JP3087992B2 - Building map creation method and device - Google Patents
Building map creation method and deviceInfo
- Publication number
- JP3087992B2 JP3087992B2 JP05114734A JP11473493A JP3087992B2 JP 3087992 B2 JP3087992 B2 JP 3087992B2 JP 05114734 A JP05114734 A JP 05114734A JP 11473493 A JP11473493 A JP 11473493A JP 3087992 B2 JP3087992 B2 JP 3087992B2
- Authority
- JP
- Japan
- Prior art keywords
- land
- building
- shape
- dimension
- outline
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Description
【0001】[0001]
【産業上の利用分野】本発明は建物図作成方法及び装置
に係り、特に、登記申請図面の建物図作成方法及び装置
に関する。The present invention relates relates to a building map creation method and apparatus <br/>, in particular, the building map creation method and apparatus <br/> articles registration application drawings.
【0002】この建物図作成方法では、登記所備付けの
土地の図を用いて、建物図を容易に作成できることが必
要とされている。In this building map creation method, it is necessary that a building map can be easily created using a land map provided at a registry office.
【0003】[0003]
【従来の技術】土地家屋調査士は、依頼人の依頼を受け
て、登記申請図面の建物図を作成する。この場合、設計
データである建物の形状データと、測量データである建
物と土地の外形線との距離データと、登記所備付けの土
地の形状図とを用いて登記申請図面の建物図を作成す
る。2. Description of the Related Art At the request of a client, a land and house surveyor creates a building drawing of a registration application drawing. In this case, the building drawing of the registration application drawing is created using the building shape data as the design data, the distance data between the building and the land outline as the surveying data, and the land shape drawing provided at the registry office. .
【0004】建物と土地の見取図である建物図に配置す
る3つの図形要素として、建物の1階の形状、土地の形
状、建物と土地の外形との距離を示す寸法線とがある。
建物の形状のデータは、設計図を元にしているから誤差
を持たない。建物と土地の外形との距離は、実際に測量
した3か所の数値を用いる。[0004] As three graphic elements to be arranged in a building drawing which is a sketch of a building and land, there are a shape of the first floor of the building, a shape of the land, and a dimension line indicating a distance between the building and the outline of the land.
The building shape data has no error because it is based on the design drawing. For the distance between the building and the land outline, numerical values of three actually measured locations are used.
【0005】土地の形状については、本来は、測量デー
タを元に、図面を作成することになっているが、依頼人
の予算の関係で、登記所備付けの地図を使用している。[0005] For the shape of the land, a drawing is originally created based on the survey data, but a map provided at a registry office is used due to the budget of the client.
【0006】従来、建物図の作成では、データとコマン
ド等を入力することで建物図を作成して出力させること
ができる作図システムが使用されている。この作図シス
テムでは、先ず、設計データである建物の形状のデー
タ、及び、3本の寸法線を付ける建物の端点の位置と測
量値である寸法値を入力する。Conventionally, a building system has been used to create and output a building map by inputting data, commands, and the like. In this drawing system, first, data on the shape of a building, which is design data, the position of an end point of a building to which three dimension lines are to be attached, and dimension values, which are survey values, are input.
【0007】また、登記所備付けの土地の形状図を、デ
ジタイザ装置等により入力する。この後、作図システム
では、操作者の操作により、土地の形状図を移動,回転
させて、建物の形状図の3本の寸法線の端点と土地の外
形線とを接合する。[0007] In addition, a shape map of the land provided at the registry office is input by a digitizer or the like. Thereafter, the drawing system moves and rotates the land shape diagram by the operation of the operator, and joins the end points of the three dimension lines of the building shape diagram and the outline line of the land.
【0008】[0008]
【発明が解決しようとする課題】従来の作図システムで
は、操作者が手動で、土地の形状図を移動,回転して、
建物の形状図の3本の寸法線の端点と土地の外形線とを
接合している。しかし、寸法線の端点が土地の外形線か
ら突き出たり、隙間ができたりしないように接合するに
は、手間がかかるという問題がある。In the conventional drawing system, the operator manually moves and rotates the land shape map,
The end points of the three dimension lines of the shape diagram of the building are joined to the outline of the land. However, there is a problem in that it takes time and effort to join such that the end points of the dimension lines do not protrude from the outline of the land or a gap is formed.
【0009】本発明は、上記の点に鑑みてなされたもの
で、自動的に建物の形状図の寸法線の端点と土地の形状
図とを接合して、容易に建物図を作成することができる
建物図作成方法を提供することを目的とする。The present invention has been made in view of the above points, and it is possible to easily create a building diagram by automatically joining the end points of the dimension lines of the building shape diagram and the land shape diagram. The purpose is to provide a building drawing creation method that can be used.
【0010】[0010]
【課題を解決するための手段】本発明の建物図作成方法
は、操作者がコマンド及びデータを入力する入力装置に
より、建物の形状図のデータを入力するステップと、 図
面データ入力装置により、土地の形状図の図面データを
入力するステップと、 前記入力された建物の形状図のデ
ータと土地の形状図の図面のデータをもとに作図処理を
行ない、表示装置に建物形状図と土地の形状図として表
示するステップと、 前記入力装置によって建物の端点か
ら土地の外形線までの距離を表す3つの寸法線の測量値
の距離データを入力するステップと、 前記建物形状図と
前記土地の形状図が表示された前記表示装置に前記寸法
線を表示するステップと、 前記3つの寸法線とそれに対
応づける前記土地の外形線を夫々選択し 、 前記土地の形
状図の移動、回転又は建物の形状図の移動、回転を行う
ことで、前記土地の外形線にそれぞれ接合される少なく
とも2つ以上の前記寸法線の端点を、前記土地の外形線
に接合するステップと、 前記建物の形状図、寸法線及び
前記土地の形状図の接合が完了していない場合に、操作
者が前記土地の形状図の頂点の移動先を指示し、前記土
地の外形線の線分がそれに対応して移動することで土地
の形状図を変更するステップとを有する。 本発明の建物
図作成装置は、建物の形状図のデータを入力する手段
と、 土地の形状図の図面データを入力する手段と、 建物
の端点から土地の外形線までの距離を表す3つの寸法線
の測量値の距離データと前記寸法線を接合する建物の端
点の位置を夫々入力する手段と、 前記寸法線とそれに対
応づける前記土地の外形線を選択する手段と、 前記土地
の形状図の移動、回転又は建物の形状図の移動、回転を
行うことで、前記土地の外形線にそれぞれ接合される少
なくとも2つ以上の前記寸法線の端点を前記土地の外形
線に接合する手段と、 操作者が前記土地の形状図の頂点
の移動先を指示する手段と、 前記頂点の移動先に対応す
るように前記外形線の線分を移動させることで土地の形
状図を変更する手段を有する。 According to the present invention, there is provided a method for creating a building diagram, comprising an input device for inputting commands and data by an operator .
More, the step of inputting data for shape view of a building, Fig.
The plane data input device can be used to convert the drawing data
Inputting and inputting the data of the inputted building shape map.
Data based on the drawing data
And display it on the display device as a building shape map and land shape map.
Indicating the end point of the building by the input device.
Survey values of three dimension lines representing the distance from the land to the outline of the land
Inputting the distance data of the building shape diagram and
The dimensions are displayed on the display device on which the land shape map is displayed.
Displaying a line, the three dimension lines and their corresponding
The outline of response characterizing the land respectively selected shape of the land
Move and rotate the plan or move and rotate the building plan
By being connected to the outline of the land,
The end points of two or more of the dimension lines,
Joining to the building , the building shape diagram, the dimension line and
If the joining of the land shape map is not completed,
Specifies the destination of the vertices of the land shape map,
As the outline of the ground moves correspondingly, the land
And changing the shape diagram. Building of the present invention
The figure creation device is a means for inputting data of a building shape drawing.
And means for inputting the drawing data of the land shape map, and the building
Three dimension lines that represent the distance from the end point of the to the outline of the land
The end of the building that joins the distance data of the survey values with the dimension line
Means for respectively inputting the position of the point, the dimension line and its paired
Means for selecting the contour line of response characterizing the land, the land
Movement and rotation of the shape diagram of the building or movement and rotation of the shape diagram of the building
By doing so, a small amount of
At least two or more endpoints of the dimension line are
Means for joining to the line, and the operator
Means for instructing the destination of the vertex;
The shape of the land is moved by moving
Means for changing the schematic.
【0011】[0011]
【作用】本発明では、土地の形状図又は建物の形状図
の、移動,回転を少なくともいずれか一方を行うことに
より、自動的に建物の形状図の寸法線の端点と土地の形
状図とを接合する。このため、容易に建物図を作成する
ことを可能とする。According to the present invention, the end point of the dimension line of the building shape diagram and the land shape diagram are automatically determined by moving and / or rotating the land shape diagram or the building shape diagram. Join. Therefore, it is possible to easily create a building diagram.
【0012】[0012]
【実施例】図1は本発明の一実施例の建物図作図処理の
処理手順を示すフローチャートである。また、図2は、
本実施例を適用した作図システムの構成図を示す。図2
に示す作図システムは、作図処理を実行する処理装置1
1、操作者がコマンド、数値等を入力するためのキーボ
ード等の入力装置12、図面のデータを入力するための
デジタイザ装置15、建物の形状図や文字等を表示する
CRTディスプレイ等の表示装置14、表示装置14上
でのカーソル位置を指定するためのポインティングデバ
イス(マウス等)13、作図結果の図面を印字出力する
ための出力装置16等を備える。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS FIG. 1 is a flowchart showing a processing procedure of a building drawing processing according to an embodiment of the present invention. Also, FIG.
1 shows a configuration diagram of a drawing system to which the present embodiment is applied. FIG.
Is a processing device 1 for executing a drawing process.
1, an input device 12 such as a keyboard for an operator to input commands, numerical values, etc., a digitizer device 15 for inputting data of drawings, a display device 14 such as a CRT display for displaying building shapes, characters, etc. A pointing device (mouse or the like) 13 for designating a cursor position on the display device 14, an output device 16 for printing out a drawing of a drawing result, and the like.
【0013】図1に示すように、作図処理では、先ず、
建物の各階の床形状のデータの入力を行う(ステップ2
01)。次に、入力された各階の床形状のうち、1階の
床形状のデータを自動参照して、1階の床形状の形状図
を、建物図用の建物の形状図とする(ステップ20
2)。図3は、建物の形状図の例を示す。図3の建物の
形状図21は、頂点A〜Fの6個の頂点を持つ形状であ
る。As shown in FIG. 1, in the drawing process, first,
Input floor shape data of each floor of the building (Step 2)
01). Next, among the input floor shapes of each floor, the data of the floor shape of the first floor is automatically referred to, and the shape diagram of the floor shape of the first floor is set as the shape diagram of the building for the building map (step 20).
2). FIG. 3 shows an example of a building shape diagram. The building shape diagram 21 of FIG. 3 is a shape having six vertices A to F.
【0014】次に、デジタイザ装置15により、登記所
備付けの土地の形状図を入力する(ステップ203)。
図4は、入力された土地の形状図の例を示す。図4の土
地の形状図22は、4つの頂点H0 ,I0 ,J0 ,K0
を持つ形状である。なお、登記所備付けの土地の形状図
は、精度が低く、実際の土地の形状とずれている場合が
ある。Next, the digitizer device 15 is used to input a shape map of the land provided at the registry (step 203).
FIG. 4 shows an example of an input land shape map. The land shape diagram 22 of FIG. 4 includes four vertices H 0 , I 0 , J 0 , and K 0.
The shape has It should be noted that the shape of the land provided at the registry office has low accuracy and may be different from the actual shape of the land.
【0015】次に、3か所で測量して得られた、建物の
端点から土地の外形線までの距離データを、寸法線の寸
法値として入力すると、寸法値が記憶されると共に、表
示装置14の画面上に、建物の形状図が表示され、寸法
線が仮表示される(ステップ204)。寸法線は後で長
さが修正される可能性があるため、ここでの寸法線の表
示は仮表示である。Next, when the distance data from the end point of the building to the outline of the land, obtained by surveying at three places, is input as the dimension value of the dimension line, the dimension value is stored and the display device is displayed. A building shape diagram is displayed on the screen 14 and dimension lines are temporarily displayed (step 204). Since the length of the dimension line may be corrected later, the display of the dimension line here is a provisional display.
【0016】図5は、建物の外形図と、寸法値が入力さ
れた寸法線の表示例を示す。建物の形状図は実線で表示
されており、寸法線は、破線で表示されている。なお、
実際の表示装置14上では、建物の形状図と寸法線のみ
が表示されるが、説明の都合上、各頂点、寸法線の端点
等を示す記号を記載している。以後の各図での表示例で
も同様である。FIG. 5 shows a display example of an outline drawing of a building and a dimension line in which dimension values are inputted. The shape diagram of the building is indicated by a solid line, and the dimension line is indicated by a broken line. In addition,
On the actual display device 14, only the shape diagram of the building and the dimension line are displayed, but for convenience of description, symbols indicating the vertices, the end points of the dimension line, and the like are described. The same applies to the display examples in the subsequent drawings.
【0017】図5の例では、建物の頂点Aから図中、左
方向に測量したときの土地の外形線までの距離が、寸法
線m1の寸法値として入力されている。また、建物の頂
点Aから図中、上方向に測量したときの土地の外形線ま
での距離が、寸法線m2の寸法値として入力されてい
る。また、建物の頂点Bから図中、上方向に測量したと
きの土地の外形線までの距離が、寸法線m3の寸法値と
して入力されている。ここで、建物の端点A,Bから延
在する寸法線m1,m2,m3の端点を、夫々、P1 ,
Q1 ,R1 としている。In the example of FIG. 5, the distance from the vertex A of the building to the outline of the land measured to the left in the figure is input as the dimension value of the dimension line m1. Further, the distance from the vertex A of the building to the outline of the land measured upward in the drawing is input as the dimension value of the dimension line m2. The distance from the vertex B of the building to the outline of the land measured upward in the figure is input as the dimension value of the dimension line m3. Here, the end points of the dimension lines m1, m2, and m3 extending from the end points A and B of the building are denoted by P 1 and P 1 , respectively.
Q 1 and R 1 .
【0018】寸法線の寸法値の入力方法としては、例え
ば、表示装置14の画面上で、表示されている建物の頂
点にカーソルを合わせた状態で、寸法線の寸法値を入力
した後に、寸法線の方向を矢印キーで指定する。As a method of inputting the dimension value of the dimension line, for example, on the screen of the display device 14, after the cursor is positioned at the vertex of the building being displayed, the dimension value of the dimension line is inputted, and then the dimension value is inputted. Specify the direction of the line with the arrow keys.
【0019】なお、入力された寸法線の寸法値は、建物
図に寸法値を数値として表示するための寸法値表示用デ
ータと、表示する寸法線の長さに対応する寸法線表示用
データとに分けて記憶される。The input dimension value of the dimension line is composed of dimension value display data for displaying the dimension value as a numerical value in the building drawing, and dimension line display data corresponding to the length of the dimension line to be displayed. Is stored separately.
【0020】次に、操作者の指定に従って、建物の形状
図の寸法線の端点と土地の形状図の外形線とを自動的に
接合する(ステップ205)。接合を行わせる際には、
表示装置14の画面上に建物の形状図と土地の形状図が
表示されている状態で、操作者は、3本の寸法線のうち
の1本の寸法線をマウス等により選択し、上記選択した
寸法線を接合する土地の外形線をマウス等で選択する。
同様に、他の2本の寸法線についても、接合する土地の
外形線を選択する。各寸法線を接合する土地の外形線が
指定されると、作図システムは、建物の形状図を基準と
して、土地の形状図の、移動,回転の少なくともいずれ
か一方を行って、自動的に、建物の形状図の寸法線の端
点と土地の形状図の外形線とを接合する。Next, in accordance with the designation of the operator, the end points of the dimension lines of the building shape diagram and the outlines of the land shape diagram are automatically joined (step 205). When joining,
With the building shape diagram and the land shape diagram displayed on the screen of the display device 14, the operator selects one of the three dimension lines with a mouse or the like, and performs the above selection. Select the outline of the land that joins the dimension lines with a mouse or the like.
Similarly, for the other two dimension lines, the outline of the land to be joined is selected. When the outline of the land that joins each dimension line is specified, the drawing system automatically moves and / or rotates the land shape drawing based on the building shape drawing, The end points of the dimension line of the building shape map and the outline of the land shape diagram are joined.
【0021】上記のように、自動的に、建物及び寸法線
の図と土地の形状図が接合されるため、従来の作図シス
テムと異なり、操作者は、接合のために手間をとられる
ことがない。As described above, since the figure of the building and the dimension line are automatically joined to the shape of the land, the operator may be troublesome to join, unlike the conventional drawing system. Absent.
【0022】なお、この接合の際に、3本の寸法線の3
つの端点を共に接合できない場合は、優先順位の高い2
つの端点を接合させ、残りの1端点は、接合すべき土地
の外形線との距離が最小になるようにしている。接合で
きなかった寸法線の1端点は、後述する土地の形状の変
更処理、建物図の配置処理によって、完全に接合させる
ことができる。At the time of this joining, three dimension lines 3
If the two endpoints cannot be joined together,
One end point is joined, and the other end point is set so that the distance from the outline of the land to be joined is minimized. One end point of the dimension line that could not be joined can be completely joined by a land shape changing process and a building drawing arrangement process described later.
【0023】優先順位の決め方としては、例えば、寸法
線の入力時に先に入力された2つの寸法線の端点を優先
とする。また、操作者に、優先させる2本の寸法線を指
定させる方法としてもよい。As a method of determining the priority, for example, the end points of the two dimension lines previously input when the dimension lines are input are prioritized. Alternatively, a method may be used in which the operator specifies two priority dimension lines.
【0024】なお、3本の寸法線の3つの端点を共に接
合できない場合の処理方法としては、寸法線の3つの端
点が均等に土地の外形線に近づくようにする方法も考え
られるが、2本の寸法線を優先的に接合させる方法に比
べて、処理時間が大幅に長くなる場合が生じる。As a processing method in a case where the three end points of the three dimension lines cannot be joined together, a method of making the three end points of the dimension line evenly approach the outline of the land can be considered. In some cases, the processing time is significantly longer than the method of preferentially joining the dimension lines of a book.
【0025】図6は、図4に示す土地の形状図と、図5
に示す建物の形状図と寸法線の場合に、建物及び寸法線
の図と土地の形状図とを接合した図を示す。図6の例で
は、寸法線m1を接合する土地の外形線として線分H1
K1 が指定され、寸法線m2,m3を接合する土地の外
形線として線分H1 I1 が指定されている。FIG. 6 is a diagram showing the shape of the land shown in FIG.
In the case of the building shape diagram and the dimension line shown in FIG. 1, a diagram in which the building and dimension line diagram and the land shape diagram are joined is shown. In the example of FIG. 6, the line segment H 1 is used as the outline of the land joining the dimension line m1.
K 1 is specified, the line H 1 I 1 is designated as the outline of the land joining the dimension line m @ 2, m3.
【0026】作図システムでは、自動的に、図4に示す
元の土地の形状図22(頂点H0 ,I0 ,J0 ,K0 )
を平行移動し、かつ、回転して、図6に示すように、寸
法線m1,m2,m3,の端点P1 ,Q1 ,R1 を土地
の外形線に接合している。接合された状態では、土地の
形状図の頂点は、夫々、頂点H1 ,I1 ,J1 ,K1に
移動されている。In the drawing system, the original land shape diagram 22 (vertices H 0 , I 0 , J 0 , K 0 ) shown in FIG. 4 is automatically obtained.
The translated and rotated, as shown in FIG. 6 are joined dimension line m1, m @ 2, m3, the end points P 1, Q 1, R 1 of the outline of the land. In the bonding state, the vertex of the shape view of land, respectively, are moved to the vertex H 1, I 1, J 1 , K 1.
【0027】図4の例では、入力された元の土地の形状
図の線分H0 I0 が、図面の精度の関係で、実際の土地
に比べて、図4中、右上がりになっている。このため、
図6に示すように、寸法線の端点に土地の外形線が接合
された状態では、土地の形状図22は、時計回りに回転
されている。In the example shown in FIG. 4, the line segment H 0 I 0 of the input original land shape diagram rises to the right in FIG. 4 in comparison with the actual land due to the accuracy of the drawing. I have. For this reason,
As shown in FIG. 6, in a state where the outline of the land is joined to the end point of the dimension line, the shape diagram 22 of the land is rotated clockwise.
【0028】上記のステップ205での、建物及び寸法
線の図と土地の形状図の接合処理が終了した後、作図シ
ステムでは、操作者により、接合完了のコマンドが入力
されたかどうかを判断する(ステップ206)。After the joining processing of the building and dimension line drawing and land shape drawing in step 205 described above is completed, the drawing system determines whether or not a command to complete joining has been input by the operator (see FIG. 4). Step 206).
【0029】操作者は、上記の建物及び寸法線の図と土
地の形状図の接合の結果を、表示装置14の画面上で確
認する。この確認の結果、寸法線の端点の接合状態、建
物の形状図に対する土地の形状図の角度等に問題が無い
場合は、操作者は、接合完了のコマンドを入力する。接
合完了のコマンドが入力された場合は、ステップ209
に進み、建物図の配置処理を行う。The operator confirms on the screen of the display device 14 the result of joining the above-described building and dimension line diagram with the land shape diagram. As a result of this check, if there is no problem in the joining state of the end points of the dimension line, the angle of the land shape map with respect to the building shape map, or the like, the operator inputs a command to complete the joining. If a joining completion command is input, step 209 is executed.
To perform the layout processing of the building diagram.
【0030】建物及び寸法線の図と土地の形状図の接合
の状態を確認した結果、入力された土地の形状図の精度
の関係で、寸法線の端点の接合状態、建物の形状図に対
する土地の形状図の角度等に問題がある場合は、土地の
形状図を変更することができる。この場合、操作者は、
接合が完了していないことを示すコマンドを入力する。As a result of checking the joining state of the figure of the building and the dimension line and the figure of the land, the joining state of the end points of the dimension line and the land to the figure of the building were determined in relation to the accuracy of the input land figure. If there is a problem with the angle or the like of the shape map, the shape map of the land can be changed. In this case, the operator
Enter a command to indicate that joining has not been completed.
【0031】作図システムは、操作者が、接合が完了し
ていないことを示すコマンドを入力すると、土地の形状
図の変更処理を行う(ステップ207)。作図システム
では、土地の形状図の変更用に、土地の頂点の位置を移
動するための頂点移動コマンド、新たな土地の頂点を追
加するための頂点追加コマンド、現在ある頂点を削除す
る頂点削除コマンドを設けている。操作者は、上記コマ
ンドを用いて、土地の形状図を、実際の土地の形状に近
づけるように、変更することができる。When the operator inputs a command indicating that joining has not been completed, the drawing system changes the land shape diagram (step 207). The drawing system uses a vertex move command to move the position of the land vertex, a vertex add command to add a new land vertex, and a vertex delete command to delete the existing vertex to change the land shape map. Is provided. The operator can change the land shape map so as to approximate the actual land shape using the above command.
【0032】例えば、土地の頂点を移動する場合は、操
作者は、頂点移動コマンドを選択してから、表示装置1
4の画面上で、移動する頂点をマウス等で選択した後、
選択した頂点の移動先をマウス等で指定する。これによ
り、頂点が移動されると共に、移動前の頂点を通ってい
た線分は、移動された頂点を通るように変更される。操
作者は、上記コマンドを用いて、土地の形状図を、実際
の土地の形状に近づけるように、手書きと同じ感覚で、
容易に変更することができる。For example, when moving the vertex of the land, the operator selects the vertex move command, and then selects the display device 1.
After selecting the vertex to be moved on the screen of step 4 with a mouse or the like,
Specify the destination of the selected vertex with a mouse or the like. Thereby, the vertex is moved, and the line segment passing through the vertex before the movement is changed to pass through the moved vertex. The operator uses the above command to bring the land shape map closer to the actual land shape, in the same sense as handwriting,
Can be easily changed.
【0033】ここでは、図6に示す、建物及び寸法線の
図と土地の形状図とを接合した図を、建物の形状図21
に対する土地の形状図22の角度に問題がある場合の例
として説明する。実際の土地の形状では、線分I1 J1
が図6中で垂直で、線分K1J1 が水平であり、また、
線分H1 K1 は、線分H1 I1 となす角度がより小さい
ものとする。In this case, the figure shown in FIG. 6 in which the figure of the building and the dimension line and the figure of the land are joined together is shown in FIG.
The following describes an example in which there is a problem with the angle of the land shape diagram 22 with respect to FIG. In the actual land shape, the line segment I 1 J 1
Is vertical in FIG. 6, the line segment K 1 J 1 is horizontal, and
It is assumed that the line segment H 1 K 1 has a smaller angle with the line segment H 1 I 1 .
【0034】図7は、図6の土地の形状図を実際の土地
の形状に近づけるように変更した図を示す。図7では、
線分I1 J2 が図7中で垂直で、線分K1 J2 が水平と
なるように、頂点移動コマンドを用いて、図6の元の頂
点J1 を頂点J2 に移動している。また、線分H1 K2
が、線分H1 I1 となす角度がより小さくなるように、
図6の元の頂点K1 を水平方向に頂点K2 に移動してい
る。この頂点J1 と頂点K1 の移動により、土地の形状
図22を、実際に土地の形状に近づけることができてい
る。FIG. 7 is a diagram in which the land shape diagram of FIG. 6 is changed so as to approximate the actual land shape. In FIG.
Segment I 1 J 2 is vertical in FIG. 7, as the line segment K 1 J 2 is horizontal, using the vertex movement command, and moves the original vertex J 1 in FIG. 6 to the vertex J 2 I have. The line segment H 1 K 2
, So that the angle formed by the line segment H 1 I 1 is smaller,
Moving the vertex K 2 the original vertex K 1 in FIG. 6 in the horizontal direction. By moving the vertices J 1 and K 1 , the land shape diagram 22 can be actually brought close to the land shape.
【0035】ただし、線分H1 K1 を線分H1 K2 に変
更した結果、寸法線m1の端点P1は少しだけ土地の外
形線から突出した状態になっている。このような寸法線
の多少の突出、或いは、土地の外形線と寸法線の隙間
は、後述する建物図の配置処理の段階で、自動的に調整
される。However, as a result of changing the line segment H 1 K 1 to the line segment H 1 K 2 , the end point P 1 of the dimension line m 1 slightly protrudes from the land outline. Such a slight protrusion of the dimension line or a gap between the contour line of the land and the dimension line is automatically adjusted at the stage of a building drawing arrangement process described later.
【0036】ステップ207での、土地の形状図の変更
処理の後、作図システムは、再度の接合処理を指示する
コマンドが入力されたかどうかを判断する(ステップ2
08)。土地の形状図の変更が終了した段階で、操作者
は、建物及び寸法線の図と土地の形状図との接合状態を
確認する。この確認の結果、もし、寸法線の端点が土地
の外形線に対して著しく突出していたり、隙間ができて
いたりする場合、或いは、土地の外形線の角度が実際と
著しく異なる場合は、再度の接合を指示するコマンドを
入力することで、再度、建物及び寸法線の図と土地の形
状図の接合処理を行わせることができる。After the process of changing the land shape map in step 207, the drawing system determines whether or not a command instructing another joining process has been input (step 2).
08). At the stage where the change of the land shape map is completed, the operator confirms the joining state between the building and dimension line diagram and the land shape diagram. As a result of this check, if the end point of the dimension line is significantly protruded from the land outline, a gap is formed, or if the angle of the land outline is significantly different from the actual one, By inputting the command to instruct the joining, the joining process of the building and the dimension line diagram and the land shape diagram can be performed again.
【0037】作図システムでは、操作者により、再度の
接合の処理を指示するコマンドが入力されると、ステッ
プ205へ戻って、前記した建物及びの寸法線の図と土
地の形状図との接合処理を実行する。In the drawing system, when a command for instructing the joining process again is input by the operator, the process returns to step 205, and the joining process of the above-mentioned drawing of the dimension line of the building and the shape of the land is performed. Execute
【0038】建物の寸法線と土地の形状図との接合状態
の確認の結果、問題が無い場合は、操作者は、再度の接
合が不要であることを指示するコマンドを入力する。こ
の場合、作図システムは、ステップ209に進み、建物
図の配置処理を実行する。If there is no problem as a result of checking the joining state between the dimension line of the building and the shape diagram of the land, the operator inputs a command instructing that the joining is not necessary again. In this case, the drawing system proceeds to step 209 and executes a building drawing arrangement process.
【0039】図7の例では、再度の接合が不要であるの
で、土地の形状図の変更が終了した後、ステップ209
に進み、建物図の配置処理を行う。In the example of FIG. 7, since the re-joining is not necessary, after the change of the land shape map is completed, step 209 is executed.
To perform the layout processing of the building diagram.
【0040】建物図の配置処理では、寸法線の端点を土
地の外形線に完全に接合させ、この後、注釈文字等を加
えて作成した建物図を登記申請図に配置する(ステップ
209)。In the process of arranging the building diagram, the end points of the dimension lines are completely joined to the outline of the land, and thereafter, the building diagram created by adding annotations and the like is arranged on the registration application diagram (step 209).
【0041】建物図の配置処理では、先ず、建物の寸法
線の端点と土地の外形線との接合状態を調べる。この結
果、建物の寸法線の端点が土地の外形線に完全に接合さ
れていない場合は、自動的に、寸法線の長さを修正し
て、寸法線の端点を土地の外形線に完全に接合させる。
このため、ステップ208までの処理で、建物及び寸法
線の図と土地の形状図の接合を行った段階で、接合部分
に多少の突出や隙間があっても、建物図の配置処理の段
階で、自動的に、接合部分が完全に接合された建物図を
作成することができる。In the process of arranging the building diagram, first, the joining state between the end point of the dimension line of the building and the outline of the land is examined. As a result, if the end points of the building dimension line are not completely joined to the land outline, the dimension line length is automatically corrected so that the dimension end point is completely connected to the land outline. Join.
For this reason, even if there are some protrusions and gaps in the joints at the stage where the drawing of the building and the dimension line and the land shape diagram are joined in the processing up to step 208, the building drawing is arranged at the stage of processing. Automatically, you can create a building diagram where the joints are completely joined.
【0042】なお、この寸法線の長さの修正の際には、
ステップ204で寸法線の寸法値が入力されたときに記
憶されている寸法線表示用データのみを変更し、寸法値
表示用データは変更しない。このため、建物図に表示す
る寸法値を変更しないで測量結果の数値としたまま、寸
法線を土地の形状図に完全に接合させることができる。When correcting the length of the dimension line,
Only the dimension line display data stored when the dimension value of the dimension line is input in step 204 is changed, and the dimension value display data is not changed. For this reason, the dimension line can be completely joined to the land shape map without changing the dimension value displayed on the building map and keeping the numerical value of the survey result.
【0043】図8は、図7に示す建物及び寸法線の図と
土地の形状図を接合した図に対して、寸法線の長さを修
正して完全に接合させた図を示す。図7では、寸法線m
1の端点P1 が若干土地の外形線から突出している。建
物図の配置処理では、寸法線m1の長さを短くして、寸
法線m1の変更後の端点P2 を完全に土地の外形線に接
合している。FIG. 8 is a diagram in which the drawing of the building and the dimension line shown in FIG. 7 and the shape diagram of the land are joined, and the length of the dimension line is corrected to be completely joined. In FIG. 7, the dimension line m
The end point P1 of 1 slightly protrudes from the outline of the land. In the placement processing of building diagrams, by shortening the length of the dimension line m1, it joins the end points P 2 after the change of the dimension line m1 completely outline of land.
【0044】寸法線の修正の後、建物図の配置処理で
は、建物及び寸法線の図と土地の形状図の接合が終了し
た図に、番地、寸法値、道路、水路等の注釈文字を加え
て、建物図を作成する。この作成した建物図を、登記申
請図に配置する。After the modification of the dimension lines, in the processing of arranging the building diagram, commentary characters such as addresses, dimension values, roads, waterways, etc. are added to the diagram in which the building and dimension line diagrams and the land shape diagram have been joined. And create a building diagram. The created building drawing is placed on the registration application drawing.
【0045】図9は、建物図を配置した登記申請図の例
を示す。図9の図面は、登記申請図の完成状態を表示装
置14の画面上で確認後に、出力装置16により印字出
力した図面の例である。図9では、図8に示した建物及
び寸法線の図と土地の形状図を接合した図を基にした建
物図23が、破線円部に配置されている。寸法線は破線
で表示され、寸法値の数値である3.0,6.0が寸法
線の近くに表示されている。また、番地を示す10−
1,10−2,10−3、注釈文字の“道路”が表示さ
れている。FIG. 9 shows an example of a registration application diagram in which a building diagram is arranged. The drawing in FIG. 9 is an example of a drawing printed out by the output device 16 after confirming the completed state of the registration application drawing on the screen of the display device 14. In FIG. 9, a building diagram 23 based on a diagram in which the diagram of the building and the dimension line shown in FIG. 8 and the shape diagram of the land are joined is arranged in the dashed circle. The dimension lines are indicated by broken lines, and the numerical values of the dimension values, 3.0 and 6.0, are displayed near the dimension lines. In addition, 10-
1, 10-2, 10-3 and the annotation character "road" are displayed.
【0046】登記申請図には、建物図の他に、建物の各
階の平面図が表示されている。図9では、1階の平面
図、及び、床面積を示すための求積表が表示されてい
る。In the registration application diagram, a plan view of each floor of the building is displayed in addition to the building diagram. In FIG. 9, a plan view of the first floor and a quadrature table for indicating the floor area are displayed.
【0047】図10は、建物及び寸法線の図と土地の形
状図を接合した図の別の例を示す。図10の例では、建
物の形状図21に対して、入力された寸法値により3本
の寸法線m4,m5,m6が付けられている。なお、こ
こでは、寸法線のうち、寸法線m4,m5の優先順位が
高いものとする。FIG. 10 shows another example of a diagram obtained by joining a diagram of buildings and dimension lines with a diagram of land shape. In the example of FIG. 10, three dimension lines m4, m5, and m6 are attached to the building shape diagram 21 according to the input dimension values. Here, it is assumed that, among the dimension lines, the dimension lines m4 and m5 have a higher priority.
【0048】デジタイザ装置15により入力された土地
の形状図32は、前記の建物及び寸法線の図と土地の形
状図の接合処理において、平行移動により、寸法線m4
の端点S1 ,寸法線m5の端点T1 に接合されている。
入力された土地の外形図32の精度の関係で、優先順位
の低い寸法線m6の端点U1 は、土地の外形線から少し
突出している。また、土地の外形線のうち、線分L1 M
1 は、実際の土地の形状に比べて、図10中、右上がり
となっている。The land shape map 32 input by the digitizer device 15 is converted into a dimension line m4 by parallel movement in the joint processing of the building and dimension line diagram and the land shape diagram.
End point S 1 of which is joined to the end point T 1 of the dimension line m5.
Accuracy of the relationship between outline drawing 32 of the input land endpoint U 1 of lower priority dimension line m6 are slightly protruding from the outline of the land. Also, among the outlines of the land, the line segment L 1 M
In FIG. 10, “ 1” is ascending to the right as compared with the actual land shape.
【0049】図11は、前記した土地の形状図の変更処
理において、図10に示す土地の形状図を実際の土地の
形状に合わせるように変更した図を示す。図11では、
土地の外形線の線分L1 M1 が図11中、水平になり、
かつ、寸法線m6の端点U1が土地の外形線に接合する
ように、頂点移動コマンドを用いて、元の頂点M1 を頂
点M2 に移動し、元の頂点N1 を頂点N2 に移動してい
る。FIG. 11 is a diagram in which the land shape map shown in FIG. 10 is changed to match the actual land shape in the land shape map change processing. In FIG.
The outline L 1 M 1 of the land is horizontal in FIG.
And, as the end point U 1 of the dimension line m6 is joined to the outline of the land, with a vertex movement command to move the original vertices M 1 to the vertex M 2, the original vertices N 1 to the vertex N 2 I'm moving.
【0050】上記の土地の形状図の変更が終わった段階
では、寸法線m5の端点T1 が土地の外形線から少し突
出している。この寸法線の突出は、再度、建物及びの寸
法線の図と土地の形状図の接合処理を実行して接合させ
ることができる。At the stage when the change of the land shape diagram has been completed, the end point T 1 of the dimension line m5 slightly protrudes from the outline of the land. The protrusion of the dimension line can be joined again by executing the joining process of the drawing of the dimension line of the building and the shape diagram of the land.
【0051】図12は、図11に示す図に対して、再
度、建物及びの寸法線の図と土地の形状図の接合処理を
行った図を示す。図12では、土地の形状図32が、自
動的に、上方、及び僅かに左方向に移動されて、寸法線
m5の端点T1 が土地の外形線に完全に接合されてい
る。この際、土地の形状図の頂点は、夫々、頂点L2 ,
M 3 ,N3 ,O2 に移動されている。ただし、土地の外
形図が僅かに左方向にも移動されているため、寸法線m
6の端点U1 は、僅かに土地の外形線から突出してい
る。FIG. 12 is a diagram corresponding to the diagram shown in FIG.
Degree, building and dimension line drawing and land shape drawing joining process
FIG. In FIG. 12, the land shape diagram 32 is
Dynamically moved up, and slightly to the left, the dimension line
end point T of m51Is completely joined to the land outline
You. At this time, the vertices of the land shape map areTwo,
M Three, NThree, OTwoHas been moved to. However, outside the land
Since the drawing has been moved slightly to the left, the dimension line m
End point 6 of 61Slightly protrudes from the land outline
You.
【0052】この寸法線m6の端点U1 は、前記した建
物図の配置処理の段階で、自動的に、端点U2 に変更さ
れて、完全に土地の外形線に接合される。[0052] endpoints U 1 of the dimension line m6 is at the stage of the placement processing of the buildings view, automatically, are changed to the end point U 2, it is completely bonded to the outline of the land.
【0053】上記のように、本実施例では、建物の形状
図を基準として、土地の形状図を移動,回転することに
より、自動的に、建物の形状図の寸法線の端点と土地の
形状図とを接合するため、操作者は、接合のために手間
をとられることが無く、容易に建物図を作成することが
できる。As described above, in the present embodiment, the end point of the dimension line of the building shape diagram and the land shape are automatically moved by moving and rotating the land shape diagram based on the building shape diagram. The operator can easily create the building drawing without joining the joining work with the drawing, because the joining is not troublesome.
【0054】また、頂点の移動、頂点の追加、頂点の削
除のコマンドを用いて土地の形状図を変更する機能を持
つため、土地の形状図の精度に問題がある場合でも、土
地の形状図を実際の土地の形状に近づけるように、容易
に変更することができる。Further, since there is a function of changing the shape of the land using commands for moving a vertex, adding a vertex, and deleting a vertex, even if there is a problem in the accuracy of the shape of the land, the shape of the land can be changed. Can be easily changed to approximate the shape of the actual land.
【0055】また、建物図の配置処理において、寸法線
の長さを自動的に修正して、寸法線を完全に土地の形状
図に接合させることができるため、建物図の作成を更に
容易にすることができる。Also, in the process of arranging the building diagram, the length of the dimension line can be automatically corrected and the dimension line can be completely joined to the land shape diagram, so that the building diagram can be more easily created. can do.
【0056】[0056]
【発明の効果】上述の如く、本発明によれば、土地の形
状図又は建物の形状図の、移動,回転を少なくともいず
れか一方を行うことにより、自動的に建物の形状図の寸
法線の端点と土地の形状図とを接合するため、容易に建
物図を作成することができる特長を有する。As described above, according to the present invention, at least one of movement and rotation of a land shape diagram or a building shape diagram is performed, so that the dimension line of the building shape diagram is automatically generated. Since the end point and the land shape map are joined, it has the feature that a building map can be easily created.
【図1】本発明の一実施例の建物図作図処理の処理手順
を示すフローチャートである。FIG. 1 is a flowchart showing a processing procedure of a building drawing processing according to an embodiment of the present invention.
【図2】作図システムの構成図である。FIG. 2 is a configuration diagram of a drawing system.
【図3】建物の形状図の例を示す図である。FIG. 3 is a diagram showing an example of a building shape diagram.
【図4】入力された土地の形状図の例を示す図である。FIG. 4 is a diagram showing an example of an input land shape map;
【図5】建物の外形図と寸法線の表示例を示す図であ
る。FIG. 5 is a diagram showing a display example of an outline drawing of a building and dimension lines.
【図6】建物及び寸法線の図と土地の外形図を接合した
図である。FIG. 6 is a diagram in which a drawing of a building and dimension lines are joined to an outline drawing of land.
【図7】図6の土地の形状図を変更した図である。FIG. 7 is a diagram obtained by changing the land shape diagram of FIG. 6;
【図8】図7の寸法線を完全に接合させた図である。FIG. 8 is a view in which the dimension lines of FIG. 7 are completely joined.
【図9】建物図を配置した登記申請図の例を示す図であ
る。FIG. 9 is a diagram illustrating an example of a registration application diagram in which a building diagram is arranged.
【図10】建物及び寸法線の図と土地の外形図を接合し
た別の例を示す図である。FIG. 10 is a diagram showing another example in which a drawing of a building and dimension lines and an outline drawing of land are joined.
【図11】図10の土地の形状図を変更した図である。11 is a diagram obtained by changing the shape of the land in FIG. 10;
【図12】図11に示す図に対して、再度、接合の処理
を行った図である。12 is a diagram in which the bonding process is performed again on the diagram shown in FIG. 11;
11 処理装置 12 入力装置 13 ポインティングデバイス 14 表示装置 15 デジタイザ装置 16 出力装置 21 建物の形状図 22,32 土地の形状図 23 建物図 DESCRIPTION OF SYMBOLS 11 Processing device 12 Input device 13 Pointing device 14 Display device 15 Digitizer device 16 Output device 21 Building shape figure 22, 32 Land shape figure 23 Building figure
フロントページの続き (56)参考文献 FUJITSU 41巻 6号 530− 536頁 松田千秋ほか「土地家屋調査士 事務所専用システム:FMG 調」 (58)調査した分野(Int.Cl.7,DB名) G06F 17/50 JICSTファイル(JOIS)Continuation of the front page (56) References FUJITSU 41 Vol. 6, No. 6, pp. 530-536 Chiaki Matsuda et al. “System for Land and House Investigator Office: FMG Style” (58) Field surveyed (Int.Cl. 7 , DB name) G06F 17/50 JICST file (JOIS)
Claims (2)
入力装置により、建物の形状図のデータを入力するステ
ップと、 図面データ入力装置により、土地の形状図の図面データ
を入力するステップと、 前記入力された建物の形状図のデータと土地の形状図の
図面のデータをもとに作図処理を行ない、表示装置に建
物形状図と土地の形状図として表示するステップと、 前記入力装置によって建物の端点から土地の外形線まで
の距離を表す3つの寸法線の測量値の距離データを入力
するステップと、 前記建物形状図と前記土地の形状図が表示された前記表
示装置に前記寸法線を表示するステップと、 前記3つの寸法線とそれに対応づける前記土地の外形線
を夫々選択し 、 前記土地の形状図の移動、回転又は建物
の形状図の移動、回転を行うことで、前記土地の外形線
にそれぞれ接合される少なくとも2つ以上の前記寸法線
の端点を、前記土地の外形線に接合するステップと、 前記建物の形状図、寸法線及び前記土地の形状図の接合
が完了していない場合に、操作者が前記土地の形状図の
頂点の移動先を指示し、前記土地の外形線の線分がそれ
に対応して移動することで土地の形状図を変更するステ
ップとを有することを 特徴とする建物図作成方法。(1)Operator inputs commands and data
The input device is used to enter the data of the building plan.
And Drawing data of land shape map by drawing data input device
Inputting The input data of the building shape and the land shape
Performs drawing processing based on the drawing data and builds it on the display device.
Displaying the object shape map and the land shape map; From the end point of the building to the outline of the land by the input device
Enter the distance data of the survey values of three dimension lines representing the distance of
Steps to The table in which the building shape map and the land shape map are displayed.
Displaying the dimension line on a display device; The three dimension lines and the corresponding outline of the land
Select each , Movement, rotation or building of the land shape map
By moving and rotating the shape diagram of the land, the outline of the land
At least two dimension lines respectively joined to
Joining the end point of the land to the outline of the land; Joining of the building shape drawing, dimension line and the land shape drawing
If the operation is not completed, the operator
Indicate the destination of the vertices, and the line segment of the land outline
To change the shape of the land by moving
To have Characteristic building diagram creation method.
と、 土地の形状図の図面データを入力する手段と、 建物の端点から土地の外形線までの距離を表す3つの寸
法線の測量値の距離データと前記寸法線を接合する建物
の端点の位置を夫々入力する手段と、 前記寸法線とそれに対応づける前記土地の外形線を選択
する手段と、 前記土地の形状図の移動、回転又は建物の形状図の移
動、回転を行うことで、前記土地の外形線にそれぞれ接
合される少なくとも2つ以上の前記寸法線の端点を前記
土地の外形線に接合する手段と、 操作者が前記土地の形状図の頂点の移動先を指示する手
段と、 前記頂点の移動先に対応するように前記外形線の線分を
移動させることで土地の形状図を変更する手段を有する
ことを特徴とする建物図作成装置。 (2)Means for inputting building shape data
When, Means for inputting drawing data of the land shape map, Three dimensions representing the distance from the end point of the building to the outline of the land
Building that joins the distance data of the normal survey value and the dimension line
Means for inputting the positions of the end points of Select the dimension line and the contour line of the land to be associated with it
Means to Movement and rotation of the land shape map or transfer of the building shape map
By moving and rotating,
The end points of at least two or more of the dimension lines
Means for joining to the outline of the land; A hand for the operator to specify the destination of the vertex of the land shape map
Steps and A line segment of the outline is defined so as to correspond to a destination of the vertex.
Has a means to change the shape of the land by moving
A building drawing creating apparatus, characterized in that:
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP05114734A JP3087992B2 (en) | 1993-05-17 | 1993-05-17 | Building map creation method and device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP05114734A JP3087992B2 (en) | 1993-05-17 | 1993-05-17 | Building map creation method and device |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH06325135A JPH06325135A (en) | 1994-11-25 |
| JP3087992B2 true JP3087992B2 (en) | 2000-09-18 |
Family
ID=14645305
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP05114734A Expired - Fee Related JP3087992B2 (en) | 1993-05-17 | 1993-05-17 | Building map creation method and device |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3087992B2 (en) |
-
1993
- 1993-05-17 JP JP05114734A patent/JP3087992B2/en not_active Expired - Fee Related
Non-Patent Citations (1)
| Title |
|---|
| FUJITSU 41巻 6号 530−536頁 松田千秋ほか「土地家屋調査士事務所専用システム:FMG 調」 |
Also Published As
| Publication number | Publication date |
|---|---|
| JPH06325135A (en) | 1994-11-25 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US6868359B2 (en) | Method and system for CAD engine independence | |
| JP2000155859A (en) | Mesh generation method and mesh generation device for numerical analysis | |
| US7433744B2 (en) | Method and apparatus for spatially coordinating, storing and manipulating computer aided design drawings | |
| JP3087992B2 (en) | Building map creation method and device | |
| JP2913814B2 (en) | Map database creation and correction system | |
| JP3298972B2 (en) | Figure processing method | |
| JP3259981B2 (en) | Partial correction system for graphic data and method for partial correction of graphic data | |
| JP2902856B2 (en) | Data entry editing device | |
| JPS63127333A (en) | Flowchart type programming device | |
| JPS61138375A (en) | Pattern information processing device | |
| JP2619246B2 (en) | Automatic drawing method of civil engineering survey map | |
| JP3298973B2 (en) | Figure processing method | |
| JPH10240790A (en) | Instructions for creating fillet surface | |
| JP2000331176A (en) | Device and method for editing graphic | |
| JP3254328B2 (en) | Ellipse data processing device | |
| JP3080080B2 (en) | Image connection system and recording medium storing image connection program | |
| JP2963320B2 (en) | Drawing display device | |
| JP2006293484A (en) | Information processing method, information processing apparatus, computer program, and storage medium | |
| JPH05224734A (en) | Robot simulating device | |
| JPH1040405A (en) | CAD equipment | |
| JPH0744720A (en) | Display/reference system for angle information in graphic editing system | |
| JPH07152893A (en) | Method for constructing picture map data base | |
| JPH056413A (en) | Parts diagram preparation method for cad system | |
| JP2000194842A (en) | Image data processing apparatus and program recording medium therefor | |
| JPH07200863A (en) | Figure input method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20000627 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080714 Year of fee payment: 8 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090714 Year of fee payment: 9 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100714 Year of fee payment: 10 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100714 Year of fee payment: 10 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110714 Year of fee payment: 11 |
|
| LAPS | Cancellation because of no payment of annual fees |