JP3215751B2 - Gas injection molding method - Google Patents
Gas injection molding methodInfo
- Publication number
- JP3215751B2 JP3215751B2 JP11854093A JP11854093A JP3215751B2 JP 3215751 B2 JP3215751 B2 JP 3215751B2 JP 11854093 A JP11854093 A JP 11854093A JP 11854093 A JP11854093 A JP 11854093A JP 3215751 B2 JP3215751 B2 JP 3215751B2
- Authority
- JP
- Japan
- Prior art keywords
- mold
- molten resin
- injection molding
- gas injection
- gas
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29C—SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
- B29C45/00—Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
- B29C45/17—Component parts, details or accessories; Auxiliary operations
- B29C45/1703—Introducing an auxiliary fluid into the mould
- B29C45/1704—Introducing an auxiliary fluid into the mould the fluid being introduced into the interior of the injected material which is still in a molten state, e.g. for producing hollow articles
- B29C45/1705—Introducing an auxiliary fluid into the mould the fluid being introduced into the interior of the injected material which is still in a molten state, e.g. for producing hollow articles using movable mould parts
Landscapes
- Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Mechanical Engineering (AREA)
- Injection Moulding Of Plastics Or The Like (AREA)
- Blow-Moulding Or Thermoforming Of Plastics Or The Like (AREA)
- Moulds For Moulding Plastics Or The Like (AREA)
Description
【0001】[0001]
【産業上の利用分野】 本発明はガス射出成形方法に係
り、自動車のバンパー、ダッシュボード、ホイールキャ
ップ、および、ドアパネル等、あるいは、家電製品のケ
ーシング、および、テレビ受信機のバックカバー等の外
観品質の要求される樹脂製品の製造に利用できる。 BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a gas injection molding method, and relates to the appearance of a bumper, a dashboard, a wheel cap, a door panel and the like of an automobile, a casing of a home appliance, and a back cover of a television receiver. It can be used for manufacturing resin products that require quality.
【0002】[0002]
【背景技術】従来より、軽量にして高剛性な成形品が得
られる射出成形方法として、ガス射出成形方法が知られ
ている。この方法によれば、金型のキャビティに充填し
た溶融樹脂の内部に窒素ガス等の不活性高圧ガスを注入
しながら射出成形を行うので、高圧ガスの膨張力により
表面にヒケが生じない良好な成形品を得ることができ
る。2. Description of the Related Art Conventionally, a gas injection molding method has been known as an injection molding method capable of obtaining a lightweight and highly rigid molded product. According to this method, injection molding is performed while injecting an inert high-pressure gas such as nitrogen gas into the molten resin filled in the cavity of the mold, so that the surface does not sink due to the expansion force of the high-pressure gas. A molded article can be obtained.
【0003】このようなガス射出成形方法には、強度お
よび剛性のある薄肉成形品を得るために、射出成形品の
内部に高圧ガスの通路であるガスチャンネルを肋骨状に
設けて射出成形を行うリブ形ガスチャンネル式のガス射
出成形方法がある。この方法は、金型のキャビティの表
面を凹ましてガスチャンネル案内部を設けておくことに
より、表面が部分的に厚くなったリブ状の厚肉部を薄肉
成形品に形成し、この厚肉部の内部にガスチャンネルを
形成するものである。この方法で形成した薄肉成形品
は、リブ状に形成した厚肉部により充分な強度・剛性が
得られ、かつ、厚肉部の内部に形成された空洞であるガ
スチャンネルにより、軽量となるうえガスチャンネル内
の高圧ガスにより表面にヒケの発生を防止できる。In such a gas injection molding method, in order to obtain a thin molded product having strength and rigidity, a gas channel, which is a high-pressure gas passage, is provided in a rib shape inside the injection molded product and injection molding is performed. There is a rib type gas channel type gas injection molding method. According to this method, a rib-shaped thick portion having a partially thickened surface is formed into a thin-walled molded product by providing a gas channel guide portion by depressing the surface of a mold cavity. Is to form a gas channel inside. The thin molded article formed by this method can obtain sufficient strength and rigidity by the thick part formed in a rib shape, and can be reduced in weight by the gas channel which is a cavity formed inside the thick part. The generation of sink marks on the surface can be prevented by the high-pressure gas in the gas channel.
【0004】また、溶融樹脂が外部に漏れない程度に不
完全に閉鎖した金型に溶融樹脂を充填し、充填した溶融
樹脂を金型の型締めにより展延することにより、金型の
すみずみまで溶融樹脂が行き渡るようにした展延式のガ
ス射出成形方法がある。この方法によれば、成形品が薄
肉であっても型締め時の展延により金型のすみずみまで
溶融樹脂を充填できるので、ショートショットによる不
良を確実に防止することができる。[0004] Further, by filling the molten resin into a mold that is imperfectly closed so that the molten resin does not leak to the outside, and spreading the filled molten resin by clamping the mold, every corner of the mold is removed. There is a spread-type gas injection molding method in which a molten resin is spread all the way. According to this method, even if the molded product is thin, the molten resin can be filled up to every corner of the mold due to the extension at the time of mold clamping, so that a failure due to a short shot can be reliably prevented.
【0005】[0005]
【発明が解決しようとする課題】しかしながら、ガスチ
ャンネル式のガス射出成形方法では、金型に設けたガス
チャンネル案内部の間隔が周囲よりも広く、溶融樹脂の
流通抵抗が金型のキャビティの他の部分よりも大きくな
っているので、ガスチャンネル案内部内を流れる溶融樹
脂は、金型のキャビティの間隔が狭い薄肉形成部を流れ
てきた溶融樹脂よりも高速で移動する。このため、ガス
チャンネル案内部内の溶融樹脂は、薄肉形成部の溶融樹
脂よりも先に金型の端縁に到達すると、上流に向かって
逆流して薄肉形成部の溶融樹脂と衝突し、この衝突によ
り成形品の表面に流動跡(以下、「ウェルドマーク」と
いう)が発生してしまう。However, in the gas channel type gas injection molding method, the distance between the gas channel guides provided in the mold is wider than the surroundings, and the flow resistance of the molten resin is smaller than that of the cavity of the mold. Therefore, the molten resin flowing in the gas channel guide moves at a higher speed than the molten resin flowing in the thin-walled portion where the space between the mold cavities is narrow. Therefore, when the molten resin in the gas channel guide reaches the edge of the mold earlier than the molten resin in the thin-walled portion, it flows backward and collides with the molten resin in the thin-walled portion. As a result, a flow mark (hereinafter, referred to as a "weld mark") is generated on the surface of the molded product.
【0006】また、薄肉形成部は、溶融樹脂の流通抵抗
が大きいので、充填中であっても金型の端縁近傍では充
分な押圧力が得られず、溶融樹脂の流動先端が一旦停止
しやすい。このため、充填の完了に近づくと溶融樹脂の
流動先端が一旦停止し、型締めやガス注入により溶融樹
脂の流動が再開した際に、成形品の表面に別の流動跡
(以下、「ヘジテーションマーク」という)が発生して
しまう。従って、従来のガス射出成形方法では、薄肉成
形品を成形しようとすると、ウェルドマークおよびヘジ
テーションマークの発生により、成形品の外観が損なわ
れるおそれがあるという問題がある。In addition, since the flow resistance of the molten resin in the thin-walled portion is large, a sufficient pressing force cannot be obtained in the vicinity of the edge of the mold even during filling, so that the flow front of the molten resin temporarily stops. Cheap. For this reason, the flow front of the molten resin is temporarily stopped when the filling is completed, and when the flow of the molten resin is restarted by mold clamping or gas injection, another flow mark (hereinafter, referred to as a hesitation mark) is formed on the surface of the molded product. "). Therefore, in the conventional gas injection molding method, there is a problem that the appearance of the molded product may be impaired due to the occurrence of weld marks and hesitation marks when molding a thin molded product.
【0007】本発明の目的は、成形品にウェルドマーク
およびヘジテーションマークが発生しないガス射出成形
方法を提供することにある。An object of the present invention is to provide a gas injection molding method which does not generate weld marks and hesitation marks on a molded product.
【0008】[0008]
【課題を解決するための手段】本発明は、完全閉鎖状態
から所定寸法開いた状態の金型に溶融樹脂を充填する第
1の工程と、前記閉鎖の不完全な金型を型締めすること
により内部に充填された溶融樹脂を加圧して展延する第
2の工程と、前記金型に充填された溶融樹脂の内部にガ
スを注入する第3の工程とを含み、前記第2および第3
の各工程を前記第1の工程が終了する前に開始し、前記
第2の工程開始以降であって当該第2の工程完了以前の
時点で前記第3の工程を開始することを特徴とする。こ
の本発明を図面に基づいて説明する。図1は、本発明に
基づいて行われるガス射出成形のタイムチャートであ
る。図1において、第1の工程は、時刻0秒に溶融樹脂
の充填を開始することにより始まり、時刻TS秒に溶融
樹脂の充填が完了することにより終了する。第2の工程
は、時刻TP秒に金型の型締めを再開することにより始
まり、時刻TE秒に型締めが完了することにより終了す
る。第3の工程は、時刻TI秒にガス注入を開始するこ
とにより始まり、時刻TC秒にガス注入を完了すること
により終了する。そして、本発明は、第2の工程の開始
時刻TP秒、および、第3の工程の開始時刻TI秒が、
第1の工程の終了時刻TS秒よりも早い時刻であり、第
3の工程の開始時刻T I 秒が、第2の工程の開始時刻T
P 秒以降であって当該第2の工程の完了時刻T E 秒以前
の時刻であることを特徴とするものである。According to the present invention, there is provided a first step of filling a mold with a predetermined size open from a completely closed state with a molten resin, and clamping the incompletely closed mold. a second step of spreading the molten resin filled in the pressurizing manner, and a third step of injecting the gas into the molten resin filled in the mold, the second and 3
Starting each step of the first step before the end of the first step ,
After the start of the second step and before the completion of the second step
The third step is started at a point in time . The present invention will be described with reference to the drawings. FIG. 1 is a time chart of gas injection molding performed according to the present invention. In Figure 1, the first step begins by initiating the filling of the molten resin at the time 0 seconds, filling time T S seconds to the molten resin is completed by completing. The second step begins by the time T P seconds to resume clamping of the mold is terminated by clamping the time T E seconds to complete. The third step begins by starting the gas injection time T I s, is terminated by completing the gas injection time T C seconds. The present invention is, start time T P seconds a second step, and, the start time T I s of the third step,
Time earlier der than the end time T S seconds of the first step is, first
Start time T I s of 3 steps is, the start time T of the second step
After P seconds and before the completion time TE seconds of the second step
Is the time of
【0009】ここで、前記第2の工程と第3の工程とを
開始するタイミングは、同時、すなわち、時刻TP 秒と
時刻TI 秒とが同じ時刻であることが望ましい。また、
前記第1の工程における金型は、完全閉鎖状態から閉じ
代を1〜3mm残して開いた状態で閉鎖されていることが
好ましい。さらに、前記第2および第3の工程は、前記
第1の工程で溶融樹脂の充填量が前記金型に充填すべき
全量の80〜99%の範囲に達したときに開始すること
が望ましい。また、前記第2の工程を終了した後に前記
第3の工程を終了させること、すなわち、第2の工程の
終了時刻TE 秒が第3の工程の終了時刻TC 秒よりも早
い時刻であることが好ましい。[0009] Here, the timing of starting the second step and the third step, simultaneously, i.e., it is desirable that the time T P seconds and time T I s is the same time. Also,
It is preferable that the mold in the first step is closed in an open state while leaving a closing margin of 1 to 3 mm from a completely closed state. Further, it is desirable that the second and third steps are started when the filling amount of the molten resin in the first step reaches a range of 80 to 99% of the total amount to be filled in the mold. Further, to terminate the third step after finishing the second step, i.e., the end time T E s of the second step is a time earlier than the end time T C seconds in the third step Is preferred.
【0010】[0010]
【作用】このような本発明では、溶融樹脂が充填される
金型は完全閉鎖状態から所定寸法開いているので、当該
金型の薄肉形成部は間隔が拡大されて、薄肉形成部の流
通抵抗はガスチャンネル案内部の流通抵抗と大差ない状
態となる。このため、薄肉形成部の溶融樹脂はガスチャ
ンネル案内部の溶融樹脂とほぼ同時に金型の端縁に到達
するようになり、溶融樹脂同士が衝突することがなくな
り、ウェルドマークの発生が未然に防止されるようにな
る。According to the present invention, since the mold filled with the molten resin is opened to a predetermined dimension from the completely closed state, the interval between the thin-walled portions of the mold is enlarged, and the flow resistance of the thin-walled portion is increased. Is not much different from the flow resistance of the gas channel guide. For this reason, the molten resin in the thin-wall forming portion reaches the edge of the mold almost at the same time as the molten resin in the gas channel guide portion, so that the molten resins do not collide with each other, thereby preventing the occurrence of weld marks. Will be done.
【0011】また、第2および第3の各工程が、前記第
1の工程とオーバーラップするうえ、第2の工程および
第3の工程が互いにオーバーラップするようになるの
で、溶融樹脂の流れの先端部分は、第1の工程の充填圧
による移動から第2の工程の展延による移動、および、
第2の工程の展延による移動から第3の工程のガス注入
による移動へ途切れなく移行するようになる。このた
め、溶融樹脂の先端部分が一旦停止しなくなり、ヘジテ
ーションマークの発生が未然に防止されるようになり、
これにより前記目的が達成される。Further, after the second and third steps are overlapped with the first step, second step and
Since the third step overlaps with each other, the leading end of the flow of the molten resin moves from the movement due to the filling pressure in the first step to the movement due to the spreading in the second step, and
The movement by spreading in the second step is seamlessly shifted to the movement by gas injection in the third step. For this reason, the tip portion of the molten resin does not stop once, and the occurrence of hesitation marks is prevented beforehand,
Thereby, the above object is achieved.
【0012】[0012]
【実施例】以下、本発明の一実施例を図面に基づいて説
明する。図2には、本実施例の射出成形機1の要部が示
されている。射出成形機1は、合成樹脂を射出する射出
装置10および成形用の金型20を有するものである。射出
装置10は、筒状のバレル11の内部に溶融状態の合成樹脂
30を混練するスクリュー12を設けたものである。バレル
11の先端にはノズル13が設けられている。ノズル13を金
型20のブッシュ21に接続して溶融樹脂30を射出すること
により、金型20の内部に溶融樹脂30が充填されるように
なっている。ノズル13の内部には、成形品31の内部に加
圧ガスを注入する吹き込み管14が挿入され、この吹き込
み管14は図示しない供給源から窒素ガス等の不活性ガス
の供給を受けるものである。An embodiment of the present invention will be described below with reference to the drawings. FIG. 2 shows a main part of the injection molding machine 1 of the present embodiment. The injection molding machine 1 has an injection device 10 for injecting a synthetic resin and a molding die 20. The injection device 10 includes a synthetic resin in a molten state inside a cylindrical barrel 11.
A screw 12 for kneading 30 is provided. barrel
A nozzle 13 is provided at the tip of 11. By connecting the nozzle 13 to the bush 21 of the mold 20 and injecting the molten resin 30, the interior of the mold 20 is filled with the molten resin 30. Inside the nozzle 13, a blowing pipe 14 for injecting a pressurized gas into the molded article 31 is inserted, and the blowing pipe 14 receives supply of an inert gas such as nitrogen gas from a supply source (not shown). .
【0013】金型20は、図中下方のコア部20A と、上方
のキャビティ部20B とに分割されたものである。キャビ
ティ部20B は、図3にも示されるように、長方形状の薄
肉成形品を成形するための凹部であるキャビティ22が形
成されたものである。The mold 20 is divided into a lower core 20A and an upper cavity 20B in the figure. As shown in FIG. 3, the cavity portion 20B has a cavity 22 which is a concave portion for forming a rectangular thin molded product.
【0014】コア部20A は、キャビティ部20B のキャビ
ティ22に対応して上側に成形面23が形成されたものであ
る。この成形面23の中央には、コア部20A を貫通するス
プルー24が開口されている。このスプルー24を介してブ
ッシュ21に当接した射出装置10のノズル13がキャビティ
22に連通されるようになっている。コア部20A の成形面
23には、溝状のガスチャンネル案内部25が成形面23の周
縁および対角線に沿って形成されている。ガスチャンネ
ル案内部25以外の部分は、キャビティ22の間隔の狭い部
分である薄肉形成部26となっている。ここで、キャビテ
ィ22および成形面23の間に溶融樹脂30を充填することに
より、ガスチャンネル案内部25の内部には厚さの厚い厚
肉部32が形成されるとともに、薄肉形成部26には厚さの
薄い薄肉部33が形成されるようになっている(図2参
照)。厚肉部32の内部には、溶融樹脂30の内部にガスを
注入することにより、ガスの通路であるガスチャンネル
34が形成されるようになっている。また、金型20は、図
示しない油圧シリンダ装置等の押圧手段で、コア部20A
およびキャビティ部20B の一方を他方に向かって押圧す
ることにより、型締め閉鎖されるようになっている。そ
して、金型20は、コア部20A およびキャビティ部20B が
完全閉鎖状態から所定寸法Rだけ開いた状態とすること
も可能となっている(図3参照)。The core portion 20A has a molding surface 23 formed on the upper side corresponding to the cavity 22 of the cavity portion 20B. A sprue 24 is formed in the center of the molding surface 23 so as to penetrate the core 20A. The nozzle 13 of the injection device 10 abutting on the bush 21 via the sprue 24
It is connected to 22. Molding surface of core 20A
In the groove 23, a groove-shaped gas channel guide 25 is formed along the periphery of the forming surface 23 and along a diagonal line. The portion other than the gas channel guide portion 25 is a thin-walled portion 26 where the space between the cavities 22 is narrow. Here, by filling the molten resin 30 between the cavity 22 and the molding surface 23, a thick portion 32 having a large thickness is formed inside the gas channel guide portion 25, and a thin portion 26 is formed in the thin portion forming portion 26. A thin portion 33 having a small thickness is formed (see FIG. 2). The gas channel, which is a gas passage, is formed by injecting a gas into the molten resin 30 inside the thick portion 32.
34 are formed. The mold 20 is pressed by a pressing means such as a hydraulic cylinder device (not shown) by a core 20A.
By pressing one of the cavities 20B toward the other, the mold is closed and closed. The mold 20 is also capable of opening the core portion 20A and the cavity portion 20B by a predetermined dimension R from the completely closed state (see FIG. 3).
【0015】このような本実施例では、図4の(A)に
示されるように、金型20の完全閉鎖状態からコア部20A
およびキャビティ部20B を所定寸法Rだけ開いた状態に
しておき、この状態の金型20に溶融樹脂30を充填して第
1の工程を開始する。なお、前記寸法Rは、1〜3mmの
範囲に設定しておく。次いで、図4の(B)に示される
ように、溶融樹脂30の流れの先端部35が停止してしまわ
ないように、溶融樹脂30の充填量が金型20に充填すべき
全量の80〜99%の範囲に達したときに、第2の工程
と第3の工程とを同時に開始する。In this embodiment, as shown in FIG. 4A, the core 20A is moved from the completely closed state of the mold 20.
The cavity 20B is opened by a predetermined dimension R, and the mold 20 in this state is filled with the molten resin 30 to start the first step. The dimension R is set in a range of 1 to 3 mm. Next, as shown in FIG. 4B, the filling amount of the molten resin 30 is set to 80 to 80% of the total amount to be filled in the mold 20 so that the leading end 35 of the flow of the molten resin 30 does not stop. When reaching the range of 99%, the second step and the third step are started simultaneously.
【0016】第2の工程の開始により、コア部20A およ
びキャビティ部20B を型締めし、内部に充填された溶融
樹脂30を加圧することにより、溶融樹脂30を展延し、溶
融樹脂30の充填が完了しても溶融樹脂30の先端部35が移
動を継続するようにする。ここで、型締めのタイミング
が早すぎると、早い時期に薄肉形成部26の流通抵抗が大
きくなってしまうので、金型20を所定寸法Rだけ開いて
おいた効果が得られず、エアポケット(穴空き)あるい
はウェルドマークが生じる。第3の工程の開始により、
金型20に充填された溶融樹脂30の内部にガスを注入し、
このガスの注入によっても先端部35が移動を継続するよ
うにする。続いて、第2の工程の終了となる金型20の型
締めの完了後、0.1〜1秒の範囲内でガスの注入を継
続し、図4の(C)に示されるように、溶融樹脂30の内
部にガスチャンネル34をガスチャンネル案内部25に沿っ
て形成し、溶融樹脂30全体にガスチャンネル34が行き渡
った後、ガスの注入を完了して第3の工程を終了する。
その後、金型20を開けて成形品31を取り出す。At the start of the second step, the core portion 20A and the cavity portion 20B are clamped, and the molten resin 30 filled therein is pressed, whereby the molten resin 30 is spread and filled with the molten resin 30. Is completed, the tip 35 of the molten resin 30 continues to move. Here, if the timing of the mold clamping is too early, the flow resistance of the thin-wall forming portion 26 will increase at an early stage, so that the effect of opening the mold 20 by the predetermined dimension R cannot be obtained, and the air pocket ( (Holes) or weld marks. With the start of the third step,
Inject gas into the molten resin 30 filled in the mold 20,
Ahead end 35 by the injection of gas so as to continue to move. Subsequently, after the completion of the mold clamping of the mold 20, which is the end of the second step, gas injection is continued within a range of 0.1 to 1 second, and as shown in FIG. A gas channel 34 is formed inside the molten resin 30 along the gas channel guide 25, and after the gas channel 34 has spread over the entire molten resin 30, the gas injection is completed and the third step is completed.
Thereafter, the mold 20 is opened and the molded product 31 is taken out.
【0017】前述のような本実施例によれば次のような
効果がある。すなわち、金型20を完全閉鎖状態から所定
寸法開いた状態で、溶融樹脂30を充填するようにし、薄
肉形成部26およびガスチャンネル案内部25の流通抵抗を
互いに大差ない状態としたので、薄肉形成部26の溶融樹
脂30はガスチャンネル案内部25の溶融樹脂30とほぼ同時
に金型20の端縁に到達するようになり、溶融樹脂30同士
が衝突することがなくなり、ウェルドマークの発生を未
然に防止できる。According to the above-described embodiment, the following effects can be obtained. That is, the molten resin 30 is filled in a state where the mold 20 is opened from the completely closed state to a predetermined dimension, and the flow resistances of the thin-wall forming section 26 and the gas channel guide section 25 are not largely different from each other. The molten resin 30 of the portion 26 reaches the edge of the mold 20 almost at the same time as the molten resin 30 of the gas channel guide portion 25, so that the molten resins 30 do not collide with each other, thereby preventing the occurrence of weld marks. Can be prevented.
【0018】また、第2および第3の工程を第1の工程
が終了する前に開始し、第1の工程の充填圧による移動
から第2の工程の展延、および、第3の工程のガス注入
による移動へと途切れなく移行することにより、溶融樹
脂30の流れの先端部35の移動が全体を通じて連続するよ
うにしたので、溶融樹脂30の先端部35が一旦停止しなく
なり、ヘジテーションマークの発生を未然に防止でき
る。Further, the second and third step starts before the first step is completed, spreading from movement by charging pressure of the first step of the second step, and, in a third step Since the movement of the front end 35 of the flow of the molten resin 30 is made continuous throughout by making a continuous transition to the movement by gas injection, the front end 35 of the molten resin 30 does not stop once, and the hesitation mark The occurrence can be prevented beforehand.
【0019】さらに、前記第2の工程と第3の工程とを
同時に開始し、溶融樹脂30の展延およびガスの注入の両
方で溶融樹脂30の先端部35の移動を継続するようにした
ので、溶融樹脂30の先端部35を移動させる推進力が強化
され、溶融樹脂30の先端部35の一旦停止が一層発生しに
くくなり、ヘジテーションマークの発生防止をさらに確
実にできる。Furthermore, the second step and the third step are started simultaneously, and the movement of the tip 35 of the molten resin 30 is continued by both the spreading of the molten resin 30 and the gas injection. In addition, the driving force for moving the distal end portion 35 of the molten resin 30 is strengthened, and the temporary stop of the distal end portion 35 of the molten resin 30 is more unlikely to occur, and the occurrence of hesitation marks can be more reliably prevented.
【0020】また、金型20の完全閉鎖状態からコア部20
A およびキャビティ部20B を所定寸法Rだけ開いた状態
にするとともに、寸法Rを1〜3mmの範囲に設定し、か
つ、第2および第3の工程を第1の工程で溶融樹脂30の
充填量が金型20に充填すべき全量の80〜99%の範囲
に達したときに開始することにより、上述の効果が確実
に得られるようになるので、射出成形を何回繰り返して
も均一な品質の成形品31を得ることができる。Also, when the mold 20 is completely closed,
A and the cavity portion 20B are opened by a predetermined dimension R, the dimension R is set in a range of 1 to 3 mm, and the filling amount of the molten resin 30 in the second and third steps is set in the first step. Is started when it reaches the range of 80 to 99% of the total amount to be filled in the mold 20, so that the above-mentioned effect can be surely obtained, so that even if injection molding is repeated many times, uniform quality can be obtained. Can be obtained.
【0021】また、第2の工程の終了後に第3の工程を
終了することにより、金型20の型締めの完了後にもガス
の注入が継続されるようにしたので、溶融樹脂30の内部
に形成されたガスチャンネル34が型締めにより潰れるこ
とがなく、当初設定されたガスチャンネル34を確実に形
成されるようになり、得られた成形品31にヒケ等の不良
が生じることがない。Further, by completing the third step after the completion of the second step, the gas injection is continued even after the mold 20 is completely clamped. The formed gas channel 34 is not crushed by the mold clamping, and the initially set gas channel 34 is reliably formed, so that the obtained molded product 31 does not have defects such as sink marks.
【0022】次に、本発明の効果を具体的な実験例に基
づいて説明する。 〔実験例〕本実験例は、本発明に基づく金型を用いてガ
ス射出成形を行う実験である。本実験例では、金型とし
て前記実施例で示した金型20と基本的構成が同一のもの
を用いるとともに、前述の実施例で説明した本発明が達
成できる範囲内において設定した射出条件の下で実験例
1〜3を行う。なお、実験例1〜3の各射出条件は表1
に示してある。Next, the effects of the present invention will be described based on specific experimental examples. [Experimental Example] This experimental example is an experiment in which gas injection molding is performed using a mold according to the present invention. In this experimental example, a mold having the same basic configuration as the mold 20 shown in the above embodiment is used, and under injection conditions set within a range where the present invention described in the above embodiment can be achieved. Experimental Examples 1 to 3 are performed. Table 1 shows the injection conditions of Experimental Examples 1 to 3.
It is shown in
【0023】[0023]
【表1】 [Table 1]
【0024】〔比較例〕本比較例は、前記実験例と比較
するために、前述の本発明が達成できる範囲から外れた
射出条件でガス射出成形を行う実験例である。本比較例
では、前記実験例と同一形状の金型20を用いる。また、
本比較例の射出条件も表1に示してある。[Comparative Example] This comparative example is an experimental example in which gas injection molding is performed under injection conditions outside the range in which the present invention can be achieved, in order to compare with the experimental example. In this comparative example, a mold 20 having the same shape as that of the experimental example is used. Also,
Table 1 also shows the injection conditions of this comparative example.
【0025】ここで、これらの比較例1〜7について具
体的な説明を簡単にしておく。比較例1は、金型20が完
全閉鎖される通常のガス射出成形の実験例である。比較
例2は、第1の工程において金型20を開く寸法Rを1mm
以下にして行う実験例である。比較例3は、比較例2と
は逆に第1の工程において金型20を開く寸法Rを3mm以
上にして行う実験例である。比較例4は、型締めの再開
時刻が早く、溶融樹脂30の充填量が金型20に充填すべき
全量の80〜99%の範囲に達する前に型締めを開始す
る実験例である。比較例5は、比較例4とは逆に型締め
の再開時刻が遅く、溶融樹脂30の充填が終了してから型
締めを開始する実験例である。比較例6は、ガス注入の
開始時刻が遅く、溶融樹脂30の充填の終了時にガス注入
を開始する実験例である。比較例7は、ガス注入の時間
が短く、型締めの終了前にガス注入が完了するガス射出
成形の実験例である。Here, a specific description of these comparative examples 1 to 7 will be simplified. Comparative Example 1 is an experimental example of ordinary gas injection molding in which the mold 20 is completely closed. In Comparative Example 2, the dimension R for opening the mold 20 in the first step was 1 mm.
This is an experimental example performed as follows. Comparative Example 3 is an experimental example in which the dimension R for opening the mold 20 is set to 3 mm or more in the first step, contrary to Comparative Example 2. Comparative Example 4 is an experimental example in which the mold clamping is restarted earlier, and the mold clamping is started before the filling amount of the molten resin 30 reaches the range of 80 to 99% of the total amount to be filled in the mold 20. Comparative Example 5 is an experimental example in which the mold reopening time is later than the comparative example 4, and the mold clamping is started after the filling of the molten resin 30 is completed. Comparative Example 6 is an experimental example in which the gas injection start time is late and the gas injection is started at the end of filling of the molten resin 30. Comparative Example 7 is an experimental example of gas injection molding in which the gas injection time is short and the gas injection is completed before the end of the mold clamping.
【0026】〔共通射出条件〕以上の実験例および比較
例では、ガス射出成形の前提となる共通射出条件を以下
のように設定する。 使用樹脂 : ノリル 成形温度 : 270 ℃ 金型温度 : 60 ℃ なお、金型20の薄肉形成部26の厚さt(図2参照)は、
1.5mmに設定する。 〔実験結果〕各実験結果は以下の通りである。なお、表
1の最右欄には、結果の概略を一言で述べてある。すな
わち、実験例1〜3では、図5に示されるように、表面
にヒケ、ウェルドマークおよびヘジテーションマーク等
の全くない外観が良好な成形品31を得ることができた。[Common Injection Conditions] In the above experimental examples and comparative examples, the common injection conditions which are the premise of gas injection molding are set as follows. Resin used: Noryl Molding temperature: 270 ° C. Mold temperature: 60 ° C. The thickness t of the thin-walled portion 26 of the mold 20 (see FIG. 2)
Set to 1.5mm. [Experimental results] Each experimental result is as follows. In the rightmost column of Table 1, the summary of the result is described in one word. That is, in Experimental Examples 1 to 3, as shown in FIG. 5, a molded product 31 having a good appearance without any sink marks, weld marks, hesitation marks, etc. on the surface could be obtained.
【0027】これに対し比較例1、比較例4、および、
比較例5では、図6に示されるように、成形品50の周縁
部分50A には、表面にウェルドマーク41およびヘジテー
ションマーク42の両方が生じ、また、スプルー51近傍の
中央部分には、一般面にガスが洩れた跡43が残ってい
た。これらにより成形品50の外見は損なわれた。比較例
2では、図7に示されるように、周縁部分52A の表面に
著しいウェルドマーク41が生じるとともに、ヘジテーシ
ョンマーク42も生じていた。薄肉部52Bの表面にはウェ
ルドマーク41のみが生じていた。これらにより成形品52
の外観が損なわれた。比較例3では、図8に示されるよ
うに、成形品53の長辺53A の中央近傍にガスリークの跡
44が残り、これにより成形品53の外見が損なわれた。比
較例6では、図9に示されるように、周縁部分54A の表
面に著しいヘジテーションマーク42が生じるとともに、
ウェルドマーク41も生じていた。これにより成形品54の
外観が損なわれた。比較例7では、図10に示されるよ
うに、長辺55A および短辺55B の両方の中央近傍の表面
にウェルドマーク41が生じるとともに、不充分なガス注
入のため短辺55B の中央近傍の表面にヒケ45が生じてい
た。これらにより成形品55の外観が損なわれた。On the other hand, Comparative Example 1, Comparative Example 4, and
In Comparative Example 5, as shown in FIG. 6, both the weld mark 41 and the hesitation mark 42 are formed on the peripheral portion 50A of the molded product 50, and the central portion near the sprue 51 has a general surface. There were traces 43 of gas leaks. As a result, the appearance of the molded product 50 was impaired. In Comparative Example 2, as shown in FIG. 7, a remarkable weld mark 41 was formed on the surface of the peripheral portion 52A, and a hesitation mark 42 was also formed. Only the weld mark 41 was formed on the surface of the thin portion 52B. The molded product 52
Appearance was impaired. In Comparative Example 3, as shown in FIG. 8, traces of gas leak were found near the center of the long side 53A of the molded product 53.
44 remained, which impaired the appearance of the molded article 53. In Comparative Example 6, as shown in FIG. 9, a significant hesitation mark 42 is formed on the surface of the peripheral portion 54A, and
A weld mark 41 was also formed. As a result, the appearance of the molded product 54 was impaired. In Comparative Example 7, as shown in FIG. 10, a weld mark 41 is formed on the surface near the center of both the long side 55A and the short side 55B, and the surface near the center of the short side 55B due to insufficient gas injection. There was a sink mark 45. These deteriorated the appearance of the molded article 55.
【0028】なお、本発明は前述の一実施例に限定され
るものではなく、次に示すような変形などをも含むもの
である。すなわち、成形品は、略面状のものに限らず、
箱状のものや容器状のものでもよく、要するに薄肉であ
ればよい。また、成形品に形成する厚肉部は、筋交い状
に限らず、格子縞状でもよく、必要な方向に必要な強度
が得られるように設定すればよい。The present invention is not limited to the above-described embodiment, but includes the following modifications. That is, the molded product is not limited to a substantially planar shape,
It may be box-shaped or container-shaped, and in short, may be thin. Further, the thick portion formed on the molded product is not limited to the strut shape, but may be a checkerboard shape, and may be set so as to obtain a required strength in a required direction.
【0029】さらに、溶融樹脂はノリルに限らず、ポロ
プロピレン等他の樹脂でもよい。また、閉塞部を駆動す
る駆動手段としては、油圧シリンダ装置に限らず、空気
シリンダ装置、電動式や電磁式のものでもよい。さら
に、加圧ガスとしては、窒素ガスに限らず、アルゴンガ
ス等の他の不活性ガスを採用してもよい。Further, the molten resin is not limited to Noryl, but may be other resins such as polypropylene. The driving means for driving the closing portion is not limited to the hydraulic cylinder device, but may be an air cylinder device, an electric type or an electromagnetic type. Further, the pressurized gas is not limited to the nitrogen gas, but may be another inert gas such as an argon gas.
【0030】[0030]
【発明の効果】前述のように本発明によれば、成形品に
ウェルドマークおよびヘジテーションマークの発生を未
然に防止でき、成形品の外観を良好にすることができ
る。As described above, according to the present invention, it is possible to prevent the occurrence of weld marks and hesitation marks on a molded product, and to improve the appearance of the molded product.
【図1】本発明を説明するタイムチャートである。FIG. 1 is a time chart illustrating the present invention.
【図2】本発明の一実施例のガス射出成形機を示す断面
図である。FIG. 2 is a sectional view showing a gas injection molding machine according to one embodiment of the present invention.
【図3】本実施例の金型の分解状態を示す斜視図であ
る。FIG. 3 is a perspective view showing a disassembled state of a mold according to the present embodiment.
【図4】本実施例の手順を示す説明図である。FIG. 4 is an explanatory diagram showing a procedure of the present embodiment.
【図5】本発明の実験例1〜3の実験結果を示す平面図
である。FIG. 5 is a plan view showing experimental results of Experimental Examples 1 to 3 of the present invention.
【図6】本発明の比較例1,4,5の実験結果を示す平
面図である。FIG. 6 is a plan view showing experimental results of Comparative Examples 1, 4, and 5 of the present invention.
【図7】本発明の比較例2の実験結果を示す平面図であ
る。FIG. 7 is a plan view showing an experimental result of Comparative Example 2 of the present invention.
【図8】本発明の比較例3の実験結果を示す平面図であ
る。FIG. 8 is a plan view showing an experimental result of Comparative Example 3 of the present invention.
【図9】本発明の比較例6の実験結果を示す平面図であ
る。FIG. 9 is a plan view showing an experimental result of Comparative Example 6 of the present invention.
【図10】本発明の比較例7の実験結果を示す平面図で
ある。FIG. 10 is a plan view showing an experimental result of Comparative Example 7 of the present invention.
20 金型 20A 金型の雄型であるコア部 20B 金型の雌型であるキャビティ部 30 溶融樹脂 31 成形品 20 Mold 20A Core, which is the male mold 20B Cavity, which is the female mold 30 Mold 31 Molded product
フロントページの続き (56)参考文献 特開 平3−133618(JP,A) 特開 昭63−27219(JP,A) 特開 平4−353408(JP,A) 特開 平4−255314(JP,A) 特開 平4−284213(JP,A) 特開 平1−157823(JP,A) (58)調査した分野(Int.Cl.7,DB名) B29C 45/00 - 45/84 Continuation of the front page (56) References JP-A-3-133618 (JP, A) JP-A-63-27219 (JP, A) JP-A-4-353408 (JP, A) JP-A-4-255314 (JP) JP-A-4-284213 (JP, A) JP-A-1-157823 (JP, A) (58) Fields investigated (Int. Cl. 7 , DB name) B29C 45/00-45/84
Claims (5)
型に溶融樹脂を充填する第1の工程と、前記閉鎖の不完
全な金型を型締めすることにより内部に充填された溶融
樹脂を加圧して展延する第2の工程と、前記金型に充填
された溶融樹脂の内部にガスを注入する第3の工程とを
含み、前記第2および第3の各工程を前記第1の工程が
終了する前に開始し、前記第2の工程開始以降であって
当該第2の工程完了以前の時点で前記第3の工程を開始
することを特徴とするガス射出成形方法。1. A first step of filling a molten resin into a mold opened to a predetermined dimension from a completely closed state, and the molten resin filled inside by closing the incompletely closed mold. And a third step of injecting a gas into the molten resin filled in the mold, wherein the second and third steps are performed by the first step. Starting before the end of the step, and starting after the start of the second step.
The gas injection molding method , wherein the third step is started before the completion of the second step .
て、前記第2の工程と第3の工程とを同時に開始するこ
とを特徴とするガス射出成形方法。2. The gas injection molding method according to claim 1, wherein the second step and the third step are started simultaneously.
のガス射出成形方法において、前記第1の工程における
金型は完全閉鎖状態から閉じ代を1〜3mm残して開いた
状態で閉鎖されていることを特徴とするガス射出成形方
法。3. The gas injection molding method according to claim 1, wherein the mold in the first step is closed in a state where the mold is opened with a margin of 1 to 3 mm from a completely closed state. A gas injection molding method characterized by being performed.
のガス射出成形方法において、前記第2および第3の工
程は前記第1の工程で溶融樹脂の充填量が前記金型に充
填すべき全量の80〜99%の範囲に達したときに開始
されることを特徴とするガス射出成形方法。4. The gas injection molding method according to claim 1, wherein the second and third steps are such that the filling amount of the molten resin in the first step is equal to the filling amount of the mold. Gas injection molding method, which is started when the range of 80 to 99% of the total amount to be obtained is reached.
のガス射出成形方法において、前記第2の工程を完了さ
せた後に前記第3の工程を完了させることを特徴とする
ガス射出成形方法。5. The gas injection molding method according to claim 1, wherein the third step is completed after the second step is completed. Method.
Priority Applications (4)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP11854093A JP3215751B2 (en) | 1993-05-20 | 1993-05-20 | Gas injection molding method |
| CA002121521A CA2121521A1 (en) | 1993-04-26 | 1994-04-18 | Gas-introduced injection molding and method of obtaining the same |
| US08/232,773 US5514447A (en) | 1993-04-26 | 1994-04-25 | Gas-introduced injection molding and method of obtaining the same |
| US08/539,598 US5750068A (en) | 1993-04-26 | 1995-10-05 | Gas-introduced injection molding and method of obtaining the same |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP11854093A JP3215751B2 (en) | 1993-05-20 | 1993-05-20 | Gas injection molding method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH06328488A JPH06328488A (en) | 1994-11-29 |
| JP3215751B2 true JP3215751B2 (en) | 2001-10-09 |
Family
ID=14739126
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP11854093A Expired - Lifetime JP3215751B2 (en) | 1993-04-26 | 1993-05-20 | Gas injection molding method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3215751B2 (en) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US6106260A (en) | 1995-03-03 | 2000-08-22 | Sumitomo Chemical Company, Limited | Mold useful in the production of hollow thermoplastic molded articles |
| US6093365A (en) * | 1995-11-09 | 2000-07-25 | Plastic Omnium Auto Interierur | Panel of material such as, for example, a vehicle door panel having reinforcements and a handle |
-
1993
- 1993-05-20 JP JP11854093A patent/JP3215751B2/en not_active Expired - Lifetime
Also Published As
| Publication number | Publication date |
|---|---|
| JPH06328488A (en) | 1994-11-29 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP3174962B2 (en) | Gas utilization method for improving surface properties in plastic molding | |
| US6739856B2 (en) | Equipment for hot moulding of articles made of thermoplastic material | |
| JP4007548B2 (en) | Molding method of foamed resin molding | |
| JP3310271B1 (en) | Injection molding method | |
| JPH06254895A (en) | Injection molding method | |
| JP3215751B2 (en) | Gas injection molding method | |
| US20040043683A1 (en) | Method of manufacturing a trim part under low pressure operating conditions | |
| JPH08174601A (en) | Skin integral molding method and skin integral molding device | |
| JP3494500B2 (en) | Injection molding method and injection mold for automotive instrument panel | |
| JP2701681B2 (en) | Method for producing resin molded product and molding die apparatus | |
| US6187251B1 (en) | Process for producing thermoplastic resin hollow molded article | |
| JP3527575B2 (en) | Manufacturing method of two-layer molded article and mold used for it | |
| JP2000127200A (en) | Method, mold, and molding for partly decorated integral forming of skin material | |
| JP2002137255A (en) | In-mold coating mold and in-mold coating method | |
| KR100493791B1 (en) | covering product molding apparatus and molding method thereof | |
| JPH05318509A (en) | Method for treating terminal of interior material | |
| JP3213137B2 (en) | Gas injection molding method and apparatus | |
| US6146579A (en) | Process for producing thermoplastic resin hollow molded article | |
| JP3505549B2 (en) | Molding method of hollow molded body | |
| JP3166440B2 (en) | Hollow injection molding equipment | |
| JPH06246765A (en) | Gas injection molding method and mold thereof | |
| JP3241490B2 (en) | Method for producing resin tubular body | |
| JPH11333876A (en) | Molding method of resin molded article | |
| JP3220272B2 (en) | Injection molding method to paint simultaneously with molding | |
| JP3290096B2 (en) | Insert molding method by press fitting |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20010626 |
|
| S111 | Request for change of ownership or part of ownership |
Free format text: JAPANESE INTERMEDIATE CODE: R313111 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| S111 | Request for change of ownership or part of ownership |
Free format text: JAPANESE INTERMEDIATE CODE: R313111 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080727 Year of fee payment: 7 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090727 Year of fee payment: 8 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090727 Year of fee payment: 8 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100727 Year of fee payment: 9 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100727 Year of fee payment: 9 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110727 Year of fee payment: 10 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120727 Year of fee payment: 11 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120727 Year of fee payment: 11 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130727 Year of fee payment: 12 |
|
| EXPY | Cancellation because of completion of term |