JP3214232B2 - Production system design support apparatus and method - Google Patents
Production system design support apparatus and methodInfo
- Publication number
- JP3214232B2 JP3214232B2 JP11796894A JP11796894A JP3214232B2 JP 3214232 B2 JP3214232 B2 JP 3214232B2 JP 11796894 A JP11796894 A JP 11796894A JP 11796894 A JP11796894 A JP 11796894A JP 3214232 B2 JP3214232 B2 JP 3214232B2
- Authority
- JP
- Japan
- Prior art keywords
- symbols
- production system
- system design
- basic form
- symbol
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
Landscapes
- General Factory Administration (AREA)
Description
【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION
【0001】[0001]
【産業上の利用分野】本発明は、生産システム設計図面
の作成及びその内容確認を支援する生産システム設計支
援装置及び方法に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a production system design support apparatus and method for supporting creation of a production system design drawing and confirmation of its contents.
【0002】[0002]
【従来の技術】CADはコンピュータによって各種図面
を作成するシステムとして周知である。この種のシステ
ムは、少なくとも、入力デバイス、表示デバイス、記憶
装置及び処理装置を備えている。図面を作成するに当た
っては、使用者は表示デバイスの画面を見ながら入力デ
バイスを操作する。処理装置は、入力デバイスの操作に
応じ、図面の基本フォームや図面を構成する各種図形又
は記号を記憶装置から読み込み、これらを表示デバイス
の画面上に配置・表示する。使用者は、このような操作
及び処理の結果得られる図面、すなわち表示デバイスの
画面上に表示される図面が正しい内容かを確認する。こ
の作業は表示デバイスの画面を見ながら行う。CADは
通常図面を印刷出力する機能を有しているから、確認は
印刷出力を用いて行うこともできる。このような技術
は、生産システムの設計に当たって広く活用できる。2. Description of the Related Art CAD is well known as a system for creating various drawings by a computer. This type of system includes at least an input device, a display device, a storage device, and a processing device. In creating a drawing, a user operates an input device while looking at a screen of a display device. The processing device reads the basic form of the drawing and various figures or symbols constituting the drawing from the storage device in accordance with the operation of the input device, and arranges and displays them on the screen of the display device. The user checks whether the drawing obtained as a result of such operation and processing, that is, the drawing displayed on the screen of the display device is correct. This work is performed while looking at the screen of the display device. Since CAD generally has a function of printing out a drawing, confirmation can be performed using the printed output. Such techniques can be widely used in designing a production system.
【0003】[0003]
【発明が解決しようとする課題】しかし、このようなシ
ステムには、使用者の作業負荷が重いという問題点があ
る。例えば、作成した生産システム設計図面が正しい内
容となっているかどうかの確認を行う際には、多大な注
意力や時間が必要である。However, such a system has a problem that a user's work load is heavy. For example, a great deal of attention and time is required to check whether the created production system design drawings have correct contents.
【0004】本発明は、このような問題点を解決するこ
とを課題としてなされたものであり、CAD等の支援装
置を使用して生産システム設計図面を作成する際、確認
作業を支援する情報を支援装置にて自動作成することに
より、使用者の作業負荷を軽減し、より迅速且つ安価に
図面を作成可能にすることを目的とする。SUMMARY OF THE INVENTION The present invention has been made to solve the above problems, and information for supporting a confirmation operation when a production system design drawing is created using a support device such as a CAD. It is an object of the present invention to reduce the work load on a user and to make a drawing more quickly and cheaply by automatically creating the drawing by a support device.
【0005】[0005]
【課題を解決するための手段】このような目的を達成す
るために、本発明の生産システム設計支援方法は、基本
フォーム上に登録記号が配置されさらに登録記号相互を
接続する接続記号が配置された生産システム設計図面を
コンピュータにより作成するステップと、配置された登
録記号に識別符号をコンピュータにより自動付与するス
テップと、配置された接続記号に基づき基本フォーム上
における登録記号相互の接続関係をコンピュータにより
分析し、その結果に基づきかつ付与された識別符号を利
用しながら、配置された登録記号相互の接続関係を示し
かつ人間可読形態を有する確認情報をコンピュータによ
り作成するステップと、を有することを特徴とする。In order to achieve such an object, a production system design support method according to the present invention is arranged such that registration symbols are arranged on a basic form, and connection symbols for connecting the registration symbols are arranged. Production system design drawings
And creating by the computer, arranged a step of automatically applying an identification code by the computer to the registration mark, the registration mark mutual connection relationship on the base form and <br/> analyzed by a computer based on the arranged connection mark Based on the result and using the assigned identification code, confirmation information indicating the connection relationship between the arranged registration symbols and having a human-readable form is transmitted by the computer.
And creating the data.
【0006】また、本発明の生産システム設計支援装置
は、生産システム設計図面の基本フォーム及び基本フォ
ーム上にレイアウトされ得る登録記号を情報として格納
する手段と、格納されている情報及び使用者からの要求
に基づき、基本フォーム上に登録記号が配置されさらに
登録記号相互を接続する接続記号が配置された生産シス
テム設計図面を作成する手段と、配置された登録記号に
識別符号を自動付与する手段と、配置された接続記号に
基づき基本フォーム上における登録記号相互の接続関係
を分析し、その結果に基づきかつ付与された識別符号を
利用しながら、配置された登録記号相互の接続関係を示
しかつ人間可読形態を有する確認情報を作成する手段
と、少なくとも生産システム設計図面及び確認情報を出
力する手段と、を備えることを特徴とする。Further, the production system design support apparatus of the present invention comprises a means for storing, as information, a basic form of a production system design drawing and a registration symbol which can be laid out on the basic form; A means for creating a production system design drawing in which registration symbols are arranged on a basic form and further connecting symbols for connecting the registration symbols based on a request; and means for automatically assigning an identification code to the arranged registration symbols. Analyzing the connection relationship between the registered symbols on the basic form based on the arranged connection symbols, and showing the connection relationship between the arranged registration symbols based on the result and using the assigned identification code; A means for creating confirmation information having a readable form, and a means for outputting at least a production system design drawing and confirmation information. And wherein the Rukoto.
【0007】本発明は、さらに、基本フォームが、工程
管理の基本構造を示す図、工程の流れを示す図、工程の
制御方法を示す図及び工程の制御に用いられるコンピュ
ータの機能を示す図を、それぞれ個別の層として含む層
構造を有することを特徴とする。According to the present invention, the basic form includes a diagram showing a basic structure of process management, a diagram showing a process flow, a diagram showing a process control method, and a diagram showing functions of a computer used for process control. , Each having a layer structure including individual layers.
【0008】[0008]
【作用】本発明においては、まず、内容確認の対象とな
る生産システム設計図面が作成される。ここにいう生産
システム設計図面とは基本フォーム、登録記号及び接続
記号から構成される図面である。基本フォームとは生産
システム設計図面の基本となる形式乃至書式をいい、登
録記号とは基本フォーム上に配置され得る各種記号乃至
図形をいう。また、同一の基本フォーム上に同一の登録
記号が複数個配置されることもある。接続記号とは、登
録記号相互を接続する矢印、線分等の記号乃至図形をい
う。生産システム設計図面が作成されると、さらに、配
置された登録記号に識別符号が自動付与される。識別符
号は登録記号相互を識別するための符号である。識別符
号付与の後、配置された接続記号に基づき基本フォーム
上における登録記号相互の接続関係が分析される。さら
に、その結果に基づきかつ付与された識別符号を利用し
ながら、配置された登録記号相互の接続関係を示しかつ
人間可読形態を有する確認情報が作成される。従って、
本発明においては、人間可読形態、すなわち人間が読み
取ることができる形式の確認情報が、作成された生産シ
ステム設計図面に基づき自動作成されるため、生産シス
テム設計図面の内容の確認に関する作業負荷が軽減され
る。In the present invention, first, a production system design drawing to be confirmed is prepared. Here, the production system design drawing is a drawing composed of a basic form, a registration symbol, and a connection symbol. The basic form refers to a basic form or format of a production system design drawing, and the registration symbols refer to various symbols or figures that can be arranged on the basic form. Further, a plurality of the same registered symbols may be arranged on the same basic form. The connection symbol refers to a symbol or figure such as an arrow or a line segment connecting the registration symbols. When the production system design drawing is created, an identification code is automatically added to the arranged registration symbols. The identification code is a code for identifying the registered symbols. After the identification code is assigned, the connection relationship between the registered symbols on the basic form is analyzed based on the arranged connection symbols. Further, based on the result and using the assigned identification code, confirmation information indicating a connection relationship between the arranged registration symbols and having a human-readable form is created. Therefore,
In the present invention, since the confirmation information in a human-readable form, that is, a human-readable form, is automatically created based on the created production system design drawings, the workload for confirming the contents of the production system design drawings is reduced. Is done.
【0009】また、本発明は、CAD等の支援装置を用
いて実現する。まず、生産システム設計図面の作成に際
し、あらかじめ格納されている基本フォーム及び登録記
号が使用者からの要求等に基づき読み出され、これに基
づき基本フォーム上に登録記号が配置される。さらに、
基本フォーム上には、使用者からの要求等に基づき接続
記号が配置される。作成された生産システム設計図面
や、この図面に基づき作成された確認情報は、表示、印
刷等の形式で出力される。従って、本発明においては、
生産システム設計図面の作成及びその内容確認が1個の
支援装置を使用するのみで実現されるため、付加的なコ
ストが発生しない。[0009] In addition, the present invention is, we realized with the aid of a support device such as CAD. Also not a, upon the creation of the production system design drawings, the basic form and registration symbols stored in advance is read out based on a request or the like from the user, is disposed registered symbols on the basic form based on this. further,
Connection symbols are arranged on the basic form based on a request from a user or the like. The created production system design drawing and the confirmation information created based on this drawing are output in a format such as display or printing. Therefore, in the present invention,
Since the creation of the production system design drawing and the confirmation of the contents are realized by using only one support device, no additional cost is generated.
【0010】基本フォームの構造は、例えば、基本フォ
ームを、工程管理の基本構造を示す図、工程の流れを示
す図、工程の制御方法を示す図及び工程の制御に用いら
れるコンピュータの機能を示す図という4種類の層から
構成される構造とする。この構造は、工場等の物理的構
造ではなく設計分野(工程設計、制御、コンピュータ
等)を念頭においた構造であるため、設計分野間の関連
を表現できる。また、工程を基本にした構造であるた
め、図面を見た人間が実際の工程に近いイメージを取得
でき、専門的知識を備えていない人間も設計概要を把握
できる。The structure of the basic form includes, for example, a diagram showing the basic structure of the process management, a diagram showing the flow of the process, a diagram showing the method of controlling the process, and the functions of the computer used for controlling the process. The structure is made up of four types of layers shown in FIG. This structure is not a physical structure of a factory or the like but a design field (process design, control, computer, etc.) in mind, so that the relationship between the design fields can be expressed. Further, since the structure is based on the process, a person who looks at the drawing can obtain an image close to the actual process, and a person who does not have specialized knowledge can grasp the design outline.
【0011】[0011]
【実施例】以下、本発明の好適な実施例について図面に
基づき説明する。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Preferred embodiments of the present invention will be described below with reference to the drawings.
【0012】図1には、本発明の一実施例に係るシステ
ムの構成が示されている。この図に示されるシステムは
入力部10、基本フォーム格納部12、登録記号格納部
14、処理部16及び表示部18から構成されており、
生産システム設計図面を作成しその内容を確認する機能
を有している。FIG. 1 shows the configuration of a system according to an embodiment of the present invention. The system shown in FIG. 1 includes an input unit 10, a basic form storage unit 12, a registered symbol storage unit 14, a processing unit 16, and a display unit 18.
It has a function to create a production system design drawing and check its contents.
【0013】この実施例において作成される生産システ
ム設計図面はトータルリンクシステム図と呼ばれる図面
である。トータルリンクシステム図は、生産システムの
企画検討段階で使用する図面であり、生産システムの構
成を網羅的に検討可能にすること及び未熟練乃至専門外
の人間(例えば生産システムの使用者や管理者)にも生
産システムの構成を容易に理解可能にすることを目的と
して開発された図面である。The production system design drawing created in this embodiment is a drawing called a total link system diagram. The total link system diagram is a drawing used at the planning and reviewing stage of the production system. The total link system diagram enables comprehensive examination of the configuration of the production system and allows unskilled or unspecified persons (for example, production system users and managers). 2) is a drawing developed for the purpose of making the configuration of the production system easily understandable.
【0014】トータルリンクシステム図は、例えば図4
に示されるような構成を有している。すなわち、工程管
理の基本構造図、工程図、工程制御図及びコンピュータ
機能図から構成される層構造を有している。最上段に配
置されている工程管理の基本構造図は、システムの狙
い、工程の名称、工程の順序、工程間の素材・ワークの
流れ、流れる素材・ワークの単位等を表している。その
下の段に配置されている工程図は、工場内における工程
の配置、生産管理・制御用コンピュータに工程の状況に
関する情報を入力しまた各工程の装置に生産管理・制御
に関する情報・指令を出力するための入出力機器の配
置、定常時又は異常時に人間が行う処置作業の内容等を
表している。さらにその下の段の工程制御図は、入出力
機器等の処理の流れや判断等を表している。最下段に配
置されているコンピュータ機能図は、生産管理・制御用
コンピュータの処理やデータの内容を表している。FIG. 4 shows a total link system diagram.
Has a configuration as shown in FIG. That is, it has a layer structure composed of a basic structure diagram of process management, a process diagram, a process control diagram, and a computer function diagram. The basic structure diagram of the process management arranged at the uppermost stage shows the purpose of the system, the names of the processes, the order of the processes, the flow of the raw material / work between the processes, the unit of the flowing raw material / work, and the like. The process diagram arranged in the lower stage is for inputting information about the status of the process to the computer for process layout, production management and control in the factory, and information and commands related to production management and control to the equipment of each process. It shows the arrangement of input / output devices for output, the contents of treatment work performed by a human at the time of normal operation or at the time of abnormality, and the like. Further, the process control diagram in the lower stage shows the flow of processing and determination of input / output devices and the like. The computer function diagram arranged at the bottom represents processing and data contents of the production management / control computer.
【0015】このように、トータルリンクシステム図で
は、システムを工場やその中のエリアといった物理的構
造で分割するのではなく設計分野(工程、工程制御、コ
ンピュータ等)で分割し層構造としている。このように
システムエンジニアリング上の類似点に着目した構造と
しているため、各設計分野がどのように関連しているの
かを、容易に読み取ることが可能である。さらに、工程
図等、各図の構成が工程を基本にしているため、図面を
見た人間が、実際に得られる生産システムに近いイメー
ジを容易に得ることができるから、詳細な専門的知識な
しにかつ心理的な抵抗なしにシステム設計内容を理解で
きる。従って、トータルリンクシステム図を作成しこれ
を使用することにより、管理者・最終使用者等を含む関
係者がシステム全体の仕様に関して討議しその最適化を
はかることができる。As described above, in the total link system diagram, the system is not divided by a physical structure such as a factory or an area therein, but is divided by a design field (process, process control, computer, etc.) to have a layer structure. Since the structure focuses on the similarities in system engineering, it is possible to easily read how each design field is related. Furthermore, since the configuration of each drawing, such as a process drawing, is based on the process, a person who looks at the drawing can easily obtain an image close to the actual production system, without detailed technical knowledge. Understand the system design contents without any psychological resistance. Therefore, by creating and using the total link system diagram, related persons including the manager and the final user can discuss and optimize the specifications of the entire system.
【0016】トータルリンクシステム図を作成・記述す
るためには、使用する記号等の統一・標準化が必要であ
る。例えば、人間の行う作業、素材・ワーク等のモノ、
情報、機器等(以下システム構成要素と呼ぶ)をそれぞ
れあらかじめ定められた記号乃至図形により記述し、記
述されたシステム構成要素間の接続関係を線分や矢印等
の記号乃至図形により記述するといった標準化が必要で
ある。このような標準化により、異なる図面間での表現
の整合性が得られ、またその内容の理解が容易になる。In order to create and describe the total link system diagram, it is necessary to unify and standardize the symbols used. For example, human work, materials and works,
Standardization in which information, devices, etc. (hereinafter, referred to as system components) are described using predetermined symbols or graphics, and connection relationships between the described system components are described using symbols or graphics such as line segments or arrows. is necessary. By such standardization, the consistency of expressions between different drawings is obtained, and the contents are easily understood.
【0017】図1に示される各構成のうち基本フォーム
格納部12は、トータルリンクシステム図の基本フォー
ム、すなわち基本的な形式乃至書式を格納する手段であ
り、また過去において作成されたトータルリンクシステ
ム図も格納している。登録記号格納部14は、システム
構成要素を記述する際に使用する記号乃至図形を格納す
る。以下、登録記号格納部14に格納される記号乃至図
形を登録記号と呼ぶ。入力部10は使用者からの指令、
データ等を入力する手段であり、処理部16は、入力部
10を介して入力される指令、データ等に基づきかつ基
本フォーム格納部12及び登録記号格納部14に格納さ
れている情報を使用して、トータルリンクシステム図を
作成し、さらにシステム構成要素の接続関係を自動分析
する。表示部18は、作成途上にある又は作成されたト
ータルリンクシステム図や、システム構成要素の接続関
係の分析結果を画面上に表示する。なお、表示部18に
代え、又はこれと併せ、印刷出力部を用いてもよい。A basic form storage unit 12 of the components shown in FIG. 1 is a means for storing a basic form of a total link system diagram, that is, a basic form or format. The figure is also stored. The registration symbol storage unit 14 stores symbols or graphics used when describing system components. Hereinafter, the symbols or graphics stored in the registered symbol storage unit 14 will be referred to as registered symbols. The input unit 10 is a command from a user,
The processing unit 16 uses information stored in the basic form storage unit 12 and the registered symbol storage unit 14 based on commands, data, and the like input via the input unit 10. Then, a total link system diagram is created, and the connection relation of the system components is automatically analyzed. The display unit 18 displays, on a screen, a total link system diagram that is being created or created, and an analysis result of a connection relationship between system components. Note that a print output unit may be used instead of or in addition to the display unit 18.
【0018】図2には、この実施例におけるトータルリ
ンクシステム図作成及び確認手順が示されている。FIG. 2 shows a procedure for creating and confirming a total link system diagram in this embodiment.
【0019】トータルリンクシステム図を作成するに当
たっては、まず、使用者が入力部10を操作し、必要な
基本フォームを基本フォーム格納部12から読み出す旨
の指令を処理部16に与える(100)。処理部16
は、この指令に応じて基本フォーム格納部12上の基本
フォームを選択的に読み出し、表示部18の画面上に表
示させる。In preparing the total link system diagram, first, the user operates the input unit 10 to give a command to the processing unit 16 to read out the required basic form from the basic form storage unit 12 (100). Processing unit 16
Selectively reads out the basic form from the basic form storage unit 12 in response to this command and displays it on the screen of the display unit 18.
【0020】使用者は、続いて、工程管理の基本構造図
の記述に関する指令、データ等を、入力部10の操作に
よって処理部16に入力する(102)。処理部16
は、入力に応じて登録記号格納部14から登録記号を選
択的に読み出し、表示部18の画面上の指定位置に配置
する。この作業が終了した段階では、基本フォームの
他、図3の最上段、すなわち工程管理の基本構造図のみ
が表示部18の画面に表示されている。Subsequently, the user inputs commands, data, etc. relating to the description of the basic structure diagram of the process management to the processing unit 16 by operating the input unit 10 (102). Processing unit 16
Selectively reads out the registered symbol from the registered symbol storage unit 14 in accordance with the input, and arranges it at a specified position on the screen of the display unit 18. At the end of this work, only the top row of FIG. 3, that is, the basic structure diagram of the process management, is displayed on the screen of the display unit 18 in addition to the basic form.
【0021】工程管理の基本構造図を記述し終えた後、
使用者は工程図、工程制御図及びコンピュータ機能図の
記述作業に移る(104)。この場合も、使用者は、記
述する図に関する指令、データ等を、入力部10の操作
によって処理部16に入力する。処理部16は、入力に
応じて登録記号格納部14から登録記号を選択的に読み
出し、表示部18の画面上の指定位置に配置する。ま
た、処理内容、データ名称等は文章で入力、表示する。
この作業が終了した段階では、図3に示されるように、
トータルリンクシステム図のうちシステム構成要素間の
接続関係を除く部分が表示されている。使用者は、続い
て、システム構成要素間の接続関係を線分、矢印等で記
述する旨、入力部10から処理部16に入力する。処理
部16はこの入力に応じて接続関係を表示部18の画面
上に表示させる。この段階では、図4に示されるような
トータルリンクシステム図が表示されている。After describing the basic structure diagram of the process management,
The user proceeds to the process of writing the process diagram, process control diagram, and computer function diagram (104). Also in this case, the user inputs commands, data, and the like relating to the figure to be described to the processing unit 16 by operating the input unit 10. The processing unit 16 selectively reads the registered symbols from the registered symbol storage unit 14 according to the input, and arranges the registered symbols at a designated position on the screen of the display unit 18. The processing contents, data names, and the like are input and displayed in text.
At the end of this work, as shown in FIG.
Portions of the total link system diagram excluding connection relationships between system components are displayed. Subsequently, the user inputs from the input unit 10 to the processing unit 16 to describe the connection relationship between the system components using line segments, arrows, and the like. The processing unit 16 displays the connection relationship on the screen of the display unit 18 according to the input. At this stage, a total link system diagram as shown in FIG. 4 is displayed.
【0022】処理部16は、この時点で、表示されてい
るシステム構成要素に識別番号を自動付与する(10
6)。すなわち、トータルリンクシステム図のうち工程
図、工程制御図及びコンピュータ機能図について、登録
記号格納部14上に格納されている登録記号のいずれか
に一致する図形乃至記号を、図の左上から右下に向かっ
て検索する。この検索により登録記号格納部14上に格
納されている登録記号のいずれかに一致する図形乃至記
号がみつかった場合、これに識別符号を付与する。処理
部16は、図5に示されるように、識別符号を伴うトー
タルリンクシステム図を表示部18の画面上に表示させ
る。この図では、識別符号(例えば“M2”、“?
1”)は、登録記号の種類を示すアルファベット等1文
字(“M”、“?”)と、登録記号の種類毎の連続番号
(“2”、“1”)から構成されている。At this time, the processing unit 16 automatically assigns an identification number to the displayed system component (10).
6). That is, for the process diagram, the process control diagram, and the computer function diagram in the total link system diagram, a figure or a symbol that matches any of the registered symbols stored in the registered symbol storage unit 14 is written from the upper left to the lower right of the diagram. Search towards. When a figure or symbol that matches any of the registered symbols stored in the registered symbol storage unit 14 is found by this search, an identification code is assigned to this figure or symbol. The processing unit 16 displays a total link system diagram with an identification code on the screen of the display unit 18 as shown in FIG. In this figure, identification codes (for example, “M2”, “?
1)) is composed of one character such as an alphabet (“M”, “?”) Indicating the type of registered symbol, and a serial number (“2”, “1”) for each type of registered symbol.
【0023】処理部16は、さらに、線分、矢印、二重
線等、システム構成要素間の接続関係を示す図形乃至記
号を辿り、当該関係を分析・認識する(108)。処理
部16は、分析・認識した接続関係を、各システム構成
要素に付与した識別符号を利用した形式に変換し、その
結果を表示部18の画面上に表示させる。その結果、表
示部18の画面は、図6に示されるような表示画面にな
る。この画面においては、システム構成要素間の接続関
係が識別符号間を結ぶ“→”、“←”、“=”等の記号
により表されている。また、識別符号に“:”により連
結して当該要素の名称や処理内容が表されている。The processing unit 16 further analyzes and recognizes the relationship by following figures or symbols indicating connection relationships between the system components, such as line segments, arrows, and double lines (108). The processing unit 16 converts the analyzed and recognized connection relationship into a format using the identification code assigned to each system component, and displays the result on the screen of the display unit 18. As a result, the screen of the display unit 18 becomes a display screen as shown in FIG. In this screen, the connection relation between the system components is represented by symbols such as “→”, “←”, “=” connecting the identification codes. In addition, the name of the element and the processing content are represented by being linked to the identification code by “:”.
【0024】使用者は、この確認表示を見ることによ
り、作成されたトータルリンクシステム図が所望の内容
か否かを確認し、その結果を入力部10から処理部16
に入力する(110)。処理部16は、“NG”、すな
わち所望の内容となっていないとの入力があった場合に
はステップ104に戻る。“OK”、すなわち所望の内
容となっているとの入力があった場合には処理を終了す
る。なお、処理を終了するに当たってトータルリンクシ
ステム図や確認表示を印刷出力するようにしてもよい。The user confirms whether or not the created total link system diagram has the desired contents by looking at the confirmation display, and transmits the result from the input unit 10 to the processing unit 16.
(110). The processing unit 16 returns to step 104 when there is an input “NG”, that is, when the input is not the desired content. If "OK", that is, an input indicating that the content is the desired content, the process ends. At the end of the processing, the total link system diagram and the confirmation display may be printed out.
【0025】このように、本実施例によれば、工程管理
の基本構造図、工程図、工程制御図及びコンピュータ機
能図という4種類の層から基本フォームを構成するよう
にしたため、専門的知識を備えていない人間を含めた討
論、検討に有効なトータルリンクシステム図を得ること
ができる。また、その作成に当たってすでに内容の確認
が済んでいるため、効率的で正確な検討が可能になる。
また、確認作業は確認表示の自動作成・表示という支援
の下に行われるため、多大な作業負荷を発生させること
がない。これは、コスト低減、設計時間の短縮につなが
る。加えて、本実施例は、CAD機能の一部改善により
実現できるため、実施に当たって多大な改良コストが発
生することがない。As described above, according to the present embodiment, the basic form is composed of the four types of layers, namely, the basic structure diagram of the process management, the process diagram, the process control diagram, and the computer function diagram. It is possible to obtain a total link system diagram that is effective for discussions and examinations including those who are not equipped. In addition, since the contents have already been confirmed at the time of creation, efficient and accurate examination becomes possible.
In addition, since the confirmation work is performed with the support of automatically creating and displaying the confirmation display, a large workload is not generated. This leads to cost reduction and design time reduction. In addition, since the present embodiment can be realized by partially improving the CAD function, no significant improvement cost is required for implementation.
【0026】[0026]
【発明の効果】以上説明したように、本発明によれば、
作成された生産システム設計図面上の登録記号に識別符
号を自動付与し、登録記号間を接続する接続記号に基づ
き登録記号相互の接続関係を分析し、その結果及び付与
した識別符号を利用しながら、配置された登録記号相互
の接続関係を示しかつ人間可読形態を有する確認情報を
作成するようにしたため、生産システム設計図面の内容
の確認に関する作業負荷を軽減でき、コスト低減、設計
時間の短縮を実現できる。更には、得られる生産システ
ム設計図面がより正確になる。As described above, according to the present invention,
The identification code is automatically assigned to the created registration symbol on the production system design drawing, the connection relationship between the registered symbols is analyzed based on the connection symbol connecting between the registered symbols, and the result and the assigned identification code are used while analyzing the result. , The confirmation information having a human-readable form that indicates the connection relationship between the registered symbols arranged is created, so that the work load for confirming the contents of the production system design drawing can be reduced, and the cost and design time can be reduced. realizable. Furthermore, the resulting production system design drawings are more accurate.
【0027】また、本発明によれば、上述の機能をCA
D等の支援装置を用いて実現するようにしたため、付加
的なコストを発生させずに上述の効果を得ることができ
る。そして、本発明によれば、工程管理の基本構造を示
す図、工程の流れを示す図、工程の制御方法を示す図及
び工程の制御に用いられるコンピュータの機能を示す図
という4種類の層から基本フォームを構成するようにし
たため、作成された図面によって設計分野間の関連を表
現でき、図面を見た人間が実際の工程に近いイメージを
取得でき、専門的知識を備えていない人間も設計概要を
把握できる。Further, according to the present invention, the above-mentioned function is provided by CA
Since the present invention is realized by using a support device such as D, the above-described effect can be obtained without generating additional cost. According to the present invention, there are four types of layers: a diagram showing a basic structure of process management, a diagram showing a process flow, a diagram showing a process control method, and a diagram showing functions of a computer used for controlling a process. Since the basic form is composed, the relationship between design fields can be expressed by the created drawing, the person who looks at the drawing can get an image close to the actual process, and the person who does not have specialized knowledge can also design summary Can understand.
【図1】本発明の一実施例に係るシステムの構成を示す
ブロック図である。FIG. 1 is a block diagram illustrating a configuration of a system according to an embodiment of the present invention.
【図2】この実施例におけるトータルリンクシステム図
作成及び確認手順を示すフローチャートである。FIG. 2 is a flowchart showing a procedure for creating and confirming a total link system diagram in this embodiment.
【図3】トータルリンクシステム図作成段階での仕掛表
示の一例を示す図である。FIG. 3 is a diagram showing an example of a work in progress display at the stage of creating a total link system diagram.
【図4】トータルリンクシステム図の表示の一例を示す
図である。FIG. 4 is a diagram showing an example of a display of a total link system diagram.
【図5】識別符号付与後のトータルリンクシステム図の
表示の一例を示す図である。FIG. 5 is a diagram showing an example of a display of a total link system diagram after an identification code is added.
【図6】トータルリンクシステム図におけるシステム構
成要素の接続関係の確認表示の一例を示す図である。FIG. 6 is a diagram illustrating an example of a confirmation display of a connection relationship between system components in a total link system diagram.
10 入力部 12 基本フォーム格納部 14 登録記号格納部 16 処理部 18 表示部 DESCRIPTION OF SYMBOLS 10 Input part 12 Basic form storage part 14 Registration symbol storage part 16 Processing part 18 Display part
───────────────────────────────────────────────────── フロントページの続き (56)参考文献 特開 平6−131411(JP,A) 日本機械学会第71期通常総会講演会講 演論文集(▲IV▼)1994年3月25日 336−338頁 宮谷孝夫ほか「生産システ ム企画・設計ツール『トータルリンクシ ステム図』」 (58)調査した分野(Int.Cl.7,DB名) G06F 17/50 636 ──────────────────────────────────────────────────続 き Continuation of the front page (56) References JP-A-6-131411 (JP, A) Proceedings of the 71st Ordinary General Meeting of the Japan Society of Mechanical Engineers (IV) March 25, 1994 336- Page 338 Takao Miyatani et al. “Production System Planning and Design Tool“ Total Link System Diagram ”” (58) Field surveyed (Int.Cl. 7 , DB name) G06F 17/50 636
Claims (2)
び基本フォーム上にレイアウトされ得る登録記号を情報
として格納する手段と、 格納されている情報及び使用者からの要求に基づき、基
本フォーム上に登録記号が配置されさらに登録記号相互
を接続する接続記号が配置された生産システム設計図面
を作成する手段と、 配置された登録記号に識別符号を自動付与する手段であ
って、基本フォーム上に配置された図形乃至記号の中か
ら、情報として格納されている登録記号のいずれかに一
致する図形乃至記号を検索し、その結果一致する図形乃
至記号が見つかった場合にその図形乃至記号に識別符号
を自動付与する手段と、 配置された接続記号に基づき基本フォーム上における登
録記号相互の接続関係を分析し、その結果に基づきかつ
付与された識別符号を利用しながら、配置された登録記
号相互の接続関係を示しかつ人間可読形態を有する確認
情報を作成する手段と、 少なくとも生産システム設計図面及び確認情報を出力す
る手段と、 を備えることを特徴とする生産システム設計支援装置。1. A means for storing, as information, a basic form of a production system design drawing and a registration symbol that can be laid out on the basic form, and a registration symbol on the basic form based on the stored information and a request from a user. means der for automatically applying means for creating a but disposed further production system design drawing connection symbol is arranged to connect the registration symbols each other, the identification code arranged registration mark
In the figure or symbol placed on the basic form
One of the registered symbols stored as information
Search for matching figures or symbols, and as a result
If a solstice symbol is found, an identification code for that figure or symbol
Means for automatically assigning the registered symbols to each other, analyzing the connection relationship between the registered symbols on the basic form based on the arranged connection symbols, and based on the result and using the assigned identification code, A production system design support device, comprising: means for generating confirmation information having a connection relationship and having a human-readable form; and means for outputting at least a production system design drawing and confirmation information.
置において、 基本フォームが、工程管理の基本構造を示す図、工程の
流れを示す図、工程の制御方法を示す図及び工程の制御
に用いられるコンピュータの機能を示す図を、それぞれ
個別の層として含む層構造を有することを特徴とする生
産システム設計支援装置。2. The production system design support apparatus according to claim 1, wherein the basic form is used for a diagram showing a basic structure of process management, a diagram showing a process flow, a diagram showing a process control method, and a process control. A production system design support apparatus having a layer structure including, as individual layers, diagrams showing the functions of the computers to be provided.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP11796894A JP3214232B2 (en) | 1994-05-31 | 1994-05-31 | Production system design support apparatus and method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP11796894A JP3214232B2 (en) | 1994-05-31 | 1994-05-31 | Production system design support apparatus and method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH07325849A JPH07325849A (en) | 1995-12-12 |
| JP3214232B2 true JP3214232B2 (en) | 2001-10-02 |
Family
ID=14724737
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP11796894A Expired - Fee Related JP3214232B2 (en) | 1994-05-31 | 1994-05-31 | Production system design support apparatus and method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3214232B2 (en) |
-
1994
- 1994-05-31 JP JP11796894A patent/JP3214232B2/en not_active Expired - Fee Related
Non-Patent Citations (1)
| Title |
|---|
| 日本機械学会第71期通常総会講演会講演論文集(▲IV▼)1994年3月25日 336−338頁 宮谷孝夫ほか「生産システム企画・設計ツール『トータルリンクシステム図』」 |
Also Published As
| Publication number | Publication date |
|---|---|
| JPH07325849A (en) | 1995-12-12 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| TW573265B (en) | Task management system and task management method | |
| JP2002259500A (en) | Instruction book making device and work support system | |
| JP3214232B2 (en) | Production system design support apparatus and method | |
| CN1328654C (en) | Function limiting program, mounting program generation program and program storage medium | |
| JP7535832B1 (en) | Information management system, information management method, and computer program | |
| CN107066213A (en) | The method for preprinting preceding DBMS for print job is set up by placement process | |
| JP2008204339A (en) | Work progress management system | |
| JPH05128116A (en) | Document editing method | |
| JP2011090452A (en) | Information processor, information processing system, and information processing program | |
| WO2022071541A1 (en) | Document creating device | |
| JP2005107635A (en) | Electronic form input system, method, program and medium | |
| US20050097446A1 (en) | Drawing management system | |
| KR100246010B1 (en) | Drawing auto kendo system | |
| JP3977673B2 (en) | Newspaper production system, editing status display method, and editing status display program | |
| EP1609090A2 (en) | Method and system of context scanning | |
| JP2006085323A (en) | Standard document creation method and standard document creation system | |
| JP3945566B2 (en) | Organization table creation device | |
| JPH08292909A (en) | Data security equipment | |
| Clark | Building control graphics criteria update: standards and criteria project 23T12 | |
| JP2003203100A (en) | Work management server, and method of preparing and submitting work document | |
| JPH07152548A (en) | Document creation device | |
| JPH04291669A (en) | Order specification method in medical treatment supporting system | |
| JPH1166174A (en) | Work management network system | |
| JPH06139055A (en) | Specification change corresponding program resource management system | |
| JP3565716B2 (en) | Display control method and apparatus for modeling data |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080727 Year of fee payment: 7 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080727 Year of fee payment: 7 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090727 Year of fee payment: 8 |
|
| LAPS | Cancellation because of no payment of annual fees |