JP3099017B2 - Joint method and joint structure of steel beam - Google Patents
Joint method and joint structure of steel beamInfo
- Publication number
- JP3099017B2 JP3099017B2 JP04273385A JP27338592A JP3099017B2 JP 3099017 B2 JP3099017 B2 JP 3099017B2 JP 04273385 A JP04273385 A JP 04273385A JP 27338592 A JP27338592 A JP 27338592A JP 3099017 B2 JP3099017 B2 JP 3099017B2
- Authority
- JP
- Japan
- Prior art keywords
- dovetail
- steel
- connecting arm
- joint
- steel beam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims description 30
- 239000010959 steel Substances 0.000 title claims description 30
- 238000000034 method Methods 0.000 title claims description 5
- 101100008050 Caenorhabditis elegans cut-6 gene Proteins 0.000 description 3
- 238000010276 construction Methods 0.000 description 2
- 238000004904 shortening Methods 0.000 description 2
- 239000000758 substrate Substances 0.000 description 1
Landscapes
- Joining Of Building Structures In Genera (AREA)
Description
【0001】[0001]
【産業上の利用分野】この発明は、鉄骨構造または鉄筋
鉄骨構造等の建築物に使用される鉄骨梁を鉄骨柱に取付
ける場合の継手工法および継手構造に関するものであ
る。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a joint method and a joint structure for attaching a steel beam used in a building such as a steel structure or a reinforced steel structure to a steel column.
【0002】[0002]
【従来の技術】従来、鉄骨梁と鉄骨柱を連結するには、
図3に示すように鉄骨柱21の連結腕22の端部とこれ
に取付ける梁23のフランジ24およびウエブ25に多
数のボルト孔26をあけて置き、鉄骨建方時に接合部分
のフランジ24の上下面およびウエブ25の両側面に添
板27を当てて多数の高力ボルト28で締付けを行って
いた。2. Description of the Related Art Conventionally, to connect a steel beam and a steel column,
As shown in FIG. 3, a large number of bolt holes 26 are formed in the end of the connecting arm 22 of the steel column 21 and the flange 24 and the web 25 of the beam 23 to be attached thereto, and the upper part of the flange 24 at the joint is formed when the steel frame is constructed. The attachment plate 27 is applied to the lower surface and both side surfaces of the web 25 and tightened with a number of high-strength bolts 28.
【0003】[0003]
【発明が解決しようとする課題】前記従来の鉄骨梁の端
部にはボルト用の多数の孔を予めあけて置くので、その
ための加工を必要とし手間がかかり、建方時に行う高力
ホルト締めは1次、2次の2段階の締付けを行う必要が
あり高力ボルトの数が多いのでその作業に長時間を費や
し、雨天の時は高力ボルトの締付け作業が行えない等、
工期の短縮上好ましくない欠点があった。Since a large number of holes for bolts are previously formed in the end of the conventional steel beam, processing for the bolt is required and it is troublesome. It is necessary to perform two-stage primary and secondary tightening, and the number of high-strength bolts is large, so it takes a long time to perform the work. In the case of rainy weather, high-strength bolts cannot be tightened.
There was an unfavorable disadvantage in shortening the construction period.
【0004】この発明はこれらの欠点を解消し、鉄骨梁
の接合作業をきわめて簡単な操作で短時間に行うことが
できる継手工法および継手構造を得ることを課題とする
ものである。[0004] It is an object of the present invention to solve these drawbacks and to obtain a joint method and a joint structure capable of performing a joining operation of a steel beam in an extremely simple operation in a short time.
【0005】[0005]
【課題を解決するための手段】前記の課題を解決するた
めにこの発明は、H形鋼からなる連結腕と、これに連結
するH形鋼からなる大梁の各上下のフランジに突設した
蟻ほぞに、それぞれ蟻溝を有する添板を横方向から滑入
させた後、ウエブに固着した固定板をボルト締めするよ
うにした鉄骨梁の継手工法、およびH形鋼からなる連結
腕とH形鋼からなる大梁の各上下のフランジに突設した
蟻ほぞに、蟻溝を設けた添板を滑入させ、連結腕と大梁
の各ウエブに固着された固定板をボルト締めした鉄骨梁
の継手構造からなる手段を講じるものである。SUMMARY OF THE INVENTION In order to solve the above-mentioned problems, the present invention provides a connecting arm made of an H-shaped steel and a dovetail projecting from each of upper and lower flanges of a large beam made of an H-shaped steel to be connected thereto. A steel plate beam joint method in which a dovetail plate each having a dovetail groove is slid into the tenon from the lateral direction and then a fixing plate fixed to the web is bolted, and a connecting arm made of H-section steel and an H-shaped section A steel beam joint in which a dovetail plate provided with a dovetail groove is slid into dove mortise protruding from the upper and lower flanges of a steel girder, and a fixing plate fixed to the web of the connecting arm and the girder is bolted. It is to take measures consisting of a structure.
【0006】[0006]
【実施例】この発明の実施例について図面を参照して説
明する。図1において、1は柱2に取付けられた梁連結
用のH形鋼からなる連結腕であり、連結腕1の右端部は
そのやや内側の上下のフランジ3、3にフランジ3の幅
一杯に幅方向の上下の蟻ほぞ4、4が設けられ、上下の
フランジ3、3でその取付位置を異ならせてある。連結
腕1のウエブ5の右端はウエブ5の高さの1/2の位置
から垂直の切込み6が設けられ、その前方の下半部は突
出部7となっている。An embodiment of the present invention will be described with reference to the drawings. In FIG. 1, reference numeral 1 denotes a connecting arm made of an H-shaped steel for beam connection attached to a column 2, and the right end of the connecting arm 1 is provided on the upper and lower flanges 3, 3 slightly inside thereof so as to fill the width of the flange 3. Upper and lower dovetails 4 and 4 in the width direction are provided, and their mounting positions are different between the upper and lower flanges 3 and 3. A vertical cut 6 is provided at the right end of the web 5 of the connecting arm 1 from a position 1 / of the height of the web 5, and a lower half portion in front of the cut 6 is a projection 7.
【0007】これに連結されるH形鋼からなる大梁8の
左端部は連結腕1と対称形をなしている。すなわち、上
下のフランジ3、3には左端部のやや内側に上下の位置
を異ならせて連結腕1と同様に蟻ほぞ4、4が設けられ
連結腕1の切込み6に対応してウエブ5に垂直な切込み
6が設けられ、左方の上半部は突出部7となっている。
連結腕1と大梁8のウエブ5における各切込み6、6の
前方の突出部7、7にはウエブ5、5の両側に取付け用
のボルト9のボルト孔10があけられた固定板11が固
着されている。また、これらとは別に連結腕1と大梁8
の端部を接合した時の蟻ほぞ4、4の位置に、両側の蟻
ほぞ4、4に嵌合する蟻溝12、12を設けた上下の添
板13、13が用意される。[0007] The left end of the girder 8 made of H-section steel connected thereto is symmetrical with the connecting arm 1. In other words, the upper and lower flanges 3 and 3 are provided with dovetail mortises 4 and 4 slightly different from the upper and lower positions on the left end, similarly to the connecting arm 1, and are provided on the web 5 corresponding to the cuts 6 of the connecting arm 1. A vertical cut 6 is provided, and the upper half on the left side is a projection 7.
A fixing plate 11 having bolt holes 10 for mounting bolts 9 on both sides of the webs 5 and 5 is fixed to the projections 7 and 7 in front of the cuts 6 and 6 in the web 5 of the connecting arm 1 and the girder 8. Have been. In addition, separately from these, the connecting arm 1 and the girder 8
At the positions of the dovetails 4 when the ends of the dovetails are joined, upper and lower attachment plates 13 and 13 having dovetail grooves 12 and 12 fitted to the dovetails 4 and 4 on both sides are prepared.
【0008】柱2の連結腕1と大梁8とを連結するに
は、連結腕1のフランジ3と大梁8のフランジ3とが水
平方向に、ウエブ5、5が垂直方向に一致するように大
梁8をクレーン等によって近接させた後、上下のフラン
ジ3、3の蟻ほぞ4、4に上下の添板13、13の蟻溝
12、12を横方向から水平に滑り込ませ、上下の固定
板11、11のボルト孔10にボルト9をねじ込んで連
結腕1と大梁8のウエブ5、5が一直線状を保つことに
より添板13の蟻溝12がフランジ3の蟻ほぞ4から外
れることがないように固定するものである。In order to connect the connecting arm 1 of the column 2 to the girder 8, the girder such that the flange 3 of the connecting arm 1 and the flange 3 of the girder 8 are aligned horizontally and the webs 5, 5 are aligned vertically. 8 are brought close by a crane or the like, and the dovetail grooves 12, 12 of the upper and lower attachment plates 13, 13 are horizontally slid into the dove mortises 4, 4 of the upper and lower flanges 3, 3 from the lateral direction. , 11 are screwed into the bolt holes 10 to keep the connecting arms 1 and the webs 5, 5 of the girders 8 straight, so that the dovetail grooves 12 of the attachment plate 13 do not come off from the dovetails 4 of the flange 3. It is fixed to.
【0009】[0009]
【発明の効果】請求項1の発明は、鉄骨建方時に鉄骨の
フランジに設けた蟻ほぞに添板を滑入させるという、き
わめて短時間の作業で鉄骨梁の接合作業の大部分を終わ
らせることができ、後は数本のボルトで固定板を固定す
るだけであるので、接合作業の操作がきわめて簡単であ
り、したがって雨天時でも作業が可能で、かつ作業を短
時間に行うことができ工期の短縮に頗る有効である。請
求項2の発明は、鉄骨のフランジに蟻ほぞを設け、これ
に蟻溝を有する添板を滑入させるという簡単な構造によ
って連結腕と大梁の強固な結合が得られ、固定板でウエ
ブを固定することによって添板が移動することのない確
実な継手構造が得られる。According to the first aspect of the present invention, most of the joining work of the steel beams is completed in a very short time, in which the attachment plate is slid into the dovetail provided on the flange of the steel frame when the steel frame is constructed. Since only a few bolts are used to fix the fixing plate, the joining operation is extremely simple, so that work can be performed even in rainy weather, and work can be performed in a short time. This is extremely effective in shortening the construction period. According to the second aspect of the present invention, a strong connection between the connecting arm and the girder can be obtained by a simple structure in which a dovetail having a dovetail is slid into a flange of a steel frame, and a slide plate having a dovetail groove is slid into the dovetail. By fixing, a reliable joint structure in which the attachment plate does not move can be obtained.
【図1】この発明の1実施例を示すもので、図2(A)
のI−I線における1部を切断した正面図である。FIG. 1 shows one embodiment of the present invention, and FIG.
FIG. 2 is a front view of a part cut along line II of FIG.
【図2】(A)は平面図、(B)は図1のII−II線
における切断平面図である。2A is a plan view, and FIG. 2B is a cut-away plan view taken along line II-II in FIG.
【図3】従来例を示す正面図である。FIG. 3 is a front view showing a conventional example.
1 連結腕 3 フランジ 4 蟻ほぞ 5 ウエブ 8 大梁 9 ボルト 11 固定板 12 蟻溝 13 添板 DESCRIPTION OF SYMBOLS 1 Connecting arm 3 Flange 4 Dovetail 5 Web 8 Large beam 9 Bolt 11 Fixing plate 12 Dovetail 13 Substrate
Claims (2)
連結するH形鋼からなる大梁(8)の各上下のフランジ
(3)に突設した蟻ほぞ(4)に、それぞれ蟻溝(1
2)を有する添板(13)を横方向から滑入させた後、
ウエブ(5)に固着した固定板(11)をボルト(9)
締めするようにした鉄骨梁の継手工法。1. A dovetail (4) projecting from each of upper and lower flanges (3) of an H-shaped steel beam (8) connected to the connecting arm (1) made of an H-shaped steel. Dovetail (1
After sliding the attachment plate (13) having 2) from the lateral direction,
Fix the fixing plate (11) fixed to the web (5) with the bolt (9)
A steel beam joint method to be tightened.
らなる大梁(8)の各上下のフランジ(3)に突設した
蟻ほぞ(4)に、蟻溝(12)を設けた添板(13)を
滑入させ、連結腕(1)と大梁(8)の各ウエブ(5)
に固着された固定板(11)をボルト(9)締めした鉄
骨梁の継手構造。2. A dovetail groove (12) is formed in a dovetail (4) projecting from each of upper and lower flanges (3) of a connecting arm (1) made of H-shaped steel and a girder (8) made of H-shaped steel. The provided attachment plate (13) is slid in, and each web (5) of the connecting arm (1) and the girder (8) is inserted.
A joint structure of a steel beam in which a fixing plate (11) fixed to the steel plate is bolted (9).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP04273385A JP3099017B2 (en) | 1992-09-18 | 1992-09-18 | Joint method and joint structure of steel beam |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP04273385A JP3099017B2 (en) | 1992-09-18 | 1992-09-18 | Joint method and joint structure of steel beam |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH06101271A JPH06101271A (en) | 1994-04-12 |
| JP3099017B2 true JP3099017B2 (en) | 2000-10-16 |
Family
ID=17527163
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP04273385A Expired - Fee Related JP3099017B2 (en) | 1992-09-18 | 1992-09-18 | Joint method and joint structure of steel beam |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3099017B2 (en) |
Families Citing this family (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP5828631B2 (en) * | 2010-12-14 | 2015-12-09 | 黒沢建設株式会社 | Composite structural beam using outer cable tension steel |
| JP6601298B2 (en) * | 2016-04-06 | 2019-11-06 | 日本製鉄株式会社 | Cascade construction method and restraint member |
| WO2018030361A1 (en) * | 2016-08-08 | 2018-02-15 | 新日鐵住金株式会社 | Vertical joint structure of steel member |
| CN111945908B (en) * | 2020-07-31 | 2021-09-28 | 徐州工业职业技术学院 | High-heat-insulation heat-preservation plate and preparation method thereof |
| CN118305522B (en) * | 2024-06-07 | 2024-08-20 | 湖南华韧钢结构工程有限公司 | Integrated steel structure correcting and welding device |
-
1992
- 1992-09-18 JP JP04273385A patent/JP3099017B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JPH06101271A (en) | 1994-04-12 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US4014089A (en) | Method of connecting beams and columns of steel frame construction | |
| US4379651A (en) | Method for releasably rigidly fastening two intersected overlapping metal profiles and means therefor | |
| JP3099017B2 (en) | Joint method and joint structure of steel beam | |
| JP2813107B2 (en) | Bridge | |
| JP3978361B2 (en) | Joints for construction and civil engineering | |
| JPH0444545A (en) | Joint of column and beam and reinforcing metal | |
| JPH03221636A (en) | Beam connecting structure | |
| JPH0941563A (en) | H-shaped steel column and its beam-column joint structure | |
| JPH10147980A (en) | Beam joint structure | |
| JPH0220322Y2 (en) | ||
| JPH09125515A (en) | Column / beam joint structure | |
| JP2000054487A (en) | Joining method of steel beam | |
| JP3024468U (en) | Rigid joint structure of beam in weak axis direction of H-shaped steel column | |
| JPS6140807Y2 (en) | ||
| JPH05156712A (en) | Steel-skeleton assembly method | |
| JP2000027295A (en) | How to join columns and beams in steel structures | |
| RU2074280C1 (en) | Bridge member forming horizontal transverse beam | |
| JPH07317064A (en) | Connecting fitting for h-steel with end plate | |
| JPH04120801U (en) | Connection structure between H-shaped column and H-shaped beam | |
| JPH04124338A (en) | Construction for column/beam joining section | |
| JPH10176375A (en) | Joint structure of steel cantilever and stay beam | |
| JPH06173340A (en) | Steel beam joint structure | |
| JPH05339991A (en) | Structure of beam connection | |
| JPH0841987A (en) | Box section brace | |
| JPH0531163Y2 (en) |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| LAPS | Cancellation because of no payment of annual fees |