Mobile communication systemInfo
- Publication number
- JP3079895B2 JP3079895B2 JP06133070A JP13307094A JP3079895B2 JP 3079895 B2 JP3079895 B2 JP 3079895B2 JP 06133070 A JP06133070 A JP 06133070A JP 13307094 A JP13307094 A JP 13307094A JP 3079895 B2 JP3079895 B2 JP 3079895B2
- Authority
- JP
- Japan
- Prior art keywords
- zone
- mobile
- call
- cch
- electric field
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Mobile Radio Communication Systems (AREA)
- Synchronisation In Digital Transmission Systems (AREA)
Description
【0001】[0001]
【発明の属する技術分野】本発明は、ディジタル移動体
通信システムなどの移動体通信におけるゾーン制御に関
するものである。The present invention relates to zone control in mobile communication such as a digital mobile communication system.
【0002】[0002]
【従来の技術】例えば、特開平05−063635に公
開された「無線基地局出力制御によるトラヒック分散方
式」においては、従来例としてセルラー方式移動体無線
通信システムの仕様書であるEIAを用いて一般的発/
着呼手順(呼接続制御)を説明し、その欠点を指摘して
いる。以下その内容を示す。図29はセルラー方式移動
体通信システムを構成する複数の無線基地局の各サービ
スエリアの一例を示す図である。2. Description of the Related Art For example, in the "traffic distribution method by radio base station output control" disclosed in Japanese Patent Laid-Open No. 05-063635, as a conventional example, an EIA which is a specification of a cellular mobile radio communication system is generally used. Departure /
The incoming call procedure (call connection control) is explained, and its drawbacks are pointed out. The contents are shown below. FIG. 29 is a diagram showing an example of each service area of a plurality of radio base stations constituting the cellular mobile communication system.
【0003】移動体電話端末(以下MLと呼ぶ)が、発
呼あるいは着呼応答動作を行った際、無線基地局50
(以下FB50と呼ぶ)の保有する通話チャネル(以下
Schと呼ぶ)が存在すれば、MLはFB内のSchを
割り当てられて通話サービスを実現できる。空きSch
が存在しない場合、FB50からMLに対して下り制御
チャネル(以下Cchと呼ぶ)上に、Directed
Retry信号を送信し、これによってMLはFB5
0以外の同調可能なFB51、52、53、54、5
5、56の放送する下りのCchのいずれかを再捕捉
し、同調した後、再選択したFBの上りCchで発呼要
求あるいは着呼応答を再送することにより再選択したF
BのSchを割り当てられて通話サービスを実現する。[0003] When a mobile telephone terminal (hereinafter referred to as ML) performs an outgoing or incoming call response operation, a radio base station 50 is called.
If there is a communication channel (hereinafter, referred to as Sch) owned by the ML (hereinafter, referred to as FB50), the ML can allocate a Sch in the FB and realize a communication service. Empty Sch
Does not exist, the FB 50 directs the ML to the ML on a downlink control channel (hereinafter referred to as Cch).
Send a Retry signal, which causes the ML to send FB5
Non-zero tunable FBs 51, 52, 53, 54, 5
After re-capturing and tuning any of the downstream Cchs broadcasted by the broadcast receivers 5 and 56, the re-selected F is retransmitted by resending a call request or an incoming call response on the re-selected upstream Cch.
The call service is realized by assigning Sch of B.
【0004】この特開平5−63635号に示されたも
のの他、従来技術として図30〜図34に示されるもの
があり、以下この従来技術につき説明する。図30にお
いて、1は移動体交換局(以下CCと呼ぶ)、2はML
(移動体端末で従来のものに基本的に同じ)、50〜5
2はFB(無線基地局で従来のものに基本的に同じ)、
500〜520はサービスエリアでFB50〜52の制
御ゾーンエリアを示す。[0004] In addition to the technique disclosed in Japanese Patent Application Laid-Open No. 5-63635, there are techniques shown in FIGS. 30 to 34 as a prior art. The prior art will be described below. In FIG. 30, 1 is a mobile switching center (hereinafter referred to as CC) and 2 is ML
(Basically the same as the conventional mobile terminal), 50 to 5
2 is an FB (basically the same as a conventional base station),
500 to 520 are service areas, which indicate control zone areas of FBs 50 to 52.
【0005】次に動作について説明する。通常CCは複
数のFBを制御し、当該ゾーンに位置しているMLに対
して、Cchで発/着呼シーケンスを実行し、当該ゾー
ンのSchを与えて通話にいたらしめる。ゾーン内にい
るMLは通常当該ゾーンのFBから送信されている下り
Cchを受信している。下りCchはフレーム切りされ
ていて、先頭にフレーム番号を付加したパッケージ情報
の流れである。1つのフレームはそれがどのような意味
を持つのかを示す”信号種別”やFB番号を示す”ゾー
ン番号”などと着呼呼出や発呼応答、通話ch指示と言
った制御情報からなる。Next, the operation will be described. Normally, the CC controls a plurality of FBs, executes an outgoing / incoming call sequence on the Cch to the ML located in the zone, and gives the Sch of the zone to start a call. The ML in the zone normally receives the downlink Cch transmitted from the FB of the zone. Downstream Cch is a flow of package information in which a frame is cut and a frame number is added to the beginning. One frame is composed of "signal type" indicating what meaning it has, "zone number" indicating FB number, and control information such as incoming call, call response, and call channel instruction.
【0006】この下りCchでは、あらかじめ報知信号
として周期的に当該ゾーンの周辺ゾーンのCchの番号
を情報として流すものとする。それによってMLは当該
ゾーンのCchを捕捉し、フレーム同期がとれ、下りC
chの情報を読み込める状態になっている上記報知信号
から周辺ゾーンのCch情報を周辺ゾーンで使用されて
いるCchの周波数を示すコードとして得ることがで
き、あらかじめ周辺ゾーンのCchを知っておくことが
できる。In this downlink Cch, it is assumed that the number of the Cch in the zone around the zone is periodically transmitted as a notification signal in advance as information. As a result, the ML captures the Cch of the zone, establishes frame synchronization, and
The Cch information of the peripheral zone can be obtained as a code indicating the frequency of the Cch used in the peripheral zone from the broadcast signal in which the information of the channel can be read, and the Cch of the peripheral zone can be known in advance. it can.
【0007】また、当該ゾーンに位置するMLを呼び出
す際に下りCchに流す着呼呼出信号において、呼び出
すMLの番号に加えて、当該ゾーンのSchが現在使用
できる状態にあるのか、ないのかを同時に示すものとす
る。これによって、MLは着呼呼び出しを受けた時に当
該ゾーンのSchがあるのかを知ることができるように
する。[0007] In addition, in the incoming call signal that is sent to the downstream Cch when calling the ML located in the zone, in addition to the number of the ML to be called, it is simultaneously determined whether the Sch of the zone is currently usable or not. Shall be shown. This allows the ML to know whether there is a Sch in the zone when receiving an incoming call.
【0008】上述した下りCchで報知されている周辺
ゾーンのCch情報をMLが取り込むアルゴリズムの例
を図31に示す。MLは下りCchを捕捉し(S31
1)、フレーム同期がとれ、情報読み込みが可能な状態
になった後(S312)報知されている周辺のCch情
報を取り込む(S313)。一通り取り込んだ後、一旦
今のCchをはずし、取り込んだCchの情報からどの
ゾーンの下りCchがどのくらいの電界で受信できるの
か順次測定してゆく(S314)。周辺ゾーンの下りC
chの測定を終えたら、その結果から受信しやすい順
(電界が強い順)にMLの内部で並べ変える。この並べ
変えられた下りCchのリストをベストリストと呼ぶ。
ベストリスト作成(S315)後は、当初のつまり最初
に捕捉し、周辺Cch情報をもらったCchを捕捉し、
通常の運用状態にはいる(S317)。尚、MLが移動
し、当該ゾーンの下りCchを受信できなくなったり、
あるいは、発/着呼時に当該ゾーンのSchがなかった
りした場合、上記ベストリストに基づき受信しやすいも
のから(つまりベスト2から)Cch捕捉動作を行うも
のとする(S316)。FIG. 31 shows an example of an algorithm in which the ML fetches the Cch information of the peripheral zone reported on the above-mentioned downlink Cch. The ML captures the downlink Cch (S31
1) After the frame is synchronized and the information can be read (S312), the notified peripheral Cch information is fetched (S313). After the data has been completely captured, the current Cch is temporarily removed, and the information of the captured Cch is sequentially measured to determine in which zone the downlink Cch can be received and at what electric field (S314). C in the surrounding zone
After the measurement of the channel is completed, the result is rearranged inside the ML in the order of easy reception (in the order of strong electric field) from the result. This rearranged list of downlink Cch is called a best list.
After the creation of the best list (S315), the Cch that has been initially captured, that is, captured first, and the Cch that has received the neighboring Cch information is captured,
It enters a normal operation state (S317). In addition, if the ML moves and cannot receive the downlink Cch of the zone,
Alternatively, if there is no Sch in the zone at the time of outgoing / incoming call, the Cch acquisition operation is performed from the one that is easy to receive based on the best list (that is, from the best 2) (S316).
【0009】図31のアルゴリズムでは、ベストリスト
は最初にCchを捕捉したときに作られる。よって、M
Lの移動状況によっては、例えば、今受信しているCc
hが切れそうなので、ベストリストにしたがってベスト
2のCchを捕捉したが、実際には、その間の移動によ
ってベスト2より下のCchの方がよく受信できる状態
になってしまった場合、実際上の一番強い(ベストの)
Cchを受信できないようなことが起こってしまう。そ
の問題を解消するために図32に示す方法が考えられ
る。ベストリストに従ってCchを切り替え、周辺Cc
h情報を取り込んだ(S323)後、周辺Cchの電界
を測定する際、この最初に切り替えたCchより強い電
界で受信できるCchがあるのかないのかをチェックす
るようにする(S325)。これによってなければ、そ
のまま図31に示すもののようにベストリストを作成す
る(S327)か、よりよく受信できるCchがあった
場合、その強い方のCchに切り替え(S326)、再
度周辺Cchの取り込みから測定を行うことによって、
現実に一番電界が強いCchを捕捉するようにするもの
である。In the algorithm of FIG. 31, a best list is created when Cch is first acquired. Therefore, M
Depending on the moving situation of L, for example, Cc
h is likely to expire, so the best 2 Cch is captured according to the best list. However, in practice, if the Cch below the 2 best can be better received by movement during that time, the actual Strongest (best)
A situation occurs in which Cch cannot be received. In order to solve the problem, a method shown in FIG. 32 can be considered. Switch Cch according to the best list and select Cc around
After capturing the h information (S323), when measuring the electric field of the peripheral Cch, it is checked whether there is any Cch that can be received with an electric field stronger than the first switched Cch (S325). Otherwise, the best list is created as shown in FIG. 31 as it is (S327), or if there is a Cch that can be received better, the Cch is switched to the stronger Cch (S326), and the fetching of neighboring Cch is performed again. By taking a measurement,
This is to capture Cch, which has the strongest electric field in reality.
【0010】次に、実際に輻輳状態に位置するMLがど
のように着呼呼び出しを受け通話に至るかを示すシーケ
ンスを図33に基づいて説明する。CCは輻輳ゾーンに
おいては、MLを呼び出す際に、着呼呼出しフレームに
おいてML番号とともにそのゾーンにSchがあるかな
いかを示して着呼信号を送信する。当該MLはこれを受
信すると、既に当該ゾーンにはSchがないことを認識
し、内部のベストリスト上から捕捉可能なCchをさが
し、捕捉できたCchの上りCchでこのゾーンでの着
呼呼出しをCCに対して要請する。CCはこの着呼呼出
要請を受けたゾーンでふたたび着呼呼出信号を送出す
る。Schがある場合は、MLは着呼応答を返し、CC
からSchを与えられて通話に至る。終話後MLは当該
ゾーンのCch受信状態になり、このCchから周辺C
ch情報を取り込んで、図32に示すアルゴリズムでふ
たたびベストのCchを捕捉する。Next, a sequence showing how the ML actually located in the congested state receives an incoming call and leads to a call will be described with reference to FIG. When calling the ML in the congestion zone, the CC transmits an incoming call signal together with the ML number in the incoming call frame, indicating whether or not there is a Sch in the zone. Upon receiving this, the ML recognizes that there is no Sch in the zone, searches for a Cch that can be captured from the internal best list, and calls the incoming call in this zone on the upstream Cch of the Cch that has been captured. Request to CC. The CC again sends an incoming call signal in the zone receiving the incoming call request. If there is a Sch, the ML returns an incoming call response and the CC
Is given Sch and leads to a call. After the end of the call, the ML enters the Cch reception state of the zone, and the C
The channel information is fetched, and the best Cch is captured again by the algorithm shown in FIG.
【0011】[0011]
【発明が解決しようとする課題】上記従来例にかける呼
接続手順では、着呼時、まず下りCchの「呼び出し」
に対してMLの着呼応答があって、それに対してDir
ected Retryなる信号が下りCchに送信さ
れ、これを受けてMLがCch再選択からリトライに至
る制御を行っている。従って、以下の如き具体的な問題
点がある。 a.図31および図32に示すようなアルゴリズムでは
MLが現在捕捉しているCchを切り離し、他ゾーンの
下りCchの電界の受信レベルのサーチ動作を行うが、
このサーチ期間中はCCとMLは通信をすることができ
ない。 b.また、このMLのリトライまでの時間まで、必ず接
続できるという保証もないのに発呼者を保留(接続でき
るかできないか不定である時間)する。 c.さらに、図33に示すような複雑なシーケンスはC
chのトラヒックを上昇させる。さらに例えば、あらか
じめ、Cch上の信号フレーム(フォーマット)上のビ
ット数、フレーム数等の制約があり、隣接Cchの情報
や着呼呼出時に輻輳を通知できない場合、あるいは着呼
呼出単位が複数ゾーンの場合、一旦複数ゾーンに着呼を
かけてMLからの応答があったゾーンが輻輳ゾーンであ
る時に輻輳ゾーン処理を実行することになるのでMLと
の間のシーケンスがふえ、そのためにトラヒックが増
す。上記a.〜c.の問題点以外に移動体の位置情報を
適性に把握すること、ハンドオーバー動作の繰り返しを
抑制すること等につき、従来技術では充分に応えられな
かった。このように従来技術では、円滑かつ効率のよい
運用を充分には達成できないという問題点があった。In the call connection procedure according to the above-mentioned conventional example, at the time of an incoming call, first, "calling" of a downlink Cch is performed.
ML has an incoming call response, and Dir
A signal called “ectedRetry” is transmitted to the downlink Cch, and in response to this, the ML performs control from Cch reselection to retry. Therefore, there are the following specific problems. a. In the algorithm as shown in FIG. 31 and FIG. 32, the ML separates the Cch currently acquired and performs a search operation of the reception level of the electric field of the downstream Cch in another zone.
During this search period, the CC and the ML cannot communicate. b. Until the time until the retry of the ML, there is no guarantee that the connection is always established, but the caller is put on hold (time when connection is possible or uncertain or uncertain). c. Further, a complicated sequence as shown in FIG.
Increase the traffic of ch. Further, for example, there is a restriction on the number of bits and the number of frames on a signal frame (format) on the Cch in advance, and congestion cannot be notified at the time of information on an adjacent Cch or an incoming call, or a unit of an incoming call for a plurality of zones. In this case, the congestion zone processing is executed when the zone that has received a response from the ML by receiving an incoming call to a plurality of zones once, and the sequence between the ML and the ML increases, thereby increasing the traffic. The above a. ~ C. In addition to the problems described above, the prior art has not been able to adequately grasp the position information of the moving object, suppress repetition of the handover operation, and the like. As described above, the conventional technology has a problem that smooth and efficient operation cannot be sufficiently achieved.
【0012】この発明は上記のような問題点を解決する
ためになされたもので、円滑で効率のよい運用を行うこ
とができる移動体通信システムを提供することを目的と
する。The present invention has been made to solve the above problems, and has as its object to provide a mobile communication system capable of performing smooth and efficient operation.
【0013】[0013]
【課題を解決するための手段】請求項第1項の発明は、
輻輳ゾーン内で移動体交換局が着呼呼出を送信する際、
移動体が輻輳ゾーンからの回避動作を行うとともに移動
体交換局が発呼者に対してゾーン切替え中である旨を通
知手段により通知するようにしたものである。According to the first aspect of the present invention,
When the mobile switching center sends an incoming call within the congestion zone,
The mobile unit performs an operation of avoiding the congestion zone, and the mobile switching center notifies the calling party that the zone switching is being performed by the notification unit.
【0014】請求項第2項の発明は、請求項第1項の発
明に加え、周辺制御チャネルの情報に基づいて周辺ゾー
ンの制御チャネルの電界を測定しその測定結果に基づき
制御チャネルのリストを作成するようにしたものであ
る。According to a second aspect of the present invention, in addition to the first aspect, an electric field of a control channel in a peripheral zone is measured based on information on the peripheral control channel, and a list of control channels is prepared based on the measurement result. It is intended to be created.
【0015】請求項第3項の発明は、請求項第1項の発
明に加え、最初に捕捉した制御チャネルよりも強い電界
の制御チャネルを捕捉し直し、当該制御チャネルから周
辺制御チャネル情報読み込みを再度行うようにしたもの
である。According to a third aspect of the present invention, in addition to the first aspect of the present invention, a control channel having an electric field stronger than that of the control channel initially captured is re-captured, and peripheral control channel information is read from the control channel. It is intended to be performed again.
【0016】請求項第4項の発明は、輻輳ゾーン内にお
いて着呼呼出を移動体交換局が送信する前に、あらかじ
め当該ゾーンの周辺ゾーンの基地局に対して輻輳ゾーン
の上り制御チャネルの電界測定を指示しておき、前記着
呼呼出に対する移動体の上り制御チャネルに送信される
着呼応答の電界を測定することにより、通話可能な周辺
ゾーンの通話用チャネルを前記移動体に指示するように
したものである。According to a fourth aspect of the present invention, before the mobile switching center transmits an incoming call within the congestion zone, the mobile station exchanges the electric field of the uplink control channel of the congestion zone with a base station in a zone surrounding the zone in advance. By instructing measurement and measuring the electric field of an incoming call response transmitted to the uplink control channel of the mobile unit with respect to the incoming call, the surrounding area where a call can be made
The communication channel of the zone is instructed to the mobile unit .
【0017】請求項第5項の発明は、輻輳ゾーンで通話
中の移動体の上り電界をその周辺ゾーンの基地局で測定
し、通話終了後に測定結果に基いて他のゾーンへの移行
を指示するようにしたものである。According to a fifth aspect of the present invention, an uplink electric field of a mobile unit during a call in a congested zone is measured by a base station in a surrounding zone, and an instruction to shift to another zone based on the measurement result after the call is completed. It is something to do.
【0018】請求項第6項の発明は、移動体を管理する
データテーブルを有し、上記データテーブルにおいて、
単位時間あたりの発/着呼数に基づいて定まるトラヒッ
クレベルと、各移動体が最後に発/着呼を行った時刻を
パラメータとして持ち、輻輳ゾーンに位置する移動体の
中から、上記移動体管理データテーブル上のトラヒック
レベルと最終アクセス時刻からあらかじめ登録された条
件で特定の移動体を抽 出するようにしたものである。According to a sixth aspect of the present invention, there is provided a data table for managing a moving object, wherein the data table includes:
It has a traffic level determined based on the number of outgoing / incoming calls per unit time and the time when each mobile body last made or received a call as a parameter .
From inside, the traffic on the above mobile management data table
Articles registered in advance from the level and last access time
It is obtained as to extract a particular mobile in the matter.
【0019】請求項第7項の発明は、請求項第6項の発
明に加え、抽出された移動体に対して周辺ゾーンへの移
行を指示し、移行指示を受信した移動体においては、切
換可能な周辺ゾーンの制御チャネルへ切替るようにした
ものである。According to a seventh aspect of the present invention, in addition to the sixth aspect of the present invention, the mobile unit that instructs the extracted mobile unit to shift to the surrounding zone, and switches the extracted mobile unit when the mobile unit receives the shift instruction. The control channel is switched to a control channel of a possible peripheral zone.
【0020】請求項第8項の発明は、請求項第6項の発
明に加え、抽出された移動体の上り電界をその周辺ゾー
ンの基地局で測定しておき、終話後に前記測定結果に基
づいて周辺ゾーンへの移行を指示するようにしたもので
ある。 [0020] The invention according to claim 8 is the invention according to claim 6, wherein the extracted uplink electric field of the moving object is measured by a base station in a zone around the extracted moving object, and the measured result is added to the measurement result after a call is terminated. <br/> Ru Oh in what was to indicate the transition to the peripheral zone based.
【0021】[0021]
【発明の実施の形態】実施例1. 図30〜図33に示してあるような呼接続シーケンスで
は、輻輳ゾーンに位置するMLに着呼させるために、あ
くまでひとつの呼処理として処理するため、すなわち着
呼MLが輻輳ゾーンではないゾーンから移動する際に
は、Cch捕捉動作を行うが、この間はCCと交信でき
ず、ふたたびCCと交信できるようになるまでいわゆ
る”鳴きわかれ”状態がどれだけ続くのか不定であり、
この間発呼者をただ保留させてしまう。周辺ゾーンも輻
輳であったり、またCch捕捉動作に時間がかかりすぎ
たり、必ず接続できる保証もなく発呼者を長時間保留す
るのは、サービスビリティ上あまり好ましいことではな
い。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Embodiment 1 FIG. In the call connection sequence as shown in FIGS. 30 to 33, in order to process a call to the ML located in the congestion zone, it is necessary to process the call as a single call processing. When moving, a Cch acquisition operation is performed, but during this time, it is not possible to communicate with the CC, and it is uncertain how long the so-called “screaming” state will continue until communication with the CC is possible again.
During this time, the caller is simply put on hold. It is not very desirable in terms of serviceability that the surrounding zones are also congested, that the Cch acquisition operation takes too long, and that the caller is kept on hold for a long time without connection guarantee.
【0022】実施例1の構成は図1に示すように、前述
の図30の構成と基本的には類似しているが、CCにト
ーキートランクTTが接続されており、このトーキート
ランク100はトーキー1、トーキー2の二種類のトー
キーが音声ファイルとして内蔵されており、それらを図
1においてT1、T2で示してある。[0022] Example 1 configured as shown in FIG. 1, it is similar to the configuration basically in FIG. 30 described above, bets on CC
Key trunk TT is connected,
In rank 100 , two types of talkies, a talkie 1 and a talkie 2, are incorporated as audio files, which are indicated by T1 and T2 in FIG.
【0023】この実施例1の動作を図2に基づき以下に
説明する。実施例1では、着呼接続シーケンスにおい
て、MLが着呼呼出(Sch空なし)を受けてベストリ
ストからCchをさがす間に、発呼者に対して”輻輳で
ある。”、”再発呼をうながす。”旨のトーキーサービ
スを行うものである。図2において、CCはMLに着呼
呼出(Sch空なし)を送出すると同時に、発呼者に対
してトーキー1により”ただいま、MLのゾーンが輻輳
中なので、MLはゾーン切り替えを実行しています。”
という内容のトーキーサービスを行う。さらに一定時間
が経過してもMLがうまく他ゾーンのCchを捕捉でき
なかった場合には、トーキー2により”しばらくしてか
らもう一度おかけ直しください。”という内容のトーキ
ーサービスを行う。発呼者はこれを聞いて一旦切断し、
もう一度電話をかけ直す。一方、MLがこの間に速やか
にCch切替え動作を実行し、別ゾーンに切り替えるこ
とができれば、CCはトーキー1をストップし、呼出音
(RBT)を発呼者に流すことによって発呼者はMLの
呼出しに成功したことを認識し、そのまま電話機を保持
していれば、やがて通話に至る。一旦切断した発呼者
が、再発呼してきた時には、時間的にみてMLは切り替
えたゾーンで通話を行うことができる。尚、ベストリス
トは、例えば前述の図31または図32に示されたアル
ゴリズムに基づきMLにより作成される。The operation of the first embodiment will be described below with reference to FIG. In the first embodiment, in the incoming call connection sequence, the ML receives the incoming call (there is no Sch empty) and searches for Cch from the best list. It provides a talkie service to the effect. In FIG. 2, the CC sends an incoming call (without Sch empty) to the ML, and at the same time, uses the talkie 1 to call the caller. "Since the ML zone is currently congested, the ML is performing a zone switch. . "
We perform talkie service of contents. If the ML has not successfully captured Cch in another zone even after a certain period of time has elapsed, a talkie service is provided by the talkie 2 which states "Please call again after a while." The caller hears this and disconnects,
Call back again. On the other hand, if the ML immediately executes the Cch switching operation during this time and can switch to another zone, the CC stops the talkie 1 and plays a ringing tone (RBT) to the calling party, thereby allowing the calling party to switch to the ML. Recognizing that the call was successful, if the telephone is held as it is, the call will be made soon. When the caller who has been disconnected once again calls again, the ML can talk in the switched zone in terms of time. The best list is created by the ML based on, for example, the algorithm shown in FIG. 31 or FIG.
【0024】実施例2. 上述の実施例1では、MLのCch捕捉動作によって輻
輳ゾーンから離脱する例を示したが、実施例2ではCC
(FB)側の制御によって、MLのCch捕捉動作をと
もなわない一般的な着呼動作に近い形で通話に至るよう
にしたものである。以下、図3および図4に基づき説明
する。図3は輻輳ゾーンFB50に位置するML2が着
呼呼び出しを受けてFB50に対して着呼応答を返して
いる状態のイメージ図でML2のこの上りCchの電界
は、FB51やFB52にも届いていることを表してい
る。図3に示されたもののシーケンスを図4に基づき以
下に説明する。輻輳ゾーンに位置するMLに着呼を行お
うとする場合、CCはまず当該ゾーンFB50の周辺ゾ
ーンFB51、52に対してFB50の上りCchの電
界を測定するように指示した(S41)後、MLが現在
位置登録しているFB50からMLに対して着呼呼び出
しを行う。MLはFB50の上りCchで着呼応答を返
すが、このMLの上り電界を周辺ゾーンであるFB5
1、FB52は測定し、その上り電界レベル測定結果を
CCに通知する。CCはこの結果に基づき(S42)、
輻輳ゾーン以外で一番電界のあったゾーンのSchをF
B50の下りCchでMLに指示する(S43)。ML
は、指示されたSchに移行し(S45)通話に至る。
図4の一連の動作は、MLにとっては、一般的な着呼動
作であり、この動作は、着呼呼出しに対する応答を返
し、通話可能なSchを指示されて、そのSchで通話
に至るという動作に外ならない。Embodiment 2 FIG. In the above-described first embodiment, an example is shown in which the mobile station leaves the congestion zone by the ML Cch acquisition operation.
By the control of the (FB) side, a call is reached in a manner similar to a general incoming call operation without the ML Cch capturing operation. Hereinafter, description will be made with reference to FIGS. FIG. 3 is a schematic diagram showing a state in which the ML2 located in the congestion zone FB50 receives an incoming call and returns an incoming response to the FB50. The electric field of this upward Cch of the ML2 also reaches the FB51 and the FB52. Is represented. The sequence of the one shown in FIG. 3 will be described below with reference to FIG. When an incoming call is to be made to the ML located in the congestion zone, the CC first instructs the surrounding zones FB51 and FB52 of the zone FB50 to measure the electric field of the upward Cch of the FB50 (S41). An incoming call is made from the FB 50 whose location is currently registered to the ML. The ML returns an incoming call response on the upstream Cch of the FB 50.
1. The FB 52 performs measurement and notifies the CC of the measurement result of the uplink electric field level. CC is based on this result (S42),
The Sch of the zone where the electric field was the most other than the congestion zone was F
The ML is instructed on the downlink Cch of B50 (S43). ML
Shifts to the instructed Sch (S45), leading to a call.
The series of operations shown in FIG. 4 is a general incoming call operation for the ML. This operation returns a response to an incoming call, is instructed by a Sch which can talk, and leads to a call on the Sch. It does not come off.
【0025】実施例3. 実施例2では、MLの上りCchの電界を測定する例を
示した。ひとつの電話端末に着目した場合、1回の通話
直後に続けて使用する確率は高いといえる。例えば、電
話がかかってきて、その通話内容によってその後別のと
ころに今度はかけるというような場合が該当する。実施
例3では、上記のような点を考慮したもので、輻輳ゾー
ンで通話中のMLを終話時にその周辺ゾーンに移行させ
てしまうことによって、続けて発呼してきても、周辺ゾ
ーンから発呼することになり、そのゾーンがすぐまた輻
輳ゾーンに戻るようなことを回避するようにしたもので
ある。もともと、ハンドオーバー処理を行うために、F
Bには通話中のMLの上り電界を測定する装置があるの
は一般的なことである。通話中のMLの上り電界測定結
果に基づいて通話後にゾーンを切り替えさせる例を図5
に示す。CCは輻輳ゾーンで通話中のML(輻輳である
から、Schの数だけ存在する。)の上り電界を測定す
るように周辺のFBに指示する(S51)。一般的なハ
ンドオーバー処理では、当該ゾーンで通話中のMLの上
り電界があるしきい値以下になった時、周辺ゾーンへ通
話中のまま移行させるため、周辺ゾーンで当該MLの電
界測定を起動するが、ここでは、しきい値以上であって
も周辺ゾーンに対して測定を指示する。各周辺ゾーンの
FBは複数のMLの上り電界測定の結果をCC順位に通
知する。CCは当該ゾーンで一番最初に終話したMLと
の間で終話シーケンスを実行し、最後に上記測定結果に
基づいて一番電界が高かったゾーンへの移行を指示する
(S52)。移行指示を受けたMLは、指示されたゾー
ンへ移行し位置登録を行う。Embodiment 3 FIG. In the second embodiment, an example in which the electric field of the upstream Cch of the ML is measured has been described. When focusing on one telephone terminal, it can be said that the probability of using the telephone terminal immediately after one call is high. For example, there is a case where a call is received and then another place is called this time depending on the contents of the call. In the third embodiment, in consideration of the above points, the ML during a call in the congestion zone is shifted to the surrounding zone at the end of the call, so that even if a call is continuously made, the calling is performed from the surrounding zone. will want to call, the zone is one that was so as to avoid things like return immediately or congestion zone. Originally, to perform handover processing, F
It is common that B has a device for measuring the uplink electric field of the ML during a call. FIG. 5 shows an example in which a zone is switched after a call based on a measurement result of an uplink electric field of a ML during a call.
Shown in The CC instructs the surrounding FBs to measure the uplink electric field of the ML (the number of Schs is present because of congestion) during a call in the congestion zone (S51). In a general handover process, when the uplink electric field of the ML during a call in the zone falls below a certain threshold value, the measurement of the electric field of the ML is started in the surrounding zone in order to shift to the surrounding zone while the call is in progress. However, here, the measurement is instructed to the surrounding zones even if the threshold value is exceeded. The FB in each peripheral zone notifies the result of the measurement of the uplink electric field of the plurality of MLs to the CC order. The CC executes a call termination sequence with the ML that has ended the call first in the zone, and finally instructs the shift to the zone with the highest electric field based on the measurement result (S52). The ML that has received the transfer instruction transfers to the designated zone and performs location registration.
【0026】この移行したMLは、続けて発呼する場合
もあるし、そうでない場合もあるが、発呼しても周辺ゾ
ーンで発呼から通話までの動作をすることになるので、
元のゾーンはすぐふたたび輻輳ゾーンにもどるというよ
うなことはない。また、別のMLが発/着呼し、元のゾ
ーンが輻輳しても、今度は、以前から通話状態にあるM
Lの周辺ゾーンでの上り電界は既に測定済みであるか
ら、新しく通話しているMLの上り電界のみ上記のよう
な要領で周辺ゾーンで測定すればよい。このようにし
て、輻輳ゾーンで通話中のMLを、終話後に周辺ゾーン
へ移行させることによって輻輳ゾーンにふたたびなり得
る確率を減らす。The shifted ML may or may not continue to make a call. However, even if a call is made, the operation from the call to the call in the surrounding zone is performed.
The original zone does not immediately return to the congestion zone again. Also, even if another ML originates / receives a call and the original zone is congested, the M
Since the upstream electric field in the peripheral zone of L has already been measured, only the upstream electric field of the ML that is newly talking needs to be measured in the peripheral zone as described above. In this way, the ML during a call in the congestion zone is shifted to the surrounding zone after the end of the call to reduce the probability that the ML may be re-entered in the congestion zone.
【0027】実施例4. 従来例としては、輻輳状態を下りCchでの報知するこ
とによってMLが周辺ゾーンへのCch切替えを行う構
成がある。そのような構成では、以下のような問題があ
る。 a.当該ゾーンに位置するすべてのMLがほぼ一斉にC
ch切替え→位置登録を実行するため周辺ゾーンのCc
hトラヒックが一時点に上昇する。 b.輻輳に1度なったら当該ゾーンにおいては、通話中
以外のMLがすべて周辺ゾーンに移動してしまい、輻輳
が解除されても結果的にMLの分布がアンバランスな状
態になる。実施例4では、上記問題を解消したもので、
図6に示すようなMLを管理するためのデータテーブル
をCCがもち、そのテーブル上からある特定のMLのみ
を選び出し、当該MLにゾーン切替えを実行させるもの
である。Embodiment 4 FIG. As a conventional example, there is a configuration in which the ML performs Cch switching to a peripheral zone by reporting a congestion state on a downlink Cch. Such a configuration has the following problems. a. All MLs located in the zone are almost all
Channel switching → Cc of peripheral zone to execute location registration
h Traffic rises at one point. b. Once congestion occurs, in that zone, all MLs other than during the call move to the surrounding zone, and even if the congestion is released, the distribution of the MLs becomes unbalanced. In the fourth embodiment, the above problem is solved.
The CC has a data table for managing the ML as shown in FIG. 6, and selects only a specific ML from the table, and causes the ML to execute zone switching.
【0028】図6に示すテーブルの特長は、パラメータ
として各MLが最後に発/着呼した最終アクセスタイム
と、ある一定期間中に何回アクセスしたかで算出される
トラヒックレベルを備えている点である。例えば、3日
間の発/着呼回数をトラヒックレベルとして設定してお
けば、トラヒックレベルの大きさが過去72時間中の使
用率の高さを示していることになる。また、最終アクセ
スタイムは、最近の使用状況の目安となる。トラヒック
レベルが同じでも、過去24時中1度もアクセスしてい
なければ、使用ピークが過ぎていると推測し、最近使用
しているようなら逆にピークを迎えつつあると推測す
る。The features of the table shown in FIG. 6 are that it has, as parameters, the last access time when each ML originated / received the call and the traffic level calculated based on the number of accesses during a certain period. It is. For example, if the number of outgoing / incoming calls for three days is set as the traffic level, the level of the traffic level indicates the high usage rate during the past 72 hours. Also, the last access time is a measure of recent usage. Even if the traffic level is the same, if no access has been made during the past 24 o'clock, it is estimated that the usage peak has passed, and if it has recently been used, it is estimated that the peak is approaching.
【0029】尚、上述のa.当該ゾーンに位置するML
を抽出する動作、b.抽出されたMLのトラヒックレベ
ル、アクセスタイムに基づき使用率の高い順に配列する
動作、c.ピークについて推測する動作等、一連の動作
はソフトウェアにより実行される。そして、上記a.、
b.の抽出、配列で何台を対象とするのかは、システム
パラメータとして”データ設定(登録)”というような
形であらかじめ登録しておく。The above a. ML located in the zone
Operation of extracting b. An operation of arranging the extracted MLs in the descending order of the usage rate based on the traffic level and the access time, c. A series of operations such as an operation for estimating a peak are executed by software. Then, a. ,
b. The number of devices to be extracted and arrayed is registered in advance in the form of "data setting (registration)" as a system parameter.
【0030】図7に上記のような要領で各MLのトラヒ
ックレベルを算出し、特定のMLを周辺ゾーンに移行さ
せるシーケンスを示す。FB50のゾーンが輻輳状態に
なった時点でCCは図6に示すMLデータテーブルを検
索し、当該ゾーンに位置するMLを洗い出す。当該ゾー
ンに位置するMLの中で上述したようにトラヒックレベ
ルが高くて最近使用しているような現時点での使用率が
高そうなMLを抽出する処理を行い(S71)、該当す
るMLが存在した場合、FB50の下りCchの特定フ
レームで当該MLに対する移行指示を流す。これを受信
したMLはベストリストで周辺のCchをサーチして周
辺ゾーンに位置登録を行い、当該周辺ゾーンへ移動する
(S72)。これによって、当該MLが発/着呼を行う
際は、輻輳ゾーンから回避される。尚、MLは例えば図
31あるいは図32のいずれかのアルゴリズムに示され
た手順に基づきベストリストを作成しているものとす
る。FIG. 7 shows a sequence in which the traffic level of each ML is calculated in the manner described above and a specific ML is shifted to the surrounding zone. When the zone of the FB 50 becomes congested, the CC searches the ML data table shown in FIG. 6 to find out the ML located in the zone. As described above, among the MLs located in the zone, a process is performed to extract an ML that has a high traffic level and is likely to have a high usage rate at the present time, such as a recently used one (S71). In this case, a transfer instruction for the ML is sent in a specific frame of the downlink Cch of the FB 50. The ML that has received this searches for the neighboring Cch in the best list, registers the location in the peripheral zone, and moves to the peripheral zone (S72). As a result, when the ML performs outgoing / incoming calls, it is avoided from the congestion zone. It is assumed that the ML has created the best list based on, for example, the procedure shown in the algorithm in either FIG. 31 or FIG.
【0031】実施例5. 実施例4では、現時点で通話していないが、CCがトラ
ヒックが高そうなMLを洗い出しゾーン切替えを行わせ
る例を示したが、すでに、通話状態にあるMLはその時
点でトラヒックが高い場合が多いので、通話終了後その
MLを、トラヒックが低い周辺ゾーンへ移行させること
が望ましいことがある。実施例5は通話中のMLが終話
したら、周辺ゾーンに移行させるようにしたもので、図
8に示す。輻輳ゾーンで通話中のMLについて、CCは
実施例4で説明したトラヒックレベルをテーブルから引
き出す(S81)。特に実施例3で述べたように通話状
態のMLは終話後も続いて発/着呼する確率が高いと考
えれば、ここであえてトラヒックレベルを引き出すまで
もなく、実施例3の通りに終話後強制的に移行させれば
よいが、そうではなくあくまでトラヒックレベルを基準
にして他のMLと同等に判定するならば、実施例4で示
したような方法でトラヒックレベルが高いMLかどうか
を判断する。移行対象になったMLが通話中である場
合、実施例3のように該当するMLのSch上り電界を
測定するように周辺ゾーンに対して指示する(S8
2)。この場合、輻輳ゾーンで通話している全MLの上
り電界を測定する必要はなく、対象となったMLのみ測
定する点が、実施例3と異なる点である。各周辺ゾーン
は、上記上り電界を測定した結果をCCに通知する。C
Cは、上記測定結果に基づいて終話シーケンス実行後
に、当該MLに移行指示を行う(S83)。移行指示を
受けたMLは、指示された周辺ゾーンへの切替えを実行
し、位置登録を行う(S84)。Embodiment 5 FIG. Fourth Embodiment In the fourth embodiment, although no call is made at the present time, an example is shown in which the CC identifies an ML with high traffic and performs zone switching, but an ML already in a call state may have a high traffic at that time. Because of the large number, it may be desirable to shift the ML to a peripheral zone with lower traffic after a call. In the fifth embodiment, when the ML during a call ends the call, it is shifted to a peripheral zone, as shown in FIG. For the ML during a call in the congestion zone, the CC extracts the traffic level described in the fourth embodiment from the table (S81). In particular, as described in the third embodiment, if it is considered that the ML in a call state has a high probability of continuing to make / receive a call even after the end of a call, the traffic level does not need to be extracted and the ML is terminated as in the third embodiment. The transition may be forcibly made after the talk. However, if it is determined that the traffic level is the same as other MLs based on the traffic level, it is determined whether the traffic level is the high traffic level by the method described in the fourth embodiment. Judge. When the ML to be shifted is busy, the peripheral zone is instructed to measure the Sch-up electric field of the corresponding ML as in the third embodiment (S8).
2). In this case, there is no need to measure the uplink electric field of all MLs that are talking in the congestion zone, and only the target ML is measured, which is different from the third embodiment. Each peripheral zone notifies the CC of the result of the measurement of the uplink electric field. C
C executes a transition instruction to the ML after executing the call termination sequence based on the measurement result (S83). The ML that has received the transfer instruction executes switching to the instructed peripheral zone and performs position registration (S84).
【0032】尚、MLが一斉に周辺ゾーンに移行した
ら、周辺ゾーンのCchトラヒックが突発的に上昇する
ことが起こり得る。この際は、実際には、Schに空が
あっても、Cch上の信号輻輳により発/着呼信号が通
りにくい状況となるので、運用上通話できにくいという
輻輳に近い状態になる。具体的にはゾーンのCchに障
害が発生したり、あるいはメンテナンスを行う場合が該
当し、ゾーン使用不可が発生する。これを回避するもの
を図9に示す。周辺ゾーンにおいて、突発的にMLが移
動してきて位置登録シーケンスを行うような状況になっ
た時、一時的にSch1本を位置登録専用に臨時Cch
として使用することで通常Cchの運用にトラヒック的
インパクトを与えることを回避するものである。FB5
0で障害が発生したり、あるいはメンテナンスでCch
を停止した場合、当該ゾーンに位置しているML20、
21は周辺ゾーンに切替えを行う必要が生じる。ML
は、下りCchの電界劣化を検出(あるいは、下り電界
は出していて、メンテナンス状態に入るから当該ゾーン
使用不可になるという意味の信号を受信)すると、受信
機の回線数chを切り替えて電界のあるchをサーチ
し、受信可能なchを選択する。When the MLs move to the peripheral zone all at once, the Cch traffic in the peripheral zone may suddenly rise. In this case, in reality, even if there is an empty space in the Sch, the outgoing / incoming signal is difficult to pass due to the signal congestion on the Cch, so that the operation is close to the congestion where it is difficult to communicate. Specifically, a failure occurs in the Cch of the zone or a case where maintenance is performed corresponds to the case, and the zone cannot be used. What avoids this
Is shown in FIG. In the peripheral zone, when the ML suddenly moves and a position registration sequence is performed, one Sch is temporarily used exclusively for position registration.
This avoids giving a traffic-like impact to the operation of the normal Cch. FB5
0 indicates failure or Cch in maintenance
Stop, the ML20 located in the zone,
21 needs to switch to the peripheral zone. ML
Detects the degradation of the electric field of the downlink Cch (or receives a signal indicating that the downlink electric field is emitted and the zone becomes unusable because it enters the maintenance state), and the number of channels of the receiver is switched to change the electric field of the electric field. A certain channel is searched, and a receivable channel is selected.
【0033】一方CCにおいては、FB50障害(ある
いはメンテナンス)発生時にFB51、52等の周辺ゾ
ーンに対してSch1本を位置登録シーケンス専用に臨
時Cchとして使用する制御をする。ゾーンを切り替え
てきたMLはFB51や52のS1chで位置登録を行
い、位置登録シーケンス終了後、そのゾーンの通常Cc
h捕捉状態にはいる。CCでは、一定時間(すなわちF
B50にいたMLが周辺ゾーンに移動しきるまでの十分
な時間)経過した後、FB51、52のS1chを通常
のS1ch(通話ch)としての運用に戻す。On the other hand, in the CC, when a failure (or maintenance) of the FB 50 occurs, control is performed such that one Sch is used as a temporary Cch exclusively for the position registration sequence for peripheral zones such as the FBs 51 and 52. The ML that has switched the zone performs location registration in the S1ch of the FBs 51 and 52, and after the location registration sequence ends, the normal Cc of that zone.
h Entering the capture state. In CC, a certain time (ie, F
After a lapse of a sufficient time until the ML at B50 moves to the peripheral zone), the S1ch of the FBs 51 and 52 is returned to the normal S1ch (call channel) operation.
【0034】前述のようにMLが周辺ゾーンの臨時Cc
h(Sch)を捕捉して位置登録を行う際、通常の下り
Cchで使用しているフレームパターンと異なるフレー
ムパターンを臨時Cchになった時に使用しておけば、
MLがCchを捕捉した時に、MLにおいてそれが通常
のCchであるのか、臨時Cchであるのか認識するこ
とができる。図10に下りCchのフレームパターンを
示す。 前述のような状況、すなわち、あるFBのCch
に障害(あるいはメンテナンス)が発生し、当該ゾーン
のCchを停止するような場合、周辺ゾーンのSchを
臨時的に第2のCchとして使用する基本動作は前述の
例に同じである。この時、図10に示すように通常のC
chフレームパターン(F0、F1、F2・・・)と異
なるフレームパターン(Fa、Fb、Fc・・・)を臨
時Cch(S1ch)に使用する。 As described above, ML is the temporary Cc of the peripheral zone.
When h (Sch) is acquired and location registration is performed, if a frame pattern different from the frame pattern used in the normal downlink Cch is used when the temporary Cch is used,
When the ML captures a Cch, the ML can recognize whether it is a normal Cch or a temporary Cch. FIG. 10 shows a frame pattern of the downlink Cch.
Show. The situation as described above, that is, Cch of a certain FB
In the case where a failure (or maintenance) occurs in the zone and the Cch of the zone is stopped, the basic operation of temporarily using the Sch of the peripheral zone as the second Cch is as described above.
Same as the example . At this time, as shown in FIG.
A frame pattern (Fa, Fb, Fc...) different from the ch frame pattern (F0, F1, F2...) is used for the temporary Cch (S1ch).
【0035】図11にMLのCch捕捉アルゴリズムを
示す。普通に運用(移動)しているMLにおいて、ゾー
ン間を移動する際は、徐々に下りCchの受信電界レベ
ルが劣化してゆく(Cchを切り離す前には、それ以前
にある程度の受信電界レベルの劣化を検出してい
る。)。しかし、障害は突然発生するため受信電界が突
然なくなる。あるいは、フレームパターンが突然なくな
る。メンテナンス時は、あらかじめ下りCchにおいて
当該ゾーンの全MLに対してメンテナンスになることを
通知し、周辺ゾーンへML移行をうながす通知を出すこ
とも可能である。このように突然下りCchがなくなっ
た時、あるいは一斉移行命令等を受けた時(S11)、
電界をサーチして(S12)Schの電界を検出した
ら、フレーム同期の引き込み(同期検出)動作を行う
(S14)。フレーム同期検出は、臨時Cchで使用す
るフレームパターン(Fa、Fb、Fc・・・)を対象
として行い、異なるフレームパターンでは同期検出を行
わない、あるいは同期検出しても本来Schであること
から、通話で使用しているものだと認識し、当該Sch
を読みとばすようにする。電界があり、フレームパター
ンも臨時Cch用であるSchを捕捉すれば、MLは位
置登録を行う(S15)。電界状態により周辺Schを
捕捉できないような場合は、通常運用のCchも捕捉で
きない可能性も高いが、動作としては、通常のCch捕
捉動作を実行する(S16)。FIG. 11 shows the ML Cch acquisition algorithm. When moving between zones in an ML that is operating (moving) normally, the reception electric field level of the downlink Cch gradually deteriorates (before the Cch is separated, a certain reception electric field level before the Cch is separated). Deterioration is detected.) However, since the failure occurs suddenly, the received electric field disappears suddenly. Alternatively, the frame pattern suddenly disappears. At the time of maintenance, it is also possible to notify in advance that maintenance is to be performed to all MLs in the zone in the downlink Cch, and to issue a notification prompting the transition to the ML to the surrounding zone. When the descending Cch disappears suddenly or when a simultaneous shift command or the like is received (S11),
When the electric field is searched (S12) and the electric field of Sch is detected, a frame synchronization pull-in (synchronization detection) operation is performed (S14). The frame synchronization detection is performed on the frame patterns (Fa, Fb, Fc...) Used in the temporary Cch, and the synchronization detection is not performed on the different frame patterns. Recognize that it is used for the call, and
To skip. If there is an electric field and the frame pattern also captures the Sch for the temporary Cch, the ML performs position registration (S15). When the surrounding Sch cannot be captured due to the electric field state, there is a high possibility that the Cch in the normal operation cannot be captured, but the normal Cch capturing operation is executed as the operation (S16).
【0036】次にフレーム同期検出のメカニズムの具体
例を図12、図13、図14を用いて説明する。本フレ
ーム同期検出方式は、異なる2つ以上のフレームパター
ンの検出処理を同時に行うことができる。図12は、フ
レーム同期検出回路の構成を示し、cpuあるいはLS
I化された論理回路群からなるフレーム同期検出処理モ
ジュール7(以下、FDETと記す。)とFDETがア
クセスするデータ格納用のRAM:8(以下RAMと記
す)からなる。FDET7はSchあるいはCchとい
う無線回線上のディジタル信号をモニタしていて、外部
から起動(START/STOP)され、フレーム同期
の確立の有/無、フレームタイミング、受信フレーム番
号などを出力する。図13にフレーム同期検出のアルゴ
リズムを示す。FDET7は起動されて(S131)
後、RAM:8をクリアし(S132)モニタしている
信号を1bitずつ受信解析する。1bit受信したと
き、過去8bitがいずれかのフレームパターンと一致
しているかどうかをチェックする(S1331)。フレ
ームパターンでない時は、図14に示すようなデータ構
成すなわちフレームパターンチェックでOKであったか
NOであったかを示すビットを0:NGにしフレームパ
ターンの種別、フレーム番号を”0”とする8bitの
データをRAM8に書き込む。フレームパターンと一致
していれば、チェックbitを1(OK)としてそのパ
ターンの種別、フレーム番号とともにRAM8に書き込
む(ここまでS1334の前半)。真のフレームパター
ンならば、ちょうど1フレーム前に当該フレーム種別の
ひとつ前の番号を受信しているはずであるから、このデ
ータを読みだし(S1334の後半)チェックを行う
が、実施例7のように臨時Cchのフレームパターンを
検出しなければならない時、臨時Cchのフレームパタ
ーンではないとわかった時点(S1335のYes)
で、過去のフレームパターン引き出しチェックはやめて
しまう。臨時Cchのフレームパターンを数フレーム受
信し(S1336)、フレーム同期確率条件(何フレー
ム中何フレームがフレームパターンとして受信できたか
どうか)を満たせば(S1337)、始めてフレーム同
期確立とする。これによって、通常のCchの電界があ
って捕捉した際、フレーム同期を引き込む時点(すなわ
ち1〜2フレーム受信しただけで)で、通常のCchで
あると判定し、別の電界があるchをサーチする動作を
行える。 Next, a specific example of a mechanism for detecting frame synchronization will be described with reference to FIGS. 12, 13 and 14. FIG. This frame synchronization detection method can simultaneously perform detection processing of two or more different frame patterns. FIG. 12 shows the configuration of the frame synchronization detection circuit, and the cpu or LS
It comprises a frame synchronization detection processing module 7 (hereinafter referred to as FDET) comprising a group of logic circuits converted into I, and a data storage RAM 8 (hereinafter referred to as RAM) accessed by the FDET. The FDET 7 monitors a digital signal on a wireless channel called Sch or Cch, is started (START / STOP) from the outside, and outputs presence / absence of establishment of frame synchronization, frame timing, a reception frame number, and the like. FIG. 13 shows an algorithm for detecting frame synchronization. FDET7 is activated (S131).
Thereafter, the RAM: 8 is cleared (S132), and the monitored signal is received and analyzed one bit at a time. When 1 bit is received, it is checked whether the past 8 bits match any of the frame patterns (S1331). When the frame pattern is not a frame pattern, 8-bit data having a data structure as shown in FIG. 14, that is, a bit indicating OK or NO in the frame pattern check is set to 0: NG and a frame pattern type and a frame number are set to "0". Write to RAM8. If it matches the frame pattern, the check bit is set to 1 (OK) and written into the RAM 8 together with the type of the pattern and the frame number (the first half of S1334 so far). In the case of a true frame pattern, the number immediately before the frame type must have been received just one frame before, so this data is read out (the latter half of S1334) and checked. When the temporary Cch frame pattern must be detected at the time, it is determined that the frame pattern is not the temporary Cch frame pattern (Yes in S1335).
Therefore, the past frame pattern withdrawal check is stopped. When several frames of the temporary Cch frame pattern are received (S1336) and the frame synchronization probability condition (whether or how many frames can be received as a frame pattern) is satisfied (S1337), frame synchronization is established for the first time. With this, when a normal Cch electric field is captured and captured, at the time of bringing in frame synchronization (that is, when only one or two frames are received), it is determined to be a normal Cch, and a channel having another electric field is searched. Can be performed.
【0037】尚、フレーム同期が一旦確立してしまう
と、フレーム同期はずれ条件(何フレーム中何フレーム
がフレームパターンと一致しなかったかどうか)を満た
すまで、たとえ新フレーム同期のデータに切り替わって
も、旧フレームが保護されてしまう。ここでは、旧フレ
ーム保護中でも新フレームを受信したら切り替えるよう
なアルゴリズムによってより早いフレーム同期タイミン
グの切替えが行えるものを示す。図15にフレーム同期
確立中(はずれ監視モード)時のアルゴリズムを示す。
1bit受信のたびに過去8bitがフレームパターン
と一致しているかどうかチェックする(S151)処理
とその結果をRAM8に格納する際のデータ構成は、実
施例8と同じである。フレームパターンと一致していな
い場合は、本来フレームパターンを受信するべきタイミ
ングであるかどうかをチェックし(S152)、もし、
そのタイミングであれば、現在同期確立中のフレームパ
ターンがひとつ一致していないことになるので、同期は
ずれ条件を満たしているかどうかを判定する(S15
3)。(満たせば同期はずれとする(S154))。フ
レームパターンと一致していた場合、今、同期確立して
いるタイミングで受信したものであるかどうかをチェッ
クし(S155)、一致していれば、そのままフレーム
パターンとしてデータを格納するだけである(S15
6)。そのタイミングではない時、今受信したタイミン
グで過去受信したデータを見直し、フレーム同期確立条
件を満たすフレーム数を受信しているかどうかをチェッ
クする(S157)。もし、フレーム同期確立条件を満
たしたのであれば、さらに、今確立中となっているフレ
ーム同期において、最近の数フレームはフレームパター
ンが一致しないでいるものの、まだ、同期はずれ条件に
満たず保護モードになっているのかどうかをチェックす
る(S158)。保護モードならば、この時点で新フレ
ーム同期のタイミングに切り替えることによって、同期
はずれ条件の保護フレーム数分早く新フレーム同期に切
り替えることができる(S159)。Once the frame synchronization is established, even if the data is switched to the new frame synchronization data until the frame synchronization loss condition (whether or not which frame does not match the frame pattern) is satisfied. The old frame is protected. Here, an example is shown in which even during the protection of the old frame , the frame synchronization timing can be switched earlier by an algorithm that switches when a new frame is received. FIG. 15 shows an algorithm when frame synchronization is being established (missing monitoring mode).
The process of checking whether or not the past 8 bits match the frame pattern each time 1 bit is received (S151) and the data configuration when storing the result in the RAM 8 are the same as in the eighth embodiment. If not coincident with the frame pattern, it is checked whether or not it is time to receive the frame pattern (S152).
At that timing, it means that one frame pattern that is currently being synchronized does not match, so it is determined whether or not the out-of-synchronization condition is satisfied (S15).
3). (If they are satisfied, the synchronization is lost (S154)). If it matches the frame pattern, it is checked whether it is received at the timing when synchronization is established (S155). If it matches, the data is simply stored as the frame pattern as it is (S155). S15
6). If it is not the timing, the data received in the past at the timing received now is reviewed, and it is checked whether or not the number of frames satisfying the frame synchronization establishment condition has been received (S157). If the frame synchronization establishment condition is satisfied, furthermore, in the frame synchronization currently being established, although the frame pattern of some recent frames does not match, the synchronization mode is still not satisfied and the protection mode is not satisfied. It is checked whether or not (S158). In the protection mode, by switching to the timing of the new frame synchronization at this point, it is possible to switch to the new frame synchronization earlier by the number of protection frames under the out-of-sync condition (S159).
【0038】前述の例では、FB50のCchが障害
(あるいはメンテナンス)時に、当該ゾーンのMLが周
辺ゾーンに移動することを示した。FB50において、
Cchのみ障害であって他のSchが使用可能である
時、あるいはメンテナンス時は、正常であるためSch
は使用できるはずである。このような場合、周辺ゾーン
で輻輳状態になった時、メンテナンスゾーンのSchを
使用する例を図16に示す。図16に示されるもののシ
ーケンスの概要を図17に基づき以下に説明する。FB
50のCchをメンテナンス状態にして、かつFB50
の他のSchが正常に使用できる状態にある時、FB5
2が輻輳になった場合(S171)に、次に、FB52
においてML2に発/着呼が発生すると、CCはFB5
2の下りCchでFB50のSchでの通話をML2に
指示する。ML2のゾーン内の位置によっては、FB5
0まで電波が届かず、通話まで至れないケースもある
が、届く場合は、ML2は指示されたSchに移行し
(S172)本来のゾーンFB52が輻輳であっても通
話することが可能になる(S173)。In the above-described example, when the Cch of the FB 50 has a failure (or maintenance), the ML of the zone moves to the surrounding zone. In FB50,
When only the Cch is faulty and another Sch can be used, or during maintenance, it is normal and the Sch is normal.
Should be usable. In such a case, FIG. 16 shows an example in which the Sch in the maintenance zone is used when the congestion occurs in the surrounding zone. An outline of the sequence shown in FIG. 16 will be described below with reference to FIG. FB
50 Cch in maintenance state, and FB50
FB5 when the other Sch is ready for normal use.
2 becomes congested (S171), then the FB 52
In the case where a call is made / received to ML2, CC becomes FB5
The ML 2 is instructed to talk on the FB 50 Sch on the downstream Cch 2. Depending on the position in the zone of ML2, FB5
In some cases, the radio wave does not reach 0 and the call cannot be reached, but if it does, the ML 2 shifts to the instructed Sch (S172), and the call can be made even if the original zone FB52 is congested (S172). S173).
【0039】前述の実施例3では、通話中のMLの上り
電界を周辺ゾーンで電界測定する例を示した。一般的に
移動体通信システムにおいては、MLの位置を管理し、
保守運用サービスのひとつとして、MLの所在情報を運
用者に提供するものがあるが、所在情報は位置登録情報
に基づくゾーン単位である。ここでは、実施例3で示し
たような周辺ゾーンでの電界測定結果に基づいて、ゾー
ン内でのおおまかな位置を把握する例を示す。図18は
図18aに示す各ゾーンのうち、ゾーンAで通話してい
るMLの上り電界をB〜Hの周辺ゾーンで電界を測定し
た結果をイメージ的に示している。電界レベルは、ここ
では10段階とし、ゾーン内で十分な電界を得られるレ
ベルを8以上とし、電界レベルの概念を示す図18bに
おいて、点線以内では、これ以上の上り電界が測定され
る。エリアの境界付近は、レベル5程度とし、これ以下
になるとCCはハンドオーバー(通話中ゾーン移動)処
理を実行すると考えてよい。今、図18のような電界測
定結果を得たとすれば、通話ゾーンであるAではレベル
6であることから境界に近い付近はMLが存在している
のではないかと推測される。そして、その周辺ゾーンB
〜Hのレベルをみると、ゾーンBとGが最も高くレベル
5の電界を得ていることから、図18aのハッチングを
施したエリアSにMLが位置していることが推測でき
る。このように、ひとつのゾーンを表す円をその周辺ゾ
ーンの数で分割したエリアに区分してMLの位置を把握
することが可能である。In the above-described third embodiment, an example has been described in which the upward electric field of the ML during a call is measured in the peripheral zone. Generally, in a mobile communication system, the position of an ML is managed,
As one of the maintenance and operation services, there is a service that provides ML location information to an operator, and the location information is in units of zones based on location registration information. Here, an example in which the approximate position in the zone is grasped based on the electric field measurement result in the peripheral zone as described in the third embodiment will be described. FIG. 18 graphically shows the results of measuring the electric field of the upstream electric field of the ML that is talking in zone A among the zones shown in FIG. Here, the electric field level is set to 10 levels, the level at which a sufficient electric field can be obtained in the zone is set to 8 or more, and in FIG. 18b showing the concept of the electric field level, a further upward electric field is measured within a dotted line. The vicinity of the boundary of the area is about level 5, and below this level, it may be considered that the CC performs the handover (zone movement during call) process. Now, if the electric field measurement result as shown in FIG. 18 is obtained, since it is level 6 in A which is the communication zone, it is presumed that ML exists near the boundary near the boundary. And the surrounding zone B
Looking at the levels H to H, since the zones B and G have the highest electric field of level 5, it can be inferred that the ML is located in the hatched area S in FIG. 18A. As described above, it is possible to grasp the position of the ML by dividing the circle representing one zone into areas divided by the number of surrounding zones.
【0040】前述の例では、MLの上り電界のみを判断
基準としているが、MLが例えばビル影に入ったときな
ど電波状況によっては、必ずしも確実な情報とはなり得
ない場合がある。ここでは、MLの上り信号のbit遅
延を観測する例を示す。図19にMLの上り信号のbi
t遅延のイメージを示す。FBではCch、Schのフ
レームタイミングを生成するために必ずマスターとなる
フレームタイミングを持っている。通常はCCとFBと
の間の伝送網に同期し、どのFBも同じタイミングでシ
ステム全体で網同期がとれている。今、このマスターフ
レームタイミングに対して通話中MLの上りフレームタ
イミングがどれだけ遅延しているのかを通話中のゾーン
とその周辺ゾーンで見れば、その相対的遅延bit数か
ら、エリア内のおおまかな位置を把握できる。In the above-described example, only the upstream electric field of the ML is used as a criterion. However, reliable information may not always be obtained depending on the radio wave condition, for example, when the ML enters a shadow of a building. Here, an example of observing the bit delay of the ML uplink signal will be described. FIG. 19 shows the bi of the ML upstream signal.
4 shows an image of a t delay. The FB always has a master frame timing in order to generate Cch and Sch frame timings. Normally, it is synchronized with the transmission network between CC and FB, and all FBs are synchronized with the entire system at the same timing. Now, by looking at how much the upstream frame timing of the talking ML is delayed with respect to the master frame timing in the talking zone and the surrounding zones, the relative number of delay bits indicates that the approximate We can grasp position.
【0041】前述の例で、ゾーン内でのおおまかな位置
を把握する例を示したが、ここでは、前述の例で得た位
置情報を表示する例を図20に示す。図20において、
例えば、パソコン3(以下PC)では、あらかじめ画情
報としてゾーンおよびゾーン内の区分を表示している。
あるいは、地図も画情報として登録されていてその上に
上記エリアが表示されるような高機能タイプのものであ
ってもよい。CC1はPC3に対して位置情報を単にア
ドレス化して(例えばエリア通話とかあるいは座標値と
かで)渡すだけでよく、PC3側で表示形式を備えてお
けばよい。この場合、一般的なPCインタフェースであ
るRS−232Cで十分実現可能である。また、PC3
ほど高機能的でなくとも、MAP4のような地図を作り
込んでやってエリア位置に相当する箇所にLED等のラ
ンプを備えておいて、このランプをCC1から通知され
るアドレスに従って点灯させてやればよりシンプルな表
示装置を得ることができる。In the above-described example, an example in which the approximate position in the zone is grasped has been described . Here, an example in which the position information obtained in the above-described example is displayed is shown in FIG. In FIG.
For example, in the personal computer 3 (hereinafter, PC), a zone and a division within the zone are displayed as image information in advance.
Alternatively, the map may be of a high function type in which the map is registered as image information and the area is displayed thereon. The CC 1 may simply address the position information to the PC 3 (for example, by area call or coordinate values) and provide the PC 3 with a display format. In this case, RS-232C which is a general PC interface can be sufficiently realized. PC3
Even if the function is not so sophisticated, a map such as MAP4 is created and a lamp such as an LED is provided at a location corresponding to the area position, and this lamp is turned on according to the address notified from CC1. Thus, a simpler display device can be obtained.
【0042】ところで、一般的なCchの捕捉動作に関
し、例えば以下のような状況が発生することがある。M
Lは通常、一旦Cchを捕捉したら、捕捉しているCc
hを受信できない状態が発生するまで、Cch捕捉動作
を行わない。ゾーン間には通常オーバーリーチと呼ばれ
るサービス可能エリアの重なりが存在するので、ゾーン
間をMLが移動してもすぐにはCchが切り替わらず、
そのままのCchを捕捉し続ける。また、一般に機器構
成、および性能上、MLの上り電波送信出力より、FB
の下り電波送信力の方が強く、MLの送信電波はもうF
Bに届かないところまで移動してしまっていても、Cc
hを捕捉し続けるというようなことが起こるケースがあ
る。次に、Cch捕捉アルゴリズムを行う移動スイッチ
をMLに備えた例を図21に、動作を図22に示す。通
常MLには、受信Cchの電界レベルをLCD等で可視
表示する機能を備えているが、ユーザがこれらから現在
受信中の電界レベルが小さいと判断した時、MLの操作
ボタン上のCchサーチ手動スイッチ10を押下する
(S221)。スイッチを押下されたMLは図31ある
いは32のようにCchをサーチする(S222)。異
なるCchを捕捉した場合は、位置登録を行う。スイッ
チ10、11は図21に示されるように複数個のスイッ
チ群のうち、最上段部に位置し、スイッチ10とスイッ
チ11との間に別の機能スイッチが位置している。 Incidentally, with respect to a general Cch capturing operation, for example, the following situation may occur. M
Normally, L once captures Cch, then captures Cc
Until the state where h cannot be received occurs, the Cch acquisition operation is not performed. Since there is an overlap of serviceable areas usually called overreach between zones, even if ML moves between zones, Cch does not switch immediately,
Continue capturing Cch as it is. In general, in terms of device configuration and performance, FB
The transmission power of the downlink radio wave is stronger, and the transmission radio wave of the ML is already F
Even if you move to a place where you cannot reach B, Cc
In some cases, the situation where h is continuously captured occurs. Next, FIG. 21 shows an example in which a mobile switch for performing the Cch acquisition algorithm is provided in the ML, and FIG. 22 shows the operation. Normally, the ML has a function of visually displaying the electric field level of the reception Cch on an LCD or the like. However, when the user determines that the electric field level currently being received is low, the Cch search manual operation on the operation button of the ML is performed. The switch 10 is pressed (S221). The ML whose switch is pressed searches for Cch as shown in FIG. 31 or 32 (S222). When a different Cch is captured, location registration is performed. As shown in FIG. 21, the switches 10 and 11 are located at the uppermost part of the plurality of switch groups, and another function switch is located between the switches 10 and 11.
【0043】また、スイッチではなくMLが自動的にC
chサーチを行う例を図23に示す。一般に、下りCc
hを受信できない状態が発生して始めてCchサーチが
起動されることは前に述べたが、ここでは、下りCch
電界測定を、一定時間単位で行い、下りCchを受信で
きなくなる前にCchサーチを起動するものとする。普
通にMLがゾーン外に移動していった場合、下りCch
の電界は徐々に弱くなるはずである。電界分布の変動が
あったとしても、一定時間内の電界測定値を平均化し、
かつ一定時間ごとにその平均値をサンプリング的に処理
してやれば、電界が劣化しつつある状態か否かは容易に
判断できる。尚、電界測定値の平均化から電界劣化状態
の判断までの動作はいわゆるソフトウェア処理により実
行する。完全にCchを受信できなくなる電界レベルよ
り少し高めにこの電界劣化レベルを設定しておき、上記
経過時間ごとの処理で電界劣化レベルがある時間続いた
とき(S231)に例えば図31のアルゴリズムに基づ
きCchサーチを起動する(S232)ように構成され
ており、このCchサーチ起動に基づき、MLはゾーン
間を移動しても受信できないレベルにおちいる前に自動
的に最適Cchを捕捉する。 Also, the ML is automatically set to C instead of the switch.
FIG. 23 shows an example of performing a channel search. In general, the descending Cc
As described above, the Cch search is started only after a state in which h cannot be received.
The electric field measurement is performed in a fixed time unit, and the Cch search is activated before the downlink Cch cannot be received. If the ML moves out of the zone normally,
Should gradually become weaker. Even if the electric field distribution fluctuates, the electric field measurement values within a certain time are averaged,
If the average value is sampled at regular intervals, it can be easily determined whether or not the electric field is deteriorating. The operations from the averaging of the electric field measurement values to the judgment of the electric field deterioration state are executed by so-called software processing. This electric field deterioration level is set slightly higher than the electric field level at which Cch cannot be completely received, and when the electric field deterioration level continues for a certain period of time (S231) in the processing for each elapsed time, for example, based on the algorithm of FIG. It is configured to start a Cch search (S232), and based on the start of the Cch search, the ML automatically captures an optimal Cch before falling into a level that cannot be received even when moving between zones.
【0044】前述の例でゾーン間のオーバーリーチ、上
り/下り電界のアンバランスを説明したが、これは通話
中のMLについてもあてはまる。例えば、図24のよう
にFB51とFB52からほぼ等距離にいるML2は、
どちらのゾーンのSchを使っても通話できる。電界状
態によっては、例えば、ビルの影を横切ったり、遮蔽物
にアンテナを向けたりした時に、タイミングによっては
ハンドオーバー(以下、H.Oと記す)が起動され、状
態がかわったらまたH.Oで元のゾーンに切り戻される
といったことが起こる。H.Oは通話状態を継続する機
能ではあるが、通話路を切り替えているため必ず瞬断が
はいり、通話品質上はH.Oが起きない方が望ましい。
図24のような場合、図25に示すようなH.O抑止ス
イッチ11をMLの操作ボタン上に備えておいて、ユー
ザが通話中にH.Oが繰り返されることを認識し、それ
に不快感をおぼえるようなケースでは、本スイッチを押
下し、MLはCCに対してH.O抑止要求を行うものと
する。通話中MLの上り信号はフレーム化されたディジ
タルの音声信号であるが、例えば図26に示すように特
定のフレーム、このH.O抑止の制御信号にあてること
によってCCは上りSch上からMLのH.O抑止要求
を知り、当該MLに対するH.O処理を以後抑止する。
尚、図26に示すフレームフォーマットにおいて、制御
信号の部分にはH.Oの抑止を要求する制御フレームを
示している。一般に制御フレームとしては、無線伝送路
上のビットエラーを考慮し、2〜4フレーム連送される
ことが多いが、この例では便宜上H.O抑止要求用の制
御フレームを1フレームのみ示している。In the above-mentioned example , the overreach between zones and the imbalance between the up / down electric fields have been described, but this also applies to the ML during a call. For example, as shown in FIG. 24, ML2 which is at substantially the same distance from FB51 and FB52,
Calls can be made using the Sch in either zone. Depending on the state of the electric field, for example, when a user crosses the shadow of a building or points an antenna at a shield, a handover (hereinafter referred to as HO) is activated depending on the timing. O returns to the original zone. H. O is a function of continuing the call state, but the call path is switched, so that an instantaneous interruption is always required. It is desirable that O does not occur.
In the case as shown in FIG. The O-suppression switch 11 is provided on the operation button of the ML so that the user can use the H.264 switch during a call. In a case where it is recognized that O is repeated and the user feels discomfort, this switch is depressed, and the ML issues an H.O to the CC. An O suppression request shall be made. The upstream signal of the ML during a call is a digital voice signal which is framed. For example, as shown in FIG. By applying the control signal to the O-suppression, the CC is transmitted from the upstream Sch on the H. O. Inhibition request is learned, and H. O processing is thereafter suppressed.
Note that in the frame format shown in FIG. 9 shows a control frame requesting suppression of O. Generally, a control frame is often transmitted continuously for 2 to 4 frames in consideration of a bit error on a wireless transmission path. Only one control frame for O suppression request is shown.
【0045】前述の例では、手動スイッチによってML
からH.O抑止要求を上げる例を示したが、スイッチの
変わりにMLにおいて、H.Oの繰り返し回数をカウン
トし規定回数以上のH.Oの繰り返しが起きたら、自動
的にH.O抑止要求を上げる例を図27に示す。通話中
のMLにおいて、CCから通話ゾーンを切り替えるよう
H.O処理を実行させられた場合に、どのゾーンからど
のゾーンへH.Oしたのかをその時の受信電界レベルと
ともに記憶しておく。同一ゾーン間H.Oを複数回やら
された場合に、MLはCCに対して実施例16のように
H.O抑止要求を行うことによって当該MLに対する
H.Oが抑止される。In the above-described example, the ML is operated by the manual switch.
To H. Although the example in which the O suppression request is raised has been described, the ML is replaced with the H.264 switch instead of the switch. The number of repetitions of O.O. When O repeat occurs, H.O. FIG. 27 shows an example of raising the O suppression request. In the ML during a call, H.264 switches the call zone from the CC. When the O process is performed, the H.O. Whether O was performed is stored together with the received electric field level at that time. H. between same zones In the case where O is performed a plurality of times, the ML notifies the CC of H. H request for the ML by making the O.Suppression request. O is suppressed.
【0046】前述の例では、MLからH.O抑止要求を
上げる例を示したが、CCが判断抑止する例を図28に
示す。図24のような状態で、FB50、FB51の間
でML2がH.Oを繰り返す場合、CCは当該通話をど
のゾーンからどのゾーンへH.Oしたのかを管理してい
て、同一ゾーン間において同一MLのH.O処理を規定
回数以上実行したとき(S281)、以後当該通話(M
L)に対するH.O処理を抑止するという制御を行う
(S282)。この時の抑止は段階的に行えば、より効
果的である。例えば、H.Oでゾーン間を1往復し、も
とのゾーンに戻ってきた場合、抑止段階1として今いる
ゾーンからのH.Oを難しくする。すなわち、H.O処
理を起動する当該ゾーンでの通話中MLの上り電界劣化
レベルの判定基準を下げる。すると、前回H.Oを起動
した上り電界よりさらに劣化しなければ、H.O処理が
起動されないので、やや、抑止されたことになる。この
ようにして、H.O処理の回数の毎に、H.O起動の判
定基準を下げてやれば、H.Oが抑止されてゆく。In the above example, ML to H.264 are used. Although the example in which the O suppression request is raised has been described, an example in which the CC determines and suppresses the request is shown in FIG. In a state as shown in FIG. 24, ML2 is H. between FB50 and FB51. When repeating O, the CC transfers the call from any zone to any zone. O is managed, and the same ML H.O. When the O process has been performed a specified number of times or more (S281), the call (M
H. for L). Control for suppressing the O processing is performed (S282). It is more effective if the deterrence is performed in stages. For example, H. In case O makes one round trip between the zones and returns to the original zone, H.0 from the current zone is used as suppression stage 1. Make O difficult. That is, H. Decrease the criterion of the upstream electric field deterioration level of the ML during a call in the zone where the O process is activated. Then, the last time If the H.O. Since the O processing is not started, it is somewhat suppressed. In this way, H. H.O. If the criterion for starting O is lowered, H.O. O is deterred.
【0047】これまでに述べた実施例1〜実施例5のい
わゆるディジタル方式の移動体通信に適用した例を示し
たが、アナログ方式の移動体通信にも適用可能である。Although an example has been shown in which the above-described first to fifth embodiments are applied to so-called digital mobile communication, the present invention is also applicable to analog mobile communication.
【0048】[0048]
【発明の効果】請求項1、2、3の発明では、MLが輻
輳ゾーン回避動作をするのと同時にCCが発呼者に対し
て”輻輳”の旨通知するので、サービスビリティがよ
い。請求項4の発明では、CC(FB)側が制御するた
め、MLはCch捕捉動作をすることがないとともに輻
輳の有/無に関係なく同じ着呼動作を行える。請求項5
の発明では、CCが通話中のMLの上り電界を測定し、
輻輳ゾーン外へ移行指示を行うので、MLは終話後あら
ためてCch捕捉動作を行わなくてすむ。請求項6、
7、8の発明では、輻輳時CCがゾーン単位ではなく、
個々のMLのトラヒック状態を管理するので、一度に多
数のMLがゾーン切替えを行わなくてすみ、Cchトラ
ヒックも高負荷にならない。 Claim 1 according to the present invention, in the third invention, since simultaneously CC and to the ML congestion zone avoidance operation notifies effect of "congestion" to the calling party, it is the service bi utility. According to the invention of claim 4 , since the CC (FB) side controls, the ML does not perform the Cch acquisition operation and can perform the same incoming call operation regardless of the presence / absence of congestion. Claim 5
In the invention of CC, the CC measures the uplink electric field of the ML during a call,
Since the shift instruction is performed outside the congestion zone, the ML does not need to perform the Cch capturing operation again after the end of the call. Claim 6,
In the inventions of 7 and 8, the CC at the time of congestion is not a zone unit,
Since managing the traffic state of the individual ML, it is not necessary to perform the switching large number of ML zones at once, Cch traffic is also not as high load.
【図1】 本発明の実施例1における移動体通信システ
ムの概要を示す図。FIG. 1 is a diagram illustrating an outline of a mobile communication system according to a first embodiment of the present invention.
【図2】 実施例1における輻輳ゾーンの着呼呼出しの
シーケンスを示す図。FIG. 2 is a diagram showing a sequence of an incoming call in a congestion zone according to the first embodiment.
【図3】 実施例2におけるMLの上りCch電界を示
す図。FIG. 3 is a diagram illustrating an upward Cch electric field of an ML according to a second embodiment.
【図4】 実施例2における輻輳ゾーンの着呼呼出しの
シーケンスを示す図。FIG. 4 is a diagram showing a sequence of an incoming call in a congestion zone according to the second embodiment.
【図5】 実施例3における輻輳ゾーンからのMLの移
行シーケンスを示す図。FIG. 5 is a diagram showing an ML transition sequence from a congestion zone in the third embodiment.
【図6】 実施例4におけるCCが持つMLに関するデ
ータテーブルを示す図。FIG. 6 is a diagram illustrating a data table regarding MLs possessed by a CC according to the fourth embodiment.
【図7】 実施例4における輻輳ゾーンからのMLの移
行シーケンスを示す図。FIG. 7 is a diagram showing an ML transition sequence from a congestion zone in the fourth embodiment.
【図8】 実施例5における輻輳ゾーンからのMLの移
行シーケンスを示す図。FIG. 8 is a diagram illustrating an ML transition sequence from a congestion zone according to the fifth embodiment.
【図9】 周辺ゾーンの突発的Cchトラヒックの回避
を行う例を示す図。 FIG. 9: Avoidance of sudden Cch traffic in surrounding zones
The figure which shows the example which performs.
【図10】 下りCchのフレームパターンを示す図。 FIG. 10 is a diagram showing a downlink Cch frame pattern.
【図11】 MLのCch捕捉手順を示す図。 FIG. 11 is a diagram showing a procedure for acquiring a ML Cch.
【図12】 フレーム同期検出回路の構成を示す図。 FIG. 12 is a diagram illustrating a configuration of a frame synchronization detection circuit.
【図13】 フレーム同期検出手順を示す図。 FIG. 13 is a diagram showing a frame synchronization detection procedure.
【図14】 データ格納RAMに格納されているデータ
構成を示す図。FIG. 14 shows data stored in a data storage RAM .
The figure which shows a structure .
【図15】 フレーム同期検出手順を示す図。 FIG. 15 is a diagram showing a frame synchronization detection procedure.
【図16】 メンテナンスゾーンでの通話を示す図。 FIG. 16 is a diagram showing a call in a maintenance zone.
【図17】 シーケンスを示す図。 FIG. 17 is a diagram showing a sequence.
【図18】 通話中MLの上り電界測定レベルを示す
図。 FIG. 18 shows an uplink electric field measurement level of a ML during a call;
FIG.
【図19】 通話中MLのビット遅延を示す図。 FIG. 19 is a diagram showing a bit delay of a ML during a call;
【図20】 MLの位置情報の表示例を示す図。 FIG. 20 is a diagram showing a display example of ML position information.
【図21】 ML形状の動作の概要を示す図。 FIG. 21 is a diagram showing an outline of the operation of the ML shape.
【図22】 MLの動作の概要を示す図。 FIG. 22 is a diagram showing an outline of the operation of the ML.
【図23】 MLの動作の概要を示す図。 FIG. 23 is a view showing an outline of the operation of the ML.
【図24】 MLの通話状態の概要を示す図。 FIG. 24 is a diagram showing an outline of a call state of the ML.
【図25】 MLからのH.O抑止要求を示す図。 FIG. 25. H. from ML . The figure which shows O suppression request.
【図26】 H.O抑止要求のための信号フォーマット
を示す図。 [26] H. Signal format for O suppression request
FIG.
【図27】 H.O抑止例を示すシーケンス図。 [Figure 27] H. FIG. 7 is a sequence diagram showing an example of O suppression.
【図28】 H.O抑止例を示すシーケンス図。 [28] H. FIG. 7 is a sequence diagram showing an example of O suppression.
【図29】 従来の移動体通信システムの構成を示す
図。FIG. 29 is a diagram showing a configuration of a conventional mobile communication system.
【図30】 従来の他の移動体通信システムの概要を示
す図。FIG. 30 is a diagram showing an outline of another conventional mobile communication system.
【図31】 図30に示したものにおけるCchのベス
トリストの一例を作成する手順を示す図。FIG. 31 is a diagram showing a procedure for creating an example of a Cch best list in the one shown in FIG. 30;
【図32】 図30に示したものにおけるCchのベス
トリストの他の例を作成する手順を示す図。FIG. 32 is an exemplary view showing a procedure for creating another example of the Cch best list in the one shown in FIG. 30;
【図33】 図30に示した移動体通信システムにおけ
る輻輳ゾーンの着呼呼出しシーケンスを示す図。FIG. 33 is a diagram showing an incoming call sequence of a congestion zone in the mobile communication system shown in FIG. 30;
1 CC(移動体交換局)、2 ML(移動体)、50
〜52:FB(無線基地局)、500〜520:サービ
スエリア、100 TT(トーキートランク)。1 CC (Mobile Switching Center), 2 ML (Mobile), 50
-52: FB (wireless base station), 500-520: service area, 100 TT (talkie trunk).
───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.7,DB名) H04B 7/24 - 7/26 H04Q 7/06 - 7/38 ──────────────────────────────────────────────────続 き Continued on the front page (58) Field surveyed (Int.Cl. 7 , DB name) H04B 7/ 24-7/26 H04Q 7 /06-7/38
Claims (8)
築し、ひとつのゾーンにはゾーン内の移動体に対して呼
接続制御を行うための制御チャネルと、通話用のチャネ
ルを備えている移動体通信システムにおいて、前記サー
ビスエリアのひとつのゾーンが輻輳ゾーンの場合、この
輻輳ゾーン内で移動体交換局が着呼呼出を送信する際、
移動体が前記輻輳ゾーンからの回避動作を行うとともに
移動体交換局が発呼者に対してゾーン切替え中である旨
を通知手段により通知することを特徴とする移動体通信
システム。A mobile communication system comprising: a service area constructed by a plurality of radio base stations; one zone having a control channel for performing call connection control for a mobile body in the zone and a communication channel; In the body communication system, the server
When one zone of the service area is a congestion zone, when the mobile switching center transmits an incoming call within the congestion zone,
Mobile communication system mobile switching center with the mobile performs avoidance operation from the congestion zone and notifies the notification means that is in switching zone to the calling party.
ンの制御チャネルを捕捉すると、報知されている周辺制
御チャネルの情報に基づいて周辺ゾーンの制御チャネル
の電界を測定しその測定結果に基づき制御チャネルのリ
ストを作成することを特徴とする請求項第1項記載の移
動体通信システム。2. When a mobile unit located in a zone captures a control channel of the zone, the mobile unit measures an electric field of the control channel of the peripheral zone based on information of the peripheral control channel that is broadcast, and based on the measurement result. 2. The mobile communication system according to claim 1, wherein a list of control channels is created.
に、最初に捕捉した制御チャネルよりも強い電界の制御
チャネルが存在する場合、あらためてその制御チャネル
を捕捉し直し、当該制御チャネルから周辺制御チャネル
情報読み込みを再度行うことを特徴とする請求項第1項
記載の移動体通信システム。3. When a control channel having an electric field stronger than that of the control channel initially captured exists during the measurement of the electric field of the control channel in the peripheral zone, the control channel is re-captured, and the control channel is re-established from the control channel. 2. The mobile communication system according to claim 1, wherein information reading is performed again.
築し、ひとつのゾーンにはゾーン内の移動体に対して呼
接続制御を行うための制御チャネルと、通話用のチャネ
ルを備えている移動体通信システムにおいて、前記サー
ビスエリアのひとつのゾーンが輻輳ゾーンの場合、この
輻輳ゾーン内において着呼呼出を移動体交換局が送信す
る前に、あらかじめ当該ゾーンの周辺ゾーンの基地局に
対して前記輻輳ゾーンの上り制御チャネルの電界測定を
指示しておき、前記着呼呼出に対する移動体の上り制御
チャネルに送信される着呼応答の電界を測定することに
より、通話可能な周辺ゾーンの通話用チャネルを前記移
動体に指示し、前記輻輳ゾーン内で通話にいたらしめる
ことを特徴とする移動体通信システム。4. A mobile area in which a service area is constructed by a plurality of radio base stations, and one zone is provided with a control channel for performing call connection control for a mobile unit in the zone and a communication channel. In the body communication system, the server
If one of the zones Bisueria is congestion zone, within this <br/> congestion zone before the incoming call call mobile switching center sends, of the congestion zones for advance base station of the peripheral zone of the zone By instructing the measurement of the electric field of the uplink control channel, and measuring the electric field of the incoming call response transmitted to the uplink control channel of the mobile in response to the incoming call, the communication channel of the peripheral zone where the communication is possible is shifted.
A mobile communication system, wherein a mobile body is instructed to make a call within the congestion zone .
築し、ひとつのゾーンにはゾーン内の移動体に対して呼
接続制御を行うための制御チャネルと、通話用のチャネ
ルを備えている移動体通信システムにおいて、前記サー
ビスエリアのひとつのゾーンが輻輳ゾーンの場合、この
輻輳ゾーンで通話中の移動体の上り電界をその周辺ゾー
ンの基地局で測定し、通話終了後に測定結果に基いて他
のゾーンへの移行を指示することを特徴とする移動体通
信システム。5. A mobile area in which a service area is constructed by a plurality of radio base stations, and one zone is provided with a control channel for performing call connection control for a mobile unit in the zone and a communication channel. In the body communication system, the server
If one zone of the service area is a congestion zone, the uplink electric field of the mobile unit that is talking in the congestion zone is measured by a base station in the surrounding zone, and after the call is terminated, the other station is transferred to another zone based on the measurement result. A mobile communication system characterized by instructing a shift of the mobile communication system.
築し、ひとつのゾーンにはゾーン内の移動体に対して呼
接続制御を行うための制御チャネルと、通話用のチャネ
ルを備えている移動体通信システムにおいて、移動体を
管理するデータテーブルを有し、上記データテーブルに
おいて、単位時間あたりの発/着呼数に基づいて定まる
トラヒックレベルと、各移動体が最後に発/着呼を行っ
た時刻をパラメータとして持ち、輻輳ゾーンに位置する
移動体の中から、上記移動体管理データテーブル上のト
ラヒックレベルと最終アクセス時刻からあらかじめ登録
された条件で特定の移動体を抽出することを特徴とする
移動体通信システム。6. A mobile area in which a service area is constructed by a plurality of radio base stations, and one zone is provided with a control channel for performing call connection control for a mobile unit in the zone and a communication channel. The mobile communication system has a data table for managing mobile units, and in the data table, a traffic level determined based on the number of outgoing / incoming calls per unit time, and each mobile unit performs outgoing / incoming calls last. Located in the congestion zone
From among the mobile units, select the
Register in advance from traffic level and last access time
A mobile communication system , wherein a specific mobile is extracted under specified conditions .
の移行を指示し、移行指示を受信した移動体において
は、切換可能な周辺ゾーンの制御チャネルへ切り替るこ
とを特徴とする請求項第6項記載の移動体通信システ
ム。7. The extracted mobile unit is instructed to shift to a peripheral zone, and the mobile unit that has received the shift instruction switches to a control channel of a switchable peripheral zone. 7. The mobile communication system according to claim 6.
移動体の上り電界をその周辺ゾーンの基地局で測定して
おき、終話後に前記測定結果に基づいて周辺ゾーンへの
移行を指示することを特徴とする請求項第6項記載の移
動体通信システム。8. When a moving object during a call is extracted, an uplink electric field of the moving object is measured by a base station in a surrounding zone, and after a call is ended, transition to a surrounding zone is performed based on the measurement result. 7. The mobile communication system according to claim 6, wherein an instruction is given.
Priority Applications (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP06133070A JP3079895B2 (en) | 1994-06-15 | 1994-06-15 | Mobile communication system |
| JP2000117706A JP3502010B2 (en) | 1994-06-15 | 2000-04-19 | Mobile communication system |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP06133070A JP3079895B2 (en) | 1994-06-15 | 1994-06-15 | Mobile communication system |
Related Child Applications (2)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2000117706A Division JP3502010B2 (en) | 1994-06-15 | 2000-04-19 | Mobile communication system |
| JP2000117705A Division JP3344410B2 (en) | 1994-06-15 | 2000-04-19 | Mobile communication system |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH089445A JPH089445A (en) | 1996-01-12 |
| JP3079895B2 true JP3079895B2 (en) | 2000-08-21 |
Family
ID=15096146
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP06133070A Expired - Fee Related JP3079895B2 (en) | 1994-06-15 | 1994-06-15 | Mobile communication system |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3079895B2 (en) |
-
1994
- 1994-06-15 JP JP06133070A patent/JP3079895B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JPH089445A (en) | 1996-01-12 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US6363246B1 (en) | Call routing method for a radiotelephone in multiple radiotelephone systems | |
| US5260988A (en) | Apparatus and method for alternative radiotelephone system selection | |
| JP3126706B2 (en) | Idle handoff method and system in cellular system | |
| KR100342565B1 (en) | Method for recovering a dropped call and informing the recovering state of mobile station in code division multipule access system | |
| US5901357A (en) | Frequency allocation for subscribers of multiple telephone systems having frequency sharing | |
| CA2332030A1 (en) | System and method for delivering a call for a mobile station using either a wireless network or a wireline network | |
| WO2002052881B1 (en) | Method and device for handling telephone calls directed to non-reachable mobile phones | |
| WO1993016560A1 (en) | Dual system cellular cordless radiotelephone apparatus and method | |
| KR100694940B1 (en) | Method and apparatus for retrieving data for selected calls | |
| EP1740002A1 (en) | Base station device and initialization method thereof | |
| JP2009206860A (en) | Radio terminal device and radio network system | |
| KR100703505B1 (en) | Communication method of mobile communication terminal capable of radio communication | |
| US5970415A (en) | Method for handling collision of calls | |
| JP3079895B2 (en) | Mobile communication system | |
| FI105518B (en) | Method of establishing outgoing connections, terminal device and information transfer system | |
| JP2000333242A (en) | Mobile communication system | |
| JP3344410B2 (en) | Mobile communication system | |
| US6807413B1 (en) | Mobile terminal communication system | |
| CN107872788B (en) | Method for voice service connection of dual-card terminal and dual-card terminal | |
| CN1549649A (en) | Calling detection method for personal hand-held communication system | |
| JPS6310618B2 (en) | ||
| JP5143414B2 (en) | Wireless communication terminal | |
| JP2667757B2 (en) | Mobile station location registration method in mobile switching system | |
| JP3507790B2 (en) | PHS handover method and PHS terminal device | |
| US20060009221A1 (en) | Cellular phone which selectively connected with one of mobile telephone systems, its control method, and its program |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080623 Year of fee payment: 8 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080623 Year of fee payment: 8 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090623 Year of fee payment: 9 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100623 Year of fee payment: 10 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100623 Year of fee payment: 10 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110623 Year of fee payment: 11 |
|
| LAPS | Cancellation because of no payment of annual fees |