JP3076207B2 - Top shaft advanced construction method - Google Patents
[go: Go Back, main page]

JP3076207B2 - Top shaft advanced construction method - Google Patents

Top shaft advanced construction method

Info

Publication number
JP3076207B2
JP3076207B2 JP06325677A JP32567794A JP3076207B2 JP 3076207 B2 JP3076207 B2 JP 3076207B2 JP 06325677 A JP06325677 A JP 06325677A JP 32567794 A JP32567794 A JP 32567794A JP 3076207 B2 JP3076207 B2 JP 3076207B2
Authority
JP
Japan
Prior art keywords
shaft
advanced
main shaft
construction method
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP06325677A
Other languages
Japanese (ja)
Other versions
JPH08184284A (en
Inventor
孝 酒井
満朗 肥後
義昭 石田
勝 中村
武志 鈴木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Komatsu Ltd
Maeda Corp
Sato Kogyo Co Ltd
Original Assignee
Komatsu Ltd
Maeda Corp
Sato Kogyo Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Komatsu Ltd, Maeda Corp, Sato Kogyo Co Ltd filed Critical Komatsu Ltd
Priority to JP06325677A priority Critical patent/JP3076207B2/en
Publication of JPH08184284A publication Critical patent/JPH08184284A/en
Application granted granted Critical
Publication of JP3076207B2 publication Critical patent/JP3076207B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明はトンネル工法、特に本坑
施工前に導坑を先進させる頂設導坑先進工法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a tunnel construction method and, more particularly, to a top shaft construction method for advancing a shaft before construction of a main shaft.

【0002】[0002]

【従来の技術】頂設導坑を施工する技術としては、矢板
工法やNATM(ニューオーストリアントンネリングメ
ソッド)による山岳工法と、トンネルを円形断面に掘削
するTBM(トンネルボーリングマシーン)による工法
とが考えられる。
2. Description of the Related Art As a technique for constructing an overhead shaft, a mountain construction method using a sheet pile method or NATM (New Austrian tunneling method) and a construction method using a TBM (tunnel boring machine) for excavating a tunnel into a circular cross section are considered. Can be

【0003】図9(a)(b)に示すように、山岳工法
の頂設導坑の場合、図内のアラビア数字に示す順番、即
ち、先進導坑として計画トンネル断面となる頂部中央
を掘削し、続いてその両側を掘削し、ついでトンネル
の主要部となる中央部、さらに下部中央とその両側
を掘削して全体断面を馬蹄形50とし、その後吹付け
などコンクリートの覆工,を行なう。
[0003] As shown in Figs. 9 (a) and 9 (b), in the case of a top tunnel of the mountain method, the order shown by Arabic numerals in the figure, that is, the center of the top of the planned tunnel section as an advanced tunnel is excavated. Subsequently, both sides of the tunnel are excavated, and then a central portion, which is a main portion of the tunnel, and a lower center and both sides thereof are excavated to form a horseshoe-shaped cross section, followed by concrete lining such as spraying.

【0004】一方、TBM工法の場合、本坑予定のトン
ネル断面の天端付近に先進導坑としてのパイロット坑掘
削61を掘削して穿設し、その後に下部切欠円形断面の
本坑60を掘削している。
[0004] On the other hand, in the case of the TBM method, a pilot well excavation 61 as an advanced shaft is excavated and drilled near the top end of the planned tunnel section, and then a main well 60 having a circular section with a lower notch is excavated. doing.

【0005】[0005]

【発明が解決しようとする課題】しかし、上記山岳工法
による場合、施工性を考慮して本坑断面が比較的自由に
設定することができるものの、TBMに較べて掘削スピ
ードや安全性の面で問題がある。
However, in the case of the above-mentioned mountain construction method, although the cross section of the main pit can be set relatively freely in consideration of the workability, the excavation speed and safety are higher than those of the TBM. There's a problem.

【0006】一方、円形の先進導坑の場合には、その掘
削形状が円形のために、円形又は馬蹄形断面の本坑掘削
ラインと接触する部分が点となり、かつ先進導坑の頂部
から後で本坑を掘削するための薬液注入やロックボルト
など本坑上部地盤の改良が効率的に施工できないという
欠点がある。
On the other hand, in the case of a circular advanced shaft, since the excavation shape is circular, a point that comes into contact with the main shaft excavation line having a circular or horseshoe-shaped cross section is a point, and the point is later from the top of the advanced shaft. There is a drawback that the improvement of the ground above the main pit, such as injection of a chemical solution for excavating the main pit and lock bolts, cannot be performed efficiently.

【0007】また、円形断面の先進導坑の上部支保を本
坑の支保と兼用して施工する場合は、その施工部分を確
保するために、先進導坑の掘削と断面と本坑の掘削断面
を重ねて掘削しなければならず、重合した箇所で余掘り
が発生して効率が悪いばかりでなく、これを施工すると
本坑の最終断面形状が設計断面の上部にコブのような条
状突出部ができていびつな形状となり、トンネル構造の
安全上も不利となるという欠点が生じる。
In the case where the upper support of the advanced shaft having a circular cross section is also used as the support of the main shaft, the excavation of the advanced shaft and the cross section and the cross section of the main shaft are required to secure the construction portion. Not only is it inefficient because of the excavation at the overlapped part, but when this is done, the final cross-sectional shape of the main pit becomes a strip like protrusion on the top of the design section. There is a drawback that the portion is formed and has an irregular shape, which is disadvantageous in terms of safety of the tunnel structure.

【0008】そこで本発明は、掘削施工のスピードと安
全性を重視して発破などによる山岳工法は採用せず、T
BMなど掘進機による機械掘削方式を前提とし、しかも
上記TBM工法における欠点を解消せんとした。すなわ
ち、先進導坑上部を本坑上部と重ね合わせた形状で施工
することで、本坑天端付近の地盤を改良するか、先進導
坑の頂設部を本坑のH鋼とコンクリート吹付けによる支
保と兼用することにより、複線トンネルの敷設などでも
余掘の少ない横長のトンネルの頂設導坑先進工法を施工
できるようにした。
Accordingly, the present invention does not employ a mountain construction method such as blasting with emphasis on the speed and safety of excavation work.
A mechanical excavation method using an excavator such as a BM is premised, and the above-mentioned drawbacks in the TBM method are not eliminated. In other words, the ground near the top of the main pit is improved by constructing the upper part of the advanced shaft with the upper part of the main shaft, or the top of the advanced shaft is sprayed with H steel and concrete. By using the double-track tunnel, it is possible to construct an advanced tunnel construction method for horizontal tunnels with little extra excavation, even when laying double-track tunnels.

【0009】また、本発明の別の目的は、上記従来のT
BMの機械掘削の特徴として掘削スピードと安全性をほ
ぼ確保しながら、本坑上部の地盤改良を効率良く行なえ
るようにした頂設導坑先進工法を提供せんとする。
Another object of the present invention is to provide the above-described conventional T
The feature of BM's mechanical excavation is to provide a top shaft advanced construction method that can efficiently improve the ground at the top of the main pit while almost ensuring the excavation speed and safety.

【0010】さらに、先進導坑の上部支保をそのまま後
で掘削する本坑の支保を兼ねることにより、効率を良く
することで工期が短くなり、経済的にも価値のある頂設
導坑先進工法を提供せんとする。
[0010] Further, by using the upper support of the advanced shaft as a support for the main shaft to be excavated as it is later, the efficiency is improved and the construction period is shortened. Will not provide.

【0011】[0011]

【課題を解決するための手段】本発明は上記の目的に基
づいてなされたものであり、その要旨とするところは、
トンネル計画路線に本坑を施工する前に、当該本坑のト
ンネル断面の頂部内側付近に先進導坑を掘削する頂設導
坑先進工法において、前記先進導坑の上部を前記本坑の
上部と線状に内接して重合するように、該先進導坑を断
面横長の楕円形に掘削することを特徴とする頂設導坑先
進工法にある。
SUMMARY OF THE INVENTION The present invention has been made based on the above objects, and the gist of the invention is as follows.
Before constructing the main shaft on the tunnel planned route, in the top shaft advanced construction method of excavating an advanced shaft near the inside of the top of the tunnel section of the main shaft, the upper part of the advanced shaft is referred to as the upper part of the main shaft. In the top shaft advanced construction method, the advanced shaft is excavated into an elliptical shape having a horizontally long cross-section so as to be inscribed in a linear manner.

【0012】上記先進導坑や本坑の掘削工法には、機械
掘削するものならば、TBM,NATM,フルシールド
TBM(シールドマシーンを兼ね備えたTBM)なども
利用される山岳工法やシールド工法など工法の種類を問
わないが、円形カッター面を掘進方向に傾斜させてトン
ネル断面を横長の楕円形として掘削する工法が必須のも
のである。
In the drilling method for the above-mentioned advanced shaft and main shaft, if the machine is to be machined, TBM, NATM, a full shield TBM (a TBM having a shield machine) and the like are also used. Any method is required, but a method is required in which a circular cutter surface is inclined in the excavation direction to excavate the tunnel into a horizontally long elliptical cross section.

【0013】また、上記先進導坑と本坑のそれぞれの上
部重合部分が線状に内接するとは、大円が小円を内接し
ている場合では点接触となるが、これとは別に大円に楕
円形の小円を内接すると重なる部分が線状になり、この
線状の重なり部分をもって本坑を掘削していく工法を意
味する。
[0013] In addition, when the upper overlap portion of each of the advanced shaft and the main shaft is inscribed in a line, point contact occurs when the great circle inscribes the small circle. When an elliptical small circle is inscribed in a circle, the overlapping portion becomes linear, and this means a method of excavating the main pit with this linear overlapping portion.

【0014】別の本発明工法では、先進導坑の上部が本
坑の頂部付近に重なるところから、この部分に薬液注入
やロックボルトなどの事前補強工を行なうと、従来工法
の点で重なる場合に行なう事前補強工よりも、掘削上部
に薬液注入することが容易になり、また重合しないロッ
クボルト部分では本坑掘削時に切断しなければならなく
なったといった不都合を回避し、より適切な工法で施工
できる。
According to another construction method of the present invention, if the upper part of the advanced shaft overlaps near the top of the main well, if this part is subjected to a pre-reinforcement work such as injection of a chemical solution or a lock bolt, the overlap with the conventional construction method may occur. It is easier to inject chemicals into the upper part of the excavation than in the pre-reinforcement work to be carried out, and to avoid the inconvenience of having to cut off the lock bolt portion that does not overlap when excavating the main pit, and construct it with a more appropriate construction method it can.

【0015】さらに、別の本発明工法は先進導坑の本坑
と重なる部分のH鋼やセグメントなど支保や覆工部の一
部を、後で施工する本坑の天端部分の支保や覆工部の一
部に兼ねることができる。
Further, another method of the present invention is to support a portion of a support or lining portion, such as H steel or a segment, which overlaps with a main shaft of an advanced shaft, and to support or cover a top end portion of the main shaft to be constructed later. It can also be used as part of the engineering department.

【0016】[0016]

【作用】本発明では、初めに横長の楕円断面の先進導坑
を掘削し、その後この先進導坑の上部を本坑の天端付近
として掘削するために、楕円形の先進導坑の上部が幅広
となり、この部分に本坑用の薬液注入やロックボルトの
地盤改良を行なうといった事前補強工を適切に行なう。
According to the present invention, the upper part of the elliptical advanced shaft is excavated in order to excavate the horizontally long elliptical advanced shaft first, and then to excavate the upper part of the advanced shaft near the top end of the main shaft. It becomes wider, and appropriate pre-reinforcement work such as injecting a chemical solution for the main shaft and improving the ground of rock bolts is performed in this area.

【0017】また、先進導坑の上部の少くとも本坑の天
端付近の重なる部分に、予め本坑のH鋼とコンクリート
吹付け、またはセグメントの巻回、あるいはこれらを複
合するなど支保や覆工に便利である。
Further, at least at the upper part of the upper shaft of the advanced shaft, near the top end of the main shaft, by spraying H steel and concrete in the main shaft, winding segments, or combining these materials to support or cover. It is convenient for construction.

【0018】[0018]

【実施例】本発明の頂設導坑先進工法を説明する前に、
この先進工法に用いる実施例としてのTBMの概略を図
3乃至図6に基づいて説明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Before explaining the advanced shaft construction method of the present invention,
An outline of a TBM as an embodiment used in this advanced construction method will be described with reference to FIGS.

【0019】TBMには、メインビーム1の先部に掘進
方向水平面に対して例えば50度傾斜した、カッタ面2
に多数のカッタ14を配置したカッタドラム3を配備
し、電動モータ5を回転して地山を掘削する。カッタド
ラム3を備えたメインビーム1とグリッパ8間にはスラ
ストジャッキ9を介在させる。掘削時には、グリッパ8
をグリッパジャッキ13により坑壁に押し付けて、これ
を反力としてスラストジャッキ9を伸長しながらカッタ
ドラム3を回転して掘進していく。メインビーム1の上
部は作業台4を配置している。カッタ面2の回転軸とト
ンネル水平軸とのなす角度は50度で回転可能にしてい
る。
At the tip of the main beam 1, a cutter surface 2 inclined at an angle of, for example, 50 degrees with respect to a horizontal plane in the excavation direction is provided on the TBM.
The cutter drum 3 on which a number of cutters 14 are arranged is provided, and the electric motor 5 is rotated to excavate the ground. A thrust jack 9 is interposed between the main beam 1 having the cutter drum 3 and the gripper 8. When excavating, gripper 8
Is pressed against the pit wall by the gripper jack 13, and the thrust jack 9 is extended by using this as a reaction force to rotate the cutter drum 3 to excavate. A workbench 4 is arranged above the main beam 1. The angle formed between the rotation axis of the cutter surface 2 and the horizontal axis of the tunnel can be rotated at 50 degrees.

【0020】スラストジャッキ9の1ストローク分を掘
進すると、グリッパ8の後方にリヤーサポート7を連設
し、これを下方に伸長して接地してから、グリッパジャ
ッキ13を収縮して坑壁から外してからスラストジャツ
キ9を収縮することによりリヤサポート7とともにグリ
ッパ8を1ストローク前進させ、再びグリッパジャッキ
13を伸長することでグリッパ8を坑壁に圧接し、リヤ
サポート7を収縮してからTBMの掘進を再開する。ル
ーフサポート10は坑壁の上部に圧接することで、傾斜
したカッタ面2の掘削によるTBMの浮き上がりを防止
する。第1段ベルトコンベア11は、その先端をカッタ
ドラム3の中央内部に、後端をリヤーサポート7の後部
に位置させて、カッタにより掘削されたズリを後方へ搬
送し、さらに第2段コンベア12によって掘削坑の後方
へ排出していく。
When the thrust jack 9 is excavated for one stroke, the rear support 7 is connected to the rear of the gripper 8 and is extended downward to ground, and then the gripper jack 13 is contracted and removed from the pit wall. After that, the gripper 8 is advanced by one stroke together with the rear support 7 by contracting the thrust jack 9, and the gripper 8 is pressed against the pit wall by extending the gripper jack 13 again, and the rear support 7 is contracted before the TBM. Resumes excavation. The roof support 10 presses against the upper part of the pit wall to prevent the TBM from rising due to excavation of the inclined cutter surface 2. The first-stage belt conveyor 11 transports the excavated waste by the cutter rearward, with its leading end located inside the center of the cutter drum 3 and its trailing end located behind the rear support 7. Drains to the back of the pit.

【0021】ロックドリル20は、後述する図1(セン
ターライン31の左半分)に示すように、本坑用ロック
ボルト30を先進導坑の頂部に所定間隔をおいて放射状
に定着させるための岩盤穿設用のドリルである。また、
先行ボーリング15はこのTBMの掘削前方上部地山に
ボーリングを施して、ボーリング孔33を穿設してか
ら、図1(センターライン31の右半分)に示すよう
に、該ボーリング孔33から地盤を硬化させるための薬
液注入32を行なって後に本坑35の天端付近の上部地
盤を改良する。さらに、支保工エレクタ16では掘削し
た坑壁17の内周にリング状のH鋼を巻回し、その後こ
の上から吹付ノズル(図示せず)によってコンクリート
を坑壁17に吹き付けてライニングを行なう。このコン
クリートライニングと同時、あるいは別に、エレクタ1
8を用いて、セグメント19を坑壁17に巻回し、セグ
メントの中央部にあるグラウト穴よりグラウトをセグメ
ントと地山間に注入してライニングする(図3では坑壁
の下部のみに記載し、他を省いている)こともできる。
As shown in FIG. 1 (left half of the center line 31) described later, the rock drill 20 is a bedrock for fixing the main shaft lock bolt 30 radially at a predetermined interval to the top of the advanced shaft. This is a drill for drilling. Also,
The leading boring 15 drills the upper ground in front of the excavation of the TBM to form a boring hole 33, and then, as shown in FIG. 1 (right half of the center line 31), removes the ground from the boring hole 33. After the chemical liquid injection 32 for hardening is performed, the upper ground near the top end of the main shaft 35 is improved. Further, in the support erector 16, a ring-shaped H steel is wound around the inner periphery of the excavated pit wall 17, and then concrete is sprayed onto the pit wall 17 from above by a spray nozzle (not shown) to perform lining. Simultaneously with or separately from this concrete lining, Elekta 1
8, the segment 19 is wound around the pit wall 17, grout is injected between the segment and the ground through a grout hole at the center of the segment, and lining is performed (in FIG. 3, only the lower part of the pit wall is described. Can be omitted).

【0022】上記構成からなるTBMを用いた本発明の
頂設導坑先進工法について以下に説明する。
The method for advancing a pit shaft according to the present invention using the TBM having the above structure will be described below.

【0023】まず、トンネル計画路線に沿って、二車線
以上の車道または複線の線路としての比較的大口径の本
坑を施工する前に、立坑の発進基地等からTBMにより
本坑35のトンネル断面の内側頂部付近にトンネルの上
部を線状に重合するように横長楕円形の先進導坑を掘削
する。この掘削はTBMの円形のカッター面を掘進方向
前だおしに傾斜することによりトンネル断面を横長楕円
形とする。
First, before constructing a main tunnel having a relatively large diameter as a two-lane or more lane or a double track along the planned tunnel line, the tunnel section of the main shaft 35 by a TBM from the starting base of the shaft, etc. Excavation of a horizontally elliptical advanced shaft is performed near the top of the inside of the tunnel so that the top of the tunnel overlaps linearly. In this excavation, the circular section of the TBM is inclined in front of the excavation direction so that the tunnel section becomes oblong in shape.

【0024】掘削するには、グリッパー8を坑壁17に
圧接して反力を取り、スラストジャッキ9を伸長する圧
力でカッタ面2を切羽に押し付けて、カッタドラム3を
電動モータ5で回転しながら、トンネルを掘進してい
く。スラストジャッキ9が1ストローク分伸びると掘削
を中断し、リヤーサポート7を伸長・接地してから、グ
リッパ8を収縮して、伸長しているスラストジャッキを
収縮することによりグリッパ8とこれにともなうリヤー
サポート7を前進させ、再びグリッパ8を伸長して坑壁
17に押し当ててからカッタドラム3で掘進していく。
To excavate, the gripper 8 is pressed against the pit wall 17 to take a reaction force, the cutter surface 2 is pressed against the face by the pressure for extending the thrust jack 9, and the cutter drum 3 is rotated by the electric motor 5. While digging through the tunnel. When the thrust jack 9 is extended by one stroke, the excavation is interrupted, the rear support 7 is extended and grounded, and then the gripper 8 is contracted, and the extended thrust jack is contracted, so that the gripper 8 and the rear associated therewith are contracted. The support 7 is advanced, the gripper 8 is extended again, pressed against the pit wall 17, and then excavated by the cutter drum 3.

【0025】掘削したズリは、カッタドラム3によりす
くい上げられて、その先端をドラム内部に位置する第1
段コンベヤ11上に落下し、該コンベア11と続く第2
段ベルトコンベア12によって排出される。
The excavated debris is scooped up by the cutter drum 3 and its tip is located in the first drum located inside the drum.
The conveyor 11 is dropped onto the step conveyor 11 and the second
It is discharged by the step belt conveyor 12.

【0026】掘削されたトンネルは、支保工エレクタ1
6によりH鋼を坑壁17の円周に沿ってリング状に建て
込み、その後H鋼を含む坑壁面にコンクリートを吹き付
ける(図2)。トンネル地盤の性状によっては、上記コ
ンクリート吹き付けに代えて、あるいはこれと同時にそ
の内側にセグメント19をセグメント搬送ホイスト18
によってトンネル周方向に巻回する(図3)。
The excavated tunnel is used as the support erector 1
6, the H steel is built in a ring shape along the circumference of the pit wall 17, and then concrete is sprayed on the pit wall including the H steel (FIG. 2). Depending on the properties of the tunnel ground, a segment 19 may be provided inside the segment transport hoist 18 instead of or simultaneously with the above-mentioned concrete spraying.
(Fig. 3).

【0027】その後、本坑の掘削に際しては、図1のセ
ンターライン31の左半分に示すように、ロックドリル
20を用いてトンネル周方向にロックボルト孔を穿設
し、これにモルタルなど定着材を入れてからロックボル
ト30を挿入して、ボルト頭のナット(図示せず)を反
力板として締着する。図ではトンネル周方向に3本ある
断面楕円形の先進導坑の地山の改良が、そのまま本坑3
5の天端上方の地山改良を兼ねることになる。この場
合、本坑35の側壁に、本坑掘削時にも新たなロックボ
ルト36を打ち込むこともできる。
Thereafter, when excavating the main pit, as shown in the left half of the center line 31 in FIG. 1, a lock bolt hole is formed in the circumferential direction of the tunnel using a rock drill 20, and a fixing material such as mortar is formed in the hole. Is inserted, the lock bolt 30 is inserted, and a nut (not shown) at the bolt head is tightened as a reaction force plate. In the figure, the improvement of the ground of three advanced tunnels with an oval cross section in the circumferential direction of the tunnel was
It will also serve as a ground improvement above the top of No. 5. In this case, a new lock bolt 36 can be driven into the side wall of the main shaft 35 even when the main shaft is excavated.

【0028】このロックボルトとは別に地山の事前補強
工として、図1のセンターライン31の右半分に示すよ
うに、先進導坑の先方上部にボーリング孔33を穿設
し、これに薬液を注入32をして軟弱な地山を補強硬化
して掘削することもできる。
As a pre-reinforcement work for the ground, separate from the lock bolts, a boring hole 33 is formed in the upper part ahead of the advanced shaft as shown in the right half of the center line 31 in FIG. It is also possible to perform excavation 32 by reinforcing and hardening a soft ground.

【0029】上記のようにして得た先進導坑は、その頂
部を点ではなく線状に重合するようにして、先進導坑の
全断面を包含する本坑を掘削していくが、この場合、上
記した先進導坑の頂部付近の支保は本坑の天端付近の一
部または全部の支保を兼用することができる。
In the advanced shaft obtained as described above, the main shaft including the entire cross section of the advanced shaft is excavated by superimposing the top portion of the advanced shaft in a line rather than a dot. In addition, the support near the top of the above-described advanced shaft can be used as a part or all of the support near the top end of the main shaft.

【0030】また、先進導坑の施工時のロックボルトや
薬液注入などの事前補強工は、本坑の掘削においてもそ
のまま、あるいは一部において補強工となる。
In addition, the pre-reinforcement work such as the injection of a lock bolt and a chemical solution during the construction of the advanced shaft is performed as it is or partially in the excavation of the main shaft.

【0031】[0031]

【発明の効果】以上述べたように、本発明は先進導坑の
上部を本坑の上部とトンネル周方向線状に重ね合せたの
で以下のような効果が期待できる。
As described above, according to the present invention, since the upper portion of the advanced shaft is overlapped with the upper portion of the main shaft in a line in the circumferential direction of the tunnel, the following effects can be expected.

【0032】 先進導坑の掘削ラインと本坑掘削ライ
ンとが接する長さが長くとれ、先進導坑からの事前補強
工や本坑用ロックボルトの施工が広範囲に行え、本坑掘
削時の地山の安定性や掘削効率を向上することができ
る。
[0032] The length of contact between the excavation line of the advanced shaft and the main shaft excavation line can be long, and pre-reinforcement work from the advanced shaft and construction of lock bolts for the main shaft can be performed over a wide range. The stability and excavation efficiency of the mountain can be improved.

【0033】 先進導坑の支保を本坑支保と兼用する
ことにより、工期も短縮でき経済的となる。
When the support of the advanced shaft is also used as the support of the main shaft, the construction period can be shortened, and it becomes economical.

【0034】 本発明の断面楕円形の先進導坑では、
同規模の円形TBMより底盤幅が広くとれるため、ズリ
出しや資材の搬入等で図7と図8に示すように、大型台
車が使用できるため、施工効率がアップされる。
In the advanced shaft of the present invention having an elliptical cross section,
Since the width of the bottom plate can be made wider than that of a circular TBM of the same size, a large bogie can be used as shown in FIGS.

【図面の簡単な説明】[Brief description of the drawings]

【図1】図1は、本発明工法の一つの特徴を示す概略断
面図である。
FIG. 1 is a schematic sectional view showing one feature of the method of the present invention.

【図2】図2は、本発明工法の他の特徴を示す概略断面
図である。
FIG. 2 is a schematic sectional view showing another feature of the method of the present invention.

【図3】図3は、本発明工法に使用する掘進装置の横方
向からの縦断面図である。
FIG. 3 is a vertical cross-sectional view of a digging device used in the method of the present invention as viewed from the lateral direction.

【図4】図4は、図3のカッター面の正面図である。FIG. 4 is a front view of the cutter surface of FIG. 3;

【図5】図5は、図3のA−A断面図である。FIG. 5 is a sectional view taken along line AA of FIG. 3;

【図6】図6は、図3のB−B断面図である。FIG. 6 is a sectional view taken along line BB of FIG. 3;

【図7】図7は、本発明工法である頂設導坑内でダンプ
トラックがすれ違う状態を示す概略縦断面図である。
FIG. 7 is a schematic vertical sectional view showing a state where dump trucks pass each other in a top tunnel that is the method of the present invention.

【図8】図8は、頂設導坑内でダンプトラックがターン
できる説明図である。
FIG. 8 is an explanatory diagram in which a dump truck can be turned in a top shaft.

【図9】図9(a),(b)は従来の発破などによる山
岳トンネルでの掘削順序を示す説明図である。
FIGS. 9 (a) and 9 (b) are explanatory diagrams showing a conventional excavation order in a mountain tunnel due to blasting or the like.

【図10】図10は、従来のTBMでの円形断面の頂設
導坑内での縦断面図である。
FIG. 10 is a vertical cross-sectional view of a conventional TBM in a top shaft having a circular cross section.

───────────────────────────────────────────────────── フロントページの続き (73)特許権者 000201478 前田建設工業株式会社 東京都千代田区富士見2丁目10番26号 (72)発明者 酒井 孝 東京都文京区音羽2−10−2 音羽NS ビル7F 財団法人先端建設技術センタ ー内 (72)発明者 肥後 満朗 東京都港区北青山2−5−8 株式会社 間組内 (72)発明者 石田 義昭 東京都中央区日本橋本町四丁目12番20号 佐藤工業株式会社内 (72)発明者 中村 勝 大阪府枚方市上野3−1−1 株式会社 小松製作所大阪工場内 (72)発明者 鈴木 武志 東京都千代田区富士見二丁目10番26号 前田建設工業株式会社内 (56)参考文献 特開 平6−137062(JP,A) (58)調査した分野(Int.Cl.7,DB名) E21D 9/00 E21D 20/00 E21D 11/12 E21D 13/00 - 13/04 ──────────────────────────────────────────────────続 き Continuing on the front page (73) Patent holder 000201478 Maeda Construction Industry Co., Ltd. 2-10-26 Fujimi, Chiyoda-ku, Tokyo (72) Inventor Takashi Sakai 2-10-2 Otowa, Bunkyo-ku, Tokyo Otowa NS Building 7F Inside the Advanced Construction Technology Center (72) Inventor Mitsuhiro Higo 2-5-8 Kitaaoyama, Minato-ku, Tokyo Inside Mazumi Co., Ltd. (72) Inventor Yoshiaki Ishida 4-12-20 Nihonbashi Honcho, Chuo-ku, Tokyo Inside Sato Kogyo Co., Ltd. (72) Masaru Nakamura 3-1-1 Ueno, Hirakata City, Osaka Prefecture Inside Osaka Plant of Komatsu Manufacturing Co., Ltd. (72) Takeshi Suzuki 2-10-26 Fujimi, Chiyoda-ku, Tokyo Maeda Construction Industry (56) References JP-A-6-137062 (JP, A) (58) Fields investigated (Int. Cl. 7 , DB name) E21D 9/00 E21D 20/00 E21D 11/12 E21D 13 / 00-13/04

Claims (4)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 トンネル計画路線に本坑を施工する前
に、当該本坑のトンネル断面の頂部内側付近に先進導坑
を掘削する頂設導坑先進工法において、 前記先進導坑の上部を前記本坑の上部と線状にほぼ内接
して重合するように、該先進導坑を断面横長の楕円形に
掘削することを特徴とする頂設導坑先進工法。
1. A method of excavating an advanced shaft near the inside of a top section of a tunnel section of the main shaft before constructing the main shaft on the planned tunnel line. A top shaft advanced construction method, characterized in that the advanced shaft is excavated into an elliptical shape having a laterally long cross section so that the shaft is substantially inscribed in a line with the upper part of the main shaft and overlaps the main shaft.
【請求項2】 前記先進導坑の掘削に際し、該坑の上部
地盤に薬液注入やロックボルトによる地盤改良などの事
前補強工を行なうことを特徴とする請求項1に記載の頂
設導坑先進工法。
2. The excavation of a top shaft according to claim 1, wherein when excavating the advanced shaft, a pre-reinforcement work such as injection of a chemical solution or ground improvement using a lock bolt is performed on the upper ground of the shaft. Construction method.
【請求項3】 前記先進導坑の掘削に際し、該坑の上部
支保が後で掘削する本坑の天端支保を兼ねるようにした
ことを特徴とする請求項1に記載の頂設導坑先進工法。
3. The top pit shaft according to claim 1, wherein, when excavating the advanced shaft, an upper support of the shaft also serves as a top end support of a main shaft to be excavated later. Construction method.
【請求項4】 前記先進導坑の掘削に際し、該坑の上部
覆工を後に掘削する本坑の天端覆工に兼ねるようにした
ことを特徴とする請求項1に記載の頂設導坑先進工法。
4. The pit shaft according to claim 1, wherein, when excavating the advanced shaft, an upper lining of the shaft is also used as a top lining of a main shaft to be excavated later. Advanced construction method.
JP06325677A 1994-12-27 1994-12-27 Top shaft advanced construction method Expired - Fee Related JP3076207B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP06325677A JP3076207B2 (en) 1994-12-27 1994-12-27 Top shaft advanced construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP06325677A JP3076207B2 (en) 1994-12-27 1994-12-27 Top shaft advanced construction method

Publications (2)

Publication Number Publication Date
JPH08184284A JPH08184284A (en) 1996-07-16
JP3076207B2 true JP3076207B2 (en) 2000-08-14

Family

ID=18179489

Family Applications (1)

Application Number Title Priority Date Filing Date
JP06325677A Expired - Fee Related JP3076207B2 (en) 1994-12-27 1994-12-27 Top shaft advanced construction method

Country Status (1)

Country Link
JP (1) JP3076207B2 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100418133B1 (en) * 2000-10-09 2004-02-14 에스케이건설 주식회사 Small Section Excavating Method of a Tunnel
JP2013238038A (en) * 2012-05-15 2013-11-28 Shimizu Corp Tunnel construction method
CN103306682B (en) * 2013-06-26 2015-03-25 中国电建集团中南勘测设计研究院有限公司 Long-span and high-side-wall underground space building and excavation support method thereof
CN103899322B (en) * 2014-03-05 2016-04-27 中铁工程装备集团有限公司 X-type open-type full-section tunnel machine
CN108547642A (en) * 2018-06-15 2018-09-18 中国电建集团成都勘测设计研究院有限公司 Diversion Tunnel excavation liner structure
CN113153317B (en) * 2021-05-11 2024-06-21 北华航天工业学院 A construction method and grouting device suitable for soft rock large-section tunnel

Also Published As

Publication number Publication date
JPH08184284A (en) 1996-07-16

Similar Documents

Publication Publication Date Title
CN107218048A (en) The shape of a hoof development machine promoted by crawler belt
JP3076207B2 (en) Top shaft advanced construction method
US6315496B1 (en) Method of lining a tunnel and apparatus for performing the same
JPS61221491A (en) Method and apparatus for windening tunnel
JP3121736B2 (en) Sidewall advanced method
JPH0828191A (en) Steel lining structure of tunnel
JP2594864B2 (en) Widening method of underground tunnel
CN206942770U (en) A kind of shape of a hoof development machine promoted by crawler belt
KR20010038697A (en) Head jacking shield tunneling apparatus and method
KR200175135Y1 (en) Head jacking shield tunneling apparatus
JP2597298B2 (en) Preceding method for the ground in front of the tunnel face
JP3512012B2 (en) How to excavate
JP2002371790A (en) Lateral hole boring machine
JP3171459B2 (en) Shield method
JPS5945075B2 (en) Tunnel excavation method that precedes the primary lining
JPH0643796B2 (en) Shield machine
JPH06100080B2 (en) Large-section tunnel construction method and ground solidification column construction device
JP2001020656A (en) Tunnel boring method in inferior ground
JPH08165899A (en) Tunnel lining method using timbering concurrently serving as reinforcing bar
Bougard The mechanical pre-cutting method
JPH0224486A (en) Construction of large-diameter tunnel and ring-cut type excavator
JP2943921B1 (en) Tunnel excavation and tunnel construction method
JPH11294076A (en) Cutter head, and cutting method of obstacle
JP3076206B2 (en) Excavation method of large diameter tunnel and excavation equipment used for the excavation
JP2000034886A (en) Shield machine and soil improvement method using the same

Legal Events

Date Code Title Description
S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

LAPS Cancellation because of no payment of annual fees