Precast floor slab for semi-underground parking and its mounting structure

Info

Publication number
JP3205653B2
JP3205653B2 JP28002193A JP28002193A JP3205653B2 JP 3205653 B2 JP3205653 B2 JP 3205653B2 JP 28002193 A JP28002193 A JP 28002193A JP 28002193 A JP28002193 A JP 28002193A JP 3205653 B2 JP3205653 B2 JP 3205653B2
Authority
JP
Japan
Prior art keywords
floor slab
concrete
receiving plate
main body
parking lot
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP28002193A
Other languages
Japanese (ja)
Other versions
JPH07109848A (en
Inventor
明 岸
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Misawa Homes Co Ltd
Original Assignee
Misawa Homes Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Misawa Homes Co Ltd filed Critical Misawa Homes Co Ltd
Priority to JP28002193A priority Critical patent/JP3205653B2/en
Publication of JPH07109848A publication Critical patent/JPH07109848A/en
Application granted granted Critical
Publication of JP3205653B2 publication Critical patent/JP3205653B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、傾斜した床面を有する
半地下型駐車場に用いるプレキャスト床版及びその取付
け構造に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a precast slab for use in a semi-underground parking lot having a sloping floor and a mounting structure thereof.

【0002】[0002]

【従来の技術】従来、この種の半地下型の駐車場を構築
する場合、駐車スペースを最小限にするために、駐車場
の床面を傾斜状態に形成することが行なわれている。
2. Description of the Related Art Conventionally, when constructing such a semi-underground parking lot, the floor of the parking lot is formed to be inclined in order to minimize the parking space.

【0003】このような傾斜床面を有する駐車場を構築
する場合、まず地盤の駐車場構築領域を掘削して根切り
部を形成し、この根切り部内の周囲に基礎を構築する。
When constructing a parking lot having such a sloping floor, first, a parking lot construction area on the ground is excavated to form a root cutting portion, and a foundation is built around the inside of the root cutting portion.

【0004】次いで、根切り部内を駐車場床面の傾斜に
相応させて埋め戻し、その傾斜面に沿ってコンクリート
を打設することによって、傾斜状態の床面を形成するよ
うにしていた。
[0004] Next, the inside of the root cutting portion is backfilled in accordance with the inclination of the floor of the parking lot, and concrete is poured along the inclined surface to form an inclined floor.

【0005】[0005]

【発明が解決しようとする課題】前記従来の半地下型の
駐車場の構築にあっては、床面を傾斜状態に形成するた
めに、根切り部を掘削形成した後に、更に根切り部内の
埋め戻しを行なわなければならず、この埋め戻しに要す
る労力は多大なもので、時間が掛り、工期が長引く上に
コスト高になるという問題があった。
In the construction of the above-mentioned conventional semi-underground parking lot, in order to form a floor surface in an inclined state, after excavating and forming a root cutting portion, the inside of the root cutting portion is further excavated. Backfilling has to be performed, and the labor required for the backfilling is enormous, requiring a long time, a long construction period, and high costs.

【0006】また、埋め戻した後に、現場打ちでコンク
リートを打設して養生しなければならないため、養生に
要する期間中、そこに立入らないようにしなければなら
ず、作業がしにくいという問題もあった。
In addition, concrete must be cast in place and cured after it is backfilled, so that it is necessary to keep out of the area during the period required for curing, which makes it difficult to work. There was also.

【0007】本発明は、前記問題点を解決するためにな
されたもので、その目的は、根切り部内の埋め戻しを行
なうことなく、傾斜状態の床面を形成することができ、
しかも養生期間を考慮することなく作業を行なうことの
できる半地下型駐車場のプレキャスト床版及びその取付
け構造を提供することにある。
SUMMARY OF THE INVENTION The present invention has been made to solve the above problems, and an object of the present invention is to form an inclined floor surface without backfilling in a root cut.
Further, it is an object of the present invention to provide a precast floor slab of a semi-underground parking garage capable of performing work without considering a curing period and a mounting structure thereof.

【0008】[0008]

【課題を解決するための手段】前記目的を達成するた
め、第1の発明は、地盤の駐車場形成領域を掘削した根
切り部内に一端側を地表面位置、他端側を根切り部の底
部に位置させた傾斜状態で配設される略方形状をなすプ
レキャストコンクリート製の床版本体と、前記床版本体
の前記一端側に形成された上部固定用のアンカーボルト
挿通孔と、前記床版本体の前記他端側に形成された下部
固定用のコンクリート注入孔と、前記床版本体の中間部
に形成された中間部支持固定用の連結孔と、を備えるこ
とを特徴としている。
In order to achieve the above object, a first aspect of the present invention is to provide a ground excavation section in which a parking lot forming area of the ground is excavated, one end of which is located at a ground surface position and the other end of which is a ground excavation section. A substantially square precast concrete floor slab body disposed at the bottom and arranged in an inclined state, an upper fixing anchor bolt insertion hole formed at the one end side of the floor slab body, and The present invention is characterized in that it has a concrete pouring hole for fixing the lower portion formed on the other end side of the plate main body, and a connecting hole for supporting and fixing an intermediate portion formed in an intermediate portion of the floor slab main body.

【0009】第2の発明は、地盤の駐車場形成領域を掘
削した根切り部内の周囲にプレキャストコンクリート製
の基礎を立設し、かつ中間部に中間支持用の束基礎を立
設すると共に、出入口側と反対側位置の根切り部の底部
に下端受け版を配設し、前記下端受け版上に前記プレキ
ャストコンクリート製の床版本体の前記他端を載置し、
前記床版本体の前記一端を出入口側の基礎上端に載置支
持させ、かつ出入口側の基礎上端より突出したアンカー
ボルトを床版本体のアンカーボルト挿通孔に挿通させて
連結し、前記下部固定用のコンクリート注入孔及び中間
部固定用の連結孔にそれぞれコンクリートを注入し、床
版本体と、束基礎及び下端受け版とを固定することを特
徴としている。
In a second aspect of the present invention, a precast concrete foundation is erected around the inside of a root excavated portion where a parking lot forming area of the ground is excavated, and an intermediate support bundle foundation is erected at an intermediate part. A lower end receiving plate is arranged at the bottom of the root cutting portion at a position opposite to the entrance side, and the other end of the precast concrete floor slab body is placed on the lower end receiving plate,
The one end of the floor slab body is placed and supported on the upper end of the entrance-side foundation, and an anchor bolt protruding from the entrance upper end of the foundation is inserted into the anchor bolt insertion hole of the floor slab body and connected to connect the lower slab. Concrete is injected into each of the concrete injection holes and the connection holes for fixing the intermediate portion, and the floor slab main body, the bundle foundation and the lower end receiving plate are fixed.

【0010】第3の発明は、前記下端受け版が、平板状
の受け版本体と、この受け版本体の両長手辺より上下方
向に連続して突出したコンクリート止め部とを備え、前
記受け版本体には、受け版本体の上下の空間を連通させ
てコンクリートを受け版本体の上下に回り込ませる連通
孔が形成されていることを特徴としている。
According to a third aspect of the present invention, the lower receiving plate includes a plate-shaped receiving plate main body, and a concrete stopper portion projecting vertically from both longitudinal sides of the receiving plate main body. The main body is characterized in that a communication hole is formed in the main body so that the space above and below the main body of the receiving plate communicates with each other and the concrete goes around the main body of the main plate.

【0011】[0011]

【作用】前記構成の第1及び第2の発明にあっては、地
盤の駐車場形成領域を掘削して形成した根切り部内の周
囲に基礎を形成し、プレキャストコンクリート製の床版
本体の一端を出入口側の基礎上端位置、他端を根切り部
の底部に位置させた傾斜状態に配設し、かつ、前記出入
口側の基礎上端から突出したアンカーボルトを床版本体
の前記一端側に形成したアンカーボルト挿通孔に挿通さ
せて連結する。
According to the first and second aspects of the present invention, a foundation is formed around a root cut portion formed by excavating a parking lot forming area of the ground, and one end of a precast concrete floor slab body is formed. Is disposed in an inclined state with the upper end position of the entrance side on the entrance side and the other end positioned at the bottom of the root cutout, and an anchor bolt projecting from the upper end of the foundation on the entrance side is formed on the one end side of the floor slab main body. And inserted into the anchor bolt insertion hole.

【0012】この場合、根切り部内を傾斜状に埋め戻し
する必要はなく、床版本体を設置するだけで済むため、
埋め戻しに要する労力を省略することができ、しかも工
期の短縮化、コストの削減が可能となる。また、現場で
広範囲なコンクリートの打設を行なう必要がなく、従っ
て、養生期間中の作業の煩わしさも解消されることとな
る。
In this case, it is not necessary to backfill the inside of the root cutting portion in an inclined manner, and only the floor slab main body needs to be installed.
The labor required for backfilling can be omitted, and the construction period can be shortened and the cost can be reduced. Further, it is not necessary to cast a wide range of concrete on site, and therefore, the troublesome work during the curing period is also eliminated.

【0013】更に、下部固定用のコンクリート注入孔及
び中間部支持固定用の連結孔よりコンクリートを注入し
て、床版本体と、束基礎及び下端受け版とを固定するこ
とにより、より確実な取付けが可能となる。
Further, concrete is injected from a concrete injection hole for fixing the lower portion and a connection hole for fixing and fixing the intermediate portion, and the floor slab main body, the bundle foundation and the lower end receiving plate are fixed, so that a more secure mounting is achieved. Becomes possible.

【0014】第3の発明にあっては、下端受け版を構成
する受け版本体の両長手辺より上下方向にコンクリート
止め部を連続して突出させ、受け版本体に上下の連通孔
を形成することにより、床版本体下端側のコンクリート
注入孔より注入したコンクリートを受け版本体の上下に
確実に回り込ませ、かつ注入したコンクリートを連結部
分に確実に保持して連結状態を強固にすることが可能と
なる。
According to the third aspect of the invention, the concrete stoppers are continuously projected vertically from both longitudinal sides of the receiving plate main body constituting the lower end receiving plate, and upper and lower communication holes are formed in the receiving plate main body. As a result, the concrete injected from the concrete injection hole at the bottom end of the floor slab can be securely wrapped around the top and bottom of the slab main body, and the injected concrete can be securely held at the connection part to strengthen the connection state Becomes

【0015】[0015]

【実施例】以下、本発明の実施例について、図面を参照
して詳細に説明する。
Embodiments of the present invention will be described below in detail with reference to the drawings.

【0016】図1は、本発明の一実施例に係る半地下駐
車場のプレキャスト床版を示す図である。
FIG. 1 is a view showing a precast floor slab of a semi-underground parking lot according to an embodiment of the present invention.

【0017】このプレキャスト床版10は、床版本体1
2と、アンカーボルト挿通孔14と、コンクリート注入
孔16と、連結孔18とから構成されている。
The precast floor slab 10 is a floor slab main body 1.
2, an anchor bolt insertion hole 14, a concrete injection hole 16, and a connection hole 18.

【0018】床版本体12は、略方形状をなすプレキャ
ストコンクリート製のもので、地盤の駐車場形成領域を
掘削した根切り部内に一端20側を地表面位置、他端2
2側を根切り部の底部に位置させた傾斜状態で配設さ
れ、駐車場の傾斜した床面を構成するようになってい
る。
The floor slab main body 12 is made of precast concrete having a substantially square shape. One end 20 is located at the ground surface position and the other end 2 is located in a root cut portion formed by excavating a parking lot forming area of the ground.
The two sides are arranged in an inclined state with the bottom located at the bottom of the root cutting portion, and constitute an inclined floor surface of the parking lot.

【0019】また、この床版本体12は、床版本体12
上に自動車が載った場合でも、折損することのないよう
に、内部に補強筋等を配設して、十分な強度を持たせる
ようにしている。
Further, the floor slab main body 12 is
Reinforcing bars and the like are provided inside to prevent the vehicle from being broken even if the vehicle is mounted on the vehicle so as to have sufficient strength.

【0020】更に、床版本体12の表面は、予め仕上処
理された状態となっており、根切り部内への配設後、仕
上処理を行なう必要がないようになっている。
Further, the surface of the floor slab main body 12 is in a state of being subjected to a finishing treatment in advance, so that it is not necessary to perform the finishing treatment after disposing it in the root cutting portion.

【0021】さらに、床版本体12の上面には,図示せ
ぬが、スリップ防止用のカラー等があらかじめ形成され
るようになっている。このカラー等は床版本体12がプ
レキャストコンクリート製であるため、容易に、しかも
安価に形成することが可能である。
Further, although not shown, a collar or the like for preventing slip is formed on the upper surface of the floor slab body 12 in advance. Since the floor slab body 12 is made of precast concrete, the collar and the like can be formed easily and at low cost.

【0022】アンカーボルト挿通孔14は、床版本体1
2の一端20側に左右一対形成され、傾斜状態の床版本
体12の上部を固定するもので、基礎側のアンカーボル
トを挿通して連結し得るようになっている。また、アン
カーボルト挿通孔14の表面周囲には、図4に示すよう
に、角形のテーパ状の凹部24が形成され、この凹部2
4をコンクリート等にて埋めることにより、アンカーボ
ルトの先端を覆うことができるようになっている。
The anchor bolt insertion hole 14 is provided in the floor slab main body 1.
A pair of left and right sides is formed on one end 20 side of the base 2 to fix the upper portion of the floor slab main body 12 in an inclined state, and can be connected by inserting an anchor bolt on the foundation side. A rectangular tapered recess 24 is formed around the surface of the anchor bolt insertion hole 14, as shown in FIG.
By embedding 4 with concrete or the like, the tip of the anchor bolt can be covered.

【0023】コンクリート注入孔16は、床版本体12
の他端22側に左右二対形成され、傾斜状態の床版本体
12の下部を固定するもので、上方からコンクリートを
注入固化させることにより、根切り部の底部に固定し得
るようになっている。また、このコンクリート注入孔1
6は、図5に示すように、表面側から裏面側にかけて、
拡開するように形成され、固定用のコンクリートの注入
が容易になるようになっている。
The concrete injection hole 16 is provided in the floor slab main body 12.
Left and right are formed on the other end 22 side, and fix the lower part of the slab body 12 in an inclined state. By injecting and solidifying concrete from above, the concrete can be fixed to the bottom of the root cutting part. I have. Also, this concrete injection hole 1
6, from the front side to the back side, as shown in FIG.
It is formed so as to expand, so that the concrete for fixing can be easily poured.

【0024】連結孔18は、床版本体12の一端20
と、他端22との間の中間部に左右一対形成され、表面
側から固定用のコンクリートを注入することにより、束
基礎等の中間部支持部材と固定されるようになってい
る。また、この連結孔18も、図7に示すように、表面
側から裏面側にかけて拡開し、固定用のコンクリートの
注入が容易になるようになっている。
The connection hole 18 is provided at one end 20 of the floor slab main body 12.
A pair of right and left is formed at an intermediate portion between the first and second ends, and is fixed to an intermediate portion support member such as a bundle foundation by injecting concrete for fixing from the surface side. Also, as shown in FIG. 7, the connection hole 18 is expanded from the front side to the back side so that the concrete for fixing can be easily injected.

【0025】次に、前記実施例に係るプレキャスト床版
10の取付け構造を、図2〜図7に基づいて説明する。
Next, a mounting structure of the precast floor slab 10 according to the embodiment will be described with reference to FIGS.

【0026】まず、図2には、半地下型駐車場30を有
する建物32が示されており、この半地下型駐車場30
を構築するに当っては、まず、図3に示すように、地盤
34の駐車場形成領域を掘削して根切り部36を形成
し、この根切り部36内の周囲にプレキャストコンクリ
ート製の基礎38、40を立設する。この場合、駐車場
30の出入口42側には、根切り部36の底部44から
略地表面46までに相当する高さの低い基礎38を用
い、その他の部分にはこの基礎38よりも高さの高い基
礎40を用いるようにしている。なお、基礎38及び4
0の外側部分は埋め戻しするようにしている。
First, FIG. 2 shows a building 32 having a semi-underground parking lot 30.
First, as shown in FIG. 3, as shown in FIG. 3, a parking lot forming area of the ground 34 is excavated to form a root cut portion 36, and a precast concrete foundation is formed around the inside of the root cut portion 36. 38 and 40 are erected. In this case, on the entrance 42 side of the parking lot 30, a base 38 having a low height corresponding to from the bottom 44 of the root cutting portion 36 to substantially the ground surface 46 is used, and the other portions are higher than the base 38. The high foundation 40 is used. In addition, foundations 38 and 4
The portion outside 0 is backfilled.

【0027】また、基礎38、40にて囲まれた根切り
部36内には、床版本体12に形成した連結孔18に相
応する位置の中間部に中間支持用の束基礎48を立設す
ると共に、出入口42側と反対側位置の根切り部36の
底部44に下端受け版50を配設している。この下端受
け版50は、プレキャストコンクリート製のもので、平
板状の受け版本体52と、この受け版本体52の両長手
辺より上下方向に連続して突出したコンクリート止め部
54とを備え、このコンクリート止め部54によって受
け版本体52の下部及び上部にコンクリート溜まり用の
空間が形成されるようになっている。また、受け版本体
52には、連通孔56が形成され、受け版本体52の上
下の空間を連通させてコンクリートを受け版本体52の
上下の空間に回り込ませるようになっている。
In the root cutting portion 36 surrounded by the foundations 38 and 40, an intermediate supporting bundle foundation 48 is erected at an intermediate portion at a position corresponding to the connection hole 18 formed in the floor slab main body 12. At the same time, a lower end receiving plate 50 is disposed at the bottom 44 of the root cutting portion 36 at a position opposite to the entrance 42 side. The lower end receiving plate 50 is made of precast concrete, and includes a flat plate receiving plate main body 52 and a concrete stopper 54 projecting vertically from both longitudinal sides of the receiving plate main body 52. The concrete stopper 54 forms a space for storing concrete in the lower part and the upper part of the receiving plate main body 52. A communication hole 56 is formed in the receiving plate main body 52 so that the upper and lower spaces of the receiving plate main body 52 are communicated with each other so that the concrete wraps around the upper and lower spaces of the receiving plate main body 52.

【0028】そして、下端受け版50上にプレキャスト
コンクリート製の床版本体12の他端22を載置し、床
版本体12の一端20を出入口42側の基礎38上端に
載置支持させて出入口42側から奥側にかけて下降傾斜
状態に支持させ、かつ出入口42側の基礎38の上端よ
り突出したアンカーボルト58を床版本体12のアンカ
ーボルト挿通孔14に挿通させ、ナット59で締めつけ
ることにより連結するようにしている(図3及び図4参
照)。また、床版本体12のアンカーボルト挿通孔14
周囲に形成した凹部24内には、図4に示すように、コ
ンクリート60を注入してアンカーボルト58を覆うよ
うにしている。
Then, the other end 22 of the precast concrete floor slab main body 12 is placed on the lower end receiving plate 50, and one end 20 of the floor slab main body 12 is placed and supported on the upper end of the foundation 38 on the side of the doorway 42 so that the doorway is opened. The anchor bolts 58 are supported in a downwardly inclined state from the 42 side to the back side, and project from the upper end of the foundation 38 on the entrance 42 side through the anchor bolt insertion holes 14 of the floor slab main body 12, and are connected by tightening with the nut 59. (See FIGS. 3 and 4). Further, the anchor bolt insertion hole 14 of the floor slab main body 12 is provided.
As shown in FIG. 4, concrete 60 is poured into the recess 24 formed on the periphery to cover the anchor bolt 58.

【0029】そして更に、図5及び図7に示すように、
下部固定用のコンクリート注入孔16及び中間部固定用
の連結孔18よりそれぞれコンクリート62、64を注
入し、床版本体12と、束基礎48及び下端受け版50
とを固定する。この場合、コンクリート注入孔16及び
連結孔18は、裏面にかけて拡開するようになっている
ので、確実に下端受け版50、束基礎48側に確実に注
入されて、固化連結状態となる。また、下端受け版50
の受け版本体52に形成した連通孔56によって、コン
クリート62が確実に受け版本体52の上下に回り込
み、かつコンクリート止め部54によってコンクリート
62が保持されるので、確実な連結状態が得られること
となる。また、束基礎48の上面には、図7(B)に示
すように、床版本体12の連結孔18対応位置に切欠き
部66が形成され、この切欠き部66内をコンクリート
64にて埋めることにより、シェアコッタを構成するよ
うにしている。なお、図示せぬが、出入口42側の基礎
38上端に換気用の切欠き部が形成されている場合に
は、この換気用の切欠き部内にコンクリート60を注入
してシェアコッタを構成するようにすることも可能であ
る。
Further, as shown in FIGS. 5 and 7,
Concrete 62 and 64 are poured from the concrete injection hole 16 for fixing the lower part and the connection hole 18 for fixing the middle part, respectively, and the floor slab main body 12, the bundle foundation 48 and the lower end receiving plate 50 are provided.
And fix. In this case, since the concrete injection hole 16 and the connection hole 18 are designed to expand toward the back surface, the concrete injection hole 16 and the connection hole 18 are reliably injected into the lower end receiving plate 50 and the bundle base 48 side to be in a solidified connection state. Also, the lower plate 50
The concrete holes 62 formed in the receiving plate main body 52 are surely wrapped up and down of the receiving plate main body 52, and the concrete 62 is held by the concrete stopper 54, so that a reliable connection state is obtained. Become. As shown in FIG. 7B, a notch 66 is formed on the upper surface of the bundle foundation 48 at a position corresponding to the connection hole 18 of the floor slab main body 12, and the inside of the notch 66 is filled with concrete 64. By filling, a share cotter is configured. Although not shown, if a notch for ventilation is formed at the upper end of the foundation 38 on the side of the entrance 42, concrete 60 is injected into the notch for ventilation to form a shear cotter. It is also possible.

【0030】このように、根切り部36内を埋め戻しす
ることなく、傾斜状態の床面を形成することができ、埋
め戻しにようする労力を省略して、工期の短縮、コスト
の削減を行なうことができる。また、プレキャスト床版
10を用いることにより、床面の仕上処理が不要とな
り、現場打ちコンクリートのように養生期間が不要であ
るため、作業の煩わしさも解消できることとなる。
As described above, the floor surface in an inclined state can be formed without backfilling the inside of the root cutting portion 36, and labor for backfilling can be omitted, thereby shortening the construction period and reducing the cost. Can do it. In addition, the use of the precast floor slab 10 eliminates the need for a finishing process on the floor surface and eliminates the need for a curing period as in the case of cast-in-place concrete, so that the troublesome work can be eliminated.

【0031】本発明は、前記実施例に限定されるもので
はなく、本発明の要旨の範囲内において、種々の変形実
施が可能である。
The present invention is not limited to the above embodiment, and various modifications can be made within the scope of the present invention.

【0032】例えば、プレキャスト床版10の中間支持
部材として束基礎を示しているが、この例に限らず、プ
レキャスト製の布基礎等を用いるようにすることも可能
である。
For example, although a bundle base is shown as an intermediate support member of the precast floor slab 10, the present invention is not limited to this example, and a precast cloth base or the like may be used.

【0033】[0033]

【発明の効果】以上説明したように、第1及び第2の発
明にあっては、プレキャストコンクリート製の床版本体
の一端を出入口側の基礎上端位置、他端を根切り部の底
部に位置させた傾斜状態に配設し、かつ、前記出入口側
の基礎上端から突出したアンカーボルトを床版本体の前
記一端側に形成したアンカーボルト挿通孔に挿通させて
連結することにより、根切り部内を傾斜状に埋め戻しす
ることなく、半地下型駐車場の傾斜した床面を形成する
ことができ、根切り部内の埋め戻しに要する労力を省略
することができ、しかも工期の短縮化、コストの削減が
なし得るという効果がある。
As described above, in the first and second aspects of the present invention, one end of the precast concrete floor slab is positioned at the upper end of the foundation on the entrance side, and the other end is positioned at the bottom of the root cutting portion. Arranged in the inclined state, and anchor bolts protruding from the upper end of the entrance-side entrance are inserted into anchor bolt insertion holes formed on the one end side of the floor slab main body and connected to each other, so that the inside of the root cut portion is formed. It is possible to form a sloping floor of a semi-underground parking lot without backfilling in a sloping manner, eliminating the labor required for backfilling in the root cut, shortening the construction period and reducing costs. There is an effect that reduction can be achieved.

【0034】また、現場で広範囲なコンクリートの打設
を行なう必要がなく、従って、養生期間中の作業の煩わ
しさも解消できるという効果がある。
In addition, there is no need to cast a wide range of concrete on site, and therefore, it is possible to eliminate the troublesome work during the curing period.

【0035】更に、下部固定用のコンクリート注入孔及
び中間部支持固定用の連結孔よりコンクリートを注入し
て、床版本体と、束基礎及び下端受け版とを固定するこ
とにより、より確実な取付けができるという効果があ
る。
Further, concrete is injected through the concrete injection hole for fixing the lower portion and the connection hole for fixing the intermediate portion, and the floor slab is fixed to the bundle base and the lower end receiving plate, thereby assuring a more secure mounting. There is an effect that can be.

【0036】第3の発明にあっては、下端受け版を構成
する受け版本体の両長手辺より上下方向にコンクリート
止め部を連続して突出させ、受け版本体に上下の連通孔
を形成することにより、床版本体下端側のコンクリート
注入孔より注入したコンクリートを受け版本体の上下に
確実に回り込ませ、かつ注入したコンクリートを連結部
分に確実に保持して連結状態を強固にすることができる
という効果がある。
According to the third aspect of the present invention, the concrete stoppers are continuously projected vertically from both longitudinal sides of the receiving plate body constituting the lower end receiving plate, and upper and lower communication holes are formed in the receiving plate body. Thereby, the concrete injected from the concrete injection hole at the lower end side of the floor slab main body can be surely wrapped around the top and bottom of the slab main body, and the injected concrete can be securely held at the connection portion to strengthen the connection state. This has the effect.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の一実施例に係る半地下型駐車場のプレ
キャスト床版を示す斜視図である。
FIG. 1 is a perspective view showing a precast floor slab of a semi-underground parking lot according to an embodiment of the present invention.

【図2】図1のプレキャスト床版を用いて構築した半地
下型の駐車場を有する建物を示す説明図である。
FIG. 2 is an explanatory diagram showing a building having a semi-underground parking lot constructed using the precast floor slab of FIG. 1;

【図3】図2の半地下型駐車場の要部拡大断面図であ
る。
FIG. 3 is an enlarged sectional view of a main part of the semi-underground parking lot of FIG. 2;

【図4】図3のプレキャスト床版上端部の連結状態を示
す拡大断面図である。
FIG. 4 is an enlarged sectional view showing a connected state of an upper end portion of the precast floor slab of FIG. 3;

【図5】図3のプレキャスト床版下端部の連結状態を示
す拡大断面図である。
FIG. 5 is an enlarged sectional view showing a connected state of a lower end portion of the precast floor slab of FIG. 3;

【図6】図5の下端受け版の拡大斜視図である。FIG. 6 is an enlarged perspective view of the lower end receiving plate of FIG. 5;

【図7】(A)は図3のプレキャスト床版中間部の連結
状態を示す拡大断面図で、(B)は(A)の矢視B方向
より見た断面図である。
7A is an enlarged cross-sectional view showing a connected state of the intermediate portion of the precast floor slab of FIG. 3, and FIG. 7B is a cross-sectional view as viewed from the arrow B direction of FIG.

【符号の説明】[Explanation of symbols]

10 プレキャスト床版 12 床版本体 14 アンカーボルト挿通孔 16 コンクリート注入孔 18 連結孔 20 一端 22 他端 30 半地下型駐車場 34 地盤 36 根切り部 38、40 基礎 42 出入口 44 底部 46 地表面 48 束基礎 50 下端受け版 52 受け版本体 54 コンクリート止め部 56 連通孔 58 アンカーボルト DESCRIPTION OF SYMBOLS 10 Precast floor slab 12 Floor slab main body 14 Anchor bolt insertion hole 16 Concrete injection hole 18 Connection hole 20 One end 22 Other end 30 Semi-underground parking lot 34 Ground 36 Root cut 38, 40 Foundation 42 Doorway 44 Bottom 46 Ground surface 48 Bundle Foundation 50 Lower end receiving plate 52 Receiving plate main body 54 Concrete stopper 56 Communication hole 58 Anchor bolt

Claims (3)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 地盤の駐車場形成領域を掘削した根切り
部内に一端側を地表面位置、他端側を根切り部の底部に
位置させた傾斜状態で配設される略方形状をなすプレキ
ャストコンクリート製の床版本体と、 前記床版本体の前記一端側に形成された上部固定用のア
ンカーボルト挿通孔と、 前記床版本体の前記他端側に形成された下部固定用のコ
ンクリート注入孔と、 前記床版本体の中間部に形成された中間部支持固定用の
連結孔と、 を備えることを特徴とする半地下型駐車場のプレキャス
ト床版。
1. A substantially rectangular shape which is disposed in an inclined state with one end located at the ground surface position and the other end located at the bottom of the root cutting portion in a root cutting portion obtained by excavating a parking lot forming area of the ground. A precast concrete floor slab body, an upper fixing anchor bolt insertion hole formed at the one end side of the floor slab body, and a lower fixing concrete injection formed at the other end side of the floor slab body. A precast floor slab for a semi-underground parking lot, comprising: a hole; and a connection hole for supporting and fixing an intermediate portion formed in an intermediate portion of the floor slab main body.
【請求項2】 地盤の駐車場形成領域を掘削した根切り
部内の周囲にプレキャストコンクリート製の基礎を立設
し、かつ中間部に中間支持用の束基礎を立設すると共
に、出入口側と反対側位置の根切り部の底部に下端受け
版を配設し、 前記下端受け版上に前記プレキャストコンクリート製の
床版本体の前記他端を載置し、前記床版本体の前記一端
を出入口側の基礎上端に載置支持させ、かつ出入口側の
基礎上端より突出したアンカーボルトを床版本体のアン
カーボルト挿通孔に挿通させて連結し、 前記下部固定用のコンクリート注入孔及び中間部固定用
の連結孔にそれぞれコンクリートを注入し、床版本体
と、束基礎及び下端受け版とを固定することを特徴とす
る請求項1に記載の半地下型駐車場のプレキャスト床版
の取付け構造。
2. A base made of precast concrete is erected around the inside of a root cut portion excavated in a parking lot forming area of the ground, and a bundle base for intermediate support is erected at an intermediate portion, and is opposite to an entrance / exit side. A lower end receiving plate is disposed at the bottom of the root cutting portion at the side position, the other end of the precast concrete floor slab body is placed on the lower end receiving plate, and the one end of the floor slab main body is placed on the entrance side. An anchor bolt protruding from the upper end of the foundation on the entrance side is inserted and connected to the anchor bolt insertion hole of the floor slab body and connected to the concrete injection hole for lower part fixing and the intermediate part fixing part. The structure for mounting a precast floor slab in a semi-underground parking lot according to claim 1, wherein concrete is poured into the connection holes, and the floor slab body, the bundle foundation and the lower end receiving slab are fixed.
【請求項3】 請求項2において、 前記下端受け版は、平板状の受け版本体と、この受け版
本体の両長手辺より上下方向に連続して突出したコンク
リート止め部とを備え、 前記受け版本体には、受け版本体の上下の空間を連通さ
せてコンクリートを受け版本体の上下に回り込ませる連
通孔が形成されていることを特徴とする半地下型駐車場
のプレキャスト床版の取付け構造。
3. The receiving plate according to claim 2, wherein the lower receiving plate has a plate-shaped receiving plate main body, and a concrete stopper portion continuously projecting vertically from both longitudinal sides of the receiving plate main body. The plate body is provided with a communication hole that connects the space above and below the receiving plate body and allows the concrete to go around the top and bottom of the printing plate body. .
JP28002193A 1993-10-13 1993-10-13 Precast floor slab for semi-underground parking and its mounting structure Expired - Fee Related JP3205653B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP28002193A JP3205653B2 (en) 1993-10-13 1993-10-13 Precast floor slab for semi-underground parking and its mounting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP28002193A JP3205653B2 (en) 1993-10-13 1993-10-13 Precast floor slab for semi-underground parking and its mounting structure

Publications (2)

Publication Number Publication Date
JPH07109848A JPH07109848A (en) 1995-04-25
JP3205653B2 true JP3205653B2 (en) 2001-09-04

Family

ID=17619199

Family Applications (1)

Application Number Title Priority Date Filing Date
JP28002193A Expired - Fee Related JP3205653B2 (en) 1993-10-13 1993-10-13 Precast floor slab for semi-underground parking and its mounting structure

Country Status (1)

Country Link
JP (1) JP3205653B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104929391B (en) * 2015-07-16 2017-03-08 开封市共创起重科技有限公司 Lift landing is passed through before villa reduction semi-underground garage

Also Published As

Publication number Publication date
JPH07109848A (en) 1995-04-25

Similar Documents

Publication Publication Date Title
JPS6019370B2 (en) How to build an underground continuous wall
JP3690437B2 (en) Seismic reinforcement structure for existing buildings
JP2535722B2 (en) Reinforcement concrete column and steel beam connection structure and building construction method
JP3205653B2 (en) Precast floor slab for semi-underground parking and its mounting structure
JP2899463B2 (en) Material
JP2001132275A (en) Signpole foundation and its construction method
JP2885055B2 (en) Construction method of frame with precast members
JP3251698B2 (en) Tunnel lining element and tunnel construction method using the same
JP3778392B2 (en) Basic block
JPH0315605Y2 (en)
JPH07310365A (en) Synthetic earth retaining wall structure and its construction method
JP2922731B2 (en) How to connect slabs and concrete columns
JPH09256383A (en) Steel pillar construction method
KR100380907B1 (en) Precast concrete segment for arch type culvert and construction method using this segment
JPH116162A (en) Construction method for reinforced concrete underground external wall
JP2643760B2 (en) How to build foundation beams
JPH0218152Y2 (en)
JPH0447248Y2 (en)
JPH0218153Y2 (en)
JP2901889B2 (en) Beam main bar anchorage device at the connection between column and beam
JPH057350Y2 (en)
JPH07166652A (en) Casing for mounting anchor bolt and mounting method of anchor bolt
JP2947083B2 (en) Construction method of deep groove block
JP2000297440A (en) Underground outer wall and construction method thereof
JP2817967B2 (en) Fabric foundation and construction method

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20010619

LAPS Cancellation because of no payment of annual fees