Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP3236455B2 - Underground electromagnetic exploration method and apparatus - Google Patents
[go: Go Back, main page]

JP3236455B2 - Underground electromagnetic exploration method and apparatus - Google Patents

Underground electromagnetic exploration method and apparatus

Info

Publication number
JP3236455B2
JP3236455B2 JP28916594A JP28916594A JP3236455B2 JP 3236455 B2 JP3236455 B2 JP 3236455B2 JP 28916594 A JP28916594 A JP 28916594A JP 28916594 A JP28916594 A JP 28916594A JP 3236455 B2 JP3236455 B2 JP 3236455B2
Authority
JP
Japan
Prior art keywords
transmission
current
tunnel
underground
electromagnetic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP28916594A
Other languages
Japanese (ja)
Other versions
JPH08128969A (en
Inventor
光政 岡村
敏昭 原
均 西牧
一成 和田
章 斎藤
秀浩 石川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toda Corp
Mitsui Mineral Development Engineering Co Ltd
Original Assignee
Toda Corp
Mitsui Mineral Development Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toda Corp, Mitsui Mineral Development Engineering Co Ltd filed Critical Toda Corp
Priority to JP28916594A priority Critical patent/JP3236455B2/en
Publication of JPH08128969A publication Critical patent/JPH08128969A/en
Application granted granted Critical
Publication of JP3236455B2 publication Critical patent/JP3236455B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Geophysics And Detection Of Objects (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、地下電磁探査方法およ
び装置、特に、時間領域の電磁探査手法を用い、トンネ
ル周囲の地山構造を求める地下電磁探査方法および装置
に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an underground electromagnetic survey method and apparatus, and more particularly, to an underground electromagnetic survey method and apparatus for obtaining a ground structure around a tunnel using a time domain electromagnetic survey technique.

【0002】[0002]

【従来の技術】従来より、トンネルの掘削を行う場合に
は、切羽前方やトンネル周囲の地山状況等を正確に把握
しておくことが、安全かつ確実な施工を行うために必要
とされる。特に、山岳トンネルなどの掘削を行う場合に
は、切羽前方や周囲の状況、とりわけ断層破砕帯の存在
等を正確に把握し、適切な対策を講ずることが、施工管
理の適正化を図るために必要とされる。
2. Description of the Related Art Conventionally, when excavating a tunnel, it is necessary to accurately grasp the conditions in front of the face and around the tunnel, etc. for safe and reliable construction. . In particular, when excavating mountain tunnels, etc., it is necessary to accurately understand the situation in front of and around the face, especially the existence of fault crush zones, and take appropriate measures. Needed.

【0003】このため、従来では、地上表面からトンネ
ル掘削経路に沿って所定間隔でボーリング調査を行い、
地下構造の測定を行っていた。
For this reason, conventionally, a boring survey has been performed at predetermined intervals from the ground surface along a tunnel excavation path,
The underground structure was being measured.

【0004】[0004]

【発明が解決しようとする課題】しかし、このような従
来の手法では、トンネル掘削経路に沿った地下構造の測
定に膨大な時間と経費が係るばかりでなく、トンネル周
囲の地山状況、特に切羽前方の状況を必ずしも正確に測
定できないという問題があった。
However, in such a conventional method, the measurement of the underground structure along the tunnel excavation path not only takes an enormous amount of time and money, but also the ground conditions around the tunnel, especially the face There was a problem that the situation in front could not always be measured accurately.

【0005】例えば、山岳トンネルの掘削を行う場合に
は、常にボーリング調査を行うことが出来るとは限ら
ず、しかもボーリング調査が可能な場合でも、ボーリン
グ設備や人員などを山奥深く移送しなければならず、そ
の作業が極めてたいへんで、手間と費用がかかるという
問題があった。
For example, when excavating a mountain tunnel, a boring survey cannot always be performed, and even when a boring survey is possible, boring equipment and personnel must be transported deep in the mountain. In addition, there is a problem that the work is extremely difficult, and requires much labor and cost.

【0006】しかも、ボーリングは所定間隔で行われ、
各サンプリングポイント間の地下構造は、サンプリング
地点の地層から推定して求められる。従って、サンプリ
ングポイントとサンプリングポイントとの間に、例えば
破砕帯などが部分的に存在する場合には、これを検出出
来ないという問題があった。
Moreover, boring is performed at predetermined intervals,
The underground structure between each sampling point can be estimated and estimated from the stratum at the sampling point. Therefore, there is a problem that, for example, when a crush zone or the like partially exists between the sampling points, it cannot be detected.

【0007】本発明は、このような従来の課題に鑑みて
されたものであり、その目的は、トンネル周囲の地山構
造、特に切羽前方の地山構造を簡単かつ正確に測定でき
る地下電磁探査方法および装置を提供することにある。
The present invention has been made in view of such a conventional problem, and an object of the present invention is to provide an underground electromagnetic probe capable of easily and accurately measuring a ground structure around a tunnel, particularly a ground structure in front of a face. It is to provide a method and an apparatus.

【0008】[0008]

【課題を解決するための手段】前記目的を達成するた
め、発明は、トンネル構内に設置されるスモークリン
グ発生用電流源と、トンネル構内の測定ポイントに設置
される電磁波受信部と、を用い地山の比抵抗分布を電磁
探査する方法であって、前記スモークリング発生用電流
源に送信電流を通電し、この送信電流を遮断することに
より、地山に渦電流が伝播して行くスモークリング現象
を発生させ、前期渦電流の減衰を前記電磁波受信部を用
い電磁場の時間関数の変化として検出し記憶する時間領
域の地下電磁探査工程を、各測定ポイント毎に繰返し行
い、各測定ポイント毎の検出データに基づき地山の比抵
抗分布を演算することを特徴とする。
In order to achieve the above object, the present invention uses a current source for generating smoke ring installed in a tunnel premises and an electromagnetic wave receiving unit installed in a measurement point in the tunnel premises. A method for electromagnetically exploring the resistivity distribution of a ground, wherein a transmission current is supplied to the current source for smoke ring generation, and by interrupting the transmission current, a smoke ring in which an eddy current propagates to the ground is provided. The phenomenon is generated, and the underground electromagnetic exploration process in the time domain in which the attenuation of the eddy current is detected and stored as a change in the time function of the electromagnetic field using the electromagnetic wave receiving unit is repeated for each measurement point, and for each measurement point, It is characterized in that the resistivity distribution of the ground is calculated based on the detection data.

【0009】また、発明は、トンネル構内に設置され
るスモークリング発生用電流源と、トンネル構内の測定
ポイントに設置される電磁波受信部と、前記スモークリ
ング発生用電流源に送信電流を通電する通電手段と、前
記送信電流の通電遮断時に発生するスモークリング現象
に起因する地下の渦電流の減衰を、各測定ポイント毎
に、電磁波受信部の出力から電磁場の時間関数の変化に
基づき、地山の比抵抗分布を演算する地下構造演算手段
と、を含み、前記地下の比抵抗分布に基づき地下構造を
求めることを特徴とする。このような構成とすることに
より、トンネル構内に設置されたスモークリング発生用
電流源に送信電流を通電し、その後これを遮断すると、
トンネル周囲の地山にうず電流が伝播していくスモーク
リング現象が発生する。この渦電流の減衰を、トンネル
構内に設けられた電磁波受信部を用いて、電磁場の時間
関数の変化として検出する。このような、検出動作を、
トンネル内の各測定ポイント毎に繰り返し行う。
Further, the present invention provides a current source for generating a smoke ring installed in a tunnel premises, an electromagnetic wave receiving unit installed at a measurement point in the tunnel premises, and applying a transmission current to the current source for generating a smoke ring. The energizing means and the attenuation of the underground eddy current caused by the smoke ringing phenomenon that occurs when the energization of the transmission current is interrupted, at each measurement point, based on the change in the time function of the electromagnetic field from the output of the electromagnetic wave receiving unit. And an underground structure calculating means for calculating the specific resistance distribution of the underground structure. By adopting such a configuration, when a transmission current is supplied to the current source for smoke ring generation installed in the tunnel premises and then cut off,
A smoke ring phenomenon occurs in which the eddy current propagates to the ground around the tunnel. The attenuation of the eddy current is detected as a change in a time function of an electromagnetic field using an electromagnetic wave receiving unit provided in the tunnel premises. Such a detection operation,
Repeat for each measurement point in the tunnel.

【0010】そして、各ポイント毎に求められた検出デ
ータに基づき、トンネル周囲の地山の比抵抗分布を演算
する。
Then, based on the detection data obtained for each point, a specific resistance distribution of the ground around the tunnel is calculated.

【0011】このようにして、トンネル周囲の地山の比
抵抗構造を正確に求めることにより、トンネル周囲の地
質構造を正確に把握することができる。
In this manner, the geological structure around the tunnel can be accurately grasped by accurately determining the resistivity structure of the ground around the tunnel.

【0012】特に、前記電磁波受信部を、トンネルの切
羽付近に設置し、検出データを求めることにより、切羽
前方の地山構造を正確に把握することができる。
In particular, by installing the electromagnetic wave receiving unit near the face of the tunnel and obtaining the detection data, the ground structure in front of the face can be accurately grasped.

【0013】ここにおいて、前記スモークリング発生用
電流源および電磁波受信部としては、トンネル構内にト
ンネル掘削方向に向けて設置された送信ループおよび受
信ループを用いることが好ましい。これにより、簡単な
構造でスモークリング現象を発生させ、しかも各測定ポ
イント毎の検出データの測定を行うことができる。
Here, it is preferable to use a transmission loop and a reception loop installed in the tunnel premise toward the tunnel excavation direction as the smoke ring generation current source and the electromagnetic wave reception unit. Thereby, the smoke ring phenomenon can be generated with a simple structure, and the detection data can be measured at each measurement point.

【0014】特に、このような構成をすることにより、
送信ループ、受信ループをトンネル構内で簡単に移動さ
せ、各測定ポイント毎のデータ測定を、容易に行うこと
ができる。
In particular, with such a configuration,
The transmission loop and the reception loop can be easily moved in the tunnel premises, and data measurement at each measurement point can be easily performed.

【0015】また、前記送信ループは、トンネル掘削方
向に向けて複数個を設置してもよい。
[0015] Further, a plurality of the transmission loops may be installed in a tunnel excavation direction.

【0016】このとき、前記複数個の送信ループに、全
て同一方向に送信電流を通電することにより、発生する
電磁場に指向性を持たせ、切羽前方の地山状況をより深
部まで正確に把握することができる。
At this time, the transmission current is applied to all of the plurality of transmission loops in the same direction so that the generated electromagnetic field has directivity, and the ground situation in front of the face can be grasped more accurately. be able to.

【0017】また、前記送信ループを複数個設けた場合
には、作業用の大型の金属製機械類などのノイズ源の存
在する付近の送信ループには、当該領域で発生する電磁
波がゼロになるよう他の送信ループとは逆方向に電流を
通電するようにしてもよい。これにより、トンネル構内
存在するノイズ源の影響を受けることなく、トンネル周
囲の地山構造を正確に検出することが可能となる。
When a plurality of the transmission loops are provided, the electromagnetic waves generated in the area of the transmission loop near a noise source such as a large working metal machine become zero. Thus, a current may be supplied in a direction opposite to that of another transmission loop. This makes it possible to accurately detect the ground structure around the tunnel without being affected by the noise source existing in the tunnel premises.

【0018】前述したように、前記送信ループを、切羽
方向に向けて複数個設置した場合には、前記通電手段
は、各送信ループへの送信電流の通電方向を、切り替え
自在に形成することが好ましい。
As described above, when a plurality of the transmission loops are provided in the direction of the face, the energizing means may be formed so as to be capable of switching the energizing direction of the transmission current to each transmission loop. preferable.

【0019】なお、前記スモークリング発生用電流源お
よび電磁波受信部としては、前述の送信ループ、受信ル
ープを用いることもできるが、これ以外の電流源や受信
部、例えば接地電極などを用いたラインアンテナなどを
必要に応じ用いても良い。
The above-mentioned transmission loop and reception loop may be used as the current source for generating the smoke ring and the electromagnetic wave reception unit. However, other current sources and reception units, such as a line using a ground electrode or the like, may be used. An antenna or the like may be used as needed.

【0020】[0020]

【実施例】次に本発明の好適な実施例を、図面に基づき
詳細に説明する。
DESCRIPTION OF THE PREFERRED EMBODIMENTS Preferred embodiments of the present invention will now be described in detail with reference to the drawings.

【0021】図1には、本発明に係る時間領域の地下電
磁探査の好適な実施例が示されている。
FIG. 1 shows a preferred embodiment of the time domain underground electromagnetic survey according to the present invention.

【0022】実施例の装置は、山岳トンネル200の構
内に設置された送信ループ10と、受信ループ20とを
含む。
The apparatus of the embodiment includes a transmission loop 10 and a reception loop 20 installed on the premises of a mountain tunnel 200.

【0023】前記送信ループ10は、スモークリング発
生用電流源として機能するものであり、トンネル構内2
00に切羽方向に向けて、設置されている。実施例のト
ンネル200は、図2に示すよう半径4.75mの断面
構造を有することから、前記送信ループ10は、縦6
m、横6.75mの長方形状に形成され、トンネル20
0構内に設置されている。そして、この送信ループ10
には、図3に示すよう送信用通電装置30から、送信電
流が通電されるように構成されている。
The transmission loop 10 functions as a current source for generating smoke ring.
At 00, it is installed facing the face. Since the tunnel 200 of the embodiment has a cross-sectional structure with a radius of 4.75 m as shown in FIG.
m, a rectangular shape with a width of 6.75 m.
0 premises. And this transmission loop 10
, The transmission current is supplied from the transmission power supply device 30 as shown in FIG.

【0024】前記受信ループ20は、電磁波受信部とし
て機能するものであり、トンネル200構内に切羽方向
へ向けて設置されている。この受信ループ20はトンネ
ル200内を自由に移動設置できるように、例えば半径
40〜50cm程度の径少に形成されており、その出力
は図3に示す受信装置50へ入力されるようになってい
る。
The receiving loop 20 functions as an electromagnetic wave receiving unit, and is installed in the tunnel 200 premises toward the face. The receiving loop 20 is formed to have a small diameter of, for example, about 40 to 50 cm so that the receiving loop 20 can be freely moved and installed in the tunnel 200, and its output is input to the receiving device 50 shown in FIG. I have.

【0025】この装置を用いて、トンネル周囲の地下電
磁探査を行なう場合には、操作領域に合わせて、送信ル
ープ10の設置位置と、受信ループ20を設置する各測
定ポイントP1,P2,…とを予め設定しておく。そし
て、前記送信ループ10、受信ループ20に用いた測定
を、各測定ポイント毎に繰り返し行い、その測定データ
を受信装置50内のメモリ58へ記憶する。
When an underground electromagnetic survey around a tunnel is performed using this device, the installation position of the transmission loop 10 and the measurement points P1, P2,. Is set in advance. Then, the measurement used in the transmission loop 10 and the reception loop 20 is repeated for each measurement point, and the measurement data is stored in the memory 58 in the reception device 50.

【0026】そして、各測定ポイント毎に得られた測定
データに基づき、トンネル周囲の地下の比抵抗分布を演
算し、得られた比抵抗分布に基づきトンネル周囲の地下
構造を求める。
Then, based on the measurement data obtained for each measurement point, the underground resistivity distribution around the tunnel is calculated, and the underground structure around the tunnel is obtained based on the obtained resistivity distribution.

【0027】図4〜図6には、この時間領域の探査方法
の原理が概略的に示されている。
FIGS. 4 to 6 schematically show the principle of the time domain search method.

【0028】測定に際しては、まず図4に示すように、
トンネル200の構内に送信ループ10を設置すると共
に、所定測定ポイントPに受信ループ20を設置する。
そして、送信ループ10に送信電流を通電し、この送信
電流を図6(A)に示すよう急激に遮断する。これによ
り、図6(B)に示すよう、電磁誘導の法則により遮断
前と同じ磁場を維持しようとする起電力が発生し、トン
ネル200周囲の地山に渦電流が発生する。この渦電流
は、地山の比抵抗に応じて減衰するが、この電流の変化
を妨げるような新しい渦電流が地山内部に生ずる。この
プロセスが繰り返され、あたかも渦電流100が、トン
ネル200の周囲から地山深部に伝搬していくような現
象が発生し、この現象はスモークリング現象と呼ばれ
る。
At the time of measurement, first, as shown in FIG.
The transmission loop 10 is installed in the premises of the tunnel 200, and the reception loop 20 is installed at a predetermined measurement point P.
Then, a transmission current is supplied to the transmission loop 10, and the transmission current is rapidly cut off as shown in FIG. As a result, as shown in FIG. 6B, an electromotive force for maintaining the same magnetic field as before the interruption is generated by the law of electromagnetic induction, and an eddy current is generated in the ground around the tunnel 200. The eddy current is attenuated in accordance with the resistivity of the ground, but a new eddy current is generated inside the ground to prevent the change of the current. This process is repeated, and a phenomenon occurs as if the eddy current 100 propagates from the periphery of the tunnel 200 to the deep ground, and this phenomenon is called a smoke ring phenomenon.

【0029】図5(A)〜(D)には、このときの地山
の電流密度分布が時系列的に示されている。時間と共
に、電流密度の最大値を示す部分が地山深部に浸透して
行くことがわかる。
FIGS. 5A to 5D show the current density distribution of the ground at this time in a time-series manner. It can be seen that the portion showing the maximum value of the current density permeates deep into the mountain with time.

【0030】これらの渦電流は、伝搬経路の地層の比抵
抗に応じて減衰する。このため、探査位置に対応して設
置された受信ループ20を用い、前記渦電流の減衰を電
磁場の時間関数の変化として図6(C)に示すように検
出し、地下の比抵抗分布を知ることができる。例えば、
地下が高比抵抗の時は、渦電流は急速に減衰していく
が、低比抵抗の時はゆっくり減衰する。
These eddy currents are attenuated according to the specific resistance of the stratum in the propagation path. For this reason, the attenuation of the eddy current is detected as a change in the time function of the electromagnetic field as shown in FIG. 6C using the reception loop 20 installed corresponding to the search position, and the underground resistivity distribution is known. be able to. For example,
When the underground has a high resistivity, the eddy current decays rapidly, but when the resistivity is low, it decays slowly.

【0031】従って、前記受信ループ20を、トンネル
構内200の測定ポイントに応じて次々と移動させ、こ
れにより得られる、受信データを分析することにより、
トンネル200周囲の地山の比抵抗分布を求めることが
でき、この比抵抗分布に基づき、地山構造を知ることが
できる。
Therefore, the reception loop 20 is moved one after another according to the measurement points of the tunnel premises 200, and the reception data obtained thereby is analyzed.
The specific resistance distribution of the ground around the tunnel 200 can be obtained, and the ground structure can be known based on this specific resistance distribution.

【0032】図3には、前記送信用通電装置30と、受
信装置50の具体的な構成が示されている。
FIG. 3 shows a specific configuration of the transmitting energizing device 30 and the receiving device 50.

【0033】前記送信用通電装置30は、クロック32
と、送信電流供給部34と、送信制御部36とを含んで
構成される。
The transmitting energizing device 30 includes a clock 32
And a transmission current supply unit 34 and a transmission control unit 36.

【0034】前記送信電流供給部34は、図6(A)に
示す送信電流を、送信制御部36からの指令により通電
するように形成されている。
The transmission current supply section 34 is formed so as to supply the transmission current shown in FIG. 6A in accordance with a command from the transmission control section 36.

【0035】また、前記受信装置50は、クロック52
と、アンプ62と、A/D変換器54と、CPU56
と、メモリ58と、入出力部60とを含んで構成され
る。そして、受信ループ20の出力は、アンプ62で増
幅されたのち、A/D変換器54によりアナログデジタ
ル変換され、CPU56に入力される。CPU56は、
入出力部60からの指令に基づき、A/D変換器54か
らのデータを、メモリ58に記憶させる。
The receiving device 50 includes a clock 52
, An amplifier 62, an A / D converter 54, and a CPU 56
, A memory 58, and an input / output unit 60. Then, the output of the receiving loop 20 is amplified by the amplifier 62, and is then converted from analog to digital by the A / D converter 54 and input to the CPU 56. The CPU 56
Based on a command from the input / output unit 60, data from the A / D converter 54 is stored in the memory 58.

【0036】また、前記送信用通電装置30と、受信装
置50とは、クロック32,52で相互に同期を取りな
がら動作するように構成されている。具体的には、通電
装置30と受信装置50とは別体に形成されているた
め、測定開始に先立って、クロック32,52が完全に
同期するように調整しておく。これにより、その後、両
装置32,52が完全に離れた状態になっても、両装置
は完全に同期をとり合いながら動作することになる。
The transmitting energizing device 30 and the receiving device 50 are configured to operate while being synchronized with each other by clocks 32 and 52. Specifically, since the energizing device 30 and the receiving device 50 are formed separately, the clocks 32 and 52 are adjusted so as to be completely synchronized before the start of measurement. As a result, even if the two devices 32 and 52 are completely separated from each other, the two devices will operate in perfect synchronization with each other.

【0037】図7には、受信ループ20を各測定ポイン
トP1,P2…に移動設置しながら測定を行なう手順の
フローチャートが示されている。
FIG. 7 shows a flowchart of a procedure for performing measurement while moving the receiving loop 20 to each of the measurement points P1, P2.

【0038】まず受信ループ20を、最初の測定ポイン
トP1に設置する(ステップS1)。
First, the receiving loop 20 is set at the first measurement point P1 (step S1).

【0039】次に、送信ループ10へ、図6(A)に示
す送信電流を通電し、これを急激に遮断する(ステップ
S2)。
Next, a transmission current shown in FIG. 6A is supplied to the transmission loop 10, and the transmission current is rapidly cut off (step S2).

【0040】送信電流が遮断されると、図4、図5に示
すよう、トンネル周囲の地山に渦電流が伝搬していくス
モークリング現象が発生する。この時、渦電流の減衰
は、測定ポイントP1に設置された受信ループ20を用
い、電磁波の時間関数の変化として図6(C)に示すよ
うに検出される。この検出データは、アンプ54から出
力され、A/D変換器54でデジタル信号に変換された
のち、CPU56を用いメモリ58へ書き込み記憶され
る。
When the transmission current is cut off, as shown in FIGS. 4 and 5, a smoke ring phenomenon occurs in which the eddy current propagates to the ground around the tunnel. At this time, the attenuation of the eddy current is detected as a change in the time function of the electromagnetic wave using the reception loop 20 installed at the measurement point P1, as shown in FIG. 6C. The detection data is output from the amplifier 54, converted into a digital signal by the A / D converter 54, and written and stored in the memory 58 using the CPU 56.

【0041】このようなステップS1,S2,S3から
なる一連の探査工程を、例えば図1に示すすべての測定
ポイントP1,P2…に対して繰り返し行う。
A series of search processes including steps S1, S2, and S3 are repeatedly performed on all measurement points P1, P2,... Shown in FIG.

【0042】そして、全ての測定ポイントでの測定が終
了すると(ステップS4)、CPU56は、地下構造演
算手段として機能し、メモリ58内に記憶された各測定
ポイントでの測定データに基づき、地山の比抵抗分布を
演算し、例えば図1に示す地下構造モデルを作成する
(ステップS5)。
When the measurement at all the measurement points is completed (step S4), the CPU 56 functions as an underground structure calculation means, and based on the measurement data at each measurement point stored in the memory 58, the ground level is calculated. Is calculated to create, for example, an underground structure model shown in FIG. 1 (step S5).

【0043】特に、実施例のような時間領域の地下電磁
探査方法では、最小自乗インバージョンや、その他の手
法を用い、各測定ポイントでの測定データから地下構造
モデルを推定演算する。このような演算処方は周知であ
り、技術と変わる所はない。このようにすることによ
り、トンネル200周囲の地山の構造モデルを正確に求
めることができ、特にトンネル200の切羽前方、すな
わちトンネル掘削予定経路210上に存在する破砕帯2
20などをも正確に検出することができる。
In particular, in the time domain underground electromagnetic survey method as in the embodiment, the underground structure model is estimated and calculated from the measurement data at each measurement point by using the least squares inversion or another method. Such calculation prescriptions are well known and do not differ from technology. By doing so, the structural model of the ground around the tunnel 200 can be accurately obtained, and in particular, the crush zone 2 existing in front of the face of the tunnel 200, that is, on the planned tunnel excavation route 210.
20 can be detected accurately.

【0044】図8には、本発明の他の実施例が示されて
いる。
FIG. 8 shows another embodiment of the present invention.

【0045】実施例のシステムは、スモークリング発生
用電流源として、複数の送信ループ10−1,10−
2,…10−5を用い、これら各送信ループ10−1,
10−2,…10−5を、所定間隔で切羽方向へ向けて
設置している。
The system according to the embodiment includes a plurality of transmission loops 10-1 and 10- as current sources for generating smoke ring.
, 10-5, these transmission loops 10-1,
.., 10-5 are installed at predetermined intervals in the face direction.

【0046】このような構成を採用することにより、例
えば全ての送信ループ10−1,10−2,…10−5
に対し同一方向に送信電流を通電することにより、切羽
方向へ向けて指向性を持った磁場を発生させ、これによ
り切羽前方の地山構造を正確に測定することが可能とな
る。
By adopting such a configuration, for example, all the transmission loops 10-1, 10-2,.
By transmitting a transmission current in the same direction, a magnetic field having directivity is generated in the direction of the face, whereby the ground structure in front of the face can be accurately measured.

【0047】また、トンネル構内の送信源付近に、なん
らかのノイズ源40が存在する場合(例えば抵抗の小さ
な金属等で構成された物体が存在するような場合)に
は、これが原因となって測定誤差を引きおこす可能性が
ある。この場合には、このノイズ源40付近の磁場がゼ
ロとなるよう、ノイズ源40の前後に位置する送信ルー
プ10−3,10−4への送信電流の通電方向を逆方向
に、設定することにより、ノイズ源40の影響を低減
し、地山構造をより正確に測定することが可能となる。
When there is any noise source 40 near the transmission source in the tunnel premises (for example, when there is an object made of metal or the like having a small resistance), this causes a measurement error. May cause In this case, the direction in which the transmission current is applied to the transmission loops 10-3 and 10-4 located before and after the noise source 40 is set to be opposite so that the magnetic field near the noise source 40 becomes zero. Thereby, the influence of the noise source 40 can be reduced, and the ground structure can be measured more accurately.

【0048】この場合、前記送信電流供給部34は、送
信制御部36の指示より、各送信ループ10−1,10
−2,…10−5への通電方向を、それぞれ個別に切替
制御するよう構成することが、好ましい。
In this case, the transmission current supply unit 34 controls the transmission loops 10-1 and 10
It is preferable that the direction of power supply to −2,..., 10-5 be individually switched and controlled.

【0049】実験データ 発明者は、実施例の測定装置を用い、すでに掘削された
山岳トンネルを測定対象として、切羽前方探査や、地山
状況の把握のための実験を行った。実験にあたっては、
すでにトンネル200の周囲の地山構造は解明されてい
たため、この地山構造と、本実施例の装置を用いて得ら
れた測定地山構造とを対比し、本実施例の装置の評価を
行った。
Experimental Data Using the measuring apparatus of the embodiment, the inventor conducted an experiment for exploring the front face of a face and grasping the state of the mountain with the already-excavated mountain tunnel as a measurement object. In the experiment,
Since the ground structure around the tunnel 200 has already been elucidated, the ground structure is compared with the measured ground structure obtained using the device of the present embodiment, and the device of the present embodiment is evaluated. Was.

【0050】図9には、実験を行ったトンネル周囲の地
山構造が概略的に示されている。ここにおいて、トンネ
ル200の周囲には、比抵抗が400Ωmの領域Aと、
その前方に比抵抗が50Ωm、200Ωmの破砕帯B、
Cとが存在している。
FIG. 9 schematically shows the ground structure around the tunnel where the experiment was performed. Here, a region A having a specific resistance of 400 Ωm is provided around the tunnel 200.
A crush zone B with a specific resistance of 50 Ωm and 200 Ωm in front of it,
C exists.

【0051】そして、このトンネル200内に、送信ル
ープ10と、受信ループ20とを設置し実験を行った。
なお、同図において300は地表面を表す。
Then, a transmission loop 10 and a reception loop 20 were set in the tunnel 200, and an experiment was performed.
In the figure, reference numeral 300 denotes the ground surface.

【0052】図10には、実験において採用された送信
ループ10と受信ループ20との配置が示されている。
FIG. 10 shows an arrangement of the transmission loop 10 and the reception loop 20 employed in the experiment.

【0053】同図(A),(B),(C)は、バックグ
ランド部での測定である。
FIGS. 7A, 7B and 7C show the measurement in the background portion.

【0054】図10(A)では、トンネル200の入口
から600mの位置に送信ループ10を1個設置し、6
25m,650m,675mの各位置を測定ポイントP
1,P2,P3として、受信ループ20を設置し、測定
を行った。
In FIG. 10A, one transmission loop 10 is set at a position 600 m from the entrance of the tunnel 200, and
Measurement points P at 25m, 650m, and 675m
The receiving loop 20 was set as 1, P2, and P3, and measurement was performed.

【0055】同図(B)では、575mと、600mの
位置に2個の送信ループ10−1,10−2を設置し、
両者に同方向の送信電磁を通電し、測定を行った。
In FIG. 9B, two transmission loops 10-1 and 10-2 are set at 575 m and 600 m, respectively.
The transmission electromagnetic waves in the same direction were applied to both, and the measurement was performed.

【0056】同図(C)では、同図(B)とは逆に、各
送信ループ10−1,10−2へ逆方向に送信電流を通
電して測定を行った。
In FIG. 6C, the measurement is performed by applying a transmission current in the opposite direction to each of the transmission loops 10-1 and 10-2, contrary to FIG.

【0057】また、同図(D),(E)は、破砕帯近傍
での測定である。
(D) and (E) show the measurements near the crush zone.

【0058】同図(D)では、740mの位置に送信ル
ープ10を1個設置して、測定を行った。
In FIG. 4D, one transmission loop 10 was installed at a position of 740 m, and measurement was performed.

【0059】また、同図(E)では、715m,740
mの位置に、2個の送信ループ10−1,10−2を設
置し測定を行った。
Also, in FIG.
Two transmission loops 10-1 and 10-2 were set at the position of m, and measurement was performed.

【0060】このように測定条件を変えながら、バック
グランド部や、破砕帯付近にて、送信ループ10の直流
電流遮断後の二次磁場の過渡現象を測定した。送信ルー
プ10と受信ループ20との距離は25m,50m,7
5mにそれぞれ設定してある。
While changing the measurement conditions in this way, the transient phenomenon of the secondary magnetic field after the DC current interruption of the transmission loop 10 was measured in the background portion and near the crush zone. The distance between the transmission loop 10 and the reception loop 20 is 25 m, 50 m, 7
Each is set to 5 m.

【0061】図11には、バックグランド部での測定デ
ータのトランシェント曲線が示されている。受信ループ
20は625mの位置に、いずれもセットした。同図に
おいて、A625,B625,C625INVは、図1
0(A),(B),(C)に示す各実験データである。
電流遮断後0.01msまでは、各データには差が無
く、それ以降は、受信ループ20から遠い方の送信ルー
プ10による影響を示している。これは各送信ループ1
0からの渦電流の伝搬現象によって説明できる。図12
には、バックグランド部(A625,A650,A67
5)の領域と、破砕帯近傍(C765,C790,C8
15)の領域で、図10(A),(D)に示すシングル
ループ型の送信アンテナ10を用いて実験を行った場合
における、受信ループ20の正規化電圧値のトランシェ
ント曲線の比較である。すなわち、同図においてA62
5,A650,A675は、図10(A)の測定条件に
おいて、受信ループ20をP1,P2,P3の位置に設
置した場合の測定データである。また、図12におい
て、C765,C790,C815は、図10(D)に
おいて、受信ループ20をP4,P5,P6の位置に設
置した場合の測定データである。これらのデータでは、
バックグランド部に比べ、破砕帯近傍でのトランシェン
ト曲線の方が、破砕帯近傍で過電流の伝搬速度が低下
し、過渡現象が遅延する様子を表している。A675と
C815のアーリータイムに見られる極性反転部は、二
次元的な比抵抗構造によるものと考えられる。
FIG. 11 shows a transient curve of the measured data in the background portion. Each of the receiving loops 20 was set at a position of 625 m. In the figure, A625, B625, and C625INV correspond to FIG.
0 (A), (B), and (C) are experimental data.
Until 0.01 ms after the current interruption, there is no difference between the data, and thereafter, the influence of the transmission loop 10 far from the reception loop 20 is shown. This is for each transmission loop 1
It can be explained by the eddy current propagation phenomenon from zero. FIG.
In the background part (A625, A650, A67
5) and the vicinity of the crush zone (C765, C790, C8)
15C is a comparison of a transient curve of the normalized voltage value of the reception loop 20 when an experiment is performed using the single-loop transmission antenna 10 shown in FIGS. 10A and 10D in the region 15). . That is, in FIG.
5, A650 and A675 are measurement data when the receiving loop 20 is set at the positions P1, P2 and P3 under the measurement conditions of FIG. In FIG. 12, C765, C790, and C815 are measurement data when the receiving loop 20 is set at the positions of P4, P5, and P6 in FIG. With these data,
Compared with the background part, the transient curve near the crush zone indicates that the propagation speed of the overcurrent decreases near the crush zone and the transient phenomenon is delayed. It is considered that the polarity reversal part seen in the early time of A675 and C815 is due to a two-dimensional specific resistance structure.

【0062】このような実験結果から、本発明のタイム
ドメインの測定手法を用たた場合、トンネル周囲の低比
抵抗帯近傍で渦電流の伝搬速度の低下が測定され、この
結果、トンネル周囲の地山および切羽前方探査へ、本発
明を適用することの有効性が確認できた。
From the above experimental results, when the time domain measurement method of the present invention is used, a decrease in the eddy current propagation speed near the low resistivity band around the tunnel is measured. The effectiveness of applying the present invention to exploration in front of the ground and the face was confirmed.

【0063】なお、本発明は前記実施例に限定されるも
のではなく、本発明の要旨の範囲内で各種の変形実施が
可能である。
The present invention is not limited to the above embodiment, and various modifications can be made within the scope of the present invention.

【0064】例えば、前記実施例では、トンネル切羽付
近の地山構造を測定する場合を例にとり説明したが、例
えばトンネル完成後に、その保守点検を行う場合に、内
部覆工されたトンネル側から、そのトンネル周囲の地山
を測定する場合にも極めて好適なものとなる。
For example, in the above-mentioned embodiment, the case where the ground structure near the tunnel face is measured has been described as an example. It is also very suitable for measuring the ground around the tunnel.

【0065】また、前記実施例では、スモークリング発
生用電流源として、送信ループを用い、電磁波受信部と
して受信ループを用いる場合を例にとり説明した。しか
し、本発明はこれに限らず、例えばスモークリング発生
用電流源として、ライン状の送信源を用いても良い。こ
の場合には、ライン状の送信源の両端を地表に接地し、
その途中に送信電流供給源を設ければよい。このような
構成の送信源を用いても、送信電流遮断すると、スモー
クリング現象を発生させることができる。
In the above-described embodiment, the case where the transmission loop is used as the current source for generating the smoke ring and the reception loop is used as the electromagnetic wave receiving section has been described as an example. However, the present invention is not limited to this. For example, a linear transmission source may be used as a current source for generating smoke ring. In this case, both ends of the linear transmission source are grounded to the ground,
A transmission current supply source may be provided on the way. Even if a transmission source having such a configuration is used, if the transmission current is interrupted, a smoke ring phenomenon can be generated.

【0066】同様に、電受波受信部として、例えば、地
表に両端を接地したライン状の受信部を用い、渦電流の
減衰を電流変化として検出するようにしてもよい。
Similarly, as the electric wave receiving unit, for example, a line-shaped receiving unit whose both ends are grounded on the ground surface may be used to detect eddy current attenuation as a current change.

【0067】[0067]

【発明の効果】以上説明したように、本発明によれば、
トンネル構内にスモークリング発生用電流源と、電受波
受信部を設置することにより、トンネル周囲の地山、特
に切羽前方の地山構造を簡単かつ確実に測定することが
できる地下電磁探査方法および装置を得ることができる
という効果がある。
As described above, according to the present invention,
By installing a current source for generating smoke ring in the tunnel premises and an electric wave receiving unit, it is possible to easily and reliably measure the ground around the tunnel, especially the ground structure in front of the face, and an underground electromagnetic exploration method and There is an effect that a device can be obtained.

【0068】[0068]

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の地下電磁探査技術を用いてトンネル周
囲の地山構造を測定する場合の概略説明図。
FIG. 1 is a schematic explanatory diagram in the case of measuring the ground structure around a tunnel using the underground electromagnetic survey technique of the present invention.

【図2】トンネル構内に設置された送信ループおよび受
信ループの概略説明図である。
FIG. 2 is a schematic explanatory diagram of a transmission loop and a reception loop installed in a tunnel premises.

【図3】本実施例の地下電磁探査装置の好適な一例を示
すブロック図である。
FIG. 3 is a block diagram showing a preferred example of the underground electromagnetic survey device of the present embodiment.

【図4】スモークリング発生原理の概略説明図である。FIG. 4 is a schematic explanatory view of the principle of smoke ring generation.

【図5】同図(A)〜(D)は、時間の経過と共に、地
山に渦電流が広がっていく様子を示す説明図である。
FIGS. 5A to 5D are explanatory diagrams showing a state in which an eddy current spreads over the ground with the passage of time.

【図6】時間領域の電磁探査を行う場合のタイミングチ
ャート図である。
FIG. 6 is a timing chart in the case of performing a time domain electromagnetic search.

【図7】実施例の地下電磁探査方法のフローチャート図
である。
FIG. 7 is a flowchart of an underground electromagnetic survey method according to the embodiment.

【図8】本発明の他の一例を示す説明図である。FIG. 8 is an explanatory diagram showing another example of the present invention.

【図9】実施例の装置を用いて行った実験の説明図であ
る。
FIG. 9 is an explanatory diagram of an experiment performed using the apparatus of the example.

【図10】トンネル構内での各種の実験パターンを示す
概略説明図である。
FIG. 10 is a schematic explanatory view showing various experimental patterns in the tunnel premises.

【図11】前述した実験により得られたデータの説明図
である。
FIG. 11 is an explanatory diagram of data obtained by the experiment described above.

【図12】前述した実験により得られたデータの説明図
である。
FIG. 12 is an explanatory diagram of data obtained by the experiment described above.

【符号の説明】 10 送信ループ 20 受信ループ 30 送信用通電装置 50 受信装置 56 CPU 58 メモリ 200 トンネル[Description of Signs] 10 transmission loop 20 reception loop 30 transmission device 50 reception device 56 CPU 58 memory 200 tunnel

───────────────────────────────────────────────────── フロントページの続き (72)発明者 西牧 均 東京都中央区京橋1丁目7番1号 戸田 建設株式会社内 (72)発明者 和田 一成 東京都品川区大井1丁目23番1号 三井 金属資源開発株式会社内 (72)発明者 斎藤 章 東京都品川区大井1丁目23番1号 三井 金属資源開発株式会社内 (72)発明者 石川 秀浩 東京都品川区大井1丁目23番1号 三井 金属資源開発株式会社内 (56)参考文献 特開 平7−110382(JP,A) 特開 平8−226977(JP,A) 「図解物理探査」物理探査学会 平成 4年6月1日発行第63−76頁 (58)調査した分野(Int.Cl.7,DB名) G01V 3/00 G01N 22/00 - 22/04 G01N 27/72 - 27/90 ────────────────────────────────────────────────── ─── Continuing on the front page (72) Inventor Hitoshi Nishimaki 1-7-1, Kyobashi, Chuo-ku, Tokyo Toda Construction Co., Ltd. (72) Inventor Kazunari Wada 1-23-1 Oi, Shinagawa-ku, Tokyo Mitsui Inside Metal Resources Development Co., Ltd. (72) Inventor Akira Saito 1-23-1 Oi, Shinagawa-ku, Tokyo Mitsui Inside Metal Resources Development Co., Ltd. (72) Inventor Hidehiro Ishikawa 1-23-1 Oi, Shinagawa-ku, Tokyo Mitsui (56) References JP-A-7-110382 (JP, A) JP-A-8-226977 (JP, A) "Illustrated physics exploration" Japan Society of Geophysical Exploration published on June 1, 1992 Pages 63-76 (58) Fields investigated (Int.Cl. 7 , DB name) G01V 3/00 G01N 22/00-22/04 G01N 27/72-27/90

Claims (5)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 トンネル構内に設置されるスモークリン
グ発生用電流源と、 トンネル構内の測定ポイントに設置される電磁波受信部
と、 を用い地山の比抵抗分布を電磁探査する方法であって、 前記スモークリング発生用電流源として、複数個の送信
ループをトンネル構内の切羽方向に向けて設置し、 前記電磁波受信部をトンネル構内の測定ポイントに設置
し、 前記各送信ループに送信電流を通電し、 この送信電流を遮断することにより、地山に渦電流が伝
播して行くスモークリング現象を発生させ、前記渦電流
の減衰を前記電磁波受信部を用い電磁場の時間関数の変
化として検出し記憶する時間領域の地下電磁探査工程
を、各測定ポイント毎に繰返し行い、 各測定ポイント毎の検出データに基づき地山の比抵抗分
布を演算することを特徴とする地下電磁探査方法。
1. A method for electromagnetically exploring a resistivity distribution of a ground using a current source for generating smoke ring installed in a tunnel premises and an electromagnetic wave receiving unit installed at a measurement point in the tunnel premises, As the smoke ring generation current source, a plurality of transmission loops are installed facing the face of the tunnel premises, the electromagnetic wave receiving unit is installed at a measurement point in the tunnel premises, and a transmission current is supplied to each of the transmission loops. By interrupting the transmission current, a smoke ringing phenomenon in which the eddy current propagates to the ground occurs, and the attenuation of the eddy current is detected and stored as a change in the time function of the electromagnetic field using the electromagnetic wave receiving unit. The feature is that the underground electromagnetic survey process in the time domain is repeated for each measurement point, and the resistivity distribution of the ground is calculated based on the detection data at each measurement point. Underground electromagnetic exploration method that.
【請求項2】 請求項1において、 前記複数の送信ループには、 同一方向に送信電流が通電されることを特徴とする地下
電磁探査方法。
2. The underground electromagnetic survey method according to claim 1, wherein a transmission current is supplied to the plurality of transmission loops in the same direction.
【請求項3】 請求項2において、 前記複数の送信ループのうちの少なくとも一つの送信ル
ープには、 他の送信ループと異なる方向に送信電流が通電されるこ
とを特徴とする地下電磁探査方法。
3. The method of claim 2, wherein a transmission current is supplied to at least one of the plurality of transmission loops in a direction different from that of the other transmission loops.
【請求項4】 トンネル構内に設置されるスモークリン
グ発生用電流源と、 トンネル構内の測定ポイントに設置される電磁波受信部
と、 前記スモークリング発生用電流源に送信電流を選択的に
通電する通電手段と、 前記送信電流の通電遮断時に発生するスモークリング現
象に起因する地下の渦電流の減衰を、各測定ポイント毎
に、電磁波受信部の出力から電磁場の時間関数の変化と
して検出し、得られた電磁場の時間関数の変化に基づ
き、地山の比抵抗分布を演算する地下構造演算手段と、 を含み、 前記スモークリング発生用電流源は、トンネル構内に切
羽方向に向けて設置される複数個の送信ループを用いて
形成され、 前記地下の比抵抗分布に基づき地下構造を求めることを
特徴とする地下電磁探査装置。
4. A current source for generating a smoke ring installed in a tunnel premises, an electromagnetic wave receiving unit installed at a measurement point in the tunnel premises, and a current supply for selectively applying a transmission current to the current source for generating a smoke ring. Means, the attenuation of the underground eddy current caused by the smoke ringing phenomenon that occurs when the transmission current is cut off, for each measurement point, detected as a change in the time function of the electromagnetic field from the output of the electromagnetic wave receiving unit, and obtained. Underground structure calculating means for calculating the resistivity distribution of the ground, based on a change in the time function of the electromagnetic field, wherein the plurality of current sources for generating smoke ring are installed in the tunnel yard in the face direction. An underground electromagnetic exploration device formed by using the transmission loop of (1), wherein an underground structure is obtained based on the underground resistivity distribution.
【請求項5】 請求項4において、 前記通電手段は、 前記各送信ループのうちの少なくとも一つの送信ループ
への送信電流の通電方向を、切り替え自在に形成された
ことを特徴とする地下電磁探査装置。
5. The underground electromagnetic exploration apparatus according to claim 4, wherein the energizing means is formed so as to be capable of switching a direction of energizing a transmission current to at least one of the transmission loops. apparatus.
JP28916594A 1994-10-28 1994-10-28 Underground electromagnetic exploration method and apparatus Expired - Fee Related JP3236455B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP28916594A JP3236455B2 (en) 1994-10-28 1994-10-28 Underground electromagnetic exploration method and apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP28916594A JP3236455B2 (en) 1994-10-28 1994-10-28 Underground electromagnetic exploration method and apparatus

Publications (2)

Publication Number Publication Date
JPH08128969A JPH08128969A (en) 1996-05-21
JP3236455B2 true JP3236455B2 (en) 2001-12-10

Family

ID=17739609

Family Applications (1)

Application Number Title Priority Date Filing Date
JP28916594A Expired - Fee Related JP3236455B2 (en) 1994-10-28 1994-10-28 Underground electromagnetic exploration method and apparatus

Country Status (1)

Country Link
JP (1) JP3236455B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AUPP813499A0 (en) * 1999-01-13 1999-02-04 Rock Solid Research Pty. Ltd. A subsurface pipeline inspection probe
JP5128912B2 (en) * 2007-11-16 2013-01-23 株式会社間組 Groundwater exploration method in the ground in front of the tunnel

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
「図解物理探査」物理探査学会 平成4年6月1日発行第63−76頁

Also Published As

Publication number Publication date
JPH08128969A (en) 1996-05-21

Similar Documents

Publication Publication Date Title
US5038107A (en) Method and apparatus for making induction measurements through casing
US7030617B2 (en) System, apparatus, and method for conducting electromagnetic induction surveys
US6914433B2 (en) Detection of subsurface resistivity contrasts with application to location of fluids
Ye et al. Comparison of detection effect of cavities behind shield tunnel segment using transient electromagnetic radar and ground penetration radar
CN106054258A (en) Magnetic source ground-tunnel transient electromagnetic advanced detection method
US5798644A (en) Method and apparatus for locating buried conveyances using locating & confirmation signals with an array of sensors
US3277363A (en) Borehole investigating method and apparatus utilizing magnetic-flux fields induced in a casing pipe lining the borehole
US4581584A (en) Microwave electromagnetic borehole dipmeter
JP3236455B2 (en) Underground electromagnetic exploration method and apparatus
US5038106A (en) Detector of metalliferous objects having two pairs of receiving loops symmetrical and orthogonal to a driving loop
JP2921613B2 (en) Inspection method for buried piping
JP3130442B2 (en) Underground electromagnetic exploration method and apparatus in front of tunnel face
US6449561B1 (en) Induction logging
JP3130418B2 (en) Underground electromagnetic exploration method and apparatus
JPH10260264A (en) Electrical resistivity survey
CN115657143B (en) A geophysical method for detecting groundwater using non-traditional transient electromagnetic methods.
Villegas-Gar ı´ ca et al. Recognition of electromagnetic overburden anomalies with horizontal loop electromagnetic survey data
Cull et al. Reflection models and ramp response for downhole TEM data
Enslin A new electromagnetic field technique
McNeill The application of electromagnetic techniques to environmental geophysical surveys
JP3204927B2 (en) Electromagnetic exploration method and electromagnetic exploration system
Huiming et al. Detecting underground cables and metal conducting pipes by using EM methods
US3182286A (en) Acoustic well logging transmission system
Zhao et al. Application of apparent resistivity ratio on the interpretation of small central-loop TEM survey in areas of conductive overburden
Kozhevnikov et al. Testing transient electromagnetics systems on the ice cover of Lake Baikal

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20010828

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100928

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130928

Year of fee payment: 12

LAPS Cancellation because of no payment of annual fees