JP3182711B2 - Reinforcing jig - Google Patents
Reinforcing jigInfo
- Publication number
- JP3182711B2 JP3182711B2 JP17909194A JP17909194A JP3182711B2 JP 3182711 B2 JP3182711 B2 JP 3182711B2 JP 17909194 A JP17909194 A JP 17909194A JP 17909194 A JP17909194 A JP 17909194A JP 3182711 B2 JP3182711 B2 JP 3182711B2
- Authority
- JP
- Japan
- Prior art keywords
- frame
- jig
- reinforcing
- reinforcing bars
- holding
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Description
【0001】[0001]
【産業上の利用分野】本発明は、鉄筋コンクリート造の
建築・土木構造物の躯体を施工する際に適用される配筋
用治具に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a reinforcing bar applied to the construction of a reinforced concrete building or civil engineering structure.
For jigs .
【0002】[0002]
【従来の技術】近年、建築・土木構造物の施工の合理化
を図るべく種々の工法が提案され、実用化されている
が、鉄筋コンクリート造の躯体を施工する際における鉄
筋の配筋作業についてはその自動化や機械化が十分に実
現されるに致っておらず、未だに主として作業員の手作
業に頼って行なわれているのが実情である。したがっ
て、特に太径の鉄筋を膨大に使用する大規模構造物の施
工に際しては配筋作業に多大な手間と時間を要してお
り、このことが工費削減や工期短縮を図るうえでの障害
の一つともなっている。2. Description of the Related Art In recent years, various construction methods have been proposed and put into practical use in order to rationalize the construction of buildings and civil engineering structures. The fact is that automation and mechanization have not yet been fully realized, and are still mainly performed manually by workers. Therefore, especially when constructing large-scale structures that use a large amount of large-diameter reinforcing steel, arranging the reinforcement requires a great deal of labor and time, which is an obstacle to reducing construction costs and shortening the construction period. It is one.
【0003】図8は太径の鉄筋が用いられる大規模構造
物の躯体の一設計例を示すものである。この図8に示す
ものは直径が100m以上にも及ぶ円筒状の地中構造物
であって、地中連続壁1の内側にさらに厚さが2m以上
にも及ぶ鉄筋コンクリート造の側壁2を逆打工法により
形成することで構築するようにしたものである。側壁2
にはたとえばD38(呼び径38mm)等の太径の縦筋
3…と横筋4…とをたとえば200mmピッチという高
密度で前後4重にわたって配筋するものとしている。ま
た、そのような太径の鉄筋どうしを接続するにはネジ込
み式の機械継手5が用いられることが多い。FIG. 8 shows a design example of a frame of a large-scale structure using a large-diameter reinforcing bar. The underground structure shown in FIG. 8 is a cylindrical underground structure having a diameter of more than 100 m, and a reinforced concrete side wall 2 having a thickness of more than 2 m is reversely struck inside an underground continuous wall 1. It is constructed by forming by a method. Side wall 2
, For example, a large-diameter vertical streak 3... Such as D38 (nominal diameter 38 mm) and a horizontal streak 4... In order to connect such large-diameter rebars, a screw-in type mechanical joint 5 is often used.
【0004】[0004]
【発明が解決しようとする課題】しかしながら、上述し
たように、このような構造物の施工における配筋作業は
多数の作業員を動員して1本ずつ手作業により行なわざ
るを得ず、したがって極めて非効率的な重作業を長期を
わたって行なわねばならないものであった。However, as described above, the rebar arrangement work in the construction of such a structure has to be carried out manually by mobilizing a large number of workers, and therefore, it is extremely difficult. Inefficient heavy work had to be performed over a long period of time.
【0005】なお、上記の場合、縦筋3…と横筋4…と
を予め金網状に一体化しておいてそれを一括して配筋す
ることも考えられるが、鉄筋が細径の場合にはともかく
としてもD38の如き太径の鉄筋を予め金網状に一体化
した場合には著しく大重量のものとなってしまって取り
扱いがますます困難になるのみならず、上記のようにネ
ジ込み式の機械継手5を用いる場合にあっては個々の鉄
筋を回転させることができなくなるのでその作業が困難
になるという不具合もあり、大規模構造物を施工する場
合に適用することは現実的ではない。[0005] In the above case, it is conceivable to integrate the vertical streaks 3 and the horizontal streaks 4 in a wire mesh shape in advance and arrange them all at once. In any case, if a large-diameter rebar such as D38 is integrated in a wire mesh in advance, it will be extremely heavy and not only will be more difficult to handle, but also the screw-in type as described above In the case where the mechanical joint 5 is used, there is a problem that the work becomes difficult because the individual rebar cannot be rotated, and it is not practical to apply the present invention to the case of constructing a large-scale structure.
【0006】本発明は上記事情に鑑みてなされたもの
で、鉄筋工事の合理化、省力化を実現し得る有効な手
段、特に大規模な土木・建築構造物の施工に際して太径
の鉄筋の配筋作業を効率的に行ない得る有効な配筋用治
具を提供することを目的としている。SUMMARY OF THE INVENTION The present invention has been made in view of the above circumstances, and is an effective means for realizing rationalization and labor saving of rebar construction, particularly, for arranging large-diameter rebars for construction of large-scale civil engineering and building structures. Effective rebar arrangement for efficient work
It is intended to provide tools .
【0007】[0007]
【課題を解決するための手段】請求項1の発明は、鉄筋
コンクリート造の躯体に埋設される鉄筋の配筋を行なう
に際して、複数本の鉄筋をほぼ平行な状態として一括に
保持するための配筋用治具であって、ハンドリング装置
によって背面側から把持される矩形枠状のフレームと、
該フレームの前面側に複数本の鉄筋を所定間隔をおいて
互いに平行な状態で保持するための複数の保持部と、該
保持部に保持した鉄筋をそれぞれフレームに対して係脱
自在に係止する係止機構を具備し、前記保持部は、保持
するべき鉄筋の外形寸法より大きな間隔をおいて前記フ
レームの前面側に突出して固定された一対のガイド体か
らなり、前記係止機構は、前記各ガイド体をスライド可
能に貫通しているスライドパイプと、該スライドパイプ
に取り付けられて該スライドパイプのスライドにより前
記一対のガイド体の間に位置して保持部を閉塞しかつそ
こから退避して保持部を解放する複数の係止爪とからな
ることを特徴とする。 According to the first aspect of the present invention, there is provided a reinforcing steel bar.
Arrange reinforcing bars buried in concrete frame
At the time, multiple rebars are put together in a substantially parallel state
A jig for reinforcing bars for holding, a handling device
A rectangular frame-like frame gripped from the back side by
At the front side of the frame, a plurality of rebars are
A plurality of holding portions for holding the members in parallel with each other;
Reinforcing / removing the rebar held by the holding part from the frame
A locking mechanism for locking freely, wherein the holding portion is
At a distance larger than the external dimensions of the reinforcing bar to be
A pair of guides projecting and fixed to the front side of the frame
And the locking mechanism can slide the respective guide bodies.
Slide pipe penetrating through the pipe and the slide pipe
Attached to the front of the slide pipe
The holding unit is closed between the pair of guides and the holding unit is closed.
A plurality of locking claws retreat from this and release the holding part.
It is characterized by that.
【0008】請求項2の発明は、請求項1の発明の配筋
用治具であって、前記保持部は個々の鉄筋をそれぞれ回
転自在に保持する構成とされていることを特徴とする。 According to a second aspect of the present invention, there is provided a bar arrangement according to the first aspect.
Jig, wherein the holding portion rotates each individual reinforcing bar.
It is characterized in that it is configured to be rotatably held.
【0009】請求項3の発明は、請求項1または2の発
明の配筋用治具であって、前記フレームはその背面側に
同一形状の他の配筋用治具のフレームが積み重ね可能と
され、かつ、該フレームの背面側には他の配筋用治具に
保持するべき鉄筋の位置決めのための他の保持部が設け
られていることを特徴とする。 The invention according to claim 3 is the invention according to claim 1 or 2.
A jig for arranging reinforcing bars, wherein the frame is provided on a back side thereof.
Frames of other jigs with the same shape can be stacked
And on the back side of the frame,
Other holding parts are provided for positioning the reinforcing bars to be held
It is characterized by having been done.
【0010】[0010]
【作用】本発明の配筋用治具を使用して鉄筋の配筋を行
うには、複数本の鉄筋を一括に保持した配筋用治具をハ
ンドリング装置により把持して配筋位置に配置すること
によって、それら鉄筋の全てを一括して配筋位置に導い
て配筋姿勢に保持するとともにそれらの接続端を既設鉄
筋の接続端に臨ませる。そして、その状態で各鉄筋を既
設鉄筋に対して順次接続していき、全ての鉄筋の接続を
完了した後に配筋用治具を取り外す。これにより、個々
の鉄筋を1本ずつ保持して位置決めを行いつつ配筋して
いく従来一般の場合に比して格段に作業効率が向上す
る。The reinforcing bar arrangement is performed by using the reinforcing jig of the present invention.
In this method, a handling device grips a jig for holding a plurality of rebars collectively by a handling device and arranges the rebars at the rebar placement position, thereby guiding all of the rebars to the rebar placement position at a time. And the connecting ends thereof face the connecting ends of the existing reinforcing bars. Then, in this state, the respective reinforcing bars are sequentially connected to the existing reinforcing bars, and after all the reinforcing bars have been connected, the reinforcing jig is removed. As a result, the work efficiency is remarkably improved as compared with a conventional general case in which individual reinforcing bars are held one by one and arranged while performing positioning.
【0011】また、本発明の配筋用治具は、フレームの
前面側に複数本の鉄筋を一括して保持するものであり、
このフレームを背面側からハンドリング装置により把持
して配筋位置に配置するものである。したがって、この
配筋用治具を用いることにより、配筋するべき全ての鉄
筋を一括して配筋位置に導いて配筋姿勢に保持でき、そ
の状態で各鉄筋を既設鉄筋に対して順次接続していくこ
とができる。フレームに対する鉄筋の保持は、鉄筋を保
持部へ装着して係止機構により係止することで行ない、
配筋作業が完了した後には係止機構の操作によりフレー
ムから鉄筋を容易に取り外すことができる。また、各鉄
筋を保持部に回転自在に保持するようにしておくことに
より、ネジ込み式の機械継手を用いる場合には各鉄筋を
回転させることで接続作業を容易に行ない得る。Further, the reinforcing jig of the present invention holds a plurality of reinforcing bars collectively on the front side of the frame.
This frame is gripped by the handling device from the rear side and arranged at the bar arrangement position. Therefore, by using this jig for reinforcing bars, all the reinforcing bars to be arranged can be led to the reinforcing position at a time and maintained in the reinforcing position, and in this state, each reinforcing bar is sequentially connected to the existing reinforcing bars. I can do it. The holding of the reinforcing bar to the frame is performed by attaching the reinforcing bar to the holding portion and locking by a locking mechanism.
After the bar arrangement work is completed, the reinforcing bar can be easily removed from the frame by operating the locking mechanism. In addition, since each rebar is rotatably held on the holding portion, when a screw-in type mechanical joint is used, the connection operation can be easily performed by rotating each rebar.
【0012】さらに、本発明の配筋用治具を自走可能な
ハンドリング装置によって把持し、そのハンドリング装
置により配筋用治具を任意の方向に変位させかつ回転さ
せることで、配筋用治具の姿勢を自由にかつ容易に調節
し得る。 Further, the reinforcing jig of the present invention can be self-propelled.
Grasping by a handling device,
Displace the jigs for reinforcement in any direction and rotate
To freely and easily adjust the posture of the bar arrangement jig
I can do it.
【0013】[0013]
【実施例】以下、本発明の実施例を図面を参照して説明
する。以下で説明する本実施例の施工方法および配筋用
治具ならびにハンドリング装置は、図8に示した地中構
造物の側壁2の縦筋3を配筋する際に適用されるもので
ある。Embodiments of the present invention will be described below with reference to the drawings. The construction method, the jig for arranging the bars, and the handling device of the present embodiment described below are applied when arranging the vertical bars 3 of the side wall 2 of the underground structure shown in FIG.
【0014】まず、図1〜図3を参照して配筋用治具1
0について説明する。本実施例の配筋用治具10は、矩
形枠状のフレーム11に複数本(図示例のものは14
本)の縦筋3を互いに平行にかつ等間隔で一括して保持
するようにしたものである。フレーム11はいずれもチ
ャンネル材からなる一対の縦材12,12とそれらを連
結している一対の横材13,13により形成され、各縦
筋3…は双方の横材13,13に対して保持されてこの
フレーム11の前面側(図1において紙面の手前側、図
2においては下面側)に保持されるようになっている。
なお、縦材12,12の下端部相互間にはアングル材か
らなるストッパ14が設けられており、このストッパ1
4により各縦筋3…は抜け落ちてしまうことのないよう
にそれらの下端部が支持されるようになっている。First, with reference to FIGS.
0 will be described. The jig 10 for reinforcing bars of the present embodiment has a plurality of
In this case, the vertical streaks 3 of the present invention are collectively held parallel to each other and at equal intervals. Each of the frames 11 is formed by a pair of vertical members 12, 12 made of a channel material and a pair of horizontal members 13, 13 connecting the vertical members 12 to each other. The frame 11 is held on the front side of the frame 11 (on the front side of the paper in FIG. 1 and on the lower side in FIG. 2).
A stopper 14 made of an angle material is provided between the lower ends of the vertical members 12, 12.
The lower end portions of the vertical streaks 3 are supported by 4 so that they do not fall off.
【0015】各横材13には各縦筋3…を保持するため
の保持部15…が設けられている。各保持部15は、保
持するべき縦筋3(本実施例においてはD38)の外形
寸法より大きな間隔(たとえば90mm程度)をおいて
フレーム11の前面側に突出して固定されている一対の
ガイド体16,16によりそれらの間に形成され、それ
ら一対のガイド体16,16の間に縦筋3を保持するよ
うになっている。なお、図1、図2において左端に位置
する保持部15のみは一方のガイド体16が省略されて
縦材12がガイド体16を兼用するものとなっている。Each of the cross members 13 is provided with a holding portion 15 for holding each of the vertical stripes 3. Each of the holding portions 15 is a pair of guide bodies that are fixed to the front side of the frame 11 with a space (for example, about 90 mm) larger than the outer dimension of the vertical streak 3 (D38 in this embodiment) to be held. The longitudinal stripes 3 are formed between the pair of guide bodies 16 and 16 by being formed between them. In FIGS. 1 and 2, only one of the guide members 16 is omitted from the holding portion 15 located at the left end, and the vertical member 12 also serves as the guide member 16.
【0016】また、各横材13,13のそれぞれには、
上記保持部15…に保持した縦筋3…を脱落しないよう
に係止するための係止機構17が備えられている。その
係止機構17は、図2および図3に示すように、横材1
3に添ってスライド可能に設けられて各ガイド体16…
を貫通しているスライドパイプ18と、上記各保持部1
5…に対応してスライドパイプ18に等間隔で取り付け
られている複数の係止爪19…から構成されている。そ
して、スライドパイプ18を先端側(図3において左
側)に押し出すと各係止爪19…は各保持部15…を形
成している一対のガイド体16,16の間に位置して全
ての保持部15…を閉塞することになり、それらガイド
体16,16と係止爪19および横材13とにより縦筋
3を取り囲んでその脱落が防止されるようになっている
(図3に示す状態)。また、その状態からスライドパイ
プ18を基端側(図3において右側)に引き込むと係止
爪19…はガイド体16,16の間から右方に退避して
保持部15…を開放し、この状態では縦筋3…を保持部
15…から自由に取り外すことができるようになってい
る。符号20はスライドパイプ18の基端部をスライド
可能に支持しているカラー部材、21はそのカラー部材
20に対してネジ込まれることでスライドパイプ18を
締め付けて固定するための留めボルトである。Also, each of the cross members 13, 13 is provided with:
A locking mechanism 17 is provided for locking the vertical streaks 3 held by the holding portions 15 so as not to fall off. The locking mechanism 17 is, as shown in FIGS.
Each guide body 16 is provided so as to be slidable along 3.
Slide pipe 18 penetrating through each of the holding portions 1
5 are constituted by a plurality of locking claws 19 attached to the slide pipe 18 at equal intervals. When the slide pipe 18 is pushed to the distal end side (the left side in FIG. 3), the locking claws 19 are located between the pair of guides 16 forming the holding portions 15 and all the holding members 19 are held. Are closed, and the guide members 16, 16 and the locking claws 19 and the cross members 13 surround the vertical stripes 3 to prevent the vertical stripes 3 from falling off (the state shown in FIG. 3). ). Further, when the slide pipe 18 is pulled toward the base end (right side in FIG. 3) from this state, the locking claws 19 are retracted to the right from between the guide bodies 16 and 16 to open the holding parts 15. In the state, the vertical stripes 3 can be freely removed from the holding portions 15. Reference numeral 20 denotes a collar member that slidably supports the base end of the slide pipe 18, and reference numeral 21 denotes a retaining bolt that is screwed into the collar member 20 to fasten and fix the slide pipe 18.
【0017】さらに、各横材13,13には上記一対の
ガイド体16,16とほぼ同位置においてフレーム11
の背面側に突出する一対の他のガイド体22,22が設
けられていて、これらガイド体22,22の間に縦筋装
着用の他の保持部23が設けられている。そして、本実
施例の配筋用治具10は同一形状のものが複数積み重ね
ることができるものとされていて、各配筋用治具10へ
の縦筋3…の装着は、複数の配筋用治具10を順次積み
重ねながら上記の保持部23…を利用して行なうことが
できるようにされている。Further, each of the cross members 13, 13 is provided with a frame 11 at substantially the same position as the pair of guides 16, 16.
A pair of other guides 22, 22 projecting to the back side of the guide are provided, and another holding portion 23 for attaching a vertical streak is provided between the guides 22, 22. The jigs 10 of the present embodiment are configured such that a plurality of jigs having the same shape can be stacked, and the mounting of the vertical streaks 3. The jigs 10 can be stacked using the holding portions 23... While being sequentially stacked.
【0018】配筋用治具10への縦筋3…の装着手順に
ついて図4を参照して説明する。まず、図4(a)に示
すようなベースフレーム30を用意する。そのベースフ
レーム30は配筋用治具10におけるフレーム11と同
一形状、同一寸法とし、その上面側には各配筋用治具1
0の背面側に設けているガイド体22,22に対応させ
てそれらと同様のガイド体31,31を取り付けてお
き、これらガイド体31,31によってベースフレーム
30の上面側に縦筋3…の位置決めのための保持部32
を設けておく。The procedure for mounting the vertical bars 3 to the bar arrangement jig 10 will be described with reference to FIG. First, a base frame 30 as shown in FIG. The base frame 30 has the same shape and the same dimensions as the frame 11 of the reinforcing arrangement jig 10, and each reinforcing arrangement jig 1
The guides 31, 31 similar to them are attached to the guides 22, 22 provided on the rear side of the base frame 30, and the vertical streaks 3 are formed on the upper surface of the base frame 30 by the guides 31, 31. Holder 32 for positioning
Is provided.
【0019】そして、このベースフレーム30の各保持
部32…に縦筋3…を配置した後、図4(b)に示すよ
うにベースフレーム30の上面に1台の配筋用治具10
を前面側を下向きとして重ねてセットする。この際、そ
の配筋用治具10のスライドパイプ18は基端側に引き
込んでおいて係止爪19…を保持部15…から退避させ
ておく。すると、ベースフレーム30上に積み重ねられ
た配筋用治具10の各保持部15…内にはベースフレー
ム30上に配置されていた各縦筋3…が自ずと入り込む
ことになるから、図4(c)に示すようにスライドパイ
プ18を先端側に押し出して係止爪19…により各保持
部15…を閉塞する。After arranging the vertical streaks 3 on each of the holding portions 32 of the base frame 30, as shown in FIG.
Is set with the front side facing down. At this time, the slide pipe 18 of the reinforcing jig 10 is retracted toward the base end, and the locking claws 19 are retracted from the holding portions 15. Then, the vertical streaks 3 arranged on the base frame 30 naturally enter into the respective holding portions 15 of the jigs 10 for reinforcing arrangement stacked on the base frame 30, and FIG. As shown in (c), the slide pipe 18 is pushed out to the distal end side, and each holding portion 15 is closed by the locking claw 19.
【0020】続いて、その鉄筋保持部10の背面側の他
の保持部23…に縦筋3…を配置し、その上面にさらに
他の配筋用治具10を積み重ねれば、その配筋用治具1
0の各保持部15…内に自ずと縦筋3…が配置され、ス
ライドパイプ18を押し出すことで縦筋3…が保持部1
5…内に保持される(図4(d)参照)。このようにし
て各配筋用治具10を順次積み重ねながらそれらに縦筋
3…を装着していき、以上の作業を必要な台数分繰り返
せば良い。Subsequently, the vertical bars 3 are arranged on the other holding portions 23 on the rear side of the reinforcing bar holding portion 10 and another jig 10 for reinforcing bars is stacked on the upper surface thereof, whereby the reinforcing bars are arranged. Jig 1
0 are naturally disposed in the holding portions 15... Of the holding portions 1 by pushing out the slide pipe 18.
5 (see FIG. 4D). In this manner, the vertical bars 3 are attached to each of the bar arrangement jigs 10 while sequentially stacking them, and the above operation may be repeated for the required number.
【0021】次に、上記配筋用治具10を把持するため
に採用して好適なハンドリング装置の一例を図5を参照
して説明する。そのハンドリング装置39は油圧ショベ
ルカーをベースマシンとするもので、自走可能な走行台
車40に旋回可能なブーム41を有し、その先端に配筋
用治具10を姿勢制御可能に把持する把持フレーム42
を取り付けたものである。把持フレーム42は、ブーム
41の先端に水平軸43を中心として上下方向に首振り
可能に取り付けられた第1フレーム44と、第1フレー
ム44に対して垂直軸45を中心として左右方向に首振
り可能に取り付けられた第2フレーム46と、第2フレ
ーム46に対して左右方向にスライド可能に取り付けら
れた第3フレーム47と、第3フレーム47に対して上
下方向にスライド可能に取り付けられた第4フレーム4
8と、第4フレーム48に対して水平軸49を中心とし
て回転可能に取り付けられた第5フレーム50とを有す
るものである。なお、符号51は把持フレーム42の全
体を上下方向に首振りさせるための油圧シリンダ、52
は第2〜第5フレームを左右方向に首振りさせるための
油圧シリンダ、53は第3〜第5フレームを左右方向に
スライドさせるための油圧シリンダ、54はそのスライ
ドを案内するガイドローラ、55は第4〜第5フレーム
を上下方向にスライドさせるための油圧シリンダ、56
はその昇降を案内するガイドローラ、57は第5フレー
ムを水平軸49回りに回転させるための油圧シリンダで
ある。Next, an example of a suitable handling device employed for gripping the reinforcing jig 10 will be described with reference to FIG. The handling device 39 uses a hydraulic excavator as a base machine, has a self-propelled traveling vehicle 40, has a swivelable boom 41, and has a gripping jig 10 at an end thereof so as to be capable of controlling the posture. Frame 42
Is attached. The gripping frame 42 is attached to the tip of the boom 41 so as to be able to swing vertically about a horizontal axis 43, and swings horizontally about a vertical axis 45 with respect to the first frame 44. A second frame 46 slidably attached to the second frame 46, a third frame 47 slidably attached to the second frame 46 in the left-right direction, and a third frame slidably attached to the third frame 47 in the up-down direction. 4 frames 4
8 and a fifth frame 50 rotatably mounted on a fourth frame 48 about a horizontal axis 49. Reference numeral 51 denotes a hydraulic cylinder for swinging the entire gripping frame 42 in the vertical direction.
Is a hydraulic cylinder for swinging the second to fifth frames in the left and right direction, 53 is a hydraulic cylinder for sliding the third to fifth frames in the left and right direction, 54 is a guide roller for guiding the sliding, and 55 is A hydraulic cylinder 56 for sliding the fourth and fifth frames vertically
Is a guide roller for guiding the ascending and descending, and 57 is a hydraulic cylinder for rotating the fifth frame around the horizontal axis 49.
【0022】そして、上記の第5フレーム50に、配筋
用治具10を背面側から把持する把持機構60が備えら
れている。その把持機構60は、図6に示すように、軸
61,62により回転自在に軸支されていて配筋用治具
10の横材13を上下から挟み込む対の把持爪63,6
4と、それら把持爪63,64を開閉操作するための油
圧シリンダ65、ロッド66、リンク67とにより構成
され、油圧シリンダ65を作動させてロッド66をその
軸方向にスライドさせることで各把持爪63,64を開
閉操作して配筋用治具10を解除可能に把持するものと
されている。The fifth frame 50 is provided with a gripping mechanism 60 for gripping the bar arrangement jig 10 from the back side. As shown in FIG. 6, the gripping mechanism 60 is rotatably supported by shafts 61 and 62, and a pair of gripping claws 63 and 6 that sandwich the horizontal member 13 of the reinforcing jig 10 from above and below.
4 and a hydraulic cylinder 65, a rod 66, and a link 67 for opening and closing the gripping claws 63 and 64. By operating the hydraulic cylinder 65 and sliding the rod 66 in the axial direction, each gripping claw is formed. The jig 10 for rebar arrangement is gripped releasably by opening and closing the 63 and 64.
【0023】上記構成のハンドリング装置39は、把持
機構60によって配筋用治具10を把持フレーム42に
把持して走行台車40を自走させ、かつブーム41を旋
回させることによって配筋用治具10を所望の配筋位置
に導き、かつ把持フレーム42を首振り、スライド、回
転させることによって、配筋用治具10を互いに直交す
る3軸方向に変位させかつそれらの軸回りに回転させて
自由に所望の姿勢とすることができるものである。In the handling device 39 having the above-described structure, the gripping jig 10 is gripped by the gripping frame 42 by the gripping mechanism 60 to allow the traveling carriage 40 to run on its own, and the boom 41 is turned to rotate the boom 41. 10 is guided to a desired bar arrangement position, and the holding frame 42 is swung, slid, and rotated to displace the bar arrangement jig 10 in three axes directions orthogonal to each other and to rotate the jigs 10 around these axes. It is possible to freely take a desired posture.
【0024】次に、上記の配筋用治具10およびハンド
リング装置39を用いて図8に示す地中構造物における
縦筋3…の配筋作業について説明する。配筋すべき縦筋
3…としてはネジ筋を用い、その一端すなわち既設縦筋
に接続するべき接続端にはネジ込み式の機械継手5…を
予め装着しておく。そして、それらの縦筋3…を、既に
述べたようにして鉄筋把持具10を順次積み重ねつつそ
れらの鉄筋把持具10に装着し、そのようにして積み重
ねた状態の複数の鉄筋把持具10…を一括して施工箇所
の近傍に搬送する。Next, a description will be given of the work of arranging the vertical streaks 3 in the underground structure shown in FIG. Screw threads are used as the vertical bars 3 to be arranged, and screwed mechanical joints 5 are attached in advance at one end, that is, a connection end to be connected to the existing vertical bar. Then, as described above, the vertical bars 3 are attached to the reinforcing bar gripping tools 10 while sequentially stacking the reinforcing bar gripping tools 10, and a plurality of the reinforcing bar gripping tools 10 in the state of being stacked in this manner are stacked. Collectively transport to the vicinity of the construction site.
【0025】施工箇所においては、図5に示すように、
積み重ねられている複数の配筋用治具10…のうちの最
上段のものを上記のハンドリング装置39により把持し
て配筋位置に導き、その把持フレーム42を操作するこ
とにより各縦筋3…の姿勢を調節してそれぞれの機械継
手5…を既設縦筋の接続端の位置に臨ませる。At the construction site, as shown in FIG.
Of the plurality of stacked jigs 10 for stacking, the uppermost one is gripped by the above-mentioned handling device 39 and guided to a bar arrangement position, and the gripping frame 42 is operated to operate the vertical bars 3. Is adjusted so that each mechanical joint 5 faces the connection end of the existing longitudinal streak.
【0026】そして、図7に示すように高所作業車70
に作業員が乗込み、各縦筋3…を機械継手5…によって
既設縦筋に対して順次接続していく。この際、縦筋3…
は保持部15…内に回転自在に保持されているので機械
継手5…によるネジ込み作業を容易に行なうことができ
る。全ての縦筋3…の接続が完了したらスライドパイプ
18を引き込むことで各縦筋3…の保持を解除し、把持
フレーム42を後退させれば配筋用治具10は取り外さ
れ、既設縦筋に接続された縦筋3…は既設縦筋から吊り
下げられた形態で残置される。これで配筋用治具1台分
つまり14本の縦筋3…の配筋作業が完了したので、以
降はハンドリング装置39に新たな配筋用治具10を把
持して同様の手順を繰り返せば良い。Then, as shown in FIG.
An operator gets in the vehicle and sequentially connects the longitudinal bars 3 to the existing longitudinal bars by mechanical joints 5. At this time, vertical streak 3 ...
Are rotatably held in the holding portions 15 so that the screwing operation by the mechanical joints 5 can be easily performed. When the connection of all the vertical bars 3 is completed, the holding of each vertical bar 3 is released by pulling in the slide pipe 18, and the gripping jig 10 is removed by retracting the gripping frame 42, and the existing vertical bars 3 are removed. Are left in a form suspended from the existing vertical streaks. With this, the rebar arrangement work for one rebar arrangement jig, that is, the 14 vertical rebars 3... Has been completed. Thereafter, the handling apparatus 39 grasps the new rebar arrangement jig 10 and repeats the same procedure. Good.
【0027】以上のように、本実施例の配筋用治具10
およびハンドリング装置39を用いることにより、複数
本の縦筋3…を一括して配筋位置に導いて配筋姿勢に保
持することができ、個々の縦筋3…を手作業により1本
ずつ位置決めして配筋していた従来の場合に比して作業
効率を格段に向上させることができ、十分な省力化を実
現できる。As described above, the bar arrangement jig 10 of this embodiment is
And the use of the handling device 39, it is possible to collectively guide the plurality of vertical streaks 3 to the bar arrangement position and hold the bar arrangement posture, and position the individual vertical streaks 3 manually one by one. The working efficiency can be greatly improved as compared with the conventional case in which the reinforcement is arranged, and sufficient labor saving can be realized.
【0028】また、本実施例の配筋用治具10は個々の
縦筋3…を回転可能な状態で保持するので、ネジ込み式
の機械継手5…を採用する場合にはそれら縦筋3…を自
由に回転させることができるものであり、したがって縦
筋3…と横筋4…とを予め金網状に一体化してしまう場
合のように接続作業が面倒になることもない。但し、縦
筋3の接続は必ずしも機械継手5を用いることに限られ
ず、たとえば既設縦筋に対して結束あるいは溶接するこ
とでも良く、その場合は必ずしも縦筋3を回転可能に保
持することはない。そのようにした場合であっても、複
数本の縦筋3…を配筋用治具10により一括して配筋姿
勢に保持しておき、既設縦筋に対する接続作業を順次行
なうことでその作業を容易に行ない得ることに変りはな
い。The jig 10 for arranging reinforcement according to the present embodiment holds the individual vertical streaks 3 in a rotatable state. Therefore, when the screw-in type mechanical joints 5 are employed, the vertical streaks 3 are used. Can be freely rotated, so that the connection work does not become troublesome as in the case where the vertical stripes 3 and the horizontal stripes 4 are integrated in a wire mesh in advance. However, the connection of the vertical streak 3 is not necessarily limited to the use of the mechanical joint 5, but may be, for example, binding or welding to the existing vertical streak. In this case, the vertical streak 3 is not necessarily held rotatably. . Even in such a case, a plurality of vertical streaks 3... Are held in a bar-arrangement posture by the bar arrangement jig 10 at a time, and the connection work to the existing vertical streaks is sequentially performed to perform the work. Is still easy to do.
【0029】ところで、縦筋3…の配筋に引続いて横筋
4…の配筋を行なうのであるが、横筋4…の配筋作業
は、上記と同様の配筋用治具10に複数本の横筋4…を
一括して保持させ、その配筋用治具10を横にした形態
で用いて各横筋4…を既設横筋に対して順次接続すると
ともに既設縦筋に対して順次結束していくことにより、
縦筋3…の場合と同様に効率的に行なうことができる。
その場合、横筋4…どうしの接続は機械継手5…を用い
て行なうこともできるし、他の形態で接続することでも
良い。Next, the arrangement of the horizontal streaks 4 is performed following the arrangement of the vertical streaks 3. A plurality of jigs 10 for the arrangement of the horizontal streaks 4. Of the horizontal streaks 4... Are collectively held, and each of the horizontal streaks 4. By going
It can be performed efficiently as in the case of the vertical stripes 3.
In this case, the horizontal streaks 4 can be connected to each other by using the mechanical joints 5 or may be connected in another form.
【0030】なお、躯体2の形状が湾曲しているために
縦筋3の配列が曲線的になったり、横筋4…を湾曲させ
ておく場合があるが、そのような場合に適用するために
は、配筋用治具10のフレーム11を躯体形状や鉄筋形
状に合致するように湾曲させておけば良い。The arrangement of the vertical streaks 3 may be curved or the horizontal streaks 4... May be curved because the shape of the frame 2 is curved. In this case, the frame 11 of the reinforcing jig 10 may be curved so as to conform to the frame shape or the reinforcing bar shape.
【0031】[0031]
【発明の効果】以上で説明したように、請求項1の発明
の配筋用治具は、ハンドリング装置により背面側から把
持される矩形枠状のフレームの前面側に、多数本の鉄筋
を保持する複数の保持部と、鉄筋をフレームに対して係
脱自在に係止する係止機構を具備し、特に、保持部を一
対のガイド体から構成するとともに係止機構をスライド
パイプとそれに取り付けた複数の係止爪から構成して、
スライドパイプをスライドさせることで係止爪により保
持部を閉塞しかつ解放する構成としたので、これを用い
ることで個々の鉄筋を1本ずつ手作業により配筋する場
合に比して配筋作業効率を格段に向上させることがで
き、十分な省力化を実現できる。 As described above, the invention of claim 1 is described.
The jigs for rebar arrangement are grasped from the back side by a handling device.
On the front side of the rectangular frame held, a number of reinforcing bars
And the reinforcing bars are fixed to the frame.
Equipped with a locking mechanism for releasably locking, in particular,
Consists of a pair of guide bodies and slides the locking mechanism
Consisting of a pipe and a plurality of locking claws attached to it,
By sliding the slide pipe, it is held by the locking claw.
The holding part is closed and released.
Where the individual reinforcing bars are arranged one by one by hand
Can significantly improve the efficiency of bar arrangement work.
As a result, sufficient labor saving can be realized.
【0032】また、請求項2の発明の配筋用治具は、保
持部内において鉄筋を回転可能に保持するので、ネジ込
み式の機械継手を用いる場合に好適である。 Further , the reinforcing jig according to the second aspect of the present invention is
Since the rebar is rotatably held in the holding section,
It is suitable when using only mechanical joints.
【0033】さらに、請求項3の発明の配筋用治具は、
フレームを順次積み重ねできるものとしておくとともに
その背面側に他のフレームに保持するべき鉄筋の位置決
めのための他の保持部を設けたので、配筋用治具に対す
る鉄筋の装着作業を容易に行なうことができる。 Further, the jig for bar arrangement according to the third aspect of the present invention
Make sure that the frames can be stacked sequentially
On its back side, the positioning of the rebar to be held in another frame
The other holding parts are provided for
The work of mounting the rebar can be easily performed.
【図1】本発明の一実施例である配筋用治具の全体正面
図である。FIG. 1 is an overall front view of a bar arrangement jig according to an embodiment of the present invention.
【図2】同配筋用治具の部分拡大平面図である。FIG. 2 is a partially enlarged plan view of the jig for reinforcing bars.
【図3】同配筋用治具の要部拡大斜視図である。FIG. 3 is an enlarged perspective view of a main part of the jig for reinforcing bars.
【図4】同配筋用治具に鉄筋を装着する一連の作業手順
を示す図である。FIG. 4 is a view showing a series of work procedures for mounting a reinforcing bar on the reinforcing bar jig.
【図5】同配筋用治具を把持するハンドリング装置の一
例を示す図であって、(a)は側面図、(b)は把持フ
レームの平面図である。5A and 5B are diagrams illustrating an example of a handling device that grips the jig for reinforcing bars, wherein FIG. 5A is a side view and FIG. 5B is a plan view of a gripping frame.
【図6】同ハンドリング装置における配筋用治具の把持
機構を示す側面図である。FIG. 6 is a side view showing a gripping mechanism of a bar arrangement jig in the handling device.
【図7】同ハンドリング装置を用いて配筋作業を行って
いる状態を示す図である。FIG. 7 is a diagram showing a state in which a bar arrangement work is performed using the handling device.
【図8】大規模な地中構造物の躯体の一例を示す図であ
る。FIG. 8 is a diagram illustrating an example of a frame of a large-scale underground structure.
2 躯体 3 縦筋(鉄筋) 4 横筋(鉄筋) 5 機械継手 10 配筋用治具 11 フレーム 15 保持部 16 ガイド体 17 係止機構 22 ガイド体 23 他の保持部 39 ハンドリング装置 40 走行台車 41 ブーム 42 把持フレーム 60 把持機構。 2 Frame 3 Vertical Bar (Rebar) 4 Horizontal Bar (Rebar) 5 Mechanical Joint 10 Jig for Reinforcement 11 Frame 15 Holder 16 Guide 17 Locking Mechanism 22 Guide 23 Other Holder 39 Handling Device 40 Traveling Dolly 41 Boom 42 gripping frame 60 gripping mechanism.
───────────────────────────────────────────────────── フロントページの続き (72)発明者 許斐 慎一 東京都港区芝浦一丁目2番3号 清水建 設株式会社内 (72)発明者 大橋 輝顕 東京都港区芝浦一丁目2番3号 清水建 設株式会社内 (56)参考文献 特開 昭60−175669(JP,A) 実開 昭57−50534(JP,U) (58)調査した分野(Int.Cl.7,DB名) E04G 21/12 105 E04G 21/16 - 21/18 ──────────────────────────────────────────────────続 き Continuing on the front page (72) Inventor Shinichi Konomi 1-3-2 Shibaura, Minato-ku, Tokyo Inside Shimizu Corporation (72) Inventor Teruaki Ohashi 1-3-2 Shibaura, Minato-ku, Tokyo Shimizu Corporation (56) References JP-A-60-175669 (JP, A) JP-A-57-50534 (JP, U) (58) Fields investigated (Int. Cl. 7 , DB name) E04G 21/12 105 E04G 21/16-21/18
Claims (3)
鉄筋の配筋を行なうに際して、複数本の鉄筋をほぼ平行
な状態として一括に保持するための配筋用治具であっ
て、 ハンドリング装置によって背面側から把持される矩形枠
状のフレームと、該フレームの前面側に複数本の鉄筋を
所定間隔をおいて互いに平行な状態で保持するための複
数の保持部と、該保持部に保持した鉄筋をそれぞれフレ
ームに対して係脱自在に係止する係止機構を具備し、 前記保持部は、保持するべき鉄筋の外形寸法より大きな
間隔をおいて前記フレームの前面側に突出して固定され
た一対のガイド体からなり、 前記係止機構は、前記各ガイド体をスライド可能に貫通
しているスライドパイプと、該スライドパイプに取り付
けられて該スライドパイプのスライドにより前記一対の
ガイド体の間に位置して保持部を閉塞しかつそこから退
避して保持部を解放する複数の係止爪とからなることを
特徴とする配筋用治具。 (1) embedded in a reinforced concrete frame
When arranging reinforcing bars, multiple reinforcing bars are almost parallel
Is a jig for reinforcing bars to hold
And the rectangular frame gripped from the back side by the handling device
And a plurality of reinforcing bars on the front side of the frame
A multiple for maintaining parallel to each other at a given interval
The number of holding parts and the reinforcing bars held by the holding parts
A locking mechanism for removably locking the arm, wherein the holding portion is larger than an outer dimension of a reinforcing bar to be held.
Projected to the front side of the frame at a distance and fixed
And the locking mechanism slidably penetrates each of the guide bodies.
Slide pipe and the slide pipe
The slide of the slide pipe causes
Closes the holding part located between the guide bodies and retreats from it.
Escaping and releasing the holding part
A special jig for bar arrangement.
記保持部は個々の鉄筋をそれぞれ回転自在に保持する構
成とされていることを特徴とする配筋用治具。 2. The jig for reinforcing bars according to claim 1, wherein
The holding section is configured to hold each rebar rotatably.
A jig for arranging reinforcement, characterized in that it is formed.
って、前記フレームはその背面側に同一形状の他の配筋
用治具のフレームが積み重ね可能とされ、かつ、該フレ
ームの背面側には他の配筋用治具に保持するべき鉄筋の
位置決めのための他の保持部が設けられていることを特
徴とする配筋用治具。 3. A jig for reinforcing bars according to claim 1 or 2.
Therefore, the frame has another reinforcing bar of the same shape on its rear side.
The jig frame can be stacked and the frame
On the back side of the arm, there is a reinforcing bar to be
Note that other holding parts for positioning are provided.
A jig for rebar arrangement.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP17909194A JP3182711B2 (en) | 1994-07-29 | 1994-07-29 | Reinforcing jig |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP17909194A JP3182711B2 (en) | 1994-07-29 | 1994-07-29 | Reinforcing jig |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH0842152A JPH0842152A (en) | 1996-02-13 |
| JP3182711B2 true JP3182711B2 (en) | 2001-07-03 |
Family
ID=16059912
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP17909194A Expired - Fee Related JP3182711B2 (en) | 1994-07-29 | 1994-07-29 | Reinforcing jig |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3182711B2 (en) |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP6129658B2 (en) * | 2013-06-25 | 2017-05-17 | 鹿島建設株式会社 | Handling device, rebar and formwork construction method |
| CN106403608B (en) * | 2016-08-31 | 2019-08-02 | 鄂尔多斯市君正能源化工有限公司 | It is a kind of for removing the device and method of Fesi Furnace lower part equipment |
| KR101999889B1 (en) * | 2017-07-12 | 2019-07-12 | 현대건설주식회사 | Jig For Pre-Assembling Iron Bar And Assembling Method Using Thereof |
| CN121184140B (en) * | 2025-11-24 | 2026-02-06 | 中建二局第一建筑工程有限公司 | Annular climbing device for tunnel reinforcement trolley |
-
1994
- 1994-07-29 JP JP17909194A patent/JP3182711B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JPH0842152A (en) | 1996-02-13 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US5033554A (en) | Well point placement and removal apparatus | |
| WO2005073497A1 (en) | Device and method for manipulation of objects on a drilling installation | |
| JP3182711B2 (en) | Reinforcing jig | |
| JP3924448B2 (en) | Suspended scaffold construction device and suspension scaffold construction method | |
| JP3021192B2 (en) | Mobile hanging scaffolding equipment | |
| DE202015004156U1 (en) | FVM - Tile Laying Machine | |
| JP7054120B2 (en) | Rod handling attachment | |
| DE3445910A1 (en) | Auxiliary building machine | |
| JP7015123B2 (en) | Handling robot and how to use it | |
| JPH0882195A (en) | Large net construction method and device | |
| JP2008201579A (en) | Hose winding device | |
| CN113775294A (en) | Follow-up pipe shed construction device and construction method while drilling | |
| JP3801323B2 (en) | Smoke lining core sampling system | |
| CN217999590U (en) | Construction self-propelled drilling and blasting trolley device | |
| JP6257372B2 (en) | Concrete groove forming apparatus and seismic strengthening method for existing concrete columns using the apparatus | |
| JPH0455144Y2 (en) | ||
| CN117386070B (en) | Steel reinforcement framework of assembled precast pile | |
| EP3913144B1 (en) | Method for making a tie rod in the ground and receiving drum for a cable element | |
| CN209755107U (en) | percussion drill fixing frame for drilling screw hole on suspended ceiling boom | |
| CN216664252U (en) | A appurtenance for deviational survey pipe ligature | |
| JPH083511Y2 (en) | Drilling rig | |
| JPH0547088U (en) | Double pipe mounting device | |
| JPH09215451A (en) | Portable greenhouse film spreading machine and greenhouse film spreading method using the same | |
| CN211647439U (en) | A hydraulic pliers for demolition of concrete structures | |
| JPS61136079A (en) | Laying device for pipe |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20010321 |
|
| LAPS | Cancellation because of no payment of annual fees |