JP3324816B2 - Standing method of handrail support - Google Patents
Standing method of handrail supportInfo
- Publication number
- JP3324816B2 JP3324816B2 JP2374893A JP2374893A JP3324816B2 JP 3324816 B2 JP3324816 B2 JP 3324816B2 JP 2374893 A JP2374893 A JP 2374893A JP 2374893 A JP2374893 A JP 2374893A JP 3324816 B2 JP3324816 B2 JP 3324816B2
- Authority
- JP
- Japan
- Prior art keywords
- screw
- cap
- holder
- support
- base plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Steps, Ramps, And Handrails (AREA)
- Fencing (AREA)
Description
【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION
【0001】[0001]
【産業上の利用分野】この発明は、パラペットの上に手
摺り支柱を立設する方法に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for erecting a handrail support on a parapet.
【0002】[0002]
【従来の技術】建物の屋上やベランダ等には、コンクリ
ートの防壁としてのパラペットが構築され、その上にキ
ャップとして金属製の笠木を被着するとともに、その上
に支柱を立設して手摺りが設けられる。手摺りは、一般
的に支柱の上端に手摺り枠を架設し、下端部に横桟を架
設し、手摺り枠と横桟との間に縦桟を列設した組立て構
造となっている。2. Description of the Related Art Parapets are constructed as concrete barriers on the rooftops and verandas of buildings. Metal caps are attached as caps on the parapets. Is provided. The handrail generally has an assembling structure in which a handrail frame is provided at an upper end of a support, a horizontal rail is provided at a lower end, and a vertical rail is arranged between the handrail frame and the horizontal rail.
【0003】従来、この手摺り支柱を立設するには、笠
木の下においてパラペットにアンカープレートがアンカ
ーボルトにより締結して固着されたが、このアンカープ
レートに対して支柱が予めビス止めされる。Conventionally, in order to erect the handrail support, an anchor plate is fastened and fixed to a parapet under an heddle by an anchor bolt, but the support is previously screwed to the anchor plate.
【0004】[0004]
【発明が解決しようとする課題】従来の手摺り支柱の立
設方法によれば、笠木に支柱が貫通した状態となり、支
柱の下端が笠木の下において固定される。そして、作業
手順としては、支柱の下端に予めアンカープレートを取
り付けておくので、パラペツトに対するアンカープレー
トの締結操作の都合から、笠木の被着が不合理に後付け
となる。つまり、支柱の立設後に笠木の被着が行われる
ことになる不都合があった。According to the conventional method of erecting a handrail support, the support penetrates through the cap and the lower end of the support is fixed under the support. And, as an operation procedure, since the anchor plate is previously attached to the lower end of the column, the attachment of the stake is irrationally retrofitted because of the operation of fastening the anchor plate to the parapet. In other words, there is a disadvantage that the shed is attached after the support is erected.
【0005】この点に関しては、支柱に予め笠木が挿通
されていると、その下におけるアンカープレートの締結
が非常に困難となるため、笠木の挿通もなされないまま
支柱が立設され、支柱の立設後において笠木をそれに挿
通するために、工場において予め手摺りを要領良く組み
立てておくことができなかった。[0005] In this regard, if a cap is inserted through the support in advance, it becomes very difficult to fasten the anchor plate thereunder. Therefore, the support is erected without the support being inserted, and the support is erected. Handrails could not be preliminarily assembled at the factory in order to insert the caps into it after installation.
【0006】この発明は、上記のような実情に鑑みて、
笠木と共に手摺りの組立てがなされていても、支柱の立
設が可能となるために、現場における手摺りの据付け作
業が非常に能率的となる手摺り支柱の立設方法を提供す
ることを目的とした。The present invention has been made in view of the above-described circumstances,
Even if the handrails are assembled together with the Kasagi, it is possible to provide a method for erecting the handrail supports, which makes it very efficient to install the handrails on site because the supports can be erected. And
【0007】[0007]
【課題を解決するための手段】上記の目的を達成するた
めに、この発明は、パラペットにアンカーボルトにより
固着するアンカープレートと、アルミ押出形材からなる
笠木ホルダーとを予め加締めにより一体化しておき、手
摺り支柱の下端のベースプレートを笠木の上から笠木ホ
ルダーにビス止めし、そのビス止めにつき、ベースプレ
ートに明けてある取付孔から笠木には取付ビスの通孔
を、笠木ホルダーには螺入孔をそれぞれ穿設する手摺り
支柱の立設方法を構成した。SUMMARY OF THE INVENTION In order to achieve the above object, the present invention provides an anchor plate fixed to a parapet with an anchor bolt and a cap holder made of an extruded aluminum member, which are previously integrated by caulking. The base plate at the lower end of the handrail support is screwed into the stake holder from the top of the stake, and the screw is screwed into the sash holder through the attachment hole drilled in the base plate. A method of erecting a handrail support for forming a hole is configured.
【0008】支柱の下端のベースプレートに笠木を予め
ねじにより仮止めしておき、笠木ホルダーには、ねじの
露出部分が納まるねじ抜孔を横方向の長孔に形成してお
けば、上記した手摺りと笠木とを予めメーカー(工場)
側でセットしたいわゆる工場ユニットタイプの出荷が可
能となり、設置現場においてそのユニットタイプを笠木
ホルダー及びアンカープレートを介してパラペットに容
易に取付けることができる。また、笠木と支柱との相互
の位置調整も可能となる。The handrail is temporarily fixed to the base plate at the lower end of the column with a screw in advance, and a screw hole for accommodating an exposed portion of the screw is formed in the elongate hole in the lateral direction. And Kasagi in advance manufacturer (factory)
The so-called factory unit type set on the side can be shipped, and the unit type can be easily attached to the parapet at the installation site via the cap holder and the anchor plate. In addition, mutual adjustment of the position of the cap and the strut becomes possible.
【0009】[0009]
【作用】笠木ホルダーが加締めによりアンカープレート
と一体化されているために、パラペツトに対して非常に
強力な固定状態が得られる。そして、この笠木ホルダー
がねじのタップ孔の穿設に適するアルミ製であるため
に、支柱の下端のベースプレートを笠木の上からその笠
木ホルダーに適切な位置においてビス止めすることがで
きる。[Function] Since the cap holder is integrated with the anchor plate by caulking, a very strong fixing state to the parapet can be obtained. Since the cap holder is made of aluminum suitable for forming a tap hole for a screw, the base plate at the lower end of the support can be screwed to the cap holder at an appropriate position from above the cap.
【0010】ベースプレートが笠木ホルダーにビス止め
されると、同時に笠木もねじ止めされることになり、笠
木を後付けする必要がないために、支柱において予め手
摺りを組み立てておくことができる。When the base plate is screwed to the coping holder, the coping is also screwed at the same time, and it is not necessary to retrofit the coping, so that the handrail can be assembled in advance on the support.
【0011】[0011]
【実施例】次に、この発明の実施例を図面に基づいて説
明する。Next, an embodiment of the present invention will be described with reference to the drawings.
【0012】図面は、一実施例を示したもので、パラペ
ット1の上に手摺り支柱3を立設するにつき、工場にお
いて、支柱3の立設基板となるアンカープレート5およ
び笠木ホルダー7が一体化される。また、笠木9と共に
手摺りPが組み立てられ、組立て状態において現場に持
ち込まれる。The drawings show an embodiment, and when a handrail support 3 is erected on a parapet 1, an anchor plate 5 and a cap holder 7 serving as an erected substrate of the support 3 are integrated in a factory. Be transformed into In addition, the handrail P is assembled together with the kasagi 9 and brought to the site in the assembled state.
【0013】アンカープレート5は、金属板をプレス加
工することにより成形したもので、前後両端部に段上が
りに屈折する結合鍔11,11を形成し、結合鍔11,
11を欠除する複数の切欠部12,12,12を設け、
両側端部には、パラペット1に対してねじ止めする長孔
13,13を設けてある。また、長孔13,13よりも
内側において左右一対のねじ孔15,15を穿設してあ
る。The anchor plate 5 is formed by pressing a metal plate, and is formed with connecting flanges 11, 11 which are bent up and down at both front and rear ends.
A plurality of notches 12, 12, 12 for removing 11;
Elongated holes 13, 13 for screwing to the parapet 1 are provided at both side ends. Further, a pair of left and right screw holes 15 is formed inside the long holes 13.
【0014】笠木ホルダー7は、ほゞチャンネル形のア
ルミ押出形材をアンカープレート5よりも短く切断し加
工したもので、上面が笠木9と密着するために、屋内側
へ傾斜する形状となっている。断面形状においては、前
後両端部にアンカープレート5の結合鍔11,11を挾
持する溝付脚17,17が形成され、その間の中央部に
アンカープレート5の上面に当たる押え脚19が垂設さ
れる。また、前後両端には、笠木9を掛け止める掛止片
21,21が垂設されている。そして、笠木9と密着す
る上面に左右一対のねじ抜孔22,22が笠木9の長手
方向の長孔にして穿設される。The cap holder 7 is formed by cutting and processing a substantially channel-shaped extruded aluminum material shorter than the anchor plate 5, and has a shape inclined to the indoor side because the upper surface is in close contact with the cap board 9. I have. In the cross-sectional shape, grooved legs 17, 17 for holding the coupling flanges 11, 11 of the anchor plate 5 are formed at both front and rear ends, and a holding leg 19, which contacts the upper surface of the anchor plate 5, is vertically provided at a central portion therebetween. . At both front and rear ends, hanging pieces 21 and 21 for hanging the cap 9 are vertically provided. Then, a pair of left and right screw holes 22, 22 is formed in the upper surface in close contact with the skirt 9 as long holes in the longitudinal direction of the skirt 9.
【0015】アンカープレート5と笠木ホルダー7との
結合については、皿ビス23,23を笠木ホルダー7の
上面に貫通してねじ孔15,15に螺入する他、裏面か
ら溝付脚17,17を切欠部12,12,12において
加締め、加締め部13がそれぞれに形成される。これに
より結合鍔11,11と溝付脚17,17との結合が保
持される。As for the connection between the anchor plate 5 and the cap holder 7, the countersunk screws 23, 23 penetrate the upper face of the cap holder 7 and are screwed into the screw holes 15, 15, and the grooved legs 17, 17 from the back face. Is crimped in the notches 12, 12, and 12, and the crimped portions 13 are formed respectively. Thus, the connection between the connecting flanges 11, 11 and the grooved legs 17, 17 is maintained.
【0016】手摺りPは、支柱3の上端に図示しない手
摺り枠を架設し、その手摺り枠と下端の横桟25との間
に縦桟27を列設したものであって、支柱3の下端には
予め笠木9が取り付けられる。The handrail P has a handrail frame (not shown) erected at the upper end of the column 3, and a vertical bar 27 is arranged between the handrail frame and the horizontal bar 25 at the lower end. A cap 9 is attached to the lower end in advance.
【0017】笠木9の取付けについては、図4に示すよ
うに、支柱3の心材29の下端にベースプレート31を
溶接し、パッキン33を間に挾んでベースプレート31
が笠木9にねじ止めされる。そのねじにはボルト35お
よびナット37が用いられ、ナット37が笠木ホルダー
7のねじ抜孔22,22に移動可能に納まるようになっ
ている。笠木9の取付けは、仮止めであって、最終的に
はねじ抜孔22,22による支柱3と笠木9との位置調
整がなされてから、ベースプレート31が笠木ホルダー
7にビス止めされる。As shown in FIG. 4, the base plate 31 is welded to the lower end of the core material 29 of the support 3 and the base plate 31 is sandwiched with the packing 33 therebetween.
Is screwed to the Kasagi 9. Bolts 35 and nuts 37 are used for the screws, and the nuts 37 are movably housed in the screw holes 22 of the cap holder 7. Attachment of the cap 9 is temporary fixing. Finally, after the positions of the support 3 and the cap 9 are adjusted by the screw holes 22, the base plate 31 is screwed to the cap holder 7.
【0018】支柱3は、このように手摺りPと一体状態
において笠木ホルダー7にビス止めされる。その手順と
しては、笠木9に対する支柱3の位置調整の後、ベース
プレート31に明けられている取付孔39,39,・・
から笠木9に取付ビス41の通孔43を明け、笠木ホル
ダー7には螺入孔45が明けられる。なお、手摺りPの
据え付けの後に、支柱3の下端に二つ割りキャップ4
6,46が組み立てられ、それによりベースプレート3
1が体裁良く被覆される。The column 3 is screwed to the cap holder 7 in such a manner as to be integrated with the handrail P. The procedure is as follows: after adjusting the position of the column 3 with respect to the skirt 9, the mounting holes 39, 39,.
Then, the through hole 43 of the mounting screw 41 is drilled in the skirt 9, and the screw hole 45 is drilled in the skirt holder 7. After the handrail P is installed, the split cap 4 is attached to the lower end of the support 3.
6, 46 are assembled so that the base plate 3
1 is nicely coated.
【0019】[0019]
【発明の効果】以上説明したように、この発明によれ
ば、次のような優れた効果がある。As described above, according to the present invention, there are the following excellent effects.
【0020】笠木と共に手摺りを組み立ててから、その
手摺り支柱をパラペットの上に立設することができるた
めに、手摺りの据付けの段取りが非常に良くなり、その
作業能率を大幅に向上させることができる。After the handrail is assembled together with the cap, the handrail support can be erected on the parapet, so that the setup of the handrail is greatly improved and the work efficiency is greatly improved. be able to.
【0021】支柱の下端のベースプレートが笠木ホルダ
ーにビス止めされるが、その笠木ホルダーがアンカープ
レートに加締めにより一体化され、また、ねじのタップ
孔の形成に適したアルミ製であるために、支柱を強力に
支持することができる。The base plate at the lower end of the column is screwed to the sash holder. The sash holder is integrated with the anchor plate by caulking and is made of aluminum suitable for forming screw tap holes. The support can be strongly supported.
【0022】ベースプレートのビス止めにつき、笠木ホ
ルダーとの間に笠木を挾み付けるために、笠木を強力に
取り付けることもできる。In connection with the screwing of the base plate, the cap can be strongly attached so that the cap is sandwiched between the cap and the holder.
【0023】支柱の下端のベースプレートに笠木を予め
ねじにより仮止めしておき、笠木ホルダーには、ねじの
露出部分が納まるねじ抜孔を横方向の長孔に形成してお
けば(請求項2)、上記した手摺りと笠木とを予めメー
カー側でセットしたいわゆる工場ユニットタイプの出荷
が可能となるばかりか、笠木と支柱との相互の位置調整
が可能となるために、さらに、手摺りの据付けが容易と
なる。If a cap is temporarily fixed to the base plate at the lower end of the column with a screw in advance, and a screw hole for accommodating an exposed portion of the screw is formed in the cap holder in a laterally elongated hole (claim 2). In addition to being able to ship what is called a factory unit type in which the above-mentioned handrails and kasagi are set in advance by the manufacturer, it is possible to adjust the mutual position between the kasagi and the support, so that the handrails must be installed. It will be easier.
【図1】要部を示す分解斜視図である。FIG. 1 is an exploded perspective view showing a main part.
【図2】支柱の立設状態を示す同部の断面図である。FIG. 2 is a cross-sectional view of the same portion showing a standing state of a column.
【図3】アンカープレートと笠木ホルダーとの結合状態
を示す裏面から見た断面図である。FIG. 3 is a cross-sectional view as viewed from the back surface, showing a coupling state of the anchor plate and the cap holder.
【図4】手摺り支柱に対する笠木の仮止め状態を示す分
解斜視図である。FIG. 4 is an exploded perspective view showing a temporary holding state of the casket on the handrail support.
P 手摺り 1 パラペット 3 支柱 5 アンカープレート 7 笠木ホルダー 9 笠木 13 加締部 15 アンカーボルト 22 ねじ抜孔 31 ベースプレート 35および37 ねじとしてのボルトおよびナット 39 取付孔 41 取付ビス 43 通孔 45 螺入孔 P Handrail 1 Parapet 3 Prop 5 Anchor plate 7 Kasagi holder 9 Kasagi 13 Caulking part 15 Anchor bolt 22 Screw hole 31 Base plate 35 and 37 Bolts and nuts as screws 39 Mounting hole 41 Mounting screw 43 Through hole 45 Screw hole
Claims (2)
するアンカープレートと、アルミ押出形材からなる笠木
ホルダーとを予め加締めにより一体化しておき、手摺り
支柱の下端のベースプレートを笠木の上から笠木ホルダ
ーにビス止めし、そのビス止めにつき、ベースプレート
に明けてある取付孔から笠木には取付ビスの通孔を、笠
木ホルダーには螺入孔をそれぞれ穿設することを特徴と
する手摺り支柱の立設方法。An anchor plate fixed to a parapet by an anchor bolt and a cap holder made of extruded aluminum are previously integrated by caulking, and a base plate at a lower end of a handrail support is attached to the cap holder from above the cap. Standing up a handrail support, characterized by drilling a screw through the mounting hole drilled in the base plate and drilling a through hole for the mounting screw from the mounting hole in the base plate, and a screw hole into the hedder holder. Method.
めねじにより仮止めしておき、笠木ホルダーには、ねじ
の露出部分が納まるねじ抜孔を横方向の長孔に形成して
おくことを特徴とする請求項1記載の手摺り支柱の立設
方法。2. A head plate is temporarily fixed to a base plate at a lower end of a column by a screw in advance, and a screw hole for accommodating an exposed portion of the screw is formed in a laterally elongated hole in the head holder. The method of standing up a handrail support according to claim 1.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2374893A JP3324816B2 (en) | 1993-01-18 | 1993-01-18 | Standing method of handrail support |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2374893A JP3324816B2 (en) | 1993-01-18 | 1993-01-18 | Standing method of handrail support |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH06212766A JPH06212766A (en) | 1994-08-02 |
| JP3324816B2 true JP3324816B2 (en) | 2002-09-17 |
Family
ID=12118941
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2374893A Expired - Lifetime JP3324816B2 (en) | 1993-01-18 | 1993-01-18 | Standing method of handrail support |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3324816B2 (en) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US7188453B2 (en) * | 2003-10-28 | 2007-03-13 | Pyramid Retaining Walls, Llc | Masonry wall supported fence and method |
| JP5247187B2 (en) * | 2008-03-03 | 2013-07-24 | 株式会社Lixil | Handrail and its construction method |
| KR102472068B1 (en) * | 2020-10-26 | 2022-11-30 | 주식회사 유엔지 테크놀러지 | a lift for a ladder |
-
1993
- 1993-01-18 JP JP2374893A patent/JP3324816B2/en not_active Expired - Lifetime
Also Published As
| Publication number | Publication date |
|---|---|
| JPH06212766A (en) | 1994-08-02 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JPS6217551Y2 (en) | ||
| JP3324816B2 (en) | Standing method of handrail support | |
| JPH0335781Y2 (en) | ||
| JPH0344895Y2 (en) | ||
| JPH055982B2 (en) | ||
| JPS6323341B2 (en) | ||
| JPH036736Y2 (en) | ||
| JPH0335783Y2 (en) | ||
| JPH0437158Y2 (en) | ||
| JP2954467B2 (en) | Connecting structure of balcony wall panels | |
| JPH041226Y2 (en) | ||
| JPH0412914Y2 (en) | ||
| JPS637601Y2 (en) | ||
| JPH0335000Y2 (en) | ||
| JPS6317762Y2 (en) | ||
| JPH0635010Y2 (en) | Roof material mounting structure | |
| JPH0213639Y2 (en) | ||
| JPH11200479A (en) | Veranda handrail wall mounting structure and lightweight cellular concrete panel | |
| JPH0335778Y2 (en) | ||
| JPH056385Y2 (en) | ||
| JPH0344896Y2 (en) | ||
| JPH10292478A (en) | Balcony fence equipment | |
| JPH0335779Y2 (en) | ||
| JPH0411071Y2 (en) | ||
| JPH0335780Y2 (en) |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20070705 Year of fee payment: 5 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080705 Year of fee payment: 6 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080705 Year of fee payment: 6 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090705 Year of fee payment: 7 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090705 Year of fee payment: 7 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100705 Year of fee payment: 8 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110705 Year of fee payment: 9 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120705 Year of fee payment: 10 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120705 Year of fee payment: 10 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130705 Year of fee payment: 11 |
|
| EXPY | Cancellation because of completion of term | ||
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130705 Year of fee payment: 11 |