Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP3129574B2 - Lubricating oil supply device for two-cycle engine - Google Patents
[go: Go Back, main page]

JP3129574B2 - Lubricating oil supply device for two-cycle engine - Google Patents

Lubricating oil supply device for two-cycle engine

Info

Publication number
JP3129574B2
JP3129574B2 JP05155000A JP15500093A JP3129574B2 JP 3129574 B2 JP3129574 B2 JP 3129574B2 JP 05155000 A JP05155000 A JP 05155000A JP 15500093 A JP15500093 A JP 15500093A JP 3129574 B2 JP3129574 B2 JP 3129574B2
Authority
JP
Japan
Prior art keywords
lubricating oil
oil supply
amount
engine
consumption
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP05155000A
Other languages
Japanese (ja)
Other versions
JPH06341308A (en
Inventor
秀敬 須原
秀明 伊藤
誠 小杉
耕生 前橋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yamaha Motor Co Ltd
Original Assignee
Yamaha Motor Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yamaha Motor Co Ltd filed Critical Yamaha Motor Co Ltd
Priority to JP05155000A priority Critical patent/JP3129574B2/en
Publication of JPH06341308A publication Critical patent/JPH06341308A/en
Application granted granted Critical
Publication of JP3129574B2 publication Critical patent/JP3129574B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F02COMBUSTION ENGINES; HOT-GAS OR COMBUSTION-PRODUCT ENGINE PLANTS
    • F02BINTERNAL-COMBUSTION PISTON ENGINES; COMBUSTION ENGINES IN GENERAL
    • F02B75/00Other engines
    • F02B75/02Engines characterised by their cycles, e.g. six-stroke
    • F02B2075/022Engines characterised by their cycles, e.g. six-stroke having less than six strokes per cycle
    • F02B2075/025Engines characterised by their cycles, e.g. six-stroke having less than six strokes per cycle two

Landscapes

  • Lubrication Of Internal Combustion Engines (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、2サイクルエンジンの
潤滑油供給装置に関し、特に間歇,給油方式を採用した
場合に、刻々と変化する運転状態に見合った適正量の潤
滑油を供給できるようにした給油方法の改善に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a lubricating oil supply system for a two-stroke engine, and more particularly, to an intermittent or lubricating system capable of supplying an appropriate amount of lubricating oil in accordance with an ever-changing operation state. The improvement of refueling methods.

【0002】[0002]

【従来の技術】2サイクルエンジンでは、ピストン摺動
面,クランクジャーナル部等の被潤滑部に潤滑油を間歇
的に噴射供給する方式の潤滑油供給装置を採用する場合
がある。この方式では、給油量は、潤滑油供給系からの
1回当たりの送油量と送油間隔とで決定される。この送
油量は負荷が大きいほど多量に、また送油間隔はエンジ
ン回転速度が高いほど短く設定するのが一般的である。
しかしこの方法では、1回当たりの送油量が多く、かつ
送油間隔の長い高負荷・低回転域において白煙が発生す
る不具合がある。一方この問題を解消するために1回当
たりの送油量を少なくすると、高負荷・高回転域におい
て必要な給油量を確保するには送油間隔を極端に短くす
る必要が生じ、潤滑油供給系の追従が困難となる問題が
ある。
2. Description of the Related Art A two-stroke engine sometimes employs a lubricating oil supply system of a type in which lubricating oil is intermittently supplied to lubricated parts such as a piston sliding surface and a crank journal. In this method, the amount of oil supply is determined by the amount of oil supplied from the lubricating oil supply system and the oil supply interval. Generally, the oil supply amount is set to be larger as the load is larger, and the oil supply interval is set to be shorter as the engine rotation speed is higher.
However, this method has a problem in that white smoke is generated in a high-load, low-rotation region where a large amount of oil is fed at one time and a long oil feeding interval is long. On the other hand, if the amount of lubrication per operation is reduced to solve this problem, it is necessary to make the lubrication interval extremely short in order to secure the required lubrication amount in a high load and high speed range. There is a problem that it is difficult to follow the system.

【0003】本出願人は、上記問題を解消するために、
通常運転域では1回当たりの送油量を最小値に固定して
送油間隔を可変とし、高負荷・高回転域では送油間隔を
最小値に固定して送油量を可変とする潤滑装置を提案し
ている(特開平2−204608号公報参照)。
[0003] In order to solve the above problem, the present applicant has
Lubrication in which the oil supply interval per operation is fixed to the minimum value in the normal operation range and the oil supply interval is variable, and in the high load and high speed range, the oil supply interval is fixed to the minimum value and the oil supply amount is variable. An apparatus has been proposed (see JP-A-2-204608).

【0004】[0004]

【発明が解決しようとする課題】しかし上記提案に係る
潤滑油供給装置では、送油と送油との間において運転状
態が変化した場合、この変化に追従できないことから潤
滑油供給量に過不足が生じることが懸念される。
However, in the lubricating oil supply apparatus according to the above proposal, if the operating state changes between oil feedings, the change cannot be followed, so that the lubricating oil supply amount is not sufficient. Is likely to occur.

【0005】本発明は、上記従来の実情に鑑みてなされ
たもので、運転状態が刻々と変化するような場合におい
ても、その運転状態に見合った適正量の潤滑油を供給す
ることかでき、その結果、潤滑油消費量を低減でき、か
つ排気管から排出される白煙を低減できる2サイクルエ
ンジンの潤滑油供給装置を提供することを目的としてい
る。
SUMMARY OF THE INVENTION The present invention has been made in view of the above-mentioned conventional circumstances, and is capable of supplying an appropriate amount of lubricating oil corresponding to the operating condition even when the operating condition changes every moment. As a result, it is an object of the present invention to provide a lubricating oil supply device for a two-stroke engine that can reduce lubricating oil consumption and reduce white smoke discharged from an exhaust pipe.

【0006】[0006]

【課題を解決するための手段】請求項1の発明は、潤滑
油をエンジンに潤滑油供給系により間歇的に供給する2
サイクルエンジンの潤滑油供給装置において、エンジン
回転速度と負荷とから被潤滑部での刻々の潤滑油消費量
を推定算出する消費量算出手段と、該算出手段によって
算出された刻々の単位消費量を積算する積算手段と、該
積算手段による積算消費量が上記潤滑油供給系における
1回当たりの送油量に達した時点で次回の潤滑油供給を
行わせる給油制御手段とを備えたことを特徴としてい
る。
According to the first aspect of the present invention, a lubricating oil is intermittently supplied to an engine by a lubricating oil supply system.
In the lubricating oil supply device for a cycle engine, a consumption calculating means for estimating and calculating the instantaneous lubricating oil consumption in the lubricated portion from the engine rotational speed and the load, and the instantaneous unit consumption calculated by the calculating means. An accumulating means for accumulating the oil; and an oil supply control means for performing a next lubricating oil supply when the accumulated consumption by the accumulating means reaches the oil supply amount per one time in the lubricating oil supply system. And

【0007】また請求項2の発明は、潤滑油供給系の送
油量,送油間隔を可変とするとともに、上記消費量算出
手段,積算手段,及び前回の供給(開始時,終了時,又
はその中間時のいずれでも良い。)からの経過時間と上
記積算消費量との関係が、上記潤滑油供給系の送油量と
送油間隔との関係に基づいて予め設定された給油境界ラ
インに達した時点で次回の潤滑油供給を行わせる給油制
御手段を備えたことを特徴としている。また、請求項3
の発明は潤滑油供給系が直接給油方式のものであること
を特徴としている。
According to a second aspect of the present invention, the oil supply amount and the oil supply interval of the lubricating oil supply system are made variable, and the consumption calculating means, the integrating means, and the previous supply (at the start, end, or The relationship between the elapsed time from the intermediate time and the above-mentioned integrated consumption amount may be determined by the relationship between the oil supply amount of the lubricating oil supply system and the oil supply interval. It is characterized by having a refueling control means for performing the next lubricating oil supply at the time of reaching. Claim 3
Is characterized in that the lubricating oil supply system is of a direct lubrication type.

【0008】[0008]

【作用】本発明に係る潤滑油供給装置によれば、刻々変
化する潤滑油消費量を算出してこれを積算し、請求項1
の発明では上記積算消費量が潤滑油供給系の1回当たり
の送油量に達した時点で、また請求項2の発明では、前
回の送油からの経過時間と積算消費量との関係が、予め
設定された給油境界ラインに達した時点でそれぞれ次回
の潤滑油供給を行わせるようにしたので、過不足なく適
正量の潤滑油を被潤滑部に供給でき、潤滑油消費量を低
減できる。
According to the lubricating oil supply device of the present invention, the lubricating oil consumption changing every moment is calculated and integrated.
According to the invention, when the integrated consumption reaches the oil supply amount per lubrication oil supply system, and in the invention according to claim 2, the relationship between the elapsed time from the previous oil supply and the integrated consumption is determined. Since the next lubricating oil supply is performed each time a predetermined lubricating boundary line is reached, an appropriate amount of lubricating oil can be supplied to the lubricated portion without excess or deficiency, and the amount of lubricating oil consumption can be reduced. .

【0009】また請求項3の発明では、上記刻々の消費
量を積算する方法を、直接給油方式の場合に適用したの
で、上記高精度に算出した必要潤滑油量を無駄なく確実
に被潤滑部に供給でき、この点からも潤滑油供給量を必
要最低限とすることができる。ちなみに、吸気通路に潤
滑油を供給する間接式給油方式の場合、必要供給量を高
精度に算出しても、この潤滑油は吸気通路等に付着する
場合もあることから被潤滑部に効率よく供給できず、効
果が若干低下するが、直接給油方式の場合はこのような
問題が生じることはない。
According to the third aspect of the present invention, the method of integrating the instantaneous consumption is applied to the case of a direct lubrication system. Therefore, the required amount of lubricating oil calculated with high accuracy can be surely and without waste. In this respect, the lubricating oil supply amount can be minimized. By the way, in the case of the indirect oil supply system that supplies the lubricating oil to the intake passage, even if the required supply amount is calculated with high accuracy, the lubricating oil may adhere to the intake passage etc. Although the supply is not possible and the effect is slightly reduced, such a problem does not occur in the case of the direct refueling system.

【0010】[0010]

【実施例】以下、本発明の実施例を添付図面に基づいて
説明する。図1及び図3は請求項1の発明の一実施例
(第1実施例)による2サイクルディーゼルエンジンの
潤滑油供給装置を説明するため図であり、図1はその概
略構成図、図2はフローチャート図、図3は給油タイミ
ングを説明するための図である。
Embodiments of the present invention will be described below with reference to the accompanying drawings. FIGS. 1 and 3 are diagrams for explaining a lubricating oil supply device for a two-cycle diesel engine according to an embodiment (first embodiment) of the first aspect of the present invention. FIG. 1 is a schematic configuration diagram thereof, and FIG. FIG. 3 is a flowchart for explaining the refueling timing.

【0011】図1において、1は3気筒の2サイクルデ
ィーゼルエンジンであり、これはクランクケース2,シ
リンダブロック3,シリンダヘッド4を積層締結し、シ
リンダブロック3内に配置されたピストン5をコンロッ
ド6でクランクケース2内に配置されたクランク軸7に
連結し、さらにシリンダヘッド4に燃料噴射弁8を配設
した構造のものである。また上記クランク軸7の一端に
はクラッチ9を介してミッション10が接続されてい
る。なお、11はエンジン回転数を検出する回転数セン
サである。
In FIG. 1, reference numeral 1 denotes a three-cylinder, two-cycle diesel engine, which comprises a crankcase 2, a cylinder block 3, and a cylinder head 4 which are stacked and fastened to each other, and a piston 5 disposed in the cylinder block 3 is connected to a connecting rod 6 by a connecting rod. The fuel injection valve 8 is connected to a crankshaft 7 disposed in the crankcase 2 and a fuel injection valve 8 is disposed in the cylinder head 4. A transmission 10 is connected to one end of the crankshaft 7 via a clutch 9. Reference numeral 11 denotes a rotation speed sensor that detects the engine rotation speed.

【0012】そして上記エンジン1には潤滑油供給装置
12が設けられており、該供給装置12は、潤滑油供給
系13と制御装置14とを備えている。上記潤滑油供給
系13は、分配型の第1,第2潤滑油ポンプ15,16
の吸込側を導入通路20を介して潤滑油タンク17に接
続し、上記第1潤滑油ポンプ15の吐出側を3つの第1
供給通路18を介してクランク軸7の3つのジャーナル
軸受部に、第2潤滑油ポンプ16の吐出側を3つの第2
供給通路19を介して3つのピストン摺動面にそれぞれ
接続した構造となっている。なお、上記ジャーナル軸受
部に供給された潤滑油の一部はクランク軸内を通ってコ
ンロッド6の大端部に導かれ、またピストン摺動面に供
給された潤滑油の一部は霧状に飛散してコンロッド6の
小端部に導かれる。
The engine 1 is provided with a lubricating oil supply device 12, which has a lubricating oil supply system 13 and a control device 14. The lubricating oil supply system 13 includes distribution type first and second lubricating oil pumps 15 and 16.
Is connected to the lubricating oil tank 17 via the introduction passage 20, and the discharge side of the first lubricating oil pump 15
The discharge side of the second lubricating oil pump 16 is connected to three journal bearings of the crankshaft 7 via the supply passages 18 by three second bearings.
The structure is such that the three piston sliding surfaces are connected to each other via the supply passage 19. A part of the lubricating oil supplied to the journal bearing part is guided to the large end of the connecting rod 6 through the crankshaft, and a part of the lubricating oil supplied to the piston sliding surface is atomized. It is scattered and guided to the small end of the connecting rod 6.

【0013】ここで上記第1,第2潤滑油ポンプ15,
16は例えばパルスモータによってエンジンの回転とは
独立に回転駆動され、1サイクルの吐出(送油)量及び
吐出時間間隔は可変となっているが、本実施例では1サ
イクルの吐出量はPq,Prに固定され、また吐出時間
間隔Tq,Trは後述の方法で可変制御される。
Here, the first and second lubricating oil pumps 15,
Reference numeral 16 denotes a pulse motor, for example, which is driven to rotate independently of the rotation of the engine, and the discharge (oiling) amount and discharge time interval in one cycle are variable. In this embodiment, the discharge amount in one cycle is Pq, It is fixed at Pr, and the ejection time intervals Tq and Tr are variably controlled by a method described later.

【0014】上記制御装置14は、消費量算出手段14
a,積算手段14b,及び給油制御手段14cを備えて
いる。上記消費量算出手段14aは、上記回転数センサ
11からのエンジン回転数信号a,図示しないアクセル
開度センサからの負荷信号b,及びエンジン運転時間積
算信号cに基づいて、慣らし運転中か慣らし運転完了後
かに基づいて、かつその運転状態下において上記クラン
クジャーナル側でエンジン1回転当たり要求される潤滑
油量(単位要求量)q,及びピストン摺動面側でエンジ
ン1回転当たり要求される潤滑油量(単位要求量)rを
推定算出する。なお上記負荷信号bは、燃料噴射弁から
の燃料噴射量,吸入空気量,又はスロットルバルブ開度
等から求めることもできる。
The control device 14 comprises a consumption calculating means 14.
a, an integrating means 14b, and a refueling control means 14c. Based on the engine speed signal a from the speed sensor 11, the load signal b from the accelerator opening sensor (not shown), and the engine running time integrated signal c, the consumption calculating means 14a performs running-in or running-in operation. The lubricating oil amount (unit required amount) q required per one revolution of the engine on the crank journal side and the lubrication required per one revolution of the engine on the piston sliding surface side based on whether the operation is completed and under the operating state. The oil amount (unit required amount) r is estimated and calculated. The load signal b can be obtained from the fuel injection amount from the fuel injection valve, the intake air amount, the throttle valve opening, or the like.

【0015】ここで上記単位要求量の算出は、例えばエ
ンジン回転数−負荷−潤滑油要求量の三次元マップを、
クランクジャーナル側用とピストン摺動面側用と別個に
内蔵しておき、この各マップを検索することにより、あ
るいは予め設定したそれぞれの演算式によって行う。こ
の場合、上記単位要求量q,rは、何れも高負荷・高回
転ほど多量に設定されている。またr/qの比sは高負
荷域のsが低負荷域のsより小さくなるように設定され
ている。
Here, the calculation of the unit required amount is performed by, for example, using a three-dimensional map of engine speed-load-lubricating oil required amount.
It is built in separately for the crank journal side and for the piston sliding surface side, and is performed by searching each of these maps or by using respective preset arithmetic expressions. In this case, the unit demands q and r are set to be larger as the load and the rotation speed increase. The r / q ratio s is set such that s in the high load region is smaller than s in the low load region.

【0016】また、上記単位要求量qの算出にあたって
は、エンジンの慣らし運転中と、慣らし運転完了後とで
別個のマップ又は演算式が採用されている。この別個の
マップ等を採用しているのは、エンジンの潤滑では慣ら
し運転中は比較的多量の潤滑油を必要とするものの、慣
らし運転完了後は潤滑油の必要量は大幅に減少すること
から、上記別個のマップ等を採用することにより全体と
しての潤滑油消費量を大幅に削減できるからである。
In calculating the unit required amount q, different maps or arithmetic expressions are used during the running-in operation of the engine and after the running-in operation is completed. The reason for using this separate map is that while lubrication of the engine requires a relatively large amount of lubricating oil during running-in, the amount of lubricating oil required after running-in is significantly reduced This is because the total consumption of lubricating oil can be greatly reduced by employing the separate maps and the like.

【0017】上記慣らし運転完了の判定は以下の各種の
方法を採用することによって行うことができる。この場
合、各判定方法を組み合わせて採用することにより、よ
り正確に慣らし運転の完了を判定することができる。例
えば、エンジン回転数,エンジン運転時間,潤滑油ポン
プ吐出回数,走行距離,ブレーキ作動回数,クラッチ作
動回数,サイドスタンド使用回数,燃料消費量,潤滑油
消費量の積算値が予め設定された基準値を越えた時点で
慣らし運転が完了したと判定する。なお、上記潤滑油消
費量の積算にあたっては、潤滑油流量を直接積算する方
法の他に、潤滑油タンクのレベルリミットスイッチが連
続的に作動した回数によって求めることもできる。
The completion of the running-in operation can be determined by employing the following various methods. In this case, the completion of the break-in operation can be more accurately determined by employing a combination of the respective determination methods. For example, the engine speed, the engine operation time, the number of times the lubricating oil pump is discharged, the traveling distance, the number of times of brake operation, the number of times of clutch operation, the number of times the side stand is used, the fuel consumption, and the integrated value of the amount of lubricating oil consumption are set to predetermined reference values. It is determined that the break-in operation has been completed at the point in time when it exceeded. In addition, in addition to the method of directly integrating the lubricating oil flow rate, the lubricating oil consumption can be calculated by the number of times the level limit switch of the lubricating oil tank is continuously operated.

【0018】なお、上記慣らし運転中において、慣らし
運転の進行段階を判定し、この慣らし運転進行段階に応
じて別個のマップを採用するようにしてもよく、このよ
うにすれば潤滑油消費量をよりきめ細かに制御できる。
During the running-in operation, the progressing stage of the running-in operation may be determined, and a separate map may be adopted in accordance with the running-up stage of the running-in operation. More precise control.

【0019】また上記積算手段14bは、上記演算され
た刻々の単位要求量q,rを積算して積算要求量Q(=
Σq),R(=Σr)を求める。そして上記給油制御手
段14cは、上記積算された潤滑油要求量Q,Rが、上
記第1,第2潤滑油ポンプ15,16の1サイクルの吐
出量Pq,Prに達した時点で上記各ポンプ15,16
のパルスモータに駆動信号A,Bを出力する。
The accumulating means 14b accumulates the calculated instantaneous required unit quantities q and r to obtain an integrated required amount Q (=
Σq) and R (= Σr). The lubrication control means 14c sets the respective pumps at the time when the integrated required lubricating oil amounts Q and R reach the discharge amounts Pq and Pr in one cycle of the first and second lubricating oil pumps 15 and 16, respectively. 15,16
Drive signals A and B are output to the pulse motors.

【0020】次に本実施例装置の動作(制御動作及び各
部の動作を含む)を図2に示すフローチャートに従って
説明する。なお、クランクジャーナル側及びピストン摺
動面側のいずれについても同様の動作が行われるので、
ここでは説明の便宜のため、クランクジャーナル側につ
いてのみ説明する。 イグニッションキーをオンにすると、図2のステッ
プS1においてΣq(ステップS8で求める潤滑油の積
算要求量)を零に設定する等の初期設定がなされる。次
にステップS2では第1潤滑油ポンプ15を駆動して、
クランク軸7のジャーナル軸受部に1回又は数回潤滑油
を送出する。次にステップS3ではエンジンを始動す
る。
Next, the operation (including the control operation and the operation of each unit) of the apparatus of this embodiment will be described with reference to the flowchart shown in FIG. Since the same operation is performed on both the crank journal side and the piston sliding surface side,
Here, for convenience of explanation, only the crank journal side will be described. When the ignition key is turned on, initial settings are made in step S1 of FIG. 2, such as setting Σq (the integrated amount of lubricating oil calculated in step S8) to zero. Next, in step S2, the first lubricating oil pump 15 is driven,
The lubricating oil is delivered to the journal bearing portion of the crankshaft 7 once or several times. Next, in step S3, the engine is started.

【0021】 次にステップS4では、エンジン回転
数センサ11から回転数信号aが、またスロットルセン
サから負荷信号bが入力されるのを待つ。上記各信号
a,bが入力されればステップS5に移行する。ステッ
プS5では、消費量算出手段14aがこれらの入力信号
からエンジンの回転数及び負荷を求める。次にステップ
S6では、慣らし運転完了判定がなされる。慣らし運転
完了の判定は上述のように各種の方法が採用できるが、
本実施例では、エンジン運転時間の積算値が100時間
を越えたか否かで判断する。上記積算値が100時間未
満の場合は慣らし運転途中であるとして、ステップS7
において慣らし前マップを検索してエンジン回転数及び
負荷に基づいてクランクジャーナル側のエンジン回転数
−負荷に応じた潤滑油要求量を求める。また上記積算値
が100時間を越えている場合は、ステップS8におい
て慣らし後マップを検索して潤滑油要求量を求める。
Next, in step S 4, the control waits for the input of the engine speed signal 11 from the engine speed sensor 11 and the input of the load signal b from the throttle sensor. If the signals a and b are input, the process proceeds to step S5. In step S5, the consumption calculation means 14a obtains the engine speed and load from these input signals. Next, in step S6, a break-in operation completion determination is made. Various methods can be used to determine the completion of the running-in operation as described above.
In this embodiment, the determination is made based on whether or not the integrated value of the engine operation time exceeds 100 hours. If the integrated value is less than 100 hours, it is determined that the running-in operation is being performed, and the process proceeds to step S7
In step (1), a pre-break-in map is searched to find the required amount of lubricating oil according to the engine speed-load on the crank journal based on the engine speed and load. If the integrated value exceeds 100 hours, the lubricating oil demand is obtained by searching the post-run-in map in step S8.

【0022】 そしてステップS9では、上記マップ
検索により、クランクジャーナル側にN回目に送油すべ
きエンジン1回転当たりの潤滑油要求量(単位要求量)
N- n (n=1,2,3,…)を求める。なお、ここで
は1回目なのでq1-n を算出する。次にステップS10
では、エンジン毎回転ごとにqN-n を積算する。これに
より、図3(a),(b)に示すように、エンジンの運
転状態に応じて刻々変化する要求量qが算出されて積算
される。
In step S9, the map search retrieves the required amount of lubricating oil per unit rotation of the engine to be fed to the crank journal side (unit required amount).
qN - n (n = 1, 2, 3,...) is obtained. Here, since it is the first time, q 1-n is calculated. Next, step S10
Then, q Nn is integrated for each revolution of the engine. As a result, as shown in FIGS. 3A and 3B, the required amount q that changes every moment according to the operating state of the engine is calculated and integrated.

【0023】 次にステップS11では、上記単位要
求量qN-n を積算した積算要求量Q(=ΣqN-n )にU
N (後述のステップS11で算出する次回への繰越要求
量)を加えたものを第1潤滑油ポンプ15の1サイクル
の吐出量Pqと比較する。なお、ここではN=1であり
1 =0に設定されている。ステップS11においてQ
+UN が吐出量Pqに達しない場合はステップS11の
判断がNoとなってプログラムはステップS4に戻り、
ステップS4〜ステップS11の処理を繰り返して行
う。またQ+UN が吐出量Pqに達するか又はこれを超
えると、ステップS11における判断がYesとなり、
プログラムはステップS12に移行する。ステップS1
2では、第1潤滑油ポンプ15に駆動信号を出力し(図
3(a)参照)、これにより潤滑油がクランクジャーナ
ル部に給油される。
Next, in step S 11, the integrated required amount Q (= Σq Nn ) obtained by integrating the unit required amount q Nn is set to U
The value obtained by adding N (the required carry-over amount for the next time calculated in step S11 described later) is compared with the discharge amount Pq of the first lubricating oil pump 15 in one cycle. Here, N = 1 and U 1 = 0. In step S11, Q
+ If U N does not reach the discharge amount Pq becomes No judgment in step S11 the program returns to step S4,
Steps S4 to S11 are repeatedly performed. Also when Q + U N exceeds or it reaches the discharge amount Pq, is Yes judgment in step S11,
The program moves to step S12. Step S1
In step 2, a drive signal is output to the first lubricating oil pump 15 (see FIG. 3A), whereby lubricating oil is supplied to the crank journal.

【0024】 次にステップS13では、上記積算要
求量Q(=ΣqN-n )にUN を加え、これから吐出量P
qを減算したものをUN+1 (次回への繰越要求量)とお
く。次にステップS14ではNをインクリメントしてN
+1とする。その後プログラムはステップS4に戻る。 このような処理により、図3(a)のU2 及びU3 のよ
うに、UN >0となる場合にはこのUN が次回の積算要
求量ΣqN-n に加算される。例えばU2 はΣq 2-n に加
算され、U3 はΣq3-n に加算される。これにより、運
転状態に応じて供給すべき潤滑油を適正な量にすること
ができる。
Next, in step S 13,
Q (= ΣqNn) To UNAnd the discharge amount P
The value obtained by subtracting q is UN + 1(Requested amount for next time)
Good. Next, in step S14, N is incremented by N
+1. Thereafter, the program returns to step S4. By such processing, U in FIG.TwoAnd UThreeNo
U, UNIf> 0, this UNIs the next mileage required
ΣqNnIs added to For example, UTwoIs Σq 2-nJoin
Calculated, UThreeIs Σq3-nIs added to This allows luck
Proper amount of lubricating oil to be supplied according to the running state
Can be.

【0025】ここで低負荷・低回転域では、単位要求量
q,rが小さく設定されていることから、第1,第2潤
滑油ポンプ15,16の吐出量Pq,Prに達するまで
の時間(図3の(a)のTq参照)が長くなり、送油間
隔が長くなる。また高負荷・高回転域では上記単位要求
量が大きく設定されていることから、上記吐出量Pq,
Prに達するまでの時間が短くなり、送油間隔が短くな
る。
Here, in the low-load and low-speed range, since the unit required amounts q and r are set small, the time required to reach the discharge amounts Pq and Pr of the first and second lubricating oil pumps 15 and 16 is obtained. (See Tq in FIG. 3A) becomes longer, and the oil supply interval becomes longer. In the high-load and high-speed range, since the unit required amount is set large, the discharge amount Pq,
The time required to reach Pr is shortened, and the oil supply interval is shortened.

【0026】このように本実施例では、エンジンの運転
状態に応じて刻々変化する要求量qを算出してこれを積
算し、該積算値Qが1回あたりの吐出量Pqに達した時
点で送油するようにしたので、過不足なく適正量の潤滑
油を被潤滑部に供給でき、潤滑油消費量を低減でき、結
果的に経済性の向上と白煙の低減を図ることができる。
また本実施例では、上記要求量qを求める場合に、エン
ジンの慣らし運転中か完了後かによって別個のマップを
検索するようにしたので、特に慣らし運転完了後の燃料
消費量を大幅に削減できる。
As described above, in the present embodiment, the required amount q that changes every moment according to the operating state of the engine is calculated and integrated, and when the integrated value Q reaches the discharge amount per one time Pq, Since the oil is supplied, an appropriate amount of lubricating oil can be supplied to the lubricated portion without excess or deficiency, the amount of lubricating oil consumed can be reduced, and as a result, the economy can be improved and the amount of white smoke can be reduced.
Further, in the present embodiment, when the required amount q is obtained, a separate map is searched depending on whether the engine is running in or after completion, so that the fuel consumption particularly after completion of the running-in operation can be significantly reduced. .

【0027】さらにまた本実施例では、上記潤滑油を被
潤滑部に直接供給するようにしたので、吸気通路壁面に
潤滑油が付着する等の問題を回避して確実に供給でき、
必要最低限の供給量とすることができ、この点からも潤
滑油消費量を低減できる。
Further, in the present embodiment, since the lubricating oil is directly supplied to the lubricated portion, the lubricating oil can be reliably supplied by avoiding the problem that the lubricating oil adheres to the wall of the intake passage.
The required minimum supply amount can be obtained, and the lubricating oil consumption can be reduced from this point as well.

【0028】図1及び図4〜図6は請求項2の発明の一
実施例(第2実施例)による2サイルエンジンの潤滑油
供給装置を説明するための図であり、図1は概略構成
図、図4はフローチャート図、図5(a),図6(a)
は給油境界ラインを示す特性図、図5(b),図6
(b)は送油間隔と送油量との関係を示す特性図であ
る。
FIGS. 1 and 4 to 6 are views for explaining a lubricating oil supply apparatus for a two-sile engine according to an embodiment (second embodiment) of the second aspect of the present invention, and FIG. 1 is a schematic configuration. FIG. 4 is a flowchart, FIG. 5 (a), FIG. 6 (a).
Is a characteristic diagram showing a refueling boundary line, FIG. 5 (b), FIG.
(B) is a characteristic diagram showing a relationship between an oiling interval and an oiling amount.

【0029】本第2実施例の概略構成は第1実施例と基
本的には同様であるが、給油制御手段14cは、以下の
ように第1実施例とは異なる機能を有している。即ち、
前回の送油開始時、又は終了時あるいはその中間時から
の経過時間Tとポンプ1回当りの送油量Xとの関係を示
す特性線が図5(a),又は図6(a)に示す給油境界
ラインA,又はBに達した時点で、同図に示す量の潤滑
油を送油するための制御信号を第1,第2潤滑油ポンプ
15,16に出力する。つまり本実施例では、送油間隔
及び送油量が可変制御される。
Although the schematic configuration of the second embodiment is basically the same as that of the first embodiment, the refueling control means 14c has a function different from that of the first embodiment as described below. That is,
FIG. 5 (a) or FIG. 6 (a) shows a characteristic line indicating the relationship between the elapsed time T from the previous oil supply start, the end, or an intermediate time and the oil supply amount X per pump. When the oil supply boundary line A or B shown is reached, a control signal for feeding the amount of lubricating oil shown in the figure is output to the first and second lubricating oil pumps 15 and 16. That is, in the present embodiment, the oil supply interval and the oil supply amount are variably controlled.

【0030】図5(a)は低負荷・低回転域における制
御マップ図であり、この場合は、前回からの経過時間T
が最短時間Tmin より長くなり、かつ積算要求量Qが最
小送油量Xmin より多くなった時点で送油する。例えば
図5(b)に示すように、経過時間TがTa,Tb,又
はTmin の時点で積算要求量QがXmin に達した場合、
Xmin を送油する。また経過時間がTmin になる前に積
算要求量QがXmin を越えた場合はTmin に達した時点
でXdを送油することを示している。なお、Xmax,Tma
x はTmin 以前にXmax に達したり、Xmin 以前にTma
x に達することがないように設定されている。ここで、
図5(a)の制御マップは送油間隔をできるだけ短く設
定する場合に適しており、図中のC点を基準とし、積算
要求量がXmin よりさらに少なくなった場合は送油間隔
をb,aというように長くし、Xmin より増加した場合
は送油量を増加する。
FIG. 5A is a control map diagram in a low-load / low-speed range. In this case, an elapsed time T from the previous time is shown.
Is longer than the shortest time Tmin, and the integrated required amount Q is larger than the minimum oil supply amount Xmin. For example, as shown in FIG. 5B, when the accumulated request amount Q reaches Xmin when the elapsed time T reaches Ta, Tb, or Tmin,
Feed Xmin. If the accumulated demand Q exceeds Xmin before the elapsed time reaches Tmin, it indicates that Xd is fed when Tmin has been reached. Note that Xmax, Tma
x reaches Xmax before Tmin or Tma before Xmin.
It is set to never reach x. here,
The control map shown in FIG. 5A is suitable for setting the oiling interval as short as possible. Based on the point C in the figure, if the integrated request amount becomes smaller than Xmin, the oiling interval is set to b, b. a, and if it exceeds Xmin, increase the oil feed rate.

【0031】また図6(a)は高負荷・高回転域におけ
る制御マップ図であり、この場合は経過時間Tが最長時
間Tmax に達した時点,あるいは積算要求量Qが最大送
油量Xmax に達した時点で送油する。例えは図6(b)
に示すように、積算要求量Qが最大送油量Xmax に達す
る前に経過時間Tが最長時間Tmax に達した場合は、そ
の時点でXeを送油する。また経過時間Tが最長時間T
max に達する前に積算要求量Qが最大送油量Xmax に達
した場合はその時点でXmax を送油する。ここで、図6
(a)の制御マップは送油間隔をできるだけ長く設定す
る場合に適しており、図中のg点を基準とし、積算要求
量がXmin よりさらに増加した場合は送油間隔を短く
し、Xmin より減少した場合は送油量を減少する。な
お、高負荷・高回転域においても上記図5(a)の制御
マップを用いても良い。
FIG. 6A is a control map diagram in a high-load / high-speed range. In this case, when the elapsed time T reaches the maximum time Tmax, or when the integrated demand Q becomes the maximum oil supply Xmax. Refuel when reached. For example, FIG.
As shown in (2), if the elapsed time T reaches the longest time Tmax before the accumulated required amount Q reaches the maximum oil supply amount Xmax, Xe is supplied at that time. The elapsed time T is the longest time T
If the accumulated required amount Q reaches the maximum oil supply amount Xmax before reaching the maximum, Xmax is supplied at that time. Here, FIG.
The control map of (a) is suitable for setting the oiling interval as long as possible. Based on the point g in the figure, if the integrated demand increases further than Xmin, the oiling interval is shortened. If it decreases, reduce the oil supply. The control map shown in FIG. 5A may be used even in a high-load / high-speed range.

【0032】本第2実施例の動作を図4のフローチャー
ト図に沿って説明する。制御装置14はプログラムがス
タートすると上記第1実施例と同様に、エンジン回転
数,負荷を読み込み、慣らし運転中か完了後かを判断
し、慣らし前マップ又は慣らし後マップの何れかを検索
して単位要求量を算出するとともにこれを積算し(ステ
ップS1〜S6)、またエンジン回転速度から経過時間
Tを算出するとともにこれを積算する(ステップS
7)。
The operation of the second embodiment will be described with reference to the flowchart of FIG. When the program starts, the control device 14 reads the engine speed and load, determines whether the running-in operation is completed or after completion, and searches either the pre-run-in map or the post-run-in map, as in the first embodiment. The unit request amount is calculated and integrated (steps S1 to S6), and the elapsed time T is calculated from the engine speed and integrated (step S1).
7).

【0033】次にエンジン回転数及び負荷によって制御
領域判定マップを図5(a)又は図6(a)の何れかに
設定し、この設定したマップにおいて、上記経過時間T
と積算要求量Qとから給油境界ラインA又はBに達した
か否かを判定する。そして該ラインに達していない場合
はステップS1に戻り、達した場合はその時点での必要
送油量Xを決定し、第1,第2潤滑油ポンプ15,16
に駆動信号を出力して送油動作を行う。なお、この後、
上記積算消費量Qを零にリセットし、または積算値から
送油量を減算する(ステップS8〜S11)。
Next, the control area determination map is set to either FIG. 5 (a) or FIG. 6 (a) according to the engine speed and the load.
Then, it is determined whether or not the refueling boundary line A or B has been reached based on the accumulated demand Q. If the line has not been reached, the process returns to step S1. If the line has been reached, the required oil supply amount X at that time is determined, and the first and second lubricating oil pumps 15, 16 are determined.
To output a driving signal to perform an oil feeding operation. After this,
The integrated consumption amount Q is reset to zero, or the oil supply amount is subtracted from the integrated value (steps S8 to S11).

【0034】本第2実施例の動作を図5,図6,及び図
7ないし図11を用いてさらに詳細に説明する。図7,
8は上記第2実施例のフローチャートの詳細図、図9は
該フローチャートの概念図、図10は給油タイミングを
説明するための図(図5に対応する図)、図11は給油
タイミングを説明するための図(図6に対応する図)で
ある。なお、クランクジャーナル側及びピストン摺動面
側のいずれについても同様の動作が行われるので、ここ
では説明の便宜のため、クランクジャーナル側について
のみ説明する。
The operation of the second embodiment will be described in more detail with reference to FIGS. 5, 6, and 7 to 11. FIG.
8 is a detailed diagram of the flowchart of the second embodiment, FIG. 9 is a conceptual diagram of the flowchart, FIG. 10 is a diagram for explaining refueling timing (a diagram corresponding to FIG. 5), and FIG. FIG. 7 (a diagram corresponding to FIG. 6). Since the same operation is performed on both the crank journal side and the piston sliding surface side, only the crank journal side will be described here for convenience of description.

【0035】 イグニッションキーをオンにすると、
図7のステップS1においてΣq(ステップS16で求
める潤滑油の積算要求量)を零に設定する等の初期設定
がなされる。次にステップS2では水温センサ(図示せ
ず)により水温の検出を行う。次にステップS3では水
温−送油量マップを検索し、ステップS4でエンジン始
動前の全送油量Pを求める。
When the ignition key is turned on,
In step S1 in FIG. 7, initial settings such as setting Σq (the required amount of lubricating oil integrated in step S16) to zero are made. Next, at step S2, a water temperature is detected by a water temperature sensor (not shown). Next, in step S3, a water temperature-oil feed amount map is searched, and in step S4, the total oil feed amount P before the engine is started is determined.

【0036】 次にステップS5では、第1潤滑油ポ
ンプ15の1サイクル当たりの最大送油量Pqmax と上
記全送油量Pとを比較する。全送油量PがPqmax と等
しいか又はこれを超える場合には、ステップS6に移行
して全送油量Pの値としてPqmax +αを入れる。これ
は該全送油量Pの値に応じてオイルポンプ15を複数回
駆動することを意味している。また全送油量PがPqma
x より小さい場合には、ステップS7に移行し、全送油
量Pの値としてPqvari(そのときのPの値すなわち変
数)を入れる。
Next, in step S5, the maximum oil supply amount Pqmax per cycle of the first lubricating oil pump 15 is compared with the total oil supply amount P. If the total oil supply amount P is equal to or exceeds Pqmax, the process proceeds to step S6, and Pqmax + α is entered as the value of the total oil supply amount P. This means that the oil pump 15 is driven a plurality of times according to the value of the total oil supply amount P. In addition, the total oil supply amount P is Pqma
If it is smaller than x, the process proceeds to step S7, and Pqvari (the value of P at that time, that is, a variable) is entered as the value of the total oil supply amount P.

【0037】 次にステップS8では第1潤滑油ポン
プ15を駆動し、ステップS7で求めた油量値Pにより
クランクジャーナル部に給油を行う。
Next, in step S8, the first lubricating oil pump 15 is driven, and lubrication is performed to the crank journal portion based on the oil amount value P obtained in step S7.

【0038】 次にステップS9ではエンジンを始動
する。なお、ここでいうエンジンの始動とはスタータモ
ータが切れることを意味しており、すなわちスタータモ
ータの駆動は該ステップS9までのどのステップで行っ
てもよい。
Next, in step S9, the engine is started. Here, the start of the engine means that the starter motor is turned off, that is, the starter motor may be driven in any of the steps up to step S9.

【0039】 次にステップS10(図8)では、回
転信号a及び負荷信号bが入力されるのを待つ。これら
の信号が入力されればステップS11に移行し、エンジ
ンの回転数及び負荷を計算する(図9の50〜53参
照)。
Next, in step S10 (FIG. 8), the control waits for the input of the rotation signal a and the load signal b. When these signals are input, the process proceeds to step S11, and the engine speed and load are calculated (see 50 to 53 in FIG. 9).

【0040】 ステップS12〜14では、慣らし運
転中か完了後かを判定するとともに、要求オイル量Q(c
c/hour) を慣らし前マップ又は慣らし後マップから検索
し、次にステップS15で、クランクジャーナル側にN
回目に送油すべきエンジン1回転当たりの潤滑油要求量
(単位要求量)qN-n (mm3/ サイクル) (n=1,2,
3,)を求める(図9の54,55a,55b,56参
照)。なお、ここでは1回目なのでq1-n を算出する。
次にステップS16では、エンジン毎回転ごとにqN-n
を積算して積算要求量ΣqN-n を求める(図9の58参
照)。
In steps S12 to S14, it is determined whether the running-in operation is being performed or after completion, and the required oil amount Q (c
c / hour) is retrieved from the pre-break-in map or the post-break-in map, and in step S15, N
Lubricating oil demand per unit rotation of engine (unit demand) q Nn (mm 3 / cycle) (n = 1, 2,
3,) (see 54, 55a, 55b, 56 in FIG. 9). Here, since it is the first time, q 1-n is calculated.
Next, in step S16, q Nn
Are integrated to obtain an integrated required amount Σq Nn (see 58 in FIG. 9).

【0041】 ステップS17では、エンジン回転周
期を積算して T=60・Σ(1/エンジン回転数) を演算する(図9の57参照)。 次にステップS18では、上記時間Tと積算要求量
ΣqN-n とから給油境界ラインに達したかどうかを判定
する(図9の60参照)。すなわち、制御マップを図5
(a)に設定した場合には Xmax ≧ΣqN-n ≧Xmin かつ Tmax ≧T≧Tmin …(1) のときに給油境界ラインに達したと判断され、また制御
マップを図6(a)に設定した場合には ΣqN-n ≧Xmax または T≧Tmax …(2) のときに達したと判断される。給油境界ラインに達した
と判断されれば、プログラムはステップS19に移行し
て必要送油量Xを決定し、そしてステップS20で第1
潤滑油ポンプ15を駆動して給油を行う(図9の61〜
63参照)。またステップS18において達していない
ときは、プログラムはステップS10に戻り、ステップ
S10〜ステップS17の処理を繰り返して行う。
In step S 17, the engine rotation cycle is integrated to calculate T = 60 · 積 算 (1 / engine rotation speed) (see 57 in FIG. 9). Next, in step S18, it is determined whether or not the refueling boundary line has been reached based on the time T and the integrated required amount Σq Nn (see 60 in FIG. 9). That is, the control map is shown in FIG.
Is determined to have reached the Xmax ≧ Σq Nn ≧ Xmin and lubrication boundary line when the Tmax ≧ T ≧ Tmin ... (1 ) If set (a), the addition was set to a control map in FIGS. 6 (a) In this case, it is determined that the condition has been reached when Σq Nn ≧ Xmax or T ≧ Tmax (2). If it is determined that the refueling boundary line has been reached, the program proceeds to step S19 to determine the required refueling amount X, and then proceeds to step S20 to determine the first refueling amount X.
The lubricating oil pump 15 is driven to supply oil (61 to 61 in FIG. 9).
63). On the other hand, if the time has not reached at step S18, the program returns to step S10, and repeats the processing of steps S10 to S17.

【0042】これを図10の場合についてみると、1回
目から3回目の各給油タイミングは上記(1)式を満足
したときに行われているのが分かる。また図11の場合
には1回目及び2回目の各給油タイミングは上記(2)
式を満足したときに行われているのが分かる。
Looking at this in the case of FIG. 10, it can be seen that the first to third refueling timings are performed when the above equation (1) is satisfied. In the case of FIG. 11, the first and second refueling timings are as described in (2) above.
It can be seen that it is performed when the expression is satisfied.

【0043】 次にステップS21では、Nをインク
リメントしてステップS10に戻る。 なお、上記図5及び図6の例では、時間Tmax ,Tmin
及び送油量Xmax ,Xmin が一定の場合を示したが、本
発明の適用はこれに限定されず、たとえば送油量Xが時
間Tの関数で表せる場合、すなわち X=f(T) の場合であってもよい。この関数f(T)がTの一次関
数の例を図12に示す。この場合において、判定式が X≧AT+B で与えられる場合には、図12の給油境界ラインXに達
した場合に送油される。
Next, in step S21, N is incremented and the process returns to step S10. In the examples of FIGS. 5 and 6, the times Tmax, Tmin
Although the case where the oil supply amounts Xmax and Xmin are constant is shown, the application of the present invention is not limited to this. For example, when the oil supply amount X can be represented by a function of time T, that is, when X = f (T) It may be. FIG. 12 shows an example in which this function f (T) is a linear function of T. In this case, if the determination formula is given by X ≧ AT + B, the oil is fed when the fuel supply boundary line X in FIG. 12 is reached.

【0044】このように本第2実施例では、エンジンの
運転状態に応じて刻々変化する消費量qを算出してこれ
を積算し、該積算値Qと経過時間Tとをプロットしてな
る特性線が、低速・低負荷時には境界ラインA,又は高
速・高負荷時には境界ラインBに達した時点で送油する
ようにしたので、エンジン回転数及び負荷等の運転状態
に応じて過不足なく適正量の潤滑油を被潤滑部に供給で
きる。
As described above, in the second embodiment, the characteristic is obtained by calculating the consumption q that changes every moment according to the operating state of the engine, integrating the calculated consumption q, and plotting the integrated value Q and the elapsed time T. Oil is fed when the line reaches the boundary line A at low speed / low load or at the boundary line B at high speed / high load. An amount of lubricating oil can be supplied to the lubricated part.

【0045】ここで上記積算中に、メンテナンス等のた
めにバッテリが外されるおそれがあることを考慮し、上
記積算値のデータ保持には不揮発性メモリ(例えばEE
PROM)を用いる、あるいはバックアップ用電池を内
蔵させる等の配慮が必要である。
In consideration of the possibility that the battery may be removed for maintenance or the like during the integration, the data of the integrated value is stored in a nonvolatile memory (for example, EE).
It is necessary to consider using a PROM) or incorporating a backup battery.

【0046】なお、上記実施例では、潤滑油供給系がパ
ルスモータで駆動される潤滑油ポンプを備えている場合
を説明したが、本発明では電気的な吐出制御機能を有す
るものであれば何れでもよく、例えば機械式ポンプと三
方電磁弁との組み合わせ、ストローク可変式電磁ポンプ
等も採用できる。
In the above embodiment, the case where the lubricating oil supply system includes the lubricating oil pump driven by the pulse motor has been described. However, in the present invention, any lubricating oil supply system having an electric discharge control function can be used. Alternatively, for example, a combination of a mechanical pump and a three-way solenoid valve, a variable stroke type solenoid pump, or the like can be employed.

【0047】また上記実施例では、2サイクルディーゼ
ルエンジンの場合を説明したが、本発明は通常の火花点
火式2サイクルガソリンエンジン,及び筒内噴射式2サ
イクルガソリンエンジンにも勿論適用できる。
In the above embodiment, the case of a two-cycle diesel engine has been described. However, the present invention can be applied to a normal spark-ignition two-cycle gasoline engine and a direct injection two-cycle gasoline engine.

【0048】[0048]

【発明の効果】以上のように、本発明に係る2サイクル
エンジンの潤滑油供給装置によれば、刻々変化する潤滑
油消費量を算出してこれを積算し、請求項1の発明では
上記積算消費量が潤滑油供給系の1回当たりの送油量に
達した時点で、また請求項2の発明では、前回の送油か
らの経過時間と積算消費量との関係が、予め設定された
給油境界ラインに達した時点で送油するようにしたの
で、過不足なく適正量の潤滑油を被潤滑部に供給でき、
潤滑油消費量を低減できるる効果がある。また本請求項
3の発明では直接給油方式を採用したので、上記高精度
に算出した必要潤滑油量を無駄なく確実に被潤滑部に供
給でき、この点からも潤滑油供給量を必要最低限とする
ことができる。
As described above, according to the lubricating oil supply apparatus for a two-stroke engine according to the present invention, the lubricating oil consumption changing every moment is calculated and integrated. At the point in time when the consumption amount reaches the oil supply amount per time of the lubricating oil supply system, and in the invention of claim 2, the relationship between the elapsed time from the previous oil supply and the accumulated consumption amount is set in advance. Since the oil is fed when it reaches the refueling boundary line, an appropriate amount of lubricating oil can be supplied to the lubricated parts without excess or shortage.
This has the effect of reducing lubricating oil consumption. Further, since the direct lubrication method is adopted in the invention of claim 3, the required amount of lubricating oil calculated with high accuracy can be reliably supplied to the lubricated portion without waste. It can be.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の第1,第2実施例による2サイクルエ
ンジンの潤滑油供給装置の概略構成を示す図である。
FIG. 1 is a diagram showing a schematic configuration of a lubricating oil supply device for a two-cycle engine according to first and second embodiments of the present invention.

【図2】上記第1実施例のフローチャート図である。FIG. 2 is a flowchart of the first embodiment.

【図3】上記第1実施例の給油タイミングを説明するた
めの図である。
FIG. 3 is a diagram for explaining refueling timing in the first embodiment.

【図4】上記第2実施例のフローチャート図である。FIG. 4 is a flowchart of the second embodiment.

【図5】上記第2実施例の動作を説明するための経過時
間−送油量特性図である。
FIG. 5 is an elapsed time-oil feed amount characteristic diagram for explaining the operation of the second embodiment.

【図6】上記第2実施例の動作を説明するための経過時
間−送油量特性図である。
FIG. 6 is an elapsed time-oil feed amount characteristic diagram for explaining the operation of the second embodiment.

【図7】上記第2実施例のフローチャートの詳細図であ
る。
FIG. 7 is a detailed view of a flowchart of the second embodiment.

【図8】上記第2実施例のフローチャートの詳細図であ
る。
FIG. 8 is a detailed view of a flowchart of the second embodiment.

【図9】図7,図8に示すフローチャートの概念図であ
る。
FIG. 9 is a conceptual diagram of the flowchart shown in FIGS. 7 and 8;

【図10】上記第2実施例の給油タイミングを説明する
ための図(図5に対応する図)である。
FIG. 10 is a diagram (a diagram corresponding to FIG. 5) for explaining refueling timing in the second embodiment.

【図11】上記第2実施例の給油タイミングを説明する
ための図(図6に対応する図)である。
FIG. 11 is a diagram (a diagram corresponding to FIG. 6) for explaining refueling timing in the second embodiment.

【図12】上記第2実施例の変形例の動作を説明するた
めの経過時間−送油量特性図である。
FIG. 12 is an elapsed time-oil feed amount characteristic diagram for explaining an operation of a modification of the second embodiment.

【符号の説明】[Explanation of symbols]

1 エンジン 12 潤滑油供給装置 13 潤滑油供給系 14a 消費量算出手段 14b 積算手段 14c 給油制御手段 A,B 給油境界ライン T 経過時間(送油間隔) q 単位要求量 Q 積算要求量 X 送油量 Reference Signs List 1 engine 12 lubricating oil supply device 13 lubricating oil supply system 14a consumption calculating means 14b integrating means 14c refueling control means A, B refueling boundary line T elapsed time (oiling interval) q unit required amount Q integrated required amount X oiled amount

───────────────────────────────────────────────────── フロントページの続き (72)発明者 前橋 耕生 静岡県磐田市新貝2500番地 ヤマハ発動 機株式会社内 (58)調査した分野(Int.Cl.7,DB名) F01M 1/16 ──────────────────────────────────────────────────続 き Continuation of the front page (72) Inventor Koki Maebashi 2500 Shinkai, Iwata-shi, Shizuoka Yamaha Motor Co., Ltd. (58) Field surveyed (Int. Cl. 7 , DB name) F01M 1/16

Claims (3)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 潤滑油をエンジンに潤滑油供給系により
間歇的に供給する2サイクルエンジンの潤滑油供給装置
において、エンジン回転速度と負荷とから被潤滑部での
刻々の潤滑油消費量を推定算出する消費量算出手段と、
該算出手段によって算出された刻々の単位消費量を積算
する積算手段と、該積算手段による積算消費量が上記潤
滑油供給系からの1回当たりの送油量に達した時点で次
回の潤滑油供給を行わせる給油制御手段とを備えたこと
を特徴とする2サイクルエンジンの潤滑油供給装置。
1. A lubricating oil supply device for a two-stroke engine that intermittently supplies lubricating oil to an engine by a lubricating oil supply system, and estimates an instantaneous amount of lubricating oil consumption in a lubricated portion from an engine speed and a load. Consumption calculation means for calculating;
An integrating means for integrating the instantaneous unit consumption calculated by the calculating means; and a next lubricating oil when the integrated consumption by the integrating means reaches the oil supply amount per one time from the lubricating oil supply system. A lubricating oil supply device for a two-stroke engine, comprising: an oil supply control means for performing supply.
【請求項2】 潤滑油をエンジンに潤滑油供給系により
間歇的に供給する2サイクルエンジンの潤滑油供給装置
において、上記潤滑油供給系の1回当たりの送油量及び
送油間隔を可変とし、エンジン回転速度と負荷とから被
潤滑部での刻々の潤滑油消費量を推定算出する消費量算
出手段と、該算出手段によって算出された刻々の単位消
費量を積算する積算手段と、前回の供給からの経過時間
と上記積算消費量との関係が、上記潤滑油供給系の送油
量と送油間隔との関係に基づいて予め設定された給油境
界ラインに達した時点で次回の潤滑油供給を行わせる給
油制御手段とを備えたことを特徴とする2サイクルエン
ジンの潤滑油供給装置。
2. A lubricating oil supply system for a two-stroke engine for intermittently supplying lubricating oil to an engine by a lubricating oil supply system, wherein the lubricating oil supply system has a variable oil supply amount and oil supply interval per time. A consumption calculating means for estimating and calculating the instantaneous lubricating oil consumption in the lubricated portion from the engine rotation speed and the load; an integrating means for integrating the instantaneous unit consumption calculated by the calculating means; When the relationship between the elapsed time from the supply and the integrated consumption reaches a refueling boundary line set in advance based on the relationship between the lubricating oil supply amount and the lubricating interval, the next lubricating oil A lubricating oil supply device for a two-stroke engine, comprising: an oil supply control means for performing supply.
【請求項3】 請求項1又は2において、上記潤滑油供
給系がエンジンの被潤滑部に直接給油する直接給油方式
のものであることを特徴とする2サイクルエンジンの潤
滑油供給装置。
3. The lubricating oil supply device for a two-stroke engine according to claim 1, wherein the lubricating oil supply system is of a direct lubrication type for directly supplying lubricated parts of the engine.
JP05155000A 1992-06-29 1993-06-25 Lubricating oil supply device for two-cycle engine Expired - Fee Related JP3129574B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP05155000A JP3129574B2 (en) 1992-06-29 1993-06-25 Lubricating oil supply device for two-cycle engine

Applications Claiming Priority (5)

Application Number Priority Date Filing Date Title
JP4-196607 1992-06-29
JP19660792 1992-06-29
JP7833993 1993-04-05
JP5-78339 1993-04-05
JP05155000A JP3129574B2 (en) 1992-06-29 1993-06-25 Lubricating oil supply device for two-cycle engine

Publications (2)

Publication Number Publication Date
JPH06341308A JPH06341308A (en) 1994-12-13
JP3129574B2 true JP3129574B2 (en) 2001-01-31

Family

ID=27302689

Family Applications (1)

Application Number Title Priority Date Filing Date
JP05155000A Expired - Fee Related JP3129574B2 (en) 1992-06-29 1993-06-25 Lubricating oil supply device for two-cycle engine

Country Status (1)

Country Link
JP (1) JP3129574B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114198177A (en) * 2021-12-14 2022-03-18 上海本家空调系统有限公司 Engine oil supply system with filtering function

Also Published As

Publication number Publication date
JPH06341308A (en) 1994-12-13

Similar Documents

Publication Publication Date Title
EP0577081B1 (en) Lubricating system for an internal combustion engine
US6804997B1 (en) Engine timing control with intake air pressure sensor
DE102004004573A1 (en) Device for controlling the engine rotation stop by estimating kinetic energy and the stop position
US5174261A (en) Fuel injection quantity control device for two cycle engines
JP2004108340A (en) Method and apparatus for starting internal combustion engine and method and apparatus for estimating starting energy used therein
FR2866927A1 (en) SYSTEM FOR AIDING THE REGENERATION OF MEANS OF DEPOLLUTION
US5537959A (en) Lubricating system for engine
US6378358B1 (en) Stroke judging device for a 4-cycle engine
US5501190A (en) Lubricating system for engine
EP0381162B1 (en) Oil feeding method and device for oiling a 2-cycle engine
JP3129574B2 (en) Lubricating oil supply device for two-cycle engine
JPH022462B2 (en)
JPH024774B2 (en)
JPS6220609A (en) Lubricating method for 2-cycle engine
JP2013199852A (en) Replacement time determination device of lubricant, replacement time determination method of lubricant and program
EP0412506B1 (en) Fuel injection control apparatus of internal combustion engine
JP3388905B2 (en) Engine lubricant supply device
JPH07189640A (en) Engine lubrication oil supply device
JPH0754681A (en) Operation stop control device for internal combustion engine
CN1474040A (en) Oil Controller for two-stroke engine
JP2806545B2 (en) Shift control method for automatic transmission
JP2779693B2 (en) Fuel injection device for two-stroke cycle engine with crankcase intake
JP2748284B2 (en) Fuel injection control device for two-cycle engine
JP7683524B2 (en) Control device for internal combustion engine
JP2789377B2 (en) Fuel injection control device for two-cycle engine

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20001031

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees