Water-blocking structure and reaching penetration method at the shaft entrance of the shield machine

Info

Publication number
JP3134731B2
JP3134731B2 JP07247991A JP24799195A JP3134731B2 JP 3134731 B2 JP3134731 B2 JP 3134731B2 JP 07247991 A JP07247991 A JP 07247991A JP 24799195 A JP24799195 A JP 24799195A JP 3134731 B2 JP3134731 B2 JP 3134731B2
Authority
JP
Japan
Prior art keywords
shield machine
access openings
shield
shaft
reaching
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP07247991A
Other languages
Japanese (ja)
Other versions
JPH0988473A (en
Inventor
剛 大井田
健作 美馬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Original Assignee
Obayashi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp filed Critical Obayashi Corp
Priority to JP07247991A priority Critical patent/JP3134731B2/en
Publication of JPH0988473A publication Critical patent/JPH0988473A/en
Application granted granted Critical
Publication of JP3134731B2 publication Critical patent/JP3134731B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】この発明は、シールド掘進機
の立坑到達口における止水構造及び到達貫入工法に関
し、特に、到達したシールド掘進機を、立坑側壁の鏡斫
りをして開口形成した到達口に貫入する際に、当該到達
口から立坑内に地下水が流入するのを防止するための止
水構造、及び到達したシールド掘進機を、立坑側壁の鏡
斫りをした後再発進させて、開口形成した到達口に貫入
させるための到達貫入工法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a watertight structure and a penetration method at a shaft entrance of a shield machine, and more particularly, to a shield machine having an opening formed by mirror-cutting a side wall of a shaft. When penetrating the mouth, the water stop structure for preventing groundwater from flowing into the shaft from the arrival port, and the shield excavator that arrived, after restarting the shaft of the shaft of the shaft, restarting, The present invention relates to a reaching penetration method for penetrating a reaching opening formed with an opening.

【0002】[0002]

【従来の技術】特に都市土木の分野において、地下水の
存在する地盤や、比較的軟弱な地盤中にトンネルを掘削
形成する方法として、シールド掘進機を用いたトンネル
工法が知られている。このシールド掘進機を用いたトン
ネル工法は、一般に、シールド掘進機により切羽面を掘
削しながら、その後方にセグメントを組み立てて覆工体
を形成し、かかる覆工体によりトンネル内壁面を防護す
るとともに、この覆工体から推進反力を得つつトンネル
を掘削形成して行くものである。
2. Description of the Related Art Particularly in the field of urban civil engineering, a tunnel construction method using a shield machine is known as a method for excavating and forming a tunnel in the ground where groundwater is present or in a relatively soft ground. The tunnel construction method using this shield machine generally excavates a face face with a shield machine, assembles segments behind it to form a lining body, and protects the inner wall surface of the tunnel with such lining body The tunnel is excavated and formed while obtaining the propulsion reaction force from the lining body.

【0003】このようなシールド掘進機を用いたトンネ
ル工法では、通常、例えば数百メートルから数キロメー
トル程度の所定のトンネル延長毎に工区分けを行い、こ
れらの各工区の両端部分に、シールド掘進機の発進用あ
るいは到達用の施設としての立坑を、例えば地中連続工
法等によりコンクリ−ト構造物として地中に構築し、各
工区毎に掘削形成したシールドトンネルをこれらの立坑
を介して連通させることにより、各シールドトンネルが
一体となった相当の延長のトンネルが構築されることに
なる。
[0003] In the tunnel construction method using such a shield excavator, usually, for example, the tunnel is divided for every predetermined tunnel extension of several hundred meters to several kilometers, and the shield excavator is provided at both ends of each of these sections. A shaft as a starting or reaching facility is constructed underground as a concrete structure by, for example, a continuous underground construction method, and a shield tunnel excavated and formed in each section is communicated through these shafts. As a result, a considerably extended tunnel in which each shield tunnel is integrated is constructed.

【0004】すなわち、このシールド掘進機を用いたト
ンネル工法によれば、シールドトンネルを立坑を介して
連通させるべく、各工区毎にシールド掘進機を立坑から
発進させ、あるいは立坑に到達させる作業を行う必要が
あるとともに、このようなシールド掘進機の発進工及び
到達工は、シールドトンネル工事の重要なポイントを締
め、その工事の正否を握っているといっても過言ではな
い。
That is, according to the tunnel construction method using the shield excavator, the shield excavator is started from the shaft or reaches the shaft in each section so that the shield tunnel can communicate with the shaft. It is necessary to say that the starting and arriving work of such a shield excavator tightens an important point of the shield tunnel construction, and it is not an exaggeration to say that it determines the success or failure of the construction.

【0005】そして、これらの発進工や到達工は、いず
れも、立坑の側壁に開口部分を形成し、この開口部分を
通してシールド掘進機を地山に貫入させ、あるいは地山
から立坑の内部に前進させるものであるため、かかる発
進作業や到達作業は、開口部分からの出水や地山の流出
を防止しながら行う必要がある。そして、これらの発進
工や到達工のうち、発進工については、各種の地盤改良
工法による補助工法としての発進防護工や、エントラン
スパッキンを用いた発進坑口工の採用等により、安定し
た施工方法が確立している。
[0005] In each of these starting and reaching works, an opening is formed in the side wall of the shaft, and the shield excavator penetrates the ground through the opening, or advances from the ground to the inside of the shaft. Therefore, it is necessary to perform such starting work and reaching work while preventing water from flowing out from the opening and outflow from the ground. Of these starters and arrivals, a stable construction method has been adopted for the starter by adopting starter protection as an auxiliary method using various ground improvement methods and starting portals using entrance packing. Established.

【0006】[0006]

【発明が解決しようとする課題】一方、到達工について
は、発進工の場合と同様に、各種の地盤改良工法による
到達防護工を補助工法として採用しているが、到達口に
おいてエントランスパッキンのような止水性の高いパッ
キンを使用することができないため、特に、シールド掘
進機を立坑側壁の直前に到達停止させ、側壁の鏡斫り
(鏡切断)をして到達口を形成した後、シールド掘進機
を再発進させてその先端部分を到達口に貫入させる、い
わゆるシールド掘進機の再発進貫入工については、その
安定した施工方法が確立していないのが現状である。
On the other hand, as for the arrival work, as in the case of the start work, the arrival protection work by various ground improvement methods is adopted as an auxiliary method. In particular, it is not possible to use highly water-tight packing, so the shield excavator must be stopped before reaching the side wall of the shaft, and the side wall must be mirror-cut (mirror cut) to form an access port. Regarding the so-called re-entry of a shield excavator, in which the excavator is restarted and the tip portion penetrates into the arrival port, a stable construction method has not yet been established.

【0007】すなわち、従来の到達工によれば、地下水
の被圧力が低い場合には、上記到達防護工を併用するの
みで、シールド掘進機を立坑側壁の直前に到達停止させ
た後は、そのままの状態で鏡斫りやシールド掘進機の再
発進を行うことがあるが、このような地下水の被圧力が
低い場合でも、出水により作業の進行が妨げられるおそ
れがあるという課題があった。
That is, according to the conventional reaching works, when the pressure of the groundwater is low, only the above-mentioned reaching protection works are used together. In such a state, the mirror shaving or the shield excavator may be restarted. However, even when the pressure of the groundwater is low, there is a problem that the work may be hindered by the flooding.

【0008】また、地下水の被圧力が高い場合には、特
にシールド掘進機の再発進時において、改良した地盤と
シールド掘進機の外周面との間には隙間が生じやすく、
したがって、かかる隙間を水みちとして出水が生じるの
を回避するために、さらに薬液注入工法や凍結工法を施
工したり、その他の対策工を施工しているが、かかる対
策工は一般に高価であるとともに、その作業に相当の時
間を要し、作業の遅延を招くことになるという課題があ
った。
Further, when the pressure of the groundwater is high, a gap is easily formed between the improved ground and the outer peripheral surface of the shield machine, particularly when the shield machine restarts.
Therefore, in order to avoid the occurrence of water flowing out of such gaps as a water path, furthermore, a chemical liquid injection method or a freezing method is constructed, or other measures are implemented, but such measures are generally expensive and However, there is a problem in that the work requires a considerable amount of time, which causes a delay in the work.

【0009】そこで、この発明は、このような従来の課
題に着目してなされたもので、シールド掘進機の到達
後、鏡斫りをして開口形成した到達口にシールド掘進機
を再発進してその先端部分を貫入する際に、地山側から
の出水を容易かつ経済的に防止することのできるシール
ド掘進機の立坑到達口における止水構造を提供すること
を目的とするものである。
In view of the above, the present invention has been made in view of such a conventional problem. After reaching the shield excavator, the shield excavator is re-started at the reaching opening formed by mirror cutting. It is an object of the present invention to provide a watertight structure at a shaft reaching port of a shield machine which can easily and economically prevent water from flowing from the ground side when penetrating a tip portion of the shaft excavator.

【0010】また、この発明は、鏡斫りをして開口形成
した到達口に、地山側からの出水を容易かつ安定して防
止しつつ、シールド掘進機を迅速に再発進貫入してゆく
ことのできるシールド掘進機の到達貫入工法を提供する
ことを目的とするものである。
[0010] Further, the present invention is to easily and stably prevent water from flowing from the ground side into a reaching opening formed by mirror shaving, and to promptly re-enter the shield machine. It is an object of the present invention to provide a method of reaching a penetration of a shield excavator which can be performed.

【0011】[0011]

【課題を解決するための手段】この発明は、上記目的を
達成するためになされたもので、その要旨は、到達した
シールド掘進機を、立坑側壁の鏡斫りをして開口形成し
た到達口に貫入する際に、当該到達口から立坑内に地下
水が流入するのを防止するための止水構造であって、前
記到達口の壁体内周面に密着するようにして、前記シー
ルド掘進機の先端外周部分に形成した発ウレタン層か
らなり、該発ウレタン層と前記壁体内周面との密着状
態を保持しつつ、前記シールド掘進機を前記到達口を通
して摺動貫入するシールド掘進機の立坑到達口であっ
て、前記シールド掘進機の先端外周部分に形成される発
ウレタン層を、前記鏡斫りの終了後にシールド掘進機
の前面外周部分に沿って取り付けたリング状の枠体によ
って形成される充填空間に発ウレタンを注入充填する
ことにより形成するものである
SUMMARY OF THE INVENTION The present invention has been made to achieve the above-mentioned object, and the gist of the invention is to provide a shield excavator which has been reached by shaving the side wall of a shaft to form an opening. When penetrating into the shaft, a water stop structure for preventing groundwater from flowing into the shaft from the arrival port, so as to be in close contact with the inner peripheral surface of the wall of the arrival port, the shield machine consists foamed urethane layer formed on the tip outer peripheral portion, while maintaining a close contact between the foam urethane layer the wall inside peripheral surface, the sliding penetration to Resid Rudo excavation the shield machine through the access openings At the shaft entrance of the machine
The shield formed on the outer periphery of the tip of the shield machine
Foam urethane layer is to form by injecting filling the foamed urethane filling the space formed by the ring-shaped frame member mounted along the front surface outer peripheral portion of the shield machine after completion of the mirror斫Ri .

【0012】また、この発明の止水構造は、前記到達口
の壁体内周面には、発ウレタンを吹き付けることによ
り到達口発ウレタン層を形成し、該到達口発ウレタ
ン層と前記シールド掘進機の発ウレタン層との密着状
態を保持しつつ、前記シールド掘進機を前記到達口を通
して摺動貫入することことが好ましい。
Further, the water stop structure of the invention, the the wall inside the peripheral surface of the access openings forms a access openings onset foam urethane layer by blowing foamed urethane,該到our mouth onset foam urethane <br / > while maintaining the emission layer adhesion state between the shield machine of foamed urethane layer, it is preferable to slide penetrate the shield machine through the access openings.

【0013】さらに、この発明の他の要旨は、到達した
シールド掘進機を、立坑側壁の鏡斫りをした後再発進さ
せて、開口形成した到達口に貫入させるための到達貫入
工法であって、シールド掘進機の到達部分の地山に対
し、シールド掘進機が当該到達部分に到達する前あるい
は到達して停止した後に、薬液注入工法や凍結工法等の
地盤改良工法を用いて到達防護工を行う工程と、前記立
坑側壁の鏡斫りをして到達口を開口形成することによ
り、掘進作業により前記立坑側壁の直前まで到達して停
止しているシールド掘進機の前面を前記到達口に臨ませ
る工程と、前記到達口の壁体内周面に密着するようにし
て、前記シールド掘進機の先端外周部分に発ウレタン
層を形成する工程と、該発ウレタン層と前記到達口の
壁体内周面との密着状態を保持しつつ、シールド掘進機
を前記到達口を通して摺動貫入する工程とからなること
を特徴とするシールド掘進機の到達貫入工法にある。
[0013] Further, another gist of the present invention is an attainment penetrating method for re-starting the reached shield excavator after cutting the side wall of the shaft and then penetrating the opening formed at the opening. Before the shield machine reaches the reaching part of the reach of the shield machine, or after the shield machine reaches the stop part and stops, use the ground improvement method such as the chemical liquid injection method or the freezing method to perform the protection work. Performing the step and mirror-cutting the shaft wall to form an opening, so that the front surface of the shield machine that has reached and stopped just before the shaft wall by excavation work faces the arrival port. a step of Maseru, said to be in close contact with the wall inside the peripheral surface of the access openings, forming a foamed urethane layer on the tip outer peripheral portion of the shield machine, the wall body of the foam urethane layer the access openings Close contact with peripheral surface While maintaining, certain shield machine to reach penetration method of shield machine, characterized in that comprising the step of sliding penetration through the access openings.

【0014】なお、シールド掘進機の到達工とは、シー
ルド掘進機を、立坑到達面まで地山の安定を図りながら
所定のルート上を推進させ、その後事前に用意した開口
部よりシールド掘進機を立坑内に引き出すか、あるいは
到達壁としての立坑側壁に対向して直前ないしはその一
部が接触する位置まで推進させた後、シールド掘進機を
停止させる一連の作業をいい、したがって、上記発明に
おいて、到達したシールド掘進機とは、掘進作業により
立坑側壁の直前まで到達して停止している状態のシール
ド掘進機を意味し、また、シールド掘進機の到達部分の
地山とは、到達口が開口形成される箇所の立坑側壁の背
面側に位置して、シールド掘進機が到達停止したとき
に、シールド掘進機の先端部分を覆うことになる領域及
びその周囲の領域の地山を意味するものである。
[0014] The arrival of the shield excavator means that the shield excavator is propelled on a predetermined route while stabilizing the ground up to the shaft reaching surface, and then the shield excavator is opened from an opening prepared in advance. It is a series of operations to stop the shield excavator after drawing it into the shaft or propelling it to the position just before or partly facing the shaft wall as the reaching wall, and then stopping the shield machine. The reached shield excavator means a shield excavator that has reached and stopped just before the side wall of the shaft due to excavation work, and the ground at the reaching part of the shield excavator has an opening at the entrance. It is located on the back side of the shaft wall at the location where it is formed, and when the shield machine stops reaching, the area that will cover the tip of the shield machine and the area around it It is intended to mean the mountain.

【0015】そして、この発明のシールド掘進機の立坑
到達口における止水構造によれば、到達したシールド掘
進機を、鏡斫りをして立坑側壁に到達口を開口形成した
後再発進させて、その先端部分を到達口に貫入する際
に、前記シールド掘進機の先端外周部分に形成した発
ウレタン層と、到達口の壁体内周面との密着状態を保持
しながらシールド掘進機を前進させる。
[0015] According to the water blocking structure of the shield excavator reaching port of the present invention, the shield excavating machine that has reached is re-started after the mirror portal is cut to form an opening in the side wall of the shaft. shield when penetrating the front end portion reaches port, a foamed <br/> urethane layer formed on the tip outer peripheral portion of the shield machine, while maintaining close contact with the wall inside the peripheral surface of the access openings Advance the excavator.

【0016】すなわち、発ウレタンは膨張性、弾力性
及び壁体内周面に対する付着性を備えるので、例えばそ
の発を拘束すること等により、到達口の壁体内周面と
接触させれば、発ウレタン層は壁体内周面を押圧しつ
つ密着することになるので、かかる密着状態を容易に保
持してシールド掘進機を摺動貫入することができ、これ
によってシールド掘進機を再発進貫入する際の到達口の
止水性を容易に確保することができる。
[0016] That is, foamed urethane expandable, since provided the adhesion to the elasticity and wall inside peripheral surface, for example, such as by constraining the foamed, be brought into contact with the wall inside the peripheral surface of the access openings, since foamed urethane layer will be in close contact while pressing the walls inside circumferential surface, such close contact easily hold the shield machine can slide penetration, the re-start penetrating this by shield machine In this case, it is possible to easily secure the water stoppage of the arrival port.

【0017】また、発ウレタン層は、鏡斫りにより到
達口を開口形成して、この到達口にシールド掘進機の前
面を臨ませた後、この前面外周部分に発ウレタン充填
用のリング状の枠体を取り付けて充填空間を形成し、こ
れに発ウレタンを注入充填することにより形成すれ
ば、発ウレタン層を精度良くかつ高品質で設けること
ができる。
Further, the foamed urethane layer, the access openings by opening forming a Kagami斫Ri, after facing the front of the shield machine into the access openings, foamed urethane ring for filling in the front peripheral portion the filling space is formed by attaching a Jo of the frame, be formed by injecting filling the foamed urethane thereto, can be provided foamed urethane layer in accuracy and quality.

【0018】さらに、前記到達口の壁体内周面に発
レタンを吹き付けることにより到達口発ウレタン層を
形成し、この到達口発ウレタン層とシールド掘進機の
ウレタン層との密着状態を保持しつつ、シールド掘
進機を摺動貫入するようにすれば、鏡斫りをした到達口
の壁体内周面に凹凸や不陸が生じている場合でも、発
ウレタンの吹き付けによってこれを整正し、より確実な
到達口の密着性及び止水性と、シールド掘進機の円滑な
摺動とを確保することができる。
Furthermore, the forming the access openings onset foam urethane layer by blowing foamed c <br/> urethane on the wall inside the peripheral surface of the access openings, the access openings onset foam urethane layer and the shield machine <br /> while maintaining the close contact between the onset foam urethane layer, if the shield machine to slide penetration, if the irregularities or uneven surface occurs on the wall inside the peripheral surface of the access openings in which the Kagami斫Ri But, it is possible to ensure correct integer this by spraying the foamed <br/> urethane, and adhesion and water cut of more reliable access openings, and a smooth sliding of the shield machine.

【0019】なお、発ウレタンは安価で入手が容易で
あるとともに、発ウレタンの充填空間を形成するため
のリング状の枠体もまた、安価な材料を用いて容易に製
作することができるので、上記止水構造は、経済的に設
置することができる。
[0019] Incidentally, with foamed urethane is easily available at low cost, a ring-shaped frame member for forming a filling space of foamed urethane, it can also be easily manufactured by using an inexpensive material Therefore, the water stopping structure can be installed economically.

【0020】そして、この発明のシールド掘進機の到達
貫入工法によれば、シールド掘進機の先端外周部分に発
ウレタン層を形成した後に、この発ウレタン層と到
達口の壁体内周面との密着状態を保持しながら再発進貫
入作業が行われる。ここで、かかる発ウレタン層は容
易かつ迅速に設けることができ、またこの発ウレタン
層は、その弾力性及び付着性により壁体内周面に密着し
て容易かつ安定して止水性を確保することができるの
で、地山側からの出水を防止しつつシールド掘進機の再
発進貫入作業を迅速かつ安定して行ってゆくことができ
る。
According to the method of reaching the penetration of the shield machine according to the present invention, the outer peripheral portion of the tip of the shield machine is formed.
After forming the foam urethane layer, restarting penetration operation is performed while maintaining the close contact between the foamed urethane layer and the wall inside the peripheral surface of the access openings. Wherein such foamed urethane layer can be provided easily and quickly, also the foamed urethane layer, ensuring easy and stable water cut in close contact with the wall inside the circumferential surface by its elasticity and adhesion Therefore, it is possible to quickly and stably perform the re-entering operation of the shield machine while preventing water from flowing from the ground side.

【0021】[0021]

【発明の実施の形態】以下、この発明の好適な実施の態
様すなわち一実施例に付いて、添付図面を参照しつつ詳
細に説明する。この実施例は、図1に示すように、到達
用の立坑10の側壁11にシールド掘進機12の先端部
分を前進貫入させて、シールドトンネル13を立坑10
に連通接続する際に、この発明の立坑到達口における止
水構造及びシールド掘進機の到達貫入工法を採用したも
のである。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Preferred embodiments of the present invention, that is, an embodiment, will be described below in detail with reference to the accompanying drawings. In this embodiment, as shown in FIG. 1, the tip of a shield excavator 12 is advanced into the side wall 11 of a reaching shaft 10 so that a shield tunnel 13 is formed.
The present invention employs the water stopping structure at the shaft reaching port and the reaching penetrating method of the shield excavator according to the present invention.

【0022】すなわち、この実施例によれば、到達用の
立坑10は、掘進作業が進行してシールド掘進機12が
立坑10に接近してくる前に、例えば地中連続壁工法等
を用いたコンクリート構造物として所定の深度まで筒状
に構築形成した側壁11の内部を、シールドトンネル1
3が設置される深度まで掘削して地中に作業空間を形成
したものであって、この立坑10は、隣接する施工区間
への発進用の立坑としても併用されるものである。
That is, according to this embodiment, for the reaching shaft 10, for example, an underground continuous wall method or the like is used before the shield excavator 12 approaches the shaft 10 as the excavation work proceeds. The inside of the side wall 11, which is formed as a concrete structure in a cylindrical shape up to a predetermined depth, is connected to the shield tunnel 1
3 is a work space formed underground by excavating to the depth at which it is installed, and this shaft 10 is also used as a shaft for starting to an adjacent construction section.

【0023】また、この実施例によれば、シールド掘進
機12が立坑10の側壁11に近接する位置まで到達す
る前に、当該側壁11の背面の到達部分の地山に対し、
到達防護工として、例えば高圧噴射注入工法(CJG工
法)や凍結工法等の地盤改良工法を地表面から地中に向
かって施工することにより改良地盤14を造成する。
Further, according to this embodiment, before the shield machine 12 reaches the position close to the side wall 11 of the shaft 10,
As the reaching protection work, the improved ground 14 is created by applying a ground improvement method such as a high pressure injection method (CJG method) or a freezing method from the ground surface to the ground.

【0024】そして、シールド掘進機12が、造成した
改良地盤14を切削しつつ側壁11に近接する位置まで
到達したら、シールド掘進機12を一旦停止し、かかる
到達部分に対向して位置する側壁11の鏡斫りを行っ
て、当該側壁11にシールド掘進機12の先端部分を貫
入前進させるための到達口15を開口形成する。なお、
上記シールド掘進機12の到達作業によれば、シールド
掘進機12の前面のカッターフェイス29を側壁11に
なるべく近接させるために、シールド掘進機12を、カ
ッターフェイス29の中央から突出するフィシュテール
部40が側壁11を切削してこれに食い込んだ状態とな
るようにして停止させている(図2参照)。
When the shield machine 12 reaches a position close to the side wall 11 while cutting the improved ground 14 formed, the shield machine 12 is temporarily stopped, and the side wall 11 positioned opposite to the reaching portion is stopped. Then, a reaching port 15 for penetrating and advancing the distal end portion of the shield machine 12 is formed in the side wall 11. In addition,
According to the reaching operation of the shield excavator 12, the shield excavator 12 is moved from the center of the cutter face 29 to the fish tail portion 40 so that the cutter face 29 on the front surface of the shield excavator 12 approaches the side wall 11 as close as possible. Are cut off and cut into the side wall 11 (see FIG. 2).

【0025】なお、かかる鏡斫りに先立って、地表面か
らあるいはシールド掘進機12の内部から、適宜薬液注
入工法や凍結工法等により止水工を補足施工することに
より、鏡斫りの作業中に、改良地盤14の切削中に生じ
たクラックや隙間を介して出水が生じるのを、さらに確
実に防止することができる。また、上記地盤改良工法に
より改良地盤14を造成する作業は、シールド掘進機1
2が立坑10の側壁11に近接する位置まで到達してか
ら、地表面からあるいはシールド掘進機12の内部から
地盤改良工法を施工することにより行うこともできる。
Prior to the mirror shaving, a water-stopping work may be supplemented from the ground surface or from inside the shield machine 12 by a chemical injection method, a freezing method, or the like, as needed, so that the mirror cutting operation is performed. In addition, it is possible to more reliably prevent water from flowing out through cracks and gaps generated during cutting of the improved ground 14. Further, the work of forming the improved ground 14 by the above ground improvement method is performed by the shield excavator 1.
After reaching the position near the side wall 11 of the shaft 10, the ground improvement method may be applied from the ground surface or from the inside of the shield machine 12.

【0026】一方、上記鏡斫りは、例えば、立坑10の
内部の作業空間から、側壁11の表面に描いた、到達口
15の周囲の位置を現す軌跡に沿って、多数のコアボー
リングを地山に向かって穿孔することにより、当該開口
部分の壁体を周囲の側壁11から縁切りし、しかる後
に、縁切りされた軌跡の内側に位置する壁体をブレーカ
等を用いて斫り取ることによって、到達口15を開口形
成することにより行われる。
On the other hand, the above-mentioned mirror shaving is performed by, for example, grounding a large number of core boring from a working space inside the shaft 10 along a locus drawn on the surface of the side wall 11 and representing a position around the arrival port 15. By drilling toward the mountain, the wall of the opening portion is cut off from the surrounding side wall 11, and thereafter, the wall located inside the cutout locus is scraped off using a breaker or the like. This is performed by forming the arrival port 15 as an opening.

【0027】そして、鏡鏡斫りを行ったら、図2に示す
ように、シールド掘進機12の先端面と側壁11との間
に位置していた到達部分の土砂を取り除くことにより、
シールド掘進機12の前面を開口形成した到達口15に
臨ませるとともに、この発明に係る立坑到達口における
止水構造20を設ける作業を行う。
Then, after performing the mirror shaving, as shown in FIG. 2, by removing the earth and sand at the reaching portion located between the tip end surface of the shield machine 12 and the side wall 11,
The front face of the shield machine 12 is made to face the opening 15 formed with an opening, and the work of providing the water stopping structure 20 at the shaft reaching port according to the present invention is performed.

【0028】すなわち、この実施例の止水構造20は、
図3にも示すように、到達口15の壁体内周面21に形
成した到達口発ウレタン層22と、シールド掘進機1
2の先端外周部分に形成した掘進機発ウレタン層23
とによって構成される。
That is, the water stopping structure 20 of this embodiment is
As shown in FIG. 3, the access openings onset foam urethane layer 22 formed on the wall inside the peripheral surface 21 of the access openings 15, the shield machine 1
Shield machine onset foam urethane layer 23 formed on the second distal outer peripheral portion
It is constituted by and.

【0029】ここで、到達口発ウレタン層22は、発
ウレタンはコンクリートに対する付着性を備えること
から、これを壁体内周面21に向かって吹き付けること
により任意の厚さで壁体内周面21に沿って容易に形成
することができる。なお、かかる吹き付け作業は、到達
口15を開口形成する際の、多数のコアボーリングの穿
孔作業やブレーカ等を用いた斫り作業に伴って、壁体内
周面21に生じた凹凸や不陸を整正するようにして行わ
れる。
[0029] In this case, access openings onset foam urethane layer 22 is issued
Since the urethane foam has an adhesive property to concrete, it can be easily formed along the wall surface 21 with an arbitrary thickness by spraying the urethane foam toward the wall surface 21. In the spraying operation, when forming the reaching port 15, the unevenness and unevenness generated on the peripheral surface 21 in the wall due to the drilling operation of a large number of core boring or the cutting operation using a breaker or the like. It is performed in such a way that it is adjusted.

【0030】また、この実施例で用いる発ウレタン
は、少なくとも膨張性、弾力性及び付着性を備える材料
で、好ましくは、例えばエアライトフォームSF−20
0NF(商品名:日清紡績株式会社製)を発倍率約3
0倍程度として用いることができる。
Further, foamed urethane used in this example, a material comprising at least swellable, elasticity and adhesion, preferably, for example, air Light Form SF-20
0NF (trade name: Nisshinbo Industries Co., Ltd.) foamed magnification about 3
It can be used as about 0 times.

【0031】一方、掘進機発ウレタン層23は、シー
ルド掘進機12の先端外周部分に取り付けたリング状の
枠体24により形成される充填空間35に発ウレタン
を注入充填することにより容易に形成することができ
る。
On the other hand, the shield machine onset foam urethane layer 23 is easily by injecting filling the filling space 35 two shot foaming urethane formed by a ring-shaped frame 24 attached to the distal end outer peripheral portion of the shield machine 12 Can be formed.

【0032】すなわち、枠体24は、図4及び図5に示
すように、周方向に16分割した弧状プレート27から
なる枠体ユニット25を、その周方向両端内周面側に山
形鋼を溶着して形成した連結片26を介して、ボルトに
より連結してリング状に構成されるとともに、このよう
にリング状に連結されることによって、各枠体ユニット
25の先端側に取り付けたリップ溝形鋼28が周方向に
連続することになる。したがって、枠体24が、シール
ド掘進機12の前面のカッターフェイス29に、溶着や
ブラケット30等を介して強固に固定されることによ
り、弧状プレート27及びリップ溝形鋼28と、カッタ
ーフェイス29や改良地盤14と、側壁11の壁体内周
面21によって囲まれる、発ウレタンを充填するため
の充填空間35が、リング状に形成されることになる
(図3参照)。
That is, as shown in FIGS. 4 and 5, the frame unit 25 is formed by welding a frame unit 25 consisting of an arcuate plate 27 divided into 16 parts in the circumferential direction, and welding angle iron to the inner circumferential surfaces of both ends in the circumferential direction. The connecting piece 26 formed as above is connected to each other by a bolt to form a ring shape, and by being connected in this way to a ring shape, the lip groove shape attached to the distal end side of each frame unit 25 is formed. The steel 28 will be continuous in the circumferential direction. Therefore, the frame body 24 is firmly fixed to the cutter face 29 on the front surface of the shield machine 12 through welding, the bracket 30 and the like, so that the arc-shaped plate 27 and the lip channel steel 28, the cutter face 29, and improved ground 14, is surrounded by a wall inside the peripheral surface 21 of the side wall 11, the filling space 35 for filling the foamed urethane will be formed in a ring shape (see FIG. 3).

【0033】また、枠体24は、リップ溝形鋼28の外
周プレート31が壁体内周面21の到達口発ウレタン
層22に接触するようにして、かつ弧状プレート27が
カッターフェイス29と側壁11との間の隙間を内方か
ら覆うようにして、到達口15の内部まで突出延長して
取り付けられている。
Further, the frame 24, the outer peripheral plate 31 so as to contact the access openings onset foam urethane layer 22 of the wall inside circumferential surface 21, and side walls and an arcuate plate 27 is a cutter face 29 of the lip groove-shaped steel 28 11 is attached so as to protrude and extend to the inside of the arrival port 15 so as to cover the gap between the port 11 and the inside.

【0034】そして、各枠体ユニット25の弧状プレー
ト27には、予めボールバルブ32が取り付けられてお
り(図4及び図5参照)、これに発ウレタンの注入バ
ルブ33を接続して(図3参照)発ウレタンを供給す
ることにより、充填空間35に発ウレタンを充填して
シールド掘進機12の先端外周部分に掘進機発ウレタ
ン層23を形成する作業を迅速に行うことができる。
[0034] Then, the arcuate plates 27 of each frame unit 25, and advance the ball valve 32 is attached (see FIGS. 4 and 5), to which are connected the inlet valve 33 of foamed urethane (Figure by supplying the 3 reference) to foam urethane, quickly work to form a shield machine onset foam urethane <br/> emission layer 23 by filling the filling space 35 two shot foaming urethane tip outer peripheral portion of the shield machine 12 Can be done.

【0035】ここで、注入された発ウレタンは、充填
空間35内に注入されて発し、この充填空間35を隙
間なく充填するとともに、さらに注入されて、弧状プレ
ート27、リップ溝形鋼28、壁体内周面21等によっ
て囲まれる充填空間35内でその発を拘束され、その
弾力性により当該充填空間35を閉塞する。また、発
ウレタンは付着力を有するため、掘進機発ウレタン層
23は、側壁11の壁体内周面21と強固に密着すると
ともに、カッターフェイス29と側壁11との間の隙間
を強固に閉塞する。
[0035] Here, injected foamed urethane, and foamed is injected into the filling space 35, the filling space 35 to fill with no gap, is further injected, the arcuate plate 27, the lip groove-shaped steel 28, is constrained to the foamed by filling space within 35 surrounded by the wall inside the peripheral surface 21 or the like, closing the filling space 35 by its elasticity. Further, since the foamed <br/> urethane having adhesion, the shield machine onset foam urethane layer 23, as well as firmly adhered to the wall inside the peripheral surface 21 of the side wall 11, between the cutter face 29 and side walls 11 Close gaps tightly.

【0036】なお、上述のようにして行なわれるこの実
施例の止水構造20の設置作業に伴って、シールド掘進
機12のチャンバー37内の土砂を取り除いたり、チャ
ンバー37内において、スキンプレート36の外周部分
に発ウレタンを注入するための注入バルブ34を取り
付ける作業が適宜行なわれる。なお、この注入バルブ3
4は、掘進機発ウレタン層23を補完する発ウレタ
ン層を、スキンプレート36の外周部分にさらに形成す
べく、発ウレタンを補足注入して、後述する再発進貫
入作業中における到達口15からの不慮の出水をさらに
確実に防止するための作業に用いるものである。
With the installation work of the water stopping structure 20 of this embodiment performed as described above, the soil and sand in the chamber 37 of the shield machine 12 are removed, and the skin plate 36 is removed in the chamber 37. work for attaching the injection valve 34 for injecting a foamed urethane outer peripheral portion is made appropriate. In addition, this injection valve 3
4, the foamed urethane <br/> emission layer to complement a shield machine onset foam urethane layer 23, to further formed on an outer peripheral portion of the skin plate 36, to supplement injecting foamed urethane, restarting penetration described below It is used for work to more reliably prevent accidental flooding from the arrival port 15 during work.

【0037】そして、この実施例によれば、上記止水構
造20を設置した後、再びシールド掘進機12前進さ
せて、少なくともスキンプレート36の先端部分が到達
口15に貫入し、到達口15の壁体によって支持される
ように配置するための再発進貫入作業を行う。
According to this embodiment, after installing the water stopping structure 20, the shield machine 12 is advanced again so that at least the tip portion of the skin plate 36 penetrates the arrival port 15, and the arrival port 15 Perform a re-penetration operation to position it to be supported by the wall.

【0038】かかる貫入作業において、シールド掘進機
12は、到達口15を通して前進摺動することになる
が、この実施例の止水構造20が設けられているため、
かかる摺動中、掘進機発ウレタン層23はその弾力性
によって到達口15の壁体内周面21に形成した到達口
ウレタン層22を押圧するとともに、付着性を備え
ることにより、壁体内周面21との密着状態を容易かつ
強固に保持する。すなわち、この実施例によれば、かか
る密着状態を保持することによって到達口15の止水性
を確実かつ安定して確保し、再発進貫入作業中の噴発等
による地下水の出水や地山の流出を容易に防止すること
ができる。
In such a penetrating operation, the shield machine 12 slides forward through the arrival port 15, but since the water stopping structure 20 of this embodiment is provided,
During such sliding, the shield machine onset foam urethane layer 23 with pressing the access openings <br/> onset foam urethane layer 22 formed on the wall inside the peripheral surface 21 of the access openings 15 by its elasticity, be provided with adhesion Thereby, the close contact state with the wall inner peripheral surface 21 is easily and firmly maintained. That is, according to this embodiment, by maintaining such a close contact state, the water stoppage of the arrival port 15 is reliably and stably secured, and the outflow of the groundwater or the outflow of the ground due to the eruption or the like during the re-entry operation. Can be easily prevented.

【0039】なお、この発明は上記実施例の実施の態様
のものに限定されるものではなく、種々の形態を採用す
ることができる。例えば、到達口15の壁体内周面21
に形成した到達口発ウレタン層22は必ずしも設ける
必要はなく、鏡斫りを行った後の到達口15の壁体内周
面21に対して、掘進機発ウレタン層23を直接に密
着摺動させつつ止水性を確保することもできる。
Note that the present invention is not limited to the embodiment of the above-described embodiment, and various forms can be adopted. For example, the inner peripheral surface 21 of the wall of the arrival port 15
Access openings onset foam urethane layer 22 formed is not necessarily provided, against the wall inside the peripheral surface 21 of the access openings 15 after the Kagami斫Ri directly contact sliding the shield machine onset foam urethane layer 23 The water stoppage can be ensured while moving.

【0040】[0040]

【発明の効果】以上詳細に説明したように、この発明の
シールド掘進機の立坑到達口における止水構造は、鏡斫
りの終了後にシールド掘進機の前面外周部分に沿って取
り付けたリング状の枠体によって形成される充填空間に
発泡ウレタンを注入充填することにより、到達口の壁体
内周面に密着するようにして、シールド掘進機の先端外
周部分に形成した発ウレタン層からなり、安価な資材
を用いて経済的かつ容易に設置することができるととも
に、この発ウレタン層と前記壁体内周面との密着状態
を保持することにより、到達口の止水性を確保して再発
進貫入時における地山側からの出水を容易かつ安定して
防止することができる。
As described in detail above, the water blocking structure at the shaft entrance of the shield machine according to the present invention is a mirror cutting machine.
After finishing the installation, take along the outer periphery of the shield machine
To the filling space formed by the ring-shaped frame
By injecting filling urethane foam, so as to close contact with the wall inside the peripheral surface of the access openings, consists foamed urethane layer formed on the tip outer peripheral portion of the shield machine, economically and easily using inexpensive materials easily it is possible to install, by holding the close contact between the foamed urethane layer and the wall inside circumferential surface, a water outlet from the ground mountainside during restarting penetrate to ensure water-blocking of the access openings to the And it can be prevented stably.

【0041】また、この発明のシールド掘進機の到達貫
入工法によれば、立坑側壁の鏡斫りをして到達口を開口
形成したら、シールド掘進機の前面外周部分に沿って取
り付けたリング状の枠体によって形成される充填空間に
発泡ウレタンを注入充填することにより、到達口の壁体
内周面に密着するようにして、シールド掘進機の先端外
周部分に発ウレタン層を形成し、この発ウレタン層
と到達口の壁体内周面との密着状態を保持しつつ、シー
ルド掘進機を前記到達口を通して摺動貫入するので、再
発進貫入時における止水性を簡易な構成により迅速に確
保するとともに、安定して到達口からの出水を防止しつ
つ容易かつ迅速に再発進貫入作業を行ってゆくことがで
きる。
According to the shield penetration machine reaching penetration method of the present invention, when the side wall of the shaft is mirror-cut and an opening is formed, the outer periphery of the front surface of the shield machine is taken out.
To the filling space formed by the ring-shaped frame
By injecting filling urethane foam, so as to close contact with the wall inside the peripheral surface of the access openings to form a foamed urethane layer on the tip outer peripheral portion of the shield machine, the wall body of the access openings This foamed urethane layer Since the shield machine is slid and penetrated through the arrival port while maintaining the close contact state with the peripheral surface, water repellency at the time of re-penetration and penetration is quickly ensured by a simple configuration, and a stable penetration from the arrival port is achieved. It is possible to easily and quickly perform the re-entry penetration work while preventing flooding.

【図面の簡単な説明】[Brief description of the drawings]

【図1】シールド掘進機を立坑に到達させる状況を説明
する略示断面図である。
FIG. 1 is a schematic cross-sectional view illustrating a situation in which a shield machine reaches a shaft.

【図2】この発明の一実施例にかかる止水構造の構成を
示す断面図である。
FIG. 2 is a cross-sectional view showing a configuration of a water stopping structure according to one embodiment of the present invention.

【図3】図2におけるA部の拡大図である。FIG. 3 is an enlarged view of a portion A in FIG. 2;

【図4】この発明の止水構造を設ける際に使用する枠体
の一例を示す正面図である。
FIG. 4 is a front view showing an example of a frame used when providing the water blocking structure of the present invention.

【図5】図4に示す枠体を構成する枠体ユニットを示す
斜視図である。
5 is a perspective view showing a frame unit constituting the frame shown in FIG. 4;

【符号の説明】[Explanation of symbols]

10 立坑 11 側壁 12 シールド掘進機 14 改良地盤 15 到達口 20 止水構造 21 壁体内周面 22 到達口発ウレタン層 23 掘進機発ウレタン層(発ウレタン層) 24 枠体 29 カッターフェイス 33 注入バルブ10 the vertical shaft 11 side wall 12 shield machine 14 improved ground 15 reaches opening 20 water-shutoff structure 21 walls inside circumferential surface 22 reaches port onset foam urethane layer 23 excavator onset foam urethane layer (foamed urethane layer) 24 frame 29 cutter face 33 Injection valve

───────────────────────────────────────────────────── フロントページの続き (56)参考文献 特開 平7−180473(JP,A) 特開 平2−240397(JP,A) 特開 平8−270373(JP,A) 特開 昭61−221492(JP,A) 特公 平6−31537(JP,B2) (58)調査した分野(Int.Cl.7,DB名) E21D 9/06 301 ──────────────────────────────────────────────────続 き Continuation of the front page (56) References JP-A-7-180473 (JP, A) JP-A-2-240397 (JP, A) JP-A 8-270373 (JP, A) JP-A 61-180373 221492 (JP, A) JP 6-31537 (JP, B2) (58) Field surveyed (Int. Cl. 7 , DB name) E21D 9/06 301

Claims (3)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 到達したシールド掘進機を、立坑側壁の
鏡斫りをして開口形成した到達口に貫入する際に、当該
到達口から立坑内に地下水が流入するのを防止するため
の止水構造であって、前記到達口の壁体内周面に密着す
るようにして、前記シールド掘進機の先端外周部分に形
成した発ウレタン層からなり、該発ウレタン層と前
記壁体内周面との密着状態を保持しつつ、前記シールド
掘進機を前記到達口を通して摺動貫入するシールド掘進
機の立坑到達口における止水構造であって、前記シール
ド掘進機の先端外周部分に形成される発泡ウレタン層
が、前記鏡斫りの終了後にシールド掘進機の前面外周部
分に沿って取り付けたリング状の枠体によって形成され
る充填空間に発泡ウレタンを注入充填することにより形
成されることを特徴とするシールド掘進機の立坑到達口
における止水構造
1. A stop for preventing groundwater from flowing into a shaft from the arrival port when the reached shield excavator penetrates into an opening port formed by mirror-cutting a shaft of a shaft. a water structure, so as to close contact with the wall inside peripheral surface of said access openings, wherein consists shield machine foamed urethane layer formed on the tip outer peripheral portion of the wall inside the circumferential surface and the foam urethane layer while maintaining close contact with, a said shield machine a water stop structure in a pit access openings of the sliding penetration to Resid Rudo excavator through the access openings, the seal
Urethane foam layer formed on the outer periphery of the tip of the machine
However, after the end of the mirror shaving, the outer peripheral portion of the front face of the shield machine is
Formed by a ring-shaped frame attached along the minute
By filling and filling urethane foam into the filling space
A shaft reaching port of a shield machine which is characterized by being formed
Water stop structure in
【請求項2】 前記到達口の壁体内周面には、発ウレ
タンを吹き付けることにより到達口発ウレタン層を形
成し、該到達口発ウレタン層と前記シールド掘進機の
ウレタン層との密着状態を保持しつつ、前記シール
ド掘進機を前記到達口を通して摺動貫入することを特徴
とする請求項1に記載のシールド掘進機の立坑到達口に
おける止水構造。
The 2. A wall inside peripheral surface of said access openings, forming a access openings onset foam urethane layer by blowing foamed urethane <br/> Tan,該到our mouth onset foam urethane layer and the shield machine while maintaining the contact state between the <br/> onset foam urethane layer, in the pit access openings of the shield machine according to the shield machine to claim 1, characterized in that the slide penetrating through the access openings Water stop structure.
【請求項3】 到達したシールド掘進機を、立坑側壁の
鏡斫りをした後再発進させて、開口形成した到達口に貫
入させるための到達貫入工法であって、シールド掘進機
の到達部分の地山に対し、シールド掘進機が当該到達部
分に到達する前あるいは到達して停止した後に、薬液注
入工法や凍結工法等の地盤改良工法を用いて到達防護工
を行う工程と、前記立坑側壁の鏡斫りをして到達口を開
口形成することにより、掘進作業により前記立坑側壁の
直前まで到達して停止しているシールド掘進機の前面を
前記到達口に臨ませる工程と、前記シールド掘進機の前
面外周部分に沿って取り付けたリング状の枠体によって
形成される充填空間に発泡ウレタンを注入充填すること
により、前記到達口の壁体内周面に密着するようにし
て、前記シールド掘進機の先端外周部分に発ウレタン
層を形成する工程と、該発ウレタン層と前記到達口の
壁体内周面との密着状態を保持しつつ、シールド掘進機
を前記到達口を通して摺動貫入する工程とからなること
を特徴とするシールド掘進機の到達貫入工法。
3. A reaching penetrating method for re-starting the reached shield excavator after mirror-cutting the side wall of the shaft and penetrating into an opening formed with an opening, wherein the reaching part of the shield excavator is provided. For the ground, before or after the shield machine reaches the reaching portion and stops, using a ground improvement method such as a chemical liquid injection method or a freezing method, a step of performing protection protection, and by opening forming the access openings to the Kagami斫Ri, a step for exposing a front surface of the shield machine is stopped to reach immediately before the pit sidewall by excavation work the access openings, the shield machine Before
With a ring-shaped frame attached along the outer periphery of the surface
Injecting and filling urethane foam into the formed filling space
Accordingly, the so as to close contact with the wall inside the peripheral surface of the access openings, forming a foamed urethane layer on the tip outer peripheral portion of the shield machine, the wall inside the circumferential surface of the foam urethane layer the access openings And a step of slidingly penetrating the shield machine through the access port while maintaining a close contact with the shield machine.
JP07247991A 1995-09-26 1995-09-26 Water-blocking structure and reaching penetration method at the shaft entrance of the shield machine Expired - Fee Related JP3134731B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP07247991A JP3134731B2 (en) 1995-09-26 1995-09-26 Water-blocking structure and reaching penetration method at the shaft entrance of the shield machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP07247991A JP3134731B2 (en) 1995-09-26 1995-09-26 Water-blocking structure and reaching penetration method at the shaft entrance of the shield machine

Publications (2)

Publication Number Publication Date
JPH0988473A JPH0988473A (en) 1997-03-31
JP3134731B2 true JP3134731B2 (en) 2001-02-13

Family

ID=17171574

Family Applications (1)

Application Number Title Priority Date Filing Date
JP07247991A Expired - Fee Related JP3134731B2 (en) 1995-09-26 1995-09-26 Water-blocking structure and reaching penetration method at the shaft entrance of the shield machine

Country Status (1)

Country Link
JP (1) JP3134731B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102364050A (en) * 2011-10-31 2012-02-29 江苏凯宫隧道机械有限公司 Foam launching device
CN110821503A (en) * 2019-11-27 2020-02-21 中铁九局集团第四工程有限公司 Construction method for main body of ultra-deep shield section air shaft after tunnel advance

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6674868B2 (en) * 2016-08-29 2020-04-01 鹿島建設株式会社 Construction method of underground structure

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102364050A (en) * 2011-10-31 2012-02-29 江苏凯宫隧道机械有限公司 Foam launching device
CN102364050B (en) * 2011-10-31 2014-12-24 江苏凯宫隧道机械有限公司 Foam launching device
CN110821503A (en) * 2019-11-27 2020-02-21 中铁九局集团第四工程有限公司 Construction method for main body of ultra-deep shield section air shaft after tunnel advance
CN110821503B (en) * 2019-11-27 2021-10-15 中铁九局集团第四工程有限公司 Construction method for main body of ultra-deep shield section air shaft after tunnel advance

Also Published As

Publication number Publication date
JPH0988473A (en) 1997-03-31

Similar Documents

Publication Publication Date Title
JP3134731B2 (en) Water-blocking structure and reaching penetration method at the shaft entrance of the shield machine
JP4335367B2 (en) Water stop method and structure for joints in underground concrete structures
JP2002047881A (en) Pipeline construction method
JPH0821183A (en) Method for starting tunnel excavation
JP2868663B2 (en) Docking dock
JP3131119B2 (en) How to stop water at a pipe propulsion wellhead
JP2017218776A (en) Shield tunneling machine with backfilling device and tunnel water stop method
JPH10176480A (en) Shield reaching method
JP2976830B2 (en) Joining method of shield excavator and reaching shaft
JPH06105029B2 (en) Freezing protection method for launching and reaching shield of deep shaft
JP3879105B2 (en) Shield connection method to existing tunnel
JPH10205280A (en) Tunnel construction method
JP2950166B2 (en) Starting method of shield machine from existing tunnel
JP7731022B1 (en) Launching equipment and launching method for tunneling machine
JP3733512B2 (en) Tunnel construction method and construction equipment
JP3122362B2 (en) Wellhead packing mounting structure
JP2002276288A (en) Excavator launch structure
JP3068396B2 (en) Shield excavator
JP2637160B2 (en) Shield method
JP3177908B2 (en) Starting method of shield excavator
JPH02140396A (en) Annular excavating device
JP2019210626A (en) Shield machine, and construction method of tunnel
JP4133898B2 (en) How to reach the excavator
JP3155980B2 (en) Tunnel joining method and equipment
JP4549585B2 (en) Shield machine start mechanism and start method

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees