Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP3281166B2 - Construction method of long materials under the ground - Google Patents
[go: Go Back, main page]

JP3281166B2 - Construction method of long materials under the ground - Google Patents

Construction method of long materials under the ground

Info

Publication number
JP3281166B2
JP3281166B2 JP04279294A JP4279294A JP3281166B2 JP 3281166 B2 JP3281166 B2 JP 3281166B2 JP 04279294 A JP04279294 A JP 04279294A JP 4279294 A JP4279294 A JP 4279294A JP 3281166 B2 JP3281166 B2 JP 3281166B2
Authority
JP
Japan
Prior art keywords
long material
guide tube
underground
propulsion
ground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP04279294A
Other languages
Japanese (ja)
Other versions
JPH07253180A (en
Inventor
光俊 林
伸吾 長島
稔 蔵品
啓氏 片平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tokyo Gas Co Ltd
Okumura Corp
Original Assignee
Tokyo Gas Co Ltd
Okumura Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyo Gas Co Ltd, Okumura Corp filed Critical Tokyo Gas Co Ltd
Priority to JP04279294A priority Critical patent/JP3281166B2/en
Publication of JPH07253180A publication Critical patent/JPH07253180A/en
Application granted granted Critical
Publication of JP3281166B2 publication Critical patent/JP3281166B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、地中に多数の並設長尺
材を施工する方法に関する。本発明は推進工法を利用
し、例えば、電力ケーブル、通信ケーブル、計測ケーブ
ル等のケーブル、ケーブル保護管、流体用埋設管等の長
尺材を多数、並列させて地中に埋設施工する技術に関す
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing a plurality of juxtaposed long members underground. The present invention relates to a technology for burying and embedding a large number of long materials such as power cables, communication cables, measurement cables and the like, cable protection tubes, buried pipes for fluids, etc. in parallel by using a propulsion method. .

【0002】[0002]

【従来の技術】地中に多数のケーブルを挿通するため
に、地中にコンクリート管等の地下ケーブルダクトを設
けて、その中にケーブル等を敷設する場合がある。この
ような場合に、長さの長い多数の並列する長尺材を同時
に能率よく地中に敷設する方法が望まれていた。
2. Description of the Related Art In order to insert a large number of cables underground, there is a case where an underground cable duct such as a concrete pipe is provided underground and cables and the like are laid in the underground cable duct. In such a case, there has been a demand for a method of efficiently and efficiently laying a large number of long members in parallel under the ground.

【0003】[0003]

【発明が解決しようとする課題】本発明は、推進工法を
応用して、専用の高強度の誘導管を用いて、推進工法に
よってこの誘導管を地中に施工し、この誘導管を用い
て、地中に多数の長さの長い長尺材を施工する方法を提
供しようとするものである。
According to the present invention, a propulsion method is applied, a dedicated high-strength guide tube is used, the guide tube is installed underground by the propulsion method, and the guide tube is used. It is an object of the present invention to provide a method of constructing a long material having many lengths in the ground.

【0004】[0004]

【課題を解決するための手段】本発明は、軸方向に貫通
する多数の孔を設けた誘導管を順次接続しながら推進工
法によって発進立坑から到達立坑まで地中に施工し、該
誘導管の多数の孔に長尺材を挿通し、該長尺材の発進立
坑側の端部を固定し、ついで誘導管を前進させながら前
記誘導管の後端部から推進孔内に充填材を充填し、前記
長尺材を地中に埋設することを特徴とする地中並設長尺
材の施工方法である。
SUMMARY OF THE INVENTION The present invention is directed to a propulsion system in which guide tubes provided with a large number of holes penetrating in the axial direction are sequentially connected.
Law by by construction in the ground from the starting pit to arrival pit, inserted through the elongated member to a large number of holes of the dielectric conduit, to secure the ends of the starting pit side of the long continuous material, then advancing the guide tube While before
A method of constructing an underground juxtaposed long material, characterized in that a filling material is filled into a propulsion hole from a rear end of the guide tube, and the long material is buried in the ground.

【0005】本発明において、前記長尺材は、中空管、
中実材、及びそれらの複合材から選ばれた1又は2以上
の材料であるとすることができる。また、前記充填材と
してコンクリート、モルタル、粉粒体、樹脂その他の充
填材を用てもよい。
[0005] In the present invention, the long material is a hollow tube,
It can be one or more materials selected from solid materials and composite materials thereof. Also, the filler and
Then, concrete, mortar, granular material, resin or other filler may be used.

【0006】[0006]

【作用】本発明では、長尺材を挿通する多数の貫通孔を
有する誘導管を用いる。この誘導管は、発進立坑から到
達立坑までの推進工法に専ら用い、回収して繰り返し使
用する。従って、頑丈に形成して十分な強度をもたせ、
貫通孔等を自由に設けることができる。
According to the present invention, a guide tube having a large number of through holes through which a long material is inserted is used. This guide tube is exclusively used for the propulsion method from the starting shaft to the reaching shaft, and is collected and used repeatedly. Therefore, make it strong enough to have sufficient strength,
Through holes and the like can be freely provided.

【0007】本発明は、多数の孔を軸方向に貫通した誘
導管を発進立坑から到達立坑まで推進施工し、前記多数
の孔に長尺材を挿通し、長尺材を発進立坑内に固定し、
誘導管を前進させて長尺材を推進孔跡に残置し、長尺材
を地中に埋設する。誘導管は到達立坑に到達した後、到
達立坑側から牽引する。本発明の長尺材としては限定さ
れないが、例えば、中空管としては、金属管、合成樹脂
管、ホース、シース等を挙げることができ、中実材とし
ては、各種ケーブル、棒材、ロープ、樹脂線、繊維集合
材等を挙げることができ、これらの複合材料も対象とな
る。
According to the present invention, a guide pipe having a large number of holes penetrating in the axial direction is propelled from a starting shaft to a reaching shaft, a long material is inserted into the large number of holes, and the long material is fixed in the starting shaft. And
The guide tube is advanced to leave the long material at the trace of the propulsion hole, and the long material is buried in the ground. After reaching the reaching shaft, the guide tube is pulled from the reaching shaft side. Although the long material of the present invention is not limited, for example, the hollow tube includes a metal tube, a synthetic resin tube, a hose, a sheath, and the like, and the solid material includes various cables, rods, and ropes. , Resin wires, fiber aggregates, etc., and these composite materials are also targets.

【0008】誘導管を前進させながら、推進孔内にコン
クリート、モルタル、ファイバ、粉粒体、土砂、岩石そ
の他の材料を充填することができる。またこの充填は、
推進孔の一部に充填することもでき、コンクリート管を
地中造管することもできるので、その技術と組み合わせ
て地中コンクリート管の壁内に長尺材を埋設することも
できる。
While the guide tube is advanced, concrete, mortar, fiber, granular material, earth and sand, rock and other materials can be filled in the propulsion hole. This filling also
Since a part of the propulsion hole can be filled and a concrete pipe can be formed underground, a long material can be embedded in the wall of the underground concrete pipe in combination with the technique.

【0009】[0009]

【実施例】図2に本発明の1実施例の誘導管の正面図を
示した。誘導管52は、中空部190を備えた円筒形を
なし、円周近傍に配置された多数の貫通孔182を備え
ている。この多数の貫通孔182は軸方向に平行に貫通
しており、長尺材、例えばケーブル、シース、光ファイ
バダクト等を挿通する貫通孔である。この実施例では、
充填材としてモルタルを注入するモルタル注入孔180
が貫通している。そして、モルタル注入孔180からモ
ルタルを注入しながら前進するようになっており、地中
にコンクリートモルタル管を造管することができる例を
示している。従っての例では、長尺材の孔はコンクリ
ート管の壁内に埋設されるようになっている。
FIG. 2 is a front view of a guide tube according to an embodiment of the present invention. The guide tube 52 has a cylindrical shape with a hollow portion 190, and has a large number of through holes 182 arranged near the circumference. The plurality of through holes 182 penetrate in parallel in the axial direction, and are through holes through which a long material, for example, a cable, a sheath, an optical fiber duct, or the like is inserted. In this example,
Mortar injection hole 180 for injecting mortar as filler
Is penetrating. Then, it adapted to advance while injecting the mortar mortar injection hole 180, shows an example capable of forming tube concrete mortar tube in the ground. The thus examples of this, holes in the long material is adapted to be embedded in the wall of the concrete pipe.

【0010】図4、図5に本発明の実施例の施工工程を
示した。掘進機50の尾端に誘導管52を連結して発進
立坑100から到達立坑102まで地中を推進させる。
発進立坑100から到達立坑102まで誘導管52の推
進が完了したら、到達立坑102において掘進機50を
取り外し、誘導管52を、到達立坑側から牽引できるよ
うにする。誘導管52の貫通孔に長尺材90を通し、そ
の端部を発進立坑内に固定する。ついで、誘導管52を
前進させ、長尺材90を推進孔内に残置する。図5は、
充填材40を充填しながら、誘導管52を順次前進させ
る工程を示している。
FIGS. 4 and 5 show construction steps of an embodiment of the present invention. A guide pipe 52 is connected to the tail end of the excavator 50 to propel the underground from the starting shaft 100 to the reaching shaft 102.
After the propulsion of the guide tube 52 from the starting shaft 100 to the reaching shaft 102 is completed, the excavator 50 is removed from the reaching shaft 102 so that the guiding tube 52 can be pulled from the reaching shaft side. The long material 90 is passed through the through hole of the guide pipe 52, and its end is fixed in the starting shaft. Next, the guide pipe 52 is advanced, and the long material 90 is left in the propulsion hole. FIG.
A step of sequentially advancing the guide tube 52 while filling the filler 40 is shown.

【0011】図2は発進立坑100から誘導管52を押
込んでいる状態を示している。推進孔の口元には、端板
160、マウスリング162、シールリング164が設
けられている。誘導管52が到達立坑に到達したら、誘
導管52の貫通孔182に長尺材90を挿通し、図3に
示すように、発進立坑100内に保持リング170を取
付け、長尺材90を保持リング170に固定片92で固
定する。ついで誘導管52を前進させると、長尺材90
は、図3に示すように、誘導管52の推進跡に残置され
る。この推進跡にモルタル注入管106からモルタル注
入孔180を経て充填材40、例えば早強モルタルを注
入する。その硬化を待って誘導管52を前進させる。こ
のようにして、並列する多数の長尺材を地中に容易に埋
設施工することができる。
FIG. 2 shows a state in which the guide tube 52 is pushed from the starting shaft 100. An end plate 160, a mouth ring 162, and a seal ring 164 are provided at the mouth of the propulsion hole. When the guide tube 52 reaches the reaching shaft, the long material 90 is inserted into the through hole 182 of the guide tube 52, and as shown in FIG. 3, the holding ring 170 is attached in the starting shaft 100 to hold the long material 90. It is fixed to the ring 170 with the fixing piece 92. Next, when the guide tube 52 is advanced, the long material 90
Is left at the propulsion mark of the guide tube 52 as shown in FIG. The filler 40, for example, an early-strength mortar is injected into the propulsion trace from the mortar injection pipe 106 through the mortar injection hole 180. After the curing, the guide tube 52 is advanced. In this way, a large number of long members arranged in parallel can be easily buried in the ground.

【0012】[0012]

【発明の効果】本発明によれば、推進専用の高剛性の誘
導管に長尺材を挿通する多数の貫通孔を設けておき、こ
れを発進立坑から到達立坑まで推進施工し、誘導管が発
進立坑から到達立坑まで到達した時、誘導管の貫通孔に
長尺材を挿通し、その発進立坑側の端部を固定し、誘導
管を前進させその推進跡に充填材を施工することにより
多数の長尺材を容易に地中に設置することができる。
According to the present invention, a large number of through-holes are provided in a high-rigidity guide tube dedicated to propulsion, through which long materials are inserted. When reaching from the starting shaft to the reaching shaft, insert a long material into the through hole of the guide tube, fix the end of the starting shaft side, advance the guide tube, and fill the propulsion mark with filling material Many long members can be easily installed underground.

【図面の簡単な説明】[Brief description of the drawings]

【図1】誘導管の正面図である。FIG. 1 is a front view of a guide tube.

【図2】発進立坑内の誘導管押込み工程の説明図であ
る。
FIG. 2 is an explanatory diagram of a guide tube pushing step in a starting shaft.

【図3】発進立坑内の誘導管推進完了後の説明図であ
る。
FIG. 3 is an explanatory view after completion of guide tube propulsion in a starting shaft.

【図4】本発明の誘導管の推進工程の説明図である。FIG. 4 is an explanatory diagram of a guide tube propulsion process of the present invention.

【図5】本発明の誘導管の推進工程の説明図である。FIG. 5 is an explanatory diagram of a guide tube propulsion process of the present invention.

【符号の説明】[Explanation of symbols]

40 充填材 50 掘進機 52 誘導管 90 長尺材 100 発進立坑 102 到達立坑 160 端板 162 マウスリング 164 シールリング 170 保持リング 180 モルタル注入孔 182 貫通孔 190 中空部 Reference Signs List 40 filler 50 excavator 52 guide tube 90 long material 100 starting shaft 102 reaching shaft 160 end plate 162 mouth ring 164 seal ring 170 retaining ring 180 mortar injection hole 182 through hole 190 hollow portion

───────────────────────────────────────────────────── フロントページの続き (72)発明者 蔵品 稔 横浜市鶴見区末広町1丁目7番7号 東 京瓦斯株式会社 導管技術センター内 (72)発明者 片平 啓氏 大阪市阿倍野区松崎町2丁目2番2号 株式会社奥村組内 (56)参考文献 特開 平4−210183(JP,A) 特公 平4−38279(JP,B2) (58)調査した分野(Int.Cl.7,DB名) F16L 1/024 F16L 1/00 ────────────────────────────────────────────────── ─── Continuing on the front page (72) Minoru Kurakura 1-7-7 Suehirocho, Tsurumi-ku, Yokohama-shi Inside the Tokyo Gas Co., Ltd. Pipe Technology Center (72) Inventor Kei Katahira Matsuzaki-cho, Abeno-ku, Osaka-shi 2-2-2, Okumura Gumi Co., Ltd. (56) References JP-A-4-210183 (JP, A) JP-B-4-38279 (JP, B2) (58) Fields surveyed (Int. Cl. 7 , (DB name) F16L 1/024 F16L 1/00

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 軸方向に貫通する多数の孔を設けた誘導
管を順次接続しながら推進工法によって発進立坑から到
達立坑まで地中に施工し、該誘導管の多数の孔に長尺材
を挿通し、該長尺材の発進立坑側の端部を固定し、つい
で誘導管を前進させながら前記誘導管の後端部から推進
孔内に充填材を充填し、前記長尺材を地中に埋設するこ
とを特徴とする地中並設長尺材の施工方法。
1. A guide pipe having a large number of holes penetrating in an axial direction is sequentially connected and constructed underground from a starting shaft to a reaching shaft by a propulsion method, and a long material is inserted into the many holes of the guiding tube. Insert and fix the end of the long material on the starting shaft side, and then advance from the rear end of the guide tube while advancing the guide tube.
A method for constructing an underground juxtaposed long material, characterized by filling a hole with a filler and burying the long material in the ground.
【請求項2】 前記長尺材は、中空管、中実材、及びそ
れらの複合材から選ばれた1又は2以上の材料であるこ
とを特徴とする請求項1記載の地中並設長尺材の施工方
法。
2. The underground juxtaposition according to claim 1, wherein the long material is one or more materials selected from a hollow tube, a solid material, and a composite material thereof. Construction method of long material.
JP04279294A 1994-03-14 1994-03-14 Construction method of long materials under the ground Expired - Fee Related JP3281166B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP04279294A JP3281166B2 (en) 1994-03-14 1994-03-14 Construction method of long materials under the ground

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP04279294A JP3281166B2 (en) 1994-03-14 1994-03-14 Construction method of long materials under the ground

Publications (2)

Publication Number Publication Date
JPH07253180A JPH07253180A (en) 1995-10-03
JP3281166B2 true JP3281166B2 (en) 2002-05-13

Family

ID=12645819

Family Applications (1)

Application Number Title Priority Date Filing Date
JP04279294A Expired - Fee Related JP3281166B2 (en) 1994-03-14 1994-03-14 Construction method of long materials under the ground

Country Status (1)

Country Link
JP (1) JP3281166B2 (en)

Also Published As

Publication number Publication date
JPH07253180A (en) 1995-10-03

Similar Documents

Publication Publication Date Title
JP3281166B2 (en) Construction method of long materials under the ground
JP2008280842A (en) Construction method of arch-shaped preceding support
JP3350679B2 (en) Tunnel lining segment and construction method
JP3308916B2 (en) Ring cable insertion device for shield segment
JP2770112B2 (en) Ground improvement method in shield excavation
JPS621074B2 (en)
JP2000134779A (en) Lightweight unit tube
JP3247788B2 (en) Construction method of underground piping
JP3507173B2 (en) Tunnel excavation wall lining method and apparatus
JP2975560B2 (en) Underground pipe burial method using shield method by simple segment
JP2754172B2 (en) Long-distance propulsion method
JPH0579286A (en) Conduit laying construction method
JPH06257382A (en) Propulsion pipe for multi-line piping and piping method using the same
JPS6037398A (en) Pipe laying method
JPH0711864A (en) Injection device with double packer for curved pipe
KR101178447B1 (en) A method construction reclamation for separating of cable using spacer
JPH0510073Y2 (en)
JP2000303796A (en) Slim lining method for small diameter tunnels
JPH10280881A (en) Filament embedding method and filament embedding device
JPH07253179A (en) Installation method of attached cable for underground piping
JPH05287726A (en) Construction method of drainage pipeline
JPH03241196A (en) Earthwork for underground piping
JP2001241291A (en) Sliding material injection method for propulsion method
JPS62178691A (en) Method of laying duct
JPH0345194B2 (en)

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20020205

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

LAPS Cancellation because of no payment of annual fees