JP3125166B2 - Megastructure damping mechanism of adaptive growth structure - Google Patents
Megastructure damping mechanism of adaptive growth structureInfo
- Publication number
- JP3125166B2 JP3125166B2 JP04304176A JP30417692A JP3125166B2 JP 3125166 B2 JP3125166 B2 JP 3125166B2 JP 04304176 A JP04304176 A JP 04304176A JP 30417692 A JP30417692 A JP 30417692A JP 3125166 B2 JP3125166 B2 JP 3125166B2
- Authority
- JP
- Japan
- Prior art keywords
- megastructure
- damping
- mega
- growth structure
- vibration energy
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
- Vibration Prevention Devices (AREA)
Description
【0001】[0001]
【産業上の利用分野】本発明は、大規模な改装や増築と
部分的な除去等を可能とする適応型成長構造物のメガス
トラクチャー制振機構に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a mega-structure damping mechanism for an adaptive growth structure which enables large-scale renovation, extension and partial removal.
【0002】[0002]
【従来の技術】既存の構造物のように竣工時の形態をそ
のまま維持するのではなく主として社会の変化や経済的
な要求による用途変更や規模の拡大の必要性から、大規
模な改装や増築と部分的な除去等を可能とする適応型成
長構造物がある。この適応型成長構造物は、柱および梁
を有するメガストラクチャーと、該メガストラクチャー
内に設置されるサブストラクチャーと、前記メガストラ
クチャーの振動を減衰させる振動エネルギ吸収機構とを
有するもので、その形態変化としては、大規模なメガス
トラクチャーの形態変化(構造物全体の形態変化)と比
較的小規模なサブストラクチャーの形態変化(レイアウ
ト変更、部分的増築および部分的解体等)とがあげられ
る。そして、上記振動エネルギ吸収機構は、最も効率的
に振動エネルギを吸収するため、適応型成長構造物に特
化して設計されている。2. Description of the Related Art Large-scale renovations and expansions are not required to maintain the form at the time of completion as is the case with existing structures. There is an adaptive growth structure that enables partial removal and the like. This adaptive growth structure has a megastructure having columns and beams, a substructure installed in the megastructure, and a vibration energy absorbing mechanism for attenuating vibration of the megastructure. Examples include a large-scale megastructure morphological change (morphological change of the entire structure) and a relatively small-scale substructure morphological change (layout change, partial extension, partial disassembly, etc.). The vibration energy absorbing mechanism is designed specifically for an adaptive growth structure in order to absorb vibration energy most efficiently.
【0003】[0003]
【発明が解決しようとする課題】上記のように振動エネ
ルギ吸収機構は、適応型成長構造物に特化して設計され
ているため、適応型成長構造物の形態変化や動的特性を
変化させた場合には、十分な機能を発揮しないばかりか
逆に振動を増幅する側に作用する可能性がある。そのた
めに、振動エネルギ吸収機構全体を適応型成長構造物の
形態変化に応じて取替えたり、あるいは新たな制振シス
テムを設計して取り付ける必要が生じてしまう。As described above, since the vibration energy absorbing mechanism is designed specifically for the adaptive growth structure, the morphological change and dynamic characteristics of the adaptive growth structure are changed. In such a case, not only does not provide a sufficient function, but also may act on the side that amplifies the vibration. Therefore, it becomes necessary to replace the entire vibration energy absorbing mechanism in accordance with a change in the form of the adaptive growth structure, or to design and mount a new vibration damping system.
【0004】したがって、本発明の目的は、適応型成長
構造物の形態変化後においても、振動エネルギ吸収機構
を取替えたり新たに設計して取り付けたりすることな
く、良好に減衰性能を発揮することができる適応型成長
構造物のメガストラクチャー制振機構を提供することで
ある。Accordingly, an object of the present invention is to provide a damping performance which is excellent even after a change in the form of an adaptive growth structure without replacing or newly designing and installing a vibration energy absorbing mechanism. The purpose of the present invention is to provide a mega-structure damping mechanism for adaptive growth structures.
【0005】[0005]
【課題を解決するための手段】上記目的を達成するた
め、本発明は、柱および梁を有するメガストラクチャー
と、該メガストラクチャー内に設置されるサブストラク
チャーと、前記メガストラクチャーの振動を減衰させる
振動エネルギ吸収機構とを有する適応型成長構造物の前
記メガストラクチャーの制振機構において、前記適応型
成長構造物の形態変化時に前記振動エネルギ吸収機構に
よる減衰力の作用点を移動させる移動機構を具備するこ
とを特徴としている。In order to achieve the above object, the present invention provides a megastructure having columns and beams, a substructure installed in the megastructure, and a vibration for damping the vibration of the megastructure. An adaptive absorption structure having an energy absorbing mechanism, wherein the megastructure has a moving mechanism for moving an action point of the damping force by the vibration energy absorbing mechanism when the form of the adaptive growth structure changes. It is characterized by:
【0006】[0006]
【作用】本発明の適応型成長構造物のメガストラクチャ
ー制振機構によれば、移動機構が、適応型成長構造物の
形態変化時に、振動エネルギ吸収機構による減衰力の作
用点を移動させることになるため、形態変化があっても
作用点を適正な位置に移動させることが可能となる。し
たがって、振動エネルギ吸収機構を取替えたり新たに設
計して取り付けたりする必要がなくなる。According to the megastructure vibration control mechanism of the adaptive growth structure of the present invention, the moving mechanism moves the action point of the damping force by the vibration energy absorbing mechanism when the form of the adaptive growth structure changes. Therefore, it is possible to move the action point to an appropriate position even if the form changes. Therefore, there is no need to replace or newly design and attach the vibration energy absorbing mechanism.
【0007】[0007]
【実施例】本発明の第1実施例による適応型成長構造物
のメガストラクチャー制振機構を図1〜図4を参照して
以下に説明する。なお、以下のすべての実施例におい
て、2棟併設型の適応型成長構造物に適用したものを例
にとり説明するが、吹き抜けを有する適応型成長構造物
等単独で建設されるものにも適用可能である。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS A megastructure damping mechanism of an adaptive growth structure according to a first embodiment of the present invention will be described below with reference to FIGS. In all of the following embodiments, an example in which the present invention is applied to an adaptive growth structure with two buildings will be described as an example. However, the invention can also be applied to an adaptive growth structure having a stairwell, which is constructed alone. It is.
【0008】まず、適応型成長構造物の全体構成につい
て図1を参照して説明すると、適応型成長構造物は外殻
全体を構成する二棟のメガストラクチャー1を有してお
り、該各メガストラクチャー1は、鉛直方向に沿って所
定間隔で複数所定位置に配設されたメガコラム(柱)2
と、該メガコラム2の所定位置に所定間隔で配置された
メガジョイント3と、該メガジョイント3間に水平方向
に延在すべく所定位置に配設されたメガビーム(梁)4
とで主に構成されている。First, the overall structure of the adaptive growth structure will be described with reference to FIG. 1. The adaptive growth structure has two megastructures 1 constituting the entire outer shell. The structure 1 includes a plurality of mega columns (pillars) 2 arranged at predetermined positions at predetermined intervals along the vertical direction.
A megajoint 3 disposed at a predetermined position on the megacolumn 2 at a predetermined interval, and a megabeam (beam) 4 disposed at a predetermined position between the megajoints 3 so as to extend in the horizontal direction.
It is mainly composed of
【0009】ここで、本実施例においては、メガストラ
クチャー1,1間の空間部5には必要に応じてメガジョ
イント3間に連絡通路6が設けられている。また、各メ
ガストラクチャー1の上部には、メガストラクチャー1
の増築等を行うための常設インテリジェント施工システ
ム(以下施工システムと称す)7が設けられており、ま
た、空間部5の下側には、増改築作業をサポートするた
めの常設地下作業現場8が設けられていて、その上側は
緑地等になっている。Here, in this embodiment, a communication passage 6 is provided between the mega joints 3 in the space 5 between the mega structures 1 and 1 as necessary. At the top of each megastructure 1 is a megastructure 1
A permanent intelligent construction system (hereinafter referred to as a construction system) 7 for performing the extension and the like of the building is provided, and a permanent underground work site 8 for supporting the extension and remodeling work is provided below the space 5. It is provided, and the upper side is green.
【0010】上記各メガストラクチャー1の近接するメ
ガコラム2同士と近接するメガビーム4同士とで区画さ
れたブロック9に、図示せぬサブストラクチャーが必要
に応じて設置されることになる。A sub-structure (not shown) is installed in a block 9 defined by the mega columns 2 adjacent to each other and the mega beams 4 adjacent to each other in each of the mega structures 1 as needed.
【0011】そして、上記施工システム7は、図2に示
すように、メガストラクチャー1の頂部のメガビーム4
上に多段積層ゴム(あるいはこれに動的アクチュエータ
を加えたもの)10を介して搭載されており、この多段
積層ゴム10は、メガビーム4および施工システム7と
の各離合が可能となっている。As shown in FIG. 2, the construction system 7 includes a mega beam 4 at the top of the mega structure 1.
The multi-stage rubber (or a dynamic actuator added thereto) 10 is mounted thereon via a multi-layer rubber, and the multi-layer rubber 10 can be separated from the mega beam 4 and the construction system 7.
【0012】また、施工システム7の中間所定位置に
は、下方に延在する、リフトアップシステム11が離合
可能に設けられており、このリフトアップシステム11
は、メガストラクチャー1の所定のメガコラム2に離合
可能となっている。A lift-up system 11 extending downward is detachably provided at a predetermined intermediate position of the construction system 7.
Can be separated from a predetermined mega column 2 of the mega structure 1.
【0013】この施工システム7は、リフトアップシス
テム11と切り離し多段積層ゴム10を該施工システム
7およびメガストラクチャー1に接合した状態とするこ
とにより、多段積層ゴム10とともに動的振動エネルギ
吸収機構を構成することになる。すなわち、施工システ
ム7が振動エネルギ吸収機構の質量として作用して、メ
ガストラクチャー1の振動を減衰させるのである。この
場合、メガストラクチャー1の頂部が減衰力の作用点と
なり、このときの振動エネルギ吸収機構を図3に模式的
に示す。The construction system 7 comprises a dynamic vibration energy absorbing mechanism together with the multi-stage laminated rubber 10 by separating the lift-up system 11 and the multi-stage laminated rubber 10 into a state of being joined to the construction system 7 and the megastructure 1. Will do. That is, the construction system 7 acts as the mass of the vibration energy absorbing mechanism to attenuate the vibration of the megastructure 1. In this case, the top of the megastructure 1 becomes the point of application of the damping force, and the vibration energy absorbing mechanism at this time is schematically shown in FIG.
【0014】そして、メガストラクチャー1を上方に増
設する場合には、リフトアップシステム11をメガスト
ラクチャー1に接合した状態で、施工システム7をリフ
トアップシステム11と接合しかつ多段積層ゴム10か
ら切り離した状態とする。この状態でリフトアップシス
テム11を作動させると施工システム7は、上方にジャ
ッキアップされることになる。そして、このジャッキア
ップされた施工システム7を自動施工システムとして用
いてメガストラクチャー1が上方に増設される。そし
て、増設された後のメガストラクチャー1の新たな頂部
に施工システム7により多段積層ゴム10を運んで載置
し、施工システム7をリフトアップシステム11と切り
離し多段積層ゴム10を施工システム7およびメガスト
ラクチャー1に接合した状態とすることにより、減衰力
の作用点がメガストラクチャー1の頂部に移動されるこ
とになる。このときの振動エネルギ吸収機構を図4に模
式的に示す(図4においてハッチングを施した部分がメ
ガストラクチャー1の増設部分である)。ここで、上記
施工システム7およびリフトアップシステム11がこの
場合の移動機構を構成するものである。When the megastructure 1 is to be extended upward, the construction system 7 is joined to the lift-up system 11 and separated from the multi-layer laminated rubber 10 with the lift-up system 11 joined to the megastructure 1. State. When the lift-up system 11 is operated in this state, the construction system 7 is jacked up. Then, the megastructure 1 is expanded upward using the jacked-up construction system 7 as an automatic construction system. Then, the construction system 7 carries and places the multi-layer laminated rubber 10 on the new top of the megastructure 1 after the expansion, and separates the construction system 7 from the lift-up system 11 to attach the multi-layer laminated rubber 10 to the construction system 7 and the mega. By being joined to the structure 1, the point of application of the damping force is moved to the top of the megastructure 1. FIG. 4 schematically shows the vibration energy absorbing mechanism at this time (a hatched portion in FIG. 4 is an additional portion of the megastructure 1). Here, the construction system 7 and the lift-up system 11 constitute a moving mechanism in this case.
【0015】以上のような構成の第1実施例において
は、移動機構を構成する施工システム7およびリフトア
ップシステム11が、メガストラクチャー1の形態変化
時に、振動エネルギ吸収機構による減衰力の作用点を振
動エネルギの集中しやすい増設されたメガストラクチャ
ー1の頂部に移動させることができる。したがって、振
動エネルギ吸収機構を取替えたり新たに設計して取り付
けたりすることなく、形態変化後も良好に減衰性能を発
揮することができる。また、常備の施工システム7等
が、本来の施工システム、動的振動エネルギ吸収機構お
よび移動機構を兼用することになるため、効率的であ
る。In the first embodiment having the above configuration, the construction system 7 and the lift-up system 11 constituting the moving mechanism determine the point of action of the damping force by the vibration energy absorbing mechanism when the configuration of the megastructure 1 changes. It can be moved to the top of the added megastructure 1 where vibration energy is easily concentrated. Therefore, the damping performance can be satisfactorily exhibited even after the form change without replacing or newly designing and attaching the vibration energy absorbing mechanism. In addition, since the regular construction system 7 and the like also serve as the original construction system, the dynamic vibration energy absorbing mechanism, and the moving mechanism, it is efficient.
【0016】次に、本発明の第2実施例による適応型成
長構造物のメガストラクチャー制振機構を図5〜図7を
参照して以下に説明する。なお、第2実施例はメガスト
ラクチャーの隣棟間を連絡通路を利用して連結し、相互
の建物の振動状態に応じて二棟間に働く減衰力を能動的
に制御を行い振動を抑制する点が第1実施例と相違して
おり、この相違部分を中心に以下に説明し、第1実施例
と同様の部分には同一の符号を付してその説明を略す。Next, a description will be given of a megastructure damping mechanism of an adaptive growth structure according to a second embodiment of the present invention with reference to FIGS. In the second embodiment, adjacent buildings of the megastructure are connected by using a communication passage, and the damping force acting between the two buildings is actively controlled according to the vibration state of the buildings to suppress the vibration. This embodiment is different from the first embodiment, and the following description will focus on the differences, and the same parts as those in the first embodiment will be denoted by the same reference numerals and description thereof will be omitted.
【0017】第2実施例の適応型成長構造物も、図5に
示すように、二棟のメガストラクチャー1を有してお
り、各メガストラクチャー1には、連絡通路6を昇降さ
せる揚重装置15が設けられている。The adaptive growth structure of the second embodiment also has two megastructures 1 as shown in FIG. 5, and each megastructure 1 has a lifting device for raising and lowering a communication passage 6. 15 are provided.
【0018】この揚重装置15は、ワイヤ16と、メガ
ストラクチャー1の空間部5に反する側の地上部にそれ
ぞれ設けられた、各ワイヤ16の巻取・繰出を行うため
のウインチ17と、該ウインチ17から繰り出されるワ
イヤ16が掛けられる、メガストラクチャー1の両側の
メガコラム2(図5においては図示せず)の頂部にそれ
ぞれ設置された滑車18とを有している。そして、各ワ
イヤ16の繰出側の先端部は、空間部5に垂下されてお
り、各ワイヤ16の先端部が連絡通路6の各端部に取り
付けられている。これにより、連絡通路6は、ワイヤ1
6によりメガストラクチャー1の頂部からサスペンドさ
れ、ウインチ17により上下に移動してどのレベルにも
移設可能となっている。また、滑車18がメガストラク
チャー1のメガコラム2の頂部に設置されているため、
ワイヤ16に生じる軸力が直接メガコラム2に流れるよ
うになっている。さらに、ウインチ17が連絡通路6と
反対側地上部の左右対称位置に配置されていること等に
より左右対称にメガコラム2に軸力がかかり易くなって
いる。ここで、連絡通路6の鉛直荷重は、ワイヤ16に
よりサスペンドされる。これは、構造物が形態変化しな
ければ、接続位置を変化させても長期荷重による変形が
変化しないからである。The lifting device 15 includes a wire 16 and a winch 17 provided on a ground portion of the megastructure 1 opposite to the space 5 for winding and unwinding the wire 16. It has pulleys 18 respectively mounted on the top of the megacolumns 2 (not shown in FIG. 5) on both sides of the megastructure 1 on which the wires 16 drawn from the winch 17 are hung. The leading end of each wire 16 on the feeding side is hung down from the space 5, and the leading end of each wire 16 is attached to each end of the communication passage 6. Thereby, the communication passage 6 is connected to the wire 1
6 suspends from the top of the megastructure 1 and can be moved up and down by the winch 17 to any level. Also, since the pulley 18 is installed on the top of the mega column 2 of the mega structure 1,
The axial force generated on the wire 16 flows directly to the mega column 2. Further, the axial force is easily applied to the mega column 2 symmetrically, for example, by arranging the winch 17 at the left-right symmetric position on the ground portion opposite to the communication passage 6. Here, the vertical load of the communication passage 6 is suspended by the wire 16. This is because, if the structure does not change, the deformation due to the long-term load does not change even if the connection position is changed.
【0019】そして、連絡通路6は、図6および図7に
示すように、メガコラム2とメガビーム4との接合位置
であるメガジョイント3に取り付けられるようになって
おり、いずれのメガジョイント3にも取り付くようにな
っている。加えて、連絡通路6は、鉛直方向の移動が規
制されかつ水平方向の移動が許容されるエキスパンショ
ンジョイント19でメガジョイント3に取り付けられて
いる。そして、連絡通路6の両端の上下にはそれぞれ複
数(図示例は三つ)のアクチュエータ20が水平方向に
沿って配設されており、このアクチュエータ20の各端
部は、それぞれメガジョイント3および連絡通路6にピ
ン結合されている。そして連絡通路6の上端部のメガコ
ラム2側には対応するワイヤ16が取り付けられる係合
部21が取り付けられている。As shown in FIGS. 6 and 7, the communication passage 6 is attached to a mega joint 3 at a position where the mega column 2 and the mega beam 4 are joined. Is also attached. In addition, the communication passage 6 is attached to the megajoint 3 by an expansion joint 19 that is restricted from moving in the vertical direction and is allowed to move in the horizontal direction. A plurality of (three in the illustrated example) actuators 20 are respectively arranged along the horizontal direction above and below both ends of the communication passage 6, and each end of the actuator 20 is connected to the mega joint 3 and the communication joint respectively. It is pin-connected to the passage 6. An engagement portion 21 to which the corresponding wire 16 is attached is attached to the upper end of the communication passage 6 on the side of the mega column 2.
【0020】上記連絡通路6は、アクチュエータ20を
作動させることによって両メガストラクチャー1,1間
の梁として作用することになる。そして、メガストラク
チャー1の振動状態に応じてアクチュエータ20の作動
力を制御しメガストラクチャー1への当接力を制御する
ことにより、各メガストラクチャー1の振動を減衰させ
るようになっている。ここで、メガストラクチャー1に
は、その振動状態を検知する図示せぬセンサが必要箇所
に設置されており、該センサからの信号が無線で飛ばさ
れることによってこの信号に応じて図示せぬ制御装置が
アクチュエータ20のゲインを決定し制御することにな
る。なお、センサ設置場所は移設可能となっている。そ
して、上記により、第2実施例における減衰力の作用点
は連絡通路6とメガジョイント3との接合位置となり、
また振動エネルギ吸収機構はアクチュエータ20が設け
られた連絡通路6により構成されることになる。なお、
メガジョイント3には、アクチュエータ20の作動力で
局部的に破壊しないように十分な強度が与えられてい
る。The communication passage 6 acts as a beam between the two megastructures 1 by operating the actuator 20. The vibration of each megastructure 1 is attenuated by controlling the operating force of the actuator 20 according to the vibration state of the megastructure 1 and controlling the contact force with the megastructure 1. Here, the megastructure 1 is provided with a sensor (not shown) for detecting its vibration state at a required position, and a signal from the sensor is wirelessly transmitted, so that a control device (not shown) is provided in accordance with the signal. Will determine and control the gain of the actuator 20. The sensor installation location can be relocated. As described above, the point of action of the damping force in the second embodiment is the joint position between the communication passage 6 and the mega joint 3,
The vibration energy absorbing mechanism is constituted by the communication passage 6 in which the actuator 20 is provided. In addition,
The mega joint 3 is given sufficient strength so as not to be locally broken by the operation force of the actuator 20.
【0021】そして、メガストラクチャー1には、第1
実施例と同様の施工システム7およびリフトアップシス
テム11(図5〜図7においては図示せず)が設けられ
ており、メガストラクチャー1を上方に増設する場合に
は、連絡通路6をメガジョイント3,3間に仮留めした
状態で、連絡通路6を吊るしているワイヤ16をウイン
チ17で緩め、メガコラム2を上方に延長し、滑車18
を延長されたメガコラム2の頂部に上記施工システム7
およびリフトアップシステム11により運んで載置す
る。載置された滑車18にワイヤ16を掛け、連絡通路
6をメガストラクチャー1から切り離した状態でウイン
チ17を作動させ、良好に振動エネルギを吸収できる位
置に連絡通路6を移動させて取り付けることになる。The megastructure 1 has the first
A construction system 7 and a lift-up system 11 (not shown in FIGS. 5 to 7) similar to those in the embodiment are provided. When the megastructure 1 is to be added upward, the communication passage 6 is connected to the mega joint 3. , 3 temporarily loosen the wire 16 suspending the communication passage 6 with the winch 17, extend the mega column 2 upward, and pull the pulley 18.
The above construction system 7 is installed on the top of the extended mega column 2
And it is carried and placed by the lift-up system 11. The wire 16 is hung on the mounted pulley 18, the winch 17 is operated in a state where the communication path 6 is separated from the megastructure 1, and the communication path 6 is moved and attached to a position where vibration energy can be well absorbed. .
【0022】ここで、上記揚重装置15、施工システム
7およびリフトアップシステム11がこの場合の移動機
構を構成するものである。なお、滑車18を、増設され
たメガコラム2に沿って例えば尺取り虫的に自走させる
自走機構を設けることも可能であり、この場合、施工シ
ステム7およびリフトアップシステム11の代りにこの
自走機構が移動機構の一部をなすことになる。The lifting device 15, the construction system 7, and the lift-up system 11 constitute a moving mechanism in this case. In addition, it is also possible to provide a self-propelled mechanism that makes the pulley 18 self-propelled, for example, as a measuring insect along the added mega column 2. In this case, the self-propelled The mechanism will be part of the moving mechanism.
【0023】以上のような構成の第2実施例において
は、移動機構を構成する揚重装置15、施工システム7
およびリフトアップシステム11が、メガストラクチャ
ー1の形態変化時に、振動エネルギ吸収機構による減衰
力の作用点すなわち連絡通路6と各メガストラクチャー
1との接合点を、増設されたメガストラクチャー1の、
最も減衰性能が良好となる所定のメガジョイント位置に
移動させることになるため、形態変化があっても作用点
を適応型成長構造物の動的特性の変化に応じて最も効率
的に振動エネルギを吸収することができる適正な位置に
移動させることができる。したがって、振動エネルギ吸
収機構を取替えたり新たに設計して取り付けたりするこ
となく、形態変化後も良好に減衰性能を発揮することが
できる。また、連絡通路6を利用することによって、形
態変化に伴う人や物の流れの変化にも対応できる。さら
に、連絡通路6とメガジョイント3との結合は変形自由
度の大きなアクチュエータ20とエキスパンションジョ
イント19だけであるため、施工性が高くなる。In the second embodiment having the above-described configuration, the lifting device 15 and the construction system 7 that constitute the moving mechanism
And the lift-up system 11 changes the point of application of the damping force by the vibration energy absorbing mechanism, that is, the junction between the communication passage 6 and each of the megastructures 1 when the megastructure 1 is changed in shape.
Since it is moved to a predetermined mega joint position where the damping performance is the best, even if there is a morphological change, the point of action is most efficiently applied to the vibration energy according to the change in the dynamic characteristics of the adaptive growth structure. It can be moved to an appropriate position where it can be absorbed. Therefore, the damping performance can be satisfactorily exhibited even after the form change without replacing or newly designing and attaching the vibration energy absorbing mechanism. Further, by using the communication passage 6, it is possible to cope with a change in the flow of a person or an object due to a change in form. Furthermore, since the connection between the communication passage 6 and the mega joint 3 is limited to only the actuator 20 and the expansion joint 19 having a large degree of freedom of deformation, workability is improved.
【0024】なお、上記第2実施例と第1実施例とを組
み合わせた振動エネルギ吸収機構、すなわち図8に模式
的に示すように動的振動エネルギ吸収機構7,10と連
絡通路6による振動エネルギ吸収機構とを組み合わせた
ものから、一方のメガストラクチャー1のみが増設され
た場合に、図9に模式的に示すように増設側のメガスト
ラクチャー1のみに動的振動エネルギ吸収機構7,10
を設けるとともに連絡通路6の位置を変更することも可
能である(図9においてハッチングを施した部分がメガ
ストラクチャー1の増設部分である)。The vibration energy absorbing mechanism obtained by combining the second embodiment and the first embodiment, that is, as shown schematically in FIG. When only one of the megastructures 1 is added from the combination with the absorption mechanism, as shown schematically in FIG. 9, only the additional megastructure 1 has the dynamic vibration energy absorption mechanisms 7 and 10.
And it is also possible to change the position of the communication passage 6 (the hatched portion in FIG. 9 is the additional portion of the megastructure 1).
【0025】また、第2実施例においては、メガストラ
クチャー1の増設に限定されることなくサブストラクチ
ャーの形態変化、あるいはメガストラクチャー1および
サブストラクチャー双方の形態変化等種々の形態変化に
適応できる。なお、メガストラクチャー1を増設し連絡
通路6を増設された部分に移動させる場合においては、
上記移動機構として、揚重装置15のみがあればよいこ
とになる。Further, in the second embodiment, it is possible to adapt to various form changes such as a form change of the substructure or a form change of both the megastructure 1 and the substructure without being limited to the addition of the megastructure 1. In addition, when the megastructure 1 is added and the communication passage 6 is moved to the added portion,
Only the lifting device 15 is required as the moving mechanism.
【0026】次に、本発明の第3実施例による適応型成
長構造物のメガストラクチャー制振機構を図10〜図1
3を参照して以下に説明する。なお、第3実施例は、構
造物の頂部と基部等、離れた二点間をワイヤ等の長い引
張部材で結合し、その間に生じた相対的な変形(あるい
は、速度)に応じて減衰力を生じる振動エネルギ吸収機
構を用いた点が第1実施例と相違しており、この相違部
分を中心に以下に説明し、第1実施例と同様の部分には
同一の符号を付してその説明を略す。Next, a megastructure damping mechanism of an adaptive growth structure according to a third embodiment of the present invention will be described with reference to FIGS.
3 will be described below. In the third embodiment, a long tensile member such as a wire connects two distant points such as a top and a base of a structure, and a damping force is applied according to a relative deformation (or speed) generated therebetween. The first embodiment is different from the first embodiment in that a vibration energy absorbing mechanism that generates a vibration is used. The following description will focus on this difference, and the same parts as those in the first embodiment are denoted by the same reference numerals. Description is omitted.
【0027】第3実施例の適応型成長構造物には、図1
0に示すように、振動エネルギ吸収機構を構成するワイ
ヤ制振装置23が設けられている。このワイヤ制振装置
23は、各メガストラクチャー1の下方所定位置にそれ
ぞれ設けられた滑車24を有しており、そのワイヤ25
は、一方のメガストラクチャー1の頂部の内側に一端が
固定され、他方のメガストラクチャー1の下方の滑車2
4に掛けられた後、一方のメガストラクチャー1の下方
の滑車24に水平に掛けられて、他方のメガストラクチ
ャー1の頂部の内側に他端が固定されている。ここで、
各滑車24,24間のワイヤ25は回転型の減衰装置2
6に巻かれている。そして、メガストラクチャー1が振
動すると、滑車24,24間のワイヤ25が移動し、該
ワイヤ25の移動が減衰装置26により減衰されること
になって、これによりメガストラクチャー1の振動エネ
ルギが吸収されることになる。FIG. 1 shows an adaptive growth structure according to a third embodiment.
As shown in FIG. 0, a wire damping device 23 constituting a vibration energy absorbing mechanism is provided. The wire damping device 23 has pulleys 24 provided at predetermined positions below each megastructure 1, and the wire 25
Has one end fixed inside the top of one megastructure 1 and the pulley 2 below the other megastructure 1
After being hung on 4, it is hung horizontally on a pulley 24 below one megastructure 1, and the other end is fixed inside the top of the other megastructure 1. here,
The wire 25 between each pulley 24, 24 is a rotary damper 2
It is wound on 6. When the megastructure 1 vibrates, the wire 25 between the pulleys 24, 24 moves, and the movement of the wire 25 is attenuated by the damping device 26, whereby the vibration energy of the megastructure 1 is absorbed. Will be.
【0028】そして、第3実施例においては、少なくと
も一方のメガストラクチャー1の頂部におけるワイヤ2
5の端部側が、図11および図12に示すような固定点
移動機構27に固定されている。この固定点移動機構2
7は、ワイヤ25に導入される張力を緩めた後移動でき
るよう構成されるもので、メガストラクチャー1の外壁
28に垂直をなし該外壁28に沿って上下に延在するガ
イドレール29と、該ガイドレール29,29間に沿っ
て上下移動する移動体30とを有している。そして、該
移動体30には、図示せぬモータの駆動力により駆動さ
れる、ガイドレール29を走行するためのローラ31が
各ガイドレール29側に複数設けられている。なお、ロ
ーラ31およびガイドレール29にはスリップして移動
体30を転落させることがないように相互に噛み合う図
示せぬ溝が、移動方向に直交して形成されている。In the third embodiment, the wire 2 at the top of at least one of the megastructures 1
5 is fixed to a fixed point moving mechanism 27 as shown in FIGS. This fixed point moving mechanism 2
7 is configured to be movable after relaxing the tension introduced into the wire 25, and is perpendicular to the outer wall 28 of the megastructure 1 and extends vertically along the outer wall 28; A moving body 30 that moves up and down along the guide rails 29; The movable body 30 is provided with a plurality of rollers 31 that are driven by a driving force of a motor (not shown) and run on the guide rails 29 on each guide rail 29 side. In addition, grooves (not shown) are formed in the roller 31 and the guide rail 29 so as to be engaged with each other so as not to slip and drop the moving body 30 so as to be orthogonal to the moving direction.
【0029】移動体30の移動制御は無線によりコンピ
ュータ制御されるようになっており、このため移動体3
0には、自走可能な上記モータと、制御信号を受信して
自走・停止確認および停止するための指令に変換する図
示せぬセンサ機構が設けられている。また、移動体30
は、スチフナ等により十分補強された図示せぬ定着治具
を用いてメガジョイント3にボルト接合されることにな
る(いずれのメガジョイント3にも接合可能)。ここ
で、メガジョイント3のボルト接合部は、ワイヤ25の
軸力等で局部的な破壊を生じないようにあらかじめ十分
補強されている。The movement control of the mobile unit 30 is computer-controlled by radio, and therefore the mobile unit 3
0 is provided with the motor capable of self-running and a sensor mechanism (not shown) for receiving a control signal and converting it into a command for self-running / stop confirmation and stop. The moving body 30
Is bolted to the megajoint 3 using a fixing jig (not shown) sufficiently reinforced by a stiffener or the like (can be joined to any of the megajoints 3). Here, the bolt joint portion of the mega joint 3 is sufficiently reinforced beforehand so that local destruction does not occur due to the axial force of the wire 25 or the like.
【0030】そして、移動体30には、ワイヤ25を巻
取、繰出および停止可能なウインチ32と、該ウインチ
32の下側に設けられた、ウインチ32に巻かれる直前
のワイヤ25が多重に巻かれる滑車33とを有してお
り、外壁28には滑車33から斜めに繰り出されるワイ
ヤ25を外部に出すためのスリット34が形成されてい
る。ここで、滑車33には図示せぬディスクブレーキ等
のストッパが設けられており、該ストッパにより滑車3
3の回転が拘束されると、摩擦力によりワイヤ25の移
動が拘束されて該ワイヤ25が滑車33に固定されるよ
うになっている。このストッパにより、ウインチ32に
は、ワイヤ25の巻取・繰出時以外の通常時においては
ワイヤ25から力がかからないようになっている。The moving body 30 is provided with a winch 32 capable of winding, feeding, and stopping the wire 25 and a wire 25 provided below the winch 32 and immediately before being wound on the winch 32. The outer wall 28 is provided with a slit 34 for taking out the wire 25 that is obliquely fed from the pulley 33 to the outside. Here, the pulley 33 is provided with a stopper such as a disc brake (not shown).
When the rotation of 3 is restricted, the movement of the wire 25 is restricted by the frictional force, and the wire 25 is fixed to the pulley 33. With this stopper, no force is applied to the winch 32 from the wire 25 in normal times other than when the wire 25 is wound and unwound.
【0031】ここで、メガストラクチャー1には、第1
実施例と同様の施工システム7およびリフトアップシス
テム11(図10〜図13においては図示せず)が設け
られており、メガストラクチャー1を上方に増設する場
合には、施工システム7およびリフトアップシステム1
1によりメガストラクチャー1を増設するとともに上記
ガイドレール29を増設する。そして、ウインチ32を
停止状態から解除しかつ滑車33のストッパを解除して
ワイヤ25の軸力を緩め、その後、移動体30をメガジ
ョイント3に定着させている図示せぬ定着治具を取り除
いた後、良好に振動エネルギを吸収できる所定の結合位
置のメガジョイント3(通常は最上部のもの)まで図示
せぬモータの駆動力で走行させる。そして、移動体30
を定着治具で新たなメガジョイント3に定着させ、ウイ
ンチ32により初期軸力をワイヤ25に導入した後、滑
車33のストッパを作動させることになる。Here, megastructure 1 has the first
A construction system 7 and a lift-up system 11 (not shown in FIGS. 10 to 13) similar to those of the embodiment are provided. When the megastructure 1 is to be added upward, the construction system 7 and the lift-up system 1
1, and the guide rail 29 is additionally provided. Then, the winch 32 is released from the stop state, and the stopper of the pulley 33 is released to loosen the axial force of the wire 25. Thereafter, a fixing jig (not shown) fixing the moving body 30 to the mega joint 3 is removed. Thereafter, the vehicle is driven by the driving force of a motor (not shown) to the mega joint 3 (usually the uppermost one) at a predetermined coupling position where the vibration energy can be favorably absorbed. And the moving body 30
Is fixed to a new mega joint 3 by a fixing jig, an initial axial force is introduced to the wire 25 by the winch 32, and then the stopper of the pulley 33 is operated.
【0032】ここで、上記固定点移動機構27、施工シ
ステム7およびリフトアップシステム11がこの場合の
移動機構を構成するものである。なお、移動体30を自
走式とする代りに施工システム7およびリフトアップシ
ステム11を用いて移動させることも可能である。Here, the fixed point moving mechanism 27, the construction system 7, and the lift-up system 11 constitute a moving mechanism in this case. In addition, it is also possible to move using the construction system 7 and the lift-up system 11 instead of making the moving body 30 self-propelled.
【0033】以上のような構成の第3実施例において
は、移動機構を構成する固定点移動機構27、施工シス
テム7およびリフトアップシステム11が、メガストラ
クチャー1の増設時に、振動エネルギ吸収機構を構成す
るワイヤ制振装置23による減衰力の作用点すなわちワ
イヤ25の固定点を、増設されたメガストラクチャー1
の、最も減衰性能が良好となる所定のメガジョイント位
置(通常は最上部)に移動させることになるため、形態
変化があっても作用点を適正な位置に移動させることが
できる(移動後の振動エネルギ吸収機構を図13に模式
的に示す。図13においてハッチングを施した部分がメ
ガストラクチャー1の増設部分である)。したがって、
振動エネルギ吸収機構を取替えたり新たに設計して取り
付けたりすることなく、形態変化後も良好に減衰性能を
発揮することができる。In the third embodiment having the above-described structure, the fixed point moving mechanism 27, the construction system 7, and the lift-up system 11 constituting the moving mechanism constitute a vibration energy absorbing mechanism when the megastructure 1 is added. The point of action of the damping force by the wire damping device 23, that is, the fixing point of the wire 25, is changed to the added megastructure 1.
However, since it is moved to a predetermined megajoint position (usually the uppermost position) where the damping performance is the best, the action point can be moved to an appropriate position even if there is a change in form (after the movement). The vibration energy absorption mechanism is schematically shown in Fig. 13. In Fig. 13, a hatched portion is an additional portion of the megastructure 1.) Therefore,
The damping performance can be satisfactorily exhibited even after the form change without replacing or newly designing and attaching the vibration energy absorbing mechanism.
【0034】なお、第3実施例においては、メガストラ
クチャー1の増設に限定されることなく種々の形態変化
に適応できる。また、メガストラクチャー1を増設し固
定点を上昇させる場合以外においては、上記移動機構と
して、固定点移動機構27のみがあればよいことにな
る。In the third embodiment, it is possible to adapt to various changes in form without being limited to the addition of the megastructure 1. Except when the megastructure 1 is added and the fixed point is raised, only the fixed point moving mechanism 27 is required as the moving mechanism.
【0035】[0035]
【発明の効果】以上詳述したように、本発明の適応型成
長構造物のメガストラクチャー制振機構によれば、移動
機構が、適応型成長構造物の形態変化時に、振動エネル
ギ吸収機構による減衰力の作用点を移動させることにな
るため、形態変化があっても作用点を適正な位置に移動
させることが可能となる。したがって、振動エネルギ吸
収機構を取替えたり新たに設計して取り付けたりするこ
となく、形態変化後も良好に減衰性能を発揮することが
できる。As described above in detail, according to the megastructure damping mechanism of the adaptive growth structure of the present invention, the moving mechanism is capable of damping by the vibration energy absorbing mechanism when the shape of the adaptive growth structure changes. Since the point of action of the force is moved, the point of action can be moved to an appropriate position even if there is a change in form. Therefore, the damping performance can be satisfactorily exhibited even after the form change without replacing or newly designing and attaching the vibration energy absorbing mechanism.
【図1】本発明の第1実施例によるメガストラクチャー
制振機構が適用される適応型成長構造物の全体構成を示
す正面図である。FIG. 1 is a front view showing an overall configuration of an adaptive growth structure to which a megastructure vibration damping mechanism according to a first embodiment of the present invention is applied.
【図2】本発明の第1実施例による適応型成長構造物の
メガストラクチャー制振機構を示す正面図である。FIG. 2 is a front view showing a megastructure damping mechanism of the adaptive growth structure according to the first embodiment of the present invention.
【図3】本発明の第1実施例による適応型成長構造物の
メガストラクチャー制振機構のメガストラクチャー増設
前の状態を示す模式図である。FIG. 3 is a schematic diagram showing a state before a megastructure is added to a megastructure damping mechanism of the adaptive growth structure according to the first embodiment of the present invention.
【図4】本発明の第1実施例による適応型成長構造物の
メガストラクチャー制振機構のメガストラクチャー増設
後の状態を示す模式図である。FIG. 4 is a schematic view showing a state after the megastructure is added to the megastructure damping mechanism of the adaptive growth structure according to the first embodiment of the present invention.
【図5】本発明の第2実施例による適応型成長構造物の
メガストラクチャー制振機構の揚重装置を概略的に示す
正面図である。FIG. 5 is a front view schematically showing a lifting device of a megastructure vibration control mechanism of an adaptive growth structure according to a second embodiment of the present invention.
【図6】本発明の第2実施例による適応型成長構造物の
メガストラクチャー制振機構の連絡通路を示す正面図で
ある。FIG. 6 is a front view showing a communication passage of a megastructure damping mechanism of an adaptive growth structure according to a second embodiment of the present invention.
【図7】本発明の第2実施例による適応型成長構造物の
メガストラクチャー制振機構の連絡通路を図6における
左方から見た側面図である。FIG. 7 is a side view of the communication passage of the megastructure damping mechanism of the adaptive growth structure according to the second embodiment of the present invention as viewed from the left in FIG.
【図8】本発明の第2実施例による適応型成長構造物の
メガストラクチャー制振機構に第1実施例を組み合せた
メガストラクチャー増設前の状態を示す模式図である。FIG. 8 is a schematic diagram showing a state before a megastructure is added in which a first embodiment is combined with a megastructure damping mechanism of an adaptive growth structure according to a second embodiment of the present invention.
【図9】本発明の第2実施例による適応型成長構造物の
メガストラクチャー制振機構に第1実施例を組み合せた
メガストラクチャー増設後の状態を示す模式図である。FIG. 9 is a schematic view showing a state after the megastructure is added by combining the megastructure damping mechanism of the adaptive growth structure according to the second embodiment of the present invention with the first embodiment.
【図10】本発明の第3実施例による適応型成長構造物
のメガストラクチャー制振機構のメガストラクチャー増
設前の状態を示す模式図である。FIG. 10 is a schematic diagram showing a state before a megastructure is added to a megastructure damping mechanism of an adaptive growth structure according to a third embodiment of the present invention.
【図11】本発明の第3実施例による適応型成長構造物
のメガストラクチャー制振機構の移動機構を示す正断面
図である。FIG. 11 is a front sectional view showing a moving mechanism of a megastructure vibration damping mechanism of an adaptive growth structure according to a third embodiment of the present invention.
【図12】本発明の第3実施例による適応型成長構造物
のメガストラクチャー制振機構の移動機構を示す側断面
図である。FIG. 12 is a side sectional view showing a moving mechanism of a megastructure damping mechanism of an adaptive growth structure according to a third embodiment of the present invention.
【図13】本発明の第3実施例による適応型成長構造物
のメガストラクチャー制振機構のメガストラクチャー増
設後の状態を示す模式図である。FIG. 13 is a schematic diagram showing a state after a megastructure is added to a megastructure damping mechanism of an adaptive growth structure according to a third embodiment of the present invention.
1 メガストラクチャー 2 メガコラム(柱) 4 メガビーム(梁) 7 施工システム(移動機構,振動エネルギ吸収機構) 10 多段積層ゴム(振動エネルギ吸収機構) 11 リフトアップシステム(移動機構) 15 揚重装置(移動機構) 23 ワイヤ制振装置(振動エネルギ吸収機構) 27 固定点移動機構(移動機構) DESCRIPTION OF SYMBOLS 1 Mega structure 2 Mega column (column) 4 Mega beam (beam) 7 Construction system (moving mechanism, vibration energy absorbing mechanism) 10 Multi-layer laminated rubber (vibrating energy absorbing mechanism) 11 Lift-up system (moving mechanism) 15 Lifting device (moving) 23) Wire damping device (vibration energy absorbing mechanism) 27 Fixed point moving mechanism (moving mechanism)
───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.7,DB名) E04H 9/02 ──────────────────────────────────────────────────続 き Continued on front page (58) Field surveyed (Int.Cl. 7 , DB name) E04H 9/02
Claims (1)
と、該メガストラクチャー内に設置されるサブストラク
チャーと、前記メガストラクチャーの振動を減衰させる
振動エネルギ吸収機構とを有する適応型成長構造物の前
記メガストラクチャーの制振機構において、 前記適応型成長構造物の形態変化時に前記振動エネルギ
吸収機構による減衰力の作用点を移動させる移動機構を
具備することを特徴とする適応型成長構造物のメガスト
ラクチャー制振機構。1. An adaptive growth structure having a megastructure having columns and beams, a substructure installed in the megastructure, and a vibration energy absorbing mechanism for damping vibration of the megastructure. The vibration damping mechanism according to any one of claims 1 to 3, further comprising a moving mechanism for moving a point of action of the damping force by the vibration energy absorbing mechanism when the form of the adaptive growing structure changes. mechanism.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP04304176A JP3125166B2 (en) | 1992-11-13 | 1992-11-13 | Megastructure damping mechanism of adaptive growth structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP04304176A JP3125166B2 (en) | 1992-11-13 | 1992-11-13 | Megastructure damping mechanism of adaptive growth structure |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH06146657A JPH06146657A (en) | 1994-05-27 |
| JP3125166B2 true JP3125166B2 (en) | 2001-01-15 |
Family
ID=17929956
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP04304176A Expired - Fee Related JP3125166B2 (en) | 1992-11-13 | 1992-11-13 | Megastructure damping mechanism of adaptive growth structure |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3125166B2 (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH11280833A (en) * | 1998-03-27 | 1999-10-15 | Tokimec Inc | Vibration control device |
-
1992
- 1992-11-13 JP JP04304176A patent/JP3125166B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JPH06146657A (en) | 1994-05-27 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP3125166B2 (en) | Megastructure damping mechanism of adaptive growth structure | |
| JP2002047805A (en) | Construction method of vertical pipe and lifting device used in the method | |
| JP3860813B2 (en) | Elevator installation structure for construction of ground-isolated building structures | |
| JP5940404B2 (en) | Construction method of beam members | |
| JP7000657B2 (en) | Structure | |
| JPH10231639A (en) | Vibration-damping structure | |
| JP6936642B2 (en) | Vibration control system | |
| JP3066460B2 (en) | How to build a tower | |
| JP4888694B2 (en) | Lifting device and climbing method thereof | |
| JP3283123B2 (en) | Building structures with vibration damping devices | |
| CN116290720B (en) | A rail transit fully enclosed sound barrier construction vehicle and construction process | |
| JP4298053B2 (en) | Elevator equipment | |
| JPH10115113A (en) | Earthquake-proof support bracket for steel tower type vertical circulation type parking device support in building | |
| JP3115942B2 (en) | Building construction method | |
| JP2000345732A (en) | Hybrid type vibration control method and vibration control structure | |
| JP2829889B2 (en) | Lift-up method using multiple steel tube concrete columns | |
| JP5348519B2 (en) | Unit member lifting device | |
| JP7052950B2 (en) | Seismic isolated building | |
| JP2006036450A (en) | Elevator device | |
| JPH06156932A (en) | Vibration prevention device for elevator rope | |
| JP2791749B2 (en) | Method and apparatus for lifting up top-level frame for structure construction | |
| JP2698063B2 (en) | Building with built-in elevator | |
| JPH0687457U (en) | Lifting cab of construction machinery | |
| JP2004197324A (en) | Vibration control frame of prestressed concrete structure | |
| JPH09100648A (en) | Building structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20000905 |
|
| LAPS | Cancellation because of no payment of annual fees |