JP3089587B2 - Unit construction method for ceiling construction - Google Patents
Unit construction method for ceiling constructionInfo
- Publication number
- JP3089587B2 JP3089587B2 JP03327754A JP32775491A JP3089587B2 JP 3089587 B2 JP3089587 B2 JP 3089587B2 JP 03327754 A JP03327754 A JP 03327754A JP 32775491 A JP32775491 A JP 32775491A JP 3089587 B2 JP3089587 B2 JP 3089587B2
- Authority
- JP
- Japan
- Prior art keywords
- ceiling
- unit
- floor
- construction
- work
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Description
【0001】[0001]
【産業上の利用分野】本発明は、一般の建物、高層ビル
等に適用され、建築仕上工事と設備工事とを一体化し天
井工事を合理化することができる天井工事におけるユニ
ット化工法に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a unit construction method in ceiling construction applied to general buildings, high-rise buildings, etc., and capable of integrating construction finishing work and equipment construction and streamlining ceiling construction.
【0002】[0002]
【従来の技術】図13および図14は、従来の天井工事
の一例を示し、図13は天井部の断面図、図14は天井
工事の全体の施工工程を示す図を示している。先ず、ス
テップS1において、型枠の墨出しを行い、インサート
51を打込みコンクリートを打設した後、型枠をばらし
てスラブ52を構築し、次に、インサート51の清掃を
行い、スラブの墨出しを行って仮設足場工事を行った
後、インサート51に吊りボルト53を接続する。2. Description of the Related Art FIGS. 13 and 14 show an example of a conventional ceiling construction, FIG. 13 is a sectional view of a ceiling part, and FIG. 14 is a view showing an entire construction process of the ceiling construction. First, in step S1, the mold is inked, the insert 51 is driven and concrete is cast, then the mold is separated to construct the slab 52, and then the insert 51 is cleaned and the slab is inked. After performing the temporary scaffolding work, the suspension bolt 53 is connected to the insert 51.
【0003】次に、ステップS2において、位置決めの
ために墨糸を張って空調用メインダクト54およびスプ
リンクラー用メイン水配管55を吊りボルト53により
支持し、また、照明用幹線配線56を吊りボルト53に
より支持する。さらに、墨糸を張って天井下地57を吊
りボルト53により吊った後、天井下地57に開口補強
のための墨出しを行い天井下地57の開口を補強する。
この開口は、空調用吹出口58、照明器具59、スプリ
ンクラー60を取り付けるための開口である。次にステ
ップS3において、空調用メインダクト54に接続ダク
ト61を取り付けるとともに空調用吹出口58を吊り込
みボルト53により取り付け、また、スプリンクラー用
メイン水配管55に接続配管62を介してスプリンクラ
ー60を取り付け、さらに、照明用幹線配線56に接続
配線63を取り付けるとともに照明器具59を吊り込み
ボルト53により取り付ける。次に、天井仕上板64を
取り付け最後に吹出口カバー、スプリンクラーヘッド、
照明カバーを取り付けて完成する。Next, in step S2, a main thread 54 for air conditioning and a main water pipe 55 for sprinklers are supported by suspending bolts 53 with black thread for positioning, and a main trunk line 56 for lighting is suspended by the suspending bolts 53. Supported by Further, after suspending the ceiling base 57 by suspending bolts 53 with black ink thread, blackout is performed on the ceiling base 57 to reinforce the opening, and the opening of the ceiling base 57 is reinforced.
This opening is an opening for attaching the air-conditioning outlet 58, the lighting fixture 59, and the sprinkler 60. Next, in step S3, the connection duct 61 is attached to the air conditioning main duct 54, the air conditioning outlet port 58 is attached by the hanging bolt 53, and the sprinkler 60 is attached to the sprinkler main water pipe 55 via the connection pipe 62. Further, the connection wiring 63 is attached to the lighting main wiring 56, and the lighting fixture 59 is attached by the suspension bolt 53. Next, the ceiling finish plate 64 is attached, and finally the outlet cover, the sprinkler head,
Attach the lighting cover to complete.
【0004】図15は上記天井工事の職種別の施工工程
を示し、建築系の職人と、空調、水配管および照明に係
わる設備系の職人によって、図14の施工順序に従っ
て、それぞれの作業を分担しながら、n階からn+1階
へと順次上方フロアーへと施工作業が行われる。[0004] Fig. 15 shows the construction process for each type of ceiling construction work. The construction work and the equipment work related to air conditioning, water piping and lighting are assigned to each work in accordance with the work order shown in Fig. 14. Meanwhile, the construction work is sequentially performed on the upper floor from the nth floor to the (n + 1) th floor.
【0005】[0005]
【発明が解決しようとする課題】しかしながら、上記従
来の天井工事においては、図15に示すように、各工事
ごとに職人が異なるため、各工事すなわち各職人ごとの
工事は同一工区において断続的となる。このような断続
的な工事の場合、職人の仕事として一日分の仕事量に満
たない場合、他の工区と同一日に一緒に工事を行うか、
または一日分の仕事量になるまで他の工区の前工程の工
事が進むのを待つことになる。このため、同時作業の
場合、下準備や工区の移動に伴うロスが生じ、一日分
の仕事量になるまで待てば、後工程の日程に支障があり
全体工事の遅れとなり、全体工事の進行に合わせた場
合、最悪の場合、半日仕事で帰る場合があるという問題
を生じる。However, in the above-mentioned conventional ceiling work, as shown in FIG. 15, since the workman is different for each work, each work, that is, the work for each workman is intermittent in the same work section. Become. In the case of such an intermittent construction, if the work of a craftsman is less than the amount of work for one day, please do the construction together with other construction sections on the same day,
Or construction of other work area of the previous step is to wait for the advance-free for until the amount of work one day. Therefore, in the case of simultaneous work, there is a loss due to the preparation and the movement of the construction zone, and if you wait until the amount of work for one day, the schedule of the post-process will be hindered and the whole work will be delayed, and In the worst case, the problem arises that the worker may return for work for half a day.
【0006】また、天井、空調、スプリンクラーおよび
照明に関する部材を全て吊り込みボルトにより支持させ
るため、吊り込みボルトの本数が増大するとともに、各
作業工程毎に墨出し作業が必要であるため作業工程が複
雑になるという問題や、殆どの作業が上向きの作業であ
るため作業能率が悪く、苦渋作業となるという問題を有
している。Further, since all members related to the ceiling, the air conditioner, the sprinkler and the lighting are supported by the suspension bolts, the number of suspension bolts is increased, and the blackout work is required for each work step. and problem of complexity, poor working efficiency because it is most of the work upward work, has a problem that a bitter work.
【0007】本発明は、上記問題を解決するものであっ
て、建築仕上工事と設備工事とを一体化し流れ作業化す
ることにより天井工事を合理化し、同時に工事の単純労
働化と軽作業化を図ることができる天井工事におけるユ
ニット化工法を提供することを目的とする。The present invention solves the above-mentioned problem, and rationalizes ceiling work by integrating building finishing work and equipment work and performing work at the same time. It is an object of the present invention to provide a unitized construction method for ceiling work that can be planned.
【0008】[0008]
【課題を解決するための手段】そのために本発明の天井
工事におけるユニット化工法は、建物の最上階に配設さ
れる各階生産システム2と、地上階に設けられる材料供
給センター3および施工管理センター4を備え、各階生
産システムにより各フロアー構造物を生産した後、各階
生産システム自体を上昇させ、順次、上方階の構造物を
生産していき、あるフロアーの構造物が構築されると、
そのフロアーで天井工事を行う工法であって、天井を複
数の天井ユニット6に分割し、天井ユニット6の構成部
品であるフレーム10、照明機器11、空調機器15、
16、17および消火機器18、21、22を、各階生
産システムの搬送設備を用いて材料供給センターから天
井を施工するフロアーに供給する工程と、該フロアー上
において前記構成部品から天井ユニット6を生産する工
程と、ユニット取付用搬送車8により前記天井ユニット
を取付場所に搬送する工程と、既設の天井ユニットと前
記搬送された天井ユニットとの辺同志を係合する工程
と、前記搬送された天井ユニットを吊り込みボルト29
により支持する工程と、隣接する天井ユニットの照明機
器、空調機器および消火機器を接続する工程とからな
り、前記施工管理センターは、複数のフロアーの天井工
事を同時に施工しながら順次上方フロアーへと施工して
いくように各工程を管理することを特徴とする。なお、
上記構成に付加した番号は、理解を容易にするために図
面と対比させるためのもので、これにより本発明の構成
が何ら限定されるものではない。For this purpose, the unit construction method in the ceiling construction according to the present invention is arranged on the top floor of a building.
And each floor production system 2
Equipped with pay center 3 and construction management center 4, each floor
After each floor structure is produced by the production system,
The production system itself is raised, and the structures on the upper floors are sequentially
As production progresses and a floor structure is built,
This is a construction method of performing ceiling work on the floor, in which the ceiling is divided into a plurality of ceiling units 6, and a frame 10, a lighting device 11, an air conditioner 15,
16, 17 and fire extinguishing equipment 18 , 21 , 22
Supplying the ceiling unit 6 from the material supply center to the floor on which the ceiling is to be constructed using the transport equipment of the production system, producing the ceiling unit 6 from the component parts on the floor, 8, the step of transferring the ceiling unit to the mounting place, the step of engaging the sides of the existing ceiling unit with the transferred ceiling unit, and the step of
And the step of connecting lighting equipment, air conditioning equipment and fire extinguishing equipment of adjacent ceiling units, and the construction management center
While doing things at the same time, work on the upper floor sequentially
It is characterized in that each process is managed in a timely manner . In addition,
The numbers added to the above configuration are for comparison with the drawings for easy understanding, and do not limit the configuration of the present invention at all.
【0009】[0009]
【作用】本発明においては天井ユニットに照明機器、空
調機器および消火機器等の全ての機器類を流れ作業によ
り事前に取り付け、完成したユニットを機械力により取
付位置まで搬送しユニットを取付けるため、建築仕上工
事と設備工事とが一体化、流れ作業化され、天井工事の
合理化、工事の単純労働化と軽作業化を図ることができ
る。In the present invention, all equipment such as lighting equipment, air conditioning equipment and fire extinguishing equipment are mounted on a ceiling unit in advance by a work flow, and the completed unit is transported to a mounting position by mechanical force to mount the unit. Finishing work and equipment work are integrated and integrated work, streamlining ceiling work, simplifying work and reducing work.
【0010】[0010]
【実施例】以下、本発明の実施例を図面を参照しつつ説
明する。図1は本発明の天井工事におけるユニット化工
法の1実施例を示す概念図である。Embodiments of the present invention will be described below with reference to the drawings. FIG. 1 is a conceptual diagram showing one embodiment of a unit construction method in ceiling work according to the present invention.
【0011】高層建築物1の最上階には、各階生産シス
テム2が配設される。この各階生産システム2は、地上
から柱、梁、PCパネル等の各種建築材料を搬入し、こ
れを組み立てて各フロアー構造物を生産した後、油圧に
より各階生産システム2自体を上昇させ、順次、上方階
の構造物を生産していくシステムであり、あるフロアー
の構造物が構築されると、次にそのフロアーで天井工事
が行われる。On the top floor of the high-rise building 1, a floor production system 2 is provided. Each floor production system 2 carries various building materials such as columns, beams, PC panels, etc. from the ground, assembles them to produce each floor structure, and then raises each floor production system 2 itself by hydraulic pressure, sequentially. This is a system that produces structures on upper floors. When a structure on a certain floor is constructed, ceiling work is then performed on that floor.
【0012】天井工事システムは、地上階に設けられる
材料供給センター3および施工管理センター4と、天井
を施工すべきフロアーに配設される無人資材搬送車5、
天井ユニット6を生産するための作業台7、天井ユニッ
ト6を取付場所に搬送し取り付けるためのユニット取付
用搬送車8とからなる。材料供給センター3において
は、現場外にある中央材料供給センターにメーカー間を
巡回する定期コンテナ便により集められた資材を、複数
の現場を巡回する各種材料を混載したコンテナ便により
運搬された資材を受け入れた後、施工部位別の材料の仕
分けを行い搬送パレットへ積載し、各階生産システム2
の搬送設備により指定フロアーに搬送する。施工管理セ
ンター4においては、天井を施工している複数フロアー
において、フレーム製作工程、各フロアー工程および資
材、現場内搬入の同期化を行うために、天井の仕上げ状
態を管理し、材料供給センター3からの資材の搬送およ
び作業台7における天井ユニット6の生産を管理する。
そのフロアーの天井9が完成すると、無人資材搬送車
5、作業台7およびユニット取付用搬送車8は、天井未
施工のフロアーに移設される。The ceiling construction system includes a material supply center 3 and a construction management center 4 provided on the ground floor, an unmanned material transport vehicle 5 arranged on the floor on which the ceiling is to be constructed,
It comprises a worktable 7 for producing the ceiling unit 6 and a unit mounting transport vehicle 8 for transporting and mounting the ceiling unit 6 to a mounting location. In the material supply center 3, materials collected by a regular container service circulating between manufacturers at a central material supply center located outside the site, and materials transported by a container service mixed with various materials circulating on a plurality of sites are collected. After receiving the materials, the materials are sorted according to the construction site, loaded on the transport pallet,
Is transported to the designated floor by the transport facility. The construction management center 4 manages the finishing state of the ceiling in order to synchronize the frame manufacturing process, each floor process, materials, and loading into the site on a plurality of floors on which the ceiling is constructed, and manages the finishing state of the ceiling. And the production of the ceiling unit 6 in the worktable 7.
When the ceiling 9 of the floor is completed, the unmanned material transport vehicle 5, the workbench 7, and the unit mounting transport vehicle 8 are moved to a floor where no ceiling is provided.
【0013】図2は前記天井ユニット6の1例を示す斜
視図であり、天井ユニット6は、ユニット取付用搬送車
8で可搬できる大きさに設計され、フレーム10に照明
機器、火災検知器、スピーカー等の電気機器、空調機器
および消火機器が取り付けられる。すなわち、矩形状の
フレーム10には、4つの照明器具11、配線12が取
り付けられ、また、フレーム10には、取付金物13、
固定バンド14により空調用メインダクト15が取り付
けられ、空調用メインダクト15に空調用接続ダクト1
6を介して吹出口17が接続される。フレーム10に
は、スプリンクラー用メイン水配管18が取付金物19
により固定され、照明器具11に支持部材20によりス
プリンクラー21が取り付けられ、スプリンクラー21
は、接続配管22を介してメイン水配管18に接続され
る。フレーム10の下面には、天井板23が取り付けら
れる。なお、フレーム10には後述するボルト孔29
a、係止用フランジ30、嵌合用フランジ31が形成さ
れている。FIG. 2 is a perspective view showing an example of the ceiling unit 6. The ceiling unit 6 is designed to have a size that can be transported by a unit mounting carrier 8, and a frame 10 has lighting equipment and a fire detector. And electrical equipment such as speakers, air conditioning equipment and fire extinguishing equipment. That is, the four lighting fixtures 11 and the wirings 12 are attached to the rectangular frame 10, and the mounting hardware 13,
An air conditioning main duct 15 is attached by a fixed band 14, and the air conditioning connection duct 1 is attached to the air conditioning main duct 15.
The outlet 17 is connected via 6. The main water pipe 18 for the sprinkler is provided on the frame 10 with mounting hardware 19.
And the sprinkler 21 is attached to the lighting fixture 11 by the support member 20.
Is connected to the main water pipe 18 via the connection pipe 22. A ceiling plate 23 is attached to the lower surface of the frame 10. The frame 10 has a bolt hole 29 to be described later.
a, a locking flange 30 and a fitting flange 31 are formed.
【0014】図3は前記天井ユニット6の配置例を示す
模式図、図4は天井ユニット6の種類を説明するための
模式図である。図3は、天井9に空調用の給気ダクト、
還気ダクト、スプリンクラー配管、電気配線を配設した
状態を示し、例えば、天井9を5列、3行のマトリクス
に分割し、合計15の天井ユニット6に分割すると、図
4に示すように、空調用ダクト、照明器具およびスプリ
ンクラーの全てがあるユニット、一部があるユニット、
天井板のみのユニット等の8種類の天井ユニット6に規
格化される。従って、数種類に規格化された天井ユニッ
ト6を生産することにより、これを組み合わせて天井9
を生産することが可能となる。FIG. 3 is a schematic diagram showing an arrangement example of the ceiling unit 6, and FIG. 4 is a schematic diagram for explaining the types of the ceiling unit 6. FIG. 3 shows an air supply duct for air conditioning on the ceiling 9,
FIG. 4 shows a state in which a return air duct, a sprinkler pipe, and electric wiring are provided. For example, when the ceiling 9 is divided into a matrix of 5 columns and 3 rows and divided into a total of 15 ceiling units 6, as shown in FIG. Units with all air conditioning ducts, lighting fixtures and sprinklers, some units,
It is standardized to eight types of ceiling units 6, such as a unit with only a ceiling plate. Therefore, by producing ceiling units 6 standardized into several types, the ceiling units 9 can be combined and produced.
Can be produced.
【0015】図5は前記天井ユニット6を生産するため
のフロー図である。施工管理センター4においては、工
程管理情報に基づいて施工図CADが選択され、施工図
CAD情報は、各工程に配置された自動機械25に入力
データとして伝送されるとともに、施工図CADに基づ
いて情報カードが発行され、材料供給センター3と各工
程に伝送される。FIG. 5 is a flow chart for producing the ceiling unit 6. In the construction management center 4, the construction drawing CAD is selected based on the process management information, and the construction drawing CAD information is transmitted as input data to the automatic machine 25 arranged in each process, and based on the construction drawing CAD. An information card is issued and transmitted to the material supply center 3 and each process.
【0016】情報カードには、その天井ユニット6が何
階、何列、何行に配設されるかの固有の番号と、図4で
説明したユニットの種類が入力されており、材料供給セ
ンター3は、情報カードのデータに基づいて、各部品群
を天井ユニット毎に仕分けし、必要部品資材仮置場26
に搬送する。作業員は、情報カードの作業要領に基づい
て各種部品を工程に供給すると、溶接ロボット、NCマ
シン等の自動機械によりフレームが製作されるととも
に、フレーム上に各種部品の取付孔が空けられ、取付金
物が固定される。そして、各種部品が情報カードの指示
に基づき流れ作業によりフレームに取り付けられ、天井
ユニット6を生産していく。各工程における不具合は、
工程管理情報にフィードバックされる。使用した情報カ
ードは、施工管理センター4に戻され工事進捗状況デー
タとして利用される。In the information card, a unique number indicating the number of floors, the number of columns, and the number of rows of the ceiling unit 6 and the type of the unit described with reference to FIG. 3 sorts each component group for each ceiling unit based on the data of the information card,
Transport to When the worker supplies various parts to the process based on the operation procedure of the information card, the frame is manufactured by an automatic machine such as a welding robot or an NC machine, and mounting holes for various parts are formed on the frame, and the mounting is performed. The hardware is fixed. Then, various parts are attached to the frame by a flow operation based on instructions of the information card, and the ceiling unit 6 is produced. Problems in each process
It is fed back to the process management information. The used information card is returned to the construction management center 4 and used as construction progress data.
【0017】図6および図7は、本発明に係わる天井ユ
ニットの生産および取付を含む天井工事におけるユニッ
ト化工法の1実施例を示し、図6は平面図、図7は斜視
図である。図には前述した、無人資材搬送車5、天井ユ
ニット6を生産するための作業台7、天井ユニット6を
搬送し取り付けるためのユニット取付用搬送車8、自動
機械25、資材仮置場26が示されている。ユニット取
付用搬送車8には、位置決め用のXY昇降ステージ27
が設けられ、作業員28は、XY昇降ステージ27上に
天井ユニット6を載置し、取付位置まで搬送してユニッ
トを天井部に取り付け天井9を構築していく。FIGS. 6 and 7 show an embodiment of a unit construction method in ceiling construction including production and installation of a ceiling unit according to the present invention. FIG. 6 is a plan view and FIG. 7 is a perspective view. The figure shows an unmanned material transport vehicle 5, a work table 7 for producing the ceiling unit 6, a unit mounting transport vehicle 8 for transporting and mounting the ceiling unit 6, an automatic machine 25, and a material temporary storage space 26. Have been. The unit mounting transport vehicle 8 has an XY lifting stage 27 for positioning.
The worker 28 places the ceiling unit 6 on the XY lifting stage 27, transports it to the mounting position, mounts the unit on the ceiling, and builds the ceiling 9.
【0018】図8、図9および図10は、前記天井ユニ
ットの取付方法を説明するための図であり、図8は取付
部分の全体平面図、図9は天井ユニットの取付前の状態
を示す拡大図であり、図Aは図BのA−A先に沿って矢
印方向から見た断面図、図Bは平面図、図10は天井ユ
ニットの取付後の状態を示す拡大図であり、図Aは図B
のA−A先に沿って矢印方向から見た断面図、図Bは平
面図である。FIGS. 8, 9 and 10 are views for explaining a method of mounting the ceiling unit. FIG. 8 is an overall plan view of the mounting portion, and FIG. 9 shows a state before the ceiling unit is mounted. It is an enlarged view, FIG. A is sectional drawing seen from the arrow direction along the AA point of FIG. B, FIG. B is a top view, FIG. 10 is an enlarged view showing the state after the ceiling unit is attached. A is figure B
2B is a cross-sectional view taken along the line AA in FIG.
【0019】図8は4つの天井ユニット6a、6b、6
c、6dを取り付ける状態を示している。天井ユニット
6a、6b、6cは既に組み付けられており、吊り込み
ボルト29により吊り下げられている。各天井ユニット
のフレーム10の周囲には、係止用フランジ30および
嵌合用フランジ31が形成されている。係止用フランジ
30は、フレーム10の2辺にわたって連続して形成さ
れており、1隅にボルト孔29aが形成され、嵌合用フ
ランジ31は、係止用フランジ30に対向するようにフ
レーム10の2辺にわたって形成されており、隅部は切
りかかれている。これから取り付けようとする天井ユニ
ット6dは、係止用フランジ30および嵌合用フランジ
31の係合により既存の天井ユニット6a、6cの2辺
に図示矢印の如く差し込まれる。各天井ユニットの1隅
に設けられたボルト孔29aには、吊り込みボルト29
が挿通され、1つの天井ユニットは、1本の吊り込みボ
ルト29により支持される。ただし、天井端部において
はユニットの辺を全て固定する。FIG. 8 shows four ceiling units 6a, 6b, 6
The state which attaches c and 6d is shown. The ceiling units 6a, 6b, 6c are already assembled and are suspended by suspension bolts 29. A locking flange 30 and a fitting flange 31 are formed around the frame 10 of each ceiling unit. The locking flange 30 is formed continuously over two sides of the frame 10, a bolt hole 29 a is formed in one corner, and the fitting flange 31 of the frame 10 is opposed to the locking flange 30. It is formed over two sides, and the corners are cut out. The ceiling unit 6d to be mounted is inserted into the two sides of the existing ceiling units 6a and 6c by the engagement of the locking flange 30 and the fitting flange 31 as shown by arrows in the drawing. A bolt hole 29a provided at one corner of each ceiling unit has a suspension bolt 29
And one ceiling unit is supported by one suspension bolt 29. However, at the ceiling end, all sides of the unit are fixed.
【0020】図9に示すように、係止用フランジ30は
係止片30aを有し、嵌合用フランジ31は前記係止片
30aが係合される嵌合片31aを有している。ある天
井ユニット6bは、吊り込みボルト29をボルト孔29
aに挿通しナット29bにより固定されている。この状
態で係止片30aを嵌合片31aに係合することによ
り、図10に示すように、各天井ユニットが取付、支持
されることになる。なお、係止片30aまたは嵌合片3
1aにスプリング等のスリップイン部材32を設けるこ
とにより、差し込み後の逆行を防止するようにしてもよ
い。As shown in FIG. 9, the locking flange 30 has a locking piece 30a, and the fitting flange 31 has a fitting piece 31a with which the locking piece 30a is engaged. A certain ceiling unit 6b is provided with a suspension bolt 29 and a bolt hole 29.
a and is fixed by a nut 29b. By engaging the locking piece 30a with the fitting piece 31a in this state, each ceiling unit is attached and supported as shown in FIG. The locking piece 30a or the fitting piece 3
By providing a slip-in member 32 such as a spring on 1a, backward movement after insertion may be prevented.
【0021】以上の取付方法により、天井端部を除いて
吊り込みボルト29の数が天井ユニット1つにつき1本
となるため、従来の工事と比較して吊り込みボルト29
の数が大幅に低減されるとともに、係止用フランジ30
および嵌合用フランジ31の接触面がいわゆる定規とな
るため、天井ユニットのレベル調整は、吊り込みボルト
29の高さ調整だけでよく作業が簡単になる。According to the above mounting method, the number of suspension bolts 29 is one per ceiling unit except for the end of the ceiling.
And the number of locking flanges 30 is greatly reduced.
In addition, since the contact surface of the fitting flange 31 is a so-called ruler, the level adjustment of the ceiling unit can be performed simply by adjusting the height of the suspension bolt 29 and the operation is simplified.
【0022】図11は本発明の天井工事におけるユニッ
ト化工法の全体フロー図を示している。先ず、ステップ
S1において、型枠の墨出しを行い、インサートを打込
みコンクリートを打設した後、型枠をばらしてスラブを
構築し、次に、インサートの清掃を行い、スラブの墨出
しを行った後、インサートに吊りボルトを接続する。次
にステップS2において、図6で説明した作業台7にお
いて天井ユニット6が生産される。すなわち、図2に示
すフレーム10が製作されるとともに、フレーム10上
に各種部品の取付孔が空けられ、取付金物19が固定さ
れる。フレーム10には、照明器具11、火災検知器、
スピーカー等が取り付けられ、また、フレーム10に
は、スプリンクラー21、吹出口17、カバー等が取り
付けられ、取付金物13、固定バンド14により空調用
メインダクト15が取り付けられ、照明器具11間の配
線が接続される。さらに、スプリンクラー用メイン水配
管18、空調用メインダクト15が取り付けられ、空調
用メインダクト15に空調用接続ダクト16を介して吹
出口17が接続され、スプリンクラー21は、接続配管
22を介してメイン水配管18に接続される。最後にフ
レーム10の下面には、天井板23が取り付けられる。FIG. 11 is an overall flow chart of the unit construction method in the ceiling construction according to the present invention. First, in step S1, the formwork was inked, an insert was poured and concrete was cast, then the formwork was separated to construct a slab, and then the insert was cleaned and the slab was inked. Then, a suspension bolt is connected to the insert. Next, in step S2, the ceiling unit 6 is produced on the worktable 7 described with reference to FIG. That is, while the frame 10 shown in FIG. 2 is manufactured, mounting holes for various components are made on the frame 10 and the mounting hardware 19 is fixed. The frame 10 includes a lighting device 11, a fire detector,
Speakers and the like are mounted, and a sprinkler 21, an air outlet 17, a cover, and the like are mounted on the frame 10, an air conditioning main duct 15 is mounted by mounting hardware 13 and a fixing band 14, and wiring between the lighting fixtures 11 is provided. Connected. Further, a sprinkler main water pipe 18 and an air conditioning main duct 15 are attached, and an air outlet 17 is connected to the air conditioning main duct 15 via an air conditioning connection duct 16. The sprinkler 21 is connected to a main pipe via a connection pipe 22. Connected to water pipe 18. Finally, a ceiling plate 23 is attached to the lower surface of the frame 10.
【0023】このようにして生産された天井ユニット6
は、ステップS3において、ユニット取付用搬送車8の
XY昇降ステージ27により取付場所まで移送され、天
井ユニットが前述した方法により取り付けられる。そし
て、最後に、隣接する天井ユニット間におけるユニット
空調用メインダクト15、スプリンクラー用メイン水配
管18、照明器具11の配線の接続が行われる。これら
のダクト、配管、配線の接続は、周知の接続器具により
手作業で行われる。The ceiling unit 6 thus produced
In step S3, is transported to the mounting location by the XY lifting stage 27 of the unit mounting transport vehicle 8, and the ceiling unit is mounted by the method described above. Finally, wiring of the unit air conditioning main duct 15, the sprinkler main water pipe 18, and the lighting equipment 11 between the adjacent ceiling units is performed. Connection of these ducts, pipes, and wires is performed manually using a well-known connection device.
【0024】図12は本発明の天井工事における施工工
程を示し、n個の天井ユニットが同一の職種作業員によ
って順次取り付けられてゆき、n階からn+1階、n+
2階へと複数のフロアーの天井工事を同時に施工しなが
ら順次上方フロアーへと施工作業が行われることにな
る。従って、作業の待ち時間がなくなり作業全体の効率
化を図ることができサイクルタイムの短縮が可能とな
り、建築仕上工事と設備工事とを一体化し流れ作業化す
ることにより天井工事を合理化し、同時に工事の単純労
働化と軽作業化および殆どの作業が下向きまたは横向き
作業となるため、従来の上向き作業による苦渋作業の大
幅な減少を図ることができる。FIG. 12 shows a construction process in the ceiling construction according to the present invention, in which n ceiling units are sequentially attached by the same occupation worker, and from the nth floor to the (n + 1) th floor , n +
While simultaneously constructing ceiling work on multiple floors to the second floor
So that the construction work is done to al sequentially upward floor. Therefore, there is no waiting time for the work, the efficiency of the whole work can be improved, and the cycle time can be shortened. Since the simple work and the light work of the above are performed, and most of the work is performed downward or sideways, it is possible to significantly reduce the troublesome work due to the conventional upward work.
【0025】[0025]
【発明の効果】以上の説明から明らかなように本発明に
よれば、天井を複数の天井ユニットに分割し該天井ユニ
ットを組み付ける天井工事であって、天井ユニットの構
成部品を天井を施工するフロアーに供給する工程と、該
フロアー上においてフレームに照明機器、空調機器およ
び消火機器を取り付けることにより天井ユニットを生産
する工程と、ユニット取付用搬送車により前記天井ユニ
ットを取付場所に搬送する工程と、既設の天井ユニット
と前記搬送された天井ユニットとの辺同志を係合する工
程と、前記搬送された天井ユニットを吊り込みボルトに
より支持する工程と、隣接する天井ユニットの照明機
器、空調機器および消火機器を接続する工程とにより天
井を構築するため、建築仕上工事と設備工事とを一体化
し流れ作業化することにより天井工事を合理化し、同時
に工事の単純労働化と軽作業化を図ることができる。さ
らに、下記の効果を奏することができる。As is apparent from the above description, according to the present invention, a ceiling work in which a ceiling is divided into a plurality of ceiling units and the ceiling units are assembled, wherein the components of the ceiling units are installed on the floor. And a step of producing a ceiling unit by attaching lighting equipment, air conditioning equipment and fire extinguishing equipment to the frame on the floor, and a step of transporting the ceiling unit to a mounting location by a unit mounting carrier, Engaging the sides of the existing ceiling unit and the transported ceiling unit, supporting the transported ceiling unit with hanging bolts, lighting equipment, air conditioning equipment and fire extinguishing of the adjacent ceiling unit In order to build the ceiling through the process of connecting the equipment, the building finishing work and equipment By streamlining the ceiling construction, it is possible to achieve a simple labor of a light work of the construction work at the same time. Further, the following effects can be obtained.
【0026】 リードタイムの短縮 遅れている作業、不具合のある作業が顕在化するため、
遅れている工程の同期化を容易に図ることができ、作業
の待ち時間がなくなり作業全体の効率化を図ることがで
きリードタイムの短縮が可能となる。また、不具合の再
発防止が容易となる。Reduction of lead time Since late work and defective work become apparent,
Synchronization of the delayed process can be easily achieved, the waiting time of the work can be eliminated, the efficiency of the entire work can be improved, and the lead time can be shortened. In addition, it becomes easy to prevent the recurrence of the defect.
【0027】 作業の単純化・苦渋作業の減少 天井ユニットの生産は大部分の作業が下向き作業とな
り、苦渋作業である上向き作業を大幅に削減できる。ま
た、施工図全体を理解する必要がなく、ユニット毎の情
報カードによる指示に従うため、専門職でなくても作業
が可能となる。また、溶接ロボット、NCマシン等の自
動機械によりフレーム上で各種部品の位置決め、取付を
行うため、従来行っていた墨出し作業および開口部の補
強を不用とすることができる。さらに、各種部品が天井
ユニットに取り付けられるため、吊り込みボルトの数を
大幅に減少させることができるとともに、取付作業の省
力化を図ることができる。Simplification of Work and Reduction of Difficult Work Most of the production of ceiling units is downward work, and upward work, which is troublesome work, can be greatly reduced. In addition, since it is not necessary to understand the entire construction drawing and follow the instructions on the information card for each unit, the work can be performed without a professional. In addition, since various parts are positioned and mounted on the frame by an automatic machine such as a welding robot or an NC machine, it is not necessary to perform the blacking-out work and the reinforcement of the opening, which are conventionally performed. Further, since various components are mounted on the ceiling unit, the number of suspension bolts can be significantly reduced, and the labor for mounting can be saved.
【0028】 多能工化 取付作業の集約化と流れ作業化により各作業が隣接し、
作業員による複数工程の同時受け持ちが可能になるた
め、全工程の負荷平準化と多能工の導入を図ることがで
きる。The multi-skilled work Each work is adjacent by the integration of the installation work and the flow work,
Since it is possible for workers to take charge of a plurality of processes at the same time, load leveling of all processes and introduction of multi-skilled workers can be achieved.
【0029】 情報カードの利用による効果 当該天井ユニットについての全ての施工情報(建築系、
設備系共)が、情報カードに一本化され、情報カードの
発行はフレーム製作の直前となるため、常に最新の一貫
した情報により施工でき、従来のような図面変更による
混乱や情報不足による手戻りがなくなる。また、組立部
品に組立情報が付いてくるため、作業員はその都度指示
に従えば良くなり、従来のように施工図を持たなくてよ
くなる。従って、全ての末端の業者に図面がわたってい
るわけでないため、図面変更も行い易い。さらに、情報
カードの回収により工事進捗状況を把握できるため、従
来のように常時、現場内を巡回する必要がなくなる。Effects of Using Information Cards All construction information (building system,
The information card is unified into the information card, and the information card is issued immediately before the frame is manufactured. Therefore, the information card can always be constructed with the latest and consistent information. There is no return. In addition, since the assembly information is attached to the assembly parts, the operator only has to follow the instructions each time, and it is not necessary to have the construction drawing as in the related art. Accordingly, since the drawings are not provided to all the end contractors, the drawings can be easily changed. Further, since the construction progress can be grasped by collecting the information card, it is not necessary to constantly go around the site as in the related art.
【図面の簡単な説明】[Brief description of the drawings]
【図1】本発明の天井工事におけるユニット化工法の1
実施例を示す概念図FIG. 1 is a diagram showing a unit construction method for ceiling work according to the present invention;
Conceptual diagram showing an embodiment
【図2】本発明の天井ユニットの1例を示す斜視図FIG. 2 is a perspective view showing an example of a ceiling unit of the present invention.
【図3】本発明に係わる天井ユニットの配置例を示す模
式図FIG. 3 is a schematic view showing an example of arrangement of ceiling units according to the present invention.
【図4】本発明に係わる天井ユニットの種類を説明する
ための模式図FIG. 4 is a schematic diagram for explaining types of ceiling units according to the present invention.
【図5】本発明に係わる天井ユニットを生産するための
フロー図FIG. 5 is a flowchart for producing a ceiling unit according to the present invention.
【図6】本発明の天井工事におけるユニット化工法の1
実施例を示す平面図FIG. 6 is a diagram showing a unit construction method in ceiling construction according to the present invention;
Plan view showing an embodiment
【図7】図6の斜視図FIG. 7 is a perspective view of FIG. 6;
【図8】天井ユニットの取付方法を説明するための取付
部分の全体平面図FIG. 8 is an overall plan view of a mounting portion for explaining a method of mounting the ceiling unit.
【図9】天井ユニットの取付前の状態を示す拡大図であ
り、図Aは図BのA−A先に沿って矢印方向から見た断
面図、図Bは平面図9 is an enlarged view showing a state before the ceiling unit is attached, FIG. 9A is a cross-sectional view taken along the line AA in FIG.
【図10】天井ユニットの取付後の状態を示す拡大図で
あり、図Aは図BのA−A先に沿って矢印方向から見た
断面図、図Bは平面図10 is an enlarged view showing a state after the ceiling unit is mounted, FIG. A is a sectional view taken along the line AA in FIG. B and viewed from the direction of the arrow, and FIG.
【図11】本発明の天井工事におけるユニット化工法の
全体フロー図FIG. 11 is an overall flowchart of the unitization method in the ceiling work according to the present invention.
【図12】本発明の天井工事における施工工程を示す図FIG. 12 is a view showing a construction process in the ceiling construction according to the present invention.
【図13】従来の天井部の断面図FIG. 13 is a sectional view of a conventional ceiling portion.
【図14】従来の天井工事の全体の施工工程を示す図FIG. 14 is a diagram showing the entire construction process of a conventional ceiling construction.
【図15】従来の天井工事の職種別の施工工程を示す図FIG. 15 is a diagram showing a construction process of each type of a conventional ceiling construction job.
3…材料供給センター、4…施工管理センター、5…無
人資材搬送車 6…天井ユニット、7…作業台、8…ユニット取付用搬
送車、10…フレーム 11…照明器具、12…配線、13、19…取付金物 15…空調用メインダクト、16…空調用接続ダクト、
17…吹出口 18…スプリンクラー用メイン水配管、21…スプリン
クラー 22…接続配管、23…天井板3 ... Material supply center, 4 ... Construction management center, 5 ... Unmanned material transport vehicle 6 ... Ceiling unit, 7 ... Work table, 8 ... Unit mounting transport vehicle, 10 ... Frame 11 ... Lighting equipment, 12 ... Wiring, 13, 19 mounting hardware 15 air conditioning main duct 16 air conditioning connection duct
17 ... Outlet 18 ... Main water pipe for sprinkler, 21 ... Sprinkler 22 ... Connection pipe, 23 ... Ceiling panel
───────────────────────────────────────────────────── フロントページの続き (72)発明者 福村貴司 東京都港区芝浦一丁目2番3号 清水建 設株式会社内 (72)発明者 中村健二 東京都港区芝浦一丁目2番3号 清水建 設株式会社内 (56)参考文献 特開 昭53−90616(JP,A) 特開 昭54−31915(JP,A) 特開 平3−96560(JP,A) 特開 昭52−131631(JP,A) 実開 平2−101419(JP,U) (58)調査した分野(Int.Cl.7,DB名) E04B 5/52 ──────────────────────────────────────────────────続 き Continued on the front page (72) Inventor Takashi Fukumura 1-3-2 Shibaura, Minato-ku, Tokyo Shimizu Corporation (72) Inventor Kenji Nakamura 1-2-3 Shibaura, Minato-ku, Tokyo Shimizu (56) References JP-A-53-90616 (JP, A) JP-A-54-31915 (JP, A) JP-A-3-96560 (JP, A) JP-A-52-131631 (JP) JP, A) Hikaru 2-101419 (JP, U) (58) Field surveyed (Int. Cl. 7 , DB name) E04B 5/52
Claims (3)
ムと、地上階に設けられる材料供給センターおよび施工
管理センターを備え、各階生産システムにより各フロア
ー構造物を生産した後、各階生産システム自体を上昇さ
せ、順次、上方階の構造物を生産していき、あるフロア
ーの構造物が構築されると、そのフロアーで天井工事を
行う工法であって、 天井を複数の天井ユニットに分割し、天井ユニットの構
成部品であるフレーム、照明機器、空調機器および消火
機器を、各階生産システムの搬送設備を用いて材料供給
センターから天井を施工するフロアーに供給する工程
と、 該フロアー上において前記構成部品から天井ユニットを
生産する工程と、 ユニット取付用搬送車により前記天井ユニットを取付場
所に搬送する工程と、 既設の天井ユニットと前記搬送された天井ユニットとの
辺同志を係合する工程と、 前記搬送された天井ユニットを吊り込みボルトにより支
持する工程と、 隣接する天井ユニットの照明機器、空調機器および消火
機器を接続する工程とからなり、前記施工管理センターは、複数のフロアーの天井工事を
同時に施工しながら順次上方フロアーへと施工していく
ように各工程を管理する ことを特徴とする天井工事にお
けるユニット化工法。1. A floor production system arranged on the top floor of a building.
And material supply centers and installations on the ground floor
Equipped with a management center, each floor is controlled by a production system
-After production of the structure, the floor production system itself is raised.
And sequentially produce structures on the upper floor,
Once the structure is constructed, ceiling construction will be performed on that floor.
In this method, the ceiling is divided into multiple ceiling units, and the components of the ceiling units, such as frames, lighting equipment, air conditioning equipment, and fire extinguishing equipment, are supplied using the transport equipment of each floor production system.
A step of supplying a ceiling unit from a center to a floor on which a ceiling is to be constructed, a step of producing a ceiling unit from the component parts on the floor, a step of transporting the ceiling unit to a mounting location by a unit mounting carrier, and an existing ceiling A step of engaging the sides of the unit and the transported ceiling unit with each other; a step of supporting the transported ceiling unit with hanging bolts; and connecting lighting equipment, air conditioning equipment and fire extinguishing equipment of the adjacent ceiling unit. The construction management center performs ceiling work on a plurality of floors.
Work on the upper floor sequentially while working simultaneously
A unit construction method in ceiling construction, characterized by managing each process as described above .
よび消火機器の配置が規格化されていることを特徴とす
る請求項1に記載の天井工事におけるユニット化工法。2. The method according to claim 1, wherein the arrangement of lighting equipment, air conditioning equipment and fire extinguishing equipment of the ceiling unit is standardized.
び取付位置を示す情報カードが付けられることを特徴と
する請求項2に記載の天井工事におけるユニット化工
法。3. The unit construction method according to claim 2, wherein an information card indicating a type of standardization and a mounting position is attached to the ceiling unit.
Priority Applications (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP03327754A JP3089587B2 (en) | 1991-12-11 | 1991-12-11 | Unit construction method for ceiling construction |
| CA 2084223 CA2084223A1 (en) | 1991-12-11 | 1992-12-01 | Unitizing method for ceiling construction |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP03327754A JP3089587B2 (en) | 1991-12-11 | 1991-12-11 | Unit construction method for ceiling construction |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH05156739A JPH05156739A (en) | 1993-06-22 |
| JP3089587B2 true JP3089587B2 (en) | 2000-09-18 |
Family
ID=18202617
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP03327754A Expired - Fee Related JP3089587B2 (en) | 1991-12-11 | 1991-12-11 | Unit construction method for ceiling construction |
Country Status (2)
| Country | Link |
|---|---|
| JP (1) | JP3089587B2 (en) |
| CA (1) | CA2084223A1 (en) |
-
1991
- 1991-12-11 JP JP03327754A patent/JP3089587B2/en not_active Expired - Fee Related
-
1992
- 1992-12-01 CA CA 2084223 patent/CA2084223A1/en not_active Abandoned
Also Published As
| Publication number | Publication date |
|---|---|
| JPH05156739A (en) | 1993-06-22 |
| CA2084223A1 (en) | 1993-06-12 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US20030051420A1 (en) | Unitized, pre-fabricated raised access floor arrangement, installation and leveling method, and automatized leveling tool | |
| US6514137B1 (en) | Modular clean room plenum | |
| US5174707A (en) | Three-dimensional manufacturing and assembly plant | |
| CN101460267A (en) | Method and system for manufacturing a structure | |
| JP2002520529A (en) | Flexible manufacturing system, apparatus and method | |
| JP3089587B2 (en) | Unit construction method for ceiling construction | |
| JP3087231B2 (en) | Ceiling unit | |
| US5928077A (en) | Clean room for manufacturing of semiconductor device | |
| RU2006143289A (en) | METHOD FOR MANUFACTURING PRELIMINARY INSTALLATION OF TRANSPORT SYSTEM AND INSTALLATION INSTALLATION FOR MANUFACTURE OF TRANSPORT SYSTEM | |
| JP3116144B2 (en) | Ceiling structure combining ceiling units | |
| CN112052501B (en) | Prefabricated construction method for modularized factory of electromechanical system in laboratory | |
| KR102609015B1 (en) | Hollow-core slab and degradation slab smart modular construction method of building structures | |
| CN215421022U (en) | Container data center modular framework and data center | |
| JPH11211003A (en) | Boiler and assembling method thereof | |
| US20050186062A1 (en) | Modular housing system | |
| JPH0886037A (en) | Plant building, construction method of the building, and structure used for the construction | |
| JP2024039109A (en) | Conveyance device | |
| CA3222237A1 (en) | A data centre system and method of construction | |
| CN113931317A (en) | Novel industrialized modular house and construction method thereof | |
| KR102844430B1 (en) | A MODULE KIT of An Integrated Vacuum System for Semiconductor Production Facilities | |
| JPH03196929A (en) | Truck device for production line of housing unit for industrialized dwelling house | |
| JP2003207588A (en) | Reactor building construction method | |
| JPH0839533A (en) | Method for and apparatus of manufacture of concrete product | |
| JPH09209589A (en) | How to set up a product group in a construction building | |
| JPH05295845A (en) | Unifying process of line type ceiling |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| LAPS | Cancellation because of no payment of annual fees |