Assembly base of lining plate unit and transport assist mechanism

Info

Publication number
JP3167397B2
JP3167397B2 JP02972192A JP2972192A JP3167397B2 JP 3167397 B2 JP3167397 B2 JP 3167397B2 JP 02972192 A JP02972192 A JP 02972192A JP 2972192 A JP2972192 A JP 2972192A JP 3167397 B2 JP3167397 B2 JP 3167397B2
Authority
JP
Japan
Prior art keywords
tunnel
girder
unit
wheel
vertical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP02972192A
Other languages
Japanese (ja)
Other versions
JPH05231097A (en
Inventor
勝範 松井
Original Assignee
石川島建材工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 石川島建材工業株式会社 filed Critical 石川島建材工業株式会社
Priority to JP02972192A priority Critical patent/JP3167397B2/en
Publication of JPH05231097A publication Critical patent/JPH05231097A/en
Application granted granted Critical
Publication of JP3167397B2 publication Critical patent/JP3167397B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、たとえば、既設のトン
ネルの内壁を、複数の補修版によって覆工し補修する場
合、予め複数の補修版をトンネル外で組み立ててユニッ
ト化し、かつトンネル内に搬送可能とするための組立架
台、およびそのユニットをトンネル内に搬送するための
搬送補助機構に関する。
BACKGROUND OF THE INVENTION The present invention relates to a method for repairing an inner wall of an existing tunnel with a plurality of repair plates, for example, by assembling a plurality of repair plates outside the tunnel in advance and forming a unit in the tunnel. The present invention relates to an assembling gantry for enabling transport and a transport assist mechanism for transporting the unit into a tunnel.

【0002】[0002]

【従来の技術】既設のトンネル(道路用等)の内壁が、
老朽化したり、あるいは部分的に損傷した場合、補修版
として、その内壁に沿ったRに湾曲成形した複数のプレ
キャスト製コンクリート版(覆工版)を、内壁に沿って
アーチ状に据え付け相互に接合する、いわゆるコンクリ
ート版による覆工によって、その内壁を補修する方法
が、近年多用されてきている。
2. Description of the Related Art The inner wall of an existing tunnel (for roads, etc.)
In the case of aging or partial damage, a plurality of precast concrete slabs (lining slabs) curved to the R along the inner wall are installed as arches along the inner wall, and joined together as a repair plate. In recent years, a method of repairing the inner wall by lining with a so-called concrete slab has been frequently used.

【0003】コンクリート版を内壁に据え付けて相互に
接合するにあたっては、トンネル出入り口にコンクリー
ト版を運搬してから、エレクタ等の移送装置によりコン
クリート版を補修部まで移送し、かつその姿勢を内壁に
沿った状態にして内壁に据え付け、それから、コンクリ
ート版にあらかじめ設けた継手金具どうしを結合して、
相互に接合するといった方法が一般的である。
When the concrete slabs are installed on the inner wall and joined to each other, the concrete slabs are transported to the entrance of the tunnel, and then transported to the repairing section by a transfer device such as an erector, and the posture is adjusted along the inner walls. In the state of being installed on the inner wall, and then joining the joint fittings previously provided on the concrete slab,
A method of joining them together is common.

【0004】[0004]

【発明が解決しようとする課題】このような方法におい
て、コンクリート版を内壁まで移送して据え付け、コン
クリート版どうしを接合するといった主となる作業は、
作業空間が限られているトンネル内で行うため、それら
作業が困難であるとともに種々の制限を受ける場合が多
く、また、トンネル内の車両等の通行を工事中は閉鎖す
る必要があり、特に交通量が多い道路では不便を来た
す。
In such a method, the main operations such as transferring the concrete slab to the inner wall and installing the concrete slab, and joining the concrete slabs together, are as follows.
Since the work is performed in a tunnel with a limited working space, the work is difficult and often subject to various restrictions.In addition, it is necessary to close the traffic of vehicles and the like in the tunnel during construction. Inconvenient on heavy roads.

【0005】そこで、上記不具合を解消する方法とし
て、予め複数のコンクリート版をトンネル外で組み立て
てユニット化してから、そのユニットをトンネル内の補
修部まで搬送し、かつ内壁に据え付ける方法を、本出願
人は先に提案している(特開平5−171900号公
)。しかしながら、複数のコンクリート版を組み立て
てユニット化するにあたり、容易かつ短時間で行えるよ
うな、いわゆる組立架台および組み立てたユニットをト
ンネル内に搬送させるための搬送補助機構の開発が要求
されてきた。
[0005] In order to solve the above-mentioned problem, a method of assembling a plurality of concrete slabs in advance outside a tunnel to form a unit, transporting the unit to a repair section in the tunnel, and installing the unit on an inner wall is disclosed in the present application. The person has proposed before ( Japanese Patent Laid-Open No. 5-171900)
Information ). However, in assembling a plurality of concrete slabs into a unit, there has been a demand for the development of a so-called assembling gantry and a transport assisting mechanism for transporting the assembled unit into a tunnel, which can be performed easily and in a short time.

【0006】[0006]

【課題を解決するための手段】本発明は上記事情に鑑み
てなされ、請求項1として、トンネル内壁に沿って湾曲
する複数の覆工版がアーチ状に連結されてなる覆工版ユ
ニットを、トンネル内壁の側部に設けた、トンネル内の
路面と平行な上面およびトンネル内の路面に面して鉛直
面に形成された側面を有する基礎側壁に沿ってトンネル
内の所定位置まで搬送させ、かつトンネル内壁に据え付
けてこのトンネル内壁を覆工するにあたり、前記覆工版
ユニットをトンネル出入り口に隣接する路面上で組み立
て、トンネル内に搬送可能とするために左右一対として
設置される組立架台であって、前記トンネル出入り口に
隣接する路面上の両側に設置される基台と、基台に対し
昇降可能に設置され、前記覆工版のトンネル長さ方向に
沿った幅よりも短い間隔をおいて上方に突出しその上面
が路面と略平行な支持面とされた複数の支持台およびこ
れら支持台の間に位置して下方に突出し路面側に面する
側面が鉛直面である水平ホイルセット部をそれぞれ一体
に有する、トンネル長さ方向に沿って路面と略平行に延
びる主桁と、この主桁の前記各支持台間にわたりトンネ
ルの長さ方向に沿って延在する状態で前記基台に固定さ
れ、その上面が、前記主桁が下降した際にこの主桁の前
記支持面と面一な状態となり得る鉛直ホイル走路とされ
た鉛直ホイル走路桁と、前記主桁の前記水平ホイルセッ
ト部の間にわたりトンネル長さ方向に沿って延在する状
態で前記基台に固定され、その路面側の側面が、水平ホ
イルセット部と面一な状態の水平ホイル走路とされた水
平ホイル走路桁とを備え、前記鉛直ホイル走路桁の上面
を、前記基礎側壁の前記上面に連続して面一で、かつ前
記水平ホイル走路桁の側面を、前記基礎側壁の前記側面
に連続して面一に構成したことを特徴としている。
SUMMARY OF THE INVENTION The present invention has been made in view of the above circumstances, and as a first aspect, a lining plate unit in which a plurality of lining plates curved along an inner wall of a tunnel are connected in an arch shape, Transported to a predetermined position in the tunnel along a base wall having an upper surface parallel to a road surface in the tunnel and a side surface formed in a vertical plane facing the road surface in the tunnel, provided on a side portion of the inner wall of the tunnel; and When the lining plate unit is installed on the inner wall of the tunnel and lining the inner wall of the tunnel, the lining plate unit is assembled on a road surface adjacent to the entrance of the tunnel, and is installed as a pair of right and left to be able to be transported into the tunnel. A base installed on both sides of the road surface adjacent to the tunnel entrance, and installed to be able to move up and down with respect to the base, shorter than a width of the lining plate along a tunnel length direction. A plurality of support bases projecting upward at intervals and having a top surface substantially parallel to the road surface, and a horizontal wheel located between these support bases and projecting downward and having a vertical side surface facing the road surface side A main girder having a set portion integrally and extending substantially in parallel with the road surface along the length direction of the tunnel; and the base extending along the length direction of the tunnel between the support bases of the main girder. A vertical foil runway girder, the upper surface of which is a vertical foil runway that can be flush with the support surface of the main girder when the main girder descends, and the horizontal wheel of the main girder A horizontal foil runway which is fixed to the base in a state extending along the tunnel length direction between the set portions, and whose side surface on the road surface side is a horizontal foil runway flush with the horizontal wheel set portion. A girder and the vertical The upper surface of the il runway girder is continuously and flush with the upper surface of the foundation side wall, and the side surface of the horizontal foil rung spar is continuously flushed with the side surface of the foundation side wall. I have.

【0007】また、請求項2は、請求項1記載の、左右
一対の組立架台の上にて組み立てられた前記覆工版ユニ
ットを、トンネル内に搬送させるための覆工版ユニット
の搬送補助機構であって、左右一対の組立架台上にて組
み立てられた覆工版ユニットの内側に配置されるととも
に、そこからトンネル内に向かって路面上を走行可能と
される据付作業台と、この据付作業台の両側部に連結機
構を介して連結された、トンネル長さ方向に延びる牽引
桁と、この牽引桁にその長さ方向に間隔をおいて着脱可
能に複数装着されるとともに、前記覆工版にも着脱可能
に装着されて牽引桁と前記覆工版ユニットとを連結する
ホイルユニットとを備えていることを特徴としている。
According to a second aspect of the present invention, there is provided a transport assist mechanism for a lining plate unit for transporting the lining plate unit assembled on the pair of right and left assembling stands into a tunnel. An installation work table which is arranged inside a lining plate unit assembled on a pair of left and right assembly bases and which can travel on a road surface from there toward a tunnel; and Towing girders extending in the tunnel length direction, which are connected to both sides of the base via a connecting mechanism, and a plurality of detachably mounted towing girders at intervals in the length direction, and the lining plate And a wheel unit that is detachably mounted to connect the towing girder and the lining plate unit.

【0008】また、請求項3として、前記連結機構を、
前記牽引桁と前記据付作業台とをトンネル幅方向および
上下方向に沿って相対移動可能に連結する連結軸と、こ
の連結軸と据付作業台との間に介装され、双方の相対移
動を緩衝するとともに、通常状態において、牽引桁と据
付作業台との間隔を一定に保つ緩衝機構と、牽引桁の側
方に延び、前記緩衝機構により、前記基礎側壁の前記側
面に圧接状態とされる、水平面に沿って回転自在なガイ
ドホイルとにより構成したことを特徴としている。さら
に、請求項4として、前記ホイルユニットを、前記牽引
桁および前記覆工版に形成されたホイルユニット装着口
に着脱可能に装着されるケーシングと、このケーシング
に回転自在に設けられ、ケーシングが牽引桁およびホイ
ルユニット装着口に装着された状態で、前記基礎側壁に
おける前記上面および前記側面を転動可能な鉛直ホイル
および水平ホイルとにより構成したことを特徴としてい
る。
According to a third aspect of the present invention, the connecting mechanism comprises:
A connection shaft that connects the tow girder and the installation worktable so as to be relatively movable along the tunnel width direction and the vertical direction, and is interposed between the connection shaft and the installation worktable, and buffers both relative movements; In the normal state, in the normal state, a buffer mechanism that keeps the gap between the towing girder and the installation work table constant, extends to the side of the towing girder, and is brought into pressure contact with the side surface of the foundation side wall by the buffering mechanism. It is characterized by comprising a guide wheel rotatable along a horizontal plane. According to a fourth aspect of the present invention, the wheel unit is removably mounted on a wheel unit mounting opening formed in the towing girder and the lining plate, and the casing is rotatably provided on the casing. The upper surface and the side surface of the foundation side wall are configured by a rollable vertical foil and a horizontal foil in a state of being mounted on a spar and a wheel unit mounting opening.

【0009】[0009]

【作用】本発明の覆工版ユニットの組立架台によれば、
主桁を上昇位置に保持した状態で、鉛直ホイル走路桁の
上面より上方に突出する複数の支持台上に、複数の覆工
版をアーチ状に接合して覆工版ユニットを組み立て、次
いで、各覆工版にホイルユニットを装着してから、主桁
を下降させ、ホイルユニットの鉛直ホイルを、鉛直ホイ
ル走路桁の上面に載せ、覆工版の荷重をホイルユニット
に移す。この状態から、搬送補助機構によりユニットU
をトンネル内に搬送させる。覆工版ユニットは、ホイル
ユニットの鉛直ホイルが、組立架台の鉛直ホイル走路桁
の上面から基礎側壁の上面を、また、ホイルユニットの
水平ホイルが、水平ホイル走路桁の側面から基礎側壁の
側面を転動することにより、トンネル内に搬送される。
すなわち、トンネル内へ搬送するためのホイルユニット
が装着され、かつ、このホイルユニットを組立架台上お
よび基礎側壁上で走行させ得る状態に、複数の覆工版か
らなる覆工版ユニットを組み立てることが、本発明の組
立架台により容易に行える。
According to the assembling base of the lining plate unit of the present invention,
While holding the main girder in the ascending position, on a plurality of supports that protrude above the upper surface of the vertical foil runway girder, a plurality of lining plates are joined in an arch shape to assemble a lining plate unit, and then After mounting the foil unit on each lining plate, the main girder is lowered, the vertical foil of the wheel unit is placed on the upper surface of the vertical foil runway girder, and the load of the lining plate is transferred to the wheel unit. From this state, the unit U is moved by the transport assist mechanism.
To the tunnel. In the lining plate unit, the vertical foil of the wheel unit extends from the upper surface of the vertical foil runway girder of the assembly stand to the upper surface of the foundation side wall, and the horizontal foil of the wheel unit extends from the side of the horizontal foil runway girder to the side surface of the foundation side wall. By rolling, it is transported into the tunnel.
That is, it is possible to assemble a lining plate unit including a plurality of lining plates in a state in which a foil unit for transporting into the tunnel is mounted, and the foil unit can be run on the assembling gantry and the foundation side wall. It can be easily performed by the assembling base of the present invention.

【0010】また、本発明の搬送補助機構によれば、覆
工版ユニットの、組立架台から基礎側壁に沿ってトンネ
ル内への搬送を、スムーズかつ容易に行える。
Further, according to the transport assisting mechanism of the present invention, the lining plate unit can be smoothly and easily transported from the assembly stand to the inside of the tunnel along the foundation side wall.

【0011】また、搬送補助機構を構成する据付作業台
と牽引桁とを連結する連結機構によれば、路面に凹凸等
があって走行する据付作業台が路面から上下あるいは左
右に動く力を受けると、その力は緩衝されて覆工版ユニ
ットには伝わらず、このため、覆工版ユニットの搬送に
は何ら支障が起きないとともに、据付作業台に変形等の
力が働かない。
Further, according to the connecting mechanism for connecting the installation work table and the towing girder that constitute the transport assist mechanism, the installation work table that travels with unevenness or the like on the road surface receives a force to move vertically or horizontally from the road surface. Then, the force is buffered and is not transmitted to the lining plate unit, so that no trouble occurs in transporting the lining plate unit, and no force such as deformation acts on the installation worktable.

【0012】さらに、本発明のホイルユニットによれ
ば、搬送補助機構の牽引桁と覆工版ユニットとの連結を
容易とするとともに、覆工版ユニットの、組立架台およ
び基礎側壁上の搬送を可能とする。特に、ホイルユニッ
トの水平ホイルが、組立架台の水平ホイル走路桁の上桁
の側面と、基礎側壁の側面を転動することにより、覆工
版ユニットは、蛇行等が生じることなく路面に沿って確
実にトンネル内に搬送される。
Further, according to the wheel unit of the present invention, it is possible to easily connect the traction plate of the transport assist mechanism to the lining plate unit, and to transport the lining plate unit on the assembling stand and the base wall. And In particular, the horizontal foil of the wheel unit rolls on the side surface of the upper girder of the horizontal foil runway girder of the assembly stand and the side surface of the foundation side wall, so that the lining plate unit can follow the road surface without meandering or the like. It is surely transported in the tunnel.

【0013】[0013]

【実施例】図1は、既設の道路用トンネルTの出入り口
の一端側および任意のトンネル断面を示しており、T1
は打設コンクリート等により構築された断面円弧状のト
ンネルTの内壁、1は道路の路面であり、2が、複数の
コンクリート版(覆工版)3をアーチ状に接合してコン
クリート版ユニットU(覆工版ユニット)を組み立てる
ための、本発明に係る左右一対の組立架台である。
FIG. 1 shows one end of an entrance and exit of an existing road tunnel T and an arbitrary cross section of the tunnel.
Is an inner wall of a tunnel T having an arcuate cross section constructed of cast concrete or the like, 1 is a road surface of a road, 2 is a concrete plate unit U by joining a plurality of concrete plates (lining plates) 3 in an arch shape. It is a pair of right and left assembly bases according to the present invention for assembling (lining plate units).

【0014】これら組立架台2の上で、組み立てたコン
クリート版ユニット(以下単にユニットと略称する)U
を、トンネルT内の補修すべき部分まで搬送してトンネ
ル内壁T1に据え付けることにより、トンネルTの補修
を行うもので、トンネルT内へのユニットUの搬送は、
本発明に係る、ホイルユニット4を有する搬送補助機構
5を用いる。
A concrete unit (hereinafter simply referred to as a unit) U assembled on the assembly base 2
Is transported to a portion to be repaired in the tunnel T and installed on the tunnel inner wall T1, thereby repairing the tunnel T. The transport of the unit U into the tunnel T is as follows.
A transport assist mechanism 5 having a wheel unit 4 according to the present invention is used.

【0015】トンネルT内の内壁T1の、路面1に臨む
両側面には、ユニットUの搬送路となり、かつユニット
Uをトンネル内壁T1に据え付けるための基礎側壁6が
設けられている。この基礎側壁6は、トンネルTの全長
にわたりその長さ方向に沿ってコンクリートを打設する
ことにより所定高さに形成されたもので、その上面6a
は路面2と平行で、路面2に臨む側面6bは鉛直面にな
っている。
On both sides of the inner wall T1 in the tunnel T facing the road surface 1, there are provided basic side walls 6 which serve as a transport path for the unit U and for mounting the unit U on the inner wall T1 of the tunnel. The foundation side wall 6 is formed at a predetermined height by casting concrete along the length of the tunnel T along the length thereof.
Is parallel to the road surface 2, and the side surface 6b facing the road surface 2 is vertical.

【0016】ここで、まずコンクリート版3を詳述する
と、このコンクリート版3は、図2に示すように、トン
ネル内壁T1に沿ったRに湾曲成形された円弧板状のも
ので、2つを、互いに向かい合わせ頂部側となる上端接
合面3aどうしをアーチ状に合わせた左右一対で1組と
して用いられる。下端部となる脚部3Aは、均一な厚さ
の他の部分より内面側が膨出して厚くなっており、上記
のように左右一対に組んだ状態で、脚部3Aの内面は鉛
直面に沿うようになっている。
First, the concrete slab 3 will be described in detail. As shown in FIG. 2, the concrete slab 3 is an arc-shaped plate which is curved and formed into an R along the tunnel inner wall T1. The left and right upper end joining surfaces 3a facing each other and forming the shape of an arch are used as one set. The leg 3A serving as the lower end has a thicker inner surface than the other portion having a uniform thickness, and the inner surface of the leg 3A is along the vertical plane in a state where the leg 3A is assembled in a pair as described above. It has become.

【0017】左右のコンクリート版3どうしの接合面と
なる上端接合面3aと、前後に隣り合うコンクリート版
3どうしの接合面となる側端接合面3bには、図3に示
すように、互いにボルト結合されることよりコンクリー
ト版3どうしを接合するための、ボルト通し孔(図示
略)があけられた継手金具7が、各接合面3a、3bに
つきそれぞれ複数設けられている。そして、コンクリー
ト版3の外面(凸面)には、継手金具7どうしをボルト
結合する際、その作業用スペースとなる継手凹所8が形
成されている。
As shown in FIG. 3, bolts are attached to the upper end joint surface 3a serving as a joint surface between the left and right concrete slabs 3 and the side end joint surface 3b serving as a joint surface between the front and rear concrete slabs. A plurality of joint fittings 7 each having a bolt through hole (not shown) for joining the concrete slabs 3 by being joined are provided for each of the joining surfaces 3a and 3b. A joint recess 8 is formed on the outer surface (convex surface) of the concrete slab 3 as a working space when the joint fittings 7 are bolted together.

【0018】また、図4に示すように、脚部3Aには、
下面から、鉛直押しボルト9のねじ部9aが、脚部3A
に埋め込まれたインサート金具10にねじ込まれ、外面
(凸面)から水平押しボルト11のねじ部11aがイン
サート金具12にねじ込まれている。鉛直押しボルト9
は、脚部3Aの内面に開口する座ぐり口13からスパナ
等の工具によりその頭部9bを回転させることができ
る。また、水平押しボルト11は、インサート金具12
から脚部3Aの内面にわたってあけられた操作孔14に
挿入したドライバ等の工具を、ねじ部11a先端に形成
された係合溝(図示略)に嵌めて回転させることができ
る。また、脚部3Aには、水平押しボルト11の頭部1
1bの座ぐり15が形成されている。これら各ボルト
9、11は、コンクリート版3の幅方向に間隔をおいて
複数設けられている。
As shown in FIG. 4, the leg 3A has
From the lower surface, the screw portion 9a of the vertical push bolt 9 is attached to the leg 3A.
The screw part 11 a of the horizontal push bolt 11 is screwed into the insert fitting 12 from the outer surface (convex surface). Vertical push bolt 9
The head 9b can be rotated with a tool such as a wrench from a counterbore 13 that opens to the inner surface of the leg 3A. In addition, the horizontal push bolt 11 is
A tool such as a driver inserted into the operation hole 14 formed over the inner surface of the leg 3A can be fitted into an engagement groove (not shown) formed at the tip of the screw portion 11a and rotated. Further, the head 3 of the horizontal push bolt 11 is attached to the leg 3A.
A counterbore 15 of 1b is formed. A plurality of these bolts 9 and 11 are provided at intervals in the width direction of the concrete plate 3.

【0019】また、これら各ボルト9、11は、コンク
リート版3を最終的にトンネル内壁T1に据え付けるま
では、それら頭部9b、11bを、座ぐり口13、座ぐ
り15に収納させておく。
The heads 9b and 11b of these bolts 9 and 11 are stored in the counterbore 13 and the counterbore 15 until the concrete plate 3 is finally installed on the inner wall T1 of the tunnel.

【0020】コンクリート版3の脚部3Aには、前記ホ
イルユニット4を装着するためのホイルユニット装着口
16が形成されている。このホイルユニット装着口16
は、コンクリート版3に一対、2つのコンクリート版3
の側端接合面3bを互いに合わせた状態で、隣り合うも
のの間の距離が均等になる位置に形成されている。
The leg 3A of the concrete slab 3 has a wheel unit mounting opening 16 for mounting the wheel unit 4 thereon. This wheel unit mounting opening 16
Is a pair of concrete slabs 3 and two concrete slabs 3
Are formed at positions where the distances between adjacent ones are equal, with the side end joining surfaces 3b being aligned with each other.

【0021】ホイルユニット装着口16は、図5および
図6に示すように、コンクリート版3の厚さ方向に貫通
し、かつ下面に開口している。その内面形状は、断面台
形状で、上から見た場合、コンクリート版3の外側から
内側に向かうに従い幅が大きくなる楔型に形成され、そ
の内面には、鋼板17が張られている。なお、コンクリ
ート版3内部のホイルユニット装着口16近傍には、複
数のジベル18が埋め込まれている。
As shown in FIGS. 5 and 6, the wheel unit mounting opening 16 penetrates in the thickness direction of the concrete slab 3, and is open on the lower surface. The inner surface has a trapezoidal cross section, and when viewed from above, is formed in a wedge shape whose width increases from the outside to the inside of the concrete slab 3, and a steel plate 17 is stretched on its inner surface. A plurality of dowels 18 are embedded in the concrete plate 3 near the wheel unit mounting opening 16.

【0022】ホイルユニット装着口16の奥側(コンク
リート版3における外側)には、等辺山形鋼からなる、
ホイルユニット取付金具19が設けられている。このホ
イルユニット取付金具19は、長さ方向をコンクリート
版3の幅方向に沿わせ、横板部19aをコンクリート版
3の底面に揃え、縦板部19bをコンクリート版3の内
側に配した状態で、前記鋼板17の側面に、その両端が
溶接されて固定されている。
The inner side of the wheel unit mounting port 16 (outside of the concrete plate 3) is made of an equilateral angle iron.
A wheel unit mounting bracket 19 is provided. The wheel unit mounting bracket 19 has a length direction along the width direction of the concrete plate 3, a horizontal plate portion 19a aligned with the bottom surface of the concrete plate 3, and a vertical plate portion 19b arranged inside the concrete plate 3. The two ends are fixed to the side surfaces of the steel plate 17 by welding.

【0023】このホイルユニット取付金具19の縦板部
19bの中央には、透孔20が形成され、この透孔20
に合わせて縦板部19bの外側に、ナット21が溶接さ
れている。
A through hole 20 is formed in the center of the vertical plate portion 19b of the wheel unit mounting bracket 19,
The nut 21 is welded to the outside of the vertical plate portion 19b in accordance with.

【0024】コンクリート版3の脚部3Aの内面におけ
るホイルユニット装着口16の上には、単なる筒状のイ
ンサート金具22が、内空を内面側に向けて、この内面
に直交する状態で埋め込まれている。
Above the wheel unit mounting opening 16 on the inner surface of the leg 3A of the concrete slab 3, a simple cylindrical insert 22 is embedded with the inner space facing the inner surface and orthogonal to the inner surface. ing.

【0025】上記構成のコンクリート版3は、アーチ状
に組んだ左右一対のそれぞれの脚部3Aを、トンネルT
内の前記左右の基礎側壁6にそれぞれ載せると、僅かな
間隔をおいてコンクリート版3の外面がトンネル内壁T
に沿った状態となり、かつ、コンクリート版3の脚部
3Aの内面が、基礎側壁6の側面6bと面一になるよう
構成されている。そして、本実施例の場合、コンクリー
ト版ユニットUは左右3つずつのコンクリート版3を組
んだものである。
In the concrete slab 3 having the above structure, a pair of left and right legs 3A, which are assembled in an arch shape, are connected to a tunnel T.
When the concrete slab 3 is placed on the left and right foundation side walls 6, the outer surface of the concrete slab 3 is slightly spaced from the inner wall T of the tunnel.
1 and the inner surface of the leg 3A of the concrete slab 3 is flush with the side surface 6b of the foundation side wall 6. In the case of the present embodiment, the concrete slab unit U is formed by assembling three right and left concrete slabs.

【0026】さて、前記組立架台2は、トンネルTの出
入り口のすぐ外側の、路面1の両側に、左右一対として
設置される。これら組立架台2は、路面1の長さ方向
(以下の説明で、この方向を前後方向、また、これに直
交する路面1の幅方向を左右方向と定義する)に沿って
等間隔に立設された複数(この場合5本)のポスト(基
台)23の上に、前後方向に沿って水平に延びる主桁2
4、鉛直ホイル走路桁25、水平ホイル走路桁26が架
け渡された基本構造となっている。以下この組立架台2
を、図7ないし図10を参照して詳述する。
The assembling bases 2 are installed as a pair on the right and left sides of the road surface 1 immediately outside the entrance of the tunnel T. These assembling stands 2 are erected at equal intervals along the length direction of the road surface 1 (this direction is defined as the front-rear direction and the width direction of the road surface 1 perpendicular to the direction is defined as the left-right direction in the following description). Main girder 2 extending horizontally in the front-rear direction on a plurality of (five in this case) posts (bases) 23
4, a vertical wheel runway girder 25 and a horizontal wheel runway girder 26 have a basic structure. This assembling stand 2
Will be described in detail with reference to FIGS.

【0027】ポスト23は、左右一対の縦材27aの間
に前後一対の横材27bが組まれたもので、各ポスト2
の前後方向の間隔は、コンクリート版3の幅と略同じ
距離に設定されている。
The posts 23, in which a pair of crosspieces 27b back and forth between a pair of longitudinal members 27a is assembled, each post 2
3 is set to a distance substantially equal to the width of the concrete slab 3.

【0028】左右一対の縦材27aのうち、路面1側、
つまり内側のもの(図8で右側のもの)は、外側のもの
より若干低く、この内側の縦材27aの上には、前後方
向に延びる水平ホイル走路桁26が固定されている。こ
の水平ホイル走路桁26は、溝形鋼である下桁28およ
び上桁29からなり、それぞれ溝が外側に向けられて溶
接により互いに固着されている。下桁28および上桁2
9の路面1に臨む各側面28a、29aは、互いに面一
で鉛直面とされている。
Of the pair of left and right vertical members 27a, the road surface 1 side,
That is, the inner one (right side in FIG. 8) is slightly lower than the outer one, and a horizontal wheel runway girder 26 extending in the front-rear direction is fixed on the inner vertical member 27a. The horizontal wheel runway girder 26 includes a lower girder 28 and an upper girder 29, which are channel steels, and the grooves are directed outward and are fixed to each other by welding. Lower girder 28 and upper girder 2
Each of the side surfaces 28a and 29a facing the road surface 9 is flush with each other and is a vertical surface.

【0029】下桁28は、前後両端のポスト23にわた
る長さを有し、それぞれのポスト23の内側の縦材27
aの上端に溶接により固着されている。一方、上桁29
は、複数あって、各ポスト23の間の中央部と、各ポス
ト23をまたぐ位置に、互いに間隔をおいて配されてい
る。
The lower girder 28 has a length extending over the posts 23 at the front and rear ends, and the vertical members 27 inside the respective posts 23.
It is fixed to the upper end of a by welding. On the other hand, upper digit 29
Are provided at intervals in a central portion between the posts 23 and at a position straddling each of the posts 23.

【0030】また、左右一対の縦材27aのうちの路面
1に対する外側の縦材27aの上には、溝形鋼からな
り、前後方向に延びる外桁30が、溝を内側に向けた状
態で、溶接により固着されている。
An outer girder 30 made of a channel steel and extending in the front-rear direction is provided on the outer vertical member 27a of the pair of left and right vertical members 27a with respect to the road surface 1 with the grooves facing inward. Are fixed by welding.

【0031】前記主桁24は、断面正方形状の中空鋼管
製で、前後両端のポスト23にわたる長さを有する主桁
本体31と、この主桁本体31の上面31aに等間隔に
配されて上方に突出する複数の支持台32と、これら支
持台32の間に位置して下方に突出する水平ホイルセッ
ト部33とを備えており、主桁本体31が、ポスト23
の上端部であって、左右の縦材27aおよび水平ホイル
走路桁26によって形成される溝に収まる状態で、各横
材27bの上に載せられている。
The main girder 24 is made of hollow steel pipe having a square cross section and has a main girder main body 31 having a length extending over the posts 23 at both front and rear ends. The main girder main body 31 is provided with a plurality of support bases 32 protruding from each other and a horizontal wheel set portion 33 positioned between the support bases 32 and protruding downward.
And is placed on each horizontal member 27b so as to fit in a groove formed by the left and right vertical members 27a and the horizontal foil runway girder 26.

【0032】前記支持台32は、各ポスト23の直上に
あたる位置および各ポスト23の間の中央にあたる位置
に配されており、その上面32aは、路面1と平行な主
桁本体31の上面31aと平行で、コンクリート版3を
その上に載せて支持する支持面とされる。
The support table 32 is disposed at a position directly above each post 23 and at a position corresponding to the center between the posts 23. The upper surface 32 a of the support table 32 is in contact with the upper surface 31 a of the main girder main body 31 parallel to the road surface 1. The support surface is parallel and supports the concrete slab 3 placed thereon.

【0033】また、前記水平ホイルセット部33は、短
い溝形鋼でできており、前記水平ホイル走路桁26の各
上桁29の間に配され、溝を外側に向けた状態で、主桁
本体31の内側の側面に溶接されて固着されている。そ
して、その路面1側に臨む側面33aは鉛直面であっ
て、かつ上桁29の側面29aに連続して面一な状態に
なっている。各水平ホイルセット部33の間は、コンク
リート版3の脚部3Aに設けられた前記ホイルユニット
装着口16の間隔と同じに設定されている。
The horizontal wheel set portion 33 is made of a short channel steel, is disposed between the upper beams 29 of the horizontal wheel runway beam 26, and has a main beam with the groove facing outward. It is welded and fixed to the inner side surface of the main body 31. The side surface 33a facing the road surface 1 is a vertical surface, and is flush with the side surface 29a of the upper girder 29. The space between the horizontal wheel set sections 33 is set to be the same as the distance between the wheel unit mounting ports 16 provided on the legs 3A of the concrete plate 3.

【0034】さて、上記構成からなる主桁24は、ポス
ト23に設けられるジャッキ装置34により昇降するよ
う構成されている。
The main girder 24 having the above structure is configured to be moved up and down by a jack device 34 provided on the post 23.

【0035】このジャッキ装置34は、図7および図8
に示すように、前後両端のポスト23の横材27bのや
や下において、左右一対の縦材27a間にわたって水平
に架け渡されたジャッキ台35の上に設置されており、
下端に形成されたフランジ36aが固定されたカラー3
6と、このカラー36に摺動的に回動自在に挿入され、
上端部周面にねじ部(図示略)を有し、中央にナット3
7aが一体に形成されたジャッキロッド37と、主桁2
4をその上面で受け、下面に一体に固着された筒部38
aがジャッキロッド37のねじ部に螺合された支台板3
8とから構成されている。支台板38と筒部38aに
は、左右方向に沿ったリブ板39が、また、前後方向に
沿ったガイド板40がそれぞれ設けられている。
The jack device 34 is shown in FIGS.
As shown in FIG. 5, slightly below the cross members 27b of the posts 23 at the front and rear ends, the post members 23 are installed on a jack base 35 horizontally spanned between a pair of left and right vertical members 27a.
Collar 3 to which flange 36a formed at the lower end is fixed
6 and slidably and rotatably inserted into the collar 36,
It has a thread (not shown) on the peripheral surface of the upper end, and a nut 3 in the center.
7a is formed integrally with the jack rod 37 and the main girder 2
4 is received on its upper surface, and the cylindrical portion 38 is integrally fixed to the lower surface.
a is the abutment plate 3 screwed into the screw portion of the jack rod 37
And 8. The abutment plate 38 and the cylindrical portion 38a are provided with a rib plate 39 extending in the left-right direction, and a guide plate 40 extending in the front-rear direction.

【0036】上記ジャッキ装置34によれば、ナット3
7aを回動させてジャッキロッド37を回動させると、
ジャッキロッド37におけるねじ部の筒部38aに対す
る捩じ込み量が変動し、これによって、支台板38が上
がったり下がったりする。支台板38が横材27bより
下にあると、主桁24は横材27bの上に載って横材2
7bに支持され、支台板38が横材27bより上に位置
した状態で、主桁24は支台板38で支持され、支台板
38とともに昇降する。ナット37aの回動は、ラチェ
ット式スパナ41を用いると、双方向の回動が便利に行
える。
According to the jack device 34, the nut 3
When the jack rod 37 is rotated by rotating 7a,
The screwing amount of the screw portion of the jack rod 37 into the cylindrical portion 38a fluctuates, whereby the abutment plate 38 moves up and down. When the abutment plate 38 is below the cross member 27b, the main girder 24 is placed on the cross member 27b and
The main girder 24 is supported by the abutment plate 38 and is moved up and down together with the abutment plate 38 in a state where the abutment plate 38 is positioned above the cross member 27b, supported by the support 7b. When the ratchet type wrench 41 is used for rotating the nut 37a, bidirectional rotation can be conveniently performed.

【0037】なお、前記水平ホイル走路桁26および外
桁30と、主桁24の側面との間は、スムーズな主桁2
4の昇降を可能とするため、若干の隙間があいている。
また、前記ガイド板40は、横材27b間に僅かな隙間
をおいて挟まれ、横材27bに当たることにより、昇降
時の、主桁24の前後方向の揺動を防止する機能を果た
す。
A smooth main girder 2 is provided between the horizontal wheel runway girder 26 and the outer girder 30 and the side surface of the main girder 24.
There is a slight gap in order to make it possible to move up and down.
Further, the guide plate 40 is sandwiched between the horizontal members 27b with a small gap therebetween and hits the horizontal members 27b, thereby performing a function of preventing the main girder 24 from swinging in the front-rear direction at the time of elevating.

【0038】上記ジャッキ装置34は、各ポスト23の
うち、少なくとも前後両端のポスト23に設ける。
The jack device 34 is provided on at least the front and rear ends 23 of the posts 23.

【0039】前記主桁24を構成する各支持台32の間
のスペースには、前記鉛直ホイル走路桁25が配されて
いる。この鉛直ホイル走路桁25は、溝形鋼が組まれて
なるもので、前後方向に延び、その上面25aは路面1
と平行であり、水平ホイル走路桁26を構成する上桁2
9の上面と外桁30の上面との間にわたって架け渡さ
れ、これら上面に、溶接により固着されている。
The vertical wheel runway girder 25 is disposed in a space between the supports 32 constituting the main girder 24. The vertical wheel runway girder 25 is formed by assembling a channel steel and extends in the front-rear direction.
Upper girder 2 which is parallel to
9 and the outer girder 30 and is fixed to the upper surface by welding.

【0040】前記主桁24が、各ポスト23の横材27
bに支持された状態では、主桁24を構成する支持台3
2の上面32aは、鉛直ホイル走路桁25の上面25a
に連続して面一となり、前記ジャッキ装置34に主桁2
4が上昇すると、支持台32の上面32aは鉛直ホイル
走路桁25の上面25aよりも上に突出する。主桁24
の上昇における上限は、主桁本体31ないし水平ホイル
セット部33が、鉛直ホイル走路桁25に当たるまでで
あり、下限は、上述の如く、横材27bに支持されてい
る状態である。また、主桁24の昇降の際の水平ホイル
セット部33は、その側面33aが、水平ホイル走路桁
26を構成する各上桁29の側面29aと面一な状態を
保ったまま、各上桁29の間で昇降し、主桁24が下限
にあるとき、その下端は、水平ホイル走路桁26に近接
する。
The main girder 24 is a cross member 27 of each post 23.
b, the support base 3 constituting the main girder 24
2 upper surface 32a of vertical foil runway girder 25
And the jack device 34 has the main girder 2
When 4 rises, the upper surface 32a of the support base 32 projects above the upper surface 25a of the vertical foil runway girder 25. Main girder 24
The upper limit of the rise is that the main girder main body 31 or the horizontal wheel set portion 33 hits the vertical wheel runway girder 25, and the lower limit is a state in which the main girder body 31 or the horizontal wheel set portion 33 is supported by the cross member 27b as described above. In addition, the horizontal wheel set portion 33 when the main girder 24 is raised and lowered has its side surface 33a kept flush with the side surface 29a of each upper girder 29 constituting the horizontal wheel runway girder 26, and 29, when the main girder 24 is at its lower limit, its lower end is close to the horizontal foil runway girder 26.

【0041】主桁24が下限状態において、前記鉛直ホ
イル走路桁25の上面25aおよび主桁24を構成する
支持台32の上面32aは、互いに面一となるが、これ
ら上面25a、32aは、前記各基礎側壁6の上面6a
にそれぞれ面一で、かつトンネルT側の端部に設けられ
た支持台32は、基礎側壁6に連続している。また、水
平ホイル走路桁26を構成する下桁28、上桁29の各
側面28a、29aは、各基礎側壁6の側面6bにそれ
ぞれ面一な状態で連続している。
When the main girder 24 is in the lower limit state, the upper surface 25a of the vertical wheel runway girder 25 and the upper surface 32a of the support base 32 constituting the main girder 24 are flush with each other, but these upper surfaces 25a, 32a Upper surface 6a of each foundation side wall 6
The support 32 provided at the end on the tunnel T side is continuous with the foundation side wall 6. The side surfaces 28a and 29a of the lower girder 28 and the upper girder 29 constituting the horizontal wheel runway girder 26 are continuous with the side surfaces 6b of the respective base side walls 6 in a state of being flush with each other.

【0042】以上が、本実施例の、ユニットUを組み立
てるための組立架台2である。なお、図1に示すよう
に、路面1の両側にそれぞれ並んで立設された各ポスト
23の外側には、作業員が載って作業足場とするため
の、前後方向に延びる足場板42が設けられている。
The above is the assembling stand 2 for assembling the unit U according to the present embodiment. As shown in FIG. 1, a scaffold plate 42 extending in the front-rear direction is provided outside each of the posts 23 erected on both sides of the road surface 1 so as to be used as a work scaffold on which workers are placed. Have been.

【0043】これら足場板42には、左右一対の組立架
台2上に組み立てるユニットUの外周面に沿って湾曲形
成された梯子状の組立足場43が、路面1をまたぐ状態
で設けられる。この組立足場43は、足場板42とユニ
ットUの外周面を転動する複数の車輪44により、前後
方向に移動するようになっている。
A ladder-like assembly scaffold 43 formed along the outer peripheral surface of the unit U assembled on the pair of left and right assembly frames 2 is provided on the scaffold plate 42 so as to straddle the road surface 1. The assembled scaffold 43 is moved in the front-rear direction by a plurality of wheels 44 rolling on the outer peripheral surface of the unit U and the scaffold plate 42.

【0044】次に、上記左右一対の組立架台2の上で組
み立てられたユニットUを、トンネルT内へ搬送するた
めの、ホイルユニット4を有する搬送補助機構5を説明
する。
Next, a description will be given of a transport assist mechanism 5 having a wheel unit 4 for transporting the unit U assembled on the pair of right and left assembly frames 2 into the tunnel T.

【0045】搬送補助機構5は、ホイルユニット4、据
付作業台45、牽引桁46および連結機構47により構
成されている。
The transport assist mechanism 5 includes the wheel unit 4, an installation worktable 45, a towing girder 46 and a connecting mechanism 47.

【0046】まず、据付作業台45から説明すると、こ
の据付作業台45は、トンネルT内を走行可能とされて
いるもので、図11および図12に示すように、左右一
対の鉛直柱48の上端に梁49が架け渡された複数の門
型フレーム50が、連結ビーム51によって連結されて
一体化され、各鉛直柱48にそれぞれ足場52が固定さ
れ、さらに、これら足場52に、前記牽引桁46がそれ
ぞれ取り付けられ、各鉛直柱48の下端に、キャスター
式の走行車輪53が取り付けられてなる。
First, the installation work table 45 will be described. The installation work table 45 can run in the tunnel T. As shown in FIGS. 11 and 12, a pair of right and left vertical columns 48 is provided. A plurality of portal frames 50 with beams 49 bridged on the upper ends are connected and integrated by a connecting beam 51, and a scaffold 52 is fixed to each of the vertical columns 48. Each of the vertical columns 48 has a caster-type traveling wheel 53 attached to the lower end thereof.

【0047】この据付作業台45は、図11に示すよう
に、長さ方向(門型フレーム50の並び方向)を、トン
ネルTの長さ方向に沿わせた状態で、かつ幅方向中心を
トンネルTのそれに合わせた状態でトンネルT内に配す
と、左右の鉛直柱48および梁49と、トンネルTの内
壁T1との間に所定の間隔が空くよう、その寸法が設定
され、前記各足場52の先端は、前記基礎側壁6に近接
するようになっている。
As shown in FIG. 11, the installation work table 45 is arranged such that the length direction (the direction in which the portal frames 50 are arranged) is aligned with the length direction of the tunnel T and the center of the width direction is the tunnel. When it is arranged in the tunnel T in a state corresponding to that of the T, its dimensions are set so that a predetermined interval is left between the left and right vertical columns 48 and the beams 49 and the inner wall T1 of the tunnel T, The tip of 52 is adapted to approach the base side wall 6.

【0048】各梁49には、この梁49の長さ方向を軸
としてヒンジ結合され、かつ据付作業台45の前側ある
いは後側に倒した状態が収納状態とされ、起立状態が手
摺りとなる、起倒式の手摺り54が設けられている。ま
た、足場52の先端側には、複数の手摺り55が、足場
52の長さ方向に適宜な相互間隔をおいて固定されてい
る。
Each beam 49 is hinged about the longitudinal direction of the beam 49 as an axis, and a state in which the installation work table 45 is tilted forward or rearward is a stored state, and an upright state is a handrail. , A handrail 54 of an upside down type is provided. Further, a plurality of handrails 55 are fixed to the tip side of the scaffold 52 at appropriate mutual intervals in the length direction of the scaffold 52.

【0049】前記牽引桁46は、足場52の全長にわた
る長さを有し、足場52の先端に、前記連結機構47を
介して取り付けられている。連結機構47に取り付けら
れた状態で、牽引桁46を説明すると、図12および図
13に示すように、足場52への取り付け部である基部
56に、上に延びる複数のホイルユニット取付部57
が、基部56の長さ方向に等間隔をおいて一体に設けら
れたもので、側面(外側)から見ると全体が櫛状で、ホ
イルユニット取付部57を含む部分の断面はL字状に形
成されている。
The tow girder 46 has a length corresponding to the entire length of the scaffold 52, and is attached to the tip of the scaffold 52 via the connecting mechanism 47. The towing girder 46 attached to the connecting mechanism 47 will be described. As shown in FIGS. 12 and 13, a plurality of wheel unit attachment portions 57 extending upward are provided on a base 56 which is an attachment portion to the scaffold 52.
However, they are integrally provided at equal intervals in the length direction of the base 56, and when viewed from the side (outside), the whole is comb-shaped, and the cross section of the portion including the wheel unit mounting portion 57 is L-shaped. Is formed.

【0050】基部56ないしホイルユニット取付部57
は、山形鋼等の型鋼が組まれてなるもので、各ホイルユ
ニット取付部57の上端部における前後端面には、図1
4に示すように、ホイルユニット4を、隣り合うホイル
ユニット取付部57の間に装着するための板状のステー
58が溶接されている。これらステー58は、前後方向
に沿って延びており、ボルト通し孔58aがあけられ、
外面には、ボルト通し孔58aに通される、ホイルユニ
ット装着用のボルト59がねじ込まれるナット60が溶
接されている。
Base 56 to wheel unit mounting portion 57
Is formed by assembling a shape steel such as an angle iron, and the front and rear end surfaces at the upper end of each wheel unit mounting portion 57 are formed as shown in FIG.
As shown in FIG. 4, a plate-like stay 58 for mounting the wheel unit 4 between the adjacent wheel unit mounting portions 57 is welded. These stays 58 extend in the front-rear direction, are provided with bolt through holes 58a,
The outer surface is welded to a nut 60 into which a bolt 59 for mounting a wheel unit is screwed, which is passed through a bolt through hole 58a.

【0051】前記基部56の前後の端部および足場52
の外側に向いた先端の前後の端部には、両者の連結を図
るための前記連結機構47が設けられている。
The front and rear ends of the base 56 and the scaffold 52
The connecting mechanism 47 for connecting the both is provided at the front and rear ends of the tip facing outward.

【0052】この連結機構47は、ウェブ61aの両端
にフランジ61bを有するコ字状の縦ブラケット61
と、この縦ブラケット61と同様の、ウェブ62aおよ
び両端のフランジ62bを有する横ブラケット62と
が、フランジ61b、62bどうしを互いに向かい合わ
せた状態で十字状に交差して配され、十字状の連結軸6
3の、縦軸63aが縦ブラケット61の各フランジ61
bに貫通され、横軸63bが横ブラケット62の各フラ
ンジ62bに貫通され、この連結軸63の各軸63a、
63bの交差部に四角い枠状のばね座64が固定され、
各軸63a、63bの外周であって、縦ブラケット61
の各フランジ61bとばね座64との間、および横ブラ
ケット62の各フランジ62bとばね座64との間に、
コイルばね(緩衝機構)65、66がそれぞれ介装さ
れ、さらに、牽引桁46における基部56の側部に、L
字金具67を介してガイドホイル68が設けられて、構
成されている。
The connecting mechanism 47 includes a U-shaped vertical bracket 61 having flanges 61b at both ends of a web 61a.
And a horizontal bracket 62 similar to the vertical bracket 61 and having a web 62a and flanges 62b at both ends are arranged in a cross-like manner with the flanges 61b and 62b facing each other, and are connected in a cross-like manner. Axis 6
The vertical axis 63a of each of the three flanges 61 of the vertical bracket 61
b, the horizontal shaft 63b is penetrated by each flange 62b of the horizontal bracket 62, and each shaft 63a of this connecting shaft 63,
A rectangular frame-shaped spring seat 64 is fixed to the intersection of 63b,
The outer periphery of each shaft 63a, 63b,
Between each flange 61b and the spring seat 64, and between each flange 62b of the horizontal bracket 62 and the spring seat 64,
Coil springs (buffer mechanisms) 65 and 66 are interposed respectively, and L
A guide wheel 68 is provided via a metal fitting 67 and configured.

【0053】前記縦ブラケット61は、ウェブ61aが
牽引桁46の基部56の前後の端面に固着され、また、
横ブラケット62は、ウェブ62aが、足場52の外側
に向いた先端の前後の端面に、図示せぬステーを介して
固着されている。連結軸63の各軸63a、63bは、
それぞれ各ブラケット61、62の各フランジ61b、
62bに遊貫しており、連結軸63と縦ブラケット61
とは、縦軸63aに沿って上下方向に相対的にスライド
可能で、連結軸63と横ブラケット62とは、横軸63
bに沿って横方向に相対的にスライド可能となってい
る。それら相対的なスライドは、各コイルばね65、6
6により規制かつ緩衝されるようになっている。
The vertical bracket 61 has a web 61a fixed to the front and rear end faces of the base 56 of the traction beam 46.
In the horizontal bracket 62, the web 62a is fixed to the front and rear end faces of the tip facing the outside of the scaffold 52 via a stay (not shown). Each shaft 63a, 63b of the connection shaft 63 is
Each flange 61b of each bracket 61, 62,
62b, the connecting shaft 63 and the vertical bracket 61
Is relatively slidable in the vertical direction along the longitudinal axis 63a, and the connecting shaft 63 and the lateral bracket 62 are
It is relatively slidable in the horizontal direction along b. The relative slides are provided by the respective coil springs 65, 6
6 is regulated and buffered.

【0054】牽引桁46の基部56の外側には、鉛直部
67aおよび水平部67bからなる複数の前記L字金具
67が、基部56の長さ方向に沿って等間隔に溶接さ
れ、これらL字金具67の鉛直部67aの先端部外面
に、水平面に沿って回転する前記ガイドホイル68が、
回転自在に装着されている。また、各L字金具67の
直部67aの下端部外面には、牽引機構69を構成する
ワイヤクリッパ70が、着脱可能に取り付けられるよう
になっている。このワイヤクリッパ70を含めた牽引機
構69は、後に説明する。
Outside the base 56 of the towing girder 46, a plurality of L-shaped fittings 67 each composed of a vertical portion 67a and a horizontal portion 67b are welded at regular intervals along the longitudinal direction of the base 56, and these L-shaped fittings 67 are welded. The guide wheel 68 that rotates along a horizontal plane is provided on the outer surface of the distal end of the vertical portion 67a of the metal fitting 67,
It is mounted rotatably. The lead of each L-shaped bracket 67
A wire clipper 70 constituting the traction mechanism 69 is detachably attached to the outer surface of the lower end of the straight portion 67a . The traction mechanism 69 including the wire clipper 70 will be described later.

【0055】据付作業台45と牽引桁46とは、連結機
構47により、相互の間隔が一定に保たれ、また、左右
のガイドホイル68の先端間は、前記基礎側壁6の側面
6b間よりもやや広く設定されている。そして、据付作
業台45を走行させてトンネルT内に入れていくと、左
右のガイドホイル68が両側の基礎側壁6の側面6bに
当たって牽引桁46がトンネルTの内側に移動し、かつ
コイルばね66の力により、左右のガイドホイル68
は、トンネルTの幅方向外側にそれぞれ付勢され、側面
6bに圧接される。これによって、据付作業台45は、
その幅方向中央がトンネルTのそれに一致し、左右の牽
引桁46と両側の基礎側壁6の側面6bとの間の間隔は
一定に保たれる。
The installation worktable 45 and the towing girder 46 are kept at a constant distance from each other by a connecting mechanism 47, and the distance between the tips of the left and right guide wheels 68 is smaller than that between the side surfaces 6b of the foundation side wall 6. It is set somewhat wide. Then, when the installation work table 45 is run and put into the tunnel T, the left and right guide wheels 68 hit the side surfaces 6b of the base side walls 6 on both sides, and the tow girders 46 move inside the tunnel T, and
By the force of the coil spring 66 , the left and right guide wheels 68
Are urged outward in the width direction of the tunnel T, and are pressed against the side surface 6b. Thereby, the installation worktable 45 is
The center in the width direction coincides with that of the tunnel T, and the distance between the left and right traction girders 46 and the side surfaces 6b of the base side walls 6 on both sides is kept constant.

【0056】また、牽引桁46の動きが上下および左右
方向の動きが拘束されていて(すなわち縦ブラケット6
1が動かない)、たとえばトンネルT内の路面1の凹凸
等により、据付作業台45に、上下あるいはトンネル幅
方向に動かされる力が与えられると、横ブラケット62
が連結軸63の縦軸63aに沿って上下にスライドする
か、あるいは横ブラケット62が連結軸63の横軸63
bに沿ってトンネル幅方向にスライドすることにより、
据付作業台45はこれらの方向に移動し、かつ各コイル
ばね65、66の力により、常に元の姿勢(位置)に戻
される力を受ける。
Further, the movement of the towing girder 46 is restricted in the vertical and horizontal movements (ie, the vertical bracket 6).
1 does not move), for example, when the installation work table 45 is given a force to be moved up and down or in the width direction of the tunnel by the unevenness of the road surface 1 in the tunnel T, etc.
Slides up and down along the longitudinal axis 63a of the connecting shaft 63, or the horizontal bracket 62
By sliding along the tunnel width direction along b
The installation worktable 45 moves in these directions, and receives a force that always returns to the original posture (position) by the force of the coil springs 65 and 66.

【0057】さて、ホイルユニット4は、上記牽引桁4
6の各ホイルユニット取付部57のステー58の間に架
け渡される状態で、これらホイルユニット取付部57に
着脱可能に取り付けられるようになっている。
Now, the wheel unit 4 is provided with
6 in such a state that it is bridged between the stays 58 of the respective wheel unit mounting portions 57, and is detachably mounted on these wheel unit mounting portions 57.

【0058】このホイルユニット4を、図5、図13、
図14、図15、図16および図17を参照して、ステ
ー58に取り付けられた状態で説明すると、このホイル
ユニット4は、鉛直ホイル71および水平ホイル72
と、鉛直ホイル71を回転自在に支持した状態でこの鉛
直ホイル71を収納し、牽引桁46に着脱可能に取り付
けられるケーシング73と、このケーシング73に一体
に固定されて水平ホイル72を支持するブラケット74
等を備えており、鉛直ホイル71が前記基礎側壁6の上
面6aを転動し、水平ホイル72が基礎側壁6の側面6
bを転動していくよう構成されている。
This wheel unit 4 is shown in FIGS.
Referring to FIG. 14, FIG. 15, FIG. 16, and FIG. 17, when the wheel unit 4 is attached to the stay 58, the wheel unit 4 includes a vertical wheel 71 and a horizontal wheel 72.
And a casing 73 that accommodates the vertical foil 71 while rotatably supporting the vertical foil 71 and that is detachably attached to the traction girder 46, and a bracket that is integrally fixed to the casing 73 and supports the horizontal foil 72. 74
The vertical wheel 71 rolls on the upper surface 6a of the base side wall 6, and the horizontal wheel 72 is mounted on the side surface 6 of the base side wall 6.
It is configured to roll b.

【0059】ケーシング73は、鋼板を組み立てて形成
されたもので、左右対称の形状をなし、上から見ると先
端側がやや細くテーパ状に形成された前部75に、ブラ
ケット板76を介して、直方体状の後部77が固定され
てなる。
The casing 73 is formed by assembling steel plates and has a symmetrical shape. When viewed from above, a front part 75 having a slightly thinner tapered end when viewed from above is provided with a bracket plate 76 interposed therebetween. A rectangular parallelepiped rear portion 77 is fixed.

【0060】前部75および後部77の内部には、軸受
板78、79がそれぞれ設けられており、また、後部7
7の後端には、フランジ板80が溶接されている。ま
た、前部75の先端側の下部には、開口部75aが形成
されている。
Bearing plates 78 and 79 are provided inside the front part 75 and the rear part 77, respectively.
A flange plate 80 is welded to the rear end of 7. In addition, an opening 75a is formed in a lower portion on the front end side of the front portion 75.

【0061】フランジ板80は、横に長く延びており、
その両端部に、牽引桁46のステー58への連結用の前
記ボルト59を通すための長孔80bが形成されてい
る。
The flange plate 80 extends laterally long,
Elongated holes 80b are formed at both ends thereof for passing the bolts 59 for connecting the traction girders 46 to the stays 58.

【0062】前部75を構成する前端板81、各軸受板
78、79、ブラケット板76およびフランジ板80に
は、軸孔81a、78a、79a、76a、80aがそ
れぞれ形成されており、これら軸孔81a、78a、7
9a、76a、80aに、前記鉛直ホイル71の軸82
が通されている。
The front end plate 81, the bearing plates 78 and 79, the bracket plate 76 and the flange plate 80 constituting the front part 75 are formed with shaft holes 81a, 78a, 79a, 76a and 80a, respectively. Holes 81a, 78a, 7
9a, 76a, 80a, the axis 82 of the vertical foil 71
Has been passed.

【0063】この軸82は、先端部の小径部82aおよ
び他の部分の大径部82bが形成され、小径部82aの
先端にねじ部82cが形成され、大径部82bの先端に
ボルト頭部82dが形成されている。ねじ部82cは、
小径部82aよりも径がやや小さく、ねじ部82cと小
径部82aの間、および小径部82aと大径部82bの
間には、それぞれ段部82e、82fが形成されてい
る。ねじ部82cは、コンクリート版3のホイルユニッ
ト装着口16に設けられた前記ホイルユニット取付金具
19に溶接されたナット21に、ねじ込み可能となって
いる。
The shaft 82 has a small-diameter portion 82a at the distal end and a large-diameter portion 82b at another portion, a screw portion 82c at the distal end of the small-diameter portion 82a, and a bolt head at the distal end of the large-diameter portion 82b. 82d are formed. The screw portion 82c is
The diameter is slightly smaller than the small diameter portion 82a, and steps 82e and 82f are formed between the screw portion 82c and the small diameter portion 82a and between the small diameter portion 82a and the large diameter portion 82b, respectively. The screw portion 82c can be screwed into a nut 21 welded to the wheel unit mounting bracket 19 provided in the wheel unit mounting opening 16 of the concrete plate 3.

【0064】そして、この軸82は、ねじ部82c側か
ら、フランジ板80、軸受板79、ブラケット板76、
軸受板78の各軸孔80a、79a、76a、78aに
通され、開口部75aから前部75内に挿入された鉛直
ホイル71の軸芯に通された後、ねじ部82cが前端板
81の軸孔81aに挿入される。この状態で、軸82の
段部82e、82fは、それぞれ前端板81、軸受板7
8に係止し、それ以上の挿入が阻止される。
The shaft 82 is formed by a flange plate 80, a bearing plate 79, a bracket plate 76,
After passing through the shaft holes 80a, 79a, 76a, 78a of the bearing plate 78 and the shaft of the vertical foil 71 inserted into the front part 75 from the opening part 75a, the screw part 82c of the front end plate 81 It is inserted into the shaft hole 81a. In this state, the steps 82e and 82f of the shaft 82 are respectively connected to the front end plate 81 and the bearing plate 7
8 to prevent further insertion.

【0065】上記構成のホイルユニット4は、コンクリ
ート版3のホイルユニット装着口16に前部75から挿
入すると、前記ホイルユニット取付金具19の透孔20
をねじ部82cが通りナット21に当たる。そして、ボ
ルト頭部82dを利用してねじ部82cをナット21に
ねじ込むことにより、前部75がホイルユニット装着口
16内に嵌合するようになっている。軸82のねじ部8
2cをナット21にねじ込むと、段部82fが軸受板7
8に対し係止状態となっているから締結力が発生し、こ
れによって、ケーシング73に対する軸82の固定ない
しホイルユニット4自体のコンクリート版3のホイルユ
ニット装着口16に対する固定がなされる。この状態
で、鉛直ホイル71は軸82に対し回転自在に装着さ
れ、その下端周面は、前部75の開口部75aより僅か
に下に出て、コンクリート版3の下面から突出する。
When the wheel unit 4 having the above structure is inserted into the wheel unit mounting opening 16 of the concrete plate 3 from the front part 75, the through holes 20 of the wheel unit mounting bracket 19 are formed.
Through the screw portion 82c and hit the nut 21. By screwing the screw portion 82c into the nut 21 using the bolt head 82d, the front portion 75 fits into the wheel unit mounting opening 16. Screw part 8 of shaft 82
When the screw 2c is screwed into the nut 21, the stepped portion 82f
As a result, the shaft 82 is fixed to the casing 73 or the concrete unit 3 of the wheel unit 4 itself is fixed to the wheel unit mounting opening 16 of the concrete unit 3. In this state, the vertical foil 71 is rotatably mounted on the shaft 82, and its lower end peripheral surface projects slightly below the opening 75 a of the front part 75 and projects from the lower surface of the concrete plate 3.

【0066】なお、前記フランジ板80には、軸82の
ボルト頭部82dの回動操作を許容する大きさを有する
透孔83aがあけられた、当て板83がビス止めされて
いる。
The flange plate 80 is screwed with a backing plate 83 having a through hole 83a large enough to allow the bolt head 82d of the shaft 82 to be turned.

【0067】前記ブラケット板76は上下に延びてお
り、ケーシング73より上の上部84は三角形状に形成
され、その上端部には、ピン通し孔84aがあけられて
いる。このピン通し孔84aには、ホイルユニット4を
コンクリート版3に仮止めするため前記インサート金具
22に挿入するピン85が通される。
The bracket plate 76 extends vertically, and an upper portion 84 above the casing 73 is formed in a triangular shape, and a pin through hole 84a is formed in an upper end portion thereof. A pin 85 to be inserted into the insert fitting 22 for temporarily fixing the wheel unit 4 to the concrete slab 3 is passed through the pin through hole 84a.

【0068】ブラケット板76の、ケーシング73より
下に延びる下部86の下端には、水平ホイル72のブラ
ケット74が固着されている。
The bracket 74 of the horizontal wheel 72 is fixed to the lower end of a lower portion 86 of the bracket plate 76 extending below the casing 73.

【0069】このブラケット74は、鋼鈑製の上板8
7、下板88、縦板89により、前記ケーシング73の
前部75側に開口するコ字状に組まれたもので、上板8
7の端部が、ブラケット板76の下部86の下端に溶接
されており、さらにこのブラケット74には、縦板89
の上端からケーシング73の後部77にわたって、補強
板90が溶接されている。
The bracket 74 is made of a steel plate upper plate 8.
7, a lower plate 88 and a vertical plate 89, which are assembled in a U-shape opening toward the front part 75 of the casing 73.
7 is welded to the lower end of the lower portion 86 of the bracket plate 76.
A reinforcing plate 90 is welded from the upper end of the casing 73 to the rear portion 77 of the casing 73.

【0070】このブラケット74の上板87と下板88
の間に軸91が取り付けられ、この軸91に、水平ホイ
ル72が回転自在に装着され、この状態で、水平ホイル
72の外側の周面は、ブラケット74からやや外側に突
出する。
The upper plate 87 and the lower plate 88 of the bracket 74
A horizontal wheel 72 is rotatably mounted on the shaft 91. In this state, the outer peripheral surface of the horizontal wheel 72 protrudes slightly outward from the bracket 74.

【0071】水平ホイル72の軸方向長さ(厚さ)は、
上板87と下板88の間隔よりも短く、また、軸91
は、上板87および下板88に対し上下に摺動可能とさ
れ、水平ホイル72は軸91とともに上下に移動可能と
なっている。そして通常は、上板87から上方に突出し
た端部に外装され、軸91の上端に取り付けられたばね
座92と上板87間に介装されたコイルばね93によ
り、上方に付勢されている。
The axial length (thickness) of the horizontal wheel 72 is
The distance between the upper plate 87 and the lower plate 88 is shorter than
Can be slid up and down with respect to an upper plate 87 and a lower plate 88, and the horizontal wheel 72 can move up and down together with a shaft 91. Normally, the coil spring 93 is provided between the spring seat 92 attached to the upper end of the shaft 91 and the coil spring 93 interposed between the spring plate 92 and the upper end of the shaft 91. .

【0072】上記水平ホイル72は、ホイルユニット4
を、上述したようにコンクリート版3のホイルユニット
装着口16に装着されると、その外側の周面は、ブラケ
ット板76よりもやや外側に出る状態となる。
The horizontal wheel 72 is a wheel unit 4
Is mounted on the wheel unit mounting opening 16 of the concrete slab 3 as described above, the outer peripheral surface thereof is in a state of protruding slightly outside the bracket plate 76.

【0073】上記構成のホイルユニット4は、以下のよ
うにして、前記据付作業台45に設けられた牽引桁46
とコンクリート版3に取り付けられ、両者を連結する。
The wheel unit 4 having the above-described structure can be mounted on the towing girder 46 provided on the installation work table 45 as follows.
And the concrete plate 3 to connect the two.

【0074】まず、牽引桁46の隣り合うホイルユニッ
ト取付部57の間から、ホイルユニット4のケーシング
73の前部75を、コンクリート版3のホイルユニット
装着口16に嵌合するとともに、ブラケット板76の上
部84のピン通し孔84aを、前記インサート金具22
に合わせ、このピン通し孔84aとインサート金具22
にピン85を挿入し、ホイルユニット4をコンクリート
版3に仮止めする。
First, the front part 75 of the casing 73 of the wheel unit 4 is fitted into the wheel unit mounting opening 16 of the concrete slab 3 from between the adjacent wheel unit mounting parts 57 of the traction girders 46 and the bracket plate 76. The pin through hole 84a of the upper part 84 of the
And the pin fitting hole 84a and the insert fitting 22
, And the wheel unit 4 is temporarily fixed to the concrete slab 3.

【0075】次いで、前記フランジ板80の両端を、ホ
イルユニット取付部57から延出するステー58に当
て、両端の長孔80bを、ステー58のボルト通し孔5
8aに合わせる。そして、フランジ板80側から長孔8
0b、ボルト通し孔58aにボルト59を通し、ナット
60にねじ込む。
Next, both ends of the flange plate 80 are applied to stays 58 extending from the wheel unit mounting portion 57, and the long holes 80b of both ends are inserted into the bolt holes 5 of the stay 58.
8a. Then, from the flange plate 80 side, the slot 8
0b, the bolt 59 is passed through the bolt through hole 58a and screwed into the nut 60.

【0076】次に、牽引桁46の基部56の外側に溶接
されたL字金具67に装着される前記ワイヤクリッパ7
0を含む前記牽引機構69を説明する。
Next, the wire clipper 7 attached to the L-shaped bracket 67 welded to the outside of the base 56 of the towing girder 46.
The traction mechanism 69 including zero will be described.

【0077】この牽引機構69は、図13等に示すよう
に、前記搬送補助機構5をトンネルT内に搬送させてい
くためのもので、L字金具67の鉛直部67aに、ボル
ト94、ナット95により着脱自在に装着される前記ワ
イヤクリッパ70と、このワイヤクリッパ70に係止さ
れる牽引ワイヤ96と、前記基礎側壁6の側面6bに固
定されたワイヤハンガ97と、トンネルTの手前側(前
記組立架台2が設置された側)の出入り口および反対側
の出入り口にそれぞれ設けられる牽引ワイヤ駆動機構9
8および牽引ワイヤ緊張機構99とから構成されてい
る。
As shown in FIG. 13 and the like, the traction mechanism 69 is for transporting the transport auxiliary mechanism 5 into the tunnel T. The vertical portion 67a of the L-shaped bracket 67 has bolts 94 and nuts. The wire clipper 70 is detachably attached by a wire 95, a pulling wire 96 locked to the wire clipper 70, a wire hanger 97 fixed to the side surface 6b of the base side wall 6, and a near side of the tunnel T (the Pulling wire drive mechanisms 9 provided at the entrance and exit on the side where the assembly base 2 is installed) and on the opposite entrance and exit, respectively.
8 and a pulling wire tensioning mechanism 99.

【0078】ワイヤクリッパ70は、所定長さを有する
2枚の板状体70aが重ね合わされてトンネルTの長さ
方向に延びるもので、長さ方向に複数設けられたビス1
00により板状体70aの下端部どうしが接合され、そ
の対向面に形成された長さ方向に延びる溝101aが一
致してワイヤ係止孔101が形成され、上端部である折
り曲げ部分が、L字金具67への装着部となっている。
そして、ビス100を外した状態で、自由端部間を広げ
て牽引ワイヤ96の上巻部96aをワイヤ係止孔101
に嵌めてから、ビス100により板状体70aどうしを
締結すれば、牽引ワイヤ96はワイヤクリッパ70に装
着される。
The wire clipper 70 is formed by laminating two plate-like members 70a each having a predetermined length and extending in the length direction of the tunnel T. A plurality of screws 1 provided in the length direction are provided.
00, the lower ends of the plate-like members 70a are joined to each other, the grooves 101a extending in the longitudinal direction formed on the opposing surfaces thereof are aligned with each other to form a wire locking hole 101, and the bent portion, which is the upper end, is L It is a mounting part to the character fitting 67.
Then, with the screw 100 removed, the gap between the free ends is widened, and the upper winding portion 96a of the pulling wire 96 is inserted into the wire locking hole 101.
Then, if the plate-like members 70a are fastened to each other with the screw 100, the pulling wire 96 is attached to the wire clipper 70.

【0079】ワイヤハンガ97は、上下に延びる左右一
対の縦フレーム102と、これらフレーム102の下端
部を連結する横フレーム103と、各縦フレーム102
の内側にそれぞれ設けられた上下一対の縦ローラ104
(上側縦ローラ104a、下側縦ローラ104b)と、
各縦フレーム102間にわたって設けられた上下一対の
横ローラ105(上側横ローラ105a、下側横ローラ
105b)とを備えている。
The wire hanger 97 includes a pair of left and right vertical frames 102 extending vertically, a horizontal frame 103 connecting lower ends of these frames 102, and each vertical frame 102.
A pair of upper and lower vertical rollers 104 respectively provided inside
(Upper vertical roller 104a, lower vertical roller 104b),
A pair of upper and lower horizontal rollers 105 (upper horizontal roller 105a, lower horizontal roller 105b) are provided between the vertical frames 102.

【0080】各縦ローラ104a、104bは、一体に
回転するよう連結され、さらに、上側横ローラ105a
は、軸受106aを介して各縦ローラ104a、104
bに連結され、下側横ローラ105bは、軸受106b
を介して下側縦ローラ104bに連結されており、各ロ
ーラ104a、104b、105a、105bのうち、
連結されたものどうしが、いずれかが回転すれば一体に
回転するようになっている。
Each of the vertical rollers 104a and 104b is connected so as to rotate integrally, and furthermore, the upper horizontal roller 105a
Is connected to each of the longitudinal rollers 104a, 104 via a bearing 106a.
b, and the lower lateral roller 105b is
Are connected to the lower vertical roller 104b through the rollers 104a, 104b, 105a, and 105b.
If one of the connected objects rotates, the other rotates together.

【0081】各縦ローラ104a、104bと各横ロー
ラ105a、105bとの間の隙間は、牽引ワイヤ96
が嵌まり込まない程度にまで、きわめて小さく設定され
ている。
The gap between each vertical roller 104a, 104b and each horizontal roller 105a, 105b is
Is set very small to the extent that does not fit.

【0082】上記構成のワイヤハンガ97は、その一方
の縦フレーム102が、前記組立架台2における水平ホ
イル走路桁26の下桁28の側面28aと、基礎側壁6
の側面6bとに、適宜間隔をおいて、ボルト止め等の手
段により固定される。固定される高さ位置は、前記据付
作業台45を路面1上に置いた状態で、前記ワイヤクリ
ッパ70の下端部が、左右の上側縦ローラ104aの間
に配される位置に設定する。
In the wire hanger 97 having the above-described structure, one of the vertical frames 102 has the side surface 28 a of the lower girder 28 of the horizontal wheel runway girder 26 in the assembling gantry 2 and the side wall 6
It is fixed to the side surface 6b by means such as bolting at an appropriate interval. The fixed height position is set to a position where the lower end of the wire clipper 70 is disposed between the left and right upper vertical rollers 104a in a state where the installation worktable 45 is placed on the road surface 1.

【0083】前記牽引ワイヤ駆動機構98は、前記左右
一対の組立架台2の端部に設置されたジャッキフレーム
107に設けられている。
The pulling wire drive mechanism 98 is provided on a jack frame 107 installed at the end of the pair of right and left assembly frames 2 .

【0084】ジャッキフレーム107は、図1および図
18に示すように、路面1の両側に立設された左右一対
の鉛直柱108の上端部間に、水平に梁109が架け渡
されてなるもので、各鉛直柱108および梁109は、
断面正方形状の中空形鋼からなり、互いに溶接により接
合されている。
As shown in FIGS. 1 and 18, the jack frame 107 is formed by horizontally extending a beam 109 between the upper ends of a pair of right and left vertical columns 108 erected on both sides of the road surface 1. Then, each vertical column 108 and beam 109 are
It is made of hollow section steel having a square cross section and is joined to each other by welding.

【0085】そして、牽引ワイヤ駆動機構98は、図1
8および図19に示すように、梁109の中央の前面
つまり、トンネルTの軸方向に直交する梁109の表裏
面の内のトンネルTの構築側と反対側の面に取り付けら
れたギヤドモータ110と、梁109の中央内に配され
ギヤドモータ110により作動させられる差動ギヤ11
1と、梁109内に配されて差動ギヤ111に連結され
た左右一対の第1の駆動シャフト112と、各鉛直柱1
08内に配されて各第1の駆動シャフト112に第1の
ベベルギヤ113を介して連結された各第2の駆動シャ
フト114と、各鉛直柱108の内側の側面に取り付け
られ、各第2の駆動シャフト114の下端に第2のベベ
ルギヤ115を介して連結された各ワイヤキャプスタン
116とから構成されている。
Then, the pulling wire drive mechanism 98 is the same as that shown in FIG.
As shown in 8 and 19, the front of the center of the beam 109,
That is, the front and back of the beam 109 orthogonal to the axial direction of the tunnel T
A geared motor 110 mounted on a surface opposite to the building side of the tunnel T of the surface, the differential is operated by a geared motor 110 disposed within the center of the beam 109 gear 11
A pair of left and right first drive shafts 112 arranged in a beam 109 and connected to a differential gear 111;
08, each second drive shaft 114 connected to each first drive shaft 112 via a first bevel gear 113, and attached to the inner side surface of each vertical column 108, Each wire capstan 116 is connected to the lower end of the drive shaft 114 via a second bevel gear 115.

【0086】また、前記牽引ワイヤ緊張機構99は、図
19に示すように、ジャッキフレーム107が設けられ
た側とは反対側のトンネルTの出入り口の左右に配され
た反力台117と、この反力台117にねじ結合される
とともにワイヤシーブ118がその先端に取り付けられ
たハンドル119とから構成されている。
Further, as shown in FIG. 19, the pulling wire tensioning mechanism 99 includes a reaction force table 117 disposed on the left and right of the entrance and exit of the tunnel T on the side opposite to the side where the jack frame 107 is provided. The wire sheave 118 is screw-connected to the reaction table 117 and has a handle 119 attached to the tip thereof.

【0087】これら牽引ワイヤ駆動機構98と牽引ワイ
ヤ緊張機構99によれば、牽引ワイヤ96を、少なくと
もワイヤキャプスタン116に複数回(3〜4回)巻い
た状態でこのワイヤキャプスタン116とワイヤシーブ
118とに巻回し、ハンドル119を回転させて反力台
117に反力を取り牽引ワイヤ96を適宜な張力に至る
まで緊張する。この状態からギヤドモータ110を作動
させると、その駆動力は、差動ギヤ111、第1の駆動
シャフト112、第1のベベルギヤ113、第2の駆動
シャフト114、第2のベベルギヤ115を経てワイヤ
キャプスタン116に伝わり、このワイヤキャプスタン
116の回転により、牽引ワイヤ96は、図19におい
て矢印(イ:送り方向)あるいは矢印(ロ:戻し方向)
に作動する。
According to the pulling wire driving mechanism 98 and the pulling wire tensioning mechanism 99, the pulling wire 96 is wound around the wire capstan 116 at least a plurality of times (3 to 4 times) and the wire capstan 116 and the wire sheave 118 are wound. Then, the handle 119 is rotated to take a reaction force on the reaction force table 117, and the pulling wire 96 is tensioned until it reaches an appropriate tension. When the geared motor 110 is operated from this state, the driving force is transmitted through the differential gear 111, the first drive shaft 112, the first bevel gear 113, the second drive shaft 114, and the second bevel gear 115 to the wire capstan. The rotation of the wire capstan 116 causes the pulling wire 96 to move as shown by an arrow (a: feed direction) or an arrow (b: return direction) in FIG.
Activate

【0088】ワイヤキャプスタン116に対し牽引ワイ
ヤ96は複数回巻かれているから、ワイヤキャプスタン
116の回転が摩擦力により牽引ワイヤ96に伝わる。
また、ギヤドモータ110の駆動力による各第1の駆動
シャフト112の回転は、差動ギヤ111により互いに
逆回転になり、その結果、左右の牽引ワイヤ96の作動
方向は同じになる。
Since the pulling wire 96 is wound around the wire capstan 116 a plurality of times, the rotation of the wire capstan 116 is transmitted to the pulling wire 96 by frictional force.
Further, the rotation of each first drive shaft 112 due to the driving force of the geared motor 110 is reversed by the differential gear 111, and as a result, the operating directions of the left and right pulling wires 96 become the same.

【0089】また、前記ジャッキフレーム107には、
前記左右一対の組立架台2上において複数(この場合6
つ)のコンクリート版3によりユニットUを組み立てる
際、左側の組立架台2上に設置する1つ目のコンクリー
ト版3を支持するための、トンネルT側に延びるアーム
ジャッキ120が設けられている。
Also, the jack frame 107 has:
A plurality (6 in this case, 6)
When the unit U is assembled with the concrete slab 3), an arm jack 120 is provided extending to the tunnel T side to support the first concrete slab 3 installed on the left assembling gantry 2.

【0090】このアームジャッキ120は、図21およ
び図22に示すように、先端に膨出部121を有するア
ーム本体122の先端に、ジャッキ123とコンクリー
ト版支持部124とを備えている。
As shown in FIGS. 21 and 22, the arm jack 120 has a jack 123 and a concrete plate support 124 at the tip of an arm body 122 having a bulge 121 at the tip.

【0091】アーム本体122は、鋼板を適宜に成形し
て溶接により接合した断面矩形状の中空体であり、前後
方向に沿って、かつ斜め上方に立ち上がった状態で、前
記ジャッキフレーム107の梁109の中央やや左寄り
に、その基端が溶接されている。
The arm body 122 is a hollow body having a rectangular cross section formed by appropriately forming a steel plate and joining by welding. The arm body 122 stands up in the front-back direction and diagonally upward, and The base is welded slightly to the left of the center.

【0092】ジャッキ123は、内周面にねじ山が形成
され、その軸線が鉛直方向に沿って互いに同軸的な状態
で、アーム本体122の膨出部121の先端に溶接され
た上下一対のねじ筒125、126と、これらねじ筒1
25、126にねじ込まれ、略中央にナット127aを
一体に有するボルト127と、このボルト127の上端
に回動可能かつ脱落不能に取り付けられた受け板128
とから構成されている。
The jack 123 has a pair of upper and lower screws welded to the tip of the bulging portion 121 of the arm body 122 in a state where a screw thread is formed on the inner peripheral surface and their axes are coaxial with each other along the vertical direction. Cylinders 125 and 126 and these screw cylinders 1
A bolt 127 which is screwed into each of the bolts 25 and 126 and integrally has a nut 127a at substantially the center thereof,
It is composed of

【0093】前記コンクリート版支持部124は、アー
ム本体122の膨出部121における、ジャッキ123
よりも手前側の一方の側面(この場合トンネルTに向か
って左側の面、図22では右側となっている)に設けら
れ、その側面に固定された円筒状のガイド129と、こ
のガイド129に摺動可能に挿入されたスライド軸13
0と、このスライド軸130の一端に固着された支持プ
レート131とからなる。
The concrete slab support portion 124 is provided with a jack 123 in the bulging portion 121 of the arm body 122.
The guide 129 is provided on one side (the left side facing the tunnel T in this case, the right side in FIG. 22 in this case) and fixed to the side. Slide shaft 13 slidably inserted
0, and a support plate 131 fixed to one end of the slide shaft 130.

【0094】ガイド129は、膨出部67の側面に、軸
線が鉛直方向に沿った状態でその外周部が溶接されてお
り、支持プレート131を上にして、スライド軸130
がガイド129に摺動可能に挿入されている。支持プレ
ート131は、スライド軸130に直交する水平プレー
ト131aと、この水平プレート131aの一側(この
場合トンネルTに向かって左側)に溶接され、ボルト通
し孔(図示略)があけられた鉛直プレート131bから
なる断面L字状のものである。
The outer periphery of the guide 129 is welded to the side surface of the bulging portion 67 with the axis line extending in the vertical direction.
Are slidably inserted into the guide 129. The support plate 131 is a horizontal plate 131a orthogonal to the slide shaft 130, and a vertical plate which is welded to one side (in this case, the left side toward the tunnel T) of the horizontal plate 131a and has a bolt through hole (not shown). L-shaped section 131b.

【0095】上記構成のアームジャッキ120によれ
ば、まず、左側の組立架台2上に設置する1つ目のコン
クリート版3の上端部の下面を、ジャッキ123の受け
板128で受け、かつ、ナット127aをラチェット式
スパナ132で適宜な方向に回転させることにより、受
け板128の高さを調整してコンクリート版3の姿勢を
調整する。次いで、コンクリート版支持部124のスラ
イド軸130を上に摺動させ、支持プレート131の鉛
直プレート131bのボルト通し孔を、コンクリート版
3における上端接合面3aの継手金具7のボルト通し孔
に合わせる。そして、これらボルト通し孔に通したボル
ト133にナット134をねじ込んで支持プレート13
1と継手金具7とを結合する。これによって、アームジ
ャッキ120は、左側に載せた1つ目のコンクリート版
3を支持する。
According to the arm jack 120 configured as described above, first, the lower surface of the upper end of the first concrete plate 3 installed on the left assembling stand 2 is received by the receiving plate 128 of the jack 123 and the nut By rotating 127 a in an appropriate direction with a ratchet type spanner 132, the height of the receiving plate 128 is adjusted to adjust the posture of the concrete plate 3. Next, the slide shaft 130 of the concrete slab support portion 124 is slid upward, and the bolt through hole of the vertical plate 131b of the support plate 131 is aligned with the bolt through hole of the joint fitting 7 at the upper end joining surface 3a of the concrete slab 3. Then, the nut 134 is screwed into the bolt 133 passed through these bolt through holes, and
1 and the joint fitting 7 are connected. Thereby, the arm jack 120 supports the first concrete plate 3 placed on the left side.

【0096】このように、アームジャッキ120により
コンクリート版3を支持した状態で、ジャッキ123の
受け板128は、図22に示すように、コンクリート版
3の幅の略中央の部分の下面に位置するよう設定され、
さらに、コンクリート版3に形成されたホイルユニット
装着口16は、図7に示すように、組立架台2の主桁2
4における水平ホイルセット部33のちょうど上に位置
するようになっている。
With the concrete plate 3 supported by the arm jack 120 in this manner, the receiving plate 128 of the jack 123 is located on the lower surface of the substantially central portion of the width of the concrete plate 3, as shown in FIG. Is set as
Further, as shown in FIG. 7, the wheel unit mounting opening 16 formed in the concrete plate 3 is
4 is located just above the horizontal wheel set portion 33.

【0097】なお、前記ジャッキフレーム107には、
図12に示すように、作業用の足場となるラダー13
5、足場136がそれぞれ設けられている。
Note that the jack frame 107 has:
As shown in FIG. 12, a ladder 13 serving as a work scaffold is provided.
5. A scaffold 136 is provided.

【0098】続いて、前記左右一対の組立架台2上にお
いて、複数のコンクリート版3をアーチ状に組み、かつ
相互に接合して1つのコンクリート版ユニットUを組み
立てる手順を、図1、図7、図23等を参照して以下に
説明する。なお、コンクリート版3の移送ならびに姿勢
の調整は、クレーンKおよび吊下げワイヤWで行う。
Next, the procedure of assembling a plurality of concrete slabs 3 in an arch shape on the pair of left and right assembling bases 2 and joining them together to assemble one concrete slab unit U will be described with reference to FIGS. This will be described below with reference to FIG. The transfer of the concrete slab 3 and the adjustment of the posture are performed by the crane K and the suspension wire W.

【0099】まず、左右の組立架台2の主桁24を、前
記ジャッキ34により上昇させて上限位置に設定し、各
支持台32の上面32aを、鉛直ホイル走路桁25の上
面25aから突出した状態とする。次いで、トンネルT
に向かって左側の組立架台2の手前側(ジャッキフレー
ム107側)の端部上であって、各支持台32(の上面
32a)の上に、1つ目のコンクリート版3ー1(第1
コンクリート版3ー1)を、湾曲方向をトンネルTのそ
れに沿った姿勢としてその脚部3Aを載置する。第1コ
ンクリート版3ー1は、その幅方向端部が、手前側の2
つのポスト23の上に位置し、その端部および中央部
が、支持台32の上に載置された状態、すなわち、3つ
の支持台32の上にまたがって載置された状態となる。
First, the main girders 24 of the left and right assembling gantry 2 are raised by the jacks 34 and set at the upper limit positions, and the upper surfaces 32a of the respective support stands 32 project from the upper surfaces 25a of the vertical wheel runway girder 25. And Next, tunnel T
The first concrete plate 3-1 (the first concrete plate) 3-1 (the first upper surface 32a) is located on the front end (the jack frame 107 side) of the assembly base 2 on the left side toward
The leg 3A is placed on the concrete slab 3-1) with the bending direction oriented along the tunnel T. The first concrete slab 3-1 has an end in the width direction that is closer to the front side.
It is located on the three posts 23, and the end and the center thereof are placed on the support 32, that is, placed on the three supports 32.

【0100】上記のように、第1コンクリート版3ー1
の脚部3Aが左側の組立架台2上に載置された状態を、
クレーンKで保持しながら、第1コンクリート版3ー1
の上端接合面3aに設けられている2つの継手金具7の
うちの、手前側の継手金具7が、アームジャッキ120
のコンクリート版支持部124における支持プレート1
31の鉛直プレート131bに合致するよう、第1コン
クリート版3ー1の前後方向の位置を微調整する。そし
て、前述したように、第1コンクリート版3ー1の上端
部の下面を、前記ジャッキ123の受け板128で受
け、かつ、ボルト127のナット127aをラチェット
式スパナ132により適宜な方向に回転させ、受け板1
28による支持高さを調整して、第1コンクリート版3
ー1の上下の揺動方向の姿勢を調整し、コンクリート版
支持部124の支持プレート131(の鉛直プレート1
31b)と継手金具7とを、ボルト133、ナット13
4により結合する。
As described above, the first concrete slab 3-1
The state in which the leg 3A is placed on the left assembly stand 2,
1st concrete slab 3-1 while holding with crane K
Of the two fittings 7 provided on the upper end joint surface 3a of the arm jack 120 is the arm jack 120
Plate 1 in concrete slab support portion 124
The position of the first concrete slab 3-1 in the front-rear direction is finely adjusted so as to match the vertical plate 131b of the first slab 31. Then, as described above, the lower surface of the upper end of the first concrete plate 3-1 is received by the receiving plate 128 of the jack 123, and the nut 127a of the bolt 127 is rotated in an appropriate direction by the ratchet type spanner 132. , Backing plate 1
28, the first concrete slab 3
-1 is adjusted in the vertical swinging direction, and the vertical position of the support plate 131 of the concrete slab support portion 124 is adjusted.
31b) and the joint fitting 7 with the bolt 133 and the nut 13
4 for binding.

【0101】上記のようにして、左側の組立架台2上に
載置した第1コンクリート版3ー1をアームジャッキ1
20で支持したら、次いで、右側の組立架台2の主桁2
4の支持台32(の上面32a)の上に、第1コンクリ
ート版3ー1に対向させ、湾曲方向をトンネルTのそれ
に沿った姿勢とし、かつ、第1コンクリート版3ー1よ
りもその幅1/2トンネルT側にずらした状態で、2つ
目のコンクリート版3(第2コンクリート版3ー2)の
脚部3Aを載置し、その上端接合面3aを、第1のコン
クリート版3ー1の上端接合面3aに突き当てる。この
状態で、第2のコンクリート版3ー2は、第1のコンク
リート版3ー1に支えられ、その姿勢が保持される。
As described above, the first concrete plate 3-1 placed on the left assembling stand 2 is moved to the arm jack 1
20 and then the main girder 2 of the right assembly stand 2
4 on the (upper surface 32a of) the support 32, facing the first concrete slab 3-1 so that the bending direction is in a posture along that of the tunnel T, and is wider than the first concrete slab 3-1. The leg 3A of the second concrete slab 3 (the second concrete slab 3-2) is placed in a state shifted to the half tunnel T side, and the upper end joint surface 3a is connected to the first concrete slab 3 -1 against the upper end joining surface 3a. In this state, the second concrete slab 3-2 is supported by the first concrete slab 3-1 and its posture is maintained.

【0102】そして、互いに突き合わせられた各上端接
合面3aにおける、第1コンクリート版3ー1の継手金
具7(トンネルT側)と第2コンクリート版3ー2の継
手金具7(反トンネルT側)とを、ボルト・ナットによ
り結合して、第1および第2コンクリート版3ー1、3
ー2を接合する。
The joint 7 of the first concrete plate 3-1 (on the tunnel T side) and the joint 7 of the second concrete plate 3-2 (on the side opposite to the tunnel T) at the upper end joining surfaces 3a butted against each other. And the first and second concrete plates 3-1 and 3
-2 are joined.

【0103】次に、第1コンクリート版3ー1と同様に
して、3つ目のコンクリート版(第3コンクリート版3
ー3)を、左側の組立架台2の主桁24の支持台32の
上であって、第1コンクリート版3ー1の隣(トンネル
T側)に載置し、手前側の側端接合面3bを、第1コン
クリート版3ー1の側端接合面3bに合わせ、かつ、上
端接合面3aを、第2コンクリート版3ー2の上端接合
面3aに突き当てる。
Next, in the same manner as in the first concrete slab 3-1, the third concrete slab (the third concrete slab 3)
-3) is placed on the support 32 of the main girder 24 of the left assembling stand 2 and next to the first concrete slab 3-1 (the side of the tunnel T), and the side end joining surface on the near side is placed. 3b is aligned with the side end joining surface 3b of the first concrete slab 3-1 and the upper end joining surface 3a is abutted against the upper end joining surface 3a of the second concrete slab 2-2.

【0104】この状態で、第3コンクリート版3ー3
は、第2コンクリート版3ー2に支えられその姿勢が保
持されるとともに、第2コンクリート版3ー2の上端接
合面3aのトンネルT側の継手金具7と、第3コンクリ
ート版3ー3の上端接合面3aの手前側の継手金具7が
合致し、さらに、第1コンクリート版3ー1のトンネル
T側の側端接合面3bの継手金具7と、第3コンクリー
ト版3ー3の手前側の側端接合面3bの継手金具7とが
合致する。そして、これら上端接合面3aおよび側端接
合面3bの合致した継手金具7どうしを、ボルト・ナッ
トにより結合する。以上により、第1および第2コンク
リート版3ー1、3ー2に対する第3コンクリート版3
ー3の接合がなされる。
In this state, the third concrete plate 3-3
Is supported by the second concrete plate 3-2 and its posture is maintained, and the joint fitting 7 on the tunnel T side of the upper end joint surface 3a of the second concrete plate 3-2 and the third concrete plate 3-3 The joint fitting 7 on the near side of the upper end joining surface 3a is matched, and the joint fitting 7 on the side end joining surface 3b on the tunnel T side of the first concrete plate 3-1 and the near side of the third concrete plate 3-3. And the joint fitting 7 on the side end joining surface 3b. Then, the joint fittings 7 in which the upper end joint surface 3a and the side end joint surface 3b coincide with each other are joined by bolts and nuts. Thus, the third concrete plate 3 with respect to the first and second concrete plates 3-1 and 3-2
-3 is made.

【0105】以上と同様の工程を繰り返し、図23に示
すように、左側の組立架台2の支持台32の上に載置し
た、第1、第3、第5のコンクリート版3ー1、3ー
3、3ー5に対し、右側の第2、第4、第6のコンクリ
ート版3ー2、3ー4、3ー6を、トンネルT側に幅1
/2ずらした状態で接合する。このように、左右の組立
架台2の、上昇状態の主桁24における鉛直ホイル走路
桁25の上面25aから突出した支持台32の上で、計
6つのコンクリート版3(第1〜第6のコンクリート版
3ー1〜3ー6)をアーチ状に組み、1つのユニットU
を組み立てる。このユニットUの組み立ての最中、ある
いは組み立て後、アームジャッキ120と第1コンクリ
ート版3ー1との連結を外す。
The same steps as above are repeated, and as shown in FIG. 23, the first, third and fifth concrete plates 3-1 and 3 placed on the support 32 of the left assembling stand 2 -3, 3-5, the second, fourth, and sixth concrete slabs 3-2, 3-4, and 3-6 on the right side with a width of 1 on the tunnel T side.
/ 2 shifted. In this manner, a total of six concrete slabs 3 (first to sixth concrete slabs) are placed on the support base 32 of the left and right assembling gantry 2 projecting from the upper surface 25a of the vertical foil runway girder 25 of the main girder 24 in the raised state. Plates 3-1 to 3-6) are assembled in an arch shape and one unit U
Assemble. During or after the assembly of the unit U, the connection between the arm jack 120 and the first concrete plate 3-1 is disconnected.

【0106】このユニットUが組み立てられた状態で、
各コンクリート版3の各ホイルユニット装着口16は、
主桁24における水平ホイルセット部33のちょうど上
に位置する。また、ユニットUの各コンクリート版3
は、各支持台32上にあって、鉛直ホイル走路桁25の
上面25aから浮いた状態となっている。
In a state where the unit U is assembled,
Each wheel unit mounting port 16 of each concrete plate 3 is
It is located just above the horizontal wheel set part 33 in the main girder 24. In addition, each concrete plate 3 of unit U
Is on each support 32 and is in a state of floating from the upper surface 25a of the vertical foil runway girder 25.

【0107】なお、上記コンクリート版3どうしの接合
作業は、各組立架台2の各足場板42にわたって設けた
足場43に作業員が登り、かつ適宜に足場43を前後に
移動させながら行う。
The joining operation of the concrete slabs 3 is performed while an operator climbs a scaffold 43 provided over each scaffold plate 42 of each assembling base 2 and moves the scaffold 43 back and forth as appropriate.

【0108】次いで、上記のように左右一対の組立架台
2の上に組み立てたユニットUを、前記搬送補助機構5
および牽引機構69によりトンネルT内に搬送した後、
トンネルTの内壁T1に据え付けてこの内壁T1を覆工
する方法を、順を追って説明する。
Next, the unit U assembled on the pair of left and right assembling frames 2 as described above
And after being transported into the tunnel T by the traction mechanism 69,
A method of installing on the inner wall T1 of the tunnel T and lining the inner wall T1 will be described step by step.

【0109】まず、牽引桁46を足場52に連結させた
状態の据付作業台45を、左右の組立架台2の間に配置
する。
First, the installation work table 45 with the tow girder 46 connected to the scaffold 52 is arranged between the left and right assembling stands 2.

【0110】次いで、牽引桁46と、ユニットUの各コ
ンクリート版3の各ホイルユニット装着口16にホイル
ユニット4を装着し、牽引桁46とユニットUとを連結
する。
Next, the wheel unit 4 is mounted on the towing girder 46 and each of the wheel unit mounting openings 16 of each of the concrete slabs 3 of the unit U, and the towing girder 46 and the unit U are connected.

【0111】すなわち、路面1上で据付作業台45を前
後に適宜移動させて、牽引桁46の各ホイルユニット取
付部57の間に、各コンクリート版3の各ホイルユニッ
ト装着口16を配し、各ホイルユニット取付部57の間
の内側から、複数のホイルユニット4の前部75を、ホ
イルユニット装着口16にそれぞれ挿入して嵌合する。
That is, the installation work table 45 is appropriately moved back and forth on the road surface 1, and the respective wheel unit mounting ports 16 of the respective concrete plates 3 are arranged between the respective wheel unit mounting portions 57 of the traction girders 46. The front portions 75 of the plurality of wheel units 4 are inserted and fitted into the wheel unit mounting openings 16 from the inside between the wheel unit mounting portions 57, respectively.

【0112】そして、ホイルユニット4のブラケット板
76における上部84のボルト通し孔84aを、前記イ
ンサート金具22に合わせ、インサート金具22にピン
85を挿入し、ホイルユニット4をコンクリート版3に
仮止めしてから、鉛直ホイル71の軸82のねじ部82
cを、ホイルユニット取付金具19に溶接されたナット
21にねじ込んで軸82を固定し、ホイルユニット4
を、ユニットUのコンクリート版3におけるホイルユニ
ット装着口16全てに装着する。この状態で、ホイルユ
ニット4の水平ホイル72の周面は、組立架台2の主桁
24における水平ホイルセット部33に接触する。
Then, the bolt holes 84a of the upper portion 84 of the bracket plate 76 of the wheel unit 4 are aligned with the insert fittings 22, and the pins 85 are inserted into the insert fittings 22 to temporarily fix the foil unit 4 to the concrete plate 3. After that, the screw portion 82 of the shaft 82 of the vertical foil 71
c is screwed into a nut 21 welded to the wheel unit mounting bracket 19 to fix the shaft 82, and the wheel unit 4
Is mounted on all of the wheel unit mounting openings 16 in the concrete slab 3 of the unit U. In this state, the peripheral surface of the horizontal wheel 72 of the wheel unit 4 comes into contact with the horizontal wheel set portion 33 of the main girder 24 of the assembly stand 2.

【0113】次に、主桁24を、鉛直ホイル71の周面
が鉛直ホイル走路桁25の上面25aに触れる程度の状
態になるまで、ジャッキ装置34により下降させ、ホイ
ルユニット4後端のフランジ板80を、ボルト59によ
り、牽引桁46のホイルユニット取付部57に固着され
たステー58に固定する。この際、必要に応じて牽引桁
46を上下左右に微動させ、ステー58をフランジ板8
0に位置合わせする。これによって、ホイルユニット4
および牽引桁46を介して、ユニットUと据付作業台4
5が連結される。
Next, the main girder 24 is lowered by the jack device 34 until the peripheral surface of the vertical foil 71 touches the upper surface 25a of the vertical foil runway girder 25, and the flange plate at the rear end of the wheel unit 4 is moved. The bolt 80 secures the stay 80 to the stay 58 fixed to the wheel unit attachment portion 57 of the towing girder 46. At this time, the towing girder 46 is slightly moved up, down, left and right as required, and the stay 58 is moved to the flange plate 8.
Align to zero. Thereby, the wheel unit 4
Unit U and the installation workbench 4 via the towing girder 46
5 are connected.

【0114】このようにしてユニットUと据付作業台4
5とを連結したら、ジャッキ装置34により主桁24を
下限まで下降させ、ユニットUを各ホイルユニット4に
より左右の組立架台2の上に支持させる。つまりユニッ
トUの荷重を、各ホイルユニット4の各鉛直ホイル71
に移す。この状態で、各コンクリート版3の脚部3Aの
底面は、組立架台2の上面(主桁24における互いに面
一となった各鉛直ホイル走路桁25および各支持台32
の上面25a、32aの上面)と僅かな隙間があいてい
る。
Thus, the unit U and the installation worktable 4
After the connection with 5, the main girder 24 is lowered to the lower limit by the jack device 34, and the unit U is supported on the left and right assembling pedestals 2 by the respective wheel units 4. That is, the load of the unit U is changed to each vertical wheel 71 of each wheel unit 4.
Transfer to In this state, the bottom surface of the leg 3A of each concrete slab 3 is connected to the upper surface of the assembling gantry 2 (the vertical wheel runway girder 25 and the support pedestal 32 which are flush with each other on the main girder 24).
And the upper surfaces 25a and 32a).

【0115】次いで、牽引機構69により、トンネルT
内の補修すべき部分まで搬送する。
Next, the tunnel T
To the part to be repaired.

【0116】まず、牽引機構69のワイヤクリッパ70
を、ボルト94、ナット95により牽引桁46に固着さ
れたL字金具67に装着するとともに、牽引ワイヤ96
の上巻部96aをワイヤクリッパ70に取り付けること
により、牽引ワイヤ96と据付作業台45とを連結す
る。そして、牽引ワイヤ駆動機構98により、牽引ワイ
ヤ96を送り方向に作動させて、据付作業台45を、ト
ンネルTに向けて走行させていく。
First, the wire clipper 70 of the traction mechanism 69
Is attached to an L-shaped bracket 67 fixed to the traction girder 46 by bolts 94 and nuts 95, and a traction wire 96
By attaching the upper winding portion 96a to the wire clipper 70, the pulling wire 96 and the installation worktable 45 are connected. Then, the pulling wire drive mechanism 98 operates the pulling wire 96 in the feed direction, and causes the installation worktable 45 to travel toward the tunnel T.

【0117】据付作業台45の走行にともない、この据
付作業台45に、ホイルユニット4および牽引桁46に
より連結されているユニットUは、ホイルユニット4の
鉛直ホイル71が、面一状態である組立架台2の各鉛直
ホイル走行桁25および各支持台32の各上面25a、
32aの上を転動し、かつ水平ホイル72が、同じく面
一状態である組立架台2の各水平ホイル走路桁26およ
び水平ホイルセット部33の各側面26a、33aを転
動することにより、組立架台2の上を搬送されていく。
すなわち、組立架台2を搬送路として、ユニットUをト
ンネルTに向けて搬送していくわけである。
As the installation worktable 45 travels, the unit U connected to the installation worktable 45 by the wheel unit 4 and the traction girder 46 is assembled such that the vertical foil 71 of the wheel unit 4 is flush. Each vertical wheel running girder 25 of the gantry 2 and each upper surface 25a of each support 32,
32a, and the horizontal wheel 72 rolls on each horizontal wheel runway girder 26 of the assembling gantry 2 and each side surface 26a, 33a of the horizontal wheel set 33, which is also in the same plane, thereby assembling. It is transported on the gantry 2.
That is, the unit U is transported toward the tunnel T using the assembly base 2 as a transport path.

【0118】そして、据付作業台45がトンネルT内に
入っていくと、これにともなってユニットUもトンネル
T内に入るが、トンネルT内における搬送路は、前記左
右の基礎側壁6となり、引き続き、鉛直ホイル71がこ
れら基礎側壁6の上面6aを転動し、水平ホイル72が
基礎側壁6の側面6bを転動することにより、トンネル
T内に搬送されていく。
Then, when the installation work table 45 enters the tunnel T, the unit U also enters the tunnel T, but the transport path in the tunnel T becomes the left and right base side walls 6 and continues. The vertical foil 71 rolls on the upper surface 6a of the foundation side wall 6, and the horizontal foil 72 rolls on the side face 6b of the foundation side wall 6, so that they are transported into the tunnel T.

【0119】この際、たとえば、路面1に凹凸等があっ
て据付作業台45が上下あるいは左右に力を受けると、
前述のごとく、連結機構47の作用により、その力を受
けて上下あるいは左右に動くものの、この動きは緩衝さ
れ、据付作業台45に変形等の力が働かない。
At this time, for example, when the installation work table 45 receives a vertical or horizontal force due to unevenness or the like on the road surface 1,
As described above, due to the action of the coupling mechanism 47, the force moves and moves up and down or left and right, but this movement is buffered, and no force such as deformation acts on the installation worktable 45.

【0120】上記のように牽引機構69によって据付作
業台45を走行させていくにあたり、路面1にスロープ
があると、牽引ワイヤ96はそれにともなって上方ある
いは下方に移動する力を受ける。
When the installation workbench 45 is run by the traction mechanism 69 as described above, if the road surface 1 has a slope, the traction wire 96 receives a force to move upward or downward accordingly.

【0121】たとえば、上り坂のスロープの場合、牽引
ワイヤ96がスロープに従って上方に引っ張られると、
牽引ワイヤ96の下巻部96bが、ワイヤハンガ97の
上側の横ローラ105aに接触し、また、下り坂のスロ
ープで牽引ワイヤ96が下方に引っ張られると、牽引ワ
イヤ96の上巻部96aが上側の横ローラ105aに、
また下巻部96bが下側の横ローラ105bに接触す
る。このように、各横ローラ105a、105bに接触
することにより、牽引ワイヤ96は、ほぼ路面1に沿っ
た状態が保持され、かつ各横ローラ105a、105b
を回転させながら、スムーズに作動する。
For example, in the case of an uphill slope, when the pulling wire 96 is pulled upward according to the slope,
When the lower winding portion 96b of the pulling wire 96 contacts the upper horizontal roller 105a of the wire hanger 97, and when the pulling wire 96 is pulled downward by the slope of the downhill, the upper winding portion 96a of the pulling wire 96 becomes the upper horizontal roller. 105a,
Further, the lower winding portion 96b contacts the lower horizontal roller 105b. In this way, by contacting each of the lateral rollers 105a and 105b, the pulling wire 96 is maintained substantially along the road surface 1 and each of the lateral rollers 105a and 105b
It works smoothly while rotating.

【0122】さらに、トンネルTが左右いずれかにカー
ブしている場合、そのカーブの内側にあるワイヤハンガ
97の各上下の縦ローラ104a、104bに、牽引ワ
イヤ96の上巻部96aおよび下巻部96bがそれぞれ
接触し、牽引ワイヤ96は、トンネルTのカーブに略沿
った状態で作動する。
Further, when the tunnel T is curved left or right, the upper winding part 96a and the lower winding part 96b of the pulling wire 96 are respectively attached to the upper and lower vertical rollers 104a and 104b of the wire hanger 97 inside the curve. In contact, the puller wire 96 operates substantially along the curve of the tunnel T.

【0123】このようにして、ワイヤハンガ97によ
り、トンネルTの形態(スロープ、カーブ)にかかわら
ず牽引ワイヤ96の作動に支障は起こらず、その結果、
据付作業台45はスムーズに走行する。
In this way, the wire hanger 97 does not hinder the operation of the pulling wire 96 regardless of the form (slope, curve) of the tunnel T. As a result,
The installation worktable 45 runs smoothly.

【0124】なお、特にトンネルTにカーブがない場
合、左右の縦ローラ104(104a、104b)は必
要ではないので、図24に示す横ローラ105(105
a、105b)のみが設けられたワイヤハンガ97Aで
かまわない。
In particular, when there is no curve in the tunnel T, the left and right vertical rollers 104 (104a, 104b) are not necessary, so the horizontal rollers 105 (105) shown in FIG.
a, 105b) may be a wire hanger 97A provided only.

【0125】上記のようにして、牽引機構69により据
付作業台45をトンネルT内の路面1上を走行させて、
ユニットUを、トンネルT内の補修すべき部分まで搬送
したら、このユニットUをトンネルTの内壁T1に据え
付ける。
As described above, the installation work table 45 is caused to travel on the road surface 1 in the tunnel T by the traction mechanism 69, and
When the unit U has been transported to the portion to be repaired in the tunnel T, the unit U is installed on the inner wall T1 of the tunnel T.

【0126】ユニットUを内壁T1に据え付けるには、
まず、各コンクリート版3に埋め込んである鉛直押しボ
ルト9を抜き方向に回転させて、この鉛直押しボルト9
の頭部9bを基礎側壁6の上面6aに当て、さらにそこ
から同方向に回転させることによりユニットUを僅かに
上昇させ、これとともに、水平押しボルト11を抜き方
向に回転させて、この水平押しボルト11の頭部11b
を、トンネルTの内壁T1に圧接させ、ユニットUの横
方向外方への移動を規制する。以上により、ユニットU
の荷重を、ホイルユニット4の鉛直ホイル71から鉛直
押しボルト9に移す。この際、ホイルユニット4もユニ
ットUとともに僅かに上昇するわけであるが、基礎側壁
6の側面6bに接している水平ホイル72は、コイルば
ね93に坑してホイルユニット4に対し相対的に下に移
動し、これによって、水平ホイル72の周面の偏磨耗が
防止される。
To mount the unit U on the inner wall T1,
First, the vertical push bolt 9 embedded in each concrete slab 3 is rotated in the pulling direction, and the vertical push bolt 9
The unit U is slightly raised by abutting the head 9b of the base member 6 on the upper surface 6a of the base side wall 6 and further rotating in the same direction from the head 9b. Head 11b of bolt 11
Is pressed against the inner wall T1 of the tunnel T to restrict the unit U from moving laterally outward. Thus, unit U
Is transferred from the vertical foil 71 of the wheel unit 4 to the vertical push bolt 9. At this time, the wheel unit 4 also slightly rises together with the unit U. However, the horizontal wheel 72 in contact with the side surface 6b of the base side wall 6 is digged by the coil spring 93 and relatively lowered with respect to the wheel unit 4. , Whereby uneven wear of the peripheral surface of the horizontal wheel 72 is prevented.

【0127】次いで、ホイルユニット4をホイルユニッ
ト装着口16から取り外し、かつ牽引桁46から取り外
して、牽引桁46とユニットUとの連結を解く。
Next, the wheel unit 4 is removed from the wheel unit mounting opening 16 and from the towing girder 46, and the connection between the towing girder 46 and the unit U is released.

【0128】このようにして、ユニットUをトンネルT
の内壁T1に据え付けたら、牽引機構69を上記と逆に
作動させて、据付作業台45をトンネルT外に出す。
Thus, unit U is connected to tunnel T
When the installation work table 45 is installed on the inner wall T1, the traction mechanism 69 is operated in the reverse manner to move the installation work table 45 out of the tunnel T.

【0129】以上により、トンネルTの内壁T1の補修
が完了するが、補修部が1つのユニットUではカバーで
きない場合、あるいは、離れた他の箇所に補修部がある
場合には、上記の工程を行って、その補修部にユニット
Uを据え付ける。また、上記の場合、コンクリート版3
を左右3つずつ計6つで1つのユニットUとしている
が、補修部の範囲に応じた数のコンクリート版によって
ユニットUを構成するようにしてもよい。
As described above, the repair of the inner wall T1 of the tunnel T is completed. However, if the repaired portion cannot be covered by one unit U, or if the repaired portion is located at another distant place, the above process is performed. Then, the unit U is installed in the repair part. In the above case, the concrete plate 3
Are formed as one unit U, three in each case on the left and right sides, but one unit U may be constituted by concrete slabs of a number corresponding to the range of the repaired part.

【0130】さらに、トンネルTの内壁T1全面を補修
する際には、上記工程を繰り返し行ってユニットUを内
壁T1全面に据え付ける。この場合、最初および最後に
据え付けるユニットUは、トンネルTの出入り口端部に
その端面を合わせるため、その端部側に、コンクリート
版3の半分の幅に成形されたコンクリート版を接合す
る。図12のユニットUは最初のコンクリート版ユニッ
トUを示しており、符号3ー0がその半分の幅のコンク
リート版である。
Further, when repairing the entire inner wall T1 of the tunnel T, the above steps are repeated to mount the unit U on the entire inner wall T1. In this case, the unit U to be installed first and last is joined with a concrete plate molded to half the width of the concrete plate 3 on its end side in order to match its end face to the entrance end of the tunnel T. The unit U in FIG. 12 shows the first concrete slab unit U, and reference numeral 3-0 denotes a concrete slab of half its width.

【0131】さて、上記本実施例の組立架台2によれ
ば、主桁24を構成する支持台32を上昇させた状態に
おいて、ユニットUをトンネルT内に搬送させるための
ホイルユニット4の装着が容易となり、また、支持台3
2を下降させてユニットUの荷重をホイルユニット4へ
移し替えることにより、ホイルユニット4によるユニッ
トUの、トンネルT内への搬送を可能とする。すなわ
ち、トンネルT内へ搬送するためのホイルユニット4を
装着することができ、かつ、このホイルユニット4を組
立架台2上で走行させ得る状態に、複数のコンクリート
版3をユニットUに組み立てることが、この組立架台2
で容易に行うことができる。
According to the assembling base 2 of the present embodiment, the mounting of the wheel unit 4 for transporting the unit U into the tunnel T in a state where the support 32 constituting the main girder 24 is raised. It becomes easy and the support 3
By lowering 2 and transferring the load of the unit U to the wheel unit 4, the unit U can be transported into the tunnel T by the wheel unit 4. That is, a plurality of concrete slabs 3 can be assembled into the unit U in a state where the wheel unit 4 for transporting into the tunnel T can be mounted and the wheel unit 4 can be run on the assembly base 2. , This assembly base 2
Can be easily performed.

【0132】また、ユニットUを搬送させるための搬送
補助機構5によれば、ユニットUの、組立架台2から基
礎側壁6に沿ってトンネルT内への搬送を、スムーズか
つ容易に行える。
Further, according to the transport assist mechanism 5 for transporting the unit U, the transport of the unit U from the assembly stand 2 to the tunnel T along the foundation side wall 6 can be performed smoothly and easily.

【0133】そして、この搬送補助機構5を構成する据
付作業台45と牽引桁46とを連結する連結機構47に
よれば、路面1に凹凸等があって走行する据付作業台4
5が路面1から上下あるいは左右に動く力を受けると、
その力は緩衝されてユニットUには伝わらず、このた
め、ユニットUの搬送には何ら支障が起きないととも
に、据付作業台45に変形等の力が働かない。
According to the connecting mechanism 47 for connecting the installation work table 45 and the towing girder 46 that constitute the transport assist mechanism 5, the installation work table 4 that travels with unevenness on the road surface 1 or the like.
When 5 receives the force to move up and down or left and right from the road surface 1,
The force is buffered and is not transmitted to the unit U, so that there is no trouble in transporting the unit U, and no force such as deformation acts on the installation worktable 45.

【0134】また、本実施例のホイルユニット4によれ
ば、搬送補助機構5の牽引桁46とユニットUとの連結
を容易とするとともに、ユニットUの、組立架台2およ
び基礎側壁6上の搬送を可能とする。特に、ホイルユニ
ット4の水平ホイル72が、組立架台2の水平ホイル走
路桁26の上桁29の側面と、基礎側壁6の側面6bを
転動することにより、ユニットUは、蛇行等が生じるこ
となく路面1に沿って確実にトンネルT内に搬送され
る。
Further, according to the wheel unit 4 of this embodiment, the connection between the towing girder 46 of the transport assist mechanism 5 and the unit U is facilitated, and the transport of the unit U on the assembling gantry 2 and the base side wall 6 is facilitated. Is possible. In particular, when the horizontal wheel 72 of the wheel unit 4 rolls on the side surface of the upper girder 29 of the horizontal wheel runway girder 26 of the assembling gantry 2 and the side surface 6b of the foundation side wall 6, the unit U may meander. And is reliably transported along the road surface 1 into the tunnel T.

【0135】また、組立架台2によって組み立てたユニ
ットUを、組立架台2およびトンネルT内の基礎側壁6
を走行させることによりトンネルT内の補修部まで搬送
した後、ユニットUを内壁T1に据え付ける本実施例の
トンネルの補修方法によれば、複数のコンクリート版3
による内壁1の覆工を、一度に完了する。このため、補
修に要する工期が大幅に短縮する。
The unit U assembled by the assembling gantry 2 is connected to the assembling gantry 2 and the base side wall 6 in the tunnel T.
According to the tunnel repair method of this embodiment in which the unit U is mounted on the inner wall T1 after being transported to the repair section in the tunnel T by traveling
Of the inner wall 1 is completed at a time. For this reason, the construction period required for repair is greatly reduced.

【0136】また、コンクリート版3どうしの連結作業
はトンネルTの外側のスペースで行うため、その作業が
種々の制限を受けることなく容易に行え、また、トンネ
ルT内の車両等の通行を工事中完全に閉鎖する必要もな
く、特に交通量が多い道路に適用すると有効である。な
お、図26に示すように、クレーンKによるコンクリー
ト版3の組立架台2へのセット時および据付作業台45
によるユニットUの搬送時等は、車両Mは一方通行(片
側通行)、図27に示すように、作業休止時は、相互通
行(通常通行)が可能となる。
Further, since the work of connecting the concrete slabs 3 is performed in the space outside the tunnel T, the work can be easily performed without being restricted by various restrictions. It does not need to be completely closed and is particularly effective when applied to roads with heavy traffic. As shown in FIG. 26, when the concrete slab 3 is set on the assembling gantry 2 by the crane K and when the
For example, when the unit U is transported, the vehicle M can pass one way (one-sided traffic), and as shown in FIG. 27, when the work is suspended, the vehicle M can pass each other (normal traffic).

【0137】[0137]

【発明の効果】以上説明したように、本発明の覆工版ユ
ニットの組立架台によれば、トンネル内へ搬送するため
のホイルユニットが装着され、かつ、このホイルユニッ
トを組立架台上および基礎側壁上で走行させ得る状態
に、複数の覆工版からなる覆工版ユニットを組み立てる
ことが、容易に行える。そして、覆工版どうしの連結作
業をトンネル外で行うため、その作業を種々の制限を受
けることなく容易に行え、また、トンネル内の車両等の
通行を工事中完全に閉鎖する必要もなく、特に交通量が
多い道路に適用すると有効であるとともに、複数のコン
クリート版によるトンネル内壁の覆工作業の工期が短縮
される。
As described above, according to the assembling stand of the lining plate unit of the present invention, the wheel unit for transporting the inside of the tunnel is mounted, and this foil unit is mounted on the assembling stand and the base side wall. It is easy to assemble a lining plate unit including a plurality of lining plates in a state where the lining plate can be run on the lining plate. And since the connection work between the lining plates is performed outside the tunnel, the work can be easily performed without being limited by various restrictions, and it is not necessary to completely close the traffic of vehicles and the like in the tunnel during construction, It is particularly effective when applied to roads with heavy traffic, and shortens the construction period of the lining work of the tunnel inner wall with a plurality of concrete slabs.

【0138】また、覆工版ユニットを搬送させる搬送補
助機構によれば、覆工版ユニットの、組立架台から基礎
側壁に沿ってトンネル内への搬送を、スムーズかつ容易
に行える。
According to the transport assist mechanism for transporting the lining plate unit, the lining plate unit can be smoothly and easily transported from the assembly stand to the inside of the tunnel along the foundation side wall.

【0139】また、搬送補助機構を構成する据付作業台
と牽引桁とを連結する連結機構によれば、路面に凹凸等
があって走行する据付作業台が路面から上下あるいは左
右に動く力を受けると、その力は緩衝されて覆工版ユニ
ットには伝わらず、このため、覆工版ユニットの搬送に
は何ら支障が起きないとともに、据付作業台に変形等の
力が働かない。
Further, according to the connecting mechanism for connecting the installation work table and the towing girder that constitute the transport assist mechanism, the installation work table that travels with unevenness or the like on the road surface receives the force to move vertically or horizontally from the road surface. Then, the force is buffered and is not transmitted to the lining plate unit, so that no trouble occurs in transporting the lining plate unit, and no force such as deformation acts on the installation worktable.

【0140】さらに、本実施例のホイルユニットによれ
ば、搬送補助機構の牽引桁と覆工版ユニットとの連結を
容易とするとともに、覆工版ユニットの、組立架台およ
び基礎側壁上の搬送を可能とする。特に、ホイルユニッ
トの水平ホイルが、組立架台の水平ホイル走路桁の上桁
の側面と、基礎側壁の側面を転動することにより、覆工
版ユニットは、蛇行等が生じることなく路面に沿って確
実にトンネル内に搬送される。
Further, according to the wheel unit of this embodiment, the connection between the towing girder of the transport assist mechanism and the lining plate unit is facilitated, and the lining plate unit is transported on the assembly stand and the side wall of the foundation. Make it possible. In particular, the horizontal foil of the wheel unit rolls on the side surface of the upper girder of the horizontal foil runway girder of the assembly stand and the side surface of the foundation side wall, so that the lining plate unit can follow the road surface without meandering or the like. It is surely transported in the tunnel.

【図面の簡単な説明】[Brief description of the drawings]

【図1】既設の道路用トンネルの出入り口の一端側に設
置された本発明の一実施例の組立架台および任意のトン
ネル断面を示す斜視図である。
FIG. 1 is a perspective view showing an assembling pedestal according to an embodiment of the present invention installed at one end of an entrance and exit of an existing road tunnel and an arbitrary cross section of the tunnel;

【図2】一実施例の組立架台からトンネル内に搬送され
たコンクリート版ユニットによりトンネル内壁が覆工さ
れた状態を示す正面図である。
FIG. 2 is a front view showing a state in which the inner wall of the tunnel is covered by a concrete slab unit transported into the tunnel from the assembly base of one embodiment.

【図3】コンクリート版の継手金具を示す側面図であ
る。
FIG. 3 is a side view showing a joint fitting of a concrete plate.

【図4】コンクリート版の脚部の断面図である。FIG. 4 is a sectional view of a leg of the concrete slab.

【図5】ホイルユニット装着口およびホイルユニットの
側面図である。
FIG. 5 is a side view of a wheel unit mounting opening and a wheel unit.

【図6】ホイルユニット装着口の正面図である。FIG. 6 is a front view of a wheel unit mounting opening.

【図7】一実施例の組立架台の一部側面図である。FIG. 7 is a partial side view of the assembly base of one embodiment.

【図8】組立架台の一部正断面図である。FIG. 8 is a partial front sectional view of the assembly base.

【図9】組立架台の一部正断面図である。FIG. 9 is a partial front sectional view of the assembly base.

【図10】組立架台の一部正断面図である。FIG. 10 is a partial front sectional view of the assembly base.

【図11】トンネルおよび据付作業台の正面図である。FIG. 11 is a front view of a tunnel and an installation work table.

【図12】コンクリート版搬送補助機構の側面図であ
る。
FIG. 12 is a side view of a concrete slab conveyance assisting mechanism.

【図13】牽引桁、ホイルユニットおよび牽引機構の一
部を示す正面図である。
FIG. 13 is a front view showing a part of a towing girder, a wheel unit, and a towing mechanism.

【図14】ホイルユニットと牽引桁との連結機構を示す
平面断面図である。
FIG. 14 is a plan sectional view showing a coupling mechanism between the wheel unit and the towing girder.

【図15】ホイルユニットの側面図である。FIG. 15 is a side view of the wheel unit.

【図16】同平面図である。FIG. 16 is a plan view of the same.

【図17】ホイルユニットの背面図である。FIG. 17 is a rear view of the wheel unit.

【図18】牽引ワイヤ駆動機構の正面図である。FIG. 18 is a front view of a pulling wire drive mechanism.

【図19】牽引ワイヤ駆動機構および牽引ワイヤ引張機
構の側面図である。
FIG. 19 is a side view of a pulling wire drive mechanism and a pulling wire pulling mechanism.

【図20】牽引ワイヤ駆動機構の差動ギヤおよびギヤモ
ータ部分の平面図である。
FIG. 20 is a plan view of a differential gear and a gear motor portion of the pulling wire drive mechanism.

【図21】アームジャッキの側面図である。FIG. 21 is a side view of the arm jack.

【図22】ジャッキフレームおよびアームジャッキのコ
ンクリート版支持部の正面図である。
FIG. 22 is a front view of a concrete slab support portion of a jack frame and an arm jack.

【図23】コンクリート版ユニットの平面図である。FIG. 23 is a plan view of a concrete plate unit.

【図24】ワイヤハンガの変形例の正面図である。FIG. 24 is a front view of a modification of the wire hanger.

【図25】搬送補助機構の側面図である。FIG. 25 is a side view of the transport assist mechanism.

【図26】組立架台上にコンクリート版をセットしてい
る状態の正面図である。
FIG. 26 is a front view of a state where a concrete plate is set on an assembly base.

【図27】組立架台上にコンクリート版をセットしてい
る状態の正面図である。
FIG. 27 is a front view of a state in which a concrete plate is set on an assembly stand.

【符号の説明】[Explanation of symbols]

1 路面 2 組立架台 3 コンクリート版(覆工版) 4 ホイルユニット 5 搬送補助機構 6 基礎側壁 6a 基礎側壁の上面 16 ホイルユニット装着口 23 ポスト(基台) 24 主桁 25 鉛直ホイル走路桁 25a 鉛直ホイル走路桁の上面 26 水平ホイル走路桁 29a 水平ホイル走路桁の側面 32 支持台 32a 支持台の上面(支持面) 33 水平ホイルセット部 33a 水平ホイルセット部の側面 45 据付作業台 46 牽引桁 47 連結機構 63 連結軸 65、66 コイルばね(緩衝機構) 68 ガイドホイル 71 鉛直ホイル 72 水平ホイル 73 ケーシング T トンネル T1 トンネル内壁 U コンクリート版ユニット DESCRIPTION OF SYMBOLS 1 Road surface 2 Assembly stand 3 Concrete plate (lining plate) 4 Wheel unit 5 Transport auxiliary mechanism 6 Foundation side wall 6a Upper surface of foundation side wall 16 Wheel unit mounting port 23 Post (base) 24 Main girder 25 Vertical foil runway girder 25a Vertical foil Top surface of runway girder 26 Horizontal wheel runway girder 29a Side surface of horizontal wheel runway girder 32 Support base 32a Upper surface of support base (support surface) 33 Horizontal wheel set part 33a Side surface of horizontal wheel set part 45 Installation workbench 46 Tow girder 47 Connection mechanism 63 Connecting shaft 65, 66 Coil spring (buffer mechanism) 68 Guide wheel 71 Vertical wheel 72 Horizontal wheel 73 Casing T Tunnel T1 Tunnel inner wall U Concrete plate unit

Claims (4)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 トンネル内壁に沿って湾曲する複数の覆
工版がアーチ状に連結されてなる覆工版ユニットを、 トンネル内壁の側部に設けた、トンネル内の路面と平行
な上面およびトンネル内の路面に面して鉛直面に形成さ
れた側面を有する基礎側壁に沿ってトンネル内の所定位
置まで搬送させ、かつトンネル内壁に据え付けてこのト
ンネル内壁を覆工するにあたり、 前記覆工版ユニットをトンネル出入り口に隣接する路面
上で組み立て、トンネル内に搬送可能とするために左右
一対として設置される組立架台であって、 前記トンネル出入り口に隣接する路面上の両側に設置さ
れる基台と、 基台に対し昇降可能に設置され、前記覆工版のトンネル
長さ方向に沿った幅よりも短い間隔をおいて上方に突出
しその上面が路面と略平行な支持面とされた複数の支持
台およびこれら支持台の間に位置して下方に突出し路面
側に面する側面が鉛直面である水平ホイルセット部をそ
れぞれ一体に有する、トンネル長さ方向に沿って路面と
略平行に延びる主桁と、 この主桁の前記各支持台間にわたりトンネルの長さ方向
に沿って延在する状態で前記基台に固定され、その上面
が、前記主桁が下降した際にこの主桁の前記支持面と面
一な状態となり得る鉛直ホイル走路とされた鉛直ホイル
走路桁と、 前記主桁の前記水平ホイルセット部の間にわたりトンネ
ル長さ方向に沿って延在する状態で前記基台に固定さ
れ、その路面側の側面が、水平ホイルセット部と面一な
状態の水平ホイル走路とされた水平ホイル走路桁とを備
え、 前記鉛直ホイル走路桁の上面は、前記基礎側壁の前記上
面に連続して面一で、かつ前記水平ホイル走路桁の側面
は、前記基礎側壁の前記側面に連続して面一であること
を特徴とする覆工版ユニットの組立架台。
A lining plate unit comprising a plurality of lining plates curved along an inner wall of a tunnel and connected in an arch shape, provided on a side portion of the inner wall of the tunnel, an upper surface parallel to a road surface in the tunnel and a tunnel. The lining plate unit is transported to a predetermined position in a tunnel along a foundation side wall having a side surface formed in a vertical plane facing a road surface inside, and installed on the inner wall of the tunnel to lining the inner wall of the tunnel; Assembled on the road surface adjacent to the tunnel entrance, and an assembling pedestal installed as a pair of left and right to be transportable in the tunnel, a base installed on both sides of the road surface adjacent to the tunnel entrance, It is installed so as to be able to move up and down with respect to the base, and projects upward at an interval shorter than the width of the lining plate along the length direction of the tunnel. A plurality of support bases and horizontal wheel set portions which are located between the support bases and project downward and face the road surface side are vertical planes, respectively, and are substantially parallel to the road surface along the tunnel length direction. A main girder extending along the length direction of the tunnel between the support bases of the main girder, and fixed to the base, and the upper surface thereof is provided when the main girder is lowered. A vertical foil runway girder, which is a vertical foil runway capable of being flush with the support surface of the girder, and the base extending in a tunnel length direction between the horizontal wheel set portions of the main girder. The vehicle is fixed to a table, and the side surface on the road surface side includes a horizontal wheel set part and a horizontal wheel run girder that is a horizontal wheel runway in a state of being flush with the upper surface of the vertical wheel runway girder, Continuously flush with the top surface And a side surface of the horizontal foil runway girder is flush with the side surface of the foundation side wall.
【請求項2】 請求項1記載の、左右一対の組立架台の
上にて組み立てられた前記覆工版ユニットを、トンネル
内に搬送させるための覆工版ユニットの搬送補助機構で
あって、 左右一対の組立架台上にて組み立てられた覆工版ユニッ
トの内側に配置されるとともに、そこからトンネル内に
向かって路面上を走行可能とされる据付作業台と、 この据付作業台の両側部に連結機構を介して連結され
た、トンネル長さ方向に延びる牽引桁と、 この牽引桁にその長さ方向に間隔をおいて着脱可能に複
数装着されるとともに、前記覆工版にも着脱可能に装着
されて牽引桁と前記覆工版ユニットとを連結するホイル
ユニットとを備えていることを特徴とする覆工版ユニッ
トの搬送補助機構。
2. A transport assisting mechanism for a lining plate unit for transferring the lining plate unit assembled on a pair of left and right assembling pedestals into a tunnel, according to claim 1. An installation workbench that is arranged inside the lining plate unit assembled on a pair of assembly bases and that can travel on the road surface from there toward the tunnel, and on both sides of this installation worktable A towing girder extending in the length direction of the tunnel connected via a connecting mechanism, and a plurality of detachably attached to the towing girder at intervals in the length direction, and detachably attached to the lining plate. A transport assist mechanism for a lining plate unit, comprising: a wheel unit mounted to connect the traction girder and the lining plate unit.
【請求項3】 前記連結機構は、 前記牽引桁と前記据付作業台とをトンネル幅方向および
上下方向に沿って相対移動可能に連結する連結軸と、 この連結軸と据付作業台との間に介装され、双方の相対
移動を緩衝するとともに、通常状態において、牽引桁と
据付作業台との間隔を一定に保つ緩衝機構と、 牽引桁の側方に延び、前記緩衝機構により、前記基礎側
壁の前記側面に圧接状態とされる、水平面に沿って回転
自在なガイドホイルとを有していることを特徴とする請
求項2記載の覆工版ユニットの搬送補助機構。
3. The connecting mechanism includes: a connecting shaft that connects the towing girder and the installation worktable so as to be relatively movable along a tunnel width direction and a vertical direction; and a connection shaft between the connection shaft and the installation worktable. A buffer mechanism interposed and buffers the relative movement of both, and in a normal state, a buffer mechanism for maintaining a constant distance between the towing girder and the installation work table; 3. The transport assisting mechanism for a lining plate unit according to claim 2, further comprising a guide wheel that is pressed against said side surface and is rotatable along a horizontal plane.
【請求項4】 前記ホイルユニットは、 前記牽引桁および前記覆工版に形成されたホイルユニッ
ト装着口に着脱可能に装着されるケーシングと、 このケーシングに回転自在に設けられ、ケーシングが牽
引桁およびホイルユニット装着口に装着された状態で、
前記基礎側壁における前記上面および前記側面を転動可
能な鉛直ホイルおよび水平ホイルとを備えていることを
特徴とする請求項2記載の覆工版ユニットの搬送補助機
構。
4. A casing detachably mounted on a wheel unit mounting opening formed in the towing girder and the lining plate, wherein the foil unit is rotatably provided on the casing. With the wheel unit installed in the opening,
The transport assist mechanism for a lining plate unit according to claim 2, further comprising a vertical foil and a horizontal foil that can roll on the upper surface and the side surface of the foundation side wall.
JP02972192A 1992-02-17 1992-02-17 Assembly base of lining plate unit and transport assist mechanism Expired - Fee Related JP3167397B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP02972192A JP3167397B2 (en) 1992-02-17 1992-02-17 Assembly base of lining plate unit and transport assist mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP02972192A JP3167397B2 (en) 1992-02-17 1992-02-17 Assembly base of lining plate unit and transport assist mechanism

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP4065373A Division JPH05231098A (en) 1992-03-23 1992-03-23 Conveying method for lining plate-unit in tunnel and traction device used therefor

Publications (2)

Publication Number Publication Date
JPH05231097A JPH05231097A (en) 1993-09-07
JP3167397B2 true JP3167397B2 (en) 2001-05-21

Family

ID=12283976

Family Applications (1)

Application Number Title Priority Date Filing Date
JP02972192A Expired - Fee Related JP3167397B2 (en) 1992-02-17 1992-02-17 Assembly base of lining plate unit and transport assist mechanism

Country Status (1)

Country Link
JP (1) JP3167397B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7988826B2 (en) 2006-03-30 2011-08-02 Harima Chemicals, Inc. Cationic surface sizing agent and paper coated with the same

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7178243B2 (en) * 2017-12-27 2022-11-25 戸田建設株式会社 Tunnel lining construction method
CN120270761B (en) * 2025-06-10 2025-08-22 中交一公局集团有限公司 A device for accurately and quickly installing steel frames in confined spaces

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7988826B2 (en) 2006-03-30 2011-08-02 Harima Chemicals, Inc. Cationic surface sizing agent and paper coated with the same

Also Published As

Publication number Publication date
JPH05231097A (en) 1993-09-07

Similar Documents

Publication Publication Date Title
JP3167397B2 (en) Assembly base of lining plate unit and transport assist mechanism
JP2019014599A (en) Forklift transportation installation jig and member transportation installation method using the same
JP2019031876A (en) Suspended scaffold device
JPS6261501B2 (en)
JPH0745800B2 (en) Method and apparatus for installing precast plate for tunnel
JPH03138294A (en) Passenger conveyor reconstructing method
JPH0396598A (en) Movable form for tunnel
JPH05231098A (en) Conveying method for lining plate-unit in tunnel and traction device used therefor
JPH04323500A (en) Lining method for tunnel and lining frame
JP2926552B2 (en) Trolley mounting / detachment device for high-altitude rails
JP2927731B2 (en) PC girder transfer device
KR20000055307A (en) Movable checking and repairing die for bridge
JP3138949B2 (en) How to install beam members
JPS59145807A (en) Swivel mobile bridge inspection scaffolding
CN2337186Y (en) Hoisting machine for ecrecting bridge flooring
JPH0972004A (en) Lateral movement of roof mounting structure
CN223293358U (en) A retractable protective platform for elevator shaft
CN222475296U (en) Aluminum strip feeding mechanism
JP3000772U (en) Unloader
JPH1060827A (en) Segment block moving device
CN211597919U (en) Track stand column connecting structure for stereo garage
JP2707881B2 (en) Floor side structure for moving objects
JPH08114031A (en) Form for constructing travel passage of linear motor car
JP2626356B2 (en) How to install a skew elevator
KR200215197Y1 (en) Frame structure for parking system

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20010130

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees