIGS. 1, 7 and the like, bobbin wheels 4 are arranged in two rows in front and rear directions on a bobbin rail 3 of a roving machine 2 equipped with an upper support type flyer 1. A single support rail 5 is arranged above the front side of the roving machine 2 in parallel with the longitudinal direction of the roving machine 2. The support rail 5 is provided with a bobbin carrier 7 having the same number of bobbin hangers 6 as the bobbin wheels 4 of one roving machine 2 so as to run freely. The support rail 5 is connected to a transport rail (not shown) that guides the bobbin transport 7 to a spinning process or the like. The bobbin transporter 7 is formed by suspending a single bobbin hanger 6 on the lower surface and connecting a support member 9 on which a roller 8 is rotatably attached to an outer surface by a link 10. The bobbin carrier 7 is a support rail 5
The bobbin hangers 6 are arranged in a staggered manner at the same pitch P as the bobbin wheels 4 on the bobbin rails 3 when the bobbin hangers 6 are introduced into the inside.

【0018】粗紡機2の前側には管替装置11が粗紡機
2と対向して配設されている。管替装置11の管替ヘッ
ド12はボビンレール3に沿って延びる状態で管替腕昇
降手段としての昇降装置13に支持されている。昇降装
置13は図2に示すように多数のパンタグラフ機構14
を備えている。図2〜図5に示すように、各パンタグラ
フ機構14にはそれぞれ4個のリンク15a,16a,
17a,18a及びリンク15b,16b,17b,1
8bからなるリンク機構が前後一対設けられている。
A tube changing device 11 is provided in front of the roving machine 2 so as to face the roving machine 2. The tube changing head 12 of the tube changing device 11 is supported by an elevating device 13 as a tube changing arm elevating means while extending along the bobbin rail 3. As shown in FIG. 2, the lifting device 13 includes a number of pantograph mechanisms 14.
It has. As shown in FIGS. 2 to 5, each pantograph mechanism 14 has four links 15a, 16a,
17a, 18a and links 15b, 16b, 17b, 1
8b is provided as a pair of front and rear link mechanisms.

【0019】図4及び図5に示すように、管替装置11
の下部には前記リンク機構の間に一対の駆動ロッド19
a,19bが粗紡機2の長手方向と平行に往復移動可能
に配設されている。管替装置11の一端には駆動ロッド
19a,19bの中央と対応する位置に、ボールねじ2
0が粗紡機2の長手方向に沿って延びる状態で軸受21
を介して回動可能に配設されている。駆動ロッド19
a,19bはその一端が、ボールねじ20に螺合するボ
ールナット22に連結部材23を介して一体移動可能に
連結されている。ボールねじ20にはギヤボックス24
内に収容された歯車列(図示せず)を介してモータ25
の駆動力が伝達されるようになっている。ボールねじ2
0の外周にはボールナット22の移動に伴って伸縮する
蛇腹26が配設されている。
As shown in FIG. 4 and FIG.
A pair of drive rods 19 are provided between the link mechanisms at the lower part of
a and 19b are disposed so as to be able to reciprocate in parallel with the longitudinal direction of the roving machine 2. One end of the tube replacement device 11 is provided with a ball screw 2 at a position corresponding to the center of the drive rods 19a and 19b.
0 extends along the longitudinal direction of the roving machine 2
It is disposed so as to be rotatable via the. Drive rod 19
One end of each of a and 19b is connected to a ball nut 22 screwed to a ball screw 20 via a connecting member 23 so as to be integrally movable. The ball screw 20 has a gear box 24
Motor 25 via a gear train (not shown) housed therein.
Is transmitted. Ball screw 2
A bellows 26 that expands and contracts with the movement of the ball nut 22 is provided on the outer periphery of the zero.

【0020】駆動ロッド19a,19bにはブラケット
27が所定間隔で一体移動可能に固定され、第1のリン
ク15a,15bの第1端部がブラケット27に軸28
を介して回動可能に連結されている。第1のリンク15
a,15bの中央には第2のリンク16a,16bがそ
の中央において軸29を介して回動可能に連結されてい
る。第2のリンク16a,16bの第1端部は駆動ロッ
ド19a,19bの近傍にブラケット27の配置間隔と
同じ間隔で固定配置された支持ブラケット30に軸31
を介して回動可能に連結されている。第1のリンク15
a,15bの第2端部には第3のリンク17a,17b
の第1端部が軸32を介して回動可能に連結されてい
る。第3のリンク17a,17bの第2端部は管替ヘッ
ド12を構成するビーム33に形成された長穴(図示せ
ず)に沿って摺動可能に設けられた軸34に回動可能に
連結されている。第3のリンク17a,17bの中央に
は第4のリンク18a,18bがその中央において軸3
5を介して回動可能に連結されている。第2のリンク1
6a,16bの第2端部は第4のリンク18a,18b
の第1端部に軸36を介して回動可能に連結され、第4
のリンク18a,18bの第2端部はビーム33の所定
位置に軸37を介して回動可能に連結されている。すな
わち、駆動ロッド19a,19bの往復動に伴ってパン
タグラフ機構14が伸縮し、管替ヘッド12が上下に平
行移動されるようになっている。
A bracket 27 is fixed to the drive rods 19a and 19b so as to be integrally movable at predetermined intervals, and the first ends of the first links 15a and 15b are
Is rotatably connected via a. First link 15
A second link 16a, 16b is rotatably connected to a center of the a, 15b via a shaft 29 at the center. The first ends of the second links 16a and 16b are connected to a support bracket 30 fixedly arranged at the same interval as the bracket 27 in the vicinity of the drive rods 19a and 19b.
Is rotatably connected via a. First link 15
a, 15b have third links 17a, 17b
Are rotatably connected via a shaft 32. The second ends of the third links 17a and 17b are rotatable about a shaft 34 slidably provided along an elongated hole (not shown) formed in the beam 33 constituting the tube replacement head 12. Are linked. A fourth link 18a, 18b is provided at the center of the third link 17a, 17b at the center thereof.
5 so as to be rotatable. Second link 1
The second ends of 6a, 16b are connected to fourth links 18a, 18b.
Is rotatably connected via a shaft 36 to a first end of the
The second ends of the links 18a and 18b are rotatably connected to predetermined positions of the beam 33 via a shaft 37. That is, the pantograph mechanism 14 expands and contracts with the reciprocation of the drive rods 19a and 19b, and the tube replacement head 12 is moved up and down in parallel.

【0021】図3及び図6等に示すように、ビーム33
の上面には第1のガイドレール38が所定間隔でビーム
33と直交する状態で固定されている。第1のガイドレ
ール38には第1のスライダ39が摺動可能に支持さ
れ、第1のスライダ39上には第2のガイドレール40
が第1のガイドレール38と平行に固着されている。第
2のガイドレール40には第2のスライダ41が摺動可
能に支持され、第2のスライダ41上にドッフィングビ
ーム42が固定されている。又、ビーム33の後側(図
3の左側)には複数の支持部43(1個のみ図示)が所
定間隔で突設されている。支持部43には管替腕前後動
手段としての第1のスコットラッセル直線運動機構44
を構成する駆動ロッド45がビーム33と平行に摺動可
能に支承されている。ビーム33の一端にはボールねじ
機構により駆動軸がモータの正逆回転に伴って往復動さ
れるパワーユニット(図示せず)が配設され、その駆動
軸に駆動ロッド45の一端が連結されている。
As shown in FIG. 3 and FIG.
A first guide rail 38 is fixed at a predetermined interval to the upper surface of the beam 33 at right angles to the beam 33. A first slider 39 is slidably supported on the first guide rail 38, and a second guide rail 40 is provided on the first slider 39.
Are fixed in parallel with the first guide rail 38. A second slider 41 is slidably supported on the second guide rail 40, and a doffing beam 42 is fixed on the second slider 41. Further, a plurality of support portions 43 (only one is shown) are provided at predetermined intervals on the rear side (left side in FIG. 3) of the beam 33. A first Scott-Russell linear motion mechanism 44 as a pipe replacement arm longitudinal movement means is provided on the support portion 43.
Is slidably supported in parallel with the beam 33. A power unit (not shown) in which a drive shaft is reciprocated by a ball screw mechanism in accordance with forward and reverse rotations of a motor is disposed at one end of the beam 33, and one end of a drive rod 45 is connected to the drive shaft. .

【0022】図8に示すように、駆動ロッド45には複
数の可動ブラケット46(1個のみ図示)が駆動ロッド
45と一体移動可能に所定間隔で取付けられている。可
動ブラケット46にはリンク47の第1端部がピン48
を介して回動可能に連結され、第2端部がドッフィング
ビーム42にピン49を介して回動可能に連結されてい
る。各リンク47の中央にはリンク47の1/2の長さ
のリンク50の第1端部がピン連結され、リンク50の
第2端部が支持部43に突設されたピン51に回動可能
に連結されている。すなわち、駆動ロッド45の往復動
に伴ってドッフィングビーム42が図3に示す待機位置
と、図6及び図8に示す最前進位置との間で水平に平行
移動されるようになっている。
As shown in FIG. 8, a plurality of movable brackets 46 (only one is shown) are attached to the drive rod 45 at predetermined intervals so as to be integrally movable with the drive rod 45. A first end of a link 47 is attached to the movable bracket 46 by a pin 48.
And a second end is rotatably connected to the doffing beam 42 via a pin 49. A first end of a link 50 having a half length of the link 47 is connected to the center of each link 47 by a pin, and a second end of the link 50 is rotated by a pin 51 protruding from the support portion 43. It is connected as possible. That is, with the reciprocation of the drive rod 45, the doffing beam 42 is horizontally translated between the standby position shown in FIG. 3 and the most advanced position shown in FIGS.

【0023】図7に示すように、ドッフィングビーム4
2には管替腕としての多数のフォーク52a,52bが
ボビンホイールピッチと同じピッチPで配設されてい
る。各フォーク52a,52bの上面内側にはボビンを
保持可能とするため、空ボビンE又は満ボビンFの鍔部
が嵌合される凹部(図示せず)が形成されている。粗紡
機2の前側に位置するボビンホイール4と対向する位置
に配設された固定フォーク52aはドッフィングビーム
42の前面に固着されている。粗紡機2の後側に位置す
るボビンホイール4と対向する位置に配設された可動フ
ォーク52bはドッフィングビーム42の長手方向と直
交する方向に移動可能に配設されている。
As shown in FIG. 7, the doffing beam 4
2, a number of forks 52a and 52b as pipe replacement arms are arranged at the same pitch P as the bobbin wheel pitch. In order to be able to hold the bobbin, concave portions (not shown) into which the flange portions of the empty bobbin E or the full bobbin F are fitted are formed inside the upper surfaces of the forks 52a and 52b. A fixed fork 52 a disposed at a position facing the bobbin wheel 4 located on the front side of the roving machine 2 is fixed to the front surface of the doffing beam 42. A movable fork 52b disposed at a position facing the bobbin wheel 4 located on the rear side of the roving machine 2 is disposed so as to be movable in a direction orthogonal to the longitudinal direction of the doffing beam 42.

【0024】各可動フォーク52bはスライドロッド5
3の先端に固着され、スライドロッド53がドッフィン
グビーム42の前面に突設されたガイドブロック54を
貫通する状態で摺動可能に支持されている。ドッフィン
グビーム42上には支持バー55がドッフィングビーム
42全長にわたって延設されるとともに、管替腕前後動
手段としての第2のスコットラッセル直線運動機構56
を利用して前後(図7及び図8の上下)方向に移動可能
に配設されている。すなわち、ドッフィングビーム42
の後側に支持ブラケット57が所定間隔で固定され、支
持ブラケット57に駆動ロッド58がドッフィングビー
ム42と平行にかつその長手方向に沿って摺動可能に支
承されている。駆動ロッド58には所定間隔で可動ブラ
ケット59が一体移動可能に取付けられている。可動ブ
ラケット59にはリンク60の第1端部がピンを介して
回動可能に連結され、第2端部が支持バー55にピンを
介して回動可能に連結されている。各リンク60の中央
にはリンク60の1/2の長さのリンク61の第1端部
がピン連結され、リンク61の第2端部が支持ブラケッ
ト57にピンを介して回動可能に連結されている。駆動
ロッド58はその一端がドッフィングビーム42の一端
に設けられたパワーユニット(図示せず)の駆動軸に連
結されている。パワーユニットの作動による駆動ロッド
58の往復動に伴って、支持バー55が水平に平行移動
されるようになっている。なお、管替ヘッド12の後側
及び上側を覆うカバー62が支持部43にねじ63によ
り固定されている。カバー62の前端は第1のガイドレ
ール38の前端と対応する位置まで延出されている。
Each movable fork 52b has a slide rod 5
The slide rod 53 is slidably supported in a state in which the slide rod 53 penetrates a guide block 54 projecting from the front surface of the doffing beam 42. A support bar 55 extends on the doffing beam 42 over the entire length of the doffing beam 42, and a second Scott-Russell linear motion mechanism 56 as a pipe replacement arm back and forth moving means.
Are arranged so as to be movable in the front-rear direction (up and down in FIGS. 7 and 8). That is, the doffing beam 42
A support bracket 57 is fixed to the rear side at a predetermined interval, and a drive rod 58 is supported by the support bracket 57 so as to be slidable in parallel with the doffing beam 42 and along the longitudinal direction thereof. A movable bracket 59 is attached to the drive rod 58 at predetermined intervals so as to be integrally movable. A first end of a link 60 is rotatably connected to the movable bracket 59 via a pin, and a second end is rotatably connected to the support bar 55 via a pin. A first end of a link 61 having a half length of the link 60 is connected to a center of each link 60 by a pin, and a second end of the link 61 is rotatably connected to a support bracket 57 via a pin. Have been. One end of the drive rod 58 is connected to a drive shaft of a power unit (not shown) provided at one end of the doffing beam 42. With the reciprocation of the drive rod 58 by the operation of the power unit, the support bar 55 is horizontally translated. In addition, a cover 62 that covers the rear side and the upper side of the tube replacement head 12 is fixed to the support portion 43 by screws 63. The front end of the cover 62 extends to a position corresponding to the front end of the first guide rail 38.

【0025】管替装置11の前側下部には支持ビーム6
4が粗紡機2の長手方向と平行に配設されている。支持
ビーム64上にはボビンホイール4と同数のぺッグ65
がボビンホイールピッチと同じピッチPでかつ、前後列
の間隔が支持レール5上に待機するボビン搬送体7のボ
ビンハンガ6の配置幅より若干小さな値となるように固
定されている。
The support beam 6 is provided at the lower part on the front side of the tube replacement device 11.
4 is arranged in parallel with the longitudinal direction of the roving machine 2. The same number of pegs 65 as the bobbin wheel 4 are provided on the support beam 64.
Are fixed so as to have the same pitch P as the bobbin wheel pitch, and the interval between the front and rear rows is slightly smaller than the arrangement width of the bobbin hanger 6 of the bobbin transporter 7 waiting on the support rail 5.

【0026】スライドロッド53の長さは、図8に示す
ように、支持バー55が最前進位置に移動配置されたと
きにフォーク52a,52bの配置がボビンホイール4
の配置と対応する状態となるようになっている。又、図
7に示すように、支持バー55が最後退位置に移動配置
されたときには、フォーク52a,52bの配置がペッ
グ65の配置とと対応するように設定されている。
As shown in FIG. 8, the length of the slide rod 53 is such that the forks 52a and 52b are arranged on the bobbin wheel 4 when the support bar 55 is moved to the most advanced position.
In a state corresponding to the arrangement. Also, as shown in FIG. 7, when the support bar 55 is moved to the rearmost position, the arrangement of the forks 52a and 52b is set to correspond to the arrangement of the pegs 65.

【0027】次に前記のように構成された装置の作用を
説明する。粗紡機2の運転中は管替ヘッド12が最下降
位置である待機位置に配置され、ドッフィングビーム4
2が最後退位置にそれぞれ配置され、粗糸切れ修復作
業、機台再起動時の粗糸自動巻付けミスの修復作業等の
粗紡機2の機台前での作業に支障のない状態に保持され
る。
Next, the operation of the device configured as described above will be described. During operation of the roving machine 2, the refilling head 12 is arranged at the standby position, which is the lowest position, and the doffing beam 4
2 are arranged at the rearmost positions, respectively, so that the work in front of the roving machine 2 such as the work for repairing broken rovings and the work for automatically winding the roving yarn when the machine is restarted is maintained. Is done.

【0028】粗紡機2の運転中に空ボビンEが吊下され
たボビン搬送体7が図9に示すように支持レール5に搬
入され、空ボビンEが各フォーク52a,52bと対向
する所定の位置に配置される。粗糸巻が満管になると粗
糸の紡出及び巻取りが停止され、図9等に示すように、
満ボビンFの鍔部上面がフライヤ1のガイドレッグ1a
の下端より若干上方となる位置までボビンレール3が降
下して粗糸の自動切断が行われる。
During the operation of the roving machine 2, the bobbin transporter 7 on which the empty bobbin E is suspended is carried into the support rail 5 as shown in FIG. 9, and the empty bobbin E faces the forks 52a and 52b. Placed in the position. When the roving becomes full, spinning and winding of the roving are stopped, and as shown in FIG.
The upper surface of the flange portion of the full bobbin F is the guide leg 1a of the flyer 1.
The bobbin rail 3 is lowered to a position slightly above the lower end of the roving, and the roving is automatically cut.

【0029】次にモータ25が正転駆動されてボールね
じ20が正転され、ボールナット22とともに駆動ロッ
ド19a,19bが往動(図4,5の左方への移動)す
る。そして、パンタグラフ機構14が伸びて各フォーク
52a,52bがボビン搬送体7に吊下された空ボビン
Eと対応する位置まで管替ヘッド12が上昇移動する。
次に第2のスコットラッセル直線運動機構56が駆動さ
れ、可動フォーク52bが前進駆動されて各フォーク5
2a,52bが空ボビンEと対応する状態に配置され
る。又、第1のスコットラッセル直線運動機構44が駆
動されて駆動ロッド45が往動され、各フォーク52
a,52bが空ボビンEの鍔部下面と対応する位置まで
ドッフィングビーム42が前進移動する。次に管替ヘッ
ド12が僅かに上昇されてボビンハンガによる空ボビン
Eの掛止状態が解除され、各空ボビンEが各フォーク5
2a,52bに吊下されて図10の状態となる。
Next, the motor 25 is driven to rotate forward, the ball screw 20 is rotated forward, and the drive rods 19a and 19b move forward together with the ball nut 22 (to the left in FIGS. 4 and 5). Then, the pantograph mechanism 14 is extended, and the refill head 12 moves up to a position corresponding to the empty bobbin E suspended by the bobbin transporter 7 with the forks 52a, 52b.
Next, the second Scott-Russell linear motion mechanism 56 is driven, and the movable fork 52b is driven forward to move each fork 5
2a and 52b are arranged in a state corresponding to the empty bobbin E. Further, the first Scott-Russell linear motion mechanism 44 is driven to move the drive rod 45 forward, and each fork 52
The doffing beam 42 moves forward to a position where a and 52b correspond to the lower surface of the flange portion of the empty bobbin E. Next, the pipe replacement head 12 is slightly raised to release the hung state of the empty bobbin E by the bobbin hanger, and each empty bobbin E is
It hangs on 2a and 52b, and it will be in the state of FIG.

【0030】次にモータ25が逆転駆動されてボールね
じ20が逆転され、ボールナット22とともに駆動ロッ
ド19a,19bが復動する。そして、パンタグラフ機
構14が収縮して各フォーク52a,52bに吊下され
た空ボビンEがペッグ65に装着される位置まで管替ヘ
ッド12が下降移動する。管替ヘッド12の下降途中で
両スコットラッセル直線運動機構44,56が駆動さ
れ、各フォーク52a,52bの配置がペッグ65の配
置と対応する状態に変更されるとともに、空ボビンEが
ぺッグ65と対向する位置までドッフィングビーム42
が僅かに後退移動する。そして、パンタグラフ機構14
の収縮が完了したときに、各空ボビンEがペッグ65に
装着されるとともに、管替フォーク52a,52bと空
ボビンEとの係合が解除される。
Next, the motor 25 is driven to rotate in the reverse direction, the ball screw 20 is rotated in the reverse direction, and the drive rods 19a and 19b move back together with the ball nut 22. Then, the pantograph mechanism 14 contracts, and the pipe replacement head 12 moves down to a position where the empty bobbin E suspended from the forks 52a, 52b is mounted on the peg 65. The Scott-Russell linear motion mechanisms 44 and 56 are driven during the lowering of the refill head 12, the arrangement of the forks 52a and 52b is changed to a state corresponding to the arrangement of the pegs 65, and the empty bobbin E is Doffing beam 42 up to the position facing 65
Slightly retreats. And the pantograph mechanism 14
When the contraction of the empty bobbin E is completed, each empty bobbin E is mounted on the peg 65, and the engagement between the replacement forks 52a and 52b and the empty bobbin E is released.

【0031】次に第1のスコットラッセル直線運動機構
44が駆動され、各フォーク52a,52bがその上昇
時に空ボビンEと係合不能な位置までドッフィングビー
ム42が僅かに後退移動する。次に各フォーク52a,
52bがボビンレール3上の満ボビンFの鍔部下面と対
応する位置まで管替ヘッド12が上昇して図11の状態
となる。この状態から第1のスコットラッセル直線運動
機構44が駆動され、ドッフィングビーム42が最前進
位置に配置される。ドッフィングビーム42が最前進位
置に配置されると固定フォーク52aがボビンレール3
上の前側の満ボビンFの鍔部下面と対応する状態とな
る。又、第2のスコットラッセル直線運動機構56も駆
動されて支持バー55が前進し、可動フォーク52bが
ボビンレール3上の後側の満ボビンFの鍔部下面と対応
する位置に配置されて図8に示す状態となる。その状態
でボビンレール3がさらに下降し、満ボビンFが各フォ
ーク52a,52bに吊下されるとともにボビンホイー
ル4が満ボビンFから離脱した図12の状態となる。
Next, the first Scott-Russell linear motion mechanism 44 is driven, and when the forks 52a, 52b are raised, the doffing beam 42 is slightly retracted to a position where it cannot be engaged with the empty bobbin E. Next, each fork 52a,
The pipe replacement head 12 rises to a position where 52b corresponds to the lower surface of the flange portion of the full bobbin F on the bobbin rail 3, and the state shown in FIG. 11 is obtained. From this state, the first Scott-Russell linear motion mechanism 44 is driven, and the doffing beam 42 is arranged at the most advanced position. When the doffing beam 42 is located at the most advanced position, the fixed fork 52a is
The state corresponds to the lower surface of the flange portion of the upper full bobbin F on the upper side. In addition, the second Scott-Russell linear motion mechanism 56 is also driven to advance the support bar 55, and the movable fork 52b is arranged at a position corresponding to the lower surface of the flange portion of the rear full bobbin F on the bobbin rail 3 as shown in FIG. The state shown in FIG. In this state, the bobbin rail 3 is further lowered, and the full bobbin F is suspended by the forks 52a and 52b, and the bobbin wheel 4 is separated from the full bobbin F, as shown in FIG.

【0032】次に第2のスコットラッセル直線運動機構
56が駆動されて支持バー55が後退し、各フォーク5
2a,52bの配置がボビン搬送体7に吊下されたボビ
ンハンガ6の配置と対応する状態となる。又、第1のス
コットラッセル直線運動機構44が駆動され、ドッフィ
ングビーム42が後退して満ボビンFがボビンレール3
の前側に取り出された図13の状態となる。次に管替ヘ
ッド12が上昇移動されるとともに、第1のスコットラ
ッセル直線運動機構44が駆動される。そして、各フォ
ーク52a,52bがボビン搬送体7に吊下されたボビ
ンハンガ6と対向する位置までドッフィングビーム42
が後退した後、管替ヘッド12が最上昇位置に配置され
て満ボビンFがボビンハンガ6に吊下された図14の状
態となる。
Next, the second Scott-Russell linear motion mechanism 56 is driven, and the support bar 55 is retracted.
The arrangement of 2a and 52b corresponds to the arrangement of the bobbin hanger 6 hung on the bobbin carrier 7. Further, the first Scott-Russell linear motion mechanism 44 is driven, the doffing beam 42 is retracted, and the full bobbin F is moved to the bobbin rail 3.
13 is taken out to the front side of FIG. Next, the refilling head 12 is moved up and the first Scott-Russell linear motion mechanism 44 is driven. The doffing beam 42 is moved to a position where each of the forks 52a, 52b faces the bobbin hanger 6 suspended on the bobbin carrier 7.
Is retracted, the pipe replacement head 12 is arranged at the highest position, and the full bobbin F is suspended from the bobbin hanger 6 as shown in FIG.

【0033】次に第1のスコットラッセル直線運動機構
44が駆動され、各フォーク52a,52bがその下降
時に満ボビンFと係合不能な位置までドッフィングビー
ム42が後退移動する。次に各フォーク52a,52b
がペッグ65上の空ボビンEの鍔部下面と対応する位置
まで管替ヘッド12が下降され。その後、第1のスコッ
トラッセル直線運動機構44が駆動され、各フォーク5
2a,52bが空ボビンEの鍔部下面と対応する位置に
配置される。その状態で管替ヘッド12が上昇されて各
フォーク52a,52bに空ボビンEが吊下された後、
ドッフィングビーム42及び支持バー55が最前進位置
に配置され、空ボビンEがボビンホイール4と対向する
図15に示す状態となる。
Next, the first Scott-Russell linear motion mechanism 44 is driven, and when the forks 52a and 52b are lowered, the doffing beam 42 is moved backward to a position where it cannot be engaged with the full bobbin F. Next, each fork 52a, 52b
The pipe replacement head 12 is lowered to a position corresponding to the lower surface of the flange portion of the empty bobbin E on the peg 65. Thereafter, the first Scott Russell linear motion mechanism 44 is driven, and each fork 5
2a and 52b are arranged at positions corresponding to the lower surface of the flange of the empty bobbin E. In this state, after the replacement head 12 is lifted and the empty bobbin E is hung on each of the forks 52a and 52b,
The doffing beam 42 and the support bar 55 are arranged at the most advanced position, and the empty bobbin E is in a state shown in FIG.

【0034】次にボビンレール3が上昇され、ボビンホ
イール4が空ボビンEの底部に嵌合した後、空ボビンE
の鍔部がフォーク52a,52bと離間する位置まで上
昇した時点でボビンレール3が停止する。次に両スコッ
トラッセル直線運動機構44,56が駆動され、ドッフ
ィングビーム42及び支持バー55が最後退位置に配置
された図16に示す状態となる。その後、図17に示す
ように管替ヘッド12が待機位置まで下降され、ボビン
レール3が粗糸巻取り位置まで上昇された後、通常の紡
出運転が開始される。
Next, after the bobbin rail 3 is raised and the bobbin wheel 4 is fitted to the bottom of the empty bobbin E, the empty bobbin E
The bobbin rail 3 stops when the flange of the cylinder rises to a position separated from the forks 52a, 52b. Next, both Scott-Russell linear motion mechanisms 44 and 56 are driven, and the state shown in FIG. 16 is reached in which the doffing beam 42 and the support bar 55 are arranged at the rearmost positions. Thereafter, as shown in FIG. 17, the pipe replacement head 12 is lowered to the standby position, the bobbin rail 3 is raised to the roving take-up position, and then the normal spinning operation is started.

【0035】前記のように管替ヘッド12が管替え作業
時以外は待機位置に配置されるとともに、粗紡機2の前
側に配設されたペッグ65上には管替え作業時に一時的
に空ボビンEが載置される。従って、管替え完了後、粗
紡機2の運転が直ちに開始され、再起動時の粗糸の自動
巻付けミスの修復作業や粗糸切れ補修作業を必要とする
事態になっても何ら作業に支障を来すことがない。
As described above, the refilling head 12 is located at the standby position except during the refilling operation, and the empty bobbin is temporarily placed on the peg 65 disposed in front of the roving machine 2 during the refilling operation. E is placed. Therefore, after completion of the pipe change, the operation of the roving machine 2 is started immediately, and even if it becomes necessary to carry out a repair operation for the automatic winding error of the roving at the restart and a repair operation for the roving breakage, there is no hindrance to any operation. Never come.

【0036】(実施例2)次に第2実施例を図18〜図
29に従って説明する。この実施例ではペッグ65が粗
紡機2のフライヤレール2aの前側に固定されたブラケ
ット66上に1列に配設されている点と、支持レール5
がフライヤレール2aの上方に配設されている点と、管
替ヘッド12の構造とが前記実施例と異なっている。
(Embodiment 2) Next, a second embodiment will be described with reference to FIGS. In this embodiment, the pegs 65 are arranged in one row on a bracket 66 fixed to the front side of the flyer rail 2a of the roving machine 2;
Are disposed above the flyer rail 2a, and the structure of the tube replacement head 12 is different from that of the above embodiment.

【0037】管替ヘッド12は支持バー55が最後退位
置に配置されたときに、固定フォーク52aと可動フォ
ーク52bとが一直線上に配置され、支持バー55が最
前進位置に配置されたときに、固定フォーク52aがボ
ビンレール3の前側のボビンホイール4と可動フォーク
52bが後側のボビンホイール4とそれぞれ対応する配
置状態となるように構成されている。そして、支持バー
55が最後退位置と最前進位置との中間位置に配置され
た際に、各フォーク52a,52bの配置が支持レール
5上の搬送体7に吊下されたボビンハンガ6の配置と対
応する状態となる。
When the support bar 55 is located at the most retracted position, the tube replacement head 12 is arranged such that the fixed fork 52a and the movable fork 52b are arranged in a straight line, and the support bar 55 is located at the most advanced position. The fixed fork 52a and the movable fork 52b are arranged so as to correspond to the front bobbin wheel 4 and the rear bobbin wheel 4, respectively. When the support bar 55 is disposed at an intermediate position between the most retracted position and the most advanced position, the arrangement of the forks 52a and 52b is different from the arrangement of the bobbin hanger 6 suspended on the carrier 7 on the support rail 5. It will be in the corresponding state.

【0038】又、空ボビンEを一時的に載置するペッグ
65がフライヤレール2aの前側に配設されているた
め、満ボビンFをボビンレール3上から取り出すときに
満ボビンFと空ボビンEとが干渉しないため、管替装置
11全体が粗紡機2側に近づいた位置に配設されてい
る。その結果、ドッフィングビーム42の前後動をガイ
ドするガイドレールは前記実施例と異なり、2段式にす
る必要がなくなる。すなわち、ビーム33の上面にガイ
ドレール67がビーム33と直交する状態で所定間隔で
固定され、ガイドレール67に摺動可能に支持されたス
ライダ68上にドッフィングビーム42が固定されてい
る。ドッフィングビーム42は前記実施例と同様に構成
された第1のスコットラッセル直線運動機構44により
前後に移動されるようになっている。
Further, since the peg 65 for temporarily placing the empty bobbin E is disposed in front of the flyer rail 2a, the full bobbin F and the empty bobbin E are removed when the full bobbin F is taken out from the bobbin rail 3. Therefore, the entire pipe replacement device 11 is disposed at a position close to the roving machine 2 side. As a result, the guide rail for guiding the back and forth movement of the doffing beam 42 does not need to be a two-stage type, unlike the above embodiment. That is, the guide rail 67 is fixed to the upper surface of the beam 33 at a predetermined interval in a state perpendicular to the beam 33, and the doffing beam 42 is fixed on the slider 68 slidably supported by the guide rail 67. The doffing beam 42 is moved back and forth by a first Scott-Russell linear motion mechanism 44 configured in the same manner as in the above embodiment.

【0039】なお、管替ヘッド12のカバー62の前端
下面には係合凸部62aが形成され、管替ヘッド12が
待機位置に配置された際に係合凸部62aが管替装置1
1のベースフレーム69に突設された支持部69aに当
接するようになっている。
An engagement protrusion 62a is formed on the lower surface of the front end of the cover 62 of the tube replacement head 12, and when the tube replacement head 12 is located at the standby position, the engagement protrusion 62a is attached to the tube replacement device 1.
It comes into contact with a support portion 69a protruding from one base frame 69.

【0040】管替え作業時には図18の状態から管替ヘ
ッド12が上昇移動され、各フォーク52a,52bが
ボビン搬送体7に吊下された空ボビンEと対応する状態
となる。次に両スコットラッセル直線運動機構44,5
6が駆動され、各フォーク52a,52bが空ボビンE
の鍔部下面と対応する位置に配置される。そして、管替
ヘッド12が僅かに上昇されて空ボビンEが各フォーク
52a,52bに吊下された図21の状態となる。次に
両スコットラッセル直線運動機構44,56が駆動さ
れ、各フォーク52a,52bが一直線上に配置される
とともにペッグ65と対向する位置に配置される。そし
て、管替ヘッド12が下降移動され、空ボビンEがペッ
グ65に装着された図22に示す状態となる。
At the time of the pipe change operation, the pipe change head 12 is moved upward from the state shown in FIG. 18, and each of the forks 52a and 52b is brought into a state corresponding to the empty bobbin E suspended from the bobbin carrier 7. Next, both Scott Russell linear motion mechanisms 44, 5
6 is driven, and the forks 52a and 52b
Is disposed at a position corresponding to the lower surface of the flange. Then, the pipe replacement head 12 is slightly raised, and the empty bobbin E is brought into a state shown in FIG. 21 in which the empty bobbin E is suspended by the forks 52a and 52b. Next, both Scott Russell linear motion mechanisms 44 and 56 are driven, and the forks 52a and 52b are arranged in a straight line and at a position facing the peg 65. Then, the tube replacement head 12 is moved down, and the empty bobbin E is mounted on the peg 65 as shown in FIG.

【0041】次に第1のスコットラッセル直線運動機構
44が駆動され、各フォーク52a,52bがブラケッ
ト66と干渉しない位置までドッフィングビーム42が
後退した後、各フォーク52a,52bがボビンレール
3上の満ボビンFの鍔部の下面と対向する位置まで管替
ヘッド12が下降移動される。その状態から両スコット
ラッセル直線運動機構44,56が駆動され、各フォー
ク52a,52bが満ボビンFの鍔部の下面と係合可能
な位置まで移動配置される。そして、ボビンレール3が
下降移動され、各フォーク52a,52bに満ボビンF
が吊下された図23に示す状態となる。次に両スコット
ラッセル直線運動機構44,56が駆動され、ドッフィ
ングビーム42が後退するとともに各フォーク52a,
52bがボビン搬送体7に吊下されたボビンハンガ6と
対応する図24の状態となる。
Next, the first Scott-Russell linear motion mechanism 44 is driven, and after the doffing beam 42 is retracted to a position where the forks 52a, 52b do not interfere with the bracket 66, the forks 52a, 52b are moved on the bobbin rail 3. The pipe replacement head 12 is moved down to a position facing the lower surface of the flange portion of the full bobbin F. From this state, both Scott-Russell linear motion mechanisms 44 and 56 are driven, and the forks 52a and 52b are moved and arranged to positions where they can be engaged with the lower surface of the flange portion of the full bobbin F. Then, the bobbin rail 3 is moved down, and the full bobbins F
Is suspended as shown in FIG. Next, both Scott Russell linear motion mechanisms 44 and 56 are driven, the doffing beam 42 is retracted, and each of the forks 52a,
FIG. 24 shows a state 52b corresponding to the bobbin hanger 6 suspended on the bobbin carrier 7.

【0042】次に管替ヘッド12が上昇移動されるとと
もに満ボビンFと空ボビンEとが接触しないようにドッ
フィングビーム42が移動され、図25に示すように満
ボビンFがボビンハンガ6に吊下される。次に第2のス
コットラッセル直線運動機構56が駆動されて各フォー
ク52a,52bが一直線上に配置される。そして、管
替ヘッド12が下降移動されるとともにドッフィングビ
ーム42が移動され、図26に示すように各フォーク5
2a,52bが空ボビンEを吊下可能な位置に配置され
る。次に各フォーク52a,52bが空ボビンEを吊下
した状態で図27に示すボビンレール3と対応する位置
に配置される。この状態から各フォーク52a,52b
が最前進位置まで移動され、空ボビンEがボビンホイー
ル4と対向する図28に示す状態となる。
Next, the refilling head 12 is moved up, and the doffing beam 42 is moved so that the full bobbin F does not come into contact with the empty bobbin E. The full bobbin F is suspended from the bobbin hanger 6 as shown in FIG. Is given. Next, the second Scott-Russell linear motion mechanism 56 is driven, and the forks 52a and 52b are arranged on a straight line. Then, the replacement head 12 is moved down and the doffing beam 42 is moved, and as shown in FIG.
2a and 52b are arranged at positions where the empty bobbin E can be suspended. Next, the forks 52a and 52b are arranged at positions corresponding to the bobbin rails 3 shown in FIG. From this state, the forks 52a, 52b
Is moved to the most advanced position, and the empty bobbin E is brought into a state shown in FIG.

【0043】次にボビンレール3が上昇移動されて空ボ
ビンEがボビンホイール4に装着されるとともに各フォ
ーク52a,52bと空ボビンEとの係合が解除され
る。その後、ドッフィングビーム42及び各フォーク5
2a,52bが最後退位置に配置されるとともに、管替
ヘッド12が待機位置に配置される。そして、ボビンレ
ール3が粗糸巻取り位置まで上昇された後、通常の紡出
運転が開始され図29に示す状態となる。
Next, the bobbin rail 3 is moved up, the empty bobbin E is mounted on the bobbin wheel 4, and the engagement between the forks 52a, 52b and the empty bobbin E is released. Then, the doffing beam 42 and each fork 5
2a and 52b are arranged at the rearmost position, and the tube replacement head 12 is arranged at the standby position. Then, after the bobbin rail 3 is raised to the roving winding position, normal spinning operation is started, and the state shown in FIG. 29 is obtained.

【0044】この実施例では前記実施例と同様な効果が
発揮される他に、ペッグ65を管替装置11側に設ける
必要がなく、その分だけ管替装置11を粗紡機2に近接
して配設でき、管替ヘッド12の巾も狭くなる。
In this embodiment, in addition to the same effect as in the previous embodiment, there is no need to provide the peg 65 on the side of the tube changing device 11, and the tube changing device 11 is moved closer to the roving machine 2 by that much. The width of the tube replacement head 12 can be reduced.

【0045】(実施例3)次に第3実施例を図30に従
って説明する。この実施例では支持レール5が図示しな
い巻取装置により繰り出しあるいは巻き取られるチェー
ン70を介して昇降可能に支持されている点と、管替ヘ
ッド12が満ボビンFをボビンレール3上から取り出す
際の作業位置より上方へ移動しない点が前記各実施例と
異なっている。すなわち、昇降装置13は管替ヘッド1
2を粗紡機2の上方に待機するボビン搬送体7と対応す
る位置まで移動させる必要がないので、従来と同様なス
コットラッセル直線運動機構と同じ構成のリンク機構を
採用できる。
(Embodiment 3) Next, a third embodiment will be described with reference to FIG. In this embodiment, the point that the support rail 5 is supported so as to be able to move up and down through a chain 70 that is fed or wound by a winding device (not shown), and that the pipe replacement head 12 takes out the full bobbin F from the bobbin rail 3. This embodiment is different from the above embodiments in that it does not move upward from the work position. That is, the elevating device 13 includes the tube replacement head 1.
Since there is no need to move the roller 2 to a position corresponding to the bobbin transporter 7 waiting above the roving machine 2, a link mechanism having the same configuration as the conventional Scott Russell linear motion mechanism can be employed.

【0046】管替え作業時には図30に示すように支持
レール5とともにボビン搬送体7が下降位置に配置され
る。そして、当該位置に配置されたボビン搬送体7に吊
下された空ボビンEが管替装置11の作動によりペッグ
65上へ載置された後、ボビンレール3上から満ボビン
Fが取り出されて空ボビンEが取り外された後のボビン
ハンガ6に吊下される。その後、チェーン70が巻き取
られて支持レール5が粗紡機2の上方の待機位置に移動
される。次いでペッグ65上に載置された空ボビンEが
ボビンレール3のボビンホイール4上に載置された後、
管替ヘッド12が待機位置に配置される。この実施例で
も管替え作業時以外は管替装置11とボビンレール3と
の間に空ボビンEあるいは満ボビンFが存在しないた
め、粗紡機2の機台前での作業に支障を来すことがな
い。
At the time of pipe replacement work, the bobbin transporter 7 is arranged at the lowered position together with the support rail 5 as shown in FIG. Then, after the empty bobbin E suspended from the bobbin transporting body 7 arranged at the position is placed on the peg 65 by the operation of the tube switching device 11, the full bobbin F is taken out from the bobbin rail 3. The empty bobbin E is suspended on the bobbin hanger 6 after being removed. Thereafter, the chain 70 is wound up and the support rail 5 is moved to a standby position above the roving machine 2. Next, after the empty bobbin E mounted on the peg 65 is mounted on the bobbin wheel 4 of the bobbin rail 3,
The replacement head 12 is arranged at the standby position. Also in this embodiment, since there is no empty bobbin E or full bobbin F between the tube changing device 11 and the bobbin rail 3 except during the tube changing operation, the operation in front of the roving machine 2 may be hindered. There is no.

【0047】なお、本発明は前記実施例に限定されるも
のではなく、例えば、前記各実施例では空ボビンEをボ
ビン搬送体7のボビンハンガ6から取り外してペッグ6
5上に載置した後、満ボビンFをボビンレール3上から
玉揚げしたが、まず、満ボビンFをボビンレール3上か
ら玉揚げしてペッグ65上に載置した後、空ボビンEを
ボビン搬送体7のボビンハンガ6から取り外してボビン
ホイール4に装着し、次に空ボビンEが取り外された後
のボビンハンガ6に満ボビンFを吊下するようにしても
よい。この場合満ボビンF同士が干渉しないようにペッ
グ65は第1実施例あるいは第3実施例のように千鳥状
に配列する必要がある。
The present invention is not limited to the above embodiment. For example, in each of the above embodiments, the empty bobbin E is removed from the bobbin hanger 6 of the bobbin carrier 7 and the peg 6
5, the bobbin F was doffed from the bobbin rail 3. First, the bobbin F was doffed from the bobbin rail 3 and placed on the peg 65. The bobbin transporter 7 may be detached from the bobbin hanger 6 and mounted on the bobbin wheel 4, and then the full bobbin F may be hung on the bobbin hanger 6 from which the empty bobbin E has been removed. In this case, the pegs 65 need to be arranged in a staggered manner as in the first or third embodiment so that the full bobbins F do not interfere with each other.

【0048】又、第1実施例及び第3実施例において空
ボビンEを載置するペッグ65を1列に配置し、各フォ
ーク52a,52bを1列に配列可能に構成してもよ
い。又、ペッグ65の配設位置は前記実施例の位置に限
らず、フライヤレール2aの上方に設けてもよい。
In the first and third embodiments, the pegs 65 on which the empty bobbins E are placed may be arranged in one line, and the forks 52a and 52b may be arranged in one line. Further, the arrangement position of the pegs 65 is not limited to the position in the above-described embodiment, and may be provided above the flyer rail 2a.

【0049】[0049]

【発明の効果】以上詳述したように本発明によれば、管
替装置と粗紡機との間に作業通路用に特別のスペースを
確保しなくても、粗紡機の運転時には常に粗紡機機台の
前側で作業が可能な状態となり、機台再起動時の粗糸の
自動巻付けミスの修復作業や粗糸切れ補修作業等を支障
なく行うことができる。又、満ボビンF及び空ボビンE
の搬送用にそれぞれ独立した搬送レールを設ける必要が
なく装置を製造する際のコスト低減が図れる。
As described in detail above, according to the present invention, the roving machine is always operated when the roving machine is operated, even if a special space is not provided for the work passage between the pipe changing device and the roving machine. Work can be performed on the front side of the table, and it is possible to perform work for repairing mistakes in automatic winding of roving yarn at the time of restart of the machine stand, repair work for roving breakage, and the like without any trouble. Full bobbin F and empty bobbin E
It is not necessary to provide independent transfer rails for each transfer, and the cost for manufacturing the apparatus can be reduced.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明を具体化した第1実施例の概略側面図で
ある。
FIG. 1 is a schematic side view of a first embodiment of the present invention.

【図2】管替装置と粗紡機との関係を示す概略正面図で
ある。
FIG. 2 is a schematic front view showing a relationship between the tube changing device and the roving machine.

【図3】管替装置の一部省略側断面図である。FIG. 3 is a partially omitted side sectional view of the tube switching device.

【図4】(a)は管替ヘッド昇降装置の駆動部を示す部
分正面図であり、(b)はリンクの支持状態を示す部分
正面図である。
FIG. 4A is a partial front view showing a driving unit of the tube replacement head elevating device, and FIG. 4B is a partial front view showing a supported state of a link.

【図5】管替ヘッド昇降装置の駆動部を示す一部破断部
分平面図である。
FIG. 5 is a partially broken partial plan view showing a drive unit of the tube replacement head elevating device.

【図6】管替装置が満ボビンを吊下した状態の一部省略
側断面図である。
FIG. 6 is a partially omitted side sectional view showing a state in which a full bobbin is suspended by a tube replacement device.

【図7】フォークの支持状態及び駆動機構を示す一部破
断部分平面図である。
FIG. 7 is a partially broken partial plan view showing a fork supporting state and a driving mechanism.

【図8】ドッフィングビームの駆動機構を示す一部破断
部分平面図である。
FIG. 8 is a partially broken partial plan view showing a driving mechanism of the doffing beam.

【図9】空ボビンが管替準備位置に搬入された状態の概
略側面図である。
FIG. 9 is a schematic side view showing a state in which an empty bobbin is carried into a tube replacement preparation position.

【図10】管替ヘッドが空ボビン吊下位置に配置された
状態の概略側面図である。
FIG. 10 is a schematic side view of a state in which the tube replacement head is arranged at an empty bobbin hanging position.

【図11】空ボビンがペッグ上に載置された状態の概略
側面図である。
FIG. 11 is a schematic side view showing a state where an empty bobbin is placed on a peg.

【図12】満ボビンがフォークに吊下された状態の概略
側面図である。
FIG. 12 is a schematic side view of a state in which a full bobbin is hung on a fork.

【図13】満ボビンが取り出された状態の概略側面図で
ある。
FIG. 13 is a schematic side view of a state where a full bobbin is taken out.

【図14】満ボビンが搬送体に吊下された状態の概略側
面図である。
FIG. 14 is a schematic side view of a state in which a full bobbin is suspended from a carrier.

【図15】空ボビンがボビンレール上に配置された状態
の概略側面図である。
FIG. 15 is a schematic side view of a state where an empty bobbin is arranged on a bobbin rail.

【図16】空ボビンがボビンホイールに装着された状態
の概略側面図である。
FIG. 16 is a schematic side view showing a state where an empty bobbin is mounted on a bobbin wheel.

【図17】管替ヘッドが待機位置に復帰した状態の概略
側面図である。
FIG. 17 is a schematic side view of a state where the tube replacement head has returned to the standby position.

【図18】第2実施例の概略側面図である。FIG. 18 is a schematic side view of the second embodiment.

【図19】管替装置の一部省略側断面図である。FIG. 19 is a partially omitted side sectional view of the tube switching device.

【図20】管替装置が満ボビンを吊下した状態の一部省
略側断面図である。
FIG. 20 is a partially omitted side sectional view showing a state in which a full bobbin is suspended by a tube replacement device.

【図21】管替ヘッドが空ボビン吊下位置に配置された
状態の概略側面図である。
FIG. 21 is a schematic side view showing a state in which the tube replacement head is arranged at an empty bobbin hanging position.

【図22】空ボビンがペッグ上に載置された状態の概略
側面図である。
FIG. 22 is a schematic side view of a state where an empty bobbin is placed on a peg.

【図23】満ボビンがフォークに吊下された状態の概略
側面図である。
FIG. 23 is a schematic side view of a state in which a full bobbin is hung on a fork.

【図24】満ボビンが取り出された状態の概略側面図で
ある。
FIG. 24 is a schematic side view of a state where a full bobbin is taken out.

【図25】満ボビンが搬送体に吊下された状態の概略側
面図である。
FIG. 25 is a schematic side view of a state in which a full bobbin is suspended from a carrier.

【図26】管替装置がペッグ上の空ボビンを吊下した状
態の側面図である。
FIG. 26 is a side view showing a state in which an empty bobbin on a peg is suspended by a tube replacement device.

【図27】空ボビンを吊下した管替ヘッドが下降した状
態の概略側面図である。
FIG. 27 is a schematic side view of a state in which the tube replacement head with an empty bobbin suspended has been lowered.

【図28】空ボビンがボビンレール上に配置された状態
の概略側面図である。
FIG. 28 is a schematic side view showing a state where an empty bobbin is arranged on a bobbin rail.

【図29】管替ヘッドが待機位置に復帰した状態の概略
側面図である。
FIG. 29 is a schematic side view of a state where the tube replacement head has returned to the standby position.

【図30】第3実施例の概略側面図である。FIG. 30 is a schematic side view of the third embodiment.

【図31】従来装置の概略側面図である。FIG. 31 is a schematic side view of a conventional device.

【図32】同じく管替え作業時の作動説明用の概略平面
図である。
FIG. 32 is a schematic plan view for explaining an operation at the time of a pipe replacement operation.

【図33】同じく管替え作業時の作動説明用の概略平面
図である。
FIG. 33 is a schematic plan view for explaining an operation at the time of pipe replacement work.

【図34】別の従来装置の概略側面図である。FIG. 34 is a schematic side view of another conventional apparatus.

【符号の説明】[Explanation of symbols]

1…フライヤ、2…粗紡機、2a…フライヤレール、3
…ボビンレール、4…ボビンホイール、5…支持レー
ル、6…ボビンハンガ、7…ボビン搬送体、11…管替
装置、12…管替ヘッド、13…昇降手段としての昇降
装置、14…パンタグラフ機構、42…ドッフィングビ
ーム、44…管替腕前後動手段としての第1のスコット
ラッセル直線運動機構、52a…管替腕としての固定フ
ォーク、52b…同じく可動フォーク、56…管替腕前
後動手段としての第2のスコットラッセル直線運動機
構、65…ペッグ、E…空ボビン、F…満ボビン。
1 ... flyer, 2 ... roving machine, 2a ... flyer rail, 3
... bobbin rails, 4 ... bobbin wheels, 5 ... support rails, 6 ... bobbin hangers, 7 ... bobbin transporters, 11 ... tube replacement heads, 13 ... lifting devices as lifting / lowering means, 14 ... pantograph mechanisms, Reference numeral 42 denotes a doffing beam, 44 denotes a first Scott Russell linear motion mechanism as a replacement arm longitudinal movement means, 52a a fixed fork as a replacement arm, 52b similarly a movable fork, 56 ... The second Scott Russell linear motion mechanism, 65 ... peg, E ... empty bobbin, F ... full bobbin.

───────────────────────────────────────────────────── フロントページの続き (56)参考文献 特開 昭58−119562(JP,A) 特開 昭63−288228(JP,A) 特開 昭62−57945(JP,A) 特開 昭61−119730(JP,A) 特公 昭63−61414(JP,B2) (58)調査した分野(Int.Cl.7,DB名) D01H 9/04 ──────────────────────────────────────────────────続 き Continuation of the front page (56) References JP-A-58-119562 (JP, A) JP-A-63-288228 (JP, A) JP-A-62-57945 (JP, A) JP-A-61-1986 119730 (JP, A) JP-B 63-61414 (JP, B2) (58) Fields investigated (Int. Cl. 7 , DB name) D01H 9/04

Claims (3)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 上部支持式のフライヤを装備した粗紡機
の前側に、粗紡機のボビンホイールピッチと同じピッチ
で配設した管替腕を粗紡機に対して前進、後退させる管
替腕前後動手段と、管替腕を昇降させる管替腕昇降手段
とを備えた管替装置を配設し、粗紡機の上方において粗
紡機に沿って配設したレール上に、少なくとも粗紡機1
台分の空ボビンをボビンホイールピッチと同じピッチで
吊架したボビンハンガを備えたボビン搬送体を待機さ
せ、管替装置の作動によりボビン搬送体上の空ボビンを
ボビンハンガから取り外すとともに前記管替腕の移動範
囲と対向する所定位置に配設されたぺッグ上に一時的に
移載し、次にボビンレール上の満ボビンを管替腕に吊架
して粗紡機の前側に移動させるとともに空ボビンが取り
外されたボビンハンガに吊架し、次に前記ぺッグ上に一
時的に移載した空ボビンをボビンレール上のボビンホイ
ールに装着する粗紡機における管替方法。
1. A forward / backward movement of a pipe changing arm provided at the front side of a roving machine equipped with an upper support type flyer and arranged at the same pitch as the bobbin wheel pitch of the roving machine. Means and a pipe replacement device provided with a pipe replacement arm elevating means for raising and lowering the pipe replacement arm, and at least a roving machine 1 is provided on a rail provided along the roving machine above the roving machine.
A bobbin transporter provided with a bobbin hanger in which empty bobbins of the same number are suspended at the same pitch as the bobbin wheel pitch is put on standby. The bobbin on the bobbin rail is temporarily suspended on a pipe transfer arm and moved to the front side of the roving machine. A pipe replacement method for a roving machine in which an empty bobbin temporarily suspended on the bobbin hanger and then temporarily transferred onto the above-mentioned peg is mounted on a bobbin wheel on a bobbin rail.
【請求項2】 上部支持式のフライヤを装備した粗紡機
の前側に、粗紡機のボビンホイールピッチと同じピッチ
で配設した管替腕を粗紡機に対して前進、後退させる管
替腕前後動手段と、管替腕を昇降させる管替腕昇降手段
とを備えた管替装置を配設し、粗紡機の上方において粗
紡機に沿って配設したレール上に、少なくとも粗紡機1
台分の空ボビンをボビンホイールピッチと同じピッチで
吊架したボビンハンガを備えたボビン搬送体を待機さ
せ、管替装置の作動によりボビンレール上の満ボビンを
管替腕に吊架して粗紡機の前側に移動させるとともに前
記管替腕の移動範囲と対向する所定位置に配設されたぺ
ッグ上に一時的に移載し、次にボビン搬送体上の空ボビ
ンをボビンハンガから取り外すとともに満ボビンが取り
外されたボビンレール上のボビンホイールに装着し、次
に前記ぺッグ上に一時的に移載した満ボビンを空ボビン
が取り外されたボビンハンガに吊架する粗紡機における
管替方法。
2. A forward / backward movement of a pipe changing arm disposed at the front side of a roving machine equipped with an upper-supporting flyer at the same pitch as the bobbin wheel pitch of the roving machine. Means and a pipe replacement device provided with a pipe replacement arm elevating means for raising and lowering the pipe replacement arm, and at least a roving machine 1 is provided on a rail provided along the roving machine above the roving machine.
A bobbin transporter equipped with a bobbin hanger in which empty bobbins of the same number are suspended at the same pitch as the bobbin wheel pitch is put on standby. At the same time as the bobbin transporter, remove the empty bobbin on the bobbin hanger from the bobbin hanger, and remove the full bobbin. A pipe replacement method for a roving machine in which a bobbin wheel mounted on a bobbin rail removed and then a full bobbin temporarily transferred to the above-mentioned peg is suspended on a bobbin hanger from which an empty bobbin has been removed.
【請求項3】 上部支持式のフライヤを装備した粗紡機
の上方において粗紡機に沿って配設されたレールと、 前記レールに沿って移動可能に配設され、少なくとも粗
紡機のボビンホイールと同数のボビンハンガをボビンホ
イールピッチと同じピッチで吊架したボビン搬送体と、 粗紡機の前側に粗紡機のボビンホイールピッチと同じピ
ッチで配設され、ボビンを保持可能な多数の管替腕と、 前記管替腕を粗紡機に対して前進、後退させる管替腕前
後動手段と、 前記管替腕を管替腕前後動手段とともに昇降させる昇降
手段と、 前記管替腕の移動範囲と対向する所定位置にボビンホイ
ールピッチと同じピッチで配設され、前記搬送体から取
り外された空ボビン又はボビンレールから取り出された
満ボビンを一時的に載置するためのぺッグとを備えた粗
紡機における管替装置。
3. A rail arranged along the roving machine above the roving machine equipped with a top-supported flyer, and at least as many bobbin wheels of the roving machine as are movable along the rail. A bobbin transporter in which the bobbin hanger is suspended at the same pitch as the bobbin wheel pitch, a number of replacement arms that are arranged at the same pitch as the bobbin wheel pitch of the roving machine on the front side of the roving machine and are capable of holding the bobbin, Forward and backward moving means for moving the refill arm forward and backward with respect to the roving machine; elevating means for raising and lowering the refill arm together with the forward and backward moving means for the refill arm; At the same pitch as the bobbin wheel pitch, and a bog for temporarily placing an empty bobbin removed from the carrier or a full bobbin removed from the bobbin rail. Kankawa in Rover device.
JP04192526A 1992-07-20 1992-07-20 Pipe replacement method and pipe replacement device in roving machine Expired - Lifetime JP3074945B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP04192526A JP3074945B2 (en) 1992-07-20 1992-07-20 Pipe replacement method and pipe replacement device in roving machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP04192526A JP3074945B2 (en) 1992-07-20 1992-07-20 Pipe replacement method and pipe replacement device in roving machine

Publications (2)

Publication Number Publication Date
JPH0641827A JPH0641827A (en) 1994-02-15
JP3074945B2 true JP3074945B2 (en) 2000-08-07

Family

ID=16292754

Family Applications (1)

Application Number Title Priority Date Filing Date
JP04192526A Expired - Lifetime JP3074945B2 (en) 1992-07-20 1992-07-20 Pipe replacement method and pipe replacement device in roving machine

Country Status (1)

Country Link
JP (1) JP3074945B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08113834A (en) * 1994-10-14 1996-05-07 Toyota Autom Loom Works Ltd Method for changing bobbin in roving frame and apparatus for changing bobbin
JPH08157144A (en) * 1994-11-30 1996-06-18 Toyota Autom Loom Works Ltd Bobbin carrying system in spinning machine

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6361414B2 (en) 2014-09-24 2018-07-25 アイシン精機株式会社 Vehicle suspension system

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6361414B2 (en) 2014-09-24 2018-07-25 アイシン精機株式会社 Vehicle suspension system

Also Published As

Publication number Publication date
JPH0641827A (en) 1994-02-15

Similar Documents

Publication Publication Date Title
JPS6361414B2 (en)
JPS6359427A (en) Method for exchanging sliver in fine spinning frame and machine therefor
JP3074945B2 (en) Pipe replacement method and pipe replacement device in roving machine
JP2906735B2 (en) Doffing device in roving machine
KR20020062167A (en) Bobbin changing device of roving frame
JP2545945B2 (en) Method and device for replacing a spinning machine
KR0139236B1 (en) Method and apparatus of doffing and donning bobbins in a roving machine
JP3114429B2 (en) Roof dripping prevention device of roving yarn changer
JP2503963B2 (en) Shining machine for spinning machines
JPH0377291B2 (en)
JP3114383B2 (en) Method and apparatus for winding a roving end of a roving bobbin
JPH0585658B2 (en)
JPS61119730A (en) Method for doffing in roving frame and apparatus therefor
JPS6331565B2 (en)
JP2000045137A (en) Cop changing apparatus of roving frame and roving frame
JPS61119728A (en) Method for doffing sliver in spinning machine
JPH086045Y2 (en) Rover replacement device
JPH057261Y2 (en)
JPH0525721A (en) Apparatus for transferring roving bobbin in spinning frame
JP2543939Y2 (en) Spinning roving guide
JPS61102429A (en) Bobbin changing in speed frame
JP2979734B2 (en) Shino exchange method and Shino exchange in spinning machine
JP2001003230A (en) Work step of roving frame
JP2002285435A (en) Cop-changing apparatus in roving frame
JPH08113835A (en) Bobbin-carrying platform of roving frame