JP3145951B2 - Support column of ball net - Google Patents
Support column of ball netInfo
- Publication number
- JP3145951B2 JP3145951B2 JP11962897A JP11962897A JP3145951B2 JP 3145951 B2 JP3145951 B2 JP 3145951B2 JP 11962897 A JP11962897 A JP 11962897A JP 11962897 A JP11962897 A JP 11962897A JP 3145951 B2 JP3145951 B2 JP 3145951B2
- Authority
- JP
- Japan
- Prior art keywords
- steel pipe
- ball
- lower steel
- flange
- support column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 claims description 96
- 239000010959 steel Substances 0.000 claims description 96
- 230000002093 peripheral effect Effects 0.000 claims description 8
- 238000009434 installation Methods 0.000 description 9
- 238000010276 construction Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 230000001747 exhibiting effect Effects 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000009191 jumping Effects 0.000 description 1
- 238000003754 machining Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/02—Structures made of specified materials
- E04H12/08—Structures made of specified materials of metal
- E04H12/085—Details of flanges for tubular masts
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Life Sciences & Earth Sciences (AREA)
- Chemical & Material Sciences (AREA)
- Materials Engineering (AREA)
- Wood Science & Technology (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Fencing (AREA)
Description
【0001】[0001]
【発明の属する技術分野】本発明は、学校や公園のグラ
ンド、あるいはゴルフ場の周辺などでボールが区域外に
飛び出すことを防止するために設置される防球ネット用
の支持柱に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a support column for a ball-proof net installed to prevent a ball from jumping out of an area in a school, a park ground, or around a golf course.
【0002】[0002]
【従来の技術】この種の支持柱としては、電柱などと同
様にコンクリートで形成されたものがあった。しかし、
このコンクリート製の支持柱は、長尺(通常15〜20
m)のため、設置現場への搬入が困難であるという問題
点を有していた。また、その設置には、専用の大型機械
を要すると共に、基礎工事も大掛かりになるという問題
点を有していた。2. Description of the Related Art As this type of support pole, there has been a support pole formed of concrete in the same manner as a utility pole. But,
This concrete support column is long (usually 15-20
m), it is difficult to carry it into the installation site. In addition, the installation has a problem that a dedicated large-sized machine is required and the foundation work is also large.
【0003】そのため近年は、複数に分割して搬入し、
現場で組み立てるようにした鋼管製のものが主流となっ
ている。For this reason, in recent years, it is divided into a plurality of pieces and carried in,
The mainstream is made of steel tubes that can be assembled on site.
【0004】従来、この種の鋼管製のものとしては、図
7に示すように鋼管11,12の端部をテーパ状に形成
し、このテーパ部分11a,12aで上下に鋼管11,
12を嵌め込むようにしたものや、図8に示すように上
下の鋼管13,14の端部に、それぞれリブ付きのフラ
ンジ15,16を取り付け、フランジ15,16同士を
ボルト17とナット18で連結することにより、上下の
鋼管13,14を連結するようにしたものがあった。Conventionally, as this type of steel pipe, as shown in FIG. 7, the ends of steel pipes 11 and 12 are formed in a tapered shape, and the steel pipes 11 and 12 are vertically formed by the tapered portions 11a and 12a.
As shown in FIG. 8, ribs 15 and 16 with ribs are attached to ends of upper and lower steel pipes 13 and 14, respectively. In some cases, the upper and lower steel pipes 13 and 14 are connected by connecting.
【0005】また、この他に図9に示すように、上位鋼
管19の下端寄りにフランジ21を溶接し、下位鋼管2
0には、ナット22付きのボルト孔24を設け、このボ
ルト孔24を挿通したボルト23の先端で、下位鋼管2
0内に挿入された上位鋼管19の外側面を押圧し、上下
の鋼管19,20を連結固定するようにしたものがあっ
た。In addition, as shown in FIG. 9, a flange 21 is welded to the lower end of the upper steel pipe 19 near the lower end thereof, and the lower steel pipe 2 is welded.
0, a bolt hole 24 with a nut 22 is provided.
In some cases, the outer surface of the upper steel pipe 19 inserted into the inner pipe 0 is pressed to connect and fix the upper and lower steel pipes 19 and 20.
【0006】[0006]
【発明が解決しようとする課題】上述した従来の防球ネ
ットの支持柱は、コンクリート製のものは、上述したよ
うに現場への搬入や設置が困難であるという問題点を有
していた。The above-mentioned conventional pillars for ball-proof nets, which are made of concrete, have a problem that it is difficult to carry them into or install them on the site as described above.
【0007】また鋼管を連結して組み立てるようにした
ものは、上記のような問題点は改善されるものの上下の
鋼管を図7に示すように、テーパ状に形成して嵌め込む
ようにしたものは、鋼管の端部を高い精度でテーパ状に
加工しなくてはならず、加工に手間を要すると共に、加
工費も嵩むという問題点があった。また、テーパ状に加
工するためには、鋼管の肉厚を薄くしなくてはならず、
必要な強度が得られなくなる虞れがあるという問題点も
有していた。さらにその組み立てにおいてもウインチな
どを用いてテーパ部分の強制圧入を図らなくてはなら
ず、作業に手間を要した。そして、このようにしてテー
パ部分の強制圧入を図っても設置後の径年変化により、
徐々に鋼管の挿入重なり寸法が大きくなり、支持柱の頂
部と地際との間に張設したワイヤーロープが弛むという
問題点もあった。[0007] In addition, the above-mentioned problems can be solved by connecting and assembling steel pipes, but the upper and lower steel pipes are formed into a tapered shape as shown in FIG. However, there is a problem that the end of the steel pipe has to be machined into a tapered shape with high precision, which requires time and effort and increases the machining cost. Also, in order to work in a tapered shape, the thickness of the steel pipe must be reduced,
There is also a problem that the required strength may not be obtained. Furthermore, in the assembly, it was necessary to force-press the tapered portion using a winch or the like, which required a lot of work. And, even if the forcible press-fitting of the tapered part is performed in this way, due to the diameter change after installation,
There is also a problem that the insertion overlap dimension of the steel pipe gradually increases, and the wire rope stretched between the top of the support column and the ground loosens.
【0008】また、図8に示すように上下の鋼管の端部
にフランジを溶接し、フランジ同士をボルトとナットで
連結するようにしたものは、高所においてボルトとナッ
トを締結しなくてはならず、作業に危険を伴うと共に、
作業能率も悪く、しかもこの作業のために足場移動用の
作業車を準備しなくてはならず、工事費コストが嵩むと
いう問題点があった。また、設置後はフランジを連結し
たボルトやナットがネットの網目に引っ掛かり、ネット
が破れるという問題点もあった。Further, as shown in FIG. 8, a flange is welded to the ends of upper and lower steel pipes, and the flanges are connected to each other with bolts and nuts. Not only is it dangerous to work,
The work efficiency is poor, and a work vehicle for moving the scaffold must be prepared for this work, which raises a problem that the construction cost is increased. Further, after installation, there is also a problem that bolts and nuts connecting the flanges are caught in the net of the net and the net is broken.
【0009】図9に示すように下位鋼管の外側から内側
にねじ込まれる複数のボルトで上位鋼管を固定するよう
にしたものは、上位鋼管の中心位置や垂直を調整しなが
ら複数のボルトを、それぞれねじ込まなくてはならず、
作業が煩わしいという問題点があった。また、この構成
では、一本のボルトに荷重が集中し、ボルトが折損した
り、あるいはボルトやナットの螺子が潰れて、上位鋼管
の位置決め保持がなされなくなる虞れも有り、信頼性に
欠けるという問題点があった。さらにこの支持柱も外部
にナットやボルトの頭部が突出しているので、ここにネ
ットの網目が引っ掛かり、ネットが破れるという問題点
を有していた。As shown in FIG. 9, the upper steel pipe is fixed by a plurality of bolts which are screwed in from the outside of the lower steel pipe to the inner side. I have to screw it in,
There was a problem that the work was troublesome. Further, in this configuration, the load is concentrated on one bolt, the bolt may be broken, or the screw of the bolt or nut may be crushed, and the positioning and holding of the upper steel pipe may not be performed. There was a problem. Further, since the heads of the nuts and bolts protrude to the outside of the support column, there is a problem that the net mesh is caught here and the net is broken.
【0010】本発明は、上記従来の防球ネットの支持柱
が有していた問題点の解決を課題とする。[0010] It is an object of the present invention to solve the problems of the above-mentioned conventional support columns of the ball-proof net.
【0011】[0011]
【課題を解決するための手段】上記の課題を解決するた
めに、本発明のうち、請求項1記載の発明は、地上に所
定間隔毎に立設され、ワイヤーで保持される防球ネット
設置用の支持柱において、上記支持柱は、径の異なる複
数の鋼管を上下に連結して形成され、前記鋼管のうち、
上位鋼管は下位鋼管より径が細く、かつ下部に下位鋼管
の上端面に当接するフランジが設けられると共に、この
フランジの下方の外周面に、下位鋼管の内周面に当接す
る位置決め部材が突設され、上位鋼管が下位鋼管上に垂
直に嵌合保持されるようにしたものである。In order to solve the above-mentioned problems, the invention according to the first aspect of the present invention is a ball-proof net installed on a ground at predetermined intervals and held by wires. In the supporting column for, the supporting column is formed by vertically connecting a plurality of steel pipes having different diameters, and among the steel pipes,
The upper steel pipe has a diameter smaller than that of the lower steel pipe, and a flange is provided at the lower portion in contact with the upper end face of the lower steel pipe, and a positioning member projecting from the outer peripheral surface below the flange is in contact with the inner peripheral surface of the lower steel pipe. The upper steel pipe is fitted and held vertically on the lower steel pipe.
【0012】請求項2記載の発明は、上記請求項1記載
の発明における位置決め部材を、鋼管の外周に等しい間
隔で突設された突片状のライナとしたことを特徴とす
る。A second aspect of the present invention is characterized in that the positioning member according to the first aspect of the present invention is a protruding piece-shaped liner protruding at an equal interval on the outer circumference of the steel pipe.
【0013】請求項3記載の発明は、上記請求項1記載
の発明における位置決め部材を、上下に所定間隙を有し
て設けられた一対のフランジとしたことを特徴とする。According to a third aspect of the present invention, the positioning member according to the first aspect of the present invention is a pair of flanges provided with a predetermined gap above and below.
【0014】[0014]
【発明の実施の形態】以下、本発明を図示した実施の形
態に基づき詳細に説明する。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, the present invention will be described in detail based on illustrated embodiments.
【0015】図1は、本発明の支持柱1を用いた防球ネ
ット100の設置例を示す正面図である。図示したよう
に防球ネット100を支持する支持柱1は、その下端を
地中に埋設して地上に所定間隔毎に立設され、それぞれ
の頂部1aから隣接した支持柱1の地際に交差状に張設
したワイヤー8と、支持柱1,1同士を横方向に連結し
た複数の水平なワイヤー9とで保持されるようになって
いる。FIG. 1 is a front view showing an example of installation of a ball-proof net 100 using a support column 1 of the present invention. As shown in the drawing, the support columns 1 supporting the ball net 100 are erected at predetermined intervals on the ground with their lower ends buried in the ground, and intersect at the ground of the adjacent support columns 1 from their respective tops 1a. The supporting wires 1 and 1 are held by a plurality of horizontal wires 9 connecting the supporting columns 1 and 1 to each other in a lateral direction.
【0016】また、両端(図1において左右両側)の支
持柱1,1は、それぞれその頂部1aが、隣合った支持
柱1の頂部1aと、ジョイントビーム10を介して連結
され、内方に倒れ込まないように保持されている。な
お、このジョイントビーム10は、両端の支持柱1,1
の外側にワイヤー(図示せず)を張設した場合は、必ず
しも必要ではない。The support pillars 1, 1 at both ends (on both the left and right sides in FIG. 1) have their tops 1a connected to the tops 1a of the adjacent support pillars 1 via joint beams 10, respectively. It is held so that it does not fall. In addition, the joint beam 10 is supported by the support columns 1, 1 at both ends.
When a wire (not shown) is stretched outside the, it is not always necessary.
【0017】ここにおいて、本発明では上記支持柱1を
図2に示すように径の異なる複数(図示した例では三
本)の鋼管2,3,4を上下に連結して形成している。
この鋼管2,3,4は、上位のもの2(または3)(以
下、上位鋼管という)が、下位のもの3(または4)
(以下、下位鋼管という)より径が細く、その内部に挿
入し得るようになっている。また、上位鋼管2(3)の
下部2a(3a)には、図3並びに図4に示すように、
フランジ5を設けると共に、このフランジ5の下方の外
周面に位置決め部材となる突片状のライナ6を複数突設
している。In the present invention, the support column 1 is formed by connecting a plurality of (three in the illustrated example) steel pipes 2, 3, and 4 having different diameters as shown in FIG.
The steel pipes 2, 3, and 4 have a higher rank 2 (or 3) (hereinafter referred to as a higher rank steel pipe) and a lower rank 3 (or 4)
It has a smaller diameter than that (hereinafter referred to as a lower steel pipe) and can be inserted therein. As shown in FIGS. 3 and 4, the lower part 2a (3a) of the upper steel pipe 2 (3)
A flange 5 is provided, and a plurality of protruding liners 6 serving as positioning members are provided on the outer peripheral surface below the flange 5.
【0018】上記フランジ5は、その外径が下位鋼管3
(4)の内径より大きく、上位鋼管2(3)を下位鋼管
3(4)に差し込んだ際、下位鋼管3(4)の上端面に
接して上位鋼管2(3)を下位鋼管3(4)上に保持す
るものである。The flange 5 has an outer diameter of the lower steel pipe 3.
When the upper steel pipe 2 (3) is larger than the inner diameter of (4) and is inserted into the lower steel pipe 3 (4), the upper steel pipe 2 (3) comes into contact with the upper end surface of the lower steel pipe 3 (4) and is connected to the lower steel pipe 3 (4). ).
【0019】また、上記ライナ6は、それぞれが上位鋼
管2(3)の内径と下位鋼管3(4)の外径との差、即
ち、上位鋼管2(3)を下位鋼管3(4)に挿入した際
に形成される間隙の約1/2の突出寸法を有している。
このライナ6は、鋼管2(3)の周囲に等間隔に、上下
にそれぞれ4個づつ設けられ、上位鋼管2(3)を下位
鋼管3(4)に差し込んだ際、その外側面が下位鋼管3
(4)の内周面に隙間なく接し、上位鋼管2(3)を下
位鋼管3(4)の中心に保持するようになっている。The liner 6 has a difference between the inner diameter of the upper steel pipe 2 (3) and the outer diameter of the lower steel pipe 3 (4), that is, the upper steel pipe 2 (3) is connected to the lower steel pipe 3 (4). It has a projecting dimension of about 1/2 of the gap formed when inserted.
The four liners 6 are provided at upper and lower sides at equal intervals around the steel pipe 2 (3). When the upper steel pipe 2 (3) is inserted into the lower steel pipe 3 (4), the outer surface thereof is positioned at the lower steel pipe 3 (4). 3
The upper steel pipe 2 (3) is held in the center of the lower steel pipe 3 (4) in contact with the inner peripheral surface of (4) without any gap.
【0020】上記構成を有する本発明の防球ネット10
0の支持柱1は、まず最下位の鋼管4をその下端を地中
に埋設して所定位置に設置し、次に中継ぎとなる中央の
鋼管3をクレーンなどで吊り下げ、その下端3aを下位
鋼管4内に差し込めば、上述の通り、ライナ6が下位鋼
管4の内周面に接して上位鋼管3を位置決め案内し、や
がて、フランジ5が下位鋼管4の上端面に接することに
より、上位鋼管3が下位鋼管4上に垂直に嵌合保持され
るものである。次にこの上位鋼管3を下位鋼管3とし
て、同様にその上側に更に細い上位鋼管2を挿入すれ
ば、この上位鋼管2は、同様にしてこの鋼管3上に垂直
に嵌合保持される。The ball-proof net 10 of the present invention having the above configuration.
First, the lowermost steel pipe 4 is installed at a predetermined position by embedding the lower end of the lower end of the steel pipe 4 in the ground, and then suspending the central steel pipe 3 serving as a joint by a crane or the like, and lowering the lower end 3a of the lower end of the lower end of the lower pipe 3a. When inserted into the steel pipe 4, as described above, the liner 6 contacts the inner peripheral surface of the lower steel pipe 4 to position and guide the upper steel pipe 3, and then the flange 5 contacts the upper end face of the lower steel pipe 4, whereby the upper steel pipe is contacted. 3 is fitted and held vertically on the lower steel pipe 4. Next, when the upper steel pipe 3 is used as the lower steel pipe 3 and the thinner upper steel pipe 2 is similarly inserted above the lower steel pipe 3, the upper steel pipe 2 is similarly fitted and held vertically on the steel pipe 3.
【0021】このようにして、同様の支持柱1を図1に
示すように地上に所定間隔毎に立設し、それぞれの頂部
1aと隣接した支持柱1の地際との間にワイヤー8を張
設すると共に、支持柱1,1同士を水平なワイヤー9で
横方向に連結することにより、その設置が完了する。In this way, the same supporting columns 1 are erected at predetermined intervals on the ground as shown in FIG. 1, and a wire 8 is connected between each top 1a and the ground of the adjacent supporting column 1. The installation is completed by extending the support columns 1 and 1 and connecting the support columns 1 and 1 laterally with the horizontal wires 9.
【0022】以上のようにして本発明の防球ネットの支
持柱1は、グランドなどの所定位置に設置され、防球ネ
ット100の取り付けに用いられるものである。As described above, the support column 1 of the ball-proof net of the present invention is installed at a predetermined position such as a ground, and is used for mounting the ball-proof net 100.
【0023】このように本発明の防球ネットの支持柱1
では、クレーンなどを用いて上位鋼管2(3)を下位鋼
管3(4)に、その上側から差し込むだけで容易に組み
立てることができる。また、この支持柱1は、頂部1a
がワイヤー8を介して地面側と連結されているので、そ
れぞれの鋼管2,3,4が上方(嵌合が抜ける方向)に
移動することができず、上下の鋼管2,3,4は、嵌合
連結された状態で確実に保持される。As described above, the supporting column 1 of the ball-proof net according to the present invention.
Then, the upper steel pipe 2 (3) can be easily assembled simply by inserting the upper steel pipe 2 (3) into the lower steel pipe 3 (4) from above using a crane or the like. The support column 1 has a top 1a.
Is connected to the ground side via the wire 8, the respective steel pipes 2, 3, 4 cannot move upward (in the direction in which the fitting is removed), and the upper and lower steel pipes 2, 3, 4 It is securely held in the state of being fitted and connected.
【0024】なお、上記では三本の鋼管2,3,4を連
結して防球ネットの支持柱1を形成した例を示したが、
連結する鋼管の数は、支持柱の高さや搬入条件などに応
じて適宜決定すれば良く、二本あるいは四本以上であっ
ても良い。In the above description, an example is shown in which the three steel pipes 2, 3, and 4 are connected to form the support column 1 of the ball-proof net.
The number of steel pipes to be connected may be appropriately determined according to the height of the support column, the loading conditions, and the like, and may be two or four or more.
【0025】また、図示した例では、環状のフランジ5
を示したが、このフランジ5の外側を下方傾斜させて外
方に延ばしても良く、このようにすれば、連結部分から
の雨水の侵入を防止することができ、一層望ましい。あ
るいは、カバー部材(図示せず)を別途、用意し、この
カバー部材でフランジ5を覆うようにしても良い。In the illustrated example, the annular flange 5
However, the outside of the flange 5 may be inclined downward and extended outward. In this way, it is possible to prevent rainwater from entering from the connecting portion, which is more preferable. Alternatively, a cover member (not shown) may be separately prepared, and the flange 5 may be covered with the cover member.
【0026】図5と図6は、それぞれ本発明の他の実施
形態を示す要部の正面図と、その下面図である。図示し
たように、この場合は、位置決め部材として上下に所定
間隔を有して一対のフランジ7,7を設けている。この
フランジ7は、上方に設けられたフランジ5より小径
で、下位鋼管3(4)の内径とほぼ同じ寸法を有するも
のである。従って、この場合も上位鋼管2(3)を下位
鋼管3(4)に、その上方から差し込めば、フランジ5
が下位鋼管3(4)の内周面に接して、この上位鋼管2
(3)を下位鋼管3(4)の中心に位置決めするように
作用し、上位鋼管2(3)は下位鋼管3(4)上に垂直
に嵌合保持される。FIGS. 5 and 6 are a front view and a bottom view, respectively, of a main part showing another embodiment of the present invention. As shown, in this case, a pair of flanges 7, 7 are provided at predetermined intervals above and below as positioning members. The flange 7 has a smaller diameter than the flange 5 provided above and has substantially the same size as the inner diameter of the lower steel pipe 3 (4). Therefore, also in this case, if the upper steel pipe 2 (3) is inserted into the lower steel pipe 3 (4) from above, the flange 5
Is in contact with the inner peripheral surface of the lower steel pipe 3 (4),
(3) acts to position the center of the lower steel pipe 3 (4), and the upper steel pipe 2 (3) is fitted and held vertically on the lower steel pipe 3 (4).
【0027】[0027]
【発明の効果】以上、説明したように本発明のうち、請
求項1記載の発明は、防球ネットの支持柱を、径の異な
る複数の鋼管を上下に連結して形成することとしたの
で、設置現場への搬入が容易になり、また上位鋼管を下
位鋼管に挿入するだけで、上位鋼管が下位鋼管上に垂直
に嵌合保持されるようにしたので、設置作業も容易で、
工事期間の短縮、並びに工事コストの削減が図られる。
また、この支持柱は従来のもののように、外部に連結用
のボルトやナットが露出していないので、防球ネットの
網目が引っ掛かってネットが破れる虞れもないという多
くの優れた効果を奏する。As described above, according to the first aspect of the present invention, the support column of the ball-proof net is formed by connecting a plurality of steel pipes having different diameters up and down. It is easy to carry in to the installation site, and by simply inserting the upper steel pipe into the lower steel pipe, the upper steel pipe is fitted and held vertically on the lower steel pipe, so the installation work is also easy,
The construction period can be shortened and the construction cost can be reduced.
Further, unlike the conventional one, the supporting pillar does not expose the connecting bolts and nuts to the outside, so that there are many excellent effects that the net of the ball-proof net is not hooked and the net is not broken. .
【0028】請求項2と請求項3記載の発明は、それぞ
れ上記請求項1記載の発明の効果を奏する支持柱用の鋼
管を、加工容易かつコスト低廉に実現するものである。According to the second and third aspects of the present invention, a steel pipe for a supporting column exhibiting the effects of the first aspect of the present invention can be realized easily and at low cost.
【図1】本発明の支持柱を用いた防球ネットの設置例を
示す正面図である。FIG. 1 is a front view showing an installation example of a ball-proof net using a support column of the present invention.
【図2】図1に示した支持柱の拡大図である。FIG. 2 is an enlarged view of a support column shown in FIG.
【図3】本発明の支持柱を構成する鋼管の実施形態を示
した要部正面図である。FIG. 3 is a main part front view showing an embodiment of a steel pipe constituting a support column of the present invention.
【図4】図3の下面図である。FIG. 4 is a bottom view of FIG. 3;
【図5】鋼管の他の実施形態を示した要部正面図であ
る。FIG. 5 is a main part front view showing another embodiment of the steel pipe.
【図6】図5の下面図である。FIG. 6 is a bottom view of FIG.
【図7】従来例の要部断面図である。FIG. 7 is a sectional view of a main part of a conventional example.
【図8】他の従来例の要部断面図である。FIG. 8 is a sectional view of a main part of another conventional example.
【図9】さらに他の従来例の要部断面図である。FIG. 9 is a cross-sectional view of a main part of still another conventional example.
1 支持柱 2,3,4 鋼管 5 フランジ 6 ライナ 7 フランジ 8,9 ワイヤ 10 ジョイントビーム 100 防球ネット DESCRIPTION OF SYMBOLS 1 Support pillar 2,3,4 Steel pipe 5 Flange 6 Liner 7 Flange 8,9 Wire 10 Joint beam 100 Ball net
───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.7,DB名) E04H 12/00 E04H 12/08 A63B 69/36 522 A63B 71/02 A63C 19/00 F16B 7/20 E04B 1/58 503 ──────────────────────────────────────────────────続 き Continued on the front page (58) Fields surveyed (Int. Cl. 7 , DB name) E04H 12/00 E04H 12/08 A63B 69/36 522 A63B 71/02 A63C 19/00 F16B 7/20 E04B 1 / 58 503
Claims (3)
で保持される防球ネット設置用の支持柱において、 上記支持柱は、径の異なる複数の鋼管を上下に連結して
形成され、前記鋼管のうち、上位鋼管は下位鋼管より径
が細く、かつ下部に下位鋼管の上端面に当接するフラン
ジが設けられると共に、フランジ下方の外周面に、下位
鋼管の内周面に当接する位置決め部材が突設され、上位
鋼管が下位鋼管上に垂直に嵌合保持されるようになされ
たことを特徴とする防球ネットの支持柱。1. A supporting column for installing a ball-proof net, which is erected at predetermined intervals on the ground and held by wires, wherein the supporting column is formed by vertically connecting a plurality of steel pipes having different diameters, Among the steel pipes, the upper steel pipe has a diameter smaller than that of the lower steel pipe, and a flange is provided at a lower portion in contact with an upper end surface of the lower steel pipe, and a positioning member that contacts an inner peripheral surface of the lower steel pipe on an outer peripheral surface below the flange. Wherein the upper steel pipe is vertically fitted on and held by the lower steel pipe.
隔で突設された突片状のライナであることを特徴とする
請求項1記載の防球ネットの支持柱。2. The supporting column for a ball-proof net according to claim 1, wherein the positioning member is a protruding liner protruding from the outer periphery of the steel pipe at an equal interval.
て設けられた一対のフランジであることを特徴とする請
求項1記載の防球ネットの支持柱。3. The support column for a ball-proof net according to claim 1, wherein the positioning member is a pair of flanges provided with a predetermined gap vertically.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP11962897A JP3145951B2 (en) | 1997-05-09 | 1997-05-09 | Support column of ball net |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP11962897A JP3145951B2 (en) | 1997-05-09 | 1997-05-09 | Support column of ball net |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH10311165A JPH10311165A (en) | 1998-11-24 |
| JP3145951B2 true JP3145951B2 (en) | 2001-03-12 |
Family
ID=14766156
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP11962897A Expired - Fee Related JP3145951B2 (en) | 1997-05-09 | 1997-05-09 | Support column of ball net |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3145951B2 (en) |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP4611260B2 (en) * | 2000-12-13 | 2011-01-12 | Jfe西日本ジーエス株式会社 | Metal tube column base structure |
| JP5904446B2 (en) * | 2013-03-04 | 2016-04-13 | フルタ鉄塔建設株式会社 | Mounting structure of supporting wire for supporting column, and mounting method of supporting wire for supporting column |
| JP2014140301A (en) * | 2014-03-31 | 2014-07-31 | Office If Kk | Photovoltaic power generation device |
| JP2024149384A (en) * | 2023-04-07 | 2024-10-18 | 株式会社アイ・ティ・シ・コンサルティング | Tower-like structure |
-
1997
- 1997-05-09 JP JP11962897A patent/JP3145951B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JPH10311165A (en) | 1998-11-24 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US7694476B2 (en) | Systems and methods for in-line base plate termination in monopole structures | |
| JP2684223B2 (en) | Module space frame seismic structure | |
| US8646219B2 (en) | Fixture for locating wind turbine equipment on foundation prior to tower installation | |
| JP3145951B2 (en) | Support column of ball net | |
| KR100611553B1 (en) | Connection structure of street light pole | |
| CN217651804U (en) | Device for improving steel support stability by utilizing concrete support | |
| JP7192153B1 (en) | Anchor bolt construction method and level adjustment member | |
| JP5538151B2 (en) | Joint structure of pile and steel column | |
| KR20090000651U (en) | Base plate for street facilities | |
| CN114232802B (en) | Steel structure dome latticed shell structure and sectional construction method thereof | |
| JP2004285816A (en) | Column joint structure and joint members used for it | |
| CN215519163U (en) | Connecting module for joint of multiple frame beams and stand columns of underground garage | |
| CN222500605U (en) | Bottom installation external member of steel construction post | |
| JPH08189041A (en) | Unit anchor and shape-steel footing beam | |
| JP2003293617A (en) | Column base hardware for steel pipe column | |
| KR200227387Y1 (en) | Device for fixing a wire to a column | |
| CN223293081U (en) | An anchoring structure for steel pipe columns at beam-column joints of cast-in-place concrete garage roofs | |
| JP3130242B2 (en) | Plug-in connection method for different diameter pipes | |
| KR102750862B1 (en) | Fence type post and deck road systen having the same | |
| CN214303219U (en) | Fender is enclosed with construction to municipal construction | |
| JP7773913B2 (en) | Fence panels | |
| JP7842569B2 (en) | Fence panel | |
| RU215200U1 (en) | Fixing Device for Power Line Pole | |
| JP2012122256A (en) | Column leg fitting | |
| JP3039430U (en) | fence |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| S804 | Written request for registration of cancellation of exclusive licence |
Free format text: JAPANESE INTERMEDIATE CODE: R314803 |
|
| R360 | Written notification for declining of transfer of rights |
Free format text: JAPANESE INTERMEDIATE CODE: R360 |
|
| S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
| R371 | Transfer withdrawn |
Free format text: JAPANESE INTERMEDIATE CODE: R371 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| S804 | Written request for registration of cancellation of exclusive licence |
Free format text: JAPANESE INTERMEDIATE CODE: R314803 |
|
| R360 | Written notification for declining of transfer of rights |
Free format text: JAPANESE INTERMEDIATE CODE: R360 |
|
| R370 | Written measure of declining of transfer procedure |
Free format text: JAPANESE INTERMEDIATE CODE: R370 |
|
| S533 | Written request for registration of change of name |
Free format text: JAPANESE INTERMEDIATE CODE: R313533 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| S804 | Written request for registration of cancellation of exclusive licence |
Free format text: JAPANESE INTERMEDIATE CODE: R314803 |
|
| R360 | Written notification for declining of transfer of rights |
Free format text: JAPANESE INTERMEDIATE CODE: R360 |
|
| R371 | Transfer withdrawn |
Free format text: JAPANESE INTERMEDIATE CODE: R371 |
|
| S804 | Written request for registration of cancellation of exclusive licence |
Free format text: JAPANESE INTERMEDIATE CODE: R314803 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080105 Year of fee payment: 7 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090105 Year of fee payment: 8 |
|
| LAPS | Cancellation because of no payment of annual fees |