Suction pressure casting equipmentInfo
- Publication number
- JP3128705B2 JP3128705B2 JP04069110A JP6911092A JP3128705B2 JP 3128705 B2 JP3128705 B2 JP 3128705B2 JP 04069110 A JP04069110 A JP 04069110A JP 6911092 A JP6911092 A JP 6911092A JP 3128705 B2 JP3128705 B2 JP 3128705B2
- Authority
- JP
- Japan
- Prior art keywords
- molten metal
- pressure
- control means
- mold
- pressurizing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Control Of Fluid Pressure (AREA)
Description
【0001】[0001]
【産業上の利用分野】この発明は、鋳造における吸引加
圧鋳造装置に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a suction pressure casting apparatus for casting.
【0002】[0002]
【従来の技術】従来、この種の吸引加圧鋳造装置として
は例えば特開昭62−114761号のものがある。こ
の鋳造装置は図3に示すように、減圧チャンバー1は低
圧鋳造用加圧室2上に配設され、減圧チャンバー1内に
は、吸引鋳造用鋳型3がその底部から垂下する湯口4が
上記加圧室2内のルツボ5内に挿入されるように配設さ
れている。2. Description of the Related Art Conventionally, as this kind of suction pressure casting apparatus, there is one disclosed in Japanese Patent Application Laid-Open No. 62-114761, for example. In this casting apparatus, as shown in FIG. 3, the decompression chamber 1 is disposed on a low-pressure casting pressurizing chamber 2, and in the decompression chamber 1, a gate 4 from which a suction casting mold 3 hangs from the bottom is formed. It is disposed so as to be inserted into the crucible 5 in the pressurizing chamber 2.
【0003】また、減圧チャンバー1には吸引制御手段
6が設けられている。この吸引制御手段6は、調整弁
7,レシーバタンク8を介して真空ポンプ9に至る吸引
パイプ10が連結されるとともに、圧力検出器11を介
して検出される減圧チャンバー1内の圧力に基づいて、
調整弁7を制御するプログラムコントローラ12とを備
えている。[0003] The decompression chamber 1 is provided with suction control means 6. The suction control means 6 is connected to a suction pipe 10 reaching a vacuum pump 9 via an adjustment valve 7 and a receiver tank 8, and based on the pressure in the decompression chamber 1 detected via a pressure detector 11. ,
And a program controller 12 for controlling the regulating valve 7.
【0004】また、低圧鋳造用加圧室2には、加圧室2
内の圧力を圧力検出器18を介して検出し、プログラム
コントローラ19により、加圧パイプ16の加圧用調整
弁17の加圧力を調整するようにした加圧制御手段15
を備えている。[0004] Further, the pressurizing chamber 2 for low-pressure casting includes a pressurizing chamber 2.
The pressurizing control means 15 detects the internal pressure via a pressure detector 18 and adjusts the pressing force of a pressurizing adjusting valve 17 of a pressurizing pipe 16 by a program controller 19.
It has.
【0005】上記のように構成された装置においては、
予め真空ポンプ9でレシーバタンク8内を減圧してお
き、調整弁7を開いて減圧チャンバー1内を減圧する
と、同時に溶湯が湯口を介して鋳型3内に充填されだ
す。減圧速度は、圧力検出器11をもって減圧チャンバ
ー1内の圧力を検出しつつプログラムコントローラ12
にて制御する。In the device configured as described above,
When the pressure in the receiver tank 8 is reduced in advance by the vacuum pump 9 and the pressure in the pressure reducing chamber 1 is reduced by opening the regulating valve 7, the molten metal is simultaneously filled into the mold 3 through the gate. The decompression rate is determined by the program controller 12 while detecting the pressure in the decompression chamber 1 by the pressure detector 11.
Is controlled by.
【0006】次いで、減圧中の所定の時点よりプログラ
ムコントローラ19を作動させ、加圧用調整弁17を開
放させて加圧室2の加圧を開始させ、ヒケ巣防止に必要
な効果を発揮する圧力を溶湯に付与する。所定の加圧時
間が終了すると減圧側および加圧側のチャンバーを大気
開放して、鋳造を終了するように構成されている。Next, the program controller 19 is operated at a predetermined time during the depressurization to open the pressurizing adjusting valve 17 to start pressurizing the pressurizing chamber 2 and to provide a pressure necessary to prevent the occurrence of sink marks. To the molten metal. When the predetermined pressurizing time is completed, the chambers on the depressurized side and the pressurized side are opened to the atmosphere, and the casting is finished.
【0007】[0007]
【発明が解決しようとする課題】しかしながら、この従
来の構成のものでは減圧チャンバー1の減圧中の所定の
時点でプログラムコントローラ19を作動し、加圧用調
整弁17を開放して加圧室2を加圧する構成であるか
ら、鋳型3に対する押し湯のタイミングが確実ではな
く、押し湯のタイミングが早すぎると鋳バリが発生し、
タイミングが遅すぎると巣が発生する問題点があり、ま
た、2個の制御手段6,15により制御するのでコスト
が高くなる等の問題点があった。However, in this conventional configuration, the program controller 19 is operated at a predetermined time during the depressurization of the decompression chamber 1 to open the pressurization adjusting valve 17 and to open the pressurization chamber 2. Since the pressure is applied, the timing of the hot water to the mold 3 is not reliable, and if the timing of the hot water is too early, casting burrs are generated.
If the timing is too late, there is a problem that nests are generated, and there is a problem that the cost is increased because the control is performed by the two control means 6 and 15.
【0008】本発明は、上記従来の問題点を解決すべく
なされたもので、鋳型に対する押し湯のタイミングを良
好に行うことかでき、1個の制御手段で制御することの
できる吸引加圧鋳造装置を提供することを目的とするも
のである。SUMMARY OF THE INVENTION The present invention has been made to solve the above-mentioned conventional problems, and it is possible to satisfactorily control the timing of hot water for a mold and to control the suction pressure by a single control means. It is intended to provide a device.
【0009】[0009]
【課題を解決するための手段】本発明は、上記技術課題
を解決するため、減圧チャンバー内に鋳型を配設し、同
減圧チャンバー内を減圧することにより溶湯保持炉内の
溶湯をストークを介して鋳型内に充填した後、前記溶湯
保持炉内を加圧し溶湯に圧力を加えて鋳造する吸引加圧
鋳造装置において、前記減圧チャンバーの減圧回路に真
空ポンプの排気流量を制御手段によって変化させること
が可能な減圧用流量制御弁を配設するとともに、溶湯保
持炉の加圧回路にも同一の制御手段により加圧エアの流
量を変化させることが可能な加圧用流量制御弁を配設
し、前記減圧チャンバー内圧力と前記溶湯保持炉内圧力
の差圧を前記制御手段にフィードバックし、同制御手段
内で記憶されている差圧−時間パターンと比較演算し、
前記減圧用流量制御弁と加圧用流量制御弁との両方を制
御可能に設け、前記鋳型に配設した溶湯検知センサーに
より溶湯が鋳型内に充填したことを検知した電気信号を
入力して、前記溶湯保持炉の加圧回路を作動し、かつ前
記制御手段内で記憶されている差圧−時間パターンを変
更可能に構成した吸引加圧鋳造装置に存する。According to the present invention, in order to solve the above technical problems, a mold is provided in a decompression chamber, and the pressure in the decompression chamber is reduced so that the molten metal in the furnace for holding the molten metal is moved through a stoke. In the suction-pressure casting apparatus, which pressurizes the molten metal holding furnace and applies pressure to the molten metal after casting in the casting mold, the evacuation flow rate of the vacuum pump is changed by a control means in the decompression circuit of the decompression chamber. A pressure reducing flow control valve capable of changing the flow rate of the pressurized air by the same control means is disposed in the pressurizing circuit of the molten metal holding furnace, and The differential pressure between the pressure in the depressurizing chamber and the pressure in the molten metal holding furnace is fed back to the control means, and the differential pressure-time pattern stored in the control means is compared and calculated,
Both the depressurizing flow control valve and the pressurizing flow control valve are provided so as to be controllable, and an electric signal that detects that the molten metal has been filled into the mold by a molten metal detection sensor disposed in the mold is inputted, The present invention resides in a suction pressure casting apparatus configured to operate a pressure circuit of a molten metal holding furnace and change a differential pressure-time pattern stored in the control means.
【0010】[0010]
【作用】上記構成としたことにより、鋳型に配設した溶
湯検知センサーにより溶湯が鋳型内に充填したことを検
知した電気信号を入力して、溶湯保持炉の加圧回路を作
動してキャビティに対する押し湯のタイミングを正確に
実施可能とする。According to the above construction, an electric signal which detects that the molten metal is filled in the mold is inputted by the molten metal detecting sensor provided in the mold, and the pressurizing circuit of the molten metal holding furnace is operated to operate the molten metal holding furnace. The timing of the hot water can be accurately performed.
【0011】[0011]
【実施例】次に、本発明の一実施例を図面にしたがって
説明すると、図1は吸引加圧鋳造装置21の概略構成を
示すもので、同吸引加圧鋳造装置21は、下ダイベース
35の下部には溶湯保持炉24が配設され、上部には減
圧チャンバー36が配設されている。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Next, an embodiment of the present invention will be described with reference to the drawings. FIG. 1 shows a schematic configuration of a suction and pressure casting apparatus 21. The molten metal holding furnace 24 is provided at the lower part, and the decompression chamber 36 is provided at the upper part.
【0012】この鋳造装置21の機枠22を構成する基
台23上には所定の容積を有する溶湯保持炉24が形成
され、同溶湯保持炉24のほぼ中央には例えばアルミニ
ウム合金等の金属溶湯26を封入可能にルツボ25が載
置されている。また、溶湯保持炉24の対応する炉壁に
は給気口27と圧力取出し口28が形成され、圧力取出
し口28は差圧センサー29に接続されている。また、
給気口27は配管30を介して外部のコンプレッサー等
の圧力源に接続され、同配管30には上流側より順次減
圧弁31、加圧用流量制御弁32、バルブ33,34が
それぞれ配設されている。A molten metal holding furnace 24 having a predetermined volume is formed on a base 23 constituting a machine frame 22 of the casting apparatus 21, and a metal molten metal such as an aluminum alloy is provided substantially at the center of the molten metal holding furnace 24. A crucible 25 is placed so that 26 can be enclosed. An air supply port 27 and a pressure outlet 28 are formed in a corresponding furnace wall of the molten metal holding furnace 24, and the pressure outlet 28 is connected to a differential pressure sensor 29. Also,
The air supply port 27 is connected to a pressure source such as an external compressor through a pipe 30. The pipe 30 is provided with a pressure reducing valve 31, a pressurizing flow control valve 32, and valves 33 and 34 sequentially from the upstream side. ing.
【0013】また、この溶湯保持炉24の上部は機枠2
2に沿って上下動可能に設けられた下ダイベース35に
より密封状に閉蓋され、この下ダイベース35の上部に
は減圧チャンバー36が形成されている。Further, the upper part of the molten metal holding furnace 24 is
A lid is hermetically closed by a lower die base 35 provided to be able to move up and down along 2, and a decompression chamber 36 is formed above the lower die base 35.
【0014】この減圧チャンバー36は下部壁枠37と
上部壁枠38の組合わせにより形成され、下部壁枠37
は下ダイベース35に取付けられ、又、上部壁枠38
は、機枠22の上部に下向きにして取付けられた昇降シ
リンダ39により昇降動される可動板40の下面に取付
けられている。又、この減圧チャンバー36内には下型
42と上型43とからなる鋳型41が配設され、この上
下型42,43の合せ面にはキャビティ44が形成さ
れ、上型43は可動板40の下面に取付けられて上下動
可能に設けられ、下型42は下ダイベース35に対向配
設されるとともに、同下型42の所定の位置には湯口4
5が形成され、同湯口45には下ダイベース35を貫通
し、かつ下方に垂設されて溶湯保持炉24に配設したル
ツボ25の金属溶湯26内に侵漬可能な長さを有するス
トーク46が垂設されて、同ストーク46を介して金属
溶湯26をキャビティ44内に導入可能に設けられてい
る。The decompression chamber 36 is formed by combining a lower wall frame 37 and an upper wall frame 38, and the lower wall frame 37
Is attached to the lower die base 35 and the upper wall frame 38
Is mounted on the lower surface of a movable plate 40 which is moved up and down by an elevating cylinder 39 which is mounted downward on the upper part of the machine frame 22. A mold 41 composed of a lower mold 42 and an upper mold 43 is disposed in the decompression chamber 36, and a cavity 44 is formed on the mating surface of the upper and lower molds 42, 43. The lower die 42 is provided opposite to the lower die base 35 and is provided at a predetermined position of the lower die 42.
The stalk 46 has a length that penetrates the lower die base 35 and extends downward from the spout 45, and has a length that can be immersed in the metal melt 26 of the crucible 25 provided in the melt holding furnace 24. Is provided so that the molten metal 26 can be introduced into the cavity 44 through the stalk 46.
【0015】また、減圧チャンバー36の下部壁枠37
の対応する壁部には排気口47および圧力取出し口48
が形成され、圧力取出し口48は差圧センサー29に接
続され、また、排気口47は配管49を介して真空ポン
プ50に接続され、同配管49には上流側より順次減圧
用流量制御弁51、バルブ52、流量調整弁53および
バルブ54,55がそれぞれ配設されている。The lower wall frame 37 of the decompression chamber 36
The exhaust port 47 and the pressure output port 48
Is formed, the pressure outlet 48 is connected to the differential pressure sensor 29, the exhaust port 47 is connected to a vacuum pump 50 via a pipe 49, and the pressure reducing flow control valve 51 is sequentially connected to the pipe 49 from the upstream side. , A valve 52, a flow control valve 53, and valves 54 and 55, respectively.
【0016】このように配設された差圧センサー29お
よび流量制御弁32,51はマイクロコンピュータで構
成される制御手段56に接続されている。また、上記し
た鋳型41の上型43のほぼ中央部には溶湯検知センサ
ー57が埋設状に取付けられてキャビティ44内に金属
溶湯26が充填したときに制御手段56へ電気信号を出
力するように設けられている。The differential pressure sensor 29 and the flow control valves 32 and 51 thus arranged are connected to control means 56 constituted by a microcomputer. A molten metal detection sensor 57 is mounted in a substantially central portion of the upper mold 43 of the mold 41 so as to output an electric signal to the control means 56 when the cavity 44 is filled with the molten metal 26. Is provided.
【0017】また、この制御手段56内には図2に示す
(チャンバー内圧力と炉内圧力の差圧)−時間パターン
S−P1−P2−P3−P4−P5−P6がメモリーさ
れており、この差圧−時間パターンに従って制御が行わ
れるIn the control means 56, a time pattern SP-P1-P2-P3-P4-P5-P6 shown in FIG. 2 (differential pressure between chamber pressure and furnace pressure) is stored. Control is performed according to this differential pressure-time pattern.
【0018】この装置21において、制御手段56内に
メモリーされた差圧−時間パターンにしたがって制御が
行われるもので、すなわち、図2において鋳込みスター
トボタンが押された時(S)に、バルブ52が開き真空
ポンプ50により減圧チャンバー36内が排気され、金
属溶湯26が吸引されて、ストーク46を介しキャビテ
ィ44内に金属溶湯26が注入される。その注入開始ポ
イントが図中P1で示すポイントであり、図中P2で示
す時点においてキャビティ44内への充填終了を溶湯検
知センサー57により検知し、この検知信号を制御手段
56に電気信号として入力し、予めメモリーされた差圧
−時間、S−P1−P2−P3−P4−P5−P6が、
差圧−時間、S−P1−P2−P3′−P4′−P5′
−P6′に自動変更される。ここでP2とP3′は同一
時間である。In this apparatus 21, the control is performed according to the differential pressure-time pattern stored in the control means 56, that is, when the casting start button is pressed (S) in FIG. Is opened, the inside of the decompression chamber 36 is exhausted by the vacuum pump 50, the molten metal 26 is sucked, and the molten metal 26 is injected into the cavity 44 through the stalk 46. The injection start point is the point indicated by P1 in the figure. At the time indicated by P2 in the figure, the completion of filling into the cavity 44 is detected by the molten metal detection sensor 57, and this detection signal is input to the control means 56 as an electric signal. , The pre-stored differential pressure-time, S-P1-P2-P3-P4-P5-P6,
Differential pressure-time, S-P1-P2-P3'-P4'-P5 '
Automatically changed to -P6 '. Here, P2 and P3 'are the same time.
【0019】一方、溶湯検知センサー57からの検知信
号を受けて、バルブ52が閉じ、減圧チャンバー36内
の減圧が終了すると同時にバルブ33が開かれ、溶湯保
持炉24内の加圧がスタートする。すなわち、図2にお
いてP3′からP4′点に亘り保持炉24内が加圧され
てキャビティ44内の金属溶湯26に圧力が加わり押し
湯工程となる。その後、P4′からP5′の間は押し湯
圧が保持さた時間であり、この時間はAで示す押し湯圧
保持時間となっている。この押し湯圧保持時間Aが経過
した後に、P5′からP6′においてバルブ33が閉
じ、バルブ55,34が開かれることにより、減圧チャ
ンバー36内が給気、溶湯保持炉24内が排気される。
この排気時間Bの時間内に自然冷却され、その後に昇降
シリンダ39により可動板40が上動されて上型43も
一体に上動されてキャビティ44より製品が取出されて
ワンショットが終了する。そして、下ダイベース35が
上動されて溶湯保持炉24の上部が開放され、ルツボ2
5に金属溶湯26が注入され、再び下ダイベース35お
よび可動板40が下動されて図1の状態に復して鋳造が
なされる。On the other hand, upon receiving the detection signal from the molten metal detection sensor 57, the valve 52 is closed, and the pressure in the pressure reducing chamber 36 is completed, and at the same time the valve 33 is opened, and the pressurization in the molten metal holding furnace 24 is started. That is, in FIG. 2, the inside of the holding furnace 24 is pressurized from the point P3 'to the point P4', and pressure is applied to the molten metal 26 in the cavity 44 to perform a hot-water feeding process. Thereafter, the period between P4 'and P5' is the time during which the feeder pressure is held, and this time is the feeder pressure holding time indicated by A. After the elapse of the hot water pressure holding time A, the valve 33 is closed and the valves 55 and 34 are opened from P5 'to P6', so that the inside of the decompression chamber 36 is supplied with air and the inside of the molten metal holding furnace 24 is exhausted. .
Natural cooling is performed within the evacuation time B, after which the movable plate 40 is moved up by the elevating cylinder 39, the upper die 43 is also moved up, and the product is taken out from the cavity 44, thereby completing one shot. Then, the lower die base 35 is moved upward to open the upper part of the molten metal holding furnace 24, and the crucible 2 is opened.
5, the lower die base 35 and the movable plate 40 are moved down again to return to the state of FIG. 1 and casting is performed.
【0020】このように図2に示す差圧−時間パターン
に沿った制御が制御手段56により行われる時には、差
圧センサー29からの信号が制御手段56に入力されて
おり、この信号に基づいて制御手段56内にて比較演算
され、その結果を流量制御弁51,32に電気信号とし
て送り、流量制御弁51,32の弁開度が調整されて制
御がなされるので、1個の制御手段56により制御をす
ることができてコストを低減することができ、とくに、
鋳型41の上型43のほぼ中央部には溶湯検知センサー
57が埋設状に取付けられてキャビティ44内に金属溶
湯26が充填したときに制御手段56へ電気信号を出力
するように設け、この電気信号に基いて溶湯保持炉24
を加圧するように構成したものであるから、キャビティ
44に対する押し湯のタイミングを正確に行うことがで
き、製品品質を向上することができる。When the control according to the differential pressure-time pattern shown in FIG. 2 is performed by the control means 56, a signal from the differential pressure sensor 29 is input to the control means 56, and based on this signal, The comparison operation is performed in the control means 56, and the result is sent to the flow control valves 51 and 32 as an electric signal, and the valve openings of the flow control valves 51 and 32 are adjusted and controlled. The control can be performed by the control by 56, and the cost can be reduced.
At a substantially central portion of the upper mold 43 of the mold 41, a molten metal detection sensor 57 is buried and provided so as to output an electric signal to the control means 56 when the molten metal 26 is filled in the cavity 44. Melt holding furnace 24 based on signal
Is pressurized, so that the timing of hot water to the cavity 44 can be accurately performed, and the product quality can be improved.
【0021】[0021]
【発明の効果】上記のように構成したものであるから、
差圧−時間パターンに沿った制御が制御手段により行わ
れる時には差圧センサーからの信号が制御手段に入力さ
れており、この信号に基づいて制御手段内にて比較演算
され、その結果を減圧用流量制御弁と加圧用流量制御弁
に電気信号として送り、両流量制御弁の弁開度が調整さ
れて制御がなされるので、1個の制御手段により制御を
することができてコストを低減することができ、とく
に、鋳型の上型のほぼ中央部には溶湯検知センサーが埋
設状に取付けられてキャビティ内に金属溶湯が充填した
ときに制御手段へ電気信号を出力するように設け、この
電気信号に基いて溶湯保持炉を加圧するように構成した
ものであるから、キャビティに対する押し湯のタイミン
グを正確に行うことができ、製品品質を向上することが
できる。According to the above-mentioned structure,
When the control in accordance with the differential pressure-time pattern is performed by the control means, a signal from the differential pressure sensor is input to the control means. Based on this signal, a comparison operation is performed in the control means. An electric signal is sent to the flow control valve and the flow control valve for pressurization, and the valve opening of both flow control valves is adjusted and controlled. Therefore, the control can be performed by one control means, and the cost is reduced. In particular, a molten metal detection sensor is buried almost at the center of the upper mold of the mold, and provided so as to output an electric signal to the control means when the cavity is filled with the molten metal. Since the molten metal holding furnace is configured to be pressurized based on the signal, the timing of pushing the molten metal into the cavity can be accurately performed, and the product quality can be improved.
【図1】吸引加圧鋳造装置の概略図である。FIG. 1 is a schematic view of a suction pressure casting apparatus.
【図2】制御手段に入力される差圧−時間パターン図で
ある。FIG. 2 is a diagram showing a differential pressure-time pattern input to a control means.
【図3】従来の吸引加圧鋳造装置の概略図である。FIG. 3 is a schematic view of a conventional suction pressure casting apparatus.
21 吸引加圧鋳造装置 24 溶湯保持炉 25 ルツボ 26 溶湯29 差圧センサー 30 配管(加圧回路) 32 加圧用流量制御弁 36 減圧チャンバー 41 鋳型 43 上型 44 キャビティ 46 ストーク 49 配管(減圧回路)50 真空ポンプ 51 減圧用流量制御弁 56 制御手段 57 溶湯検知センサーDESCRIPTION OF SYMBOLS 21 Suction pressure casting apparatus 24 Melt holding furnace 25 Crucible 26 Melt 29 Differential pressure sensor 30 Piping (pressurizing circuit) 32 Flow rate control valve for pressurizing 36 Depressurizing chamber 41 Mold 43 Upper mold 44 Cavity 46 Stoke 49 Piping (Depressurizing circuit) 50 Vacuum pump 51 Depressurization flow control valve 56 Control means 57 Molten metal detection sensor
───────────────────────────────────────────────────── フロントページの続き (56)参考文献 特開 平5−228605(JP,A) 特開 平5−169231(JP,A) 特開 昭62−248551(JP,A) 特開 平5−96356(JP,A) (58)調査した分野(Int.Cl.7,DB名) B22D 18/04 B22D 18/06 B22D 18/08 ──────────────────────────────────────────────────続 き Continuation of front page (56) References JP-A-5-228605 (JP, A) JP-A-5-169231 (JP, A) JP-A-62-248551 (JP, A) JP-A-5-228551 96356 (JP, A) (58) Field surveyed (Int. Cl. 7 , DB name) B22D 18/04 B22D 18/06 B22D 18/08
Claims (1)
圧チャンバー内を減圧することにより溶湯保持炉内の溶
湯をストークを介して鋳型内に充填した後、前記溶湯保
持炉内を加圧し、溶湯に圧力を加えて鋳造する吸引加圧
鋳造装置において、 前記減圧チャンバー内の減圧回路に真空ポンプの排気流
量を制御手段によって変化させることが可能な減圧用流
量制御弁を配設するとともに、溶湯保持炉内の加圧回路
にも同一の制御手段により加圧エアの流量を変化させる
ことが可能な加圧用流量制御弁を配設し、 前記減圧チャンバー内圧力と前記溶湯保持炉内圧力の差
圧を前記制御手段にフィードバックし、同制御手段内で
記憶されている差圧−時間パターンと比較演算し、前記
減圧用流量制御弁と加圧用流量制御弁との両方を制御可
能に設け、前記鋳型に配設した溶湯検知センサーにより
溶湯が鋳型内に充填したことを検知した電気信号を入力
して、前記溶湯保持炉の加圧回路を作動し、かつ前記制
御手段内で記憶されている差圧−時間パターンを変更可
能に構成した吸引加圧鋳造装置。1. A mold is provided in a decompression chamber, and the pressure in the decompression chamber is reduced to fill the molten metal in the molten metal holding furnace into the mold through stalk. In a suction and pressure casting apparatus for casting by applying pressure to the molten metal, a pressure reducing flow control valve capable of changing an exhaust flow rate of a vacuum pump by a control unit is provided in a pressure reducing circuit in the pressure reducing chamber, A pressurizing flow control valve capable of changing the flow rate of pressurized air by the same control means is also provided in a pressurizing circuit in the molten metal holding furnace. The differential pressure is fed back to the control means, the differential pressure stored in the control means is compared with a time pattern, and a comparison operation is performed, and both the pressure reducing flow control valve and the pressurizing flow control valve are provided so as to be controllable. An electric signal that detects that the molten metal has filled the mold is input by a molten metal detection sensor disposed on the mold, the pressurizing circuit of the molten metal holding furnace is operated, and stored in the control means. A suction and pressure casting device configured to be able to change the differential pressure-time pattern.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP04069110A JP3128705B2 (en) | 1992-02-17 | 1992-02-17 | Suction pressure casting equipment |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP04069110A JP3128705B2 (en) | 1992-02-17 | 1992-02-17 | Suction pressure casting equipment |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH05228604A JPH05228604A (en) | 1993-09-07 |
| JP3128705B2 true JP3128705B2 (en) | 2001-01-29 |
Family
ID=13393166
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP04069110A Expired - Fee Related JP3128705B2 (en) | 1992-02-17 | 1992-02-17 | Suction pressure casting equipment |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3128705B2 (en) |
Families Citing this family (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US6247521B1 (en) | 1996-08-15 | 2001-06-19 | Toyota Jidosha Kabushiki Kaisha | Pressure difference control method for filling a cavity with melt |
| JP5158501B2 (en) * | 2008-06-26 | 2013-03-06 | 新東工業株式会社 | Casting equipment |
| CN104028729A (en) * | 2014-05-09 | 2014-09-10 | 西北工业大学 | Vacuum low-pressure casting forming device for titanium alloy component |
| KR101906093B1 (en) | 2015-05-22 | 2018-10-08 | 닛산 지도우샤 가부시키가이샤 | Suction pressure casting method |
| CN115365478B (en) * | 2022-08-12 | 2023-08-29 | 中国兵器装备集团西南技术工程研究所 | Nonlinear pressurization control method and system for casting and forming complex metal component |
| CN115365486B (en) * | 2022-08-12 | 2023-08-29 | 中国兵器装备集团西南技术工程研究所 | Control system of multi-field pressurizing casting equipment |
-
1992
- 1992-02-17 JP JP04069110A patent/JP3128705B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JPH05228604A (en) | 1993-09-07 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP3113948B2 (en) | Multifunctional casting equipment | |
| JP3490188B2 (en) | Vacuum control method and apparatus in vacuum die casting | |
| JPS5811302B2 (en) | Vacuum pressure casting method | |
| JP3128705B2 (en) | Suction pressure casting equipment | |
| JPS58949B2 (en) | Compression vacuum suction casting equipment using high frequency heating | |
| JPH0768366A (en) | Method and equipment of vacuum die casting | |
| JP3388019B2 (en) | Pressure control method and pressure control device in low pressure casting | |
| KR960007630B1 (en) | Low pressure casting method and device | |
| JPH0957422A (en) | Vacuum casting | |
| JP3727444B2 (en) | Differential pressure casting apparatus and differential pressure casting method | |
| JP2799454B2 (en) | Pressure control method and pressure control device for low pressure casting machine | |
| JPH06320250A (en) | Low pressure casting device | |
| JP2517810B2 (en) | Low pressure casting method | |
| JP2936580B2 (en) | Press forming equipment | |
| JP2517810C (en) | ||
| JP4129352B2 (en) | Casting method of low pressure casting equipment | |
| JP3759384B2 (en) | Depressurization method of vacuum mold and suction piping apparatus | |
| JP2003200251A (en) | Low pressure casting method and low pressure casting device | |
| JPH02155558A (en) | Pressurization controller for low-pressure casting machine | |
| JP2814845B2 (en) | Low pressure casting method | |
| JPS5855166A (en) | Casting method and equipment | |
| JPH0938765A (en) | Apparatus for pouring molten metal | |
| JPH05329616A (en) | Casting method | |
| JPH1157978A (en) | Differential pressure casting apparatus | |
| JPH11300464A (en) | Low pressure casting method and low pressure casting holding furnace device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20091117 Year of fee payment: 9 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20111117 Year of fee payment: 11 |
|
| LAPS | Cancellation because of no payment of annual fees |