JP3333838B2 - Water body structure having a water retarding chamber - Google Patents
Water body structure having a water retarding chamberInfo
- Publication number
- JP3333838B2 JP3333838B2 JP19229994A JP19229994A JP3333838B2 JP 3333838 B2 JP3333838 B2 JP 3333838B2 JP 19229994 A JP19229994 A JP 19229994A JP 19229994 A JP19229994 A JP 19229994A JP 3333838 B2 JP3333838 B2 JP 3333838B2
- Authority
- JP
- Japan
- Prior art keywords
- water
- body structure
- pile
- water body
- lower layer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Revetment (AREA)
Description
【0001】[0001]
【産業上の利用分野】本発明は、水域に設置される遊水
室を有する水域構造物に関するものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an aquatic structure having a play chamber installed in a water area.
【0002】[0002]
【従来の技術】従来、港湾などの水域に設ける杭式桟橋
構造としては、図34に示す構造のものが知られてい
る。2. Description of the Related Art Conventionally, as a pile type pier structure provided in a water area such as a harbor, a structure shown in FIG. 34 is known.
【0003】[0003]
【発明が解決しようとする課題】通常、杭式桟橋構造に
おいては、杭式桟橋延長方向およびその延長直角方向に
5〜6mおきに、コンクリート製上部工24を支持する
ための鋼管杭29が配置されるため、鋼管杭29の相互
の間隔すなわちスリットの幅が、大き過ぎ、そのためこ
の部分を通過する波のエネルギー損失は殆んどなく、反
射波高が大きくなるという問題があった。Normally, in a pile-type pier structure, steel pipe piles 29 for supporting the concrete superstructure 24 are arranged every 5 to 6 m in the extension direction of the pile-type pier and in the direction perpendicular to the extension direction. Therefore, the interval between the steel pipe piles 29, that is, the width of the slit is too large, so that there is almost no energy loss of the wave passing through this portion, and the reflected wave height is increased.
【0004】[0004]
【課題を解決するための手段】前述の問題を有利に解決
するために、本発明の遊水室を有する水域構造物におい
ては、下側に継手1,2を備えている多数の壁体構成部
材3を、前記継手1,2を噛み合わせて水底地盤4に打
設して、上側に通水用スリット5を有する壁体6を構成
し、その壁体6から陸側に離れた位置において、後部杭
17を水底地盤4に打設し、前記後部杭17との間の下
部に遊水室下部層9を設け、その遊水室下部層9の前部
上面を、前記各継手1,2の上端部よりも低い位置に配
置し、遊水室下部層9の上部に遊水室10を設ける。SUMMARY OF THE INVENTION In order to advantageously solve the above-mentioned problems, in a water body structure having a water play chamber according to the present invention, a large number of wall components having joints 1 and 2 on the lower side are provided. 3 is engaged with the joints 1 and 2 and cast into the submarine ground 4 to form a wall 6 having a slit 5 for water flow on the upper side, and at a position away from the wall 6 on the land side, The rear pile 17 is cast on the underwater ground 4, and the lower layer 9 of the water chamber is provided below the rear pile 17. The upper surface of the lower layer 9 of the water chamber is connected to the upper end of each of the joints 1 and 2. It is arranged at a position lower than the section, and a water retarding chamber 10 is provided above the water retarding chamber lower layer 9.
【0005】[0005]
【実施例】図1ないし図4は、本発明の第1実施例を示
すものであって、鋼管矢板本体19における下半部の左
側および前記鋼管矢板本体19における下半部の右側
に、T字状の鋼製継手1とスリット20を有する鋼製パ
イプからなる継手2とが、溶接により固着されて、鋼管
矢板からなる壁体構成部材3が構成され、多数の壁体構
成部材3における各継手1,2が、相互に噛み合わされ
た状態で、水底地盤4に打設されて、上側に通水用スリ
ット5を有する壁体6が構成されている。1 to 4 show a first embodiment of the present invention, in which a left side of a lower half of a steel pipe sheet pile main body 19 and a right side of a lower half of the steel pipe sheet pile main body 19 are provided with T. A steel joint 1 having a U-shape and a joint 2 made of a steel pipe having a slit 20 are fixed by welding to form a wall member 3 made of a sheet pipe sheet pile. The joints 1 and 2 are cast on the underwater ground 4 in a state where they are engaged with each other to form a wall body 6 having a water passage slit 5 on the upper side.
【0006】前記上側に通水用スリット5を有する壁体
6から陸側に離れた位置において、壁体6と後部杭17
との間において、複数列の鋼製中間杭23が水底地盤4
に打設され、かつ前記壁体6と後部杭17との間に、土
砂または石からなる遊水室下部層9が設けられ、その遊
水室下部層9の上面は、陸側から沖側に向かって低くな
るように傾斜し、さらに壁体6の上端部と、後部杭17
の上端部と中間杭23の上端部とにわたって、コンクリ
ート製上部工24が設けられ、前記遊水室下部層9の上
面と前記上部工24との間に遊水室10が設けられてい
る。At a position away from the wall 6 having the slit 5 for water flow on the upper side on the land side, the wall 6 and the rear stake 17
Between the plurality of rows of steel intermediate piles 23
And a lower layer 9 of a water chamber formed of earth and sand or stone is provided between the wall body 6 and the rear pile 17, and the upper surface of the lower layer 9 of the water chamber is directed from the land side to the offshore side. And the upper end of the wall 6 and the rear stake 17
A concrete superstructure 24 is provided over the upper end of the intermediate pile 23 and the upper end of the intermediate pile 23, and the water-retention chamber 10 is provided between the upper surface of the water-retention chamber lower layer 9 and the superstructure 24.
【0007】前記壁体6における継手1,2の上端部
は、前記遊水室下部層9の前部すなわち沖側端部よりも
高レベルに配置され、かつ陸側の地盤25に、コンクリ
ート製上部工24の後部に対向する位置において、コン
クリート製土留部材26が載置されている。The upper ends of the joints 1 and 2 in the wall body 6 are arranged at a higher level than the front part of the water-reducing chamber lower layer 9, that is, the offshore end, and a concrete upper part is placed on the land 25 on the land side. A concrete retaining member 26 is placed at a position facing the rear part of the work 24.
【0008】前記通水用スリット5の巾をD1とし、か
つ壁体構成部材3の配置間隔をD2とすると、D1/D
2は約5〜35%に設定され、好ましくは10〜20%
である。Assuming that the width of the slit 5 for water passage is D1 and the interval between the wall members 3 is D2, D1 / D
2 is set to about 5-35%, preferably 10-20%
It is.
【0009】図5ないし図9は本発明の第2実施例を示
すものであって、土留壁8として、鋼管矢板本体14の
左右両側に溶接により固着されたT字状の鋼製継手21
およびスリット付き継手22とからなる鋼管矢板7を、
前記継手21と継手22とを相互に噛み合せた状態で、
水底地盤4に打設して、土留壁8を構成する。前記壁体
6,土留壁8との間に、複数列の中間杭23が打設さ
れ、かつ土留部材26が省略されているが、その他の構
成は、本発明の第1実施例の場合と同様である。FIGS. 5 to 9 show a second embodiment of the present invention. As a retaining wall 8, a T-shaped steel joint 21 fixed to both left and right sides of a steel pipe sheet pile main body 14 by welding.
And steel pipe sheet pile 7 composed of
In a state where the joint 21 and the joint 22 are engaged with each other,
The earth retaining wall 8 is formed by being cast on the underwater ground 4. A plurality of rows of intermediate piles 23 are cast between the wall body 6 and the retaining wall 8 and the retaining member 26 is omitted, but other configurations are the same as those of the first embodiment of the present invention. The same is true.
【0010】図10ないし図12は本発明の第3実施例
を示すものであって、遊水室下部層9の上面が、沖側の
斜面11と陸側の水平面12とにより構成されている
が、その他の構成は、本発明の第2実施例の場合と同様
である。FIGS. 10 to 12 show a third embodiment of the present invention, in which the upper surface of the lower layer 9 of the water retarding chamber is constituted by a slope 11 on the offshore side and a horizontal plane 12 on the land side. The other configuration is the same as that of the second embodiment of the present invention.
【0011】図13は本発明の第4実施例を示すもので
あって、遊水室下部層9の上面全体が水平面12からな
っているが、その他の構成は、本発明の第2実施例の場
合と同様である。FIG. 13 shows a fourth embodiment of the present invention, in which the entire upper surface of the lower layer 9 of the retarding chamber is formed of a horizontal plane 12, but the other structure is the same as that of the second embodiment of the present invention. Same as in the case.
【0012】図14は本発明の第5実施例を示すもので
あって、遊水室下部層9の上面全体が水平面12になっ
ていて陸側まで延長されると共に、その水平面12に石
27が敷設され、陸側の石27の上面に、補強リブ28
を有するコンクリート製重力式構造物13が載置されて
いるが、その他の構成は本発明の第1実施例の場合と同
様である。FIG. 14 shows a fifth embodiment of the present invention, in which the entire upper surface of the lower layer 9 of the retarding chamber is a horizontal plane 12 which extends to the land side, and a stone 27 is placed on the horizontal plane 12. It is laid and the reinforcing ribs 28
The concrete gravity type structure 13 having the above structure is placed, but the other configuration is the same as that of the first embodiment of the present invention.
【0013】図15は本発明の第6実施例を示すもので
あって、遊水室下部層9の水平面の上に消波ブロック1
6が積載され、図14における重力式構造物13が省略
されているが、その他の構成は、本発明の第2実施例の
場合と同様である。FIG. 15 shows a sixth embodiment of the present invention.
6 are loaded and the gravity type structure 13 in FIG. 14 is omitted, but the other configuration is the same as that of the second embodiment of the present invention.
【0014】図16は本発明の第7実施例を示すもので
あって、遊水室下部層9の上面に、沖側の斜面11と陸
側の水平面12とが設けられているが、その他の構成
は、本発明の第1実施例の場合と同様である。FIG. 16 shows a seventh embodiment of the present invention, in which a slope 11 on the offshore side and a horizontal plane 12 on the land side are provided on the upper surface of the lower layer 9 of the retarding chamber. The configuration is similar to that of the first embodiment of the present invention.
【0015】図17および図18は本発明の第8実施例
を示すものであって、中間杭23の上側部分と後部杭1
7の上端部とがブレース15を介して連結されている
が、その他の構成は、本発明の第1実施例の場合と同様
である。FIGS. 17 and 18 show an eighth embodiment of the present invention, in which an upper portion of an intermediate pile 23 and a rear pile 1 are shown.
7 is connected via a brace 15, but the other configuration is the same as that of the first embodiment of the present invention.
【0016】図19および図20は本発明の第9実施例
を示すものであって、前部の中間杭23の上側部分と後
部の中間杭23の上端部とが、ブレース15を介して連
結され、かつ後部の中間杭23の上側部分と後部杭17
の上端部とが、ブレース15を介して連結されている
が、その他の構成は、本発明の第1実施例の場合と同様
である。FIGS. 19 and 20 show a ninth embodiment of the present invention, in which the upper part of the front middle pile 23 and the upper end of the rear middle pile 23 are connected via the brace 15. And the upper part of the rear intermediate pile 23 and the rear pile 17
Is connected via a brace 15, but the other configuration is the same as that of the first embodiment of the present invention.
【0017】図21および図22は本発明の第10実施
例を示すものであって、後部の中間杭23の上側部分
に、一対のブレース15の一端部が固定され、かつ一方
のブレース15の他端部は前部の中間杭23の上端部に
固定され、さらに他方のブレース15の他端部は、後部
杭17の上端部に固定されているが、その他の構成は、
本発明の第1実施例の場合と同様である。FIGS. 21 and 22 show a tenth embodiment of the present invention, in which one end of a pair of braces 15 is fixed to an upper portion of a rear intermediate pile 23 and one of the braces 15 is fixed. The other end is fixed to the upper end of the front middle stake 23, and the other end of the other brace 15 is fixed to the upper end of the rear stake 17, but in other configurations,
This is the same as in the first embodiment of the present invention.
【0018】次にブレースの取付例について説明する。
図23ないし図27に示すように、下部筒体30内の上
部および下部の周囲に、その下部筒体30と中間杭23
との間隔を一定以上に保つための複数(例えば4箇)の
スペーサ31を等角度間隔で固定し、前記下部筒体30
の内周面に複数のジベル32を固着し、前記下部筒体3
0における下部内周に、ゴムまたは合成樹脂系弾性材料
からなるシールリング33を配置し、かつそのシールリ
ング33を前記下部筒体30に固着された上下一対の支
持リングの間に挿入してボルト等の機械的手段により固
定し、前記下部筒体30の下側に連結した注入管34
に、開閉弁35を介してグラウト注入用ホース36を接
続し、そのホース36,開閉弁35および注入管34を
通って、下部筒体30と外面に複数のジベル37を固定
した中間杭23との間に、水中不分離性混和剤を混入し
たモルタル等の経時硬化性材料38を注入充填し、次に
前記開閉弁35を閉じたのち、前記ホース36を開閉弁
35から取外して回収する。Next, an example of mounting the brace will be described.
As shown in FIGS. 23 to 27, the lower cylinder 30 and the intermediate pile 23 are provided around the upper and lower portions in the lower cylinder 30.
(For example, four) spacers 31 are fixed at equal angular intervals to keep the interval between the lower cylindrical body 30 and the lower cylindrical body 30
A plurality of dowels 32 are fixed to the inner peripheral surface of the lower cylindrical body 3.
0, a seal ring 33 made of rubber or a synthetic resin-based elastic material is arranged on the inner periphery of the lower part, and the seal ring 33 is inserted between a pair of upper and lower support rings fixed to the lower cylindrical body 30 so that bolts The injection pipe 34 fixed by mechanical means such as the like and connected to the lower side of the lower cylindrical body 30
Is connected to a grout injection hose 36 via an opening / closing valve 35, and passes through the hose 36, the opening / closing valve 35, and the injection pipe 34, and is connected to the lower cylinder 30 and the intermediate pile 23 having a plurality of dowels 37 fixed to the outer surface. In the meantime, a time-hardening material 38 such as mortar mixed with a water-immiscible admixture is injected and filled. Then, after the on-off valve 35 is closed, the hose 36 is removed from the on-off valve 35 and collected.
【0019】ブレース15の上端部と鋼管矢板7または
後部杭17とは、単数または複数の鋼製連結部材39を
介して溶接により固着され、その鋼製連結部材39によ
る連結部は上部工24内に埋め込まれている。The upper end of the brace 15 and the steel pipe sheet pile 7 or the rear pile 17 are fixed by welding through one or more steel connecting members 39, and the connecting portion of the steel connecting members 39 is formed in the superstructure 24. Embedded in
【0020】図28および図29は、鋼製横梁40を使
用した例を示すものであって、予め壁体構成部材3内の
上側と、中間杭23内の上側および鋼管矢板7内または
後部杭17内の上側に仕切板42が固定され、前記鋼製
横梁40が、壁体構成部材3の上端部と、中間杭23の
上端部と、鋼管矢板7または後部杭17の上端部とにわ
たって架設され、壁体構成部材3と、中間杭23と、鋼
管矢板7または後部杭17の位置における鋼製横梁40
の上端側に、逆U字状鉄筋41が固定され、さらに逆U
字状鉄筋41の脚部は、壁体構成部材3の上部と、中間
杭23の上部と、鋼管矢板7または後部杭17の上部と
に挿入され、かつ壁体構成部材3内の上部と、中間杭2
3内の上部と、鋼管矢板7または後部杭17内の上部と
に経時硬化性材料43が充填され、前記逆U字状鉄筋4
1の脚部は、その経時硬化性材料43内に埋込まれてい
る。FIGS. 28 and 29 show an example in which a steel cross beam 40 is used. The upper part in the wall member 3, the upper part in the intermediate pile 23, and the steel pipe sheet pile 7 or the rear pile are shown in advance. A partition plate 42 is fixed to the upper side of the inside 17, and the steel cross beam 40 is installed over the upper end of the wall member 3, the upper end of the intermediate pile 23, and the upper end of the steel pipe sheet pile 7 or the rear pile 17. The wall member 3, the intermediate pile 23, and the steel cross beam 40 at the position of the steel pipe sheet pile 7 or the rear pile 17.
U-shaped reinforcing bar 41 is fixed to the upper end of
The legs of the U-shaped reinforcing bar 41 are inserted into the upper portion of the wall component 3, the upper portion of the intermediate pile 23, the upper portion of the steel pipe sheet pile 7 or the upper portion of the rear pile 17, and the upper portion of the wall component 3. Intermediate pile 2
3 and the upper part of the steel pipe sheet pile 7 or the upper part of the rear pile 17 are filled with the age-hardenable material 43,
One leg is embedded in the time-curable material 43.
【0021】図30および図31は壁体構成部材3およ
び鋼管矢板7の継手構造を示すものであって、図30の
場合は、隣り合う一方の鋼管14,19に間隔をおいて
配置された一対のL字形鋼44の一側部が溶接により固
着され、隣り合う他方の鋼管14,19にT字形鋼48
の中央脚が溶接により固着されている。また図31の場
合は、スリット45を有する細径の鋼管46が、そのス
リット45をそれぞれ偏位させた状態で鋼管14,19
に溶接により固着されている。FIGS. 30 and 31 show the joint structure of the wall member 3 and the steel pipe sheet pile 7. In the case of FIG. 30, the steel pipes 14 and 19 are arranged at an interval. One side of the pair of L-shaped steels 44 is fixed by welding, and the T-shaped steel 48 is attached to the other adjacent steel pipes 14 and 19.
Are fixed by welding. In the case of FIG. 31, the small-diameter steel pipe 46 having the slit 45 is provided with the steel pipes 14 and 19 with the slit 45 deviated.
Is fixed by welding.
【0022】図32および図33は、壁体構成部材3,
鋼管矢板7,後部杭17および中間杭23の上部の鋼製
横梁40により連結構造を示すものであって、鋼製横梁
40の下面に、鋼製脚杆47が固着され、かつ各壁体構
成部材3,鋼管矢板7,後部杭17および中間杭23の
上端側に仕切板42が溶接により固着され、さらに前記
鋼製脚杆47は、壁体構成部材3,鋼管矢板7,後部杭
17および中間杭23の上部に挿入され、また壁体構成
部材3,鋼管矢板7後部杭17,および中間杭23の仕
切板42よりも上側部分にコンクリートなどの経時硬化
性材料43が充填され、かつコンクリートからなる経時
硬化性材料からなる上部工24が打設される。FIG. 32 and FIG.
The steel pipe sheet pile 7, the rear pile 17, and the steel cross beam 40 above the intermediate pile 23 show a connection structure. A steel leg 47 is fixed to the lower surface of the steel cross beam 40, and each wall structure is formed. The partition plate 42 is fixed to the upper end side of the member 3, the steel pipe sheet pile 7, the rear pile 17, and the intermediate pile 23 by welding. Further, the steel leg 47 is connected to the wall component 3, the steel pipe sheet pile 7, the rear pile 17, and The temporally hardening material 43 such as concrete is inserted into the upper part of the intermediate pile 23, the wall member 3, the rear pile 17 of the steel pipe sheet pile 7, and the partition 42 of the intermediate pile 23 are filled with the time-hardening material 43. A superstructure 24 made of a time-curable material made of the following material is cast.
【0023】[0023]
【発明の効果】本発明によれば、狭い幅の多数の通水用
スリット5が壁体6に設けられているので、この通水用
スリット5を通過する波のエネルギー損失が大きくな
り、そのため反射波高が小さくなる。また通水用スリッ
ト5の鉛直方向の範囲を任意に設定できるため、周期や
波高などの波浪条件に応じて消波効率を調整することが
でき、また遊水室下部層9の上面形状を変化させたり、
遊水室下部層9の上に消波ブロック16を積載すること
によっても、消波効率を調整することができる。According to the present invention, since a large number of narrow slits 5 for water passage are provided in the wall 6, the energy loss of the waves passing through the slits 5 for water passage becomes large. The reflected wave height decreases. In addition, since the vertical range of the water passage slit 5 can be set arbitrarily, the wave-dissipating efficiency can be adjusted according to wave conditions such as the period and wave height, and the upper surface shape of the water-reducing chamber lower layer 9 can be changed. Or
The wave-dissipating efficiency can also be adjusted by loading the wave-dissipating block 16 on the water-retention-chamber lower layer 9.
【図1】本発明の第1実施例に係る遊水室を有する水域
構造物を示す縦断側面図である。FIG. 1 is a vertical sectional side view showing a water body structure having a water retarding chamber according to a first embodiment of the present invention.
【図2】図1のA−A線拡大断面図である。FIG. 2 is an enlarged sectional view taken along line AA of FIG.
【図3】図1のB−B線拡大断面図である。FIG. 3 is an enlarged sectional view taken along line BB of FIG. 1;
【図4】通水用スリットを有する壁体を示す横断平面図
である。FIG. 4 is a cross-sectional plan view showing a wall body having a slit for water passage.
【図5】本発明の第2実施例に係る遊水室を有する水域
構造物を示す縦断側面図である。FIG. 5 is a vertical sectional side view showing a water body structure having a water retarding chamber according to a second embodiment of the present invention.
【図6】図5のC−C線拡大断面図である。FIG. 6 is an enlarged sectional view taken along line CC of FIG. 5;
【図7】図5のD−D線拡大断面図である。FIG. 7 is an enlarged sectional view taken along line DD of FIG. 5;
【図8】通水用スリットを有する壁体を示す横断平面図
である。FIG. 8 is a cross-sectional plan view showing a wall body having a slit for water flow.
【図9】土留用矢板壁を示す横断平面図である。FIG. 9 is a cross-sectional plan view showing the pile sheet wall for retaining.
【図10】本発明の第3実施例に係る遊水室を有する水
域構造物を示す縦断側面図である。FIG. 10 is a longitudinal sectional side view showing a water body structure having a water retarding chamber according to a third embodiment of the present invention.
【図11】図10のE−E線拡大断面図である。FIG. 11 is an enlarged sectional view taken along line EE of FIG. 10;
【図12】図10のF−F線拡大断面図である。FIG. 12 is an enlarged sectional view taken along line FF of FIG. 10;
【図13】本発明の第4実施例に係る遊水室を有する水
域構造物を示す縦断側面図である。FIG. 13 is a vertical sectional side view showing a water body structure having a water retarding chamber according to a fourth embodiment of the present invention.
【図14】本発明の第5実施例に係る遊水室を有する水
域構造物を示す縦断側面図である。FIG. 14 is a vertical sectional side view showing a water body structure having a water retarding chamber according to a fifth embodiment of the present invention.
【図15】本発明の第6実施例に係る遊水室を有する水
域構造物を示す縦断側面図である。FIG. 15 is a longitudinal sectional side view showing a water body structure having a water retarding chamber according to a sixth embodiment of the present invention.
【図16】本発明の第7実施例に係る遊水室を有する水
域構造物を示す縦断側面図である。FIG. 16 is a longitudinal sectional side view showing a water body structure having a water retarding chamber according to a seventh embodiment of the present invention.
【図17】本発明の第8実施例に係る遊水室を有する水
域構造物を示す縦断側面図である。FIG. 17 is a longitudinal sectional side view showing a water body structure having a water retarding chamber according to an eighth embodiment of the present invention.
【図18】図17に示す部分の平面図である。18 is a plan view of the portion shown in FIG.
【図19】本発明の第9実施例に係る遊水室を有する水
域構造物を示す縦断側面図である。FIG. 19 is a vertical sectional side view showing a water body structure having a water retarding chamber according to a ninth embodiment of the present invention.
【図20】図19に示す部分の平面図である。FIG. 20 is a plan view of the portion shown in FIG. 19;
【図21】本発明の第10実施例に係る遊水室を有する
水域構造物を示す縦断側面図である。FIG. 21 is a longitudinal sectional side view showing a water body structure having a water retarding chamber according to a tenth embodiment of the present invention.
【図22】図21に示す部分の平面図である。FIG. 22 is a plan view of the portion shown in FIG. 21;
【図23】ブレースの下部と中間杭との連結部を示す縦
断側面図である。FIG. 23 is a longitudinal sectional side view showing a connecting portion between a lower part of a brace and an intermediate pile.
【図24】ブレースの下部と中間杭との連結部を示す縦
断正面図である。FIG. 24 is a longitudinal sectional front view showing a connecting portion between a lower part of a brace and an intermediate pile.
【図25】ブレースの上端部の連結構造を示す一部縦断
側面図である。FIG. 25 is a partially longitudinal side view showing a connection structure of an upper end portion of a brace.
【図26】ブレースの上端部の連結構造における一部縦
断側面図である。FIG. 26 is a partially longitudinal side view of the connection structure of the upper end of the brace.
【図27】図26の右上側部分を拡大して示す側面図で
ある。FIG. 27 is an enlarged side view showing an upper right side portion of FIG. 26;
【図28】中間杭または後部杭とブレースの上端部との
連結構造を示す平面図である。FIG. 28 is a plan view showing a connection structure between an intermediate pile or a rear pile and an upper end of a brace.
【図29】壁体構成部材と中間杭と後部杭と鋼管矢板と
に対する鋼製横梁の連結部を示す縦断側面図である。FIG. 29 is a longitudinal sectional side view showing a connecting portion of a steel cross beam to a wall member, an intermediate pile, a rear pile, and a steel pipe sheet pile.
【図30】鋼管連結部の他の例を示す横断平面図であ
る。FIG. 30 is a cross-sectional plan view showing another example of the steel pipe connecting portion.
【図31】鋼管連結部のもう一つの例を示す横断平面図
である。FIG. 31 is a cross-sectional plan view showing another example of the steel pipe connecting portion.
【図32】本発明を実施する場合に横梁と中間杭との結
合部を示す縦断側面図である。FIG. 32 is a longitudinal sectional side view showing a connecting portion between a cross beam and an intermediate pile when the present invention is carried out.
【図33】本発明を実施する場合に後部杭および壁体構
成部材,鋼管矢板,後部杭と、横梁との連結部を示す縦
断側面図である。FIG. 33 is a vertical sectional side view showing a connecting portion between a rear pile and a wall component, a steel pipe sheet pile, a rear pile, and a cross beam when the present invention is carried out.
【図34】従来の水域構造物を示す縦断側面図である。FIG. 34 is a vertical sectional side view showing a conventional water body structure.
1 継手 2 継手 3 壁体構成部材 4 水底地盤 5 通水用スリット 6 壁体 7 鋼管矢板 8 土留壁 9 遊水室下部層 10 遊水室 11 斜面 12 水平面 13 重力式構造物 14 鋼矢板または鋼管矢板本体 15 ブレース 16 消波ブロック 17 後部杭 19 鋼管矢板本体 20 スリット 21 継手 22 継手 23 鋼製中間杭 24 コンクリート製上部工 25 地盤 26 コンクリート製土留部材 27 石 28 補強リブ 30 下部筒体 31 スペーサ 32 ジベル 33 シールリング 34 注入管 35 開閉弁 36 グラウト注入用ホース 37 ジベル 38 経時硬化性材料 39 鋼製連結部材 40 鋼製横梁 41 逆U字状鉄筋 42 仕切板 43 経時硬化性材料 44 L形鋼 45 スリット 46 鋼管 47 鋼製脚杆 48 T形鋼 DESCRIPTION OF SYMBOLS 1 Joint 2 Joint 3 Wall component 4 Water bottom ground 5 Slit for water penetration 6 Wall 7 Steel pipe sheet pile 8 Reservoir wall 9 Lower layer of water chamber 10 Water chamber 11 Slope 12 Horizontal plane 13 Gravitational structure 14 Steel sheet pile or steel sheet pile main body REFERENCE SIGNS LIST 15 brace 16 wave-dissipating block 17 rear pile 19 steel sheet pile body 20 slit 21 joint 22 joint 23 steel intermediate pile 24 concrete superstructure 25 ground 26 concrete soil retaining member 27 stone 28 reinforcing rib 30 lower cylinder 31 spacer 32 dibel 33 Seal ring 34 Injection pipe 35 Open / close valve 36 Grout injection hose 37 Dowel 38 Temporary hardening material 39 Steel connecting member 40 Steel cross beam 41 Inverted U-shaped reinforcing bar 42 Partition plate 43 Temporary hardening material 44 L-shaped steel 45 Slit 46 Steel pipe 47 Steel leg 48 T-section steel
───────────────────────────────────────────────────── フロントページの続き (72)発明者 高橋 邦夫 神奈川県横須賀市長瀬三丁目一番一号 運輸省 港湾技術研究所内 (72)発明者 永井 豊 北海道室蘭市入江町1−14 北海道開発 局 室蘭開発建設部内 (72)発明者 宮本 義憲 北海道苫小牧市末広町一丁目1番1号 北海道開発局 室蘭開発建設部 苫小牧 港湾建設事務所内 (72)発明者 深海 正彦 東京都千代田区大手町一丁目4番1号 竹橋ビル 海外経済協力基金内 (72)発明者 佐野 透 北海道札幌市豊平区平岸1条3丁目 北 海道開発局開発土木研究所内 (72)発明者 菅沼 史典 北海道苫小牧市末広町一丁目1番1号 北海道開発局 室蘭開発建設部 苫小牧 港湾建設事務所内 (72)発明者 伊東 公人 北海道苫小牧市末広町一丁目1番1号 北海道開発局 室蘭開発建設部 苫小牧 港湾建設事務所内 (72)発明者 水野 雄三 北海道札幌市豊平区平岸1条3丁目 北 海道開発局開発土木研究所内 (72)発明者 木村 克俊 北海道札幌市豊平区平岸1条3丁目 北 海道開発局開発土木研究所内 (72)発明者 山本 泰司 北海道札幌市豊平区平岸1条3丁目 北 海道開発局開発土木研究所内 (72)発明者 佐藤 光一 北海道札幌市中央区北2条西4丁目 北 海道ビル 新日本製鐵株式会社 札幌支 店内 審査官 大森 伸一 (56)参考文献 特開 平6−346418(JP,A) 特開 平7−247527(JP,A) 実開 平4−134533(JP,U) 特公 昭58−24566(JP,B2) (58)調査した分野(Int.Cl.7,DB名) E02B 3/06 301 ──────────────────────────────────────────────────続 き Continuing on the front page (72) Inventor Kunio Takahashi 3-chome, Nagase 3-chome, Yokosuka City, Kanagawa Prefecture Within the Port and Harbor Research Institute, Ministry of Transport (72) Inventor Yutaka Nagai 1-14 Iriecho, Muroran City, Hokkaido Muroran, Hokkaido Development Bureau Inside the Development and Construction Department (72) Inventor Yoshinori Miyamoto 1-1-1 Suehirocho, Tomakomai City, Hokkaido Hokkaido Development Bureau Muroran Development and Construction Department Tomakomai Port Construction Office (72) Inventor Masahiko Fukami 1-4-1 Otemachi, Chiyoda-ku, Tokyo No. 1 Takebashi Building Within the Overseas Economic Cooperation Fund (72) Inventor Toru Sano 1-3-chome, Hiragishi, Toyohira-ku, Sapporo-city, Hokkaido Inside the Public Works Research Institute, Kita Kaido Development Bureau (72) Fuminori Suganuma 1-1-1, Suehirocho, Tomakomai-city, Hokkaido No. 1 Hokkaido Development Bureau Muroran Development and Construction Department Tomakomai Port Construction Office (72) Inventor Kimito Ito Hokkaido 1-1-1, Suehirocho, Tomakomai City Hokkaido Development Bureau Muroran Development and Construction Department Tomakomai Port Construction Office Inventor Katsutoshi Kimura 1-3-chome Hiragishi, Toyohira-ku, Sapporo-city, Hokkaido Inside the Public Works Research Institute, Kita-kaido Development Bureau (72) Inventor Koichi Sato 4-chome Kita 2-Jo Nishi, Chuo-ku, Sapporo, Hokkaido Nippon Steel Corporation Sapporo branch Inspector Shinichi Omori (56) References JP-A-6-346418 (JP, A) 7-247527 (JP, A) JP-A-4-134533 (JP, U) JP-B-58-24566 (JP, B2) (58) Fields investigated (Int. Cl. 7 , DB name) E02B 3/06 301
Claims (13)
体構成部材3を、前記継手1,2を噛み合わせて水底地
盤4に打設して、上側に通水用スリット5を有する壁体
6を構成し、その壁体6から陸側に離れた位置におい
て、後部杭17を水底地盤4に打設し、前記後部杭17
との間の下部に遊水室下部層9を設け、その遊水室下部
層9の前部上面を、前記各継手1,2の上端部よりも低
い位置に配置し、遊水室下部層9の上部に遊水室10を
設けたことを特徴とする遊水室を有する水域構造物。1. A large number of wall components 3 provided with joints 1 and 2 on the lower side are driven into a submarine ground 4 by engaging the joints 1 and 2, and a slit 5 for water passage is formed on an upper side. The rear pile 17 is cast on the underwater ground 4 at a position away from the wall 6 on the land side, and the rear pile 17
The lower layer 9 of the retarding chamber is provided at a lower portion between the lower layer 9 and the front upper surface of the lower layer 9 of the retarding chamber is disposed at a position lower than the upper ends of the joints 1 and 2. A water area structure having a water retarding chamber, wherein a water retarding chamber 10 is provided.
する斜面11からなることを特徴とする請求項1の遊水
室を有する水域構造物。2. The water body structure having a water retarding chamber according to claim 1, wherein the upper surface of the lower layer of the water retarding chamber comprises a slope 11 inclined at the same angle.
面12とからなることを特徴とする請求項1の遊水室を
有する水域構造物。3. A water body structure having a water retarding chamber according to claim 1, wherein the upper surface of the lower layer of the water retarding chamber comprises an inclined surface and a horizontal surface.
からなることを特徴とする請求項1の遊水室を有する水
域構造物。4. The entire upper surface of the lower layer 9 of the retarding chamber is a horizontal surface 12.
A water body structure having a water retarding chamber according to claim 1, wherein the water body structure comprises:
を特徴とする請求項1の遊水室を有する水域構造物。5. The water body structure having a water retarding chamber according to claim 1, wherein the earth retaining portion comprises a gravity type structure.
4からなることを特徴とする請求項1の遊水室を有する
水域構造物。6. The retaining wall 8 is made of steel sheet pile or steel pipe sheet pile main body 1.
4. The water body structure having a water retarding chamber according to claim 1, wherein the water body structure comprises:
により結合されていることを特徴とする請求項1の遊水
室を有する水域構造物。7. The upper part of the intermediate pile 23 is mutually braced.
The water body structure having a water retarding chamber according to claim 1, wherein the water body structure is connected by:
と中間杭23とが、ブレース15により結合されている
ことを特徴とする請求項1の遊水室を有する水域構造
物。8. An earth retaining wall 8 made of steel sheet pile or steel pipe sheet pile.
The water body structure having a water play chamber according to claim 1, wherein the intermediate pile (23) and the intermediate pile (23) are connected by a brace (15).
直前に打設されている中間杭23の上部とがブレース1
5により結合されていることを特徴とする請求項1の遊
水室を有する水域構造物。9. The upper end of the rear pile 17 and the upper part of the intermediate pile 23 cast immediately before the rear pile 17 have a brace 1.
The water body structure having a water retarding chamber according to claim 1, wherein the water body structure is connected by 5.
などの柱状部材からなることを特徴とする請求項1の遊
水室を有する水域構造物。10. The member forming the retaining wall 8 is a rear pile 17
The water body structure having a water retarding chamber according to claim 1, comprising a columnar member such as
なることを特徴とする請求項1の遊水室を有する水域構
造物。11. The water body structure having a water play chamber according to claim 1, wherein the water play chamber lower layer 9 is made of earth and sand or stone.
遊水室下部層9の上側が石からなることを特徴とする請
求項1の遊水室を有する水域構造物。12. The lower side of the water-reducing chamber lower layer 9 is earth and sand,
The water body structure having a water play chamber according to claim 1, wherein the upper side of the water play chamber lower layer 9 is made of stone.
16が配置されていることを特徴とする請求項1の遊水
室を有する水域構造物。13. The water body structure having a water retardation chamber according to claim 1, wherein the wave-dissipating block is disposed on the upper surface of the lower layer of the water retardation chamber.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP19229994A JP3333838B2 (en) | 1994-07-25 | 1994-07-25 | Water body structure having a water retarding chamber |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP19229994A JP3333838B2 (en) | 1994-07-25 | 1994-07-25 | Water body structure having a water retarding chamber |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH0835219A JPH0835219A (en) | 1996-02-06 |
| JP3333838B2 true JP3333838B2 (en) | 2002-10-15 |
Family
ID=16288972
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP19229994A Expired - Lifetime JP3333838B2 (en) | 1994-07-25 | 1994-07-25 | Water body structure having a water retarding chamber |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3333838B2 (en) |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP4603242B2 (en) * | 2003-02-12 | 2010-12-22 | 新日本製鐵株式会社 | Water structure |
| JP4799092B2 (en) * | 2005-09-12 | 2011-10-19 | 鹿島建設株式会社 | Water structure, construction method of water structure |
| JP4951726B2 (en) * | 2006-07-07 | 2012-06-13 | 独立行政法人港湾空港技術研究所 | Long-period wave reduction structure |
| JP6941660B2 (en) * | 2019-10-09 | 2021-09-29 | 東亜建設工業株式会社 | Construction method of superstructure on water and structure of superstructure |
Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP5824566B2 (en) | 2010-04-22 | 2015-11-25 | シャープ株式会社 | Base station, user apparatus, communication method, and integrated circuit for allocating physical uplink control channel resources |
-
1994
- 1994-07-25 JP JP19229994A patent/JP3333838B2/en not_active Expired - Lifetime
Patent Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP5824566B2 (en) | 2010-04-22 | 2015-11-25 | シャープ株式会社 | Base station, user apparatus, communication method, and integrated circuit for allocating physical uplink control channel resources |
Also Published As
| Publication number | Publication date |
|---|---|
| JPH0835219A (en) | 1996-02-06 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR100243401B1 (en) | A supporting structure for laying pipes under the ground | |
| JP3333838B2 (en) | Water body structure having a water retarding chamber | |
| CN104271841A (en) | Steel wall | |
| JP3905776B2 (en) | Revetment structure | |
| CN202170498U (en) | Reinforced concrete pile dike | |
| JPH06146305A (en) | Underwater foundation and installation method thereof | |
| JP2002371529A (en) | Water body structure having a water retarding chamber | |
| SU1060766A1 (en) | Counter-landside structure | |
| JP2548634B2 (en) | Underwater structure using underwater ground driving member | |
| CN218374182U (en) | Drainage pipeline system is got to bank | |
| JP4716626B2 (en) | Steel pipe sheet pile foundation structure | |
| JPS62237983A (en) | Wall body for preventing leakage of waste | |
| JPH04350207A (en) | Wave control structure using columnar member | |
| GB1580142A (en) | Process for staking soil | |
| JP3364432B2 (en) | Stone retaining wall | |
| JPS638249B2 (en) | ||
| JP4231194B2 (en) | Revetment structure | |
| JPS5944460B2 (en) | Corrosion prevention construction method for steel sheet piles for bank protection | |
| RU2202678C2 (en) | Mudflow conduit | |
| JP2021124003A (en) | Embankment for individual building | |
| JP3619953B2 (en) | River structure using composite pile for river structure and back split levee using the river structure | |
| RU2856078C1 (en) | Sheet pile wall for hydraulic structures | |
| KR100662011B1 (en) | Construction method of riverside protection work using reinforcement strip | |
| JPH0125843B2 (en) | ||
| JPH10311054A (en) | Construction method of water stop solidification wall |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20020611 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080802 Year of fee payment: 6 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090802 Year of fee payment: 7 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100802 Year of fee payment: 8 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100802 Year of fee payment: 8 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110802 Year of fee payment: 9 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110802 Year of fee payment: 9 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120802 Year of fee payment: 10 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130802 Year of fee payment: 11 |
|
| S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130802 Year of fee payment: 11 |
|
| S533 | Written request for registration of change of name |
Free format text: JAPANESE INTERMEDIATE CODE: R313533 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130802 Year of fee payment: 11 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| S111 | Request for change of ownership or part of ownership |
Free format text: JAPANESE INTERMEDIATE CODE: R313111 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130802 Year of fee payment: 11 |
|
| R360 | Written notification for declining of transfer of rights |
Free format text: JAPANESE INTERMEDIATE CODE: R360 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130802 Year of fee payment: 11 |
|
| R370 | Written measure of declining of transfer procedure |
Free format text: JAPANESE INTERMEDIATE CODE: R370 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130802 Year of fee payment: 11 |
|
| S111 | Request for change of ownership or part of ownership |
Free format text: JAPANESE INTERMEDIATE CODE: R313115 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130802 Year of fee payment: 11 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| EXPY | Cancellation because of completion of term |