Countermeasures against debris flow and construction methods

Info

Publication number
JP3245712B2
JP3245712B2 JP09956599A JP9956599A JP3245712B2 JP 3245712 B2 JP3245712 B2 JP 3245712B2 JP 09956599 A JP09956599 A JP 09956599A JP 9956599 A JP9956599 A JP 9956599A JP 3245712 B2 JP3245712 B2 JP 3245712B2
Authority
JP
Japan
Prior art keywords
concrete
steel pipe
debris flow
holes
rectangular parallelepiped
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP09956599A
Other languages
Japanese (ja)
Other versions
JP2000290969A (en
Inventor
弘 中澤
幸夫 篠原
展 小松澤
謙二 永田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yachiyo Engineering Co Ltd
Original Assignee
Yachiyo Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yachiyo Engineering Co Ltd filed Critical Yachiyo Engineering Co Ltd
Priority to JP09956599A priority Critical patent/JP3245712B2/en
Publication of JP2000290969A publication Critical patent/JP2000290969A/en
Application granted granted Critical
Publication of JP3245712B2 publication Critical patent/JP3245712B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Revetment (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、土石流や火山泥流
等の対策構造物およびその施工法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a countermeasure against debris flow, volcanic mudflow, and the like, and a method of constructing the structure.

【0002】[0002]

【従来の技術】火山噴火直後の状況下で土石流、火山泥
流対策施設を緊急に施工する必要がある場合の対策とし
ては従来、確立したものがなかった。
2. Description of the Related Art There has been no established countermeasure for urgently installing a debris flow or volcanic mudflow countermeasure facility immediately after a volcanic eruption.

【0003】緊急を要する場合で、急速施工に適したも
のとしては、コンクリートブロック等の工場製品を予め
製作しておき、この工場製品を緊急時に施工箇所へ運搬
してダム・導流堤を施工することが考えられる。
[0003] In case of emergency, suitable for rapid construction is to manufacture a factory product such as a concrete block in advance, and transport this factory product to the construction site in the event of an emergency to construct a dam or dike. It is possible to do.

【0004】[0004]

【発明が解決しようとする課題】しかし、通常のコンク
リートブロックダム・導流堤では土石流、火山泥流の流
下時、その流体力により個々が運搬され、流失する可能
性がある。
However, when a debris flow or a volcanic mud flow flows down in a normal concrete block dam or dike, the individual may be transported by the fluid force and may be washed away.

【0005】本発明の目的は前記従来例の不都合を解消
し、土石流や火山泥流に対する耐土石流性の高い砂防ダ
ムまたは導流堤が得られるものであり、しかも、通常の
コンクリート砂防ダムで行われるコンクリート打設作業
等を不必要とするなど、急速施工が可能な土石流等の対
策構造物およびその施工法を提供することにある。
[0005] An object of the present invention is to solve the above-mentioned disadvantages of the prior art and to obtain a sabo dam or a dike with high debris flow resistance to debris flow and volcanic mud flow. It is an object of the present invention to provide a countermeasure structure such as a debris flow that can be rapidly constructed, for example, which does not require a concrete placing operation or the like, and a construction method thereof.

【0006】[0006]

【課題を解決するための手段】本発明は前記目的を達成
するため、土石流等の対策構造物としては、第1に、コ
ンクリート充填鋼管を軸として立設し、鋼管の貫通孔を
形成した直方体コンクリートブロックをこのコンクリー
ト充填鋼管に対して串刺し状に積上げて形成した砂防ダ
ムまたは導流堤からなるもので、コンクリートブロック
は上下方向に開口する鋼管の貫通孔を左右に形成し、こ
の貫通孔同士を合わせながら千鳥状または直交させて積
上げたこと、第2に、コンクリート充填鋼管は内部にP
C鋼棒を配置したプレストレスコンクリート(PC)充
填鋼管であること、第3に、コンクリートブロックは鋼
管の貫通孔を衝撃緩衝材で被覆すること、第4に、コン
クリートブロックは左右に鋼管の貫通孔を形成し、この
貫通孔同士を合わせながら交互に積上げることを要旨と
するものである。
In order to achieve the above-mentioned object, the present invention provides, as a countermeasure for debris flow or the like, firstly, a rectangular parallelepiped in which a concrete-filled steel pipe is erected and a through-hole is formed in the steel pipe. It consists of a sabo dam or a dike built by stacking concrete blocks in a skewered manner on this concrete-filled steel pipe. The concrete block forms through-holes in the steel pipes that open vertically, and these through-holes Second, concrete-filled steel pipes have P inside
Prestressed concrete (PC) filled steel pipes with C steel rods placed. Third, concrete blocks covered with through holes in steel pipes with impact buffer. Fourth, concrete blocks penetrated steel pipes to the left and right. The gist of the present invention is to form holes and alternately stack them while aligning the through holes.

【0007】また、土石流等の対策構造物の施工法とし
ては、第1に、上下方向に開口する鋼管の貫通孔を左右
に形成した直方体コンクリートブロックを、この貫通孔
同士を合わせながら千鳥状または直交させて順次積み上
げ、上下に連続する貫通孔に鋼管を差し入れて直方体コ
ンクリートブロックを串刺し状に固定して砂防ダムまた
は導流堤を構築すること、第2に、鋼管はコンクリート
充填鋼管であり、内部にPC鋼棒を配置したプレストレ
スコンクリート(PC)充填鋼管であることを要旨とす
るものである。
As a method of constructing a structure for preventing debris flow or the like, first, a rectangular parallelepiped concrete block in which through-holes of steel pipes opening vertically are formed on the left and right sides is formed in a zigzag or a staggered manner while the through-holes are aligned. The steel pipes are concrete-filled steel pipes by vertically stacking them one after another, inserting steel pipes into vertically continuous through holes and skewing the rectangular parallelepiped concrete block in a skewered manner to construct a sabo dam or a dike. The gist is a prestressed concrete (PC) -filled steel pipe in which a PC steel rod is arranged.

【0008】請求項1記載の本発明によれば、直方体コ
ンクリートブロックを積上げるだけで砂防ダム・導流堤
を急速に施工することができるものであり、かつ、この
直方体コンクリートブロックはコンクリート充填鋼管を
軸として串刺し状に固定するので、土石流の流体力等を
受けても個々のブロックが流失することがなく、土石流
衝突時には鋼管の変形により土石流荷重を吸収すること
ができる。
According to the first aspect of the present invention, it is possible to rapidly construct a sabo dam and a dike just by stacking rectangular parallelepiped concrete blocks, and the rectangular parallelepiped concrete blocks are concrete-filled steel pipes. Is fixed in a skewered manner with the shaft as an axis, the individual blocks do not flow away even when subjected to the fluid force of the debris flow, and the debris flow load can be absorbed by the deformation of the steel pipe at the time of the debris flow collision.

【0009】請求項2および請求項5記載の本発明によ
れば、前記作用に加えて、直方体コンクリートブロック
に貫通させるコンクリート充填鋼管を曲げ応力に対する
強度の高いコンクリート充填PC鋼管とすることで、よ
りブロックの連結性を高めた構造とすることができ、ま
た、変形による土石流荷重の吸収能力を向上させること
ができる。
According to the second and fifth aspects of the present invention, in addition to the above functions, the concrete-filled steel pipe penetrating through the rectangular parallelepiped concrete block is made of a concrete-filled PC steel pipe having high strength against bending stress. It is possible to have a structure in which the connectivity of the blocks is enhanced, and it is possible to improve the ability to absorb debris flow load due to deformation.

【0010】請求項3記載の本発明によれば、貫通孔を
衝撃緩衝材で被覆することで、設置や土石流荷重を受け
た際に、コンクリート充填鋼管に対して直方体コンクリ
ートブロックがぶつかり破損することを防止でき、鋼管
の大きいじん性を有効に利用することができる。
According to the third aspect of the present invention, by covering the through-hole with the shock absorbing material, the rectangular parallelepiped concrete block collides with the concrete-filled steel pipe and breaks when installed or subjected to a debris flow load. Can be prevented, and the large toughness of the steel pipe can be effectively used.

【0011】また、請求項1および請求項4記載の本発
明によれば、直方体コンクリートブロックはこれを交互
に積むことで連結性を高めた構造とすることができる。
According to the first and fourth aspects of the present invention, the rectangular parallelepiped concrete blocks can be stacked alternately to have a structure with improved connectivity.

【0012】請求項4記載の本発明によれば、コンクリ
ートブロック、鋼管とも予め噴火前に作成して、適当な
箇所にストックしておき、噴火時に施工箇所へ運搬して
施工するものであり、通常のコンクリート砂防ダムで行
われるコンクリート打設作業等が不必要となるなど、急
速施工が可能である。
According to the fourth aspect of the present invention, both the concrete block and the steel pipe are prepared before the eruption, stocked at an appropriate location, and transported to the construction location during the eruption for construction. Rapid construction is possible, for example, because the concrete pouring work and the like performed in a normal concrete sabo dam are not required.

【0013】[0013]

【発明の実施の形態】以下、本発明の実施例を詳細に説
明する。図1は本発明の土石流等の対策構造物の1実施
形態を示す正面図、図2は同上平面図で、ダム1とした
ときの場合である。また、図3はこのようなダム1を設
けた場合の俯瞰図であるが、土石流や火山泥流の堆積、
氾濫の可能性がある地域であり、砂防ダムの急速省力人
化施工が困難な地域を示すものである。
DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, embodiments of the present invention will be described in detail. FIG. 1 is a front view showing an embodiment of a countermeasure structure against debris flow or the like according to the present invention, and FIG. FIG. 3 is an overhead view in the case where such a dam 1 is provided.
This indicates an area where there is a possibility of flooding, and where it is difficult to rapidly construct a sabo dam and save labor.

【0014】本発明の土石流等の対策構造物は、直方体
コンクリートブロック2とコンクリート充填鋼管3の組
み合わせからなる。
The countermeasure structure against debris flow or the like according to the present invention comprises a combination of a rectangular parallelepiped concrete block 2 and a concrete-filled steel pipe 3.

【0015】先にこの直方体コンクリートブロック2か
ら説明すると、一例として、図4、図5に示すようにコ
ンクリート充填鋼管3の貫通孔4を左右に2つもつ直方
体ブロックである。
First, the rectangular parallelepiped concrete block 2 will be described. As an example, as shown in FIGS. 4 and 5, a rectangular parallelepiped block having two through holes 4 on the right and left of a concrete-filled steel pipe 3 is shown.

【0016】コンクリート充填鋼管3の挿入を容易にす
るため、上下方向に開口する貫通孔4はコンクリート充
填鋼管3の鋼管直径と比較して余裕をもった大きい直径
とする。また、衝撃緩衝材5として貫通孔4にブチルゴ
ムシール等を用いて被覆した。該衝撃緩衝材5は孔から
の抜けを防止するため、フランジ5aを有するものとし
てもよい。
In order to facilitate the insertion of the concrete-filled steel pipe 3, the through-hole 4, which opens in the vertical direction, has a larger diameter with a margin as compared with the steel pipe diameter of the concrete-filled steel pipe 3. Further, the through hole 4 was covered with a butyl rubber seal or the like as an impact buffer 5. The impact buffer 5 may have a flange 5a in order to prevent the impact buffer 5 from coming out of the hole.

【0017】図6〜図8にコンクリート充填鋼管3を示
すが、鋼管杭として利用できるもので、通常のコンクリ
ート充填鋼管でもよいが、本実施形態では通常のコンク
リート充填鋼管と比較し、曲げに対する強度を高いもの
とするため、内部上下端に水平仕切り板としてのアンカ
ーブレート6を配設し、このアンカーブレート6に対し
て端部をナット5て締結してなるアンボンド型PC鋼棒
8を配置したプレストレスコンクリート(PC)充填鋼
管として構成する。
FIGS. 6 to 8 show concrete-filled steel pipes 3, which can be used as steel pipe piles and may be ordinary concrete-filled steel pipes. In order to increase the height, an anchor plate 6 as a horizontal partition plate is disposed at the upper and lower ends of the inside, and an unbonded PC steel rod 8 whose end is fastened to the anchor plate 6 with a nut 5 is disposed. Configured as prestressed concrete (PC) filled steel pipe.

【0018】前記ダム1はコンクリート充填鋼管3を軸
として立設し、直方体コンクリートブロック2をこのコ
ンクリート充填鋼管3に対して串刺し状に積上げて形成
した。なお、ダム1としては砂防ダムまたは導流堤であ
る。
The dam 1 is erected around a concrete-filled steel pipe 3 and is formed by stacking rectangular parallelepiped concrete blocks 2 in a skewered manner on the concrete-filled steel pipe 3. The dam 1 is a sabo dam or a dike.

【0019】次に、本発明の土石流等の対策構造物の施
工法を説明する。図2、図3において9は堤体基礎部
で、これは土石流、火山泥流対策施設を緊急に施工する
必要がある場合を想定して必要な場所に予め施工してお
く。また、袖部10については直方体コンクリートブロッ
ク2がおけるように平坦部な段部を確保しておく。
Next, a method of constructing a structure for preventing debris flow or the like according to the present invention will be described. 2 and 3, reference numeral 9 denotes an embankment foundation, which is preliminarily constructed at a necessary place in a case where a debris flow and volcanic mudflow countermeasure facility needs to be constructed urgently. In addition, a flat step is secured for the sleeve 10 so that the rectangular parallelepiped concrete block 2 can be placed.

【0020】直方体コンクリートブロック2とコンクリ
ート充填鋼管3とは予め噴火前に作成して、適当な箇所
に適当数をストックしておき、噴火時に施工箇所へ運搬
して施工する。その際、コンクリート充填鋼管3はアン
ボンド型PC鋼棒8を配置してプレストレスコンクリー
ト(PC)充填鋼管として構成されている。
The rectangular parallelepiped concrete block 2 and the concrete-filled steel pipe 3 are prepared in advance before the eruption, a suitable number of them are stocked at an appropriate location, and transported to the construction location during the eruption for construction. At this time, the concrete-filled steel pipe 3 is configured as a prestressed concrete (PC) -filled steel pipe by disposing an unbonded PC steel rod 8.

【0021】クレーンで直方体コンクリートブロック2
を積上げながら、このように積上げた直方体コンクリー
トブロック2には貫通孔4は上下に連続するものとなる
ので、この連続する貫通孔4にコンクリート充填鋼管3
を差し入れて直方体コンクリートブロック2を串刺し状
に固定する。コンクリート充填鋼管3と直方体コンクリ
ートブロック2の隙間には砂を詰める。
[0021] Rectangular concrete block 2 with a crane
The through-holes 4 are vertically continuous in the rectangular parallelepiped concrete block 2 thus stacked, and the concrete-filled steel pipe 3 is inserted into the continuous through-holes 4.
And fix the rectangular parallelepiped concrete block 2 in a skewered manner. The gap between the concrete-filled steel pipe 3 and the rectangular parallelepiped concrete block 2 is filled with sand.

【0022】本実施形態では前記直方体コンクリートブ
ロック2を積上げるのに、交互(千鳥状または直交させ
て)に積上げるものとし、その際、直方体コンクリート
ブロック2は左右に貫通孔4を有するので、これら左右
の貫通孔4が互い違いに合致して連続する孔を形成する
ので、ここにコンクリート充填鋼管3を挿入した。
In the present embodiment, the rectangular parallelepiped concrete blocks 2 are stacked alternately (in a staggered or orthogonal manner). At this time, the rectangular parallelepiped concrete blocks 2 have through holes 4 on the left and right sides. Since the left and right through holes 4 alternately correspond to each other to form a continuous hole, the concrete-filled steel pipe 3 was inserted here.

【0023】なお、このように先に、直方体コンクリー
トブロック2を順次積み上げ、貫通孔4にコンクリート
充填鋼管3を挿入する方法の他に、立設したコンクリー
ト充填鋼管3に対して直方体コンクリートブロック2を
串刺し状に積上げていく方法も採用し得る。
As described above, in addition to the method of sequentially stacking the rectangular parallelepiped concrete blocks 2 and inserting the concrete-filled steel pipes 3 into the through holes 4, the rectangular parallelepiped concrete blocks 2 are inserted into the standing concrete-filled steel pipes 3. A method of stacking in a skewered shape can also be adopted.

【0024】図1、図2は砂防ダムに一例を示すもの
で、コンクリートブロックの形状は直方体であるため、
水通しの袖小口勾配は直として施工を簡易なものとし
た。
FIGS. 1 and 2 show an example of a sabo dam. The concrete block has a rectangular parallelepiped shape.
The slope of the crotch is straight and the construction is simple.

【0025】このようにして、施工した砂防ダムまたは
導流堤は、図9に模試図を示すが曲げ変形性の大きいコ
ンクリート充填PC鋼管によるコンクリート充填鋼管3
を用い、コンクリート充填鋼管3と直方体コンクリート
ブロック2および直方体コンクリートブロック2相互は
一体化しないので、直方体コンクリートブロック2がず
れるという変形により土石流荷重を吸収する。
FIG. 9 is a schematic diagram showing the construction of the sabo dam or the dike constructed as described above.
Since the concrete-filled steel pipe 3 and the rectangular parallelepiped concrete block 2 and the rectangular parallelepiped concrete block 2 are not integrated with each other, the debris flow load is absorbed by the deformation that the rectangular parallelepiped concrete block 2 shifts.

【0026】前記直方体コンクリートブロック2とコン
クリート充填鋼管3との間の隙間に詰めた砂は、ここで
コンクリート鋼管の変形を許容するものとなる。
The sand packed in the gap between the rectangular parallelepiped concrete block 2 and the concrete-filled steel pipe 3 allows the concrete steel pipe to deform here.

【0027】また、直方体コンクリートブロック2とコ
ンクリート充填鋼管3は一体としない構造なので、噴火
活動により流域が変化した場合などに一旦解体して他の
地域に移設することもできる。
Further, since the rectangular parallelepiped concrete block 2 and the concrete-filled steel pipe 3 are not integrated, when the basin changes due to an eruptive activity, it can be dismantled and moved to another area.

【0028】[0028]

【発明の効果】以上述べたように本発明の土石流等の対
策構造物およびその施工法は、土石流や火山泥流に対す
る耐土石流性の高い砂防ダムまたは導流堤が得られるも
のであり、しかも、通常のコンクリート砂防ダムで行わ
れるコンクリート打設作業等を不必要とするなど、急速
施工が可能なものである。
As described above, the countermeasure structure against debris flow and the like and the method of construction according to the present invention can provide a sabo dam or a dike with high debris flow resistance to debris flow and volcanic mud flow. Rapid construction is possible, for example, by eliminating the need for concrete pouring work and the like performed in ordinary concrete sabo dams.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の土石流等の対策構造物の1実施形態を
示す正面図である。
FIG. 1 is a front view showing an embodiment of a countermeasure structure against debris flow or the like of the present invention.

【図2】本発明の土石流等の対策構造物の1実施形態を
示す平面図である。
FIG. 2 is a plan view showing an embodiment of a countermeasure structure against debris flow or the like according to the present invention.

【図3】本発明の土石流等の対策構造物の1実施形態を
示す俯瞰図である。
FIG. 3 is an overhead view showing one embodiment of a countermeasure structure against debris flow or the like according to the present invention.

【図4】本発明で使用する直方体コンクリートブロック
の平面図である。
FIG. 4 is a plan view of a rectangular parallelepiped concrete block used in the present invention.

【図5】本発明で使用する直方体コンクリートブロック
の一部切欠いた側面図である。
FIG. 5 is a partially cutaway side view of a rectangular parallelepiped concrete block used in the present invention.

【図6】本発明で使用するコンクリート充填鋼管の横断
平面図である。
FIG. 6 is a cross-sectional plan view of a concrete-filled steel pipe used in the present invention.

【図7】本発明で使用するコンクリート充填鋼管の一部
切欠いた平面図である。
FIG. 7 is a partially cutaway plan view of a concrete-filled steel pipe used in the present invention.

【図8】本発明で使用するコンクリート充填鋼管の一部
切欠いた側面図である。
FIG. 8 is a partially cutaway side view of a concrete-filled steel pipe used in the present invention.

【図9】本発明の土石流等の対策構造物の作用を示す模
試図である。
FIG. 9 is a schematic diagram illustrating an operation of a countermeasure structure for debris flow or the like according to the present invention.

【符号の説明】[Explanation of symbols]

1…ダム 2…直方体コンク
リートブロック 3…コンクリート充填鋼管 4…貫通孔 5…衝撃緩衝材 5a…フランジ 6…アンカープレート 7…ナット 8…PC鋼棒 9…堤体基礎部 10…袖部
DESCRIPTION OF SYMBOLS 1 ... Dam 2 ... Rectangular parallelepiped concrete block 3 ... Concrete filled steel pipe 4 ... Through-hole 5 ... Impact buffer 5a ... Flange 6 ... Anchor plate 7 ... Nut 8 ... PC steel bar 9 ... Embankment base 10 ... Sleeve

フロントページの続き (72)発明者 小松澤 展 群馬県渋川市121番1号 建設省関東地 方建設局利根川水系砂防工事事務所内 (72)発明者 永田 謙二 東京都目黒区中目黒1丁目10番21号 八 千代エンジニヤリング株式会社内 (56)参考文献 特開 平9−228348(JP,A) 特開 昭61−151303(JP,A) (58)調査した分野(Int.Cl.7,DB名) E02B 7/02 Continuation of the front page (72) Inventor Komatsuzawa No. 121-1, Shibukawa-shi, Gunma Prefecture Ministry of Construction Kanto District Construction Bureau Tonegawa Water System Sabo Works Office (72) Inventor Kenji Nagata 1-1-10 Nakameguro, Meguro-ku, Tokyo No. 21 Yachiyo Engineering Co., Ltd. (56) References JP-A-9-228348 (JP, A) JP-A-61-151303 (JP, A) (58) Fields investigated (Int. Cl. 7 , DB (Name) E02B 7/02

Claims (5)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 コンクリート充填鋼管を軸として立設
し、鋼管の貫通孔を形成した直方体コンクリートブロッ
クをこのコンクリート充填鋼管に対して串刺し状に積上
げて形成した砂防ダムまたは導流堤からなるもので、コ
ンクリートブロックは上下方向に開口する鋼管の貫通孔
を左右に形成し、この貫通孔同士を合わせながら千鳥状
または直交させて積上げたことを特徴とする土石流等の
対策構造物。
1. A sabo dam or a dike constructed by erected around a concrete-filled steel pipe and stacking rectangular parallelepiped concrete blocks having through-holes in the steel pipe in a skewered manner. The concrete block is a countermeasure against debris flow or the like, characterized in that the through holes of steel pipes which open vertically are formed on the left and right, and the through holes are aligned and stacked in a staggered or orthogonal manner.
【請求項2】 コンクリート充填鋼管は内部にPC鋼棒
を配置したプレストレスコンクリート(PC)充填鋼管
である請求項1記載の土石流等の対策構造物。
2. The structure according to claim 1, wherein the concrete-filled steel pipe is a prestressed concrete (PC) -filled steel pipe in which a PC steel rod is disposed.
【請求項3】 コンクリートブロックは鋼管の貫通孔を
衝撃緩衝材で被覆する請求項1または請求項2記載の土
石流等の対策構造物。
3. The structure for preventing debris flow or the like according to claim 1, wherein the concrete block covers a through hole of the steel pipe with an impact buffer.
【請求項4】 上下方向に開口する鋼管の貫通孔を左右
に形成した直方体コンクリートブロックを、この貫通孔
同士を合わせながら千鳥状または直交させて順次積み上
げ、上下に連続する貫通孔に鋼管を差し入れて直方体コ
ンクリートブロックを串刺し状に固定して砂防ダムまた
は導流堤を構築することを特徴とする土石流等の対策構
造物の施工法。
4. A rectangular parallelepiped concrete block in which through-holes of steel pipes opening in the vertical direction are formed on the left and right is stacked in a staggered or orthogonal manner while aligning the through-holes, and the steel pipes are inserted into vertically continuous through-holes. A method for constructing a structure for countermeasures against debris flow, comprising constructing a sabo dam or a dike by fixing a rectangular parallelepiped concrete block in a skewered manner.
【請求項5】 鋼管はコンクリート充填鋼管であり、内
部にPC鋼棒を配置したプレストレスコンクリート(P
C)充填鋼管である請求項4記載の土石流等の対策構造
物の施工法。
5. The steel pipe is a concrete-filled steel pipe, and a prestressed concrete (P) having a PC steel rod disposed therein.
C) The method for constructing a structure for preventing debris flow or the like according to claim 4, wherein the structure is a filled steel pipe.
JP09956599A 1999-04-07 1999-04-07 Countermeasures against debris flow and construction methods Expired - Lifetime JP3245712B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP09956599A JP3245712B2 (en) 1999-04-07 1999-04-07 Countermeasures against debris flow and construction methods

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP09956599A JP3245712B2 (en) 1999-04-07 1999-04-07 Countermeasures against debris flow and construction methods

Publications (2)

Publication Number Publication Date
JP2000290969A JP2000290969A (en) 2000-10-17
JP3245712B2 true JP3245712B2 (en) 2002-01-15

Family

ID=14250667

Family Applications (1)

Application Number Title Priority Date Filing Date
JP09956599A Expired - Lifetime JP3245712B2 (en) 1999-04-07 1999-04-07 Countermeasures against debris flow and construction methods

Country Status (1)

Country Link
JP (1) JP3245712B2 (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100918026B1 (en) 2009-04-16 2009-09-24 대한민국 Ecological blocks everywhere.
KR101326216B1 (en) * 2010-10-12 2013-11-11 한국건설기술연구원 Maintenance structure for dam and reservoir strucrute using the same
JP2017082441A (en) * 2015-10-26 2017-05-18 Jfe建材株式会社 Dam structure
JP2017082439A (en) * 2015-10-26 2017-05-18 Jfe建材株式会社 dam
JP2017082440A (en) * 2015-10-26 2017-05-18 Jfe建材株式会社 Dam construction method
CN107503327B (en) * 2017-09-20 2019-04-30 太原理工大学 wing wall type retaining dam
JP6765680B2 (en) * 2017-11-14 2020-10-07 ゼニス羽田株式会社 Block assembly type sabo dam
JP7280567B2 (en) * 2019-03-01 2023-05-24 日鉄建材株式会社 catcher
CN112609632A (en) * 2020-12-07 2021-04-06 四川建筑职业技术学院 Precast pile formula mud-rock flow sand blocking dam system
CN112921906A (en) * 2021-04-09 2021-06-08 中国电建集团成都勘测设计研究院有限公司 A block structure for mud-rock flow disaster is administered
JP7393094B1 (en) 2023-05-02 2023-12-06 原田 好也 Sabo dam and dike

Also Published As

Publication number Publication date
JP2000290969A (en) 2000-10-17

Similar Documents

Publication Publication Date Title
JP3245712B2 (en) Countermeasures against debris flow and construction methods
JPH09158212A (en) Foundation reinforcement structure for structures
JP3690437B2 (en) Seismic reinforcement structure for existing buildings
JPH0424330A (en) Earthquake-proof reinforcing structure of construction
KR20120109418A (en) Inclined earth retaining structure method
KR20060092552A (en) Construction method of unsupported downward frame using cast-in-place pile
JP3603424B2 (en) Basement wall and asymmetric closed section steel sheet pile
JP3714395B2 (en) Reinforcement method for the ground below existing structures
JP3385876B2 (en) Cast-in-place pile construction method just below the existing foundation
JPH056601B2 (en)
JP4636478B2 (en) Liquefaction prevention structure
JP6292028B2 (en) Embankment reinforcement structure
JP2973815B2 (en) Construction method of pressure-resistant wall under the building
JPH1077644A (en) Earthquake resisting pile foundation construction method
JP3135495B2 (en) Construction method of avalanche and rock fall protection fence and avalanche and rock fall protection fence
JP3109038B2 (en) Underground skeleton structure and construction method
KR100662524B1 (en) Horizontal skeletal structure and underground soil support
JP2002227220A (en) Foundation for dwelling and foundation construction method
JPH1082055A (en) Method of earthquake-resisting pile foundation construction
CN222782065U (en) Foundation pit supporting waterproof structure and engineering prefabricated supporting structure
JPS63280153A (en) Reverse construction method for underground framework
KR100515971B1 (en) Soil retaining method using H-pile having large section
JP2987371B2 (en) Underground diaphragm wall
RU2098559C1 (en) Method of installation of fence in ground
JP2007239440A (en) Seismic reinforcement method for existing concrete pier

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20071102

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081102

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081102

Year of fee payment: 7

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081102

Year of fee payment: 7

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

EXPY Cancellation because of completion of term