JP3097381B2 - Method and apparatus for forming yarn in spinning machine - Google Patents
Method and apparatus for forming yarn in spinning machineInfo
- Publication number
- JP3097381B2 JP3097381B2 JP05077149A JP7714993A JP3097381B2 JP 3097381 B2 JP3097381 B2 JP 3097381B2 JP 05077149 A JP05077149 A JP 05077149A JP 7714993 A JP7714993 A JP 7714993A JP 3097381 B2 JP3097381 B2 JP 3097381B2
- Authority
- JP
- Japan
- Prior art keywords
- length
- yarn
- lift
- ring rail
- production
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Spinning Or Twisting Of Yarns (AREA)
Description
【0001】[0001]
【産業上の利用分野】本発明はリング精紡機、リング撚
糸機等の紡機における管糸形成方法及び管糸形成装置に
関するものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method and apparatus for forming a yarn in a spinning machine such as a ring spinning machine or a ring twisting machine.
【0002】[0002]
【従来の技術】一般にこの種の紡機では、フロントロー
ラからの紡出量とボビンへの巻取量が同量となるよう
に、フロントローラの回転速度とスピンドルの回転数が
一定の比となるように設定されている。リングレール
は、ボビンの軸方向に所定ストローク(チェイス長)で
昇降動しながらリングレールの1回の昇降毎にその位置
が所定量すなわち基準シェーパステップずつ上方へスラ
イドされるようになっている。こうして1回の昇降毎に
リングレールの位置が基準シェーパステップずつ上方へ
スライドされることによりボビンの下部から上部へ向か
って管糸は形成されてゆく。2. Description of the Related Art Generally, in this type of spinning machine, the rotation speed of a front roller and the rotation speed of a spindle have a fixed ratio so that the amount of spinning from a front roller and the amount of winding on a bobbin are the same. It is set as follows. The ring rail moves up and down by a predetermined stroke (chase length) in the axial direction of the bobbin, and its position is slid upward by a predetermined amount, that is, a reference shaper step each time the ring rail moves up and down once. Thus, each time the ring rail is moved up and down, the position of the ring rail is slid upward by the reference shaper step, so that the bobbin thread is formed from the lower part to the upper part of the bobbin.
【0003】管糸は満管時に巻き取られた生産糸長LB
と管糸の軸方向の幅すなわちリフト長Ltとが予め設定
された値となるように形成される必要がある。生産糸長
LBとリフト長Ltとの関係は基準シェーパステップに
より決まるため、管糸の生産糸長LBとリフト長Ltと
を設定どおりにするために適正な基準シェーパステップ
SSCを設定する必要がある。[0003] The yarn produced is the length LB of the yarn wound when it is full.
And the axial length of the tube thread, that is, the lift length Lt, must be formed so as to have a preset value. Since the relationship between the production yarn length LB and the lift length Lt is determined by the reference shaper step, it is necessary to set an appropriate reference shaper step SSC in order to keep the production yarn length LB and the lift length Lt of the tubular yarn as set. .
【0004】図5はチェイス回数に対するリングレール
の高さすなわち紡出糸のボビンへの巻取り位置を示した
グラフである。2本の線A,Bはそれぞれリフティング
の上端位置及び下端位置を示し、リングレールは各チェ
イス毎に2本の線A,Bの間を昇降し、同図右側の管糸
Gのように形成される。FIG. 5 is a graph showing the height of the ring rail with respect to the number of chase, that is, the position at which the spun yarn is wound on the bobbin. The two lines A and B indicate the upper and lower positions of the lifting, respectively, and the ring rail moves up and down between the two lines A and B for each chase, and is formed like a tube thread G on the right side in the figure. Is done.
【0005】機台の運転前に設定する基準シェーパステ
ップSSCは通常同図の斜線部における巻取り量を生産
糸長LBとして次式より算出される。 SSC=(Lt−C)/(LB/L) ここで、Cはチェイス長、Lは平均ダブルストローク糸
長でリングレールの1回昇降当たりの平均巻取り糸長で
あり次式から算出される。[0005] The reference shaper step SSC set before the operation of the machine base is normally calculated by the following equation using the winding amount in the hatched portion in the figure as the production yarn length LB. SSC = (Lt−C) / (LB / L) where C is the chase length, L is the average double stroke yarn length, and the average winding yarn length per one up and down movement of the ring rail, which is calculated by the following equation. .
【0006】 L=(3/2)・(π(DE+D)・C/2000P) ただし、DEは平均ボビン裸径、Dは管糸外径、Pは糸
ピッチである。糸ピッチPは糸ピッチ係数k及び番手N
eを用いて次式から算出される。L = (3/2) · (π (DE + D) · C / 2000P) where DE is the average bobbin bare diameter, D is the outer diameter of the tube yarn, and P is the yarn pitch. The yarn pitch P is the yarn pitch coefficient k and the yarn count N
It is calculated from the following equation using e.
【0007】P=k/(1.06√(Ne)) また、管糸外径Dは直接求めることができないため簡易
的にリングの直径Rを基準とした値とされ、一般にD=
R−3に設定される。また、管糸の下部は満管時の生産
糸長LBを多くするため増量巻きが行われて外側に膨ら
んだ形状に形成されている(例えば、特開平2−277
827号公報)。P = k / (1.06√ (Ne)) Further, since the outer diameter D of the thread cannot be obtained directly, it is simply set to a value based on the diameter R of the ring.
R-3 is set. In addition, the lower portion of the tube yarn is formed in a shape which is bulged outward by increasing winding in order to increase the production yarn length LB when the tube is full (for example, Japanese Unexamined Patent Publication No. 2-277).
No. 827).
【0008】[0008]
【発明が解決しようとする課題】ところが、平均ダブル
ストローク糸長Lを算出するときに管糸外径Dをリング
径Rを基準にして一般にD=R−3に簡易的に設定して
いるので、実際には必ずしもD=R−3とはならず、適
正な基準シェーパステップSSCが算出されない場合が
あった。その結果、管糸の実際の生産糸長及びリフト長
が、必ずしも共に設定どおりにならないという問題があ
った。また、前記のように増量巻きが行われた管糸で
は、実際の生産糸長は設定した生産糸長LBよりもΔL
B(ΔLB=(S1/S2)・LB、ただし(S1/S
2)は図5における面積比S1/S2)だけ多く糸が巻
かれており、実際の生産糸長と設定した生産糸長LBと
が一致しないという問題があった。However, when calculating the average double-stroke yarn length L, the outer diameter D of the yarn is generally simply set to D = R-3 based on the ring diameter R. Actually, D = R−3 is not always satisfied, and an appropriate reference shaper step SSC may not be calculated. As a result, there has been a problem that both the actual production yarn length and the lift length of the tube yarn are not always as set. In addition, in the case of the tube yarn that has been wound as described above, the actual production yarn length is ΔL longer than the set production yarn length LB.
B (ΔLB = (S1 / S2) · LB, where (S1 / S
In the case of 2), the yarn is wound more by the area ratio S1 / S2) in FIG. 5, and there is a problem that the actual production yarn length does not match the set production yarn length LB.
【0009】本発明は上記問題点を解決するためになさ
れたものであって、その目的は設定生産糸長だけ糸を巻
き取って管糸を形成した際に、管糸のリフト長を設定リ
フト長とほぼ等しくすることができる紡機における管糸
形成方法及び管糸形成装置を提供することにある。SUMMARY OF THE INVENTION The present invention has been made to solve the above problems, and an object of the present invention is to set a lift length of a tubing by setting a lift length of a tubing by winding a yarn by a set production yarn length. An object of the present invention is to provide a method and apparatus for forming a yarn in a spinning machine that can be made substantially equal in length.
【0010】[0010]
【課題を解決するための手段】上記問題点を解決するた
め、請求項1に記載の発明では、リングレールの昇降速
度とスピンドル回転数とが所定の比例関係となるように
駆動する紡機において、管糸形成開始前に、管糸に対し
て所望する生産糸長及びリフト長等をデータとして入力
装置を介して記憶装置に入力し、該記憶装置に記憶され
た前記のデータに基づいて演算手段により1チェイス当
たりのリングレールの昇降切換位置の変位量である基準
シェーパステップを算出し、算出した基準シェーパステ
ップに基づいて演算手段により管糸形成のシミュレーシ
ョンを行って生産糸長及びリフト長を算出し、算出した
生産糸長及びリフト長が所望する生産糸長及びリフト長
とほぼ一致するか否かを判定し、両者がほぼ一致しない
場合には基準シェーパステップを補正し、当該基準シェ
ーパステップに基づく管糸形成のシミュレーションによ
る生産糸長及びリフト長が所望する生産糸長及びリフト
長とほぼ一致することを確認した後に当該基準シェーパ
ステップに基づいてリングレールの昇降切換位置を制御
して管糸を形成するようにした。In order to solve the above problems, according to the first aspect of the present invention, there is provided a spinning machine driven such that the elevating speed of a ring rail and a spindle speed have a predetermined proportional relationship. Prior to the start of the formation of the tubing, the desired production yarn length and lift length for the tubing are input to the storage device via the input device as data, and arithmetic means is executed based on the data stored in the storage device. Calculates the reference shaper step which is the displacement amount of the ring rail up / down switching position per chase, and calculates the production yarn length and the lift length by performing a simulation of the formation of the tube yarn based on the calculated reference shaper step. Then, it is determined whether or not the calculated production yarn length and lift length substantially coincide with the desired production yarn length and lift length. After correcting the step length and confirming that the production yarn length and the lift length by the simulation of the yarn formation based on the reference shaper step substantially match the desired production yarn length and the desired lift length, the ring rail is determined based on the reference shaper step. Is controlled so as to form a tube thread.
【0011】請求項2に記載の発明では、リングレール
の昇降速度とスピンドル回転数とが所定の比例関係とな
るように駆動する精紡機において、所望する生産糸長及
びリフト長等のデータを入力する入力装置と、前記入力
装置により入力されたデータを記憶する第1の記憶装置
と、管糸形成のシミュレーションのプログラムデータ
と、該シミュレーションに基づく管糸の生産糸長及びリ
フト長が所望する生産糸長及びリフト長とほぼ一致する
ようにさせる1チェイス当たりのリングレールの昇降切
換位置の変位量である基準シェーパステップを算出する
ためのプログラムデータを記憶する第2の記憶装置と、
前記第1の記憶装置及び第2の記憶装置に記憶された生
産糸長及びリフト長等のデータ及びプログラムデータに
基づいて基準シェーパステップを算出する演算手段と、
前記基準シェーパステップに基づいてリングレールの昇
降切換を制御する制御装置とを備えた。According to the second aspect of the present invention, in a spinning machine driven such that the elevating speed of the ring rail and the spindle speed have a predetermined proportional relationship, data such as desired production yarn length and lift length are inputted. An input device, a first storage device for storing data input by the input device, program data for simulation of tube yarn formation, and production of a tube yarn based on the simulation. A second storage device for storing program data for calculating a reference shaper step which is a displacement amount of a lifting / lowering switching position of a ring rail per one chase to be substantially equal to a yarn length and a lift length;
Calculating means for calculating a reference shaper step based on data such as a production yarn length and a lift length and program data stored in the first storage device and the second storage device;
A control device for controlling switching of the ring rail up and down based on the reference shaper step.
【0012】[0012]
【作用】上記構成により請求項1に記載の発明によれ
ば、紡機はリングレールの昇降速度とスピンドル回転数
とが所定の比例関係となるように駆動される。まず管糸
形成開始前に、管糸に対して所望する生産糸長及びリフ
ト長等のデータが入力装置を介して記憶装置に入力され
る。演算手段はこの入力データに基づいて1チェイス当
たりのリングレールの昇降切換位置の変位量である基準
シェーパステップを算出する。演算手段は基準シェーパ
ステップに基づいて管糸形成のシミュレーションを行
い、このシミュレーションに基づく生産糸長及びリフト
長を算出し、算出した生産糸長及びリフト長が所望する
生産糸長及びリフト長とほぼ一致するか否かを判定し、
両者がほぼ一致しない場合には基準シェーパステップを
補正する。さらに、演算手段は当該基準シェーパステッ
プに基づく管糸形成のシミュレーションによる生産糸長
及びリフト長が所望する生産糸長及びリフト長とほぼ一
致することを確認する。その後、演算手段は当該基準シ
ェーパステップに基づいてリングレールの昇降切換位置
を制御して管糸を形成させる。従って、実際に形成され
る管糸の生産糸長及びリフト長は所望する生産糸長及び
リフト長とほぼ一致する。According to the first aspect of the present invention, the spinning machine is driven such that the vertical speed of the ring rail and the spindle speed have a predetermined proportional relationship. First, before starting the formation of the yarn, data such as a desired production yarn length and a lift length for the yarn is input to the storage device via the input device. The calculating means calculates a reference shaper step, which is a displacement amount of the up / down switching position of the ring rail per chase, based on the input data. The calculating means simulates the yarn formation based on the reference shaper step, calculates the production yarn length and the lift length based on the simulation, and the calculated production yarn length and the lift length are almost equal to the desired production yarn length and the lift length. Judge whether they match,
If they do not substantially match, the reference shaper step is corrected. Further, the calculating means confirms that the production yarn length and the lift length by the simulation of the yarn formation based on the reference shaper step substantially match the desired production yarn length and the desired lift length. Thereafter, the arithmetic means controls the up / down switching position of the ring rail based on the reference shaper step to form the thread. Therefore, the production yarn length and the lift length of the actually formed tubular yarn substantially match the desired production yarn length and the desired lift length.
【0013】請求項2に記載の発明によれば、紡機はリ
ングレールの昇降速度とスピンドル回転数とが所定の比
例関係となるように駆動される。入力装置は所望する生
産糸長及びリフト長等のデータを入力し、入力されたデ
ータは第1の記憶装置に記憶される。演算手段は第1の
記憶装置及び第2の記憶装置に記憶された生産糸長及び
リフト長等のデータ及びプログラムデータに基づいて基
準シェーパステップを算出する。そして、その基準シェ
ーパステップで管糸形成のシミュレーションを行い、シ
ミュレーション結果が所望の生産糸長及びリフト長とほ
ぼ一致するか否かを判断する。ミュレーション結果が所
望の生産糸長及びリフト長とほぼ一致したとき、制御装
置はその基準シェーパステップに基づいてリングレール
の昇降切換の位置を制御する。従って、実際に形成され
る管糸の生産糸長及びリフト長は所望する生産糸長及び
リフト長とほぼ一致する。According to the second aspect of the present invention, the spinning machine is driven such that the vertical speed of the ring rail and the spindle speed have a predetermined proportional relationship. The input device inputs desired data such as a production yarn length and a lift length, and the input data is stored in the first storage device. The calculation means calculates the reference shaper step based on the data such as the production yarn length and the lift length stored in the first storage device and the second storage device and the program data. Then, a simulation of the yarn formation is performed in the reference shaper step, and it is determined whether or not the simulation result substantially matches the desired production yarn length and the desired lift length. When the simulation result substantially coincides with the desired production yarn length and lift length, the control device controls the position of the up / down switching of the ring rail based on the reference shaper step. Therefore, the production yarn length and the lift length of the actually formed tubular yarn substantially match the desired production yarn length and the desired lift length.
【0014】[0014]
【実施例】以下、本発明を具体化した一実施例を図1〜
図4に基づいて説明する。精紡機の機台にはリングレー
ルを昇降動させる図4に示すようなリフティング装置が
配設されている。同図に示すように、精紡機の機台の左
右両側(片側のみ図示)にその長手方向に沿ってライン
シャフト1が回転自在に配設され、ラインシャフト1に
ねじ歯車2及びかさ歯車3が一体回転可能に所定間隔で
多数嵌着されている。一方、スピンドルレール(図示せ
ず)にはリングレール4を支持するポーカピラー5がス
ライドガイド(図示せず)を介して上下方向に摺動可能
に支承され、スライドガイドの下方にはナット体6がス
ピンドルレールに対して回転自在に支持されている。ナ
ット体6には前記ポーカピラー5の下部に形成されたス
クリュー部5aが螺入されるとともに、下端には前記ね
じ歯車2と噛合するねじ歯車7が嵌着固定されている。
又、ラペットアングル8を支持するポーカピラー9はス
ライドガイドを介して機台フレーム(いずれも図示せ
ず)に対して上下方向に摺動可能に支承されている。ポ
ーカピラー9は機台フレームに対して回転自在に支持さ
れるとともに、かさ歯車3と噛合するかさ歯車10を備
えたナット体11に対して下端スクリュー部9aが螺入
されている。DESCRIPTION OF THE PREFERRED EMBODIMENTS One embodiment of the present invention will now be described with reference to FIGS.
A description will be given based on FIG. A lifting device for raising and lowering the ring rail as shown in FIG. 4 is provided on the frame of the spinning machine. As shown in the figure, a line shaft 1 is rotatably disposed along the longitudinal direction on both left and right sides (only one side is shown) of a frame of a spinning machine. Many are fitted at predetermined intervals so as to be able to rotate together. On the other hand, a poker pillar 5 supporting a ring rail 4 is supported on a spindle rail (not shown) via a slide guide (not shown) so as to be vertically slidable, and a nut body 6 is provided below the slide guide. It is rotatably supported on the spindle rail. A screw portion 5a formed below the poker pillar 5 is screwed into the nut body 6, and a screw gear 7 meshing with the screw gear 2 is fitted and fixed to the lower end.
The poker pillar 9 supporting the lappet angle 8 is supported via a slide guide so as to be vertically slidable with respect to a machine frame (both not shown). The poker pillar 9 is rotatably supported by the machine frame, and a lower end screw portion 9a is screwed into a nut body 11 having a bevel gear 10 that meshes with the bevel gear 3.
【0015】ラインシャフト1にはフロントローラ12
の回転が歯車列13,14,15等を介して伝達され、
歯車列14に設けられた一対の電磁クラッチ16,17
の励消磁に対応してラインシャフト1が正逆回転駆動さ
れるようになっている。なお、このリフティング装置は
特開昭62−133129号公報に開示されたものと同
様な構成である。A front roller 12 is mounted on the line shaft 1.
Is transmitted via gear trains 13, 14, 15 and the like,
A pair of electromagnetic clutches 16 and 17 provided in the gear train 14
The line shaft 1 is driven to rotate forward and backward in accordance with the excitation and demagnetization. This lifting device has the same configuration as that disclosed in Japanese Patent Application Laid-Open No. 62-133129.
【0016】電磁クラッチ16,17による正逆回転の
切換が行われる中間軸18の端部には中間軸18の回転
数を検出するロータリエンコーダ19が取り付けられ、
ロータリエンコーダ19の検出信号は制御装置20に出
力されるようになっている。制御装置20はロータリエ
ンコーダ19からの検出信号に基づいてリングレール4
の位置を演算し、リングレール4が所定位置に到達する
と電磁クラッチ16,17に対して切換駆動信号を出力
するようになっている。電磁クラッチ16,17は切換
駆動信号に基づいて励消磁されるようになっている。制
御装置20には入力装置21が備えられ、管糸の生産糸
長LBやリフト長Lt等のデータが機台の運転前に入力
されるようになっている。A rotary encoder 19 for detecting the number of rotations of the intermediate shaft 18 is attached to an end of the intermediate shaft 18 at which switching between forward and reverse rotation by the electromagnetic clutches 16 and 17 is performed.
The detection signal of the rotary encoder 19 is output to the control device 20. The control device 20 controls the ring rail 4 based on the detection signal from the rotary encoder 19.
Is calculated, and when the ring rail 4 reaches a predetermined position, a switching drive signal is output to the electromagnetic clutches 16 and 17. The electromagnetic clutches 16 and 17 are demagnetized based on the switching drive signal. The control device 20 is provided with an input device 21 so that data such as the production yarn length LB and the lift length Lt of the pipe yarn are input before the operation of the machine base.
【0017】制御装置20にはマイクロコンピュータ2
2が内蔵されている。制御装置20はマイクロコンピュ
ータ22により設定された基準シェーパステップSSC
とロータリエンコーダ19からの検出信号に基づきリン
グレール4の昇降切換時期すなわち電磁クラッチ16,
17の励消磁の切換時期を演算し、切換駆動信号を出力
するようになっている。電磁クラッチ16,17は切換
駆動信号に基づいて制御装置20により駆動制御される
ようになっている。The control device 20 includes a microcomputer 2
2 are built-in. The control device 20 controls the reference shaper step SSC set by the microcomputer 22.
And switching timing of the ring rail 4 based on the detection signal from the rotary encoder 19, that is, the electromagnetic clutch 16,
The switching timing of the excitation and demagnetization is calculated and a switching drive signal is output. The drive of the electromagnetic clutches 16 and 17 is controlled by the control device 20 based on the switching drive signal.
【0018】図3に示すように、制御装置20を構成す
るマイクロコンピュータ22は演算手段としての中央処
理装置(以下CPUという)23と、第2の記憶装置と
してのプログラムメモリ24と、第1の記憶装置として
の作業用メモリ25とからなる。プログラムメモリ24
は制御プログラムを記憶した読出し専用メモリ(RO
M)からなり、作業用メモリ25は入力装置21により
入力された入力データ及びCPU23における演算処理
結果等を一時記憶する読出し及び書替え可能なメモリ
(RAM)からなっている。As shown in FIG. 3, a microcomputer 22 constituting the control device 20 includes a central processing unit (hereinafter referred to as a CPU) 23 as an arithmetic means, a program memory 24 as a second storage device, and a first memory device. It comprises a working memory 25 as a storage device. Program memory 24
Is a read-only memory (RO) storing a control program
M), and the working memory 25 is a readable and rewritable memory (RAM) for temporarily storing input data input by the input device 21 and results of arithmetic processing in the CPU 23.
【0019】CPU23はプログラムメモリ24に記憶
されたプログラムデータに基づいて動作するようになっ
ている。作業用メモリ25には入力装置21を介して生
産糸長LB、リフト長Lt、番手Ne、増量巻き係数d
0 、チェイス長C、平均ボビン裸径DE等が入力される
ようになっている。また、プログラムメモリ24にはフ
ロントローラ径Rf、フロントローラの回転数とリフテ
ィング速度から決まる機械定数K、糸ピッチを算出する
ための糸ピッチ係数k及び基準シェーパステップSSC
を算出するための算出ルーチン等がプログラムデータと
して記憶されている。The CPU 23 operates based on the program data stored in the program memory 24. In the working memory 25, the production yarn length LB, the lift length Lt, the count Ne, and the increased winding coefficient d are input via the input device 21.
0 , the chase length C, the average bobbin diameter DE, and the like are input. The program memory 24 has a front roller diameter Rf, a mechanical constant K determined from the number of rotations of the front roller and the lifting speed, a yarn pitch coefficient k for calculating the yarn pitch, and a reference shaper step SSC.
And the like are stored as program data.
【0020】CPU23はプログラムメモリ24及び作
業用メモリ25に記憶された各種データから基準シェー
パステップの初期値SSC0 を算出するようになってい
る。CPU23は基準シェーパステップSSCに基づい
て管糸形成のシミュレーションを行い、シミュレーショ
ンによる生産糸長LBX及びリフト長Ltがそれぞれの
設定値にほぼ一致するか否かを判定し、ほぼ一致しない
場合には基準シェーパステップSSCの値を逐次補正す
るようになっている。そして、CPU23はシミュレー
ションによる生産糸長LBX及びリフト長Ltと設定さ
れた生産糸長LB及びリフト長Ltとがほぼ一致するこ
とを確認すると、その基準シェーパステップSSCの値
を設定値とするようになっている。The CPU23 is adapted to calculate the initial value SSC 0 reference shaper step from various data stored in the program memory 24 and working memory 25. The CPU 23 simulates the yarn formation based on the reference shaper step SSC, determines whether or not the production yarn length LBX and the lift length Lt by simulation substantially match the respective set values. The value of the shaper step SSC is sequentially corrected. When the CPU 23 confirms that the production yarn length LBX and the lift length Lt obtained by the simulation substantially match the set production yarn length LB and the lift length Lt, the CPU 23 sets the value of the reference shaper step SSC to the set value. Has become.
【0021】CPU23は出力インターフェース26を
介してクラッチ切換駆動回路27と接続されている。C
PU23は設定された基準シェーパステップSSCとロ
ータリエンコーダ19からの検出信号に基づきリングレ
ール4の昇降切換時期すなわち電磁クラッチ16,17
の励消磁の切換時期を演算するようになっている。そし
て、その演算結果に基づいてCPU23は出力インター
フェース26を介して切換駆動信号をクラッチ切換駆動
回路27に出力するようになっている。クラッチ切換駆
動回路27は切換駆動信号に基づいて電磁クラッチ1
6,17の励消磁の切換を行うようになっている。The CPU 23 is connected to a clutch switching drive circuit 27 via an output interface 26. C
The PU 23 determines the timing of switching the ring rail 4 up and down, that is, the electromagnetic clutches 16 and 17 based on the set reference shaper step SSC and the detection signal from the rotary encoder 19.
Is calculated. Then, based on the calculation result, the CPU 23 outputs a switching drive signal to the clutch switching drive circuit 27 via the output interface 26. The clutch switching drive circuit 27 controls the electromagnetic clutch 1 based on the switching drive signal.
The switching of the excitation and demagnetization is performed at 6, 17.
【0022】また、CPU23は出力インターフェース
26を介してモータ駆動回路28と接続され、モータ駆
動回路28に対してモータ駆動信号を出力するようにな
っている。モータ駆動回路28はモータ駆動信号に基づ
いてモータ29を駆動制御するようになっている。モー
タ29の駆動力は図示しない歯車列を介して歯車列13
に一旦伝達され、歯車列13を介してフロントローラ1
2に伝達されるとともに歯車列13〜15を介してライ
ンシャフト1にそれぞれ伝達されるようになっている。
フロントローラ12とラインシャフト1は一定の回転速
度比で同期して回転するようになっている。The CPU 23 is connected to a motor drive circuit 28 via an output interface 26, and outputs a motor drive signal to the motor drive circuit 28. The motor drive circuit 28 drives and controls the motor 29 based on the motor drive signal. The driving force of the motor 29 is transmitted to the gear train 13 via a gear train (not shown).
To the front roller 1 via the gear train 13.
2 and transmitted to the line shaft 1 via the gear trains 13 to 15, respectively.
The front roller 12 and the line shaft 1 rotate synchronously at a constant rotation speed ratio.
【0023】次に、上記のように構成された管糸形成装
置による管糸形成方法について説明する。図2は管糸形
成過程におけるリングレール4の切換位置をチェイス回
数xに対して表したグラフである。同図においてF
U (x)はリフティング上端の関数であり、FD (x)
はリフティング下端の関数である。すなわち、糸は各チ
ェイス毎にそのチェイス回数に対応するFU (x)とF
D (x)との間をリングレールに案内されながら巻き取
られる。Next, a description will be given of a method of forming a yarn using the yarn forming apparatus configured as described above. FIG. 2 is a graph showing the switching position of the ring rail 4 in the process of forming the yarn with respect to the number of chase times x. In FIG.
U (x) is a function of the lifting upper end, and F D (x)
Is a function of the lifting bottom. In other words, the yarn has F U (x) and F corresponding to the number of chase for each chase.
It is wound up while being guided by the ring rail between D (x).
【0024】機台の運転に先立ってまず生産糸長LB
(以下、設定糸長LBという)、リフト長Lt、番手N
e、増量巻き係数d0 、チェイス長C、平均ボビン裸径
DE等の管糸形成のための設定条件が入力装置21を介
して制御装置20に入力される。入力データは作業用メ
モリ25に記憶される。制御装置20は入力データに基
づいて機台の運転前に管糸形成のシミュレーションを行
い、電磁クラッチ16,17の励消磁の切換時期を決め
る基準シェーパステップSSCを算出する。Prior to the operation of the machine stand, first, the production yarn length LB
(Hereinafter referred to as set thread length LB), lift length Lt, and count N
Setting conditions for forming the thread, such as e, the increased winding coefficient d 0 , the chase length C, and the average bobbin bare diameter DE, are input to the control device 20 via the input device 21. The input data is stored in the working memory 25. The control device 20 simulates the thread formation before the operation of the machine base on the basis of the input data, and calculates a reference shaper step SSC which determines the switching timing of the excitation and demagnetization of the electromagnetic clutches 16 and 17.
【0025】以下、図1のフローチャートに従って基準
シェーパステップSSCを算出するCPU23の処理動
作について説明する。まずステップ1(以下、ステップ
をSと記す)において、CPU23は作業用メモリ25
に記憶された設定糸長LB、リフト長Lt、番手Ne、
増量巻き係数d0 、チェイス長C、平均ボビン裸径DE
等のデータを作業メモリ25から読み出す。次に、S2
において、CPU23は読み出したチェイス長Cのデー
タから平均ダブルストローク糸長Lを算出する。平均ダ
ブルストローク糸長Lは次式より算出される。The processing operation of the CPU 23 for calculating the reference shaper step SSC will be described below with reference to the flowchart of FIG. First, in step 1 (hereinafter, step is referred to as S), the CPU 23
The set thread length LB, lift length Lt, count Ne,
Increased winding coefficient d 0 , chase length C, average bobbin bare diameter DE
Is read out from the working memory 25. Next, S2
, The CPU 23 calculates the average double-stroke yarn length L from the read data of the chase length C. The average double stroke yarn length L is calculated by the following equation.
【0026】 L=(3/2)・(π(DE+D)・C/2000P) ここで、DEは平均ボビン裸径、Dは管糸外径、Pは糸
ピッチである。糸ピッチPは糸ピッチ係数k及び番手N
eを用いてP=k/(1.06√(Ne))で表され
る。また、管糸外径Dは簡易的にリングの直径Rを基準
としてD=R−3に設定されている。L = (3/2) · (π (DE + D) · C / 2000P) Here, DE is an average bobbin bare diameter, D is a tube thread outer diameter, and P is a thread pitch. The yarn pitch P is the yarn pitch coefficient k and the yarn count N
It is expressed by P = k / (1.06√ (Ne)) using e. Further, the outer diameter D of the thread is simply set to D = R−3 based on the diameter R of the ring.
【0027】S3において、CPU23は基準シェーパ
ステップSSCの初期値SSC0 を算出する。この初期
値SSC0 は次式より算出される。 SSC0 =(Lt−d0 )/(LB/L) すなわち、SSC0 は図2におけるリフティング上端の
関数FU (x)の管糸形成過程における変位量(Lt−
d0 )をチェイス数の概算値(LB/L)で割ることに
より求められる。[0027] In S3, CPU 23 calculates the initial value SSC 0 reference shaper step SSC. This initial value SSC 0 is calculated by the following equation. SSC 0 = (Lt−d 0 ) / (LB / L) That is, SSC 0 is the displacement amount (Lt−d) of the function F U (x) at the upper end of the lifting in FIG.
d 0 ) by the approximate value of the number of chase (LB / L).
【0028】S4において、CPU23は増量巻き区間
(0≦x≦C/SSC)におけるチェイス長C(x)す
なわち増量巻き区間におけるリングレール4の昇降スト
ロークを算出する。ここで、増量巻き区間におけるリフ
ティング上端の関数FU (x)及びリフティング下端の
関数FD (x)はそれぞれ、 FU (x)=SSC・x+C−d0 FD (x)=(SSC/C)2 ・(C−d0 )x2 と表される。CPU23はチェイス量C(x)を次式よ
り算出する。In S4, the CPU 23 calculates the chase length C (x) in the incremental winding section (0 ≦ x ≦ C / SSC), that is, the vertical stroke of the ring rail 4 in the incremental winding section. Here, the function F U (x) at the upper end of the lifting and the function F D (x) at the lower end of the lifting in the increased winding section are respectively: F U (x) = SSC · x + C−d 0 F D (x) = (SSC / C) 2 · (C-d 0 ) × 2 . The CPU 23 calculates the chase amount C (x) from the following equation.
【0029】 C(x)=FU (x)−FD (x) =−(SSC/C)2 ・(C−d0 )x2 +SSC・x+C−d0 S5において、CPU23は増量巻き区間(0≦x≦C
/SSC)におけるダブルストローク糸長L(x)を算
出する。ダブルストローク糸長L(x)は次式より算出
される。C (x) = F U (x) −F D (x) = − (SSC / C) 2 · (C−d 0 ) × 2 + SSC · x + C−d 0 In S5, the CPU 23 performs the increase winding section. (0 ≦ x ≦ C
/ SSC) to calculate the double stroke yarn length L (x). The double stroke yarn length L (x) is calculated by the following equation.
【0030】L(x)=(Rf/K)・C(x) ここで、Rfはフロントローラ径、Kは機械定数でフロ
ントローラの回転数とリフティング速度から決まる定数
である。L (x) = (Rf / K) · C (x) where Rf is the diameter of the front roller, and K is a mechanical constant, which is a constant determined by the rotation speed of the front roller and the lifting speed.
【0031】次にS6において、CPU23は増量巻き
区間(0≦x≦C/SSC)で巻き取られる糸長LB1
を算出する。糸長LB1は次式より算出される。Next, in S6, the CPU 23 determines the yarn length LB1 to be wound in the increased winding section (0 ≦ x ≦ C / SSC).
Is calculated. The yarn length LB1 is calculated by the following equation.
【0032】[0032]
【数1】 S7において、CPU23は通常巻き区間(C/SSC
<x≦xn )で巻き取られる糸長LB2を算出する。糸
長LB2は次式より算出される。(Equation 1) In S7, the CPU 23 sets the normal winding section (C / SSC
<X ≦ x n ) to calculate the yarn length LB2 to be wound. The yarn length LB2 is calculated by the following equation.
【0033】 LB2=L・{Lt−(2C−d0 )}/SSC S8において、CPU23は満管時の全糸長LBXを次
式より算出する。 LBX=LB1+LB2 S9において、CPU23はシミュレーションから求ま
った糸長LBXが作業用メモリ25から読み出した設定
糸長LBに許容値±δ内でほぼ等しいか否かを判断す
る。すなわち、糸長LBXと設定糸長LBの差の絶対値
|LBX−LB|が許容範囲δより小さいか否かが判断
される。LB2 = L · {Lt− (2C−d 0 )} / SSC In S8, the CPU 23 calculates the total yarn length LBX when the tube is full by the following equation. LBX = LB1 + LB2 In S9, the CPU 23 determines whether or not the thread length LBX obtained from the simulation is substantially equal to the set thread length LB read from the working memory 25 within an allowable value ± δ. That is, it is determined whether or not the absolute value | LBX−LB | of the difference between the yarn length LBX and the set yarn length LB is smaller than the allowable range δ.
【0034】S9において|LBX−LB|値がδより
小さい場合には、CPU23はS11に移行し、その時
点でのSSC値を実際に使用される基準シェーパステッ
プとして設定する。そして、CPU23はこのルーチン
の処理動作を終了する。ここで、設定された基準シェー
パステップSSC値は、実際に形成される管糸の生産糸
長LBX及びリフト長Ltが設定された生産糸長LB及
びリフト長Ltとほぼ一致することが管糸形成のシミュ
レーションにより予め確認された値となっている。If the | LBX-LB | value is smaller than δ in S9, the CPU 23 proceeds to S11 and sets the SSC value at that time as the reference shaper step actually used. Then, the CPU 23 ends the processing operation of this routine. Here, it is determined that the set reference shaper step SSC value substantially matches the production yarn length LB and the lift length Lt in which the production yarn length LBX and the lift length Lt of the actually formed yarn are set. Is a value confirmed in advance by the simulation.
【0035】一方、|LBX−LB|値がδより大きい
場合には、S10においてCPU23は基準シェーパス
テップSSCに(LBX/LB)を掛けた値(LBX/
LB)・SSCを新たな基準シェーパステップSSCと
して設定し、S10からS4へ移行する。その後、CP
U23はS9において|LBX−LB|値がδより小さ
くなるまでS4〜S10までの処理動作を繰り返し行
う。そして、|LBX−LB|値がδより小さくなった
時点でS11に移行する。On the other hand, if the value | LBX-LB | is greater than δ, the CPU 23 multiplies the reference shaper step SSC by (LBX / LB) (LBX / LB) in S10.
LB) · SSC is set as a new reference shaper step SSC, and the process shifts from S10 to S4. After that, CP
U23 repeats the processing operations from S4 to S10 until the | LBX-LB | value becomes smaller than δ in S9. Then, when the | LBX−LB | value becomes smaller than δ, the process shifts to S11.
【0036】その後、CPU23は出力インターフェイ
ス26を介してモータ駆動回路28にモータ駆動信号を
出力し、モータ駆動回路28はモータ駆動信号に基づい
てモータ29の駆動を開始させる。モータ29の駆動力
は図示しない歯車列を介して歯車列13に一旦伝達さ
れ、歯車列13を介してフロントローラ12に伝達され
るとともに歯車列13〜15を介してラインシャフト1
にそれぞれ伝達される。その結果、フロントローラ12
とラインシャフト1は一定の回転速度比で同期して回転
する。Thereafter, the CPU 23 outputs a motor drive signal to the motor drive circuit 28 via the output interface 26, and the motor drive circuit 28 starts driving the motor 29 based on the motor drive signal. The driving force of the motor 29 is transmitted once to the gear train 13 via a gear train (not shown), transmitted to the front roller 12 via the gear train 13, and transmitted to the line shaft 1 via the gear trains 13 to 15.
Respectively. As a result, the front roller 12
And the line shaft 1 rotate synchronously at a constant rotation speed ratio.
【0037】CPU23は設定された基準シェーパステ
ップSSCとロータリエンコーダ19からの検出信号に
基づいて切換駆動信号を出力する時期を演算する。その
演算結果に基づいてCPU23は切換駆動信号をクラッ
チ切換駆動回路27に出力する。この切換駆動信号に基
づいて電磁クラッチ16,17はクラッチ切換駆動回路
27により励消磁される。電磁クラッチ16が励磁され
るとともに電磁クラッチ17が消磁された状態ではライ
ンシャフト1が正転駆動され、反対に電磁クラッチ16
が消磁されるとともに電磁クラッチ17が励磁された状
態ではラインシャフト1が逆転駆動される。こうしてラ
インシャフト1は正逆回転する。The CPU 23 calculates the timing for outputting the switching drive signal based on the set reference shaper step SSC and the detection signal from the rotary encoder 19. Based on the calculation result, the CPU 23 outputs a switching drive signal to the clutch switching drive circuit 27. The electromagnetic clutches 16 and 17 are demagnetized by the clutch switching drive circuit 27 based on the switching drive signal. When the electromagnetic clutch 16 is excited and the electromagnetic clutch 17 is demagnetized, the line shaft 1 is driven to rotate forward, and conversely, the electromagnetic clutch 16
Is demagnetized and the line shaft 1 is driven in reverse when the electromagnetic clutch 17 is excited. Thus, the line shaft 1 rotates forward and backward.
【0038】そして、ラインシャフト1の正逆回転に対
応してねじ歯車2,7を介してナット体6が、かさ歯車
3,10を介してナット体11が正逆回転駆動される。
ナット体6,11の正逆回転駆動力はナット体6,11
が螺入されたスクリュー部5a,9aを介してリングレ
ール4及びラペットアングル8に伝達され、リングレー
ル4及びラペットアングル8は同期して昇降動される。The nut body 6 is driven via the screw gears 2 and 7 and the nut body 11 is driven via the bevel gears 3 and 10 in accordance with the forward / reverse rotation of the line shaft 1.
The forward and reverse rotation driving force of the nut bodies 6, 11 is
Is transmitted to the ring rail 4 and the wrappet angle 8 via the screwed portions 5a and 9a into which the ring rail 4 and the lappet angle 8 are moved synchronously.
【0039】以上詳述したように本実施例の精紡機にお
ける管糸形成方法及び管糸形成装置によれば、機台の運
転前に管糸形成のシミュレーションを行い、実際の生産
糸長LBX及びリフト長Ltが設定された生産糸長LB
及びリフト長Ltにほぼ一致することを予め確認するこ
とができる。その結果、シミュレーションから求めた基
準シェーパステップSSCに基づいて実際に管糸を形成
することにより、形成された管糸の満管時における生産
糸長LB及びリフト長Ltをほぼ設定値どおりとするこ
とができる。さらに、本実施例のような増量巻きの管糸
において、管糸形成のシミュレーションから求まる生産
糸長LBXは増量巻き分も考慮された値なので、実際の
生産糸長LBXと設定された生産糸長LBとを確実にほ
ぼ一致させることができる。また、生産糸長LB、リフ
ト長Lt及び糸の番手Ne等の各条件が変更されても、
予めシミュレーションにより設定どおりになることが確
認されるので、いつも設定どおりの糸長及び形状等を有
する均質な管糸を提供することができる。As described in detail above, according to the method and apparatus for forming the yarn in the spinning machine of this embodiment, the simulation of the yarn formation is performed before the operation of the machine stand, and the actual production yarn length LBX and Production yarn length LB with lift length Lt set
And it can be confirmed in advance that they substantially coincide with the lift length Lt. As a result, by actually forming the yarn based on the reference shaper step SSC obtained from the simulation, the production yarn length LB and the lift length Lt when the formed yarn is full are almost as set. Can be. Further, in the case of the increased winding yarn such as in the present embodiment, the production yarn length LBX obtained from the simulation of the formation of the yarn is a value in which the increased winding length is also taken into consideration, and thus the actual production yarn length LBX and the set production yarn length are set. LB can be surely substantially matched. Further, even if the conditions such as the production yarn length LB, the lift length Lt, and the yarn count Ne are changed,
Since it is confirmed in advance by simulation that the setting is the same as the setting, it is possible to always provide a uniform yarn having the set yarn length and shape as set.
【0040】尚、本発明は上記実施例に限定されるもの
ではなく、発明の趣旨を逸脱しない範囲で例えば次のよ
うに構成することもできる。 (1)上記実施例では、S7で通常巻き区間の糸長LB
2の算出を計算式から一度に算出したが、チェイス毎に
逐次加算してゆくループにより通常巻き区間の糸長LB
2を算出してもよい。It should be noted that the present invention is not limited to the above-described embodiment, and may be configured as follows without departing from the spirit of the invention. (1) In the above embodiment, the yarn length LB of the normal winding section is determined in S7.
2 was calculated at once from the calculation formula, but the loop length LB of the normal winding section was calculated by a loop that is sequentially added for each chase.
2 may be calculated.
【0041】(2)フロントローラ12とラインシャフ
ト1を速度制御可能な別々のモータにより駆動させても
よい。この場合、フロントローラ12とラインシャフト
1との回転速度比は各モータの速度制御により一定とす
ることができる。(2) The front roller 12 and the line shaft 1 may be driven by separate motors whose speed can be controlled. In this case, the rotation speed ratio between the front roller 12 and the line shaft 1 can be made constant by controlling the speed of each motor.
【0042】(3)上記実施例では、本発明を管糸の下
部形状が膨らんだ増量巻きの管糸に適用したが、管糸の
下部形状が平坦な通常の管糸に本発明を適用してもよ
い。 (4)ラインシャフト1の正逆転駆動手段として一対の
電磁クラッチ16,17を用いる代わりに正逆転可能な
可変速リフティングモータを用いてもよい。(3) In the above embodiment, the present invention is applied to an increased-winding tubing in which the lower portion of the tubing is expanded, but the present invention is applied to a normal tubing having a flat lower portion of the tubing. You may. (4) Instead of using the pair of electromagnetic clutches 16 and 17 as the forward / reverse driving means for the line shaft 1, a variable speed lifting motor capable of forward / reverse rotation may be used.
【0043】[0043]
【発明の効果】以上詳述したように本発明によれば、設
定生産糸長だけ糸を巻き取って管糸を形成した際に、管
糸のリフト長を設定リフト長とほぼ等しくすることがで
きるという優れた効果を奏する。As described above in detail, according to the present invention, when the yarn is wound by the set production yarn length to form the yarn, the lift length of the yarn can be made substantially equal to the set lift length. It has an excellent effect that it can be done.
【図1】本発明を具体化した一実施例における基準シェ
ーパステップ及び生産糸長を算出するフローチャートで
ある。FIG. 1 is a flowchart for calculating a reference shaper step and a production yarn length according to an embodiment of the present invention.
【図2】一実施例において管糸形成過程におけるチェイ
ス回数とリングレール高さとの関係を示すグラフであ
る。FIG. 2 is a graph showing the relationship between the number of chase and the height of a ring rail in a tube thread forming process in one embodiment.
【図3】一実施例において管糸形成装置の電気的構成を
示すブロック図である。FIG. 3 is a block diagram showing an electrical configuration of the tube thread forming device in one embodiment.
【図4】一実施例におけるリフティング装置の概略斜視
図である。FIG. 4 is a schematic perspective view of a lifting device according to one embodiment.
【図5】従来技術において管糸形成過程におけるチェイ
ス回数とリングレール高さとの関係を示すグラフであ
る。FIG. 5 is a graph showing the relationship between the number of chase and the height of a ring rail in a tube thread forming process in the prior art.
4…リングレール、20…制御装置、21…入力装置、
23…演算手段としてのCPU、24…第2の記憶装置
としてプログラムメモリ、25…第1の記憶装置として
作業用メモリ、LB…生産糸長、Lt…リフト長、SS
C…基準シェーパステップ。4 ... Ring rail, 20 ... Control device, 21 ... Input device,
23: CPU as arithmetic means, 24: program memory as second storage device, 25: working memory as first storage device, LB: production thread length, Lt: lift length, SS
C: Reference shaper step.
───────────────────────────────────────────────────── フロントページの続き (56)参考文献 特開 昭63−190030(JP,A) 特開 平2−277827(JP,A) (58)調査した分野(Int.Cl.7,DB名) D01H 1/36 ──────────────────────────────────────────────────続 き Continuation of front page (56) References JP-A-63-190030 (JP, A) JP-A-2-277827 (JP, A) (58) Fields investigated (Int. Cl. 7 , DB name) D01H 1/36
Claims (2)
転数とが所定の比例関係となるように駆動する紡機にお
いて、 管糸形成開始前に、管糸に対して所望する生産糸長及び
リフト長等をデータとして入力装置を介して記憶装置に
入力し、該記憶装置に記憶された前記のデータに基づい
て演算手段により1チェイス当たりのリングレールの昇
降切換位置の変位量である基準シェーパステップを算出
し、算出した基準シェーパステップに基づいて演算手段
により管糸形成のシミュレーションを行って生産糸長及
びリフト長を算出し、算出した生産糸長及びリフト長が
所望する生産糸長及びリフト長とほぼ一致するか否かを
判定し、両者がほぼ一致しない場合には基準シェーパス
テップを補正し、当該基準シェーパステップに基づく管
糸形成のシミュレーションによる生産糸長及びリフト長
が所望する生産糸長及びリフト長とほぼ一致することを
確認した後に当該基準シェーパステップに基づいてリン
グレールの昇降切換位置を制御して管糸を形成する紡機
における管糸形成方法。1. A spinning machine driven such that the elevating / lowering speed of a ring rail and the spindle speed are in a predetermined proportional relationship, wherein a desired production yarn length, a lift length, etc., for the yarn before starting the yarn formation. Is input as data to a storage device via an input device, and a calculation unit calculates a reference shaper step, which is a displacement amount of a ring rail elevation switching position per chase, based on the data stored in the storage device. Then, the production yarn length and the lift length are calculated by performing a simulation of the yarn formation by the calculating means based on the calculated reference shaper step, and the calculated production yarn length and the lift length are almost equal to the desired production yarn length and the lift length. It is determined whether or not they match, and if they do not substantially match, the reference shaper step is corrected, and the yarn forming thread based on the reference shaper step is adjusted. After confirming that the production yarn length and the lift length by the simulation substantially match the desired production yarn length and the lift length, in the spinning machine that forms the yarn by controlling the up / down switching position of the ring rail based on the reference shaper step. Tube thread forming method.
転数とが所定の比例関係となるように駆動する紡機にお
いて、 所望する生産糸長及びリフト長等のデータを入力する入
力装置と、 前記入力装置により入力されたデータを記憶する第1の
記憶装置と、 管糸形成のシミュレーションのプログラムデータと、該
シミュレーションに基づく管糸の生産糸長及びリフト長
が所望する生産糸長及びリフト長とほぼ一致するように
させる1チェイス当たりのリングレールの昇降切換位置
の変位量である基準シェーパステップを算出するための
プログラムデータを記憶する第2の記憶装置と、 前記第1の記憶装置及び第2の記憶装置に記憶された生
産糸長及びリフト長等のデータ及びプログラムデータに
基づいて基準シェーパステップを算出する演算手段と、 前記基準シェーパステップに基づいてリングレールの昇
降切換の位置を制御する制御装置とを備えた紡機におけ
る管糸形成装置。2. An input device for inputting data such as a desired production yarn length and a lift length in a spinning machine driven such that a lifting speed of a ring rail and a spindle rotation speed have a predetermined proportional relationship. A first storage device for storing the data input by the computer; a program data for the simulation of the formation of the yarn; and a production yarn length and a lift length of the yarn based on the simulation substantially coincide with the desired production yarn length and the lift length. A second storage device for storing program data for calculating a reference shaper step which is a displacement amount of a lifting / lowering switching position of a ring rail per chase to be performed, and the first storage device and the second storage Calculation for calculating the reference shaper step based on the data such as the production yarn length and lift length and the program data stored in the device Stage and, cop forming apparatus for a spinning machine having a control device for controlling the position of the elevating switching ring rail based on the reference shaper step.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP05077149A JP3097381B2 (en) | 1993-04-02 | 1993-04-02 | Method and apparatus for forming yarn in spinning machine |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP05077149A JP3097381B2 (en) | 1993-04-02 | 1993-04-02 | Method and apparatus for forming yarn in spinning machine |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH06287820A JPH06287820A (en) | 1994-10-11 |
| JP3097381B2 true JP3097381B2 (en) | 2000-10-10 |
Family
ID=13625741
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP05077149A Expired - Fee Related JP3097381B2 (en) | 1993-04-02 | 1993-04-02 | Method and apparatus for forming yarn in spinning machine |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3097381B2 (en) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US6634590B1 (en) * | 2000-10-20 | 2003-10-21 | Ppg Industries Ohio, Inc. | Filling wind for bobbin twisting |
| JP4635958B2 (en) * | 2006-05-12 | 2011-02-23 | 株式会社豊田自動織機 | Pipe yarn forming method in spinning machine |
| CN111560671B (en) * | 2020-05-20 | 2021-05-07 | 新昌县恒佳纺织机械厂 | A lift-type high-speed yarn doubling process |
-
1993
- 1993-04-02 JP JP05077149A patent/JP3097381B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JPH06287820A (en) | 1994-10-11 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP3097381B2 (en) | Method and apparatus for forming yarn in spinning machine | |
| EP1602756B1 (en) | Method and apparatus for manufacturing special yarn | |
| JP3134604B2 (en) | Method and apparatus for forming yarn in spinning machine | |
| JP4013325B2 (en) | Spinning tube forming method | |
| JP3775061B2 (en) | Spinning ring rail lifting control device | |
| JP4635958B2 (en) | Pipe yarn forming method in spinning machine | |
| JP2712526B2 (en) | Method of forming yarn for spinning machine | |
| JP2008274460A (en) | Method for winding roving yarns in roving frame | |
| JP2000303270A (en) | Spinning machine winding operation control device | |
| JP3028005B2 (en) | Switching method of bobbin rails for roving machines | |
| JPH06313228A (en) | Method for winding roving of flyer frame | |
| JP3019576B2 (en) | Switching method of bobbin rails for roving machines | |
| JPH0745572Y2 (en) | Ring rail lifting control device for spinning machine | |
| JP3480125B2 (en) | Spinning machine operation method and drive control device | |
| JP2745651B2 (en) | Roving machine for roving machine | |
| JP2929759B2 (en) | Method of constant length winding and stopping at appropriate position of roving winding in roving machine | |
| JPH09195129A (en) | Prevention of deforming of formed roving bobbin in roving frame and apparatus therefor | |
| JP3480134B2 (en) | Method and apparatus for controlling drive of motor during reversal of ring rail of spinning machine | |
| JP3139147B2 (en) | Bobbin rail lift control method for roving machine | |
| JP3149617B2 (en) | Operation method at the beginning of winding in a roving machine | |
| JP2884821B2 (en) | Roof winding control method in roving machine | |
| JPS62206034A (en) | Lifting of spinning frame and apparatus therefor | |
| JPH0813261A (en) | Method for stopping full bobbin in roving frame | |
| JP3021765B2 (en) | Prevention method of rubbing ball in ring spinning machine | |
| JP2010281020A (en) | Method for forming pirn in spinning machine |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| LAPS | Cancellation because of no payment of annual fees |