Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP3209282B2 - Waste treatment method - Google Patents
[go: Go Back, main page]

JP3209282B2 - Waste treatment method - Google Patents

Waste treatment method

Info

Publication number
JP3209282B2
JP3209282B2 JP7812692A JP7812692A JP3209282B2 JP 3209282 B2 JP3209282 B2 JP 3209282B2 JP 7812692 A JP7812692 A JP 7812692A JP 7812692 A JP7812692 A JP 7812692A JP 3209282 B2 JP3209282 B2 JP 3209282B2
Authority
JP
Japan
Prior art keywords
waste
slope
sprayed
recess
rubber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP7812692A
Other languages
Japanese (ja)
Other versions
JPH05277459A (en
Inventor
行夫 東
洋司 菊地
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nittoc Constructions Co Ltd
Original Assignee
Nittoc Constructions Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nittoc Constructions Co Ltd filed Critical Nittoc Constructions Co Ltd
Priority to JP7812692A priority Critical patent/JP3209282B2/en
Publication of JPH05277459A publication Critical patent/JPH05277459A/en
Application granted granted Critical
Publication of JP3209282B2 publication Critical patent/JP3209282B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/30Landfill technologies aiming to mitigate methane emissions

Landscapes

  • Processing Of Solid Wastes (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、廃棄物の処理方法に関
する。
The present invention relates to a method for treating waste.

【0002】[0002]

【従来の技術】従来の一般の廃棄物や産業廃棄物の処理
は例えば図2及び図3に示すように、地山1に凹部10
を掘削し、その表面にモルタル・コンクリートを吹き付
けてモルタル・コンクリート層13を形成し、そのモル
タル・コンクリート層13の表面にゴム・アスファルト
層を吹付け、厚さが例えば1.5mmのゴム・アスファ
ルト層14を形成して表面層12を形成し、又は、図4
に示すように凹部10の表面に、ゴム・アスファルトシ
ート15を付設する(図4)。そして、表面層12又は
ゴム・アスファルトシート15の上に廃棄物Bを投棄
し、廃棄物Bの表面を整地用機械Cで均して図示しない
厚さが0.5〜1.0mの軟透水性の粘土材覆土で覆っ
ていた。
2. Description of the Related Art As shown in FIGS.
Is excavated, and mortar / concrete is sprayed on the surface thereof to form a mortar / concrete layer 13, and a rubber / asphalt layer is sprayed on the surface of the mortar / concrete layer 13 to have a thickness of, for example, 1.5 mm. Forming layer 14 to form surface layer 12 or FIG.
As shown in FIG. 4, a rubber / asphalt sheet 15 is provided on the surface of the concave portion 10 (FIG. 4). Then, the waste B is discarded on the surface layer 12 or the rubber / asphalt sheet 15, and the surface of the waste B is leveled by a leveling machine C to have a soft water permeable having a thickness of 0.5 to 1.0 m (not shown). It was covered with clay soil covering.

【0003】[0003]

【発明が解決しようとする課題】従来の方法において、
ゴム・アスファルトの場合は、モルタル・コンクリート
とゴム・アスファルトとの2回の吹付け作業が必要で、
施工に手間がかかり、また、モルタル・コンクリート層
13の劣化に伴い、ゴム・アスファルト層14にクラッ
クが発生し、公害物質の漏洩が生じ本来の目的が達成で
きない。
SUMMARY OF THE INVENTION In the conventional method,
In the case of rubber and asphalt, two spraying operations of mortar concrete and rubber asphalt are necessary,
The construction takes time, and the deterioration of the mortar / concrete layer 13 causes cracks in the rubber / asphalt layer 14, causing leakage of pollutants, and the original purpose cannot be achieved.

【0004】また、ゴム・アスファルトシート15の場
合は、法面部11の施工勾配が、1:1.5〜2.0の
緩い勾配でないと施工できないので、廃棄物Bの可能投
棄量が少ない。また、シートとシートとのジョイント部
の施工が、確実に密着しているかの確認が困難である。
また、シート15は、地山1に布設するので、廃棄物B
の投棄が随時行われる過程で、シート15が廃棄物Bの
重量、整地用機械Cの重量転圧や地山1の小石により破
損し易く、更に、破損の位置を確認して補修するのが極
めて困難であるなどの問題がある。
Further, in the case of the rubber / asphalt sheet 15, since the slope cannot be constructed unless the slope of the slope 11 is a gentle slope of 1: 1.5 to 2.0, the possible dumping amount of the waste B is small. In addition, it is difficult to check whether the joints between the sheets are securely adhered to each other.
Since the sheet 15 is laid on the ground 1, the waste B
In the process where the dumping is performed as needed, the sheet 15 is easily damaged by the weight of the waste B, the weight compaction of the leveling machine C and the pebbles of the ground 1, and further, it is necessary to confirm the position of the damage and repair it. There is a problem that it is extremely difficult.

【0005】本発明は、施工が容易で耐久性があり処理
量が多く、公害物質の漏洩がない廃棄物の処理方法を提
供することを目的としている。
[0005] An object of the present invention is to provide a method for treating waste which is easy to construct, is durable, has a large amount of treatment, and has no leakage of pollutants.

【0006】[0006]

【課題を解決するための手段】本発明の廃棄物の処理方
法によれば、地山に法面部の勾配が1:0.5〜1.0
と比較的急勾配の凹部を掘削し、セメントと砂とセメン
トに対して3〜10%重量%のシリカヒュームと0.8
〜2.0容積%の鋼繊維と水とを混合した吹付材を準備
し、その吹付材を7〜10kg/cmの高圧エアで前
記凹部の表面に吹付けて表面層を形成し、その表面層が
固化した後にゴム・アスファルトを散布し、そして凹部
内に廃棄物を投棄し、その投棄した廃棄物の表面を均し
て厚さが0.5〜1.0mの軟透水性の粘土材覆土で覆
うようになっている。
According to the waste disposal method of the present invention, the slope of the slope is 1: 0.5 to 1.0.
Excavated a relatively steep recess, and 3-10% by weight of silica fume and 0.8% of cement, sand and cement.
A spray material prepared by mixing steel fiber and water in an amount of up to 2.0% by volume is prepared, and the spray material is sprayed on the surface of the recess with high-pressure air of 7 to 10 kg / cm 2 to form a surface layer. After the surface layer is solidified, rubber asphalt is sprayed, and the waste is dumped in the recess. The surface of the dumped waste is leveled to a soft permeable clay having a thickness of 0.5 to 1.0 m. It is to be covered with wood covering soil.

【0007】[0007]

【作用】シリカヒュームのセメントに対する重量%は3
%以下では地山との密着性が悪くまた10%以上では無
駄であるからシリカヒュームは上記の範囲が最適であ
る。また、鋼繊維が0.8容積%以下では強度の向上や
地山とのからみ付きの効果がなく、そして2%以上では
強度やからみ付きの効果があまり向上しない。
[Function] The weight percentage of silica fume to cement is 3
% Or less, the adhesion to the ground is poor, and if it is 10% or more, it is wasteful, so that the above range of silica fume is optimal. Further, if the steel fiber content is 0.8% by volume or less, there is no effect of improving the strength or sticking to the ground, and if it is 2% or more, the effect of the strength and sticking is not so much improved.

【0008】[0008]

【0009】このように本発明によれば、シリカヒュー
ムや鋼繊維により、モルタル・コンクリートの特性であ
る粗密性が改善され、均一な密性が得られ、強度や地山
との密着性が向上される。したがって、廃棄物の重量等
による表面層の破損が防止され、また、法面部の勾配が
従来より急勾配で施工が可能となり、廃棄物の可能投棄
量が多くなる。そして遮水性が充分に保たれるので、公
害物質が漏洩することがない。
As described above, according to the present invention, silica fume and steel fiber improve the density of the mortar / concrete which is uniform, obtain a uniform density, and improve the strength and adhesion to the ground. Is done. Therefore, the surface layer is prevented from being damaged due to the weight of the waste and the like, and the slope of the slope portion can be constructed with a steeper slope than before, and the possible amount of waste to be dumped increases. And, since the water shielding property is sufficiently maintained, the pollutant does not leak.

【0010】[0010]

【実施例】以下図面を参照して本発明の実施例を説明す
る。
Embodiments of the present invention will be described below with reference to the drawings.

【0011】図1において、地山1に法面部3の勾配が
1:0.5〜1.0と比較的急勾配の凹部2を掘削す
る。次いで、その凹部2の表面に吹付材を吹付けて一様
な厚さの表面層4を形成する。この吹付材は、例えばセ
メント380〜450kg/m、セメントの4倍の
砂、高純度のシリカヒューム3〜10%(セメントに対
する重量%)、鋼繊維0.8〜2.0容積%及び水を順
次所定の時間で混合する。そして、この吹付材を、例え
ば7〜10kg/cmの高圧エアで耐圧ホースによ
り凹部2の表面に所定厚さで吹付ける。そして表面層4
が固化した後に、ゴム・アスファルトを散布する。
Referring to FIG. 1, a recess 2 having a relatively steep slope of 1: 0.5 to 1.0 is excavated in the ground 1. Next, a spray material is sprayed on the surface of the concave portion 2 to form a surface layer 4 having a uniform thickness. The spraying material is, for example, 380 to 450 kg / m 3 of cement, 4 times the sand of cement, 3 to 10% of high-purity silica fume (% by weight based on cement), 0.8 to 2.0% by volume of steel fiber, and water. Are sequentially mixed for a predetermined time. Then, the spraying material is sprayed with a high-pressure air of, for example, 7 to 10 kg / cm 2 onto the surface of the concave portion 2 with a predetermined thickness by a pressure-resistant hose. And surface layer 4
After solidification, rubber and asphalt is sprayed.

【0012】このようにして、投棄場Aの造成が終った
ら、廃棄物Bを投棄する。そして、整地用機械Cで廃棄
物Bの表面を均し、厚さが0.5〜1.0mの軟透水性
の粘土材覆土(図示せず)で表面を覆う。
When the construction of the dump site A is completed, the waste B is dumped. Then, the surface of the waste B is leveled by the leveling machine C, and the surface is covered with a soft permeable clay covering soil (not shown) having a thickness of 0.5 to 1.0 m.

【0013】したがって、シリカヒュームにより吹付け
モルタル・コンクリートの特性である粗密部が改善さ
れ、均一な密性が向上され、強度や地山1に対する密着
性が向上される。その結果、投棄した廃棄物Bの重量や
整地用機械Cの重量転圧による表面層4の破損が防止さ
れ、遮水性が向上できる。また、法面部3の勾配も、従
来の勾配1:1.5〜2.0に対し急勾配1:0.5〜
1.0を得ることができ、廃棄物Bの可能投棄量が多く
なる。
[0013] Therefore, the silica fume improves the density of the sprayed mortar / concrete, which improves the uniformity and the strength and the adhesion to the ground 1. As a result, breakage of the surface layer 4 due to the weight of the discarded waste B and the weight compaction of the leveling machine C can be prevented, and the water shielding can be improved. Also, the slope of the slope 3 is steep 1: 0.5 to 2.0 in comparison with the conventional slope of 1: 1.5 to 2.0.
1.0 can be obtained, and the possible amount of waste B to be discarded increases.

【0014】[0014]

【発明の効果】以上の通り本発明によれば、下記のすぐ
れた効果を奏する。 (a) シリカヒュームによりモルタル・コンクリート
の地山との密着性が向上し、急勾配の凹所を形成でき、
処理量が増加する。 (b) 鋼繊維を用いるため、そのからみ付きにより地
山との密着性がよく、また鉄筋の作用により強度が向上
し、耐久性がある。 (c) シリカヒュームにより遮水性が向上するが、さ
らにゴム・アスファルトを散布するので、公害物質の漏
洩がない。
As described above, according to the present invention, the following excellent effects can be obtained. (A) Adhesion of mortar and concrete to the ground is improved by silica fume, and a steep recess can be formed.
Processing volume increases. (B) Since the steel fiber is used, the adhesion to the ground is good due to the entanglement, and the strength is improved and the durability is enhanced by the action of the reinforcing bar. (C) Silica fume improves the water barrier, but since rubber and asphalt is sprayed, there is no leakage of pollutants.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明による投棄場を示す垂直断面図。FIG. 1 is a vertical sectional view showing a dump site according to the present invention.

【図2】従来の投棄場を示す垂直断面図。FIG. 2 is a vertical sectional view showing a conventional dump site.

【図3】図1の部分的拡大図。FIG. 3 is a partially enlarged view of FIG. 1;

【図4】ゴム・アスファルトシート布設を示す垂直断面
図。
FIG. 4 is a vertical sectional view showing laying of a rubber / asphalt sheet.

【符号の説明】[Explanation of symbols]

A・・・投棄場 B・・・廃棄物 C・・・整地用機械 1・・・地山 2、10・・・凹部 3、11・・・法面部 4、12・・・表面層 13・・・モルタル・コンクリート層 14・・・ゴム・アスファルト層 15・・・ゴム・アスファルトシート A: Dumping site B: Waste C: Machine for land preparation 1: Ground 2, 10, Depression 3, 11, Slope 4, 12, Surface layer 13. ..Mortar / Concrete layer 14 ... Rubber / asphalt layer 15 ... Rubber / asphalt sheet

───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.7,DB名) B09B 1/00 E02B 3/18 ──────────────────────────────────────────────────続 き Continued on the front page (58) Field surveyed (Int.Cl. 7 , DB name) B09B 1/00 E02B 3/18

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 地山に法面部の勾配が1:0.5〜1.
0と比較的急勾配の凹部を掘削し、セメントと砂とセメ
ントに対して3〜10%重量%のシリカヒュームと0.
8〜2.0容積%の鋼繊維と水とを混合した吹付材を準
備し、その吹付材を7〜10kg/cmの高圧エアで
前記凹部の表面に吹付けて表面層を形成し、その表面層
が固化した後にゴム・アスファルトを散布し、そして凹
部内に廃棄物を投棄し、その投棄した廃棄物の表面を均
して厚さが0.5〜1.0mの軟透水性の粘土材覆土で
覆うことを特徴とする廃棄物の処理方法。
1. The slope of the slope portion in the ground is 1: 0.5-1.
Drilling a relatively steep recess of 0, 3-10% by weight silica and fume with cement, sand and cement.
A spray material prepared by mixing 8 to 2.0% by volume of steel fiber and water is prepared, and the spray material is sprayed on the surface of the recess with high-pressure air of 7 to 10 kg / cm 2 to form a surface layer, After the surface layer is solidified, the rubber asphalt is sprayed, and the waste is dumped in the recess, and the surface of the dumped waste is leveled to a soft water-permeable material having a thickness of 0.5 to 1.0 m. A method for treating waste, comprising covering with clay covering soil.
JP7812692A 1992-04-01 1992-04-01 Waste treatment method Expired - Lifetime JP3209282B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7812692A JP3209282B2 (en) 1992-04-01 1992-04-01 Waste treatment method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7812692A JP3209282B2 (en) 1992-04-01 1992-04-01 Waste treatment method

Publications (2)

Publication Number Publication Date
JPH05277459A JPH05277459A (en) 1993-10-26
JP3209282B2 true JP3209282B2 (en) 2001-09-17

Family

ID=13653195

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7812692A Expired - Lifetime JP3209282B2 (en) 1992-04-01 1992-04-01 Waste treatment method

Country Status (1)

Country Link
JP (1) JP3209282B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110105016A (en) * 2019-05-17 2019-08-09 成都理工大学 Barrier wall material and its application method for ion Rare Earth Mine contaminated site

Also Published As

Publication number Publication date
JPH05277459A (en) 1993-10-26

Similar Documents

Publication Publication Date Title
CN102776897B (en) Wash apron anti-settling anti-cracking construction method and structure
CN100467814C (en) Anti-leakage construction process for inclined roof
CN209722598U (en) A kind of light-weight foamed soil structure of railway
CN209324375U (en) A kind of reparation structure of the poor highway tunnel lining cavity of pair of country rock
CA2334380C (en) A method of stabilising the ground in road construction work
CN106702845B (en) One kind preventing saline and alkaline permeable pavement structure
JP3209282B2 (en) Waste treatment method
CN109024123A (en) A kind of roadbed construction method
CN109681243A (en) A kind of pair of tunnel-liner two serves as a contrast the exposed method for comprehensive repairing of concrete water-proof plate
JP2000328544A (en) Laying of the impermeable layer at the bottom of the final disposal site, etc.
CN216865268U (en) Fill out earlier and post-cast strip structure
CN114381977A (en) A kind of treatment method for the reinforcement of renewable resources on the back of the platform on the steep slope of the road
JPS5996320A (en) Improvement of soft ground
KR100381056B1 (en) Construction method of porous concrete for river bank and surface
CN115463944B (en) Protection pile head processing method, device, terminal equipment and medium
JP2003212633A (en) Architectural molded plate, its manufacturing method and its construction method
JP3839369B2 (en) Impermeable foundation construction method for industrial waste treatment plant
JP2802815B2 (en) Embankment structure
JPS63138015A (en) Improving construction for construction site
JPH076177B2 (en) Water stop method for artificial pond
JPH0574644B2 (en)
CN108612286A (en) Residential housing is floating to build formula sound insulation vibration damping flooring construction method
JPS5822609B2 (en) How to build a tank foundation
Knapton et al. Single pour industrial floor slabs
JPS63138017A (en) Ground improvement method for construction

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20070713

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100713

Year of fee payment: 9