JP3285335B2 - Segment assembly method - Google Patents
[go: Go Back, main page]

JP3285335B2 - Segment assembly method - Google Patents

Segment assembly method

Info

Publication number
JP3285335B2
JP3285335B2 JP32988599A JP32988599A JP3285335B2 JP 3285335 B2 JP3285335 B2 JP 3285335B2 JP 32988599 A JP32988599 A JP 32988599A JP 32988599 A JP32988599 A JP 32988599A JP 3285335 B2 JP3285335 B2 JP 3285335B2
Authority
JP
Japan
Prior art keywords
segment
jack
erector
pressing
ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP32988599A
Other languages
Japanese (ja)
Other versions
JP2000120396A (en
Inventor
清 土屋
文哉 高野
英嗣 山崎
泰雄 森
均 高橋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Construction Machinery Co Ltd
Original Assignee
Hitachi Construction Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Construction Machinery Co Ltd filed Critical Hitachi Construction Machinery Co Ltd
Priority to JP32988599A priority Critical patent/JP3285335B2/en
Publication of JP2000120396A publication Critical patent/JP2000120396A/en
Application granted granted Critical
Publication of JP3285335B2 publication Critical patent/JP3285335B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、シールド掘進機内
に搬入されたトンネル覆工用セグメントを組み立てるた
めのセグメント組立工法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a segment assembling method for assembling a tunnel lining segment carried into a shield machine.

【0002】[0002]

【従来の技術】従来の多連シールドトンネルのセグメン
ト組立作業は、図18および図19に示すような通常の
リング式エレクタ(以下、従来形エレクタという)を用
いて行われていた。図20は、2連シールドトンネルに
使用される1リング分のセグメントを示したもので、左
右の擬似円形部を形成する円弧状の標準セグメント1
a、左右の擬似円形部を接合するためのV形断面の上下
のキーセグメント1b、1c、中央部に挿入される支柱
セグメント1dから成り、1リングごとに両翼部の短い
キーセグメント1bと両翼部の長いキーセグメント1c
とを交互に入れ替えることにより、セグメントの継目位
置が千鳥形にずれるように組み立てられる。図18およ
び図19において、シールド本体2の後部に設置された
左右2基のエレクタ3A、3Bは、それぞれシールド本
体2の内周に沿って配置されたガイドローラ5により案
内され、シールド本体2に装備された旋回用モータ6に
よりピニオン7とリングギヤ8を介して旋回駆動される
エレクタリング4と、該エレクタリング4からシールド
本体2の後方に向けて突出した左右1対のエレクタアー
ム9と、該エレクタアーム9を貫通する左右2本のガイ
ドロッド11を有し、エレクタアーム9に装備された押
付ジャッキ12によりエレクタリング4の径方向に摺動
させられる門形状の吊りビーム10と、該吊りビーム1
0の中央部にスライダガイド13を介して支持され、吊
りビーム10に装備された前後摺動ジャッキ14により
エレクタリング4の軸線方向に摺動させられるセグメン
ト把持部16を有するスライダ15から構成されてお
り、これら2基のエレクタ3A、3Bを用いて図20に
示すセグメント1a、1b、1c、1dを1ピースずつ
吊りあげ、所定の組立位置に搬送し、既設セグメントお
よび円周方向の隣接セグメントに順次ボルトを締結して
図19に示すセグメントリング1を組立てる。
2. Description of the Related Art A conventional ring-type erector (hereinafter, referred to as a conventional erector) as shown in FIGS. 18 and 19 has been used for assembling segments of a conventional multiple shield tunnel. FIG. 20 shows a segment for one ring used in a double shield tunnel, and is a standard segment 1 in the form of an arc forming left and right pseudo circular portions.
a, upper and lower key segments 1b and 1c having a V-shaped cross-section for joining the left and right pseudo-circular portions, and a post segment 1d inserted into the center portion; Long key segment 1c
By assembling them alternately, the segments are assembled such that the joint positions are shifted in a staggered manner. 18 and 19, two left and right erectors 3A and 3B installed at the rear part of the shield main body 2 are guided by guide rollers 5 arranged along the inner periphery of the shield main body 2, respectively. An elector ring 4 pivotally driven by a pivoting motor 6 via a pinion 7 and a ring gear 8, a pair of left and right elector arms 9 projecting rearward of the shield body 2 from the elector ring 4, A gate-shaped suspension beam 10 having two left and right guide rods 11 penetrating the elector arm 9 and being slid in the radial direction of the elector ring 4 by a pressing jack 12 mounted on the elector arm 9; 1
The slider 15 has a segment gripper 16 which is supported at a center portion of the slider 0 via a slider guide 13 and is slid in the axial direction of the elector ring 4 by a front-rear sliding jack 14 mounted on the suspension beam 10. The segments 1a, 1b, 1c, and 1d shown in FIG. 20 are lifted one piece at a time by using these two erectors 3A and 3B, and transported to a predetermined assembly position. The bolts are sequentially tightened to assemble the segment ring 1 shown in FIG.

【0003】[0003]

【発明が解決しようとする課題】しかし、図18および
図19に示す従来形エレクタは、円弧状の標準セグメン
ト1aの組立てには向いているものの、V形断面のキー
セグメント1b、1c、支柱セグメント1dなどのよう
な異形セグメントの組立てには適していない。その理由
の1つは、図18に示すように、これから組み立てよう
とするキーセグメント1b、1cや支柱セグメント1d
をエレクタのスライダ15に把持させるためエレクタの
下に置いたとき、これらのセグメント1b、1c、1d
の高さh1ないしh3が標準セグメント1aより高くな
ってしまい、その分スライダ15の位置をエレクタリン
グ4の中心寄りに引き上げなければ、セグメントの把持
ができないことである。スライダ15の位置を引き上げ
ると、図18でエレクタリング4、エレクタアーム9お
よび吊りビーム10により囲まれたエレクタの内空部1
7が狭くなり、シールド掘進機の排土装置(スクリュー
コンベア18または送排泥管)やセグメント組立用の作
業デッキ19などを通すためのスペースが確保できなく
なる。
However, the conventional erector shown in FIGS. 18 and 19 is suitable for assembling the arc-shaped standard segment 1a, but has key segments 1b and 1c having a V-shaped cross section and a column segment. It is not suitable for assembling odd-shaped segments such as 1d. One of the reasons is, as shown in FIG. 18, the key segments 1b and 1c and the pillar segments 1d to be assembled.
Are placed under the erector to allow the slider 15 of the erector to grip them, these segments 1b, 1c, 1d
Is higher than the standard segment 1a, and the segment cannot be gripped unless the position of the slider 15 is raised toward the center of the erector ring 4 by that amount. When the position of the slider 15 is raised, the inner space 1 of the erector surrounded by the erector ring 4, the erector arm 9, and the suspension beam 10 in FIG.
7 becomes narrow, and it becomes impossible to secure a space for passing a soil discharging device (a screw conveyor 18 or a feeding and discharging mud pipe) of a shield excavator and a work deck 19 for assembling a segment.

【0004】 本発明は、上記のような従来技術の問題点
を解決するためになされたもので、多連シールドトンネ
ル等に使用される各種形状のセグメントに対応して、特
に支柱セグメントのような平板上のセグメントの組立を
容易迅速に行うことができるようにしたセグメント組立
工法を提供することを目的とする。
The present invention has been made to solve the above-mentioned problems of the prior art, and corresponds to segments of various shapes used for multiple shield tunnels and the like. An object of the present invention is to provide a segment assembling method capable of easily and quickly assembling segments on a flat plate.

【0005】[0005]

【課題を解決するための手段】上記の目的を達成するた
め、本出願の請求項1に記載の発明においては、シール
ド掘進機内に搬入されたトンネル覆工用のセグメント
を、シールド本体内に回転可能に支持されたエレクタリ
ングと、このエレクタリングに支持されたエレクタアー
ムと、このエレクタアーム内を貫通するガイドロッド
と、このガイドロッドの一端側に設けられた押付ビーム
と、一方側が前記エレクタアームに,他方側が前記押付
ビームに取り付けられ前記押付ビームを前記エレクタリ
ングのほぼ接線方向に移動可能とする押付ジャッキと、
前記押付ビームに前記エレクタリングの軸線方向に直角
な平面内で揺動可能に支持された揺動アームと、この揺
動アームに設けられた振れ止めジャッキとこの振れ止め
ジャッキに設けられセグメントを把持するセグメント把
持部とこのセグメント把持部の周囲に配置された複数の
セグメント振れ止め具からなりセグメントを着脱可能に
保持するセグメント保持装置とを備えたエレクタ装置を
用いて組み立てるセグメント組立工法において、平板状
のセグメントに設けられたセグメント吊り具と前記セグ
メント把持部とを連結し、前記振れ止めジャッキを縮め
て前記セグメント把持部を引き込み、前記平板状のセグ
メントを前記セグメント振れ止め具に当接させて、前記
平板状のセグメントを前記押付ジャッキと直角になるよ
うに保持した後、前記エレクタリングを旋回させて前記
平板状のセグメントの姿勢を鉛直にし、その後、前記押
付ジャッキの伸長により前記平板状のセグメントを予め
設置された下部キーセグメントと上部キーセグメントと
の間に装着するようにした。
In order to achieve the above object, according to the first aspect of the present invention, a tunnel lining segment carried into a shield machine is rotated into a shield body. Elector ring supported so as to be possible, Electa arm supported by this Elector ring, and guide rod penetrating through this Electa arm
And a pressing beam provided on one end side of the guide rod, one side of the guide rod and the other side of the guide rod.
A pressing jack attached to a beam and capable of moving the pressing beam substantially tangentially to the erector ring ;
Gripping a swing arm in which the swingably supported by the pressing beam to the erector plane perpendicular to the axis direction of the ring, the segments provided with bracing jack provided on the swing arm to the bracing jack In a segment assembling method of assembling using an erector device having a segment holding portion to be segmented and a plurality of segment steady rests arranged around the segment holding portion and having a segment holding device for detachably holding a segment, The segment hanging tool provided on the segment and the segment gripping part are connected, the steady rest jack is contracted to retract the segment gripping part, and the flat plate segment is brought into contact with the segment steady rest, After holding the flat segment so as to be perpendicular to the pressing jack, The electoring ring is turned to make the position of the plate-shaped segment vertical, and then, by extending the pressing jack, the plate-shaped segment is mounted between the lower key segment and the upper key segment which are installed in advance. I made it.

【0006】また、請求項2に記載の発明においては、
シールド掘進機内に搬入されたトンネル覆工用のセグメ
ントを、シールド本体内に回転可能に支持されたエレク
タリングと、このエレクタリングに支持されたエレクタ
アームと、このエレクタアーム内を貫通するガイドロッ
ドと、このガイドロッドの一端側に設けられた押付ビー
ムと、一方側が前記エレクタアームに,他方側が前記押
付ビームに取り付けられ前記押付ビームを前記エレクタ
リングのほぼ接線方向に移動可能とする押付ジャッキ
と、前記押付ビームに前記エレクタリングの軸線方向に
直角な平面内で揺動可能に支持された揺動アームと、こ
の揺動アームに設けられた振れ止めジャッキとこの振れ
止めジャッキに設けられセグメントを把持するセグメン
ト把持部とこのセグメント把持部の周囲に配置された複
数のセグメント振れ止め具からなりセグメントを着脱可
能に保持するセグメント保持装置と、前記揺動アームの
傾きを制御する姿勢制御ジャッキとを備えたエレクタ装
置を用いて組み立てるセグメント組立工法において、前
記揺動アームに設けられた複数のセグメント振れ止め具
のセグメント当接面が前記押付ジャッキとほぼ直角にな
るように前記姿勢制御ジャッキにより揺動アームの角度
を制御した後、平板状のセグメントに設けられたセグメ
ント吊り具と前記セグメント把持部とを連結し、前記振
れ止めジャッキを縮めて前記セグメントを引き込み、前
記平板状のセグメントを前記セグメント振れ止め具に当
接させて、前記平板状のセグメントを押付ジャッキと直
角になるように保持した後、前記エレクタリングを旋回
させて前記平板状のセグメントの姿勢を鉛直にし、その
後前記押付ジャッキの伸長により前記平板状のセグメン
トを予め設置された下部キーセグメントと上部キーセグ
メントとの間に装着するようにした。
Further, in the invention according to claim 2,
The tunnel lining segment carried into the shield machine is connected to an erector ring rotatably supported in the shield body, an erector arm supported by the erector ring, and a guide lock penetrating through the erector arm.
And a pressing beam provided at one end of the guide rod, one side of the guide rod and the other side of the guide rod.
A pressing jack attached to a mounting beam and capable of moving the pressing beam substantially in a tangential direction of the electoring ring.
When the swing arm swingably supported by the pressing beam to the erector plane perpendicular to the axis direction of the ring, provided the steadying jack provided on the swing arm to the bracing jack segments A segment holding device for holding a segment detachably, comprising a segment gripper for gripping a plurality of segment steady rests arranged around the segment gripper, and a position control jack for controlling the tilt of the swing arm. In the segment assembling method for assembling using the erector device provided with the erector device, the posture control jack swings so that the segment contact surfaces of the plurality of segment steady rests provided on the swing arm are substantially perpendicular to the pressing jack. After controlling the angle of the moving arm, the segment hanger provided on the plate-shaped segment and the And the segment grip is contracted, the steady rest jack is contracted, the segment is pulled in, the flat segment is brought into contact with the segment steady rest, and the flat segment is perpendicular to the pressing jack. After that, the electoring ring is turned to make the posture of the plate-shaped segment vertical, and then the plate-shaped segment is moved between the lower key segment and the upper key segment previously set by the extension of the pressing jack. To be mounted on.

【0007】[0007]

【発明の実施の形態】以下、2連シールド掘進機に適用
した本発明の一実施の形態を図1ないし図4により説明
する。組み立てようとするセグメントは、図1に示すよ
うに、標準セグメント1a、上下キーセグメント1b、
1c、および支柱セグメント1dの4種類である。図1
ないし図4において、シールド本体2の後方に設置され
た左右2基のエレクタ20A、20Bは、同一構造であ
り、対応する部分には同一の符号を付けて示す。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS One embodiment of the present invention applied to a double shield machine will be described below with reference to FIGS. The segments to be assembled include a standard segment 1a, an upper and lower key segment 1b,
1c and a support segment 1d. FIG.
In FIG. 4 to FIG. 4, the left and right erectors 20A and 20B installed behind the shield main body 2 have the same structure, and corresponding parts are denoted by the same reference numerals.

【0008】エレクタリング21はシールド本体2の内
周に沿って配置されたガイドローラ22により案内さ
れ、エレクタリング21にはリングギヤ25が取り付け
られている。シールド本体2に装備された旋回用モータ
23には、リングギヤ25に噛み合うピニオン24が取
り付けられている。したがって、旋回用モータ23の作
動によりエレクタリング21が旋回させられる。
The elector ring 21 is guided by a guide roller 22 disposed along the inner periphery of the shield main body 2, and a ring gear 25 is attached to the elector ring 21. A pinion 24 that meshes with a ring gear 25 is attached to a turning motor 23 provided in the shield body 2. Therefore, the operation of the turning motor 23 causes the electoring ring 21 to turn.

【0009】エレクタアーム26は、エレクタリング2
1上の旋回中心に対する片側位置にシールド本体2の後
方に向けて突出して設けられている。また、カウンタウ
エイト27は、エレクタリング21の回転バランスをと
るようにエレクタリング21に取り付けられている。
The erector arm 26 includes the erector ring 2
At a position on one side of the upper turning center 1, it is provided to protrude rearward of the shield body 2. The counterweight 27 is attached to the erector ring 21 so as to balance the rotation of the erector ring 21.

【0010】エレクタアーム26には、押付ビーム28
に取り付けられた前後2本のガイドロッド29が摺動可
能に貫通しており、押付ビーム28は、この2本のガイ
ドロッド29により案内され、かつ回り止めされてい
る。押付ビーム28は、箱形構造体で、エレクタリング
21の円周の一部に沿うようにガイドロッド29に対し
斜めに配置されている。
The erector arm 26 has a pressing beam 28
Are slidably penetrated, and the pressing beam 28 is guided by the two guide rods 29 and is prevented from rotating. The pressing beam 28 is a box-shaped structure, and is arranged obliquely with respect to the guide rod 29 so as to follow a part of the circumference of the erector ring 21.

【0011】押付ジャッキ30のシリンダ側はエレクタ
アーム26に取り付けられ、ロッド側は押付ビーム28
に取り付けられており、この押付ジャッキ30により押
付ビーム28はエレクタリング21の円周に対しほぼ接
線方向に摺動させられる。
The cylinder side of the pressing jack 30 is attached to the elector arm 26, and the rod side is a pressing beam 28.
The pressing jack 30 causes the pressing beam 28 to slide substantially tangentially with respect to the circumference of the erector ring 21.

【0012】揺動アーム31は、押付ビーム28の先端
に揺動ピン32を介して揺動可能に取り付けられてい
る。押付ビーム28には前後2本の姿勢制御ジャッキ3
3が装備されている。各姿勢制御ジャッキ33のシリン
ダ側は押付ビーム28のブラケット28aに、ロッド側
は揺動アーム31のブラケット31aにそれぞれ取り付
けられている。
The swing arm 31 is swingably attached to the tip of the pressing beam 28 via a swing pin 32. The pressing beam 28 includes two front and rear attitude control jacks 3.
3 are equipped. The cylinder side of each attitude control jack 33 is attached to the bracket 28 a of the pressing beam 28, and the rod side is attached to the bracket 31 a of the swing arm 31.

【0013】したがって、揺動アーム31は、前記姿勢
制御ジャッキ33により揺動ピン32を中心にして揺動
させられ、エレクタリング21の軸線方向に直角な平面
内で押付ビーム28に対する揺動アーム31の傾きを広
い範囲で変えられるようになっている。
Accordingly, the swing arm 31 is swung about the swing pin 32 by the attitude control jack 33, and swings with respect to the pressing beam 28 in a plane perpendicular to the axial direction of the erector ring 21. Can be changed over a wide range.

【0014】スライダ34は、図1、図2および図4に
示すように、揺動アーム31に設けられたスライダガイ
ド35により案内され、揺動アーム31に装備された前
後摺動ジャッキ36によりエレクタリング21の軸線方
向に摺動させられる。
The slider 34 is guided by a slider guide 35 provided on the swing arm 31, as shown in FIGS. The ring 21 is slid in the axial direction.

【0015】スライダ34に装備された振れ止めジャッ
キ37は、ロッド側をスライダ34ブラケット34aに
取り付けられ、スライダ34の円筒形ガイド部34bに
より案内されるシリンダ側の端部にピン穴38aを有す
るセグメント把持部38が設けられている。また、スラ
イダ34には、セグメント把持部38を囲む4箇所にセ
グメント振れ止め具34cがセグメント側に突出して設
けられている。
The steady rest jack 37 mounted on the slider 34 has a segment in which the rod side is attached to the slider 34 bracket 34a and which has a pin hole 38a at the cylinder end guided by the cylindrical guide portion 34b of the slider 34. A grip 38 is provided. In addition, the slider 34 is provided with segment wobble stoppers 34c protruding toward the segment side at four locations surrounding the segment grip portion 38.

【0016】スライダ34にセグメントを把持させる際
には、セグメントの種類およびその置かれた高さに応じ
て押付ジャッキ30および姿勢制御ジャッキ33を動作
させ、揺動アーム31の高さと傾きを調節するととも
に、前後摺動ジャッキ36によりエレクタリング21の
軸線方向の位置合わせをする。
When the slider 34 grips the segment, the pressing jack 30 and the attitude control jack 33 are operated according to the type of the segment and the height at which the segment is placed, and the height and inclination of the swing arm 31 are adjusted. At the same time, the position of the elector ring 21 in the axial direction is adjusted by the front-rear sliding jack 36.

【0017】図1は、一例として下部キーセグメント1
cを把持し吊り上げた状態を示している。セグメントに
取り付けた吊り金具のピン穴とセグメント把持部38の
ピン穴38aに吊りピン39を挿入した後、振れ止めジ
ャッキ37を縮めてセグメント把持部38を引き込むこ
とにより、把持したセグメントをスライダ34の4ヵ所
の振れ止め具34cに密着させてスライダ34に固定す
る。それから、把持したセグメントを旋回用モータ2
3、押付ジャッキ30、姿勢制御ジャッキ33および前
後摺動ジャッキ36により所定の組立位置に搬送し組付
けを行う。
FIG. 1 shows a lower key segment 1 as an example.
3 shows a state in which c is held and lifted. After the hanging pin 39 is inserted into the pin hole of the hanging metal fitting attached to the segment and the pin hole 38a of the segment gripping portion 38, the steady rest jack 37 is contracted, and the segment gripping portion 38 is pulled in. The slider 34 is fixed to the slider 34 in close contact with the four steady rests 34c. Then, the grasped segment is moved to the turning motor 2.
3. The pressing jack 30, the attitude control jack 33, and the front-rear sliding jack 36 transport and assemble to a predetermined assembly position.

【0018】図5ないし図15は、セグメントリングの
1リング分の組立工程を示す工程図である。図5に示す
ように、シールド本体2の右側の底面に下部キーセグメ
ント1cが供給されると、右側のエレクタ20Aが動作
して、エレクタリング21を所定の角度回転させた後、
押付ジャッキ30により、左側のエレクタ20Bの状態
から押付ビーム28をエレクタリング21の接線方向に
移動させるとともに、姿勢制御ジャッキ33により、揺
動アーム31を揺動させ、スライダ21を所要の方向に
向かせ、スライダ34を下部キーセグメント1cに近接
させる。
FIGS. 5 to 15 are process diagrams showing an assembling process for one segment ring. As shown in FIG. 5, when the lower key segment 1c is supplied to the right bottom surface of the shield main body 2, the right erector 20A operates to rotate the erector ring 21 by a predetermined angle.
The pressing jack 30 moves the pressing beam 28 in the tangential direction of the erector ring 21 from the state of the left erector 20B, and the attitude control jack 33 swings the swing arm 31 to move the slider 21 in the required direction. The slider 34 is moved closer to the lower key segment 1c.

【0019】この状態で、セグメント把持部と吊り金具
をピンで結合し、振れ止めジャッキを縮めて、下部キー
セグメント1cをスライダ34に密着させ把持する。
In this state, the segment holding portion and the hanging bracket are connected by a pin, the steady rest jack is contracted, and the lower key segment 1c is brought into close contact with the slider 34 and held.

【0020】図6に示すように、押付ジャッキ30を縮
めて押付ビーム28を引上げ、下部キーセグメント1c
を吊り上げる。
As shown in FIG. 6, the pressing jack 30 is contracted to raise the pressing beam 28, and the lower key segment 1c
Hoist.

【0021】図7に示すように、エレクタリング21を
回転させ、下部キーセグメント1cをその組付け位置へ
搬送するとともに、押付ジャッキ30を伸ばし、姿勢制
御ジャッキ33を縮め、必要に応じて前後摺動ジャッキ
36により下部キーセグメント1cを組付け位置へ位置
決めし、既設のセグメントリングにボルトなどの締結手
段によって固定して組付ける。
As shown in FIG. 7, the electrer ring 21 is rotated to convey the lower key segment 1c to its assembling position, the pressing jack 30 is extended, the attitude control jack 33 is contracted, and if necessary, The lower key segment 1c is positioned at the mounting position by the moving jack 36, and is fixed to the existing segment ring by fastening means such as bolts.

【0022】この状態で、振れ止めジャッキを伸ばし
て、下部キーセグメント1cとスライダ34の密着を解
除し、セグメント把持部と吊り金具を結合しているピン
を抜取り下部キーセグメント1cを開放する。
In this state, the steady rest jack is extended, the close contact between the lower key segment 1c and the slider 34 is released, the pin connecting the segment holding portion and the hanging metal is removed, and the lower key segment 1c is opened.

【0023】図8に示すように、下部キーセグメント1
cがその組付け位置に位置決めされると、シールド本体
2の左右の底面に標準セグメント1aが供給される。す
ると、左右のエレクタ20A、20Bが同時に動作し
て、エレクタリング21を回転させた後、押付ジャッキ
30により、押付ビーム28をエレクタリング21の接
線方向に移動させ、スライダ34を標準セグメント1a
に近接させる。
As shown in FIG. 8, the lower key segment 1
When c is positioned at the assembling position, the standard segments 1a are supplied to the left and right bottom surfaces of the shield body 2. Then, the left and right erectors 20A, 20B operate simultaneously to rotate the erector ring 21, and then the pressing jack 30 moves the pressing beam 28 in the tangential direction of the erector ring 21 to move the slider 34 to the standard segment 1a.
Close to.

【0024】この状態で、セグメント把持部と吊り金具
をピンで結合し、振れ止めジャッキを縮めて、標準セグ
メント1aをスライダ34に密着させ把持する。
In this state, the segment holding portion and the hanging bracket are connected with a pin, the steady rest jack is contracted, and the standard segment 1a is brought into close contact with the slider 34 and held.

【0025】図9に示すように、押付ジャッキ30を縮
めて、標準セグメント1aをテールクリアランス分だけ
吊り上げる。そして、必要に応じて姿勢制御ジャッキ3
3、前後摺動ジャッキ36により、標準セグメント1a
の姿勢と位置を修正して、標準セグメント1aの下部キ
ーセグメント1cおよび既設のセグメントリングとの接
触面をボルトなどの締結手段によって固定して、標準セ
グメント1aを組付ける。
As shown in FIG. 9, the pressing jack 30 is contracted, and the standard segment 1a is lifted by the amount of the tail clearance. Then, if necessary, the attitude control jack 3
3. Standard segment 1a by front and rear sliding jack 36
Is corrected, and the contact surface between the lower key segment 1c of the standard segment 1a and the existing segment ring is fixed by fastening means such as bolts, and the standard segment 1a is assembled.

【0026】この状態で、振れ止めジャッキを伸ばし
て、下部キーセグメント1cとスライダ34の密着を解
除し、セグメント把持部と吊り金具を結合しているピン
を抜取り標準セグメント1aを開放する。
In this state, the steady rest jack is extended, the close contact between the lower key segment 1c and the slider 34 is released, the pin connecting the segment holding portion and the hanging metal is removed, and the standard segment 1a is opened.

【0027】図10に示すように、2枚目以降の標準セ
グメント1aは、既に組付けられたセグメント上に供給
される。新たに供給された標準セグメント1aは、上記
の標準セグメント1aと同様の動作によって、図11お
よび図12に示すように順次組付ける。
As shown in FIG. 10, the second and subsequent standard segments 1a are supplied on the already assembled segments. The newly supplied standard segments 1a are sequentially assembled as shown in FIGS. 11 and 12 by the same operation as the above-described standard segments 1a.

【0028】図12に示すように、標準セグメント1a
の組付けが終了すると、右側のエレクタ20Aは、最後
に組付けられた標準セグメント1aを支持した状態で待
機する。一方、左側のエレクタ20Bには、既に組付け
られた標準セグメント1a上に上部キーセグメント1b
が供給される。すると、前記下部キーセグメント1cの
場合と同様にして、スライダ34に上部キーセグメント
1bを把持させる。この状態で、押付ジャッキ30を動
作させ上部キーセグメント1bを吊り上げる。
As shown in FIG. 12, the standard segment 1a
Is completed, the right erector 20A stands by while supporting the standard segment 1a assembled last. On the other hand, the left erector 20B has an upper key segment 1b on the already assembled standard segment 1a.
Is supplied. Then, in the same manner as in the case of the lower key segment 1c, the slider 34 grips the upper key segment 1b. In this state, the pressing jack 30 is operated to lift the upper key segment 1b.

【0029】図13に示すように、エレクタリング21
を回転させ、上部キーセグメント1bを組付け位置へ搬
送する。そして、必要に応じて押付ジャッキ30、姿勢
制御ジャッキ33、前後摺動ジャッキ36により、上部
キーセグメント1bの姿勢と位置を修正して、最後に組
付けられた左右の標準セグメント1aの間に上部キーセ
グメント1bを装着する。
As shown in FIG.
Is rotated to transport the upper key segment 1b to the assembling position. Then, the posture and position of the upper key segment 1b are corrected by the pressing jack 30, the posture control jack 33, and the front-rear sliding jack 36 as necessary, so that the upper key segment 1b is located between the left and right standard segments 1a. The key segment 1b is mounted.

【0030】この状態で、上部キーセグメント1bを既
設のセグメントリングと左右の標準セグメント1aに固
定して組付ける。上部キーセグメント1bの組付けが終
了すると、右側のエレクタ20Aは、最後に組付けられ
た標準セグメント1aの支持を開放する。一方、左側の
エレクタ20Bは、上部キーセグメント1bを支持した
状態で待機する。
In this state, the upper key segment 1b is fixedly attached to the existing segment ring and the left and right standard segments 1a. When the assembly of the upper key segment 1b is completed, the right erector 20A releases the support of the standard segment 1a assembled last. On the other hand, the left erector 20B stands by while supporting the upper key segment 1b.

【0031】図14に示すように、右側のエレクタ20
Aには、既に組付けられた標準セグメント1a上に支柱
セグメント1dが供給される。このとき、押付ジャッキ
30と、複数のセグメント振れ止め具34cにより形成
されるセグメント当接面とが直角になるように、姿勢制
御ジャッキ33により揺動アーム31の姿勢を制御す
る。
[0031] As shown in FIG.
A is supplied with the column segments 1d on the already assembled standard segments 1a. At this time, the attitude of the swing arm 31 is controlled by the attitude control jack 33 so that the pressing jack 30 and the segment contact surface formed by the plurality of segment steadying members 34c are at right angles.

【0032】そして、支柱セグメント1dのセグメント
吊り金具41aとスライダ34のセグメント把持部38
が結合させ、振れ止めジャッキ37を収縮させると、セ
グメント把持部38が引き込まれる。
The segment hanging member 41a of the column segment 1d and the segment holding portion 38 of the slider 34
Are combined and the steady rest jack 37 is contracted, the segment grip 38 is retracted.

【0033】そして、支柱セグメント1dが吊り上げら
れ、セグメント振れ止め具34cに当接すると、支柱セ
グメント1dは、押付ジャッキ30と直角な状態で保持
される。このようにして保持された支柱セグメント1d
は、セグメント振れ止め具34cを介して固定物である
ブラケット34aに固定されるため、その姿勢が安定
し、振れることがない。
When the column segment 1d is lifted up and comes into contact with the segment swing stopper 34c, the column segment 1d is held at a right angle to the pressing jack 30. Strut segment 1d thus held
Is fixed to the bracket 34a, which is a fixed object, via the segment steadying member 34c, so that its posture is stable and does not swing.

【0034】その後、図15に示すように、エレクタリ
ング21を回転させ、支柱セグメント1dを組付け位置
へ搬送する。このとき、支柱セグメント1dは押付ジャ
ッキ30と直角な状態を保っているので、押付ジャッキ
30を水平にすれば、支柱セグメント1dは鉛直状態を
保つことになる。この状態で、押付ジャッキ30を伸ば
して支柱セグメント1dを下部キーセグメント1cと上
部キーセグメント1bの間に装着する。
Thereafter, as shown in FIG. 15, the erector ring 21 is rotated, and the column segment 1d is transported to the assembling position. At this time, since the strut segment 1d maintains a state perpendicular to the pressing jack 30, if the pressing jack 30 is made horizontal, the strut segment 1d will maintain a vertical state. In this state, the pressing jack 30 is extended, and the column segment 1d is mounted between the lower key segment 1c and the upper key segment 1b.

【0035】以上により図2に示すセグメントリング1
の組立を完了する。
As described above, the segment ring 1 shown in FIG.
Is completed.

【0036】上述のように本実施の形態に示すエレクタ
装置を用いたセグメント組立工法においては、セグメン
ト1a〜1dを把持するセグメント把持部38とこのセ
グメント把持部38の周囲に配置された複数のセグメン
ト振れ止め具34cからなりセグメントを着脱可能に保
持するセグメント保持装置により支柱セグメント1dを
保持しているので、安定した状態で支柱セグメント1d
を保持することができる。
As described above, in the segment assembling method using the erector device shown in the present embodiment, the segment holding portion 38 for holding the segments 1a to 1d and the plurality of segments arranged around the segment holding portion 38 Since the strut segment 1d is held by the segment holding device that is composed of the steady rest 34c and detachably holds the segment, the strut segment 1d is stably held.
Can be held.

【0037】よって、支柱セグメント1dを把持する前
に、セグメント振れ止め具34cの支柱セグメント1d
の当接面と押付ジャッキ30との角度を直角になるよう
に設定することができる。すなわち、この直角な状態で
支柱セグメント1dを把持すれば、押付ジャッキ30と
支柱セグメント1dは直角に保持されることになる。
Therefore, before gripping the column segment 1d, the column segment 1d
Can be set so that the angle between the contact surface and the pressing jack 30 is a right angle. That is, if the column segment 1d is gripped in the right-angled state, the pressing jack 30 and the column segment 1d are held at a right angle.

【0038】その結果、支柱セグメント1d組付時の煩
雑な位置決め制御を行うことなく、押付ジャッキ30を
伸長させるだけで支柱セグメント1dの組立が行えるの
で、容易迅速にセグメントの組立を行うことができる。
As a result, the column segment 1d can be assembled simply by extending the pressing jack 30 without performing complicated positioning control when assembling the column segment 1d, so that the segment can be assembled quickly and easily. .

【0039】図16および 図17は、組付時に支柱セ
グメント1dの中央部を押したい場合に用いるセグメン
ト吊り具の形態を示したものである。すなわち、通常、
搬送などを考慮して支柱セグメント1dの長手方向ほぼ
中央部に設けられるピン穴の位置を、エレクタ装置のセ
グメント把持部38が把持しやすい位置にずらしながら
も、支柱セグメント1dに掛かる力をこのセグメント吊
り具41を介して支柱セグメント1dの中央部に掛かる
ようにしたものである。
FIGS. 16 and 17 show a form of a segment hanging tool used when it is desired to push the center of the column segment 1d during assembly. That is,
In consideration of transportation, the position of the pin hole provided substantially at the center in the longitudinal direction of the column segment 1d is shifted to a position where the segment grip portion 38 of the elector device can be easily gripped. It is designed to be hung on the central portion of the pillar segment 1d via the hanging tool 41.

【0040】セグメント吊り具41の一端をボルト42
で支柱セグメント1dの中央部に取付け、他端に設けた
ピン穴41aに図1に示す吊りピン39を通して支柱セ
グメント1dを把持するようにすればよい。
One end of the segment hanging member 41 is connected to a bolt 42
Then, the support segment 1d may be attached to the center of the support segment 1d, and the support segment 1d may be gripped by passing the suspension pin 39 shown in FIG. 1 into a pin hole 41a provided at the other end.

【0041】このセグメント吊り具41を用いれば、支
柱セグメント1dと押付ジャッキ30が直角な状態を保
つように支柱セグメント1dを把持できるような位置に
ピン穴41aを調整することが可能になる。なお、この
セグメント吊り具41を用いて支柱セグメント1dを把
持した場合でも、図17に示すように、セグメント吊り
具41のピン穴41aの周囲を振れ止め具34cにより
押さえつけるので、支柱セグメント1dを安定した状態
で把持することができる。
By using the segment hanging tool 41, it is possible to adjust the pin hole 41a to a position where the support segment 1d can be gripped so that the support segment 1d and the pressing jack 30 are maintained at a right angle. Even when the support segment 1d is gripped by using the segment suspender 41, the periphery of the pin hole 41a of the segment suspender 41 is pressed by the steady rest 34c as shown in FIG. It can be gripped in a state where it is held.

【0042】なお、上述の説明においては、多連シール
ドトンネルの支柱セグメントの組立工法について説明し
たが、本発明は、平板状のセグメントを組み付ける場合
にも適用可能である。
In the above description, the method of assembling the column segments of the multiple shield tunnel has been described. However, the present invention is also applicable to a case where a flat segment is assembled.

【0043】[0043]

【発明の効果】以上述べたように、本発明によれば、平
板状のセグメントを押付ジャッキと直角に保持した状態
で組立位置まで旋回搬送することができるため、押付ジ
ャッキの伸長動作により平板状のセグメントをその組立
位置に組み立てることができる。
As described above, according to the present invention, a flat segment can be turned and conveyed to the assembling position while being held at a right angle to the pressing jack. Can be assembled in that assembly position.

【0044】その結果、平板状のセグメントの組立作業
が容易、かつ迅速になり、トンネル覆工の作業効率を向
上させることができる。
As a result, the work of assembling the plate-like segments becomes easy and quick, and the work efficiency of tunnel lining can be improved.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明によるエレクタ装置のシールド本体テー
ル側から見た正面図。
FIG. 1 is a front view of an elector device according to the present invention as viewed from a shield main body tail side.

【図2】図1のA−A断面図。FIG. 2 is a sectional view taken along line AA of FIG.

【図3】図2のB矢視図。FIG. 3 is a view taken in the direction of arrow B in FIG. 2;

【図4】図2のC−C断面図。FIG. 4 is a sectional view taken along line CC of FIG. 2;

【図5】セグメント組立工程を示す工程図。FIG. 5 is a process chart showing a segment assembling process.

【図6】セグメント組立工程を示す工程図。FIG. 6 is a process diagram showing a segment assembling process.

【図7】セグメント組立工程を示す工程図。FIG. 7 is a process diagram showing a segment assembling process.

【図8】セグメント組立工程を示す工程図。FIG. 8 is a process diagram showing a segment assembling process.

【図9】セグメント組立工程を示す工程図。FIG. 9 is a process diagram showing a segment assembling process.

【図10】セグメント組立工程を示す工程図。FIG. 10 is a process diagram showing a segment assembling process.

【図11】セグメント組立工程を示す工程図。FIG. 11 is a process diagram showing a segment assembling process.

【図12】セグメント組立工程を示す工程図。FIG. 12 is a process diagram showing a segment assembling process.

【図13】セグメント組立工程を示す工程図。FIG. 13 is a process diagram showing a segment assembling process.

【図14】セグメント組立工程を示す工程図。FIG. 14 is a process chart showing a segment assembling process.

【図15】セグメント組立工程を示す工程図。FIG. 15 is a process chart showing a segment assembling process.

【図16】図4におけるセグメント吊り具の別の形態を
示す正面図。
FIG. 16 is a front view showing another embodiment of the segment hanger in FIG. 4;

【図17】図16の平面図。FIG. 17 is a plan view of FIG. 16;

【図18】FIG. 従来のエレクタ装置のシールド掘進機のテーConventional shield machine
ル側から見た正面図。FIG.

【図19】FIG. 図18のD−D断面図。The DD sectional view of FIG.

【図20】FIG. 2連シールド用セグメントの組立て状態を示Shows the assembly status of the double shield segment
す正面図。FIG.

【符号の説明】[Explanation of symbols]

1b 上部キーセグメント 1c 下部キーセグメント 1d 支柱セグメント(平板状のセグメント) 2 シールド本体 20A、20B エレクタリング 21 エレクタリング 26 エレクタアーム 28 押付ビーム 30 押付ジャッキ 31 揺動アーム 33 姿勢制御ジャッキ 34 スライダ 34c セグメント振れ止め具 37 振れ止めジャッキ 38 セグメント把持部 41 セグメント吊り具 1b Upper key segment 1c Lower key segment 1d Strut segment (flat segment) 2 Shield body 20A, 20B Electoring 21 Electoring 26 Elector arm 28 Pressing beam 30 Pressing jack 31 Swing arm 33 Attitude control jack 34 Slider 34c Segment swing Stopper 37 Steady-stop jack 38 Segment gripper 41 Segment suspender

───────────────────────────────────────────────────── フロントページの続き (72)発明者 森 泰雄 茨城県土浦市神立町650番地 日立建機 株式会社 土浦工場 内 (72)発明者 高橋 均 茨城県土浦市神立町650番地 日立建機 株式会社 土浦工場 内 (56)参考文献 実開 平2−116599(JP,U) (58)調査した分野(Int.Cl.7,DB名) E21D 11/40 ──────────────────────────────────────────────────の Continuing on the front page (72) Inventor Yasuo Mori 650, Kandamachi, Tsuchiura-shi, Ibaraki Hitachi Construction Machinery Co., Ltd. Inside the Tsuchiura Plant (72) Inventor Hitoshi Takahashi 650, Kanda-machi, Tsuchiura-shi, Ibaraki Hitachi Construction Machinery Tsuchiura Works (56) References Hikaru 2-116599 (JP, U) (58) Field surveyed (Int. Cl. 7 , DB name) E21D 11/40

Claims (3)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】シールド掘進機内に搬入されたトンネル覆
工用のセグメントを、シールド本体内に回転可能に支持
されたエレクタリングと、このエレクタリングに支持さ
れたエレクタアームと、このエレクタアーム内を貫通す
るガイドロッドと、このガイドロッドの一端側に設けら
れた押付ビームと、一方側が前記エレクタアームに,他
方側が前記押付ビームに取り付けられ前記押付ビームを
前記エレクタリングのほぼ接線方向に移動可能とする
ジャッキと、前記押付ビームに前記エレクタリングの
軸線方向に直角な平面内で揺動可能に支持された揺動ア
ームと、この揺動アームに設けられた振れ止めジャッキ
とこの振れ止めジャッキに設けられセグメントを把持す
るセグメント把持部とこのセグメント把持部の周囲に配
置された複数のセグメント振れ止め具からなりセグメン
トを着脱可能に保持するセグメント保持装置とを備えた
エレクタ装置を用いて組み立てるセグメント組立工法に
おいて、平板状のセグメントに設けられたセグメント吊
り具と前記セグメント把持部とを連結し、前記振れ止め
ジャッキを縮めて前記セグメント把持部を引き込み、前
記平板状のセグメントを前記セグメント振れ止め具に当
接させて、前記平板状のセグメントを前記押付ジャッキ
と直角になるように保持した後、前記エレクタリングを
旋回させて前記平板状のセグメントの姿勢を鉛直にし、
その後、前記押付ジャッキの伸長により前記平板状のセ
グメントを予め設置された下部キーセグメントと上部キ
ーセグメントとの間に装着することを特徴とするセグメ
ント組立工法。
An erector ring rotatably supported in a shield body, an erector arm supported by the erector ring, and an inner wall of the erector arm. Penetrate
Guide rod and one end of the guide rod
A pressing beam, one side to said erector arm, other
A pressing jack mounted on one side to the pressing beam and capable of moving the pressing beam substantially in a tangential direction of the electoring ring; and a right angle to the pressing beam at right angles to an axial direction of the elector ring. A swing arm supported to be swingable in a plane, a steady rest jack provided on the swing arm, a segment grip portion provided on the steady swing jack for gripping a segment, and arranged around the segment grip portion; In a segment assembling method of assembling using an erector device including a plurality of segment steady rests and a segment holding device for detachably holding a segment, a segment hanging tool provided on a flat segment and the segment gripper are provided. Part, and retracts the steady rest jack, pulls in the segment gripping part, and After the segment is brought into contact with the segment steady rest and the flat plate segment is held at a right angle to the pressing jack, the erector ring is turned to make the posture of the flat plate segment vertical,
Thereafter, the plate-like segment is attached between a lower key segment and an upper key segment, which are provided in advance, by extending the pressing jack.
【請求項2】シールド掘進機内に搬入されたトンネル覆
工用のセグメントを、シールド本体内に回転可能に支持
されたエレクタリングと、このエレクタリングに支持さ
れたエレクタアームと、このエレクタアーム内を貫通す
るガイドロッドと、このガイドロッドの一端側に設けら
れた押付ビームと、一方側が前記エレクタアームに,他
方側が前記押付ビームに取り付けられ前記押付ビームを
前記エレクタリングのほぼ接線方向に移動可能とする
ジャッキと、前記押付ビームに前記エレクタリングの
軸線方向に直角な平面内で揺動可能に支持された揺動ア
ームと、この揺動アームに設けられた振れ止めジャッキ
とこの振れ止めジャッキに設けられセグメントを把持す
るセグメント把持部とこのセグメント把持部の周囲に配
置された複数のセグメント振れ止め具からなりセグメン
トを着脱可能に保持するセグメント保持装置と、前記揺
動アームの傾きを制御する姿勢制御ジャッキとを備えた
エレクタ装置を用いて組み立てるセグメント組立工法に
おいて、前記揺動アームに設けられた複数のセグメント
振れ止め具のセグメント当接面が前記押付ジャッキとほ
ぼ直角になるように前記姿勢制御ジャッキにより揺動ア
ームの角度を制御した後、平板状のセグメントに設けら
れたセグメント吊り具と前記セグメント把持部とを連結
し、前記振れ止めジャッキを縮めて前記セグメントを引
き込み、前記平板状のセグメントを前記セグメント振れ
止め具に当接させて、前記平板状のセグメントを押付ジ
ャッキと直角になるように保持した後、前記エレクタリ
ングを旋回させて前記平板状のセグメントの姿勢を鉛直
にし、その後前記押付ジャッキの伸長により前記平板状
のセグメントを予め設置された下部キーセグメントと上
部キーセグメントとの間に装着することを特徴とするセ
グメント組立工法。
2. A segment for tunnel lining carried into a shield machine, an erector ring rotatably supported in a shield body, an erector arm supported by the erector ring, and an inner portion of the erector arm. Penetrate
Guide rod and one end of the guide rod
A pressing beam, one side to said erector arm, other
A pressing jack mounted on one side to the pressing beam and capable of moving the pressing beam substantially in a tangential direction of the electoring ring; and a right angle to the pressing beam at right angles to an axial direction of the elector ring. A swing arm supported to be swingable in a plane, a steady rest jack provided on the swing arm, a segment grip portion provided on the steady swing jack for gripping a segment, and arranged around the segment grip portion; A segment holding device that is composed of a plurality of segment steady rests and holds the segment detachably, and a segment assembling method for assembling using an erector device including an attitude control jack that controls the tilt of the swing arm. The segment contact surfaces of the plurality of segment steady rests provided on the swing arm are substantially perpendicular to the pressing jack. After controlling the angle of the swing arm by the attitude control jack as described above, the segment hanging tool provided on the plate-shaped segment is connected to the segment gripping portion, the steady rest jack is contracted, and the segment is retracted. After the flat plate segment is brought into contact with the segment steady rest, the flat plate segment is held at a right angle to the pressing jack, and then the electoring ring is turned to set the position of the flat plate segment. A vertical segment, and thereafter mounting the flat plate segment between a lower key segment and an upper key segment which are previously set by extending the pressing jack.
【請求項3】請求項1または請求項2記載のセグメント
組立工法において、前記平板状のセグメントに、前記複
数のセグメント振れ止め具のセグメント当接面が前記押
付ジャッキとほぼ直角になるように前記揺動アームの角
度を制御した際の前記セグメント把持部の位置に、前記
セグメント吊り具のピン穴の位置が合うように調整可能
なセグメント吊り具を、前記平板状のセグメントが組立
用セグメントとして既設のセグメント上に供給される前
に装着することを特徴とするセグメント組立工法。
3. The segment assembling method according to claim 1, wherein the segment contact surfaces of the plurality of segment steady rests are substantially perpendicular to the pressing jack on the flat segment. A segment hanger that can be adjusted so that the position of the pin hole of the segment hanger matches the position of the segment gripper when the angle of the swing arm is controlled, and the flat segment is already provided as an assembly segment. A segment assembling method characterized by being mounted before being supplied onto a segment.
JP32988599A 1999-11-19 1999-11-19 Segment assembly method Expired - Fee Related JP3285335B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP32988599A JP3285335B2 (en) 1999-11-19 1999-11-19 Segment assembly method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP32988599A JP3285335B2 (en) 1999-11-19 1999-11-19 Segment assembly method

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
JP08128633A Division JP3075554B2 (en) 1996-05-23 1996-05-23 Electa device

Publications (2)

Publication Number Publication Date
JP2000120396A JP2000120396A (en) 2000-04-25
JP3285335B2 true JP3285335B2 (en) 2002-05-27

Family

ID=18226350

Family Applications (1)

Application Number Title Priority Date Filing Date
JP32988599A Expired - Fee Related JP3285335B2 (en) 1999-11-19 1999-11-19 Segment assembly method

Country Status (1)

Country Link
JP (1) JP3285335B2 (en)

Also Published As

Publication number Publication date
JP2000120396A (en) 2000-04-25

Similar Documents

Publication Publication Date Title
JPS5938492A (en) Movable drilling rig
JP3285335B2 (en) Segment assembly method
US4629362A (en) Shield tunneling machine
JP3075554B2 (en) Electa device
CN215057203U (en) Drilling equipment
JP2850302B2 (en) Segment erector device
JP2588458Y2 (en) Segment installation equipment
JP3215093B2 (en) Multiple shield excavator
JP2516708Y2 (en) Erector device for tunnel machine
JPH04365790A (en) A pipe suspension device connected to a drilling machine
JPH0430094A (en) Starting device and starting method of shield excavator for inclined shaft
JPH04149399A (en) Segment feeder
JP3027885B2 (en) Segment centering device
JPH11159299A (en) Electa device of shield machine
JPH0455110Y2 (en)
JPH0523673Y2 (en)
JPH0365479B2 (en)
JP3281627B2 (en) Tunnel support body assembly device
JPH05263581A (en) Double tube rod handling device
JPS6213699A (en) Segment automatic asembling device
JP2001082090A (en) Tunnel excavator
JP3281626B2 (en) Tunnel support piece assembly equipment
JP3595523B2 (en) Electa device
JP4019517B2 (en) Elector hoist beam
JPH0481040B2 (en)

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees