Method and apparatus for placing concrete for tunnel using formwork with boxless foam

Info

Publication number
JP3157488B2
JP3157488B2 JP21806097A JP21806097A JP3157488B2 JP 3157488 B2 JP3157488 B2 JP 3157488B2 JP 21806097 A JP21806097 A JP 21806097A JP 21806097 A JP21806097 A JP 21806097A JP 3157488 B2 JP3157488 B2 JP 3157488B2
Authority
JP
Japan
Prior art keywords
tunnel
concrete
storage space
formwork
boxed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP21806097A
Other languages
Japanese (ja)
Other versions
JPH1144198A (en
Inventor
忠行 若松
伸一 岡本
新一 徳重
弘 岡田
利彦 谷津
勉 北川
常秀 大久保
佳明 大友
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nishimatsu Construction Co Ltd
Okumura Corp
Original Assignee
Nishimatsu Construction Co Ltd
Okumura Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nishimatsu Construction Co Ltd, Okumura Corp filed Critical Nishimatsu Construction Co Ltd
Priority to JP21806097A priority Critical patent/JP3157488B2/en
Publication of JPH1144198A publication Critical patent/JPH1144198A/en
Application granted granted Critical
Publication of JP3157488B2 publication Critical patent/JP3157488B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、型枠に突出自在に
配設された箱抜フォームを使用して、トンネル内への二
次覆工用コンクリートの打設時に、非常電話、消火器具
等の災害設備を設置する収納スペースを同時成形するこ
とができる箱抜フォームを備えた型枠によるトンネル用
コンクリート打設方法およびその装置に関するものであ
る。なお、本明細書中、「打設」とは、養生硬化してな
い流動性コンクリートを型枠と、トンネル内壁面(掘削
面)または一次覆工用コンクリートと、の間に充填させ
ることをいう。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an emergency telephone, a fire extinguisher, etc., when a concrete for secondary lining is put into a tunnel by using a box-extracted foam which is disposed on a formwork so as to be able to protrude. The present invention relates to a method and an apparatus for placing concrete for a tunnel by using a formwork having a box-opening form capable of simultaneously forming a storage space for installing disaster facilities. In the present specification, “placement” refers to filling fluid concrete, which has not been cured and hardened, between the formwork and the tunnel inner wall surface (excavated surface) or the primary lining concrete. .

【0002】[0002]

【従来の技術】元来、災害に備え、トンネル内には所定
距離毎に、非常電話、消火器具等の災害設備が常設され
ている(図6参照)。
2. Description of the Related Art Originally, in preparation for a disaster, disaster facilities such as emergency telephones and fire extinguishers are permanently installed at predetermined intervals in a tunnel (see FIG. 6).

【0003】この災害設備を設置するための収納スペー
スは、トンネル内への二次覆工用コンクリートの打設時
に同時成形される。
[0003] The storage space for installing this disaster facility is formed at the same time when the concrete for secondary lining is poured into the tunnel.

【0004】この災害設備の収納スペースの成形方法
は、図10に示すように、二次覆工用コンクリートを打
設するための型枠に先行し、予めトンネル内に災害設備
の収納スペースに対応した箱抜フォームを設置した後、
型枠を順次移動させ、箱抜フォームと型枠とを固定した
後、二次覆工用コンクリートを打設し、コンクリートの
養生硬化後、箱抜フォームおよび型枠を脱型させること
により、成形されていた。
As shown in FIG. 10, this method for forming a storage space for disaster equipment precedes a formwork for placing concrete for secondary lining, and corresponds to a storage space for disaster equipment in a tunnel in advance. After installing the empty box form,
After moving the formwork in sequence and fixing the boxed form and the formwork, cast concrete for secondary lining, and after curing the concrete, remove the boxed form and the formwork to form. It had been.

【0005】この箱抜フォームの構造は、図7〜図9に
示すように、多数個のフォーム部材を連結させて形成さ
れている。
[0005] As shown in Figs. 7 to 9, the structure of the box-extracted foam is formed by connecting a large number of foam members.

【0006】この箱抜フォームのトンネル内への設置作
業は、トンネルの底面にボルトにより固定していた。
[0006] In the installation work of this boxed form in the tunnel, it is fixed to the bottom of the tunnel by bolts.

【0007】また、箱抜フォームと型枠との固定作業
は、型枠の検査窓等を介して箱抜フォームの設置位置を
確認しながら、型枠の内側からボルトを介して両者を固
定していた。
[0007] Further, the fixing work of the box-extracted form and the formwork is carried out by checking the installation position of the box-extracted form through the inspection window of the formwork and fixing the both from the inside of the form by using bolts. I was

【0008】また、トンネル内に打設した二次覆工用コ
ンクリートの養生硬化後、型枠の脱型と共に、箱抜フォ
ームも脱型する必要があった。
After curing and curing of the concrete for secondary lining poured into the tunnel, it is necessary to remove the box form as well as remove the mold.

【0009】この箱抜フォームのトンネル内への設置作
業および箱抜フォームの脱型作業にはそれぞれ約1日程
度かかるのが現状である。
At present, it takes about one day each for the work of installing the box-opened form in the tunnel and the work of removing the box-outed form.

【0010】また、同一トンネル内に数種類の災害設備
を設置する場合には、箱抜フォームを数種類用意する必
要があった。
When several types of disaster facilities are installed in the same tunnel, it is necessary to prepare several types of boxed forms.

【0011】なお、図6〜図10中、12は型枠、14
はトンネル、16は二次覆工用コンクリート、24はト
ンネル内壁面、34は災害設備、36は収納スペース、
38は収納スペース36の底面部、44は箱抜フォー
ム、46はフォーム部材、48は固定ボルトを示す。
In FIGS. 6 to 10, reference numeral 12 denotes a mold;
Is a tunnel, 16 is a secondary lining concrete, 24 is a tunnel inner wall surface, 34 is a disaster facility, 36 is a storage space,
Reference numeral 38 denotes a bottom surface of the storage space 36, 44 denotes a box-extracted foam, 46 denotes a foam member, and 48 denotes a fixing bolt.

【0012】[0012]

【発明が解決しようとする課題】従来、トンネル内への
二次覆工用コンクリート打設時に災害設備の収納スペー
スの成形において、型枠とは別体の箱抜フォームを使用
していたため、この箱抜フォームのトンネル床面への固
定作業、型枠との固定作業が必要不可欠となり、この作
業が面倒であるばかりか、作業時間も長くかかることが
問題となっていた。
Conventionally, when forming a storage space for a disaster facility at the time of placing concrete for secondary lining in a tunnel, a box-opened form separate from a formwork has been used. The work of fixing the boxed form to the floor of the tunnel and the work of fixing it to the formwork are indispensable, and this work is not only troublesome but also requires a long working time.

【0013】また、型枠の脱型作業とは別に、箱抜フォ
ームの脱型作業も必要であり、この箱抜フォームの脱型
において、災害設備の収納スペースの損傷を防止するた
め、慎重な作業が要求され、面倒であるばかりか、作業
能率が良くないことが問題となっていた。
In addition to the removal of the mold, it is also necessary to remove the boxed form. In removing the boxed form, care must be taken to prevent damage to the storage space of disaster facilities. Work has been required, and not only is it troublesome, but also the work efficiency is poor.

【0014】また、災害設備の種類に応じて箱抜フォー
ムを数種類用意する必要があり、工事コスト高騰の要因
となることが問題となっていた。
[0014] Further, it is necessary to prepare several types of boxed forms in accordance with the type of disaster equipment, which causes a problem that construction costs rise.

【0015】本発明は、このような欠点に鑑み、災害設
備の収納スペースを形成するための箱抜フォームを型枠
と一体化し、トンネル内への二次覆工用コンクリート打
設時に災害設備の収納スペースに対応させ、容易に、能
率良く形成することができる型抜フォームを備えた型枠
によるトンネル用コンクリート打設方法およびその装置
を提供することを目的とするものである。
In view of the above drawbacks, the present invention integrates a boxed form for forming a storage space for a disaster facility with a formwork, and installs the disaster facility when placing concrete for secondary lining in a tunnel. An object of the present invention is to provide a method and an apparatus for placing concrete for a tunnel by using a mold having a die-cutting form that can be easily and efficiently formed in accordance with a storage space.

【0016】[0016]

【課題を解決するための手段】本発明の方法は、ガント
リー上に天端フォームおよび両側フォームを配設させて
なる型枠を介して、トンネル内に、非常電話、消火器具
等の災害設備を設置する収納スペースを形成させると共
に、二次覆工用コンクリートを打設する方法において、
型枠の少なくとも一方の側フォームに、トンネル内壁面
側に向けて側フォームから突出自在に配設された箱抜フ
ォームを、災害設備の収納スペースの幅に対応させて、
側フォームから突出させることにより、災害設備の収納
スペースを確保した後、トンネル内に二次覆工用コンク
リートを打設することを特徴とするもの、あるいは箱抜
フォームの、本体部と下部とを分離移動自在とし、打設
した二次覆工用コンクリートの養生硬化後の型枠の脱型
時に、箱抜フォームの下部を型枠内側に移動させた後、
箱抜フォームの本体部を型枠の内側に移動させることに
より、箱抜フォームの脱型時に二次覆工用コンクリート
打設により形成される災害設備の収納スペースの底面部
の損傷を防止することを特徴とするものである。
According to the method of the present invention, emergency facilities such as emergency telephones and fire extinguishing equipment are installed in a tunnel through a form having a top end form and both side forms arranged on a gantry. In the method of forming a storage space to be installed and placing concrete for secondary lining,
On at least one side form of the formwork, a boxed form that is freely protruded from the side form toward the inner wall surface of the tunnel, corresponding to the width of the storage space of the disaster equipment,
After securing the storage space for disaster equipment by protruding from the side foam, the concrete for secondary lining is poured into the tunnel, or the main body and the lower part of the boxed foam are After the curing and curing of the cast concrete for secondary lining and removal of the mold, the lower part of the box-extracted foam is moved inside the mold,
By moving the main body of the box-extracted foam inside the formwork, it is possible to prevent damage to the bottom of the storage space for disaster facilities formed by placing concrete for secondary lining when removing the box-extracted foam. It is characterized by the following.

【0017】本発明の装置は、ガントリー上に天端フォ
ームおよび両側フォームを配設させてなる型枠を介し
て、トンネル内に、非常電話、消火器具等の災害設備を
設置する収納スペースを形成させると共に、二次覆工用
コンクリートを打設する装置において、型枠の少なくと
も一方の側フォームに、トンネル内壁面側に向けて側フ
ォームから突出自在に箱抜フォームを配設させてなり、
災害設備の収納スペースの幅に対応させて、箱抜フォー
ムを側フォームから突出させることにより、災害設備の
収納スペースを確保した後、トンネル内に二次覆工用コ
ンクリートを打設することを特徴とするもの、あるいは
箱抜フォームの、本体部と下部とを分離移動自在とし、
打設した二次覆工用コンクリートの養生硬化後の型枠の
脱型時に、箱抜フォームの下部を型枠内側に移動させた
後、箱抜フォームの本体部を型枠の内側に移動させるこ
とにより、箱抜フォームの脱型時に二次覆工用コンクリ
ート打設により形成される災害設備の収納スペースの底
面部の損傷を防止することを特徴とするものである。
The apparatus of the present invention forms a storage space for installing emergency equipment such as emergency telephones and fire extinguishers in a tunnel through a form having a top end foam and two side foams arranged on a gantry. In addition, in an apparatus for casting concrete for secondary lining, at least one side form of the form, a boxed form is disposed so as to freely project from the side form toward the inner wall surface of the tunnel,
The boxed foam is made to protrude from the side foam in accordance with the width of the storage space for disaster facilities, and after securing the storage space for disaster facilities, concrete for secondary lining is cast in the tunnel. Or the boxed form, the main body and the lower part can be separated and moved,
At the time of removing the mold after curing and hardening of the cast concrete for secondary lining, after moving the lower part of the boxed form to the inside of the form, move the main part of the boxed form to the inside of the form. This prevents damage to the bottom of the storage space for disaster facilities formed by placing concrete for secondary lining when removing the boxed form.

【0018】[0018]

【発明の実施の形態】本発明に係る箱抜フォームを備え
た型枠によるトンネル用コンクリート打設装置は、図1
〜図6に示すように、以下の構成からなるものである。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS A concrete casting device for a tunnel using a form provided with a boxed form according to the present invention is shown in FIG.
As shown in FIG. 6 to FIG.

【0019】本発明で使用する型枠12は、トンネル1
4内に二次覆工用コンクリート16を打設するためのも
のであり、トンネル14内に移動自在に配設されたガン
トリー18上に、天端フォーム20および両側フォーム
22,22が、ガントリー18の長さ方向に移動自在に
配設され、各フォーム20,22,22が伸縮自在であ
ると共に、両側フォーム22,22が折畳み可能なもの
である。
The formwork 12 used in the present invention comprises the tunnel 1
4 is for placing concrete 16 for secondary lining into the inside 4. On a gantry 18 movably disposed in the tunnel 14, a top end foam 20 and both side foams 22, 22 are mounted on the gantry 18. Are arranged movably in the length direction of the first and second forms 20, 22 and 22 are expandable and contractable, and both sides of the forms 22 and 22 are foldable.

【0020】型枠12の少なくとも一方(図1において
左側)の側フォーム22の一部に、トンネル内壁面24
側に向けて側フォーム22から突出自在に箱抜フォーム
26が配設されている。
At least one of the side forms 22 on the left side of FIG.
A box-extracted form 26 is provided so as to freely project from the side form 22 toward the side.

【0021】本例において、箱抜フォーム26は、従来
例同様断面箱型のものであり、側フォーム22と回動ア
ーム28を介して突出(移動)自在に連結されている。
In the present embodiment, the box removing form 26 is a box-shaped section as in the conventional example, and is connected to the side form 22 via a rotating arm 28 so as to be freely protruded (movable).

【0022】また、箱抜フォーム26は、本体部30と
下部32とを分離移動自在としてある。
The boxed form 26 has a main body 30 and a lower part 32 which can be separated and moved.

【0023】これは、打設した二次覆工用コンクリート
16の養生硬化後の型枠12の脱型時に、箱抜フォーム
26の下部32を型枠12の内側に移動させた後、箱抜
フォーム26の本体部30を型枠12の内側に移動させ
ることにより、箱抜フォーム26の脱型時に二次覆工用
コンクリート16の打設により形成される災害設備34
の収納スペース36の底面部38の損傷を防止するため
である。
This is because the lower portion 32 of the boxed form 26 is moved to the inside of the mold 12 at the time of releasing the form 12 after curing and curing of the poured concrete 16 for secondary lining, and then removing the box. By moving the main body 30 of the form 26 to the inside of the formwork 12, a disaster facility 34 formed by placing the concrete 16 for secondary lining when the boxed form 26 is removed from the form 26.
This is to prevent the bottom 38 of the storage space 36 from being damaged.

【0024】また、箱抜フォーム26の本体部30およ
び下部32の側フォーム22からの突出(移動)手段は
油圧ジャッキ40によるものである。
The means for projecting (moving) the boxed form 26 from the main body 30 and the lower part 32 from the side form 22 is by a hydraulic jack 40.

【0025】なお、図中42は箱抜フォーム26の本体
部30と下部32との連結軸、50は型抜フォーム26
の下部32と本体部20を同時に脱型させた際に損傷が
予期される収納スペース36の個所を示す。
In the drawing, reference numeral 42 denotes a connecting shaft between the main body 30 and the lower part 32 of the box-cutting form 26, and 50 denotes a mold-cutting form 26.
2 shows a portion of the storage space 36 that is expected to be damaged when the lower portion 32 and the main body portion 20 are removed at the same time.

【0026】本装置を使用してトンネル14内に、災害
設備34の収納スペース36を形勢させると共に、二次
覆工用コンクリート16を打設する方法を以下に詳述す
る。
A method of forming the storage space 36 of the disaster facility 34 and placing the secondary lining concrete 16 in the tunnel 14 using the present apparatus will be described in detail below.

【0027】まず、型枠12をトンネル14の所定位置
まで移動させ、形成すべき災害設備34の収納スペース
36の幅に対応させて箱抜フォーム26をトンネル内壁
面24側へ突出させる。
First, the formwork 12 is moved to a predetermined position of the tunnel 14, and the box-extracted form 26 is protruded toward the inner wall surface 24 of the tunnel corresponding to the width of the storage space 36 of the disaster facility 34 to be formed.

【0028】この際、災害設備34の収納スペース36
の幅が各工程において相違しても、箱抜フォーム26の
トンネル内壁面24側への突出長はその都度調整するこ
とが可能である。
At this time, the storage space 36 of the disaster facility 34
Even if the width of the box-shaped form 26 is different in each step, the length of the boxed form 26 protruding toward the inner wall surface 24 of the tunnel can be adjusted each time.

【0029】また、型枠12のトンネル掘削側と反対側
は、既二次覆工用コンクリート打設部(図示略)と重合
させておく必要がある。
Further, the side opposite to the tunnel excavation side of the formwork 12 needs to be overlapped with an already-placed concrete laying portion for secondary lining (not shown).

【0030】次に、型枠12のトンネル掘削側周縁を確
実に被覆(妻止め)する。
Next, the periphery of the formwork 12 on the tunnel excavation side is securely covered (stopped).

【0031】その後、二次覆工用コンクリート16を打
設し、養生硬化させる。
Thereafter, concrete 16 for secondary lining is cast and cured.

【0032】次に、型抜フォーム26の下部32を、油
圧ジャッキ40を介して型枠12の内側へ移動させた
後、箱抜フォーム26の本体部30を、油圧ジャッキ4
0を介して型枠12の内側に移動させることにより、箱
抜フォーム26の脱型時に二次覆工用コンクリート16
の打設により形成される災害設備34の収納スペース3
6の底面部38の損傷を防止することができる。
Next, after the lower portion 32 of the punched form 26 is moved to the inside of the mold frame 12 via the hydraulic jack 40, the main body 30 of the boxed form 26 is moved to the hydraulic jack 4.
0, the concrete 16 for the secondary lining is removed when the boxed form 26 is removed from the mold.
Storage space 3 for disaster facilities 34 formed by casting
6 can be prevented from being damaged.

【0033】次に、型枠12を脱型させる。Next, the mold 12 is removed.

【0034】前記工程により、型枠12が設置された個
所の二次覆工用コンクリートの打設と共に、災害設備3
4の収納スペース36の形成が完了する。
According to the above process, the concrete for secondary lining is cast at the place where the formwork 12 is installed, and the disaster equipment 3
4 is completed.

【0035】この二次覆工用コンクリートの打設を、ト
ンネル掘削側へ向けて順次型枠12を移動させて行い、
トンネル14の全長にわたり行う。
The casting of the secondary lining concrete is performed by sequentially moving the formwork 12 toward the tunnel excavation side.
This is performed over the entire length of the tunnel 14.

【0036】また、二次覆工用コンクリート打設時に、
災害設備34の収納スペース36を形成しない場合に
は、型枠12と箱抜フォーム26との間の空隙に被覆部
材43(図5の想像線で示す)を装填させ、通常通り二
次覆工用コンクリート打設を行うことにより、二次覆工
用コンクリート打設面を均一に形成することができる。
Also, when placing concrete for secondary lining,
When the storage space 36 of the disaster facility 34 is not formed, the covering member 43 (shown by the imaginary line in FIG. 5) is loaded into the gap between the formwork 12 and the boxed form 26, and the secondary lining is performed as usual. By placing concrete for concrete, the concrete placing surface for secondary lining can be formed uniformly.

【0037】なお、本例において、箱抜フォーム26の
本体部30および下部32の側フォーム22からの突出
(移動)手段は油圧ジャッキ40によるものであるが、
他の移動手段、例えばスクリューモーターによるもので
もよく、他の移動機構でもよい。
In the present embodiment, the means for projecting (moving) the boxed form 26 from the main body 30 and the lower part 32 from the side form 22 is by means of the hydraulic jack 40.
Other moving means such as a screw motor may be used, or another moving mechanism may be used.

【0038】また、災害設備34の収納スペース36の
底面部38が損傷しても支障がない(底面部38の形状
が設計上あまり問題とならない)場合には、箱抜フォー
ム26の下部32を本体部30とを分離移動自在とする
ことなく、一体化し、移動させることは自明のことであ
る。
If there is no problem even if the bottom 38 of the storage space 36 of the disaster facility 34 is damaged (the shape of the bottom 38 is not so problematic in design), the lower part 32 of the boxed form 26 is removed. It is self-evident that the main unit 30 is integrated and moved without being separated and movable.

【0039】また、災害設備34の収納スペース36を
トンネル14の両側に配備させる際には、箱抜フォーム
26を型枠12の両側フォーム22,22にそれぞれ突
出自在に配設させることは自明のことである。
When disposing the storage space 36 of the disaster facility 34 on both sides of the tunnel 14, it is obvious that the box-extracted form 26 is disposed on the forms 22 on both sides of the form 12 so as to be able to protrude respectively. That is.

【0040】また、型枠12は伸縮、折畳み自在のもの
であるが、必ずしも伸縮折畳み自在のものに限定される
ことはない。
The mold 12 is freely expandable, contractible and foldable, but is not necessarily limited to the formable and foldable one.

【0041】また、本例は略半円形のトンネル等のコン
クリート打設におけるものであるが、円形のトンネル、
例えば海中トンネル、下水道等にも利用できる。
In this embodiment, the concrete is cast in a semi-circular tunnel or the like.
For example, it can be used for underwater tunnels, sewers, and the like.

【0042】[0042]

【発明の効果】本発明に係る箱抜フォームを備えた型枠
によるトンネル用コンクリート打設方法およびその装置
によれば、災害設備の収納スペースを形成するための箱
抜フォームを型枠の側フォームに突出自在に配設させて
あるため、形成すべき災害設備の収納スペースの幅に対
応させて箱抜フォームをトンネル内壁面側へ突出させる
ことができ、二次覆工用コンクリートの打設時に従来必
要であった箱抜フォームのトンネル底面への固定作業お
よび箱抜フォームの脱型作業が皆無となり、作業能率の
向上に役立つ。
According to the method and the apparatus for placing concrete for a tunnel by using a formwork provided with a boxed form according to the present invention, the boxed form for forming a storage space for disaster facilities is replaced with a side form of the formwork. The boxed form can be protruded toward the inner wall surface of the tunnel in accordance with the width of the storage space for disaster facilities to be formed. There is no need to fix the box-extracted foam to the bottom of the tunnel and to remove the box-extracted form, which is necessary in the past, which helps to improve the work efficiency.

【0043】また、箱抜フォームの本体部と下部とを分
離移動自在とすることにより、二次覆工用コンクリート
の打設、養生硬化後、まず型抜フォームの下部を型枠の
内側へ移動させ、次いで箱抜フォームの本体部を型枠の
内側に移動させることができ、箱抜フォームの脱型時に
二次覆工用コンクリートの打設により形成される災害設
備の収納スペースの底面部の損傷を防止することができ
る。
Also, by separating and moving the main body portion and the lower portion of the box-extracted foam, the concrete for the secondary lining is cast and cured, and then the lower portion of the die-cut foam is first moved to the inside of the mold. Then, the main body of the boxed form can be moved to the inside of the mold, and the bottom of the storage space for disaster facilities formed by casting concrete for secondary lining when removing the boxed form is removed. Damage can be prevented.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に係る箱抜フォームを備えた型枠による
トンネル用コンクリート打設装置の正面図。
FIG. 1 is a front view of a concrete placing device for a tunnel using a formwork provided with a boxed foam according to the present invention.

【図2】同、平面図。FIG. 2 is a plan view of the same.

【図3】箱抜フォームの第1脱型状態を示す要部拡大正
面図。
FIG. 3 is an enlarged front view of a main part showing a first removal state of the box-extracted foam.

【図4】同、第2脱型状態を示す要部拡大正面図。FIG. 4 is an enlarged front view of a main part showing the second detached state.

【図5】同、第3脱型状態を示す要部拡大正面図。FIG. 5 is an enlarged front view of a main part showing a third detached state.

【図6】災害設備の収納スペースを備えたトンネルの略
線断面図。
FIG. 6 is a schematic sectional view of a tunnel provided with a storage space for disaster facilities.

【図7】箱抜フォームの従来例を示す正面図。FIG. 7 is a front view showing a conventional example of a boxed form.

【図8】同、側面図。FIG. 8 is a side view of the same.

【図9】図8のA−A線断面図。FIG. 9 is a sectional view taken along line AA of FIG. 8;

【図10】従来の災害設備の収納スペースの形成作業を
示す略線平面図。
FIG. 10 is a schematic plan view showing a conventional operation for forming a storage space for disaster facilities.

【符号の説明】[Explanation of symbols]

12 型枠 14 トンネル 16 二次覆工用コンクリート 18 ガントリー 20 天端フォーム 22 側フォーム 24 トンネル内壁面 26 箱抜フォーム 30 本体部(箱抜フォームの) 32 下部(箱抜フォームの) 34 災害設備 36 収納スペース(災害設備の) 38 底面部(収納スペースの) 40 油圧ジャッキ 12 Formwork 14 Tunnel 16 Concrete for secondary lining 18 Gantry 20 Top-end form 22 Side form 24 Tunnel inner wall surface 26 Box-out form 30 Main unit (box-out form) 32 Lower part (box-out form) 34 Disaster equipment 36 Storage space (for disaster facilities) 38 Bottom part (for storage space) 40 Hydraulic jack

───────────────────────────────────────────────────── フロントページの続き (72)発明者 岡本 伸一 大阪市阿倍野区松崎町2丁目2番2号 株式会社奥村組内 (72)発明者 徳重 新一 大阪市阿倍野区松崎町2丁目2番2号 株式会社奥村組内 (72)発明者 岡田 弘 東京都港区虎ノ門1丁目20番10号 西松 建設株 式会社内 (72)発明者 谷津 利彦 東京都港区虎ノ門1丁目20番10号 西松 建設株 式会社内 (72)発明者 北川 勉 岐阜県本巣郡真正町十四条144番地 岐 阜工業株 式会社内 (72)発明者 大久保 常秀 岐阜県本巣郡真正町十四条144番地 岐 阜工業株 式会社内 (72)発明者 大友 佳明 岐阜県本巣郡真正町十四条144番地 岐 阜工業株 式会社内 (56)参考文献 特開 昭62−121297(JP,A) 特開 平9−158690(JP,A) 特開 平6−240997(JP,A) 実開 昭56−55099(JP,U) (58)調査した分野(Int.Cl.7,DB名) E21D 11/10 ──────────────────────────────────────────────────続 き Continuing on the front page (72) Inventor Shinichi Okamoto 2-2-2 Matsuzaki-cho, Abeno-ku, Osaka-shi Okumura Gumi Co., Ltd. (72) Inventor Shin-ichi Tokushige 2-2-2 Matsuzaki-cho, Abeno-ku, Osaka-shi (72) Inventor Hiroshi Okada 1-20-10 Toranomon, Minato-ku, Tokyo Nishimatsu Construction Co., Ltd. (72) Inventor Toshihiko Yatsu 1-20-10 Toranomon, Minato-ku, Tokyo Nishimatsu Construction Co., Ltd. Inside the company (72) Inventor Tsutomu Kitagawa 144 Shinjocho, Motosu-gun, Gifu Prefecture Gifu Kogyo Co., Ltd. (72) Inventor Tsunehide Okubo 144 Shinjocho, Masamachi-cho, Motosu-gun, Gifu Gifu Kogyo Inside the Shikisha company (72) Inventor Yoshiaki Otomo 144 Shinjocho, Motosu-gun, Gifu Prefecture 144 Article Gifu Industrial Co., Ltd. (56) References JP-A-62-121297 (JP, A) JP-A-9-158690 (JP , A) JP-A-6-240997 (JP, A) JP-A-56-55099 (JP, U) (58) Fields investigated (Int. Cl. 7 , DB name) E21D 11/10

Claims (4)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 ガントリー(18)上に天端フォーム(20)お
よび両側フォーム(22),(22)を配設させてなる型枠(12)
を介して、トンネル(14)内に、非常電話、消火器具等の
災害設備(34)を設置する収納スペース(36)を形成させる
と共に、二次覆工用コンクリート(16)を打設する方法に
おいて、 型枠(12)の少なくとも一方の側フォーム(22)に、トンネ
ル内壁面(24)側に向けて側フォーム(22)から突出自在に
配設された箱抜フォーム(26)を、災害設備(34)の収納ス
ペース(36)の幅に対応させて、側フォーム(22)から突出
させることにより、災害設備(34)の収納スペース(36)を
確保した後、トンネル(14)内に二次覆工用コンクリート
(16)を打設することを特徴とする箱抜フォームを備えた
型枠によるトンネル用コンクリート打設方法。
1. A form (12) comprising a gantry (18) having a top foam (20) and two side foams (22), (22).
A method of forming a storage space (36) for installing emergency equipment (34) such as emergency telephones and fire extinguishing equipment in the tunnel (14) and placing concrete (16) for secondary lining through In at least one side foam (22) of the formwork (12), a boxed form (26), which is disposed so as to freely project from the side foam (22) toward the tunnel inner wall surface (24), After securing the storage space (36) for the disaster equipment (34) by projecting from the side foam (22) according to the width of the storage space (36) of the equipment (34), it is inserted into the tunnel (14). Secondary lining concrete
(16) A method for placing concrete for a tunnel using a formwork provided with a box-extracted foam, characterized by placing a box.
【請求項2】 箱抜フォーム(26)の本体部(30)と下部(3
2)とを分離移動自在とし、打設した二次覆工用コンクリ
ート(16)の養生硬化後の型枠(12)の脱型時に、箱抜フォ
ーム(26)の下部(32)を型枠(12)の内側に移動させた後、
箱抜フォーム(26)の本体部(30)を型枠(12)の内側に移動
させることにより、箱抜フォーム(26)の脱型時に二次覆
工用コンクリート(16)の打設により形成される災害設備
(34)の収納スペース(36)の底面部(38)の損傷を防止する
ことを特徴とする請求項1記載の箱抜フォームを備えた
型枠によるトンネル用コンクリート打設方法。
2. A box body form (26) having a main body (30) and a lower part (3).
2) can be separated and moved, and when the mold (12) after curing and curing of the poured concrete for secondary lining (16) is released, the lower part (32) of the boxed form (26) is removed from the mold. After moving inside (12),
By moving the body part (30) of the boxed form (26) inside the formwork (12), it is formed by casting the concrete for secondary lining (16) when removing the boxed form (26). Disaster equipment
2. The method according to claim 1, wherein the bottom of the storage space of the storage space is prevented from being damaged.
【請求項3】 ガントリー(18)上に天端フォーム(20)お
よび両側フォーム(22),(22)を配設させてなる型枠(12)
を介して、トンネル(14)内に、非常電話、消火器具等の
災害設備(34)を設置する収納スペース(36)を形成させる
と共に、二次覆工用コンクリート(16)を打設する装置に
おいて、 型枠(12)の少なくとも一方の側フォーム(22)に、トンネ
ル内壁面(24)側に向けて側フォーム(22)から突出自在に
箱抜フォーム(26)が配設されてなり、 災害設備(34)の収納スペース(36)の幅に対応させて、箱
抜フォーム(26)を側フォーム(22)から突出させることに
より、災害設備(34)の収納スペース(36)を確保した後、
トンネル(14)内に二次覆工用コンクリート(16)を打設す
ることを特徴とする箱抜フォームを備えた型枠によるト
ンネル用コンクリート打設装置。
3. A formwork (12) comprising a gantry (18) with a top foam (20) and foams on both sides (22), (22).
A storage space (36) for installing emergency equipment (34) such as emergency telephones and fire extinguishers in the tunnel (14), and a device for placing concrete for secondary lining (16) In, at least one side form (22) of the formwork (12), a box emptying form (26) is disposed so as to freely project from the side form (22) toward the tunnel inner wall surface (24) side, In accordance with the width of the storage space (36) of the disaster equipment (34), the storage space (36) of the disaster equipment (34) was secured by projecting the boxed form (26) from the side foam (22). rear,
An apparatus for placing concrete for a tunnel by a formwork provided with a boxed form, wherein the concrete for secondary lining (16) is placed in the tunnel (14).
【請求項4】 箱抜フォーム(26)の本体部(30)と下部(3
2)とを分離移動自在とし、打設した二次覆工用コンクリ
ート(16)の養生硬化後の型枠(12)の脱型時に、箱抜フォ
ーム(26)の下部(32)を型枠(12)の内側に移動させた後、
箱抜フォーム(26)の本体部(30)を型枠(12)の内側に移動
させることにより、箱抜フォーム(26)の脱型時に二次覆
工用コンクリート(16)の打設により形成される災害設備
(34)の収納スペース(36)の底面部(38)の損傷を防止する
ことを特徴とする請求項3記載の箱抜フォームを備えた
型枠によるトンネル用コンクリート打設装置。
4. A main body (30) and a lower portion (3) of a boxless form (26).
2) can be separated and moved, and when the mold (12) after curing and curing of the poured concrete for secondary lining (16) is released, the lower part (32) of the boxed form (26) is removed from the mold. After moving inside (12),
By moving the body part (30) of the boxed form (26) inside the formwork (12), it is formed by casting the concrete for secondary lining (16) when removing the boxed form (26). Disaster equipment
4. A concrete placing device for a tunnel by a formwork provided with a boxed form according to claim 3, wherein a damage to a bottom portion (38) of the storage space (36) of the (34) is prevented.
JP21806097A 1997-07-29 1997-07-29 Method and apparatus for placing concrete for tunnel using formwork with boxless foam Expired - Fee Related JP3157488B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP21806097A JP3157488B2 (en) 1997-07-29 1997-07-29 Method and apparatus for placing concrete for tunnel using formwork with boxless foam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP21806097A JP3157488B2 (en) 1997-07-29 1997-07-29 Method and apparatus for placing concrete for tunnel using formwork with boxless foam

Publications (2)

Publication Number Publication Date
JPH1144198A JPH1144198A (en) 1999-02-16
JP3157488B2 true JP3157488B2 (en) 2001-04-16

Family

ID=16714026

Family Applications (1)

Application Number Title Priority Date Filing Date
JP21806097A Expired - Fee Related JP3157488B2 (en) 1997-07-29 1997-07-29 Method and apparatus for placing concrete for tunnel using formwork with boxless foam

Country Status (1)

Country Link
JP (1) JP3157488B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4519190B1 (en) * 2009-02-11 2010-08-04 永井木工株式会社 Forming box for use in placing concrete and boxing space forming method using the same
JP7374843B2 (en) * 2020-05-11 2023-11-07 株式会社東芝 Center formwork equipment and tunnel construction method
JP6884295B1 (en) * 2021-01-25 2021-06-09 株式会社高洋商会 The mine formwork, the tunnel construction method using it, and the ballacentle used for it.

Also Published As

Publication number Publication date
JPH1144198A (en) 1999-02-16

Similar Documents

Publication Publication Date Title
JP5767558B2 (en) Mobile formwork apparatus and lining concrete construction method
JP3029022B2 (en) Formwork apparatus for tunnel lining and lining method using the same
JP7210895B2 (en) Lining concrete construction system
JP2018105029A (en) Movable type form device
KR102526362B1 (en) Apparatus for constructing downward vertical structure
JP3157488B2 (en) Method and apparatus for placing concrete for tunnel using formwork with boxless foam
JP3202615B2 (en) Method and apparatus for installing concrete frame for tunnel lining
JPH0913884A (en) Primary lining method for tunnel
JP3527106B2 (en) Concrete placement method using formwork fitted with boxless foam
KR101818428B1 (en) Filler for forming mating surface of concrete pile and construction method of concrete pile using the same
JPH108898A (en) Method of vibrating placed concrete for tunnel and device therefor
JP6422052B2 (en) Covering concrete construction method and centr for lining
JP3338878B2 (en) Apparatus and method for applying anticorrosion sheet
JP3233870B2 (en) Underground storage tank embedding method and tank fixing aid
JP2022045030A (en) Wife formwork fixing device
JP2741387B2 (en) Construction manhole construction method
WO1996005378A1 (en) A method of lining a well or a pipe and a support ring for use when carrying out the method
JP7061526B2 (en) Excavation method and excavation equipment
JPH051878B2 (en)
JP3075399B2 (en) Rehabilitation manhole wall structure
JPH06129181A (en) Tunnel boring construction method and tunnel construction support device
JP3041434B2 (en) Open shield method
JP2001214697A (en) Method and apparatus for constructing tunnel structure
JP2003184321A (en) Apparatus and method for dismantling tower-like structures
JPH08284194A (en) Repairing material for concrete structure under ground and repairing method therefor

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080209

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090209

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090209

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100209

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130209

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140209

Year of fee payment: 13

LAPS Cancellation because of no payment of annual fees