Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP3210604B2 - Transport trolley operating device - Google Patents
[go: Go Back, main page]

JP3210604B2 - Transport trolley operating device - Google Patents

Transport trolley operating device

Info

Publication number
JP3210604B2
JP3210604B2 JP18037197A JP18037197A JP3210604B2 JP 3210604 B2 JP3210604 B2 JP 3210604B2 JP 18037197 A JP18037197 A JP 18037197A JP 18037197 A JP18037197 A JP 18037197A JP 3210604 B2 JP3210604 B2 JP 3210604B2
Authority
JP
Japan
Prior art keywords
track
truck
groove
transport
vehicle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP18037197A
Other languages
Japanese (ja)
Other versions
JPH1113400A (en
Inventor
義純 岡田
隆 笠井
良則 中野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Okumura Corp
Original Assignee
Okumura Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Okumura Corp filed Critical Okumura Corp
Priority to JP18037197A priority Critical patent/JP3210604B2/en
Publication of JPH1113400A publication Critical patent/JPH1113400A/en
Application granted granted Critical
Publication of JP3210604B2 publication Critical patent/JP3210604B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明はトンネル築造時にお
いて、地上から立坑内に送り込まれたセグメント等の資
材の搬送台車を立坑からトンネルに敷設した軌道上に送
り出し、資材の搬送後、軌道上から立坑側に移し替えて
地上に送り出す搬送台車運行装置に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of constructing a tunnel, in which a carrier for transporting materials such as segments sent from the ground into a shaft is sent out from the shaft onto a track laid in a tunnel, and after the material is transferred, the material is transported from the track. The present invention relates to a transport trolley operating device for transferring to a shaft and sending it to the ground.

【0002】[0002]

【従来の技術】従来から、このような搬送台車運行装置
としては、図8に示すように、立坑Aの後壁側底部上に
地上側から昇降手段によって搬入される資材搬送台車20
を受け取ってトンネルTに敷設した軌道10の搬送始端部
上に移し替える旋回機構30を配設すると共に軌道10から
立坑A側に向かって分岐軌道11を敷設してこの分岐軌道
11上に起動車90を待機させるように構成している。
2. Description of the Related Art Conventionally, as such a transport vehicle operating device, as shown in FIG. 8, a material transport vehicle 20 which is carried in from above the ground on a rear wall side bottom of a shaft A by a lifting means.
And a turning mechanism 30 for transferring the track 10 on the transport start end of the track 10 laid in the tunnel T, and laying a branch track 11 from the track 10 toward the shaft A side.
It is configured such that the starting vehicle 90 is on standby on 11.

【0003】そして、地上から旋回機構30上に順次搬入
される資材搬送台車20を該旋回機構30上から軌道10上に
移し替えて順次連結したのち、分岐軌道11上に待機して
いた起動車90を前進させてこの資材搬送台車列の後端に
連結させ、起動車90によってセグメント等の資材施工現
場にまで搬送し、次いで、空になった搬送台車20を起動
車90によって再び立坑A側に牽引したのち、該起動車90
を搬送台車列から切り離して分岐軌道11側に待機させ、
搬送台車20を順次、旋回機構30に送り込んで昇降手段に
より地上側に搬出している。
[0003] After the material transporting trolleys 20 sequentially loaded from the ground onto the turning mechanism 30 are transferred from the turning mechanism 30 onto the track 10 and connected sequentially, the starting vehicle waiting on the branch track 11 is connected. 90 is moved forward and connected to the rear end of this row of material transport carts, transported to the material construction site such as a segment by the starting vehicle 90, and then the empty transport cart 20 is again moved to the shaft A side by the starting vehicle 90. Tow the starting vehicle 90
Is separated from the row of carrier trucks and waits on the branch track 11 side,
The transport vehicles 20 are sequentially sent to the turning mechanism 30, and are carried out to the ground side by the elevating means.

【0004】[0004]

【発明が解決しようとする課題】上記搬送台車運行シス
テムによれば、トンネル内への資材の搬入後、空になっ
た搬送台車20を旋回機構30に送り出すには、まず、起動
車90を搬送台車列から切り離して軌道10上から離れた場
所に待機させておく必要があるが、この待機方法として
は、従来から上述したように分岐軌道11を敷設して行っ
ているため、起動車90を該分岐軌道11に送り出したのち
は、搬送台車列を人力押しによって旋回機構30側に移動
させなければならなく、この作業に多大な労力と手間を
要することになる。
According to the above-mentioned transporting vehicle operation system, in order to send out the empty transporting vehicle 20 to the turning mechanism 30 after the material is loaded into the tunnel, first, the starting vehicle 90 is transported. Although it is necessary to separate from the bogie train and make it stand by at a place distant from the track 10, as the waiting method, since the branch track 11 is laid conventionally as described above, the starting vehicle 90 is After being sent to the branch track 11, the row of transport carts must be moved to the turning mechanism 30 by manual pushing, and this work requires a great deal of labor and labor.

【0005】さらに、旋回機構30から軌道10上にセグメ
ント等の資材を積載した搬送台車20を送り込む際におい
ても、最後尾の搬送台車20が分岐軌道11を前方側に通過
した状態となるまで順次、人力押しによって送り込まな
ければならず、上記以上に労力と手間を要して作業能率
が著しく低下するという問題点がある。
[0005] Further, when the transport vehicle 20 loaded with materials such as segments is sent from the revolving mechanism 30 onto the track 10, the transport vehicle 20 at the rear end is sequentially turned to the state where it has passed the branch track 11 forward. However, there is a problem that the work efficiency has to be remarkably reduced because the work has to be sent by manual push, requiring more labor and time.

【0006】本発明はこのような問題点に鑑みてなされ
たもので、その目的とするところは旋回機構から軌道端
に送り込まれる資材搬送台車を人手を要することなく、
最後尾の搬送台車が起動車に連結し得る位置まで順次、
自動的に移送すると共に資材の搬送が終了した搬送台車
を旋回機構の位置まで同じく自動的に能率よく移送する
ようにした搬送台車運行装置を提供するにある。
The present invention has been made in view of such a problem, and an object of the present invention is to provide a material transporting trolley fed from a turning mechanism to the end of a track without requiring any manual operation.
Sequentially to the position where the last carrier can be connected to the starting vehicle,
It is an object of the present invention to provide a transport trolley operating device that automatically and efficiently transports a transport trolley, which has been automatically transported and has completed material transport, to a position of a turning mechanism.

【0007】[0007]

【課題を解決するための手段】上記目的を達成するため
に、本発明の請求項1に係る搬送台車運行装置は、軌道
上で複数台連結した搬送台車列を起動車により運搬する
ように構成した搬送台車運行装置において、上記軌道の
下方に該軌道に沿って上記搬送台車列の長さに相当する
条溝を設け、この条溝内に搬送台車を一台ずつ上載して
搬送する第1起重台車を配設すると共に上記条溝端に該
条溝に直交する横断溝を設け、この横断溝に上記起動車
を上載して軌道上から一旦待機させる第2起重台車を配
設すると共に該第2起重台車に横断溝上の上記軌道部分
を分断してなる長さを有する分断軌道片を固定してなる
構造としている。
According to a first aspect of the present invention, there is provided a transport vehicle operating apparatus configured to transport a plurality of connected transport vehicle trains on a track by a starting vehicle. In the transporting vehicle operating device described above, a groove corresponding to the length of the row of transporting vehicles is provided below the track along the track, and a first transporting vehicle is loaded and transported one by one in the groove. At the end of the groove, a transverse groove orthogonal to the groove is provided, and a second lift truck on which the starting vehicle is mounted and temporarily waits from a track is disposed in the transverse groove. A split track piece having a length obtained by splitting the track portion on the transverse groove is fixed to the second hoisting truck.

【0008】請求項2に係る発明は上記第1および第2
起重台車の走行用軌道であって、上記条溝に上記横断溝
の部分を除いて第1起重台車の走行用軌道を敷設してい
る一方、上記横断溝にこの第1起重台車の走行用軌道よ
りも下方に位置させて上記第2起重台車の走行用軌道を
敷設していることを特徴とするものである。
The invention according to claim 2 is the first and second inventions.
A running track of the first hoisting truck, wherein the running track of the first hoisting truck is laid in the groove without the portion of the transverse groove. A running track of the second lifting truck is laid below the running track.

【0009】請求項3に係る発明は上記第1起重台車の
構造であって、この第1起重台車は台車本体にジャッキ
の作動によって昇降する搬送台車受台を配設してなり、
請求項4に係る発明は上記第2起重台車の構造であっ
て、この第2起重台車は台車本体の一半部上にジャッキ
の作動によって昇降する起動車受台を配設していると共
に他半部上に上記条溝に敷設した軌道における横断溝部
分の軌道部を取付けていることを特徴としている。又、
請求項5に係る発明は、資材搬送台車と起動車にはその
前後端に下方に向けて突出した連結ピンと該連結ピンが
嵌入可能な連結孔とをそれぞれ設けていることを特徴と
している。
According to a third aspect of the present invention, there is provided the structure of the first hoisting truck, wherein the first hoisting truck is provided with a carrier bogie cradle which moves up and down by operation of a jack on a bogie main body.
The invention according to claim 4 is the structure of the second hoisting truck, wherein the second hoisting truck is provided with a starting vehicle receiving stand which is raised and lowered by operation of a jack on one half of the bogie main body. A track portion of a transverse groove portion of the track laid in the groove is mounted on the other half. or,
The invention according to claim 5 is characterized in that the material transporting trolley and the starting vehicle are provided with connecting pins projecting downward at the front and rear ends thereof and connecting holes into which the connecting pins can be fitted, respectively.

【0010】[0010]

【作用】地上から昇降設備によってセグメント等の資材
を積載した搬送台車を立坑底部上の旋回機構上に搬入
し、旋回機構を旋回動させることによって該資材搬送台
車をトンネルに敷設した軌道端に向ける。この時、条溝
内に走行自在に配設している第1起重台車を軌道端側ま
で移動させて待機させておく一方、横断溝内の第2起重
台車はこの第1起重台車の走行の妨げにならないように
起動車を搭載した状態で横断溝の奥側に待機させてお
く。この状態にして旋回機構から第1起重台車の搬送台
車受台上に資材搬送台車を搭載し、該第1起重台車を軌
道に沿って条溝の前端まで走行させたのち、搬送台車受
台を降下させることによって該受台上の資材搬送台車を
軌道上に載置する。
A transport truck loaded with materials such as segments from the ground is carried into the turning mechanism on the bottom of the shaft by the lifting equipment, and the turning mechanism is turned so that the material transport truck is directed to the end of the track laid in the tunnel. . At this time, the first hoisting carriage movably disposed in the groove is moved to the track end side and kept on standby, while the second hoisting carriage in the transverse groove is the first hoisting carriage. In order not to hinder the running of the vehicle, the vehicle is kept on standby at the back of the crossing groove with the starting vehicle mounted. In this state, the material transporting trolley is mounted on the transporting trolley cradle of the first lifting trolley from the turning mechanism, and the first lifting trolley is moved along the track to the front end of the groove, and then the transporting trolley is received. By lowering the platform, the material transport trolley on the receiving platform is placed on the track.

【0011】次いで、第1起重台車を軌道端まで後退さ
せて再び地上から旋回機構上に搬入された資材搬送台車
を該第1起重台車に搭載し、軌道に沿って先に送り込ん
だ資材搬送台車の後端側にまで搬送したのち、搬送台車
受台を降下させることによって該資材搬送台車を軌道上
に載置すると共に前側の資材搬送台車の後端にその前端
を連結する。以下、同様にして複数台の資材搬送台車を
旋回機構側から順次、第1起重台車上に搭載して先に送
り込んだ資材搬送台車の後端側の軌道上に載置すると共
に互いに連結させたのち、横断溝に待機していた第2起
重台車を軌道端の下方にまで移動させ、その起動車受台
を降下させることによって分断軌道片を上記軌道に連続
させると共にこの軌道上に起動車を載置し且つ該起動車
の前端を複数台連結してなる資材搬送台車列の最後尾の
搬送台車の後端に連結させる。
Next, the first lift truck is retracted to the end of the track, and the material transporting truck transported from the ground onto the turning mechanism is mounted on the first lift truck, and the material previously fed along the track is transported. After being transported to the rear end side of the transport vehicle, the material transport vehicle is placed on the track by lowering the transport vehicle cradle, and its front end is connected to the rear end of the material transport vehicle on the front side. Hereinafter, in the same manner, a plurality of material transport vehicles are sequentially mounted from the turning mechanism side on the first hoisting vehicle, placed on the track on the rear end side of the material transport vehicle sent in earlier, and connected to each other. After that, the second lifting truck waiting in the crossing groove is moved to below the track end, and the starting vehicle cradle is lowered to connect the divided track pieces to the above track and start on the track. A vehicle is placed, and a front end of the starting vehicle is connected to a rear end of a rearmost transportation vehicle in a material transportation vehicle train formed by connecting a plurality of vehicles.

【0012】この状態にして起動車を駆動して資材搬送
台車列をトンネル内の施工現場にまで搬送し、資材を供
給したのち、空になった搬送台車列を起動車で旋回機構
側にまで牽引し、横断溝まで達した起動車を条溝と該横
断溝との交差部に待機させておいた第2起重台車の分断
軌道片上を走行させてこの第2起重台車の起動車受台上
で停止させる。しかるのち、搬送台車列の後端から起動
車の連結を解いて第2起重台車を横断溝の奥側に移動さ
せる。
In this state, the starting vehicle is driven to convey the material conveying vehicle train to the construction site in the tunnel, and after supplying the material, the empty conveying vehicle train is moved to the turning mechanism side by the starting vehicle. The starting vehicle that has been towed and reached the crossing groove is caused to travel on the divided track piece of the second hoisting vehicle, which is kept at the intersection of the groove and the crossing groove, to receive the starting vehicle of the second hoisting vehicle. Stop on the bench. Thereafter, the connection of the starting vehicle is released from the rear end of the row of transport vehicles, and the second lifting vehicle is moved to the far side of the transverse groove.

【0013】次いで、最後尾の搬送台車下方に第1起重
台車を移動させ、その搬送台車受台を上昇させることに
よって搬送台車を持ち上げると共に前側の搬送台車との
連結を解いたのちこの第1起重台車を軌道端にまで走行
させて該第1起重台車上の搬送台車を旋回機構側に移載
させ、この旋回機構から昇降設備によって地上側に搬出
する。同様に、再び第1起重台車を搬送台車列の後側搬
送台車下方にまで移動させたのち、該搬送台車をこの第
1起重台車によって軌道端まで搬送し、旋回機構側に送
り出して昇降設備により地上側に搬出させ、以下、この
作業を繰り返し行って全ての搬送台車を搬出するもので
ある。
Next, the first lift truck is moved below the rearmost transport truck, and the transport truck is lifted by raising the transport truck receiving stand, and the connection with the front transport truck is released. The lifting truck is moved to the end of the track to transfer the transport truck on the first lifting truck to the turning mechanism side, and is carried out from the turning mechanism to the ground side by the lifting equipment. Similarly, after the first lifting truck is again moved to the lower side of the rear transportation truck in the row of transportation trucks, the transportation truck is transported to the track end by the first lifting truck, sent out to the turning mechanism side, and moved up and down. The equipment is carried out to the ground side, and thereafter, this operation is repeated to carry out all the transport vehicles.

【0014】このような搬送台車運行装置において、上
記第1及び第2起重台車は請求項2に記載したように、
条溝と横断溝とに第1及び第2起重台車を走行させる軌
道をそれぞれ設けておくことによってこれらの第1及び
第2起重台車の走行が正確且つ円滑に行えると共に条溝
に敷設した軌道において横断溝に交差した部分を切除
し、この部分に請求項4に記載したように、第2起重台
車側に設けている軌道部を合致させるように構成してい
るので、第2起重台車を横断溝の奥側に待機させた状態
にして第1起重台車を上記軌道部上を走行させて軌道端
まで移動させることができる。
[0014] In such a transport vehicle operating device, the first and second hoisting vehicles are as described in claim 2;
By providing the tracks for running the first and second hoisting trucks in the groove and the transverse groove, respectively, the first and second hoisting trucks can be run accurately and smoothly, and laid in the groove. In the track, a portion intersecting with the transverse groove is cut off, and as described in claim 4, the track portion provided on the second hoisting carriage side is configured to match with the portion. With the heavy truck standing by at the back of the crossing groove, the first lifting truck can be moved on the above-mentioned track portion and moved to the track end.

【0015】また、上記第1及び第2起重台車は、請求
項3、請求項4に記載したように台車本体にジャッキに
よって昇降する受台を配設してなるものであるから、軌
道に対しての搬送台車や起動車の上昇、降下が確実に行
われ、その上、請求項5に記載したように資材搬送台車
と起動車との前後端に下方に向けて突出した連結ピンと
該連結ピンが嵌入可能な連結孔とをそれぞれ設けておく
ことによって、搬送台車台車同士の連結作業や連結解除
作業および搬送台車と起動車の連結作業や連結解除作業
が上記のように受台の昇降によって同時に能率よく行え
るものである。
Further, since the first and second hoisting trucks are provided with the receiving stand which is lifted and lowered by the jack on the bogie main body as described in the third and fourth aspects of the present invention, The transporting vehicle and the starting vehicle are reliably raised and lowered with respect to the connecting pins, and furthermore, the connecting pins projecting downward at the front and rear ends of the material transporting vehicle and the starting vehicle as described in claim 5 and the connection. By providing a connection hole in which a pin can be inserted, the connection work and the uncoupling work between the transport trolleys and the connection work and the decoupling work between the transport trolley and the starting vehicle are performed by elevating the receiving pedestal as described above. At the same time, it can be performed efficiently.

【0016】[0016]

【発明の実施の形態】本発明の具体的な実施の形態を図
面について説明すると、図1及び図2において、立坑A
の底部前壁側には築造中のトンネルTの掘削始端が開口
してあり、このトンネルTの底面にトンネルTの覆工現
場まで軌道1が敷設されていてこの軌道1上をセグメン
トSを積載した搬送台車2を走行させるように構成して
いる一方、立坑Aの底部後壁側には旋回機構3が配設さ
れ、上記軌道1の端部をこの旋回機構3の近傍位置まで
立坑Aの底部上に敷設して該軌道端を旋回機構3上の搬
送台車授受部に対向させるように構成している。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Referring to the drawings, a specific embodiment of the present invention will be described.
The excavation start end of the tunnel T under construction is open at the bottom front wall side, and a track 1 is laid on the bottom surface of the tunnel T to the lining site of the tunnel T, and a segment S is loaded on the track 1. The trolley 2 is configured to move the transport trolley 2, and a turning mechanism 3 is disposed on the bottom rear wall side of the shaft A, and the end of the track 1 is moved to a position near the turning mechanism 3. It is constructed such that it is laid on the bottom so that the end of the track faces the transfer trolley transfer unit on the turning mechanism 3.

【0017】さらに、地上Bから立坑A内を通じて旋回
機構3に対して搬送台車2を搬入、搬出するための昇降
設備4を配設していると共に上記軌道1の左右レール間
に該軌道端から前方に向かって複数台の搬送台車2を連
結してなる搬送台車列の長さに相当する条溝5を掘削、
形成してあり、この条溝5内に一台の搬送台車2を上載
して移送する第1起重台車6を走行自在に配設してい
る。また、上記旋回機構3の近傍部における軌道端部の
下方に、上記条溝5に直交し且つ該条溝5よりも深い横
断溝7を掘削、形成してあり、この横断溝7内に、搬送
台車2の搬送用起動車11を上記軌道1上から持ち上げて
横断溝7の一側奥部内に待機させるための第2起重台車
8を条溝5と交差する方向に移動自在に配設していると
共に上記条溝5と横断溝7との交差部分において、上記
軌道1は横断溝7の前後方向の長さに相当する部分が分
断され、その分断部に介入する軌道片1a(図6に示す)
を上記第2起重台車8側に敷設している。
Further, a lifting device 4 for loading and unloading the transporting trolley 2 from the ground B to the turning mechanism 3 through the shaft A is provided, and the rail 1 is located between the left and right rails of the track 1 from the track end. Excavating a groove 5 corresponding to the length of a row of carriages formed by connecting a plurality of carriages 2 forward;
In the groove 5, a first lift truck 6 for carrying one transport truck 2 thereon is provided so as to be able to travel. Further, a transverse groove 7 perpendicular to the groove 5 and deeper than the groove 5 is excavated and formed below the track end in the vicinity of the turning mechanism 3. A second lifting truck 8 for lifting the transport starting vehicle 11 of the transport truck 2 from above the track 1 and waiting inside one side of the transverse groove 7 is movably disposed in a direction intersecting the groove 5. At the intersection between the groove 5 and the transverse groove 7, the track 1 is divided at a portion corresponding to the length of the transverse groove 7 in the front-rear direction, and the track piece 1a intervening in the divided portion (FIG. 6)
Is laid on the second hoisting carriage 8 side.

【0018】また、上記搬送台車2の前後端の中央部に
は図3に示すように、下方に向けて突設した連結ピン12
と該連結ピン12が嵌入可能な大きさの連結孔13がそれぞ
れ設けられてあり、上記起動車11の中央部にも図5に示
すように、下方に向けて突設した連結ピン14と連結孔15
がそれぞれ設けられている。
As shown in FIG. 3, a connecting pin 12 projecting downward is provided at the center of the front and rear ends of the carrier 2.
And a connection hole 13 large enough to allow the connection pin 12 to be fitted therein. The connection hole 13 is also provided at the center of the starting vehicle 11 with a connection pin 14 projecting downward as shown in FIG. Hole 15
Are provided respectively.

【0019】上記昇降設備4は、地上Bに設置したウイ
ンチ41に巻装しているワイヤ42を立坑A内に垂下させ、
このワイヤ42の下端を、昇降架台43の四隅部上にその脚
部を固着させている門形状のフレーム44に回転自在に軸
支されたシーブ45に掛け渡してウインチ41の作動により
昇降架台43を地上と旋回機構3上との間で昇降させるよ
うに構成している。さらに、立坑Aの後壁面には下端が
旋回機構3の上面近くにまで達し、上端が上記フレーム
44の上端にまで配設している垂直レール46、46を固着し
てあり、この垂直レール46、46に上記昇降架台43の一側
端面の両端部に固着したガイド片47を係脱可能に係合さ
せて垂直レール46、46に沿って昇降架台43を昇降させ、
且つ該昇降架台43が旋回機構3の旋回台31上に受止され
た時に、垂直レール46、46の下端からガイド片47を離脱
させるように構成している。又、昇降架台43の上面には
上記軌道1のレール間と同一間隔を存して搬送台車載置
軌道48を敷設している。
The elevating equipment 4 causes the wire 42 wound around the winch 41 installed on the ground B to hang down in the shaft A,
The lower end of the wire 42 is wrapped around a sheave 45 rotatably supported by a gate-shaped frame 44 having its legs fixed to the four corners of the lifting platform 43, and the winch 41 is actuated. Is moved up and down between the ground and the turning mechanism 3. Further, the lower end of the rear wall of the shaft A reaches near the upper surface of the turning mechanism 3, and the upper end of the shaft
Vertical rails 46, 46 provided up to the upper end of 44 are fixed, and guide pieces 47 fixed to both ends of one side end surface of the elevating gantry 43 can be disengaged from the vertical rails 46, 46. Engage to raise and lower the lifting frame 43 along the vertical rails 46, 46,
Further, the guide piece 47 is detached from the lower ends of the vertical rails 46 when the lift frame 43 is received on the turntable 31 of the turn mechanism 3. Further, on the upper surface of the lift frame 43, a vehicle-mounted vehicle mounting track 48 is laid at the same interval as between the rails of the track 1 described above.

【0020】旋回機構3は立坑底部に設置した固定基台
31上に上記昇降架台43を受止する旋回台32を配設し、こ
の旋回台32の後端中央部を固定基台31に水平方向に回動
自在に枢着33していると共に固定基台31の前端側に上記
枢着部33を中心として円弧状に湾曲した固定ガイドレー
ル34を一体に設けてこの固定ガイドレール34上に沿って
旋回台32を旋回させるようにし、且つ旋回台32の後端に
突設したブラケット35と固定基台31又は立坑Aの後端面
間に旋回用ジャッキ36を連結してこのジャッキ36を作動
させることにより旋回台32を左右に旋回動させるように
構成している。また、旋回台32の高さは、この旋回台32
上に上記昇降架台43を載置させた時に、該昇降架台43上
に敷設した搬送台車載置軌道48が上記軌道1と略同一水
平面上となる高さに形成されている。
The turning mechanism 3 is a fixed base installed at the bottom of the shaft.
A swivel base 32 for receiving the elevating mount 43 is disposed on the upper base 31, and a rear end center portion of the swivel base 32 is pivotally attached to a fixed base 31 so as to be rotatable in a horizontal direction 33. A fixed guide rail 34, which is curved in an arc shape around the pivotal connection portion 33, is integrally provided on the front end side of the base 31 so that the swivel base 32 is swiveled along the fixed guide rail 34, and the swivel base 32 A pivoting jack 36 is connected between the bracket 35 protruding from the rear end and the rear end face of the fixed base 31 or the shaft A, and by operating this jack 36, the swivel table 32 is pivoted right and left. are doing. The height of the swivel 32 is
When the elevating platform 43 is mounted on the elevating platform 43, the on-vehicle mounting track 48 laid on the elevating platform 43 is formed at a height substantially on the same horizontal plane as the track 1.

【0021】上記条溝5と横断溝7の溝底にはそれぞれ
上記第1起重台車6の走行用軌道9と、該軌道9の下方
で交差する第2起重台車8の走行用軌道10とが敷設され
てあり、第1起重台車6の走行用軌道9は横断溝7と交
差した部分が切除されてその切除部の長さに相当する軌
道部9aを第2起重台車8側に敷設している。
The running track 9 of the first hoisting truck 6 and the running track 10 of the second hoisting truck 8 intersecting below the track 9 are respectively provided on the groove bottoms of the groove 5 and the transverse groove 7. The running track 9 of the first hoisting carriage 6 is cut off at a portion intersecting with the transverse groove 7 so that a track portion 9a corresponding to the length of the cutout portion is formed on the second hoisting carriage 8 side. Is laid.

【0022】第1起重台車6は図3、図4に示すよう
に、条溝5に敷設した上記軌道9上を走行する台車本体
61上にX字状に組み合わせたリンク機構よりなる昇降手
段63を介して搬送台車受台62を配設していると共にこれ
らの台車本体61と受台62間をジャッキ64により連結し
て、該ジャッキ64の作動により昇降手段63を上下方向に
伸縮させて受台62を昇降させるように構成している。こ
の受台62の上面の前後端部には搬送台車2の前後車輪2
a、2b間よりも狭い間隔を存して搬送台車2の下面を受
止する受止材65、65が固定されている。さらに、台車本
体61にはこの第1起重台車6の駆動用モータ66や油圧ユ
ニット67、駆動操作用ケーブル68等が配設されている。
As shown in FIGS. 3 and 4, the first hoisting carriage 6 travels on the track 9 laid in the groove 5.
A transport trolley support 62 is arranged via an elevating means 63 composed of a link mechanism combined in an X-shape on 61, and the trolley main body 61 and the cradle 62 are connected by a jack 64, and By operating the jack 64, the lifting / lowering means 63 is expanded and contracted in the vertical direction, and the receiving table 62 is raised and lowered. Front and rear wheels 2 of the transport vehicle 2 are provided on front and rear ends of the upper surface of the receiving table 62.
Receiving members 65, 65 for receiving the lower surface of the carrier 2 at a smaller interval than between a and 2b are fixed. Further, the truck main body 61 is provided with a drive motor 66, a hydraulic unit 67, a drive operation cable 68, and the like of the first lifting truck 6.

【0023】第2起重台車8は図5〜図7に示すよう
に、横断溝7に敷設した上記軌道10上を走行する台車本
体81の一半部(横断溝7の奥側)上に上記第1起重台車
6と同一構造を有するリンク機構よりなる昇降手段83を
介して起動車受台82を配設していると共にこれらの台車
本体83と受台82間をジャッキ84により連結して、該ジャ
ッキ84の作動により昇降手段83を上下方向に伸縮させて
受台82を昇降させるように構成している。この受台82の
上面の前後端部には起動車11の前後車輪11a 、11b より
も狭い間隔を存して起動車11の下面を受止する受止材8
5、85が固定されている。さらに、軌道10のレール間に
一端が溝底に固定され他端が台車本体83に連結している
走行用ジャッキ88を配設してこの走行用ジャッキ88の作
動により第2起重台車8を条溝5に交差する左右方向に
走行させるように構成している。86は横断溝7の適所に
設置した油圧ユニットである。
As shown in FIGS. 5 to 7, the second hoisting carriage 8 is mounted on one half of the carriage body 81 (on the back side of the transverse groove 7) running on the track 10 laid in the transverse groove 7. A starting vehicle cradle 82 is provided via lifting means 83 comprising a link mechanism having the same structure as the first lifting trolley 6, and the bogie main body 83 and the cradle 82 are connected by a jack 84. The operation of the jack 84 causes the elevating means 83 to expand and contract in the up and down direction, thereby moving the receiving table 82 up and down. At the front and rear ends of the upper surface of the receiving base 82, receiving members 8 for receiving the lower surface of the starting vehicle 11 with a smaller gap than the front and rear wheels 11a and 11b of the starting vehicle 11
5, 85 are fixed. Further, a traveling jack 88 having one end fixed to the groove bottom and the other end connected to the bogie main body 83 is provided between the rails of the track 10, and the second lifting bogie 8 is operated by the operation of the traveling jack 88. It is configured to run in the left-right direction crossing the groove 5. Reference numeral 86 denotes a hydraulic unit installed at an appropriate position in the transverse groove 7.

【0024】また、台車本体81の他半部上には前後方向
に向けて上記条溝5に敷設した軌道9の切除部に介入さ
せる上記軌道部9aを敷設していると共に台車本体81の一
半部上に受台82を挟んで支柱87、87を立設し、この支柱
87、87上に上記軌道1の分断部に介入する軌道片1aを敷
設している。なお、上記昇降手段63、83は2本のリンク
をX字状に組み合わせてその交差部を回動自在に枢着す
ると共にこれらのリンクの一端を台車本体と受台の一端
側対向面にそれぞれ枢着し、他端を台車本体と受台の他
端側対向面に摺動自在に支持させてなる構造としている
が、ジャッキや螺子機構等の昇降手段を採用してもよ
い。
On the other half of the bogie main body 81, the above-mentioned track portion 9a for laying in the cutout portion of the track 9 laid in the above-mentioned groove 5 in the front-rear direction is laid and one half of the bogie main body 81 is provided. Supports 87, 87 are erected on the base with the receiving stand 82
Track pieces 1a that intervene in the divided portions of the track 1 are laid on the tracks 87 and 87. The elevating means 63 and 83 combine the two links in an X-shape to pivotally connect the intersections thereof, and attach one end of each of these links to the bogie main body and one end facing surface of the receiving stand, respectively. Although it has a structure in which it is pivotally attached and the other end is slidably supported on the other end side of the bogie main body and the receiving stand, lifting means such as a jack or a screw mechanism may be adopted.

【0025】以上のように構成した搬送台車運行装置に
よってセグメント等の資材(以下、セグメントとする)
を積載した搬送台車2を地上BからトンネルT内に搬入
し、空になった搬送台車2をトンネルTから地上Bに搬
出するシステムについて説明すると、地上B側で搬送台
車2上にセグメントSを積載し、この搬送台車2を図1
に示すように地上Bに敷設した軌道16上を昇降設備4ま
で走行させる。この時、昇降設備4の昇降架台43はウイ
ンチ41の作動によって立坑Aの後壁面に固定した垂直レ
ール46をガイドとして立坑Aの上端まで上昇しており、
上記軌道12からこの昇降架台43上の軌道48上に搬送台車
2を移載させる。
Materials such as segments (hereinafter referred to as "segments") by the transporting vehicle operating device configured as described above.
The following describes a system in which the transport trolley 2 loaded with the vehicle is loaded into the tunnel T from the ground B and the empty transport trolley 2 is transported from the tunnel T to the ground B. After loading, the transport cart 2 is
As shown in (1), the vehicle travels on the track 16 laid on the ground B to the lifting equipment 4. At this time, the lifting platform 43 of the lifting equipment 4 has been raised to the upper end of the shaft A by the operation of the winch 41 using the vertical rail 46 fixed to the rear wall of the shaft A as a guide.
The carrier 2 is transferred from the track 12 to a track 48 on the lifting platform 43.

【0026】しかるのち、昇降架台43を垂直レール46に
沿って立坑A内の底部にまで降下させ、該昇降架台43の
下方にまでジャッキ36の作動によって旋回させておいた
旋回機構3の旋回台32上に昇降架台43を載せる。昇降架
台43が旋回台32上に乗ると、そのガイド片47が垂直レー
ル46の下端から離脱した状態となっており、次いで、ジ
ャッキ36を作動させて旋回台32をトンネルTから立坑A
の底面中央部側まで敷設している軌道1の端部と合致す
る位置まで回動させ、昇降架台43上のセグメント積載搬
送台車2を該軌道1の端部側に移動させる。なお、昇降
架台43から軌道1側への搬送台車2の移動は、人力によ
り行ってもよく、また、昇降架台43の後端部上にジャッ
キ等の押圧手段を設けておき、この押圧手段によって行
ってもよい。
Thereafter, the lifting platform 43 is lowered along the vertical rail 46 to the bottom of the shaft A, and the rotating platform 3 of the rotating mechanism 3 is rotated below the lifting platform 43 by the operation of the jack 36. The lifting platform 43 is placed on the platform 32. When the lifting platform 43 rides on the swivel base 32, the guide piece 47 is separated from the lower end of the vertical rail 46, and then the jack 36 is operated to move the swivel base 32 from the tunnel T to the shaft A.
Is rotated to a position that matches the end of the track 1 laid down to the center of the bottom surface of the track 1, and the segment loading / transporting carriage 2 on the lifting platform 43 is moved to the end of the track 1. In addition, the movement of the carrier 2 from the elevating platform 43 to the track 1 side may be performed manually, or a pressing means such as a jack may be provided on the rear end of the elevating platform 43, and the pressing means may be used. May go.

【0027】昇降架台43から軌道1側への搬送台車2の
移動が終わると、旋回機構3の旋回台32を後方に旋回動
させて昇降架台43のガイド片47を垂直レール46の下端に
臨ませ、昇降設備4のウインチ41を作動させて昇降架台
43を地上Bまで上昇させ、次のセグメント積載搬送台車
2をその上面の軌道48上に受け入れるようにする。
When the movement of the carriage 2 from the lifting platform 43 to the track 1 is completed, the swivel 32 of the rotating mechanism 3 is swung rearward so that the guide piece 47 of the lifting platform 43 faces the lower end of the vertical rail 46. Activate the winch 41 of the lifting equipment 4
43 is raised to the ground B, and the next segment loading and transporting vehicle 2 is received on the track 48 on the upper surface thereof.

【0028】一方、軌道1の端部側には条溝5内を走行
する第1起重台車6が待機しており、上記昇降架台43上
から軌道1の端部側に移動させられるセグメント積載搬
送台車2がこの第1起重台車6の受台62上に移載させら
れ、移載後、該第1起重台車6の受台62をジャッキ64の
伸長によって僅かに上昇させて受止材65により搬送台車
2の底面を受止して該搬送台車2を軌道1から持ち上げ
た状態とする。この状態で第1起重台車6を条溝5に敷
設している軌道9上を走行させてトンネルT内の条溝5
の前端部まで移動させる。この時、第2起重台車8はそ
の受台82上に起動車11を受止した状態で条溝5と横断溝
7との交差部から離れた該横断溝7の奥部に待機してい
ると共にその台車本体81の他半部上に敷設している軌道
片9aを上記軌道9の分断部に介入させており、従って、
第1起重台車6はこの軌道片9a上を介して軌道9上を前
方に向かって走行することができる。
On the other hand, on the end side of the track 1, a first lifting truck 6 running in the groove 5 is on standby, and the segment loading machine which is moved from the elevating platform 43 to the end side of the track 1 The transport vehicle 2 is transferred onto the receiving platform 62 of the first lifting truck 6, and after the transfer, the receiving platform 62 of the first lifting truck 6 is slightly raised by the extension of the jack 64 to be received. The bottom surface of the carriage 2 is received by the material 65, and the carriage 2 is lifted from the track 1. In this state, the first lift truck 6 is caused to travel on the track 9 laid in the groove 5, and the groove 5 in the tunnel T is moved.
To the front end of the At this time, the second hoisting carriage 8 stands by at the back of the transverse groove 7 away from the intersection of the groove 5 and the transverse groove 7 with the starter car 11 received on the receiving stand 82. And the track piece 9a laid on the other half of the bogie main body 81 is interposed in the divided portion of the track 9, and therefore,
The first lifting truck 6 can travel forward on the track 9 via the track piece 9a.

【0029】条溝5の前端部に達した第1起重台車6は
その位置で、ジャッキ64を収縮させることにより受台62
を降下させて該受台62上のセグメント積載搬送台車2の
車輪2a、2bを軌道1上に載せ、受台62を搬送台車2の底
面から下方に離間させる。しかるのち、この第1起重台
車6を再び条溝5の後端部における上記軌条1の端部下
方にまで移動させ、上記同様にして地上Bから昇降設備
4によって旋回機構3上に搬入された次のセグメント積
載搬送台車2を昇降架台43から第1起重台車6の受台62
上に移載させたのち、受台62を僅かに上昇させて該受台
62上で搬送台車2を受止した状態にして第1起重台車6
を先に搬送したセグメント積載搬送台車2の後端まで前
進、走行させ、しかるのち、受台62を降下させることに
よってこの受台62上の搬送台車2の前端部中央に下方に
向けて突設している連結ピン12を先に搬送したセグメン
ト積載搬送台車2の後端中央部に穿設している連結孔13
に嵌入させて両搬送台車2、2を連結させる。
When the first lifting carriage 6 reaches the front end of the groove 5, the jack 64 is contracted at that position to cause the receiving platform 62 to contract.
And the wheels 2a and 2b of the segment loading and transporting vehicle 2 on the receiving table 62 are placed on the track 1, and the receiving table 62 is separated downward from the bottom surface of the transporting vehicle 2. Thereafter, the first lift truck 6 is again moved to a position below the end of the rail 1 at the rear end of the groove 5 and is carried into the turning mechanism 3 from the ground B by the lifting equipment 4 in the same manner as described above. The next segment loading and transporting vehicle 2 is moved from the lifting platform 43 to the receiving platform 62 of the first hoisting vehicle 6.
After the transfer, the pedestal 62 is slightly raised and
62, the first carriage 6 is set in a state where the carriage 2 is received.
Is advanced to the rear end of the segment-loaded transporting vehicle 2 that has been transported earlier, and then the receiving platform 62 is lowered to project downward at the center of the front end of the transporting vehicle 2 on the receiving platform 62. Connecting hole 13 formed in the center of the rear end of the segment loading and transporting carriage 2 which has previously transported the connecting pin 12
And the two carriages 2 are connected to each other.

【0030】このように、第1起重台車6の条溝5内で
の往復走行工程と、上記昇降設備4による地上からのセ
グメント積載搬送台車2の搬入工程と、該セグメント積
載搬送台車2を旋回機構3の旋回台32から上記第1起重
台車6上への移載工程とを繰り返し行って条溝5上にお
ける軌道1上に最後尾の搬送台車2が横断溝7の前端側
に達するように複数台のセグメント積載搬送台車2を連
結させてなる搬送台車列とする。
As described above, the reciprocating traveling process of the first lifting truck 6 in the groove 5, the loading process of the segment loading transport truck 2 from the ground by the lifting equipment 4, and the segment loading transport truck 2 are performed. The transfer process from the revolving platform 32 of the revolving mechanism 3 to the first lifting platform 6 is repeatedly performed so that the rearmost transport platform 2 reaches the front end side of the transverse groove 7 on the track 1 on the groove 5. In this way, a plurality of segment-loaded carriages 2 are connected to form a carriage train.

【0031】次いで、横断溝7に待機していた第2起重
台車8をジャッキ88の作動によって条溝5側に移動さ
せ、その支柱87上に敷設している分断軌道片1aを上記軌
道1の切除部間に介入させた位置で停止させたのち、受
台82を降下させて該受台82上に載置している起動車11の
前端中央部に突設している連結ピン14を最後尾のセグメ
ント積載搬送台車2の後端連結孔13に嵌入させて起動車
11を搬送台車2の後尾に連結すると共に軌道1上に載せ
る。
Next, the second lifting carriage 8 waiting in the transverse groove 7 is moved toward the groove 5 by the operation of the jack 88, and the divided track piece 1a laid on the column 87 is moved to the track 1 After stopping at the position where it was interposed between the cut portions, the receiving pin 82 was lowered to connect the connecting pin 14 projecting from the center of the front end of the starting vehicle 11 placed on the receiving table 82. The starting vehicle is inserted into the rear end connecting hole 13 of the rearmost segment loading and transporting vehicle 2.
11 is connected to the rear end of the carriage 2 and placed on the track 1.

【0032】しかるのち、起動車11を前進駆動して搬送
台車列をトンネルT内のセグメント施工場所まで搬送
し、セグメントSを搬送台車2から順次積み下ろしたの
ち、空になった搬送台車列を起動車11によって立坑A側
に牽引する。起動車11が横断溝7に達するとその位置に
待機している上記第2起重台車8上の分断軌道片1a上を
後側車輪11b が通過した位置で停止させ、第2起重台車
8の受台82を僅かに上昇させて該起動車11を受台82に受
止させると共に軌道1から前後車輪11a 、11b を浮かし
且つ前端中央部の連結ピン14を搬送台車2の連結孔13か
ら離脱させた状態にしたのち、第2起重台車8をジャッ
キ88の作動によって横断溝7の奥側に移動させ、該第2
起重台車8の台車本体81の他半部上に敷設している軌道
片9aを条溝5に敷設している軌道9の分断部に介在させ
た状態にする。
Thereafter, the starting vehicle 11 is driven forward to transport the train of transport vehicles to the segment construction location in the tunnel T, and the segments S are sequentially loaded and unloaded from the transport vehicle 2, and then the empty train of transport vehicles is activated. The vehicle 11 is pulled to the shaft A side. When the starting vehicle 11 reaches the crossing groove 7, the starting vehicle 11 is stopped at the position where the rear wheel 11b has passed on the divided track piece 1a on the second hoisting vehicle 8 waiting at that position, and the second hoisting vehicle 8 The starting vehicle 11 is received by the receiving base 82 and the front and rear wheels 11a and 11b are lifted from the track 1 and the connecting pin 14 at the center of the front end is moved from the connecting hole 13 of the transporting vehicle 2 After being released, the second lifting truck 8 is moved to the rear side of the transverse groove 7 by the operation of the jack 88, and
The track piece 9a laid on the other half of the bogie main body 81 of the hoisting trolley 8 is made to be in a state of being interposed in the divided portion of the track 9 laid in the groove 5.

【0033】この状態から第1起重台車6を最後尾の搬
送台車2の下方に移動させ、その受台62を上昇させて搬
送台車2を持ち上げてその連結ピン12を前側の搬送台車
2の連結孔13から離脱させたのち、受台62上に該搬送台
車2を載置した状態で第1起重台車6を軌道1の端部ま
で軌道9の上記軌道片9a上を走行させ、しかるのち、こ
の搬送台車2を旋回機構3の旋回台32上の昇降架台43に
移載させる。次いで、旋回台32を後方に旋回動させて昇
降架台43を昇降設備4の垂直レール46に沿わせ、ガイド
片47を該垂直レール46に係合させながら昇降設備4のウ
インチ41の作動によって昇降架台43を上昇させ、地上B
に達した該昇降架台43から搬送台車2を地上に敷設して
いる軌道16に送り出して次のセグメント積載に備える。
In this state, the first lifting carriage 6 is moved below the rearmost carriage 2, the receiving table 62 is raised, the carriage 2 is lifted, and the connecting pin 12 is connected to the front carriage 2. After being detached from the connection hole 13, the first lifting truck 6 is caused to travel on the track piece 9a of the track 9 to the end of the track 1 in a state where the carrier 2 is placed on the receiving table 62. After that, the transport vehicle 2 is transferred to the lifting platform 43 on the revolving table 32 of the revolving mechanism 3. Then, the swivel table 32 is swung rearward to move the elevating platform 43 along the vertical rails 46 of the elevating equipment 4, and while the guide pieces 47 are engaged with the vertical rails 46, the lifting and lowering is performed by the operation of the winch 41 of the elevating equipment 4. Raise the base 43, and
The transport carriage 2 is sent out from the lift platform 43 that has reached the above to the track 16 laid on the ground to prepare for the next segment loading.

【0034】一方、第1起重台車6は次の後尾側の搬送
台車2の下方にまで移動し、上記同様にして該搬送台車
2を載せて軌道端にまで搬送し、再び、上記同様に該軌
道端に対向する位置まで旋回させた旋回台32上の昇降架
台43に送り込んだのち、地上B側に搬出し、この作業を
繰り返し行って全ての搬送台車2を順次搬出するもので
ある。そして、再び、セグメント積載搬送台車2を順次
地上Bから立坑Aを通じて昇降設備4により旋回機構3
上に搬入すると共に該セグメント積載搬送台車2を第1
起重台車6により軌道1上に順次搬送して互いに連結さ
せ、この搬送台車列を横断溝7に待機していた起動車11
によってトンネルTの施工場所まで搬送するものであ
る。なお、搬送台車2に積載する資材としては上記セグ
メントSに限らず、トンネルTの築造に必要なその他の
資材であってもよい。
On the other hand, the first lifting truck 6 moves to a position below the next trailing truck 2 and carries the truck 2 in the same manner as described above and transports it to the end of the track. After being sent to the elevating platform 43 on the swivel base 32 turned to a position facing the track end, it is carried out to the ground B side, and this operation is repeated to carry out all the transport vehicles 2 sequentially. Then, again, the segment loading / transporting vehicle 2 is sequentially moved from the ground B through the shaft A by the lifting / lowering facility 4 to the turning mechanism 3.
And the segment loading and transporting cart 2 is moved to the first position.
The starting vehicle 11 which is sequentially conveyed on the track 1 by the hoisting truck 6 and connected to each other, and this conveyer train is waiting in the transverse groove 7
Transport to the construction site of the tunnel T. The material to be loaded on the transport trolley 2 is not limited to the segment S, and may be other materials necessary for building the tunnel T.

【0035】[0035]

【発明の効果】以上のように本発明の請求項1に係る搬
送台車運行装置によれば、地上から立坑内に搬入した資
材積載搬送台車を旋回機構上から軌道端に待機している
第1起重台車上に送り込み、この第1起重台車を軌道の
下方に設けた条溝に沿って走行させるように構成してい
るので、第1起重台車によって搬送台車を順次、軌道上
の所定位置まで円滑且つ能率よく搬送することができ
る。さらに、軌道端部において上記条溝に交差する横断
溝を設け、この横断溝に起動車を上載する第2起重台車
を配設しているので、軌道上に搬送した上記複数台の搬
送台車列の後端に該起動車を直ちに連結させて搬送台車
列をトンネル内の所定場所まで搬入することができる。
As described above, according to the transport vehicle operating device according to the first aspect of the present invention, the first material loading transport vehicle carried into the shaft from the ground stands by at the track end from the turning mechanism. Since the first lift truck is sent on the lift truck and the first lift truck travels along the groove provided below the track, the transport trucks are sequentially moved on the track by the first lift truck. It can be transported smoothly and efficiently to the position. Furthermore, since a transverse groove intersecting the above-mentioned groove is provided at the end of the track, and the second lift truck on which the starting vehicle is mounted is disposed in the transverse groove, the plurality of transport vehicles transported on the track are provided. The starting vehicle can be immediately connected to the rear end of the row, and the row of carriages can be carried to a predetermined location in the tunnel.

【0036】また、上記第2起重台車に横断溝上の軌道
部分を分断した長さを有する分断軌道片を固定している
ので、第2起重台車の移動経路が軌道に交差しているに
もかかわらず該分断軌道片によって軌道を旋回機構まで
連続させることができ、従って、トンネル内に資材を搬
送後、空になった搬送台車を起動車によって確実に船旋
回機構側の軌道端まで牽引させることができ、搬送台車
の搬出作業が能率よく行えるものである。
Further, since the divided track piece having a length obtained by dividing the track portion on the transverse groove is fixed to the second hoisting truck, the moving path of the second hoisting vehicle intersects the track. Nevertheless, the track can be continued to the turning mechanism by the divided track pieces. Therefore, after the material is conveyed into the tunnel, the empty carrier is securely pulled by the starting vehicle to the track end on the ship turning mechanism side. This makes it possible to efficiently carry out the work of unloading the carriage.

【0037】このような搬送台車運行装置において、請
求項2に係る発明は、上記条溝と横断溝とに第1及び第
2起重台車を走行させる軌道をそれぞれ設けているの
で、これらの第1及び第2起重台車の走行が正確且つ円
滑に行えると共に条溝に敷設した軌道において横断溝に
交差した部分を切除し、この部分に請求項4に記載した
ように、第2起重台車側に設けている軌道部を合致させ
るように構成しているので、第2起重台車を横断溝の奥
側に待機させた状態にして第1起重台車を上記軌道部上
を走行させて軌道端まで移動させることができる。
In such a transport vehicle operating device, in the invention according to claim 2, since the tracks for running the first and second lifting vehicles are provided in the groove and the transverse groove, respectively, The first and second hoisted trucks can be accurately and smoothly run, and a portion intersecting with the transverse groove in the track laid in the groove is cut off. Since the track portion provided on the side is configured to match, the first lift truck is caused to travel on the track portion with the second lift truck standing by at the back side of the transverse groove. It can be moved to the end of the orbit.

【0038】また、上記第1及び第2起重台車は、請求
項3、請求項4に記載したように台車本体にジャッキに
よって昇降する受台を配設してなるものであるから、軌
道に対しての搬送台車や起動車の上昇、降下が確実に行
われ、その上、請求項5に記載したように資材搬送台車
と起動車との前後端に下方に向けて突出した連結ピンと
該連結ピンが嵌入可能な連結孔とをそれぞれ設けておく
ことによって、搬送台車台車同士の連結作業や連結解除
作業および搬送台車と起動車の連結作業や連結解除作業
が上記のように受台の昇降によって同時に能率よく行え
るものである。
Further, the first and second hoisting trucks are provided with a receiving stand which is lifted and lowered by a jack on the bogie main body as described in the third and fourth aspects. The transporting vehicle and the starting vehicle are reliably raised and lowered with respect to the connecting pins, and furthermore, the connecting pins projecting downward at the front and rear ends of the material transporting vehicle and the starting vehicle as described in claim 5 and the connection. By providing a connection hole in which a pin can be inserted, the connection work and the uncoupling work between the transport trolleys and the connection work and the decoupling work between the transport trolley and the starting vehicle can be performed by raising and lowering the receiving stand as described above. At the same time, it can be performed efficiently.

【図面の簡単な説明】[Brief description of the drawings]

【図1】搬送台車運行装置全体の簡略側面図、FIG. 1 is a simplified side view of the entire transport trolley operating device,

【図2】その平面図、FIG. 2 is a plan view thereof,

【図3】条溝内に配設した第1起重台車の側面図、FIG. 3 is a side view of a first hoisting truck arranged in the groove;

【図4】その正面図、FIG. 4 is a front view thereof,

【図5】横断溝内に配設した第2起重台車の側面図、FIG. 5 is a side view of a second hoisting truck disposed in the transverse groove,

【図6】その正面図、FIG. 6 is a front view thereof,

【図7】その平面図、FIG. 7 is a plan view thereof,

【図8】従来例を示す簡略平面図。FIG. 8 is a simplified plan view showing a conventional example.

【符号の説明】[Explanation of symbols]

1 軌道 1a 分断軌道片 2 搬送台車 3 旋回機構 4 昇降設備 5 条溝 6 第1起重台車 7 横断溝 8 第2起重台車 9 第1起重台車の軌道 10 第2起重台車の軌道 11 起動車 12、14 連結ピン 13、15 連結孔 DESCRIPTION OF SYMBOLS 1 Track 1a Separated track piece 2 Carriage truck 3 Swivel mechanism 4 Elevating equipment 5 Groove 6 First hoisting carriage 7 Crossing groove 8 Second hoisting car 9 Track of first hoisting car 10 Track of second hoisting car 11 Starting vehicle 12, 14 Connection pin 13, 15 Connection hole

───────────────────────────────────────────────────── フロントページの続き (56)参考文献 特開 平9−217600(JP,A) 特開 平1−131800(JP,A) (58)調査した分野(Int.Cl.7,DB名) E21F 13/00 - 13/02 E21D 11/40 ────────────────────────────────────────────────── ─── Continuation of the front page (56) References JP-A-9-217600 (JP, A) JP-A-1-131800 (JP, A) (58) Fields investigated (Int. Cl. 7 , DB name) E21F 13/00-13/02 E21D 11/40

Claims (5)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 軌道上で複数台連結した搬送台車列を起
動車により運搬するように構成した搬送台車運行装置に
おいて、上記軌道の下方に該軌道に沿って上記搬送台車
列の長さに相当する条溝を設け、この条溝内に搬送台車
を一台ずつ上載して搬送する第1起重台車を配設すると
共に上記条溝端に該条溝に直交する横断溝を設け、この
横断溝に上記起動車を上載して軌道上から一旦待機させ
る第2起重台車を配設すると共に該第2起重台車に上記
横断溝上の上記軌道部分を分断してなる長さを有する分
断軌道片を固定していることを特徴とする搬送台車運行
装置。
1. A transport vehicle operating device configured to transport a plurality of coupled transport vehicles on a track by a starting vehicle, the transport vehicle operating device corresponding to a length of the transport vehicle array along the track below the track. A first lifting truck for carrying and transporting the carriages one by one in the groove, and a transverse groove orthogonal to the groove at the end of the groove; And a split track piece having a length obtained by separating the track portion on the transverse groove from the second hoist truck, wherein the second hoist truck is mounted on the track and temporarily suspended from the track. A transport trolley operating device characterized in that the trolley is fixed.
【請求項2】 上記条溝には上記横断溝の部分を除いて
第1起重台車の走行用軌道が敷設されている一方、上記
横断溝にはこの第1起重台車の走行用軌道よりも下方に
位置させて上記第2起重台車の走行用軌道を敷設してい
ることを特徴とする請求項1に記載の搬送台車運行装
置。
2. The running track of the first hoisting truck is laid in the groove except for the portion of the transverse groove, while the running track of the first hoisting truck is provided in the transverse groove. The transporting vehicle operating device according to claim 1, wherein a traveling track of the second lifting vehicle is laid so as to be positioned also below.
【請求項3】 上記第1起重台車は台車本体にジャッキ
の作動によって昇降する搬送台車受台を配設してなるこ
とを特徴とする請求項1又は請求項2に記載の搬送台車
運行装置。
3. The transport vehicle operating device according to claim 1, wherein the first hoisting truck is provided with a transport truck receiving stand that is raised and lowered by actuation of a jack on a truck body. .
【請求項4】 上記第2起重台車は台車本体の一半部上
にジャッキの作動によって昇降する起動車受台を配設し
ていると共に、他半部上に上記条溝に敷設した軌道にお
ける横断溝部分の軌道部を取付けていることを特徴とす
る請求項1又は請求項2に記載の搬送台車運行装置。
4. The truck according to claim 2, wherein the second lift truck has a starter cradle which moves up and down by actuation of a jack on one half of the truck body and a track laid in the groove on the other half. 3. The transport vehicle operating device according to claim 1, wherein a track portion of the transverse groove portion is attached.
【請求項5】 資材搬送台車と起動車にはその前後端に
下方に向けて突出した連結ピンと該連結ピンが嵌入可能
な連結孔とをそれぞれ設けていることを特徴とする請求
項1、請求項3又は請求項4に記載の搬送台車運行装
置。
5. The material transporting trolley and the starting vehicle are provided with connecting pins protruding downward at the front and rear ends thereof and connecting holes into which the connecting pins can be fitted, respectively. The transport vehicle operating device according to claim 3 or 4.
JP18037197A 1997-06-19 1997-06-19 Transport trolley operating device Expired - Lifetime JP3210604B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP18037197A JP3210604B2 (en) 1997-06-19 1997-06-19 Transport trolley operating device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP18037197A JP3210604B2 (en) 1997-06-19 1997-06-19 Transport trolley operating device

Publications (2)

Publication Number Publication Date
JPH1113400A JPH1113400A (en) 1999-01-19
JP3210604B2 true JP3210604B2 (en) 2001-09-17

Family

ID=16082080

Family Applications (1)

Application Number Title Priority Date Filing Date
JP18037197A Expired - Lifetime JP3210604B2 (en) 1997-06-19 1997-06-19 Transport trolley operating device

Country Status (1)

Country Link
JP (1) JP3210604B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103397904B (en) * 2013-08-21 2015-05-13 中交天和机械设备制造有限公司 Downhole transportation method for shuttle cabin of ultra-large type shield tunneling machine

Also Published As

Publication number Publication date
JPH1113400A (en) 1999-01-19

Similar Documents

Publication Publication Date Title
RU2361801C2 (en) Method and device to unload long rails from railway vehicles
JP2001200700A (en) Segment transport method and device for small diameter shield
JPH07309231A (en) Rail transportation device
CN115217500A (en) Shield segment conveying device and shield segment conveying method
JP3210604B2 (en) Transport trolley operating device
JPS5931224A (en) Cargo handling equipment
JP3411826B2 (en) Carriage loading / unloading device
JP2662581B2 (en) Automatic material transfer method in shield method
JP3399842B2 (en) Consolidated operation device for transport vehicles
JP4508073B2 (en) Method and system for transporting and loading heavy objects
JPH0819838B2 (en) Automatic shield material transfer method and shield material automatic transfer device
JP3689165B2 (en) Material and material transport structure for uplift excavation
JPH05248194A (en) Segment supply device for tunnel lining
JP3517383B2 (en) Pipe transport method and pipe transport cart
JPH10331599A (en) Loading system of lining segment for construction of tunnel
JP3138762B2 (en) Transport cart and transport method
JPH06129200A (en) Automatic transfer device for materials and equipment for shield method
JP2819949B2 (en) Transfer equipment using hangers
JP5063574B2 (en) Segment carrying-in assembly method and segment carrying-in assembly facility
JP4242660B2 (en) Conveyor truck connected operation device
JP2004339802A (en) Segment assembling apparatus and segment assembling method
JP3202261B2 (en) Panel transportation and erection equipment
JP3192116B2 (en) Box culvert laying method and laying device
JPH09217600A (en) Material transportation method for tunnel mine construction and alternate transportation device for trolleys in tunnel mine
JP3619646B2 (en) Vehicle re-introduction device for vehicle transport line

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20070713

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100713

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130713

Year of fee payment: 12

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term