Jack-up device for concrete slab level correction method

Info

Publication number
JP3156066B2
JP3156066B2 JP16580794A JP16580794A JP3156066B2 JP 3156066 B2 JP3156066 B2 JP 3156066B2 JP 16580794 A JP16580794 A JP 16580794A JP 16580794 A JP16580794 A JP 16580794A JP 3156066 B2 JP3156066 B2 JP 3156066B2
Authority
JP
Japan
Prior art keywords
jack
plate
block
concrete
reaction force
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP16580794A
Other languages
Japanese (ja)
Other versions
JPH0813814A (en
Inventor
一宏 畠山
英男 下村
芳正 中野
剛士 松浦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Corp
Original Assignee
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Corp filed Critical Shimizu Corp
Priority to JP16580794A priority Critical patent/JP3156066B2/en
Publication of JPH0813814A publication Critical patent/JPH0813814A/en
Application granted granted Critical
Publication of JP3156066B2 publication Critical patent/JP3156066B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、軟弱地盤上に建設され
た土間コンクリート床に不同沈下が発生した場合、イニ
シャルコストを少なくして短時間に復旧可能としたコン
クリート版レベル修正工法用ジャッキアップ装置に関す
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a jack-up for a concrete level correction method in which initial settlement can be reduced in a short period of time when uneven settlement occurs on a concrete soil floor constructed on soft ground. Related to the device.

【0002】[0002]

【従来の技術及び発明が解決しようとする課題】軟弱地
盤上に建設された空港施設の滑走路、エプロン等の土間
コンクリート床に不同沈下が発生した場合、用途上短時
間の床レベル修正作業が求められる。従来は、沈下した
表面に超早強コンクリートを打設し、平坦性を回復する
オーバーレイ工法が施工されている。該オーバーレイ工
法は床レベルの測定、床コンクリート表面の目荒しとハ
ツリ工事を準備するだけで施工できるので、イニシャル
コストは安いが、ハツリ工事による粉塵の発生、床全面
を厚くして修正した場合は床のライン引き等の再施工が
必要、床取出口レベルの修正が必要、オーバーレイの薄
い部分にはひび割れが発生し易い等のデメリットを抱え
ている。また、土間コンクリート床の上層がプレストレ
スコンクリート舗装(以下PC舗装)されている場合に
は、下層の改良地盤に圧力盤を後施工し、上層のPC舗
装にリフトアップ金具を後付けしてリフトアップするピ
ーエス(株)等の方式のリフトアップ工法が施工されて
いるが、上層のコンクリート厚さが厚いため孔加工に時
間がかかる、イニシャルコストが高い、ジャッキアップ
に時間がかかる等のデメリットを抱えていて、イニシャ
ルコストを軽減し、土間コンクリート床の一部でも全体
でも対応し易い修正工法用のジャッキアップ装置の出現
が待たれていた。
2. Description of the Related Art In the case of uneven settlement on concrete floors such as runways and aprons of airport facilities constructed on soft ground, it is necessary to correct the floor level for a short period of time. Desired. Conventionally, an overlay construction method for recovering flatness by placing ultra-high-strength concrete on the sinking surface has been applied. The overlay construction method can be constructed simply by measuring the floor level, roughing the surface of the floor concrete and filing work, so the initial cost is low.However, if dust is generated by filing work and the whole floor is thickened and corrected, It has disadvantages such as the necessity of rebuilding the floor line, the need to modify the floor exit level, and the possibility of cracking easily in the thin part of the overlay. In addition, when the upper layer of the concrete floor is prestressed concrete pavement (hereinafter referred to as PC pavement), a pressure plate is post-installed on the lower layer of the improved ground, and a lift-up metal fitting is attached to the upper layer PC pavement to lift up. Although the lift-up method of the method of PS Co., Ltd., etc. is being constructed, there are disadvantages such as the time required for hole drilling due to the thick upper concrete layer, the high initial cost, and the time required for jack-up. Therefore, there has been a long-awaited appearance of a jack-up device for a repair method, which can reduce initial costs and can easily handle part or the whole of the concrete floor.

【0003】[0003]

【課題を解決するための手段及び作用】本発明は前記課
題の解決を目的とするものであって、以下の技術思想を
もって解決しようとするものである。 (1)オーバーレイ工法ではハツリ工事の環境公害の課
題、床レベルが高くなる、オーバーレイの薄い部分にひ
び割れが発生し易い等の課題があるので、沈下した上層
部分のジャッキアップ工法で修正する方がよい。そのた
めには、最上層に比較的薄い鉄筋コンクリートブロック
版を敷設し、最小限の該ブロック版をジャッキアップし
て修正すればよいようにし、中層に鉄筋コンクリートマ
ットスラブ、最下層にセメント安全処理工法等による改
良地盤の三層構造で土間コンクリート床を構成すると共
に、最上層のブロック版の下にはく離シートを介在させ
て、該ブロック版のジャッキアップを容易にしたコンク
リート版レベル修正工法が好適である。 (2)ジャッキアップ装置としては簡易、安価で急速に対
応可能な構成であることが望ましく、その最上層のブロ
ック版には、吊り上げボルト用ネジ孔を穿設した支柱を
中心としてその周縁のY形状頂点位置に3本のパイプを
配設してなる吊り上げ用連結具を埋設し、不同沈下が発
生した場合は、該連結具を使ってそのパイプ内に反力ボ
ルトを立設し、その主柱の中心に吊り上げボルトを螺結
して上下2枚の反力プレートを組立て、その上方の反力
プレートをジャッキ受け用、下方の反力プレートを仮受
け用としてジャッキアップする。
SUMMARY OF THE INVENTION The present invention has been made to solve the above-mentioned problems, and is to be solved by the following technical concept. (1) In the overlay method, there are issues such as environmental pollution problems of filing work, high floor level, cracks easily occur in the thin part of the overlay, etc., so it is better to correct it by jacking up the sinking upper layer. Good. For this purpose, a relatively thin reinforced concrete block slab is laid on the top layer, the minimum block slab is jacked up and modified, and the middle layer is reinforced concrete mat slab and the bottom layer is a cement safe processing method etc. A concrete slab level modification method in which a concrete floor is constructed with a three-layer structure of improved ground and a release sheet is interposed under the uppermost block slab to facilitate jacking up of the block slab. (2) It is desirable that the jack-up device should be simple, inexpensive, and capable of rapidly responding. The block plate of the uppermost layer has a Y around the periphery of a support having a screw hole for a lifting bolt. A lifting connector consisting of three pipes is buried at the apex of the shape, and when uneven settlement occurs, a reaction force bolt is erected in the pipe using the connector and the main bolt is set up. A lifting bolt is screwed into the center of the column to assemble the upper and lower reaction force plates, and the upper reaction force plate is jack-received and the lower reaction force plate is provisionally received for jack-up.

【0004】すなわち、本発明の解決手段は以下のごと
く構成される。 (1)軟弱地盤上の土間コンクリート床を、最上層が比
較的薄い鉄筋コンクリートブロック版、中層が鉄筋コン
クリートマツトスラブ、最下層がセメント安全処理工法
等による改良地盤からなる三層構造とし、かつ該最上層
と中層の間にははく離シートを介在させ、該最上層のブ
ロック版には、吊り上げボルト用ネジ孔を穿設した主柱
を中心として、その周縁のY形状頂点位置に3本のパイ
プを立設すると共に、その上下両端を天端プレートと荷
重受プレートで固定してなる吊り上げ用連結具を一体的
に埋設し、前記の荷重受プレートに当接させて中層のマ
ットスラブ上には反力受プレートを敷設し、前記の天端
プレートの上を常時は蓋で被覆するごとく構成し、不同
沈下が発生した場合は、前記の蓋を取り外し、前記の3
本のパイプに反力ボルトを挿入して反力受プレート上に
直立させ、該3本の反力ボルトに上下各2個の受けナッ
トを螺着して上下2枚の反力プレートを受支させ、該上
下2枚の反力プレートの中心孔には吊り上げボルトを貫
挿し、その下端を前記の支柱ネジ孔に螺結し、その上部
には上下2個の押さえナットを螺着し、上方の押さえナ
ットでは上方の反力プレートとの間で載置されたジャッ
キを上から締着し、下方の押さえナットでは下方の受け
ナットとの間で下方の反力プレートを締着し、該ジャッ
キの作動により最上層のブロック版を上方の押えナット
を介し上方の反力プレート上にジャッキアップ可能とし
た構成を特徴とするコンクリート版レベル修正工法用ジ
ャッキアップ装置。 (2)ジャッキの作動により最上層のブロック版をジャ
ッキアップしたとき、下方の押えナットに発生した間隙
を締め直して下方の反力プレートを再締着し、ジャッキ
アップされたブロック版を下方の押さえナットを介し下
方の反力プレート上に仮受け可能とした構成を特徴とす
る(1)項記載のコンクリート版レベル修正工法用ジャ
ッキアップ装置。 (3)不同沈下が発生した土間コンクリート床の床レベ
ルを三次元計測して、最上層のブロック版のうちから不
同沈下の修正に必要な最小限のジャッキアップ施工ブロ
ック版を決定し、ジャッキアップ可能とした構成を特徴
とする(1)項及び(2)項記載のコンクリート版レベ
ル修正工法用ジャッキアップ装置。
That is, the solution of the present invention is constituted as follows. (1) The soil concrete floor on the soft ground has a three-layer structure consisting of a reinforced concrete block slab of the uppermost layer, a reinforced concrete mat slab of the middle layer, and an improved ground of the lowermost layer by the cement safe processing method or the like. A release sheet is interposed between the upper layer and the middle layer, and three pipes are erected on the top of the block plate at the apex of the Y-shape on the periphery of the main column having the screw holes for lifting bolts as the center. And a lifting connector fixed at its upper and lower ends with a top plate and a load receiving plate is integrally buried, and is brought into contact with the load receiving plate so that a reaction force is applied to the middle layer mat slab. A receiving plate is laid, and the top of the top plate is always covered with a lid. If uneven settlement occurs, the lid is removed.
The reaction bolts are inserted into the three pipes, and they are erected on the reaction force receiving plate. Two upper and lower receiving nuts are screwed onto the three reaction bolts to support the upper and lower two reaction plates. A lifting bolt is inserted into the center hole of the upper and lower reaction force plates, the lower end thereof is screwed into the above-mentioned support screw hole, and two upper and lower holding nuts are screwed on the upper portion thereof, and With the holding nut, the jack placed between the upper holding plate and the upper reaction plate is fastened from above, and with the lower holding nut, the lower reaction plate is fastened between the lower receiving nut and the jack. The jack-up device for the concrete slab level correction method, characterized in that the uppermost block slab can be jacked up on the upper reaction plate via the upper holding nut by the operation of. (2) When the uppermost block plate is jacked up by the operation of the jack, the gap generated in the lower presser nut is retightened, the lower reaction plate is retightened, and the jacked-up block plate is moved downward. The jack-up device for concrete level correction method according to (1), characterized in that it can be temporarily received on a lower reaction plate via a holding nut. (3) Three-dimensionally measure the floor level of the concrete concrete floor where uneven settlement has occurred, determine the minimum jack-up construction block version necessary for correcting uneven settlement from the top block version, and jack up A jack-up device for a concrete slab level correction method according to the above mode (1) or (2), characterized in that it is made possible.

【0005】[0005]

【 実 施 例 】本発明のコンクリート版レベル修正工法
用ジャッキアップ装置の実施例を図面に基づき以下に詳
説する。図1は本発明を構成する三層構造の土間コンク
リート床の説明図であって、本発明では、軟弱地盤E上
の土間コンクリート床1は、最上層を多数枚の比較的薄
い鉄筋コンクリートブロック版2aを並列した鉄筋コン
クリートブロック版2とし、中層を鉄筋コンクリートマ
ットスラブ3とし、最下層をセメント安定処理(たとえ
ば−軸圧縮強度Qu=10Kg/cm)工法による改
良地盤とする三層構造によって構成し、最上層のブロッ
ク版2を以下に詳説するごとくジャッキアップする。な
お、各層の厚さの割合は最上層:中層:最下層を2:
5:5としているが、改良地盤の強度と同様に床荷重に
よって適宜設定される。また、ブロック版2の下にビニ
ールシート5を介在させてジャッキアップ時の分離を容
易にしている。
[Embodiment] An embodiment of a jack-up device for a concrete slab level correcting method according to the present invention will be described below in detail with reference to the drawings. FIG. 1 is an explanatory view of a three-layer structure of the concrete floor of the present invention. In the present invention, the concrete floor 1 on the soft ground E is composed of a number of relatively thin reinforced concrete block plates 2a. And the middle layer is a reinforced concrete mat slab 3, and the lowermost layer is an improved ground by a cement stabilization method (for example, -axial compressive strength Qu = 10 Kg / cm 2 ). The upper block 2 is jacked up as detailed below. The ratio of the thickness of each layer is as follows: top layer: middle layer: bottom layer is 2:
Although the ratio is 5: 5, it is appropriately set according to the floor load similarly to the strength of the improved ground. In addition, a vinyl sheet 5 is interposed under the block plate 2 to facilitate separation when jacking up.

【0006】図2は本発明の三層構造土間コンクリート
床の最上層のブロック版に埋設された吊り上げ用連結具
の展開した縦断面図であり、図3はそのA−A線に沿っ
た横断面図である。本発明では最上層のブロック版2の
ジャッキアップに使用するため、各ブロック版2aには
その全厚さに、中心に吊り上げボルト用ネジ孔6aを穿
設した主柱6を立設し、その周縁の120°ピッチのY
形状頂点位置に3本のパイプ7、…を立設し、それぞれ
の間をリブ6bで連結し、それらの上下両端に天端プレ
ート8aと荷重受プレート8bを配設して、一体に形設
された吊り上げ用連結具9を前もって埋設している。ま
た、前記の荷重受プレート8bの底面に当接させて、中
層のマットスラブ3の上面には反力受プレート10が敷
設されている。また、前記の天端プレート8aの上を常
時は蓋11で被覆し、蓋11の上面はブロック版2の上
面に倣って平坦となっている。
FIG. 2 is an exploded longitudinal sectional view of a lifting connector buried in a block slab on the uppermost layer of a three-layered concrete floor according to the present invention, and FIG. 3 is a cross-sectional view taken along the line AA. FIG. In the present invention, in order to be used for jacking up the top block block 2, each block plate 2 a is provided with a main pillar 6 having a screw hole 6 a for a lifting bolt formed in the center in the entire thickness thereof. 120 ° pitch Y around the periphery
Three pipes 7, ... are erected at the apex position of the shape, connected between them by ribs 6b, and a top plate 8a and a load receiving plate 8b are arranged on both upper and lower ends thereof, and are integrally formed. The lifting connector 9 is buried in advance. A reaction force receiving plate 10 is laid on the upper surface of the mat slab 3 in the middle layer so as to be in contact with the bottom surface of the load receiving plate 8b. The top plate 8a is always covered with the lid 11, and the upper surface of the lid 11 is flat following the upper surface of the block plate 2.

【0007】図1に示す三層構造の土間コンクリート床
1において不同沈下が発生すると、床レベルを三次元計
測して、最上層の鉄筋コンクリートブロック版2に対
し、最小限の枚数の施工ブロック版2aを決定する。図
4にジャッキアップ装置のセット状態を示すが、施工ブ
ロック版2aに対し、前記の蓋11を取外し、中心の主
柱6のネジ孔6aと周縁の3本のパイプ7、…を露出さ
せる。3本のパイプ7、…には長さを揃えた反力ボルト
12、…をそれぞれ挿入し、中層のマットスラブ3上に
敷設された反力受プレート10の上面に直立させる。次
に、該3本の反力ボルト12、…に上下各2個の受けナ
ット15、16をそれぞれ螺着すると共に、上下2枚の
反力プレート13、14を貫挿してそれぞれを下から受
支させる。13b、14bは貫挿用の孔である。また、
上下の反力プレート13、14の各中心孔13a、14
aには吊り上げボルト17を貫挿し、その下端を連結具
9の主柱6のネジ孔6aに螺結し、その上部には上下2
個の押えナット18、19を螺着する。また、前記の吊
り上げボルト17にはジャッキ20を貫挿し、上方の反
力プレート13上に載置して、上方の押えナット18で
上から締着する。他方、下方の押えナット19では下方
の圧力プレート14を直接に上から締着する。かくし
て、ブロック版2aの上には、ジャッキアップ装置21
が連結具9に対向して簡易に組立てられる。
When uneven settlement occurs in the three-story soil concrete floor 1 shown in FIG. 1, the floor level is three-dimensionally measured and the minimum number of construction block slabs 2a relative to the uppermost reinforced concrete block slab 2. To determine. FIG. 4 shows the set-up state of the jack-up device. The lid 11 is removed from the construction block plate 2a to expose the screw hole 6a of the main pillar 6 at the center and the three pipes 7 at the periphery. Each of the three pipes 7,... Is inserted with a reaction force bolt 12,... Having the same length, and is set upright on the upper surface of the reaction force receiving plate 10 laid on the middle layer mat slab 3. Then, two upper and lower receiving nuts 15 and 16 are respectively screwed into the three reaction force bolts 12 and so on, and the upper and lower two reaction force plates 13 and 14 are inserted into the three receiving bolts and received from below. To support. 13b and 14b are holes for insertion. Also,
Center holes 13a, 14 of upper and lower reaction plates 13, 14
a, a lower end of which is screwed into a screw hole 6 a of the main column 6 of the connecting tool 9,
The holding nuts 18 and 19 are screwed. A jack 20 is inserted into the lifting bolt 17, placed on the upper reaction plate 13, and fastened from above with a holding nut 18. On the other hand, the lower holding plate 19 fastens the lower pressure plate 14 directly from above. Thus, the jack-up device 21 is placed on the block plate 2a.
Are easily assembled facing the connecting tool 9.

【0008】上方の反力プレート13はジャッキ20の
受け用として機能し、ジャッキ20を作動させると図5
のごとくその下部20bに対してその上部20aが上昇
し、上方の押えナット18及び吊り上げボルト17を引
き上げ、螺結された連結具9を介して最上層のブロック
版2aを吊り上げ、中層のマットスラブ3との間には空
洞部22が形成される。このジャッキアップによりブロ
ック版2aと上面は初期の水平状態に回復される。ま
た、このジャッキアップにより下方の押えナット19は
下方の反力プレート14から離隔して、間隙19aが発
生する。
The upper reaction plate 13 functions to receive the jack 20. When the jack 20 is operated, the upper reaction plate 13 shown in FIG.
The upper part 20a is raised with respect to the lower part 20b, the upper holding nut 18 and the lifting bolt 17 are pulled up, and the uppermost block slab 2a is lifted via the threaded connecting tool 9, thereby forming the middle layer mat slab. 3, a cavity 22 is formed. By this jack-up, the block plate 2a and the upper surface are restored to the initial horizontal state. In addition, the jack-up causes the lower presser nut 19 to be separated from the lower reaction plate 14, thereby generating a gap 19a.

【0009】施工ブロック版2aの数が多いときは、そ
の数に見合ったジャッキアップ装置21を必要とする
が、ジャッキアップ装置21の構成部品としてジャッキ
20の費用負担が課題となる。本発明のジャッキアップ
装置21は、ジャッキアップ状態で、図6のごとく、押
さえナット19に発生した間隙19aを締め直し、下方
の反力プレート14を最締着し、下方の反力プレート1
4にブロック版2aのジャッキアップ状態を仮受けさ
せ、上方の押えナット18とジャッキ20を取外すこと
が可能となっている。この場合、ナット19を下降締め
付けてもよく、或は反力プレート14と共にナット16
を上昇締め付けてもよい。取外したジャッキ20を他の
ジャッキアップ装置21に共用することにより、前記の
ジャッキ20の必要台数を著しく減らすことが可能とな
る。なお、反力プレート14に対する吊り上げボルト1
7のリフト量がジャッキアップ量となるから、該ボルト
17にレベル把握の目盛りを刻印すればジャッキアップ
量の把握が簡単にできる。次に、ジャッキアップにより
形成された空洞部22に対してはモルタルをグラウト注
入して、最上層のブロック版2を修正回復状態で固定す
る。反力ボルト12、吊り上げボルト17等のジャッキ
アップ装置21の構成部品は分解除去されて、連結具9
は蓋11により再び被覆される。
When the number of construction block plates 2a is large, a jack-up device 21 corresponding to the number is required, but the cost of the jack 20 as a component of the jack-up device 21 becomes a problem. The jack-up device 21 of the present invention, in the jack-up state, retightens the gap 19a generated in the presser nut 19, retightens the lower reaction force plate 14 as shown in FIG.
4 can temporarily receive the jack-up state of the block plate 2a, and the upper holding nut 18 and the jack 20 can be removed. In this case, the nut 19 may be tightened downward, or the nut 16 may be tightened together with the reaction force plate 14.
May be tightened upward. By sharing the removed jack 20 with another jack-up device 21, the required number of jacks 20 can be significantly reduced. The lifting bolt 1 for the reaction force plate 14
Since the lift amount of 7 is the jack-up amount, the jack-up amount can be easily grasped by marking the bolt 17 with a scale for grasping the level. Next, mortar is grout-injected into the hollow portion 22 formed by jacking up, and the uppermost block plate 2 is fixed in a corrected recovery state. The components of the jack-up device 21, such as the reaction force bolt 12 and the lifting bolt 17, are disassembled and removed.
Is again covered by the lid 11.

【0010】[0010]

【発明の効果】本発明のジャッキアップ装置は以上の構
成を有するので、以下の種々の効果を期待できる。 (1)ジャッキアップ装置の構造が簡潔であって、イニ
シャルコストを軽減でき、不同沈下の発生時に急速な修
正回復が可能である。 (2)ジャッキ受け用と仮受け用の上下2枚の反力プレ
ートを備えており、下方の反力プレートに仮受けさせる
ことによりジャッキの取外し、他の地点への移動が可能
であって、ジャッキ台数を減らし、施工作業の合理化に
寄与する。 (3)ジャッキアップ施工時に、吊り上げボルトにレベ
ル把握の目盛りを印することによりジャッキアップ量を
簡単に把握できる。
Since the jack-up device of the present invention has the above-described configuration, the following various effects can be expected. (1) The structure of the jack-up device is simple, the initial cost can be reduced, and rapid correction and recovery can be performed when uneven settlement occurs. (2) Equipped with two upper and lower reaction force plates for jack reception and temporary reception, the jack can be removed and moved to another point by temporarily receiving the lower reaction plate. Reduce the number of jacks and contribute to streamlining of construction work. (3) At the time of jack-up construction, the amount of jack-up can be easily grasped by marking a level grasp scale on the lifting bolt.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の三層構造の土間コンクリート床の説明
図である。
FIG. 1 is an explanatory view of a three-story concrete slab of the present invention.

【図2】本発明の埋設された吊り上げ用連結具の縦断面
図である。
FIG. 2 is a longitudinal sectional view of the buried lifting connector of the present invention.

【図3】図2のA−A線に沿った横断面図である。FIG. 3 is a transverse sectional view taken along line AA of FIG. 2;

【図4】ジャッキアップ装置をセットした状態を示す縦
断面図である。
FIG. 4 is a longitudinal sectional view showing a state in which a jack-up device is set.

【図5】ジャッキアップ状態を示す縦断面図である。FIG. 5 is a longitudinal sectional view showing a jack-up state.

【図6】仮受けしてジャッキを取外した状態を示す縦断
面図である。
FIG. 6 is a longitudinal sectional view showing a state where the jack is temporarily removed and the jack is removed.

【符号の説明】[Explanation of symbols]

1 土間コンクリート床 2 最上層のブロッ
ク版 2a 単体のブロック版 3 中層の鉄筋コン
クリート 4 改良地盤 5 はく離シート 6 主柱 7 パイプ 8a 天端プレート 8b 荷重受プレー
ト 9 吊り上げ用連結具 10 反力受プレート 11 蓋 12 反力ボルト 13 ジャッキ受け用反力プレート 14 仮受け用反力プレート 15 上方の受けナット 16 下方の受けナ
ット 17 吊り上げ用ボルト 18 上方の押えナ
ット 19 下方の押えナット 20 ジャッキ 20a ジャッキの上部 20b ジャッキの
下部 21 ジャッキアップ装置 22 空洞部 E 軟弱地盤
DESCRIPTION OF SYMBOLS 1 Slab concrete floor 2 Top block block 2a Single block block 3 Middle layer reinforced concrete 4 Improved ground 5 Peeling sheet 6 Main pillar 7 Pipe 8a Top end plate 8b Load receiving plate 9 Lifting connection tool 10 Reaction force receiving plate 11 Lid Reference Signs List 12 reaction force bolt 13 jack receiving reaction plate 14 temporary receiving reaction plate 15 upper receiving nut 16 lower receiving nut 17 lifting bolt 18 upper holding nut 19 lower holding nut 20 jack 20a top of jack 20b jack Lower part 21 jack-up device 22 cavity E soft ground

───────────────────────────────────────────────────── フロントページの続き (72)発明者 松浦 剛士 東京都港区芝浦一丁目2番3号 清水建 設株式会社内 (56)参考文献 特開 平4−49379(JP,A) (58)調査した分野(Int.Cl.7,DB名) E04G 23/06 ──────────────────────────────────────────────────続 き Continuation of front page (72) Inventor Takeshi Matsuura 1-3-2 Shibaura, Minato-ku, Tokyo Shimizu Corporation (56) References JP-A-4-49379 (JP, A) (58) Field surveyed (Int.Cl. 7 , DB name) E04G 23/06

Claims (3)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 軟弱地盤上の土間コンクリート床を、最
上層が比較的薄い鉄筋コンクリートブロック版、中層が
鉄筋コンクリートマットスラブ、最下層がセメント安全
処理工法等による改良地盤からなる三層構造とし、かつ
該最上層と中層の間にははく離シートを介在させ、該最
上層のブロック版には、吊り下げボルト用ネジ孔を穿設
した主柱を中心として、その周縁のY形状頂点位置に3
本のパイプを立設すると共に、その上下両端を天端プレ
ートと荷重受プレートで固定してなる吊り上げ用連結具
を一体的に埋設し、前記の荷重受プレートに当接させて
中層のマットスラブ上には反力受プレートを敷設し、前
記の天端プレートの上を常時は蓋で被覆するごとく構成
し、不同沈下が発生した場合は、前記の蓋を取外し、前
記の3本のパイプに反力ボルトを挿入して反力受プレー
ト上に直立させ、該3本の反力ボルトに上下各2個の受
けナットを螺着して上下2枚の反力プレートを受支さ
せ、該上下2枚の反力プレートの中心孔には吊り上げボ
ルトを貫挿し、その下端を前記の支柱ネジ孔に螺結し、
その上部には上下2個の押えナットを螺着し、上方の押
えナットでは上方の反力プレートとの間で載置されたジ
ャッキを上から締着し、下方の押えナットでは下方の受
けナットとの間で下方の反力プレートを締着し、該ジャ
ッキの作動により最上層のブロック版を上方の押えナッ
トを介し上方の反力プレート上に、ジャッキアップ可能
とした構成を特徴とするコンクリート版レベル修正工法
用ジャッキアップ装置。
The concrete floor on the soft ground has a three-layer structure comprising a reinforced concrete block slab on the uppermost layer, a reinforced concrete mat slab on the middle layer, and an improved ground on the lowermost layer by a cement safe processing method or the like. A release sheet is interposed between the uppermost layer and the middle layer, and the block plate of the uppermost layer is located at the apex position of the Y-shape on the periphery of the main column having the screw holes for the suspension bolts as the center.
A standing pipe is erected, and a lifting connector having upper and lower ends fixed by a top plate and a load receiving plate is buried integrally with the pipe, and is brought into contact with the load receiving plate to form a middle layer mat slab. A reaction force receiving plate is laid on the top, the top of the top plate is always covered with a lid, and if uneven settlement occurs, the lid is removed and the three pipes are attached. The reaction force bolts are inserted so as to stand upright on the reaction force receiving plate, and two upper and lower receiving nuts are screwed onto the three reaction force bolts to support the upper and lower two reaction force plates. A lifting bolt is inserted through the center hole of the two reaction force plates, and the lower ends thereof are screwed into the support screw holes,
Two upper and lower presser nuts are screwed on the upper part, a jack placed between the upper presser nut and the upper reaction plate is tightened from above, and a lower presser nut is a lower receiving nut. A concrete structure characterized in that the lower reaction plate is fastened between the upper plate and the uppermost block plate can be jacked up on the upper reaction plate via the upper holding nut by the operation of the jack. Jack-up device for plate level correction method.
【請求項2】 ジャッキの作動により最上層のブロック
版をジャッキアップしたとき、下方の押えナットに発生
した間隙を締め直して下方の反力プレートを再締着し、
ジャッキアップされたブロック版を下方の押さえナット
を介し下方の反力プレート上に仮受け可能とした構成を
特徴とする請求項1記載のコンクリート版レベル修正工
法用ジャッキアップ装置。
2. When the uppermost block plate is jacked up by the operation of the jack, the gap generated in the lower holding nut is retightened, and the lower reaction plate is retightened.
2. The jack-up device for a concrete slab level correction method according to claim 1, wherein the jack-up block slab can be temporarily received on a lower reaction plate via a lower holding nut.
【請求項3】 不同沈下が発生した土間コンクリート床
の床レベルを三次元計測して、最上層のブロック版のう
ちから不同沈下の修正に必要な最小限のジャッキアップ
施工ブロック版を決定し、ジャッキアップ可能とした構
成を特徴とする請求項1または2記載のコンクリート版
レベル修正工法用ジャッキアップ装置。
3. A three-dimensional measurement of a floor level of a concrete concrete floor in which uneven settlement has occurred, and a minimum jack-up construction block necessary for correction of uneven settlement is determined from a block of the uppermost layer. 3. The jack-up device for a concrete slab level correction method according to claim 1, wherein the jack-up device is capable of jacking up.
JP16580794A 1994-06-27 1994-06-27 Jack-up device for concrete slab level correction method Expired - Fee Related JP3156066B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP16580794A JP3156066B2 (en) 1994-06-27 1994-06-27 Jack-up device for concrete slab level correction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP16580794A JP3156066B2 (en) 1994-06-27 1994-06-27 Jack-up device for concrete slab level correction method

Publications (2)

Publication Number Publication Date
JPH0813814A JPH0813814A (en) 1996-01-16
JP3156066B2 true JP3156066B2 (en) 2001-04-16

Family

ID=15819375

Family Applications (1)

Application Number Title Priority Date Filing Date
JP16580794A Expired - Fee Related JP3156066B2 (en) 1994-06-27 1994-06-27 Jack-up device for concrete slab level correction method

Country Status (1)

Country Link
JP (1) JP3156066B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009091112A (en) * 2007-10-09 2009-04-30 Minato Seiki Kogyo Kk Heavy load lifting adjustment tool
JP2013172692A (en) * 2012-02-27 2013-09-05 Samson Co Ltd Heat sterilization device
KR101513064B1 (en) * 2014-07-18 2015-04-17 이장희 Method for lifting traditional korean-style house
CN107269025B (en) * 2017-06-01 2019-03-08 浙江省建筑设计研究院 Sleeve type limit mechanism for lateral displacement control of building jacking

Also Published As

Publication number Publication date
JPH0813814A (en) 1996-01-16

Similar Documents

Publication Publication Date Title
CN110439270A (en) A kind of post-cast strip exempts to tear support system construction method open
CN111751226A (en) Test device for flexural load-bearing and deformation performance of rammed earth and wooden beam joints and its use method
CN110630029A (en) A kind of wall opening underpinning device and using method
CN102720356A (en) Steel beam grid floor formwork system
CN111734166A (en) A detachable conversion device and a reverse dismantling construction method using the same
JP3156066B2 (en) Jack-up device for concrete slab level correction method
CN216109354U (en) A transfer layer steel column installation structure
CN100424298C (en) Construction method of making laminated floor slab with upper support frame
JP3141189B2 (en) Differential settlement settlement method and differential settlement modification floor structure
CN107558607B (en) Tower crane system arranged on existing concrete structure and construction method thereof
CN216665082U (en) Leveling device for prefabricated floor slab
CN209976068U (en) Connectable steel cushion block for jacking and storey-adding
CN115821784A (en) Cantilever bent cap construction system and construction method
CN213539523U (en) Multistage mixed step node structure
CN212459227U (en) A test device for the flexural load-bearing and deformation performance of rammed earth and wood beam joints
JPS631723Y2 (en)
CN107165280A (en) A kind of large span open-spandrel sandwich board stay in place form support system and construction method
CN207406032U (en) The underpinning structure of existing building base isolation reinforcement
CN221856250U (en) Wallboard building supporting device for assembled building construction
CN219490645U (en) Trestle structure capable of being quickly disassembled and recombined for laying
CN221218507U (en) Transverse and vertical two-way combined steel box girder supporting cushion block
CN118996997B (en) A foundation reinforcement structure for a temporary steel support structure and its construction method
CN222667536U (en) Steel stair structure for bearing steel beam construction
CN112282351A (en) Expansion joint shaping formwork and construction method thereof
CN222924178U (en) Assembled supporting system applied to beam and plate back-top unloading

Legal Events

Date Code Title Description
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100209

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100209

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110209

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110209

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120209

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120209

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130209

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130209

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140209

Year of fee payment: 13

LAPS Cancellation because of no payment of annual fees