JP3095209B2 - Construction method of anchor for steel pipe column retaining wall - Google Patents
[go: Go Back, main page]

JP3095209B2 - Construction method of anchor for steel pipe column retaining wall - Google Patents

Construction method of anchor for steel pipe column retaining wall

Info

Publication number
JP3095209B2
JP3095209B2 JP07344591A JP34459195A JP3095209B2 JP 3095209 B2 JP3095209 B2 JP 3095209B2 JP 07344591 A JP07344591 A JP 07344591A JP 34459195 A JP34459195 A JP 34459195A JP 3095209 B2 JP3095209 B2 JP 3095209B2
Authority
JP
Japan
Prior art keywords
steel pipe
anchor
joint
anchor hole
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP07344591A
Other languages
Japanese (ja)
Other versions
JPH09158173A (en
Inventor
太雅 黒澤
貢 大槻
厚志 柴田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kubota Corp
Original Assignee
Kubota Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kubota Corp filed Critical Kubota Corp
Priority to JP07344591A priority Critical patent/JP3095209B2/en
Publication of JPH09158173A publication Critical patent/JPH09158173A/en
Application granted granted Critical
Publication of JP3095209B2 publication Critical patent/JP3095209B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、鋼管杭を柱列状に連設
してなる土留壁の構築において、鋼管相互の継手部より
グランドアンカーを施工する方法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of constructing a ground anchor from a joint between steel pipes in the construction of a retaining wall formed by connecting steel pipe piles in a column.

【0002】[0002]

【従来の技術】建設現場での土留や仕切りとして、鋼管
杭を柱列状に連結打設する土留壁が用いられている。こ
の土留壁は、鋼管の両側に長手方向に沿って継手を設け
た鋼管杭を、互いに継手を介して連結して柱列壁状に形
成され、奥の地盤にアンカーを打設して土圧に対杭させ
るようにしている。
2. Description of the Related Art As a retaining wall or a partition at a construction site, a retaining wall in which steel pipe piles are connected and driven in a columnar manner has been used. The retaining wall is formed by connecting steel pipe piles provided with joints along the longitudinal direction on both sides of the steel pipe to each other via joints, and formed into a pillar-column wall shape. It is made to be piled up.

【0003】上記土留壁にアンカーを施工する場合、従
来は、予め工場にて鋼管本管にアンカー用の孔を加工し
ておき、この孔を通して施工現場でグランドアンカーを
施工していた。しかし、この方法では、アンカーの追加
や施工位置の変更等の設計変更があった場合、それに対
応できないという問題があった。そこで、削孔が容易で
ある鋼管杭の継手部分に現場でアンカー孔を施工してア
ンカーを打設できるようにした工法(特願平5−311391
号参照)が提案されている。
Conventionally, when an anchor is installed on the earth retaining wall, a hole for an anchor is previously formed in a steel pipe main pipe at a factory, and a ground anchor is installed at a construction site through the hole. However, this method has a problem that it is not possible to cope with a design change such as addition of an anchor or change of a construction position. Therefore, a method was adopted in which an anchor hole was constructed on the joint of a steel pipe pile where drilling was easy so that an anchor could be driven (Japanese Patent Application No. 5-311391).
No.) has been proposed.

【0004】ところで、鋼管柱列の土留壁では、雄継手
3と雌継手4の嵌合部分がソイルセメント7で覆われて
いることにより、継手部5の止水性が保たれているので
あるが、上記のような、継手部に現場でアンカー孔8a
を設ける工法では、削孔時に継手3,4に振動が与えら
れることで、ソイルセメント7との剥離が生じて水みち
ができ、止水性を低下させるというような悪影響が懸念
される。また、雄継手3の方は小径で曲率が大なため、
削孔がむずかしいとともに、その削孔による振動も大と
なる。
By the way, in the retaining wall of the steel tube column, the fitting portion of the male joint 3 and the female joint 4 is covered with the soil cement 7, so that the waterproofness of the joint portion 5 is maintained. Anchor hole 8a at the site of the joint as described above
In the method of providing the joint, vibrations are applied to the joints 3 and 4 at the time of drilling, so that the joints 3 and 4 may be separated from the soil cement 7 and water may be formed, which may cause adverse effects such as lowering water stoppage. Since the male joint 3 has a small diameter and a large curvature,
The drilling is difficult and the vibration caused by the drilling is large.

【0005】本発明は、上記の課題を解決するためにな
されたもので、継手部分の少なくとも雄継手に不連続部
分を設けておき、その部分を削孔してアンカーを打設す
ることにより、アンカー孔の削孔が容易に能率よく行え
るとともに、削孔に伴う振動が少なくなり、継手部及び
その周辺のソイルセメントの肌離れによる漏水の発生を
防止することができるようにしようとするものである。
SUMMARY OF THE INVENTION The present invention has been made to solve the above-mentioned problem. A discontinuous portion is provided at least in a male joint of a joint portion, and the hole is drilled in the portion to drive an anchor. It aims to easily and efficiently drill holes in the anchor hole, reduce vibrations caused by drilling, and prevent the occurrence of water leakage due to separation of soil cement from the joint part and its surroundings. is there.

【0006】[0006]

【課題を解決するための手段】上記の目的を達成するた
めの本発明の構成について、実施例に対応する図面を参
照して説明すると、請求項1の施工方法は、鋼管杭1,
1どうしを連結する継手部5よりアンカー15を打設する
鋼管柱列土留壁Aの施工において、あらかじめ、鋼管杭
1の雄継手3に、アンカー孔10を削成する個所付近の所
要長さにわたり不連続部6を設けておき、鋼管杭1,1
どうしの連結後、継手部5の上記不連続部6のある個所
より、地盤Bの奥までアンカー孔10を削成し、該アンカ
ー孔に、雌継手4の外側面に接合する止水板12を外周に
突出して設けるとともに、止水板12に挿入して排出管13
を設けた短尺の口元管11を挿入して、その止水板12を雌
継手4の外側面に水密に固着して取り付けた後、アンカ
ー15とセメントミルクの注入管16を貫挿した栓体17を口
元管11に嵌着し、セメントミルクを注入して、アンカー
孔10及びアンカー孔10内周と口元管11との間隙にセメン
トミルクを充填することを特徴とするものである。
The construction of the present invention for achieving the above object will be described with reference to the drawings corresponding to the embodiments.
In the construction of the steel pipe column retaining wall A in which the anchors 15 are cast from the joints 5 connecting the joints 1 to each other, the male joints 3 of the steel pipe piles 1 must be prepared in advance over the required length near the place where the anchor hole 10 is cut. The discontinuous portion 6 is provided, and the steel pipe piles 1, 1
After the connection, the anchor hole 10 is cut from the portion of the joint portion 5 where the discontinuous portion 6 is located to the depth of the ground B, and the water blocking plate 12 joined to the outer surface of the female joint 4 is formed in the anchor hole. Is provided on the outer periphery, and is inserted into the water stop plate 12 so that the discharge pipe 13 is provided.
After inserting a short mouth pipe 11 provided with a watertight plate 12 to the outer surface of the female joint 4 in a water-tight manner, the stopper 15 is inserted through the anchor 15 and the cement milk injection pipe 16. 17 is fitted to the mouth pipe 11, cement milk is injected, and the gap between the anchor hole 10 and the inner periphery of the anchor hole 10 and the mouth pipe 11 is filled with cement milk.

【0007】また、請求項2の施工方法は、請求項1の
方法において、鋼管杭1の雄継手3と雌継手4の両方に
不連続部6,7を設けておくことを特徴とするものであ
る。
[0007] The construction method of claim 2 is characterized in that, in the method of claim 1, discontinuous portions 6 and 7 are provided on both the male joint 3 and the female joint 4 of the steel pipe pile 1. It is.

【0008】また、請求項3の施工方法は、鋼管杭1,
1どうしを連結する継手部5よりアンカー15を打設する
鋼管柱列土留壁Aの施工において、あらかじめ、鋼管杭
1の雄継手3またはこれと雌継手4の両方に、アンカー
15を削成する個所付近の上下位置に切目線3a,3a,
4a,4aを設けておき、施工現場において、鋼管杭
1,1どうしの連結後、切目線3a,3a,4a,4a
間の部分を取り除いて不連続部6,7を形成し、継手部
5の上記不連続部6,7のある個所より、地盤Bの奥ま
でアンカー孔10を削成し、該アンカー孔に、雌継手4の
外側面に接合する止水板12を外周に突出して設けるとと
もに、止水板12に挿入して排出管13を設けた短尺の止水
板12を外周に突出して設けた口元管11を挿入して、その
止水板12を雌継手4の外側面に水密に固着して取り付け
た後、アンカー15とセメントミルクの注入管16を貫挿し
た栓体17を口元管11に嵌着し、セメントミルクを注入し
て、アンカー孔10及びアンカー孔10内周と口元管11との
間隙にセメントミルクを充填することを特徴とするもの
である。
[0008] The construction method of claim 3 is characterized in that the steel pipe pile 1
In the construction of the steel pipe column retaining wall A in which the anchors 15 are cast from the joints 5 connecting the joints 1 to each other, the male joints 3 of the steel pipe pile 1 or both of the male joints 3 and the female joints 4 are previously anchored.
Cut lines 3a, 3a,
4a, 4a are provided, and at the construction site, after the steel pipe piles 1, 1 are connected to each other, the score lines 3a, 3a, 4a, 4a
The discontinuous portions 6 and 7 are formed by removing the portion between them, and an anchor hole 10 is cut from the location of the discontinuous portions 6 and 7 of the joint portion 5 to the depth of the ground B. A mouth pipe which is provided on the outer surface of the female joint 4 so as to protrude outward and has a short water stop plate 12 which is inserted into the water stop plate 12 and provided with a discharge pipe 13 and which protrudes outwardly. After the water stop plate 12 is fixed to the outer surface of the female joint 4 in a water-tight manner and attached thereto, the stopper 17 inserted through the anchor 15 and the cement milk injection pipe 16 is fitted into the mouth pipe 11. It is characterized in that cement milk is injected and cement milk is filled into the gap between the anchor hole 10 and the inner periphery of the anchor hole 10 and the mouth tube 11.

【0009】[0009]

【作用】鋼管杭1の継手部5の削孔にあたっては振動が
与えられるが、特に雄継手3は曲率が大なため、削孔が
しにくく、それにともなう振動も比較的大きくなるた
め、ソイルセメント9との肌離れにより止水性の低下す
るおそれがある。
Vibration is applied to the drilling of the joint portion 5 of the steel pipe pile 1. Particularly, since the male joint 3 has a large curvature, drilling is difficult, and the vibration accompanying the drilling is relatively large. There is a possibility that the water stoppage may decrease due to the separation of the skin from the skin.

【0010】請求項1の施工方法では、雄継手3への削
孔を要しないので、削孔時の振動の発生は大巾に軽減さ
れる。また、請求項2の施工方法では、雄継手3と、雌
継手4の両方とも削孔を要しないので、削孔時の振動は
殆ど発生しないとともに、削孔作業が極めて容易に能率
よくできる。また、請求項3の施工方法では、施工現場
で両継手3,4の一方または両方の不連続部を形成する
ので、それら継手3,4の固着作業やその取付精度が向
上できる。
According to the construction method of the first aspect, since the drilling of the male joint 3 is not required, the generation of vibration at the time of drilling is greatly reduced. According to the construction method of claim 2, since the male joint 3 and the female joint 4 do not require drilling, vibration during drilling hardly occurs, and drilling work can be extremely easily and efficiently performed. In the construction method according to the third aspect, since one or both discontinuous portions of the two joints 3 and 4 are formed at the construction site, the fixing work of the joints 3 and 4 and the mounting accuracy thereof can be improved.

【0011】[0011]

【発明の実施の形態】以下、本発明の実施の形態につい
て図面を参照して説明する。図1は本発明により施工さ
れた鋼管柱列土留壁の一実施例を示した平断面図、図2
は同要部の拡大側面図である。また、図3及び図4は、
本発明で使用する鋼管杭の継手部を示した斜視図であ
る。
Embodiments of the present invention will be described below with reference to the drawings. FIG. 1 is a plan sectional view showing an embodiment of a steel pipe column retaining wall constructed according to the present invention, FIG.
Is an enlarged side view of the main part. 3 and FIG.
It is the perspective view which showed the joint part of the steel pipe pile used by this invention.

【0012】これらの図において、1は鋼管杭で、鋼管
2の対向する両外側面に、鋼管杭1,1どうしを連結す
る雄継手(O継手)3と雌継手(C継手)4とが、鋼管
2の長手方向に沿って固着されており、それら両継手
3,4が嵌合して継手部5が形成される。そして、雄継
手3の方は、アンカー10を打設する位置付近が所要の長
さにわたり欠除されて、不連続部6が形成されている。
この不連続部6は、あらかじめ工場等において作成され
る。
In these figures, reference numeral 1 denotes a steel pipe pile, and a male joint (O joint) 3 and a female joint (C joint) 4 for connecting the steel pipe piles 1 and 1 are provided on both opposite outer surfaces of the steel pipe 2. , Are fixed along the longitudinal direction of the steel pipe 2, and the joints 3 and 4 are fitted to each other to form a joint portion 5. In the male joint 3, the discontinuous portion 6 is formed by cutting off the vicinity of the position where the anchor 10 is cast over a required length.
This discontinuous portion 6 is created in a factory or the like in advance.

【0013】上記の鋼管杭1,1は、地盤に掘削孔8,
8を連続形成させてソイルセメント9を充填し、その中
に上記継手3,4の嵌合により多数連結しながら沈設さ
れ、鋼管柱列土留壁Aが形成されることになる。その後
は、建造物構築側となる片側の地盤を掘り下げて露出さ
せる。そして、雄継手3の不連続部6に位置している雌
継手4の所定の個所を貫通してアンカー孔10を地盤Bの
奥まで削成する。
The above-mentioned steel pipe piles 1, 1 are provided with excavation holes 8,
8 are continuously formed and filled with the soil cement 9, and the soil cement 9 is sunk into the soil cement 9 by fitting the joints 3 and 4 therein, thereby forming the steel pipe column retaining wall A. After that, the ground on one side, which is the building construction side, is dug down and exposed. Then, the anchor hole 10 is cut through the predetermined portion of the female joint 4 located at the discontinuous portion 6 of the male joint 3 to the depth of the ground B.

【0014】アンカー孔10の削成後は、雌継手4の外側
面に接合する止水板12を外周に突出して設けるととも
に、止水板12に挿入して排出管13を設けた短尺の口元管
11を、雌継手4よりアンカー孔10に挿入し、止水板12を
雌継手4に溶接或は接着剤を用いて水密に固着して取り
付ける。そして、アンカー15とセメントミルクの注入管
16を貫挿した栓体17を口元管11の基端部内に嵌着する。
その際、アンカー15はその先端がアンカー孔10の奥部に
達するようにするとともに、その基端部は腹起し材18,
18より外方に突出されるようにする。
After the drilling of the anchor hole 10, a water stop plate 12 to be joined to the outer surface of the female joint 4 is provided so as to protrude on the outer periphery, and is inserted into the water stop plate 12 to provide a discharge pipe 13. tube
11 is inserted into the anchor hole 10 from the female joint 4, and the water stop plate 12 is fixed to the female joint 4 by welding or using an adhesive in a watertight manner. And anchor 15 and cement milk injection tube
The plug 17 into which the plug 16 has been inserted is fitted into the base end of the mouth tube 11.
At this time, the distal end of the anchor 15 reaches the inner part of the anchor hole 10, and the base end of the anchor 15
So that it protrudes outward beyond 18.

【0015】次に、注入管16よりアンカー孔10内にセメ
ントミルク20を圧送、注入する。注入されたセメントミ
ルク20は、アンカー孔10内に充満される。その際、アン
カー孔10内の空気は排出管13より孔外に排出される。ま
た、セメントミルク20の充満は排出管13よりセメントミ
ルク20が排出されることで確認される。
Next, cement milk 20 is pumped and injected into the anchor hole 10 from the injection pipe 16. The injected cement milk 20 fills the anchor holes 10. At this time, the air in the anchor hole 10 is discharged from the discharge pipe 13 to the outside of the hole. Further, the filling of the cement milk 20 is confirmed by discharging the cement milk 20 from the discharge pipe 13.

【0016】なお、上記口元管11は、図2に示すよう
に、アンカー孔10より少し小径に形成しておけば、セメ
ントミルク20の注入圧力によって、アンカー孔10の内壁
と口元管11外周との間隙にセメントミルク20の一部が流
入、充填されることになり、口元管11と継手部5内とは
より水密に遮断されるとともに、ソイルセメント9のア
ンカー孔10を削成された部分が補強されることになる。
また、口元管11には多孔管を用いることもできる。
If the mouth tube 11 is formed to have a slightly smaller diameter than the anchor hole 10 as shown in FIG. 2, the inner wall of the anchor hole 10 and the outer periphery of the mouth tube 11 are formed by the injection pressure of the cement milk 20. A part of the cement milk 20 flows into and is filled in the gap between the mouth pipe 11 and the inside of the joint part 5 in a more watertight manner, and the part where the anchor hole 10 of the soil cement 9 is cut. Will be reinforced.
Further, a perforated tube can be used as the mouth tube 11.

【0017】注入したセメントミルク20が固結した後
は、アンカー10の基部に取付座21を挿通し、ナット22を
螺着して緊締し、施工が終了することになる。
After the injected cement milk 20 is solidified, the mounting seat 21 is inserted into the base of the anchor 10, and the nut 22 is screwed and tightened to complete the construction.

【0018】図5〜図7は本発明の他の実施例を示した
ものである。すなわち、本発明では、図示のように、雄
継手3の不連続部6に対向して、雌継手4の方にも、こ
れを欠除した不連続部7を設けることができる。この場
合、不連続部6,7の個所では継手部5内のソイルセメ
ント9が露出した状態となる。アンカー孔の削成はその
露出したソイルセメント9の個所を通して行われ、雄、
雌両継手3,4の削孔が伴わないので、削孔による振動
が殆どなくなるとともに、施工も極めて簡易となる。
FIGS. 5 to 7 show another embodiment of the present invention. That is, in the present invention, as shown in the figure, the female joint 4 can be provided with a discontinuous portion 7 lacking this, facing the discontinuous portion 6 of the male joint 3. In this case, the soil cement 9 in the joint portion 5 is exposed at the discontinuous portions 6 and 7. The drilling of the anchor holes is performed through the exposed soil cement 9 points,
Since no drilling of the female joints 3 and 4 is involved, vibration due to drilling is almost eliminated, and construction is extremely simple.

【0019】図8は、雄継手3に不連続部6を設けるこ
とでの他の実施例を示したものである。この例では、不
連続部6の両端にあたる位置に切目線3a,3aを設け
た雄継手3を鋼管2に固着しておき、施工現場において
打撃を加える等して切目線3a,3a間の部分を取り除
いて不連続部6を形成させる。この場合は、図3の実施
例に比べ、雄継手3の鋼管2への固着作業及び精度の向
上が図れる。
FIG. 8 shows another embodiment in which the male joint 3 is provided with a discontinuous portion 6. In this example, a male joint 3 having cut lines 3a, 3a at positions corresponding to both ends of the discontinuous portion 6 is fixed to the steel pipe 2, and a portion between the cut lines 3a, 3a is applied by applying a blow at a construction site. Is removed to form the discontinuous portion 6. In this case, the operation of fixing the male joint 3 to the steel pipe 2 and the accuracy can be improved as compared with the embodiment of FIG.

【0020】また、図9は、雄継手3及び雌継手4の両
方に不連続部6,7を設けることでの他の実施例を示し
たものである。この場合は、上記の雄継手3と同様に雌
継手4の方にも切目線4a,4aを設けておき、施工現
場で不連続部6,7を形成させる。なお、雌継手4の切
目線4a,4aは、削孔を開始する側の継手部分だけに
設け、その部分だけを取り除くようにしてもよい。
FIG. 9 shows another embodiment in which discontinuous portions 6 and 7 are provided in both the male joint 3 and the female joint 4. In this case, the cut lines 4a, 4a are also provided in the female joint 4 similarly to the male joint 3 described above, and the discontinuous portions 6, 7 are formed at the construction site. The cut lines 4a, 4a of the female joint 4 may be provided only at the joint part on the side where drilling starts, and only that part may be removed.

【0021】[0021]

【発明の効果】以上説明したように、本発明によれば、
施工現場において、継手部を通してアンカー孔を削成す
るにあたり、その削孔個所に、雄継手またはこれと雌継
手の両方が存在しないので、削孔にともなう振動が大巾
に軽減され、或は振動の発生が殆どなく行えることにな
り、振動による継手とソイルセメントとの肌離れを生ず
るおそれがなく、継手部における止水性を良好に保つこ
とができる。また、継手の一方または両方への削孔がな
いことから、アンカー孔の削成が容易に能率よく行える
ことになり、現場の施工性が向上される。
As described above, according to the present invention,
At the construction site, when drilling an anchor hole through a joint, since there is no male joint or both of this and a female joint at the drilling location, the vibration accompanying the drilling is greatly reduced, or This can be performed with almost no occurrence, and there is no possibility that the skin is separated from the joint and the soil cement due to the vibration, and the water stopping property at the joint can be favorably maintained. Further, since there is no drilling in one or both of the joints, drilling of the anchor hole can be easily and efficiently performed, and workability at the site is improved.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明による鋼管柱列土止壁の一実施例を示す
平断面図である。
FIG. 1 is a plan sectional view showing one embodiment of a steel pipe column bank retaining wall according to the present invention.

【図2】同要部の拡大側断面図である。FIG. 2 is an enlarged side sectional view of the main part.

【図3】同使用する鋼管の要部を示す斜視図である。FIG. 3 is a perspective view showing a main part of the steel pipe used.

【図4】同継手部の削孔状態を示す斜視図である。FIG. 4 is a perspective view showing a drilled state of the joint.

【図5】本発明の他の実施例を示す要部拡大側断面図で
ある。
FIG. 5 is an enlarged side sectional view of a main part showing another embodiment of the present invention.

【図6】同鋼管の要部を示す斜視図である。FIG. 6 is a perspective view showing a main part of the steel pipe.

【図7】同継手部の削孔状態を示す斜視図である。FIG. 7 is a perspective view showing a drilled state of the joint.

【図8】使用する鋼管の他の実施例を示す要部斜視図で
ある。
FIG. 8 is a perspective view of a main part showing another embodiment of a steel pipe to be used.

【図9】同さらに他の実施例を示す要部斜視図である。FIG. 9 is a perspective view of a main part showing still another embodiment.

【符号の説明】[Explanation of symbols]

A 鋼管柱列土留壁 B 地盤 1 鋼管杭 3 雄継手 3a,4a 切込線 4 雌継手 5 継手部 6,7 不連続部 9 ソイルセメント 10 アンカー孔 11 口元管 12 止水板 13 排出管 15 アンカー 16 注入管 17 栓体 A Steel pipe column retaining wall B Ground 1 Steel pipe pile 3 Male joint 3a, 4a Cut line 4 Female joint 5 Joint part 6, 7 Discontinuity part 9 Soil cement 10 Anchor hole 11 Base pipe 12 Water stop plate 13 Discharge pipe 15 Anchor 16 Injection tube 17 Plug

フロントページの続き (56)参考文献 特開 平5−195526(JP,A) 特開 平7−82739(JP,A) 実開 昭53−55205(JP,U) (58)調査した分野(Int.Cl.7,DB名) E02D 5/02 - 5/20 E02D 17/04 E02D 5/74 - 5/80 Continuation of the front page (56) References JP-A-5-195526 (JP, A) JP-A-7-82739 (JP, A) JP-A-53-55205 (JP, U) (58) Fields investigated (Int) .Cl. 7 , DB name) E02D 5/02-5/20 E02D 17/04 E02D 5/74-5/80

Claims (3)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 鋼管杭どうしを連結する継手部よりアン
カーを打設する鋼管柱列土留壁の施工において、あらか
じめ、鋼管杭の雄継手に、アンカー孔を削成する個所付
近の所要長さにわたり不連続部を設けておき、鋼管杭ど
うしの連結後、継手部の上記不連続部のある個所より、
地盤の奥までアンカー孔を削成した後、該アンカー孔
に、雌継手の外側面に接合する止水板を外周に突出して
設けるとともに、止水板に挿入して排出管を設けた短尺
の口元管を挿入して、その止水板を雌継手の外側面に水
密に固着して取り付けた後、アンカーとセメントミルク
の注入管を貫挿した栓体を口元管に嵌着し、セメントミ
ルクを注入して、アンカー孔及びアンカー孔内周と口元
管との間隙にセメントミルクを充填することを特徴とす
る鋼管柱列土留壁におけるアンカーの施工方法。
In the construction of a steel pipe column retaining wall in which an anchor is cast from a joint section connecting steel pipe piles, a male joint of the steel pipe pile is previously extended over a required length near a place where an anchor hole is formed. A discontinuous part is provided, and after connecting the steel pipe piles, from the place where the discontinuous part of the joint part is,
After shaving the anchor hole to the depth of the ground, a water-stop plate to be joined to the outer surface of the female joint is provided on the anchor hole so as to protrude to the outer circumference, and a short pipe is provided in the water-stop plate to provide a discharge pipe. After inserting the mouth tube and attaching the water stop plate to the outer surface of the female joint in a water-tight manner, a stopper inserted through the anchor and the injection tube of the cement milk is fitted to the mouth tube, and the cement milk is inserted. And filling the gap between the anchor hole and the inner periphery of the anchor hole with the mouth pipe with cement milk.
【請求項2】 鋼管杭の雄継手と雌継手の両方に不連続
部を設けておくことを特徴とする、請求項1記載の鋼管
柱列土留壁におけるアンカーの施工方法。
2. The method according to claim 1, wherein a discontinuous portion is provided in both the male joint and the female joint of the steel pipe pile.
【請求項3】 鋼管杭どうしを連結する継手部よりアン
カーを打設する鋼管柱列土留壁の施工において、あらか
じめ、鋼管杭の雄継手またはこれと雌継手の両方に、ア
ンカーを削成する個所付近の上下位置に切目線を設けて
おき、施工現場において、鋼管杭どうしの連結後、切目
線間の部分を取り除いて不連続部を形成し、継手部の上
記不連続部のある個所より、地盤の奥までアンカー孔を
削成した後、該アンカー孔に、雌継手の外側面に接合す
る止水板を外周に突出して設けるとともに、止水板に挿
入して排出管を設けた短尺の口元管を挿入して、その止
水板を雌継手の外側面に水密に固着して取り付けた後、
アンカーとセメントミルクの注入管を貫挿した栓体を口
元管に嵌着し、セメントミルクを注入して、アンカー孔
及びアンカー孔内周と口元管との間隙にセメントミルク
を充填することを特徴とする鋼管柱列土留壁におけるア
ンカーの施工方法。
3. In the construction of a steel pipe column retaining wall in which an anchor is cast from a joint connecting steel pipe piles, a place where an anchor is previously formed in a male joint of the steel pipe pile or in both of the male and female joints. A cut line is provided in the vicinity of the top and bottom, and at the construction site, after connecting the steel pipe piles, a portion between the cut lines is removed to form a discontinuous portion, and from a place where the joint portion has the discontinuous portion, After shaving the anchor hole to the depth of the ground, a water-stop plate to be joined to the outer surface of the female joint is provided on the anchor hole so as to protrude to the outer circumference, and a short pipe is provided in the water-stop plate to provide a discharge pipe. After inserting the mouth pipe and fixing the water stop plate to the outer surface of the female joint in a watertight manner,
A plug body inserted through an anchor and an injection pipe for cement milk is fitted to the mouth pipe, cement milk is injected, and the gap between the anchor hole and the inner circumference of the anchor hole and the mouth pipe is filled with cement milk. Construction method of anchor on steel pipe column soil retaining wall.
JP07344591A 1995-12-05 1995-12-05 Construction method of anchor for steel pipe column retaining wall Expired - Fee Related JP3095209B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP07344591A JP3095209B2 (en) 1995-12-05 1995-12-05 Construction method of anchor for steel pipe column retaining wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP07344591A JP3095209B2 (en) 1995-12-05 1995-12-05 Construction method of anchor for steel pipe column retaining wall

Publications (2)

Publication Number Publication Date
JPH09158173A JPH09158173A (en) 1997-06-17
JP3095209B2 true JP3095209B2 (en) 2000-10-03

Family

ID=18370460

Family Applications (1)

Application Number Title Priority Date Filing Date
JP07344591A Expired - Fee Related JP3095209B2 (en) 1995-12-05 1995-12-05 Construction method of anchor for steel pipe column retaining wall

Country Status (1)

Country Link
JP (1) JP3095209B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8340313B2 (en) 2003-09-24 2012-12-25 Thomson Licensing Wireless digital transmission of low frequency effects and surround channels for surround sound system

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2006123009A1 (en) * 2005-05-20 2006-11-23 Turun Ammattikorkeakoulu Sealing of a piling
JP2007009605A (en) * 2005-07-01 2007-01-18 Maeda Corp Noise suppressing method and structure for underpass road
KR100721605B1 (en) * 2005-10-05 2007-05-23 최영근 Structure of the front pressure plate of the soil nail
CN106930294A (en) * 2017-04-26 2017-07-07 辽宁有色基础工程公司 A kind of bedrock fracture artesian area grouting method
CN113802574B (en) * 2021-09-30 2022-12-23 王宝林 Roadbed rapid supporting structure for roadbed-side foundation pit construction and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8340313B2 (en) 2003-09-24 2012-12-25 Thomson Licensing Wireless digital transmission of low frequency effects and surround channels for surround sound system

Also Published As

Publication number Publication date
JPH09158173A (en) 1997-06-17

Similar Documents

Publication Publication Date Title
JP3095209B2 (en) Construction method of anchor for steel pipe column retaining wall
JPWO2003008715A1 (en) Construction method of manhole structure, waterproof joint for manhole structure and manhole structure
JP3458116B2 (en) Construction method of cast-in-place pile
JP4440497B2 (en) Construction method of underground continuous wall and construction method of underground structure
JP2823369B2 (en) Flexible pipe and its construction method
JP3893052B2 (en) Joint structure of manhole for propulsion pipe and its construction method
JP4663541B2 (en) Seismic reinforcement method for existing concrete pier
JP2002220991A (en) Partition wall provided in main tunnel tunnel and method of constructing it
JP2908735B2 (en) Construction method of earth anchor on steel pipe column retaining wall
JP3712602B2 (en) Joint pipe water blocking structure
JP2005256571A (en) Continuous wall and its construction method
JP2003055985A (en) Column and pile connection method
JPH05171654A (en) Execution construction of landslid protection pile and execution method
JP2642585B2 (en) Pile construction method using existing piles
JP2935634B2 (en) Steel pipe sheet pile wall construction method
JP3014267B2 (en) Steel pipe sheet pile wall construction method and steel pipe sheet pile
JPH0559215B2 (en)
JP2985063B2 (en) Caisson prefabricated manhole and its construction method
JP3227115B2 (en) Propulsion box support device
JPH0483018A (en) water stop wall
JP2935632B2 (en) Steel pipe sheet pile wall construction method
KR100645010B1 (en) Manhole structure for watertight coupling and pipe joining method using the same
JPS63125724A (en) Construction method of underground continuous wall
JPS6255321A (en) Construction of h-steel bearing pile
JP2579424B2 (en) Check Boring Penetration Reinforcement Structure and Check Boring Penetration Method

Legal Events

Date Code Title Description
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080804

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090804

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100804

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100804

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110804

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120804

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130804

Year of fee payment: 13

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140804

Year of fee payment: 14

LAPS Cancellation because of no payment of annual fees