Method and apparatus for inspecting leak position of thin tube

Info

Publication number
JP3349655B2
JP3349655B2 JP25660097A JP25660097A JP3349655B2 JP 3349655 B2 JP3349655 B2 JP 3349655B2 JP 25660097 A JP25660097 A JP 25660097A JP 25660097 A JP25660097 A JP 25660097A JP 3349655 B2 JP3349655 B2 JP 3349655B2
Authority
JP
Japan
Prior art keywords
gas
cooling water
inspection
water passage
water channel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP25660097A
Other languages
Japanese (ja)
Other versions
JPH1194683A (en
Inventor
勉 國井
照広 滝沢
弘 笹島
正亜 清水
貴 新井
松本  潔
政己 鈴木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Priority to JP25660097A priority Critical patent/JP3349655B2/en
Publication of JPH1194683A publication Critical patent/JPH1194683A/en
Application granted granted Critical
Publication of JP3349655B2 publication Critical patent/JP3349655B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin
    • Y02E30/30Nuclear fission reactors

Landscapes

  • Monitoring And Testing Of Nuclear Reactors (AREA)
  • Examining Or Testing Airtightness (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、内径が狭くかつ長
い形状の細管に発生した漏れ部分を検査する細管の漏れ
位置検査方法、及びその装置に係り、特に、核融合装置
におけるトロイダルコイル内の冷却水路を検査するのに
好適な細管の漏れ位置検査方法、及びその装置に関す
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for inspecting a leak position of a thin tube for inspecting a leak portion generated in a narrow tube having a small inner diameter and a long shape, and to an apparatus therefor. The present invention relates to a method and an apparatus for inspecting a leak position of a thin tube suitable for inspecting a cooling water channel.

【0002】[0002]

【従来の技術】一般に、核融合装置にあっては、真空容
器内にプラズマを閉じ込めるために、トロイダルコイル
等が設置されているが、このトロイダルコイルの内部に
はこれに水を流通させて冷却する冷却水路が形成されて
いる。
2. Description of the Related Art Generally, a nuclear fusion device is provided with a toroidal coil or the like for confining plasma in a vacuum vessel. Water is circulated inside the toroidal coil for cooling. A cooling water channel is formed.

【0003】このようなトロイダルコイルは、冷却水路
に水のしみだし部分、即ち、冷却水路を形成する細管の
周壁に水しみだし部分が存在しているかいないかを検査
する必要がある。ところが、細管はトロイダルコイルに
埋設されているので、細管の外側から水しみだし部分を
検査することができない。そのため、従来の検査方法で
は、冷却水路内の水を完全に抜き取った後、特定のガス
を冷却水路に注入して加圧し、該ガスの圧力変動を監視
して、ガス圧が低下したとき、細管の周壁に水のしみだ
し部分が存在するのを判定するようにしていた。
In such a toroidal coil, it is necessary to inspect whether or not a water seepage portion exists in the cooling water channel, that is, whether or not a water seeping portion exists on the peripheral wall of the thin tube forming the cooling water channel. However, since the thin tube is buried in the toroidal coil, it is not possible to inspect the oozing portion from the outside of the thin tube. Therefore, in the conventional inspection method, after completely draining the water in the cooling water channel, a specific gas is injected into the cooling water channel and pressurized, the pressure fluctuation of the gas is monitored, and when the gas pressure decreases, It was determined that there was a water seepage on the peripheral wall of the thin tube.

【0004】[0004]

【発明が解決しようとする課題】ところで、上記に示す
従来技術では、冷却水路を形成する細管の周壁に単に水
のしみだし部分があるかないかを検査するだけであり、
例えしみだし部分の存在を検査できたとしても、そのし
みだし部分の位置を特定することができなかった。しか
も、従来技術のガス加圧では、温度の変化によって圧力
が変動するばかりでなく、冷却水路の容積が大きくなる
に伴い測定精度が低下するので、信頼性の面で難題があ
った。
In the above-mentioned prior art, however, it is only necessary to inspect whether or not there is a seepage portion of water on the peripheral wall of the thin tube forming the cooling water passage.
Even if the presence of a bleeding part could be checked, the position of the bleeding part could not be specified. Moreover, in the conventional gas pressurization, not only the pressure fluctuates due to a change in temperature, but also the measurement accuracy decreases as the volume of the cooling water channel increases, and thus there is a problem in reliability.

【0005】本発明の目的は、上記従来技術の問題点に
鑑み、冷却水路を形成する細管に水のしみだし部分が発
生しても、その位置を確実に特定することができ、しか
も温度変化や冷却水路の容積に拘わらず的確に測定し得
る細管の漏れ位置検査方法を提供することにあり、他の
目的は、上記方法を的確に実施し得る細管の漏れ位置検
査装置を提供することにある。
SUMMARY OF THE INVENTION In view of the above-mentioned problems of the prior art, even if a water oozing portion occurs in a thin tube forming a cooling water channel, the position of the water oozing portion can be specified without fail, and the temperature change can be achieved. Another object of the present invention is to provide a thin-tube leak position inspection apparatus capable of accurately performing the above-described method regardless of the volume of the cooling water passage or the volume of the cooling water passage. is there.

【0006】[0006]

【課題を解決するための手段】本発明方法においては、
冷却水路を形成しかつ環状をなす細管の周壁に存在する
水しみだし部分を検査する方法であって、A)空になっ
ている状態の冷却水路内に加圧された検査用ガスを充満
し、細管の周壁に存在している水しみだし部分と導体を
包囲している包囲材とに検査用ガスを押し出させ、B)
次いで、冷却水路内の検査用ガスを除去した後、C)細
管周壁の水しみだし部分と包囲材とにしみこんでいる検
査用ガスを、冷却水路内に引き出すと共に、該引き出し
た検査用ガスが冷却水路内にキャリアガスを流すことに
より、水しみだし部より上流にはなく、下流側にのみ存
在する状態をつくり、D)予め形成された吸込みプロー
ブを冷却水路に沿い移動しながら、該吸込みプローブに
冷却水路内のガスを吸込ませ、E)該吸込んだガスのう
ち、冷却水路内の水しみだし部分から下流側にのみ存在
している検査用ガスを検出した時点で、冷却水路におけ
る吸込みプローブの移動量に基づき細管周壁の水しみだ
し部分を特定することを特徴とするものである。
According to the method of the present invention,
A method for inspecting a bleeding portion present on a peripheral wall of a circular tube forming a cooling water passage and forming an annular shape, comprising the following steps: A) Filling an empty cooling water passage with a test gas pressurized. The test gas is extruded into the oozing part existing on the peripheral wall of the capillary and the surrounding material surrounding the conductor, B).
Next, after removing the inspection gas in the cooling water channel, C) the inspection gas impregnated into the oozing portion of the peripheral wall of the thin tube and the surrounding material is drawn into the cooling water channel, and the extracted inspection gas is discharged. By flowing the carrier gas into the cooling water channel, a state is created which is present only upstream but not upstream of the draining portion. D) While moving the preformed suction probe along the cooling water channel, the suction is performed. The probe sucks the gas in the cooling water passage. E) When the test gas existing only on the downstream side from the bleeding portion in the cooling water passage is detected from the sucked gas, the suction in the cooling water passage is performed. The present invention is characterized in that a bleeding portion of a peripheral wall of a thin tube is specified based on a moving amount of a probe.

【0007】また、本発明装置においては、冷却水路を
形成しかつ環状をなす細管の周壁に存在する水しみだし
部分を検査する装置であって、検査用ガス及びキャリア
ガスのガス供給源と、細管の冷却水路内に対しガス供給
源からのガスを給排すると共に、冷却水路内を流通する
ガスの流量及び圧力を調整し、冷却水路内から、細管の
周壁に存在している水しみだし部分と導体を包囲してい
る包囲材とに検査用ガスを押し出させ、かつ該押し出し
た検査用ガスを冷却水路内の水しみだし部分と下流側の
みに存在させる手段と、冷却水路内を移動しながら冷却
水路内のガスを吸込む吸い込み,かつ該吸込んだガスの
うち、冷却水路内の水しみだし部分と下流側にのみ存在
している検査用ガスを測定する検査手段とを有してい
る。
Further, the present invention is an apparatus for inspecting a bleeding portion present on a peripheral wall of a narrow tube forming a cooling water passage and forming an annular shape, comprising: a gas supply source of an inspection gas and a carrier gas; The gas from the gas supply source is supplied to and discharged from the cooling water channel of the thin tube, and the flow rate and the pressure of the gas flowing through the cooling water channel are adjusted, so that the water present on the peripheral wall of the thin tube from the cooling water channel. Means for causing the inspection gas to be extruded into the portion and the surrounding material surrounding the conductor, and causing the extruded inspection gas to be present only in the water bleeding portion and the downstream side in the cooling channel, and moving in the cooling channel. A suction means for sucking in the gas in the cooling water passage while inspecting means for measuring a test gas existing only on the downstream side of the water leaking portion in the cooling water passage among the sucked gas. .

【0008】[0008]

【発明の実施の形態】以下、本発明の一実施例を図1乃
至図5により説明する。図1乃至図5は本発明方法を実
施するための漏れ検査装置の一実施例を、核融合装置の
トロイダルコイルに適用した一実施例を示している。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS One embodiment of the present invention will be described below with reference to FIGS. FIGS. 1 to 5 show an embodiment in which an embodiment of a leak inspection apparatus for carrying out the method of the present invention is applied to a toroidal coil of a nuclear fusion apparatus.

【0009】漏れ検査装置を説明する前に、図1に破線
にて示すトロイダルコイル100について概略的に述べ
ると、該トロイダルコイル100は、図示しない圧力容
器にトーラス方向に沿って設けられている。このトロイ
ダルコイル100は、図2及びその部分拡大した図3に
示すように、非磁性コイルケース101にアース絶縁材
102を介しコイル導体103が複数層に積層されてい
る。コイル導体103の各々は表面が層間絶縁体104
により被覆され、かつその内部に細管である角パイプ1
05が埋設され、角パイプ105の内部が冷却水路10
6を構成している。
Before describing the leak inspection apparatus, a toroidal coil 100 indicated by a broken line in FIG. 1 will be described briefly. The toroidal coil 100 is provided in a pressure vessel (not shown) along the torus direction. As shown in FIG. 2 and a partially enlarged FIG. 3 of the toroidal coil 100, a plurality of coil conductors 103 are laminated on a non-magnetic coil case 101 via a ground insulating material 102. The surface of each of the coil conductors 103 is an interlayer insulator 104.
Square pipe 1 covered with
05 is buried, and the inside of the square pipe 105 is
6.

【0010】冷却水路106は詳細に図示していない
が、各コイル導体103の冷却水路内と連通することに
より図1に示す如き多重の彎曲形状に形成されている。
この冷却水路106は断面形状が核融合装置の大きさに
もよるが、例えば断面5×15mm程度の大きさであ
り、冷却水が流通することにより、トロイダルコイル1
00を冷却する。
Although not shown in detail, the cooling water passage 106 is formed in a multiple curved shape as shown in FIG. 1 by communicating with the inside of the cooling water passage of each coil conductor 103.
The cross section of the cooling water passage 106 is, for example, about 5 × 15 mm in cross section, depending on the size of the nuclear fusion device.
Cool 00.

【0011】そして、実施例の漏れ位置検査装置は、大
別すると、ガス供給源と、ガス供給源からのガスを冷却
水路106に対し給排する一方、冷却水路内を流通する
ガスの流量及び圧力を調整する給排手段と、冷却水路1
06内の検査用ガスを吸込んで測定する検査手段とを有
して構成されている。
The leak position inspection apparatus according to the embodiment is roughly divided into a gas supply source and a gas supplied and discharged from the gas supply source to and from the cooling water passage 106, while the flow rate and the flow rate of the gas flowing through the cooling water passage are changed. Supply / discharge means for adjusting pressure, and cooling water channel 1
Inspection means for inhaling and measuring the inspection gas in 06.

【0012】詳しく述べると、図1において、前記ガス
供給源は検査用ガスとしてのヘリウムガス供給源3と、
冷却水路106を乾燥させたりヘリウムガス用のキャリ
アガスとしての機能させる窒素ガス供給源2とからなっ
ている。
More specifically, in FIG. 1, the gas supply source is a helium gas supply source 3 as a test gas,
The cooling water passage 106 is dried and functions as a carrier gas for helium gas.

【0013】前記給排手段は、検査に際し、冷却水路1
06の一端(上流)に接続されるガス供給管1と、冷却
水路106の末端(末端)に接続されるガス接続管4
と、ガス接続管4に接続された真空ポンプ5とを有して
いる。ガス供給管1の上流部分には分岐管1a,1bが
設けられ、これら1a,1bに窒素ガス供給源2,ヘリ
ウムガス供給源3が接続される。
The above-mentioned supply / discharge means is used for cooling water passage
06 and a gas connection pipe 4 connected to the end (end) of the cooling water channel 106.
And a vacuum pump 5 connected to the gas connection pipe 4. Branch pipes 1a and 1b are provided at an upstream portion of the gas supply pipe 1, and a nitrogen gas supply source 2 and a helium gas supply source 3 are connected to these branch pipes 1a and 1b.

【0014】分岐管1aの途中位置には窒素ガス供給源
2から供給される窒素ガスの流量を調整する流量調整弁
6と、流量計7とが設けられている。分岐管1bの途中
位置にはヘリウムガス供給源3からのヘリウムガスを下
流側に供給したり、停止したりする開閉弁8が設けられ
ている。また、ガス供給管1において分岐管1a,1b
より下流側には冷却水路106内の圧力を負圧と正圧と
の間で計測できる連成計9が設けられている。
A flow adjusting valve 6 for adjusting the flow rate of the nitrogen gas supplied from the nitrogen gas supply source 2 and a flow meter 7 are provided at an intermediate position of the branch pipe 1a. An on-off valve 8 for supplying or stopping the helium gas from the helium gas supply source 3 to the downstream side is provided at an intermediate position of the branch pipe 1b. In the gas supply pipe 1, branch pipes 1a, 1b
Further downstream, there is provided a compound meter 9 capable of measuring the pressure in the cooling water passage 106 between a negative pressure and a positive pressure.

【0015】真空ポンプ5は、冷却水路106内を真空
引きするものであり、必要に応じ駆動される。ガス排気
管4の途中位置には開閉弁10が設けられると共に、真
空ポンプ5の真空引き状態を計測する真空計11が設け
られている。
The vacuum pump 5 is for evacuating the inside of the cooling water passage 106 and is driven as required. An opening / closing valve 10 is provided at an intermediate position of the gas exhaust pipe 4, and a vacuum gauge 11 for measuring a vacuuming state of the vacuum pump 5 is provided.

【0016】一方、前記検査手段は、冷却水路106内
を移動する吸込みプローブ12と、該吸込みプローブ1
2より冷却水路106内のガスを吸入する検査ポンプ1
3と、ポンプから吐き出されたヘリウムガスを検知す測
定器14とを有している。吸込みプローブ12は、ガス
供給管1の先端側に設けられた開閉弁15側より冷却水
路106内に挿入され、かつ冷却水路106内を移動し
ながら冷却水路106内のガスを吸い込むためのもので
あり、そのため、冷却水路106内に挿入できるように
極めて細く、しかも彎曲形状をなす冷却水路106の曲
部でも移動し得るような柔軟性を有する管状体である。
例えば内径が細くかつ極めて薄肉の筒体をなすと共に、
冷却水路106の長さより長い寸法に形成(内径0.5
φ、長さ50m)されたステンレス製の長尺注射針状で
構成されている。
On the other hand, the inspection means includes a suction probe 12 moving in the cooling water passage 106 and the suction probe 1.
Inspection pump 1 that sucks gas in cooling water passage 106 from 2
3 and a measuring device 14 for detecting helium gas discharged from the pump. The suction probe 12 is inserted into the cooling water passage 106 from the opening / closing valve 15 side provided at the distal end side of the gas supply pipe 1, and serves to suck the gas in the cooling water passage 106 while moving inside the cooling water passage 106. Therefore, the tubular body is extremely thin so that it can be inserted into the cooling water passage 106, and has flexibility so that it can move even at a curved portion of the cooling water passage 106 having a curved shape.
For example, while having a thin and extremely thin cylindrical body,
Formed to be longer than the length of the cooling water passage 106 (inner diameter 0.5
(φ, length 50 m).

【0017】検査ポンプ13は、検査用ガスであるヘリ
ウムガス以外のガスを吸着すると共に、ヘリウムガスの
みをそのまま通過させるものであり、そのため、内部に
ヘリウムガス以外のガスを吸着する特殊な吸着材が設け
られている。測定器14は、検査ポンプ13から吐出さ
れたヘリウムガスを検出すると、図4に実線Aにて示す
最も高い部分の如く、その検出信号に応じて出力表示す
るようにしている。この場合、測定器14によってヘリ
ウムガスが検出されると、そのときの冷却水路1に対す
る吸込みプローブ12の長さに基づき、冷却水路1の水
しみだし部分の位置(図4においてBの部分)、即ち冷
却水路1を形成する角パイプ105の水しみだし部分を
特定するようにしている。
The inspection pump 13 adsorbs a gas other than helium gas, which is an inspection gas, and passes only helium gas as it is. Therefore, a special adsorbent for adsorbing a gas other than helium gas therein is used. Is provided. When detecting the helium gas discharged from the inspection pump 13, the measuring device 14 outputs and displays the helium gas in accordance with the detection signal, as indicated by the highest portion indicated by the solid line A in FIG. In this case, when the helium gas is detected by the measuring device 14, the position of the bleeding portion of the cooling water channel 1 (portion B in FIG. 4) is determined based on the length of the suction probe 12 with respect to the cooling water channel 1 at that time. That is, the bleeding portion of the square pipe 105 forming the cooling water channel 1 is specified.

【0018】この漏れ検査装置は概略的には、冷却水路
106内に加圧されたヘリウムガスを充満させ、冷却水
路106内から、これを形成する各パイプ105の水し
みだし部分とその周囲の絶縁物とにヘリウムガスを押し
出し、次いで、冷却水路106内の不要な検査用ガスを
除去した後、冷却水路106内から各パイプ105の水
しみだし部分とその周囲の絶縁物とに押し出されたヘリ
ウムガスを、冷却水路106における水しみだし部分に
引き出し粘性流状態にして、その後、吸込みプローブ1
2を冷却水路106内で移動しながら吸込みプローブに
ガスを吸込ませ、該吸込みプローブ12が冷却水路10
6内に滞留しているヘリウムガスを検出したとき、冷却
水路106における吸込みプローブ12の移動量に基づ
き冷却水路106の水しみだし部分を特定するようにし
たものである。
This leak inspection apparatus is generally filled with a pressurized helium gas in a cooling water passage 106, and from the inside of the cooling water passage 106, a bleeding portion of each pipe 105 forming the same and its surroundings. The helium gas was extruded into the insulator and then unnecessary inspection gas in the cooling water passage 106 was removed, and then the water was extruded from the cooling water passage 106 into the oozing portion of each pipe 105 and the surrounding insulator. The helium gas is drawn into a water seepage portion in the cooling water channel 106 to be in a viscous flow state.
2 is moved in the cooling water channel 106 to suck gas into the suction probe, and the suction probe 12
When the helium gas staying in the cooling water passage 6 is detected, the water leaking portion of the cooling water passage 106 is specified based on the movement amount of the suction probe 12 in the cooling water passage 106.

【0019】次に、実施例の細管漏れ検査装置の取扱い
に関連して本発明方法の一実施例を、図5を用いて述べ
る。冷却水路1の検査に先立ち、トロイダルコイル10
0の冷却水路106内の水を完全に抜き取った後(ステ
ップ31)、検査に必要な準備処理を行う。
Next, an embodiment of the method of the present invention will be described with reference to FIG. Prior to the inspection of the cooling water channel 1, the toroidal coil 10
After completely draining the water in the cooling water passage 106 (step 31), a preparation process required for inspection is performed.

【0020】即ち、まず、冷却水路106の一端にガス
供給管1の先端を接続すると共に、冷却水路106の末
端にガス排気管4を接続した後、その状態で冷却水路1
06内を完全に乾燥する。この場合、ガス供給管1のヘ
リウムガス用の開閉弁8,検出用の開閉弁15を夫々閉
にする一方、ガス供給管1の流量調整弁6,ガス排気管
4の開閉弁10を開き、次いで、窒素ガス供給源2より
冷却水路106内に窒素ガスを供給することにより、冷
却水路106内を乾燥させる(ステップ32)。
That is, first, the end of the gas supply pipe 1 is connected to one end of the cooling water passage 106, and the gas exhaust pipe 4 is connected to the end of the cooling water passage 106.
06 is completely dried. In this case, the on-off valve 8 for helium gas and the on-off valve 15 for detection of the gas supply pipe 1 are respectively closed, while the flow control valve 6 of the gas supply pipe 1 and the on-off valve 10 of the gas exhaust pipe 4 are opened. Next, the inside of the cooling water passage 106 is dried by supplying nitrogen gas into the cooling water passage 106 from the nitrogen gas supply source 2 (step 32).

【0021】その後、開閉弁6を閉じると共に真空ポン
プ5を駆動し、冷却水路106内の窒素ガスを真空引き
することにより、ガスを完全に抜き取る(ステップ3
3)。なお、冷却水路106内の真空引きが終了した時
点で、真空ポンプ5の運転を停止する。真空引きされた
か否かは、連成計9及び真空計11を監視することによ
り、確認することができる。
Thereafter, the on-off valve 6 is closed and the vacuum pump 5 is driven to evacuate the nitrogen gas in the cooling water passage 106 to completely remove the gas (step 3).
3). When the evacuation of the cooling water passage 106 is completed, the operation of the vacuum pump 5 is stopped. Whether or not the evacuation has been performed can be confirmed by monitoring the compound gauge 9 and the vacuum gauge 11.

【0022】上記真空引き後、今度は、冷却水路106
内に検査用ガスとしてのヘリウムガスを供給し加圧する
(ステップ34)。即ち、分岐間1bの開閉弁を開く
一方、ガス排気管4の開閉弁10を閉じ、その状態でヘ
リウムガス供給源3により、加圧されたヘリウムガスを
冷却水路106内に供給して充満させる。これにより、
冷却水路106を形成する角パイプ105の周壁に水し
みだし部分が存在する場合、冷却水路106内のヘリウ
ムガスが各パイプ周壁の水しみだし部分と、その外周側
の絶縁部分とにヘリウムガスを押し出された状態とな
る。この場合、加圧されたヘリウムガスは、冷却水路1
06内にそのままの状態で1時間程度保持され、冷却水
路106内から各パイプ周壁の水しみだし部分及びその
外周側の絶縁物に確実に押し出されるようにする。その
後、分岐管1bの開閉弁8を閉じると共に、ガス排気管
4の開閉弁10を開き、冷却水路106内のヘリウムガ
スを大気圧状態に減圧する。
After the evacuation, the cooling water passage 106
A helium gas as a test gas is supplied and pressurized (step 34). That is, while the on-off valve 8 of the branch 1b is opened, the on-off valve 10 of the gas exhaust pipe 4 is closed, and in this state, the helium gas supply source 3 supplies the pressurized helium gas into the cooling water passage 106 to fill it. Let it. This allows
When there is a water seepage portion on the peripheral wall of the square pipe 105 forming the cooling water channel 106, the helium gas in the cooling water channel 106 supplies helium gas to the water seepage portion of each pipe peripheral wall and the insulating portion on the outer peripheral side. It will be in the state of being pushed out. In this case, the pressurized helium gas is supplied to the cooling water passage 1
06 is maintained for about one hour as it is, so that it is surely pushed out of the cooling water passage 106 to the oozing portion of each pipe peripheral wall and the insulator on the outer peripheral side thereof. Thereafter, the on-off valve 8 of the branch pipe 1b is closed, and the on-off valve 10 of the gas exhaust pipe 4 is opened to reduce the pressure of the helium gas in the cooling water passage 106 to the atmospheric pressure.

【0023】しかる後、冷却水路106に再び窒素ガス
を供給し、冷却水路106内のヘリウムガスを窒素ガス
に置換する(ステップ35)。この場合、分岐管1aの
流量調整弁6を開き、窒素ガス供給源2により窒素ガス
を供給することにより、冷却水路106内のヘリウムガ
スを窒素ガスに置換する。
Thereafter, the nitrogen gas is again supplied to the cooling water passage 106, and the helium gas in the cooling water passage 106 is replaced with nitrogen gas (step 35). In this case, the helium gas in the cooling water passage 106 is replaced with nitrogen gas by opening the flow control valve 6 of the branch pipe 1a and supplying nitrogen gas from the nitrogen gas supply source 2.

【0024】従って、冷却水路106内においてヘリウ
ムガス状態から窒素ガスに置換することにより、冷却水
路106では、各パイプ周壁の水しみだし部分及び絶縁
物に押し出されているヘリウムガス以外の不要なヘリウ
ムガスが排気されることとなる。
Therefore, by replacing the helium gas state with the nitrogen gas in the cooling water passage 106, unnecessary helium other than the helium gas extruded by the water bleeding portion of each pipe peripheral wall and the insulator in the cooling water passage 106. The gas will be exhausted.

【0025】そして、吸込みプローブ12を冷却水路1
06に挿入するため、ガス供給管1の開閉弁15を開
け、ここに図示しないプローブ用ジョンイント等の工具
を介し吸込みプローブ12の先端部を入れる(ステップ
36)。この場合、吸込みプローブ12と開閉弁15間
には隙間が発生してガスが漏れることのないようにする
ため、図示しないシール材を充填する。なお、吸込みプ
ローブ12は、予め検査ポンプ13及び測定器14が運
転されているので、開閉弁15側から挿入したとき、冷
却水路106内のヘリウムガスを吸い込もうとするが、
上記ステップ35の処理により冷却水路内が窒素ガスに
置換されているので、不要なヘリウムガスを吸込んで検
査の誤診を招くおそれがない。
Then, the suction probe 12 is connected to the cooling water channel 1.
In order to insert the suction probe into the gas inlet pipe 06, the on-off valve 15 of the gas supply pipe 1 is opened, and the tip of the suction probe 12 is inserted therein through a tool such as a probe joint (not shown) (step 36). In this case, a sealing material (not shown) is filled to prevent a gas from leaking due to a gap between the suction probe 12 and the on-off valve 15. Since the inspection pump 13 and the measuring device 14 are operated in advance, the suction probe 12 tries to suck the helium gas in the cooling water passage 106 when inserted from the on-off valve 15 side.
Since the inside of the cooling water channel is replaced with the nitrogen gas by the processing of the above step 35, there is no possibility that unnecessary helium gas is inhaled to cause a misdiagnosis of the inspection.

【0026】次いで、分岐管1aの流量調整弁6及びガ
ス排気管4の開閉弁を開き、窒素ガス供給源2より冷却
水路106内に窒素ガスを流すと共に、その流し続けて
いる状態のとき、真空ポンプ5を運転して冷却水路10
6内が負圧になるように減圧する(ステップ37)。こ
れにより、角パイプ105の水しみだし部分及びその外
周側の絶縁物に押し出されているヘリウムガスが冷却水
路106の空間に引き出されることとなる。
Next, the flow rate control valve 6 of the branch pipe 1a and the open / close valve of the gas exhaust pipe 4 are opened, and the nitrogen gas is supplied from the nitrogen gas supply source 2 into the cooling water passage 106. By operating the vacuum pump 5, the cooling water passage 10
The pressure is reduced so that the inside of the chamber 6 becomes a negative pressure (step 37). As a result, the helium gas that has been pushed out by the draining portion of the square pipe 105 and the insulator on the outer peripheral side thereof is drawn into the space of the cooling water passage 106.

【0027】またそのとき、冷却水路106内に引き出
されたヘリウムガスが水しみだし部より上流にはなく、
水しみだし部と下流側にのみ存在するようにするため、
流量調整弁6を調節し、所望量の窒素ガスを冷却水路1
06内に供給して冷却水路106内を粘性流状態にする
(ステップ38)。
At that time, the helium gas drawn into the cooling water passage 106 is not located upstream of the water seepage portion,
In order to be present only at the bleeding part and downstream,
The flow control valve 6 is adjusted to supply a desired amount of nitrogen gas to the cooling water channel 1.
06 to make the inside of the cooling water passage 106 into a viscous flow state (step 38).

【0028】上述の如く、冷却水路106内の水しみだ
し部分側にヘリウムガスが引き出され、かつ粘性流状態
状態にあるとき、今度は、ヘリウムガスの検出を開始す
る(ステップ39)。即ち、吸込みプローブ12を冷却
水路106内で移動させ、吸込みプローブ12の先端部
が冷却水路106の全経路内に通過するようにする。こ
の場合、吸込みプローブ12は、柔軟性があるので、冷
却水路106が彎曲していても、確実に移動することが
できる。なお、吸込みプローブ12の移動は、ヘリウム
ガスを確実に吸い込めるようするため、上流側から下流
側へゆっくり移動すればよく、さらには下流側から上流
側に戻るようにするのも好ましい。
As described above, when the helium gas is drawn out to the draining portion side in the cooling water passage 106 and is in a viscous flow state, detection of the helium gas is started (step 39). That is, the suction probe 12 is moved in the cooling water passage 106 so that the distal end of the suction probe 12 passes through the entire cooling water passage 106. In this case, since the suction probe 12 is flexible, the suction probe 12 can surely move even if the cooling water passage 106 is curved. The suction probe 12 may be moved slowly from the upstream side to the downstream side in order to surely suck the helium gas, and it is also preferable to return from the downstream side to the upstream side.

【0029】上記吸込みプローブ12の移動時、測定器
14がヘリウムガスを検出したか否かをチェックする
(ステップ40)。例えば、冷却水路106内の水しみ
だし部分側に吸込みプローブ12が達し、該吸込みプロ
ーブ12の先端部より、検査用ガスのヘリウムガスを吸
込んだ場合、ヘリウムガスは、吸込みプローブ12を介
して検査ポンプ13に取り込まれ、測定器14に送り出
されると、該測定器14は、図4に実線AのB部分にて
示すように、出力が著しく高く表示されることとなる。
When the suction probe 12 moves, it is checked whether or not the measuring instrument 14 has detected helium gas (step 40). For example, when the suction probe 12 reaches the water bleeding part side in the cooling water channel 106 and helium gas as a test gas is sucked from the tip of the suction probe 12, the helium gas is inspected through the suction probe 12. When taken into the pump 13 and sent out to the measuring device 14, the output of the measuring device 14 is markedly increased as indicated by the portion B of the solid line A in FIG.

【0030】従って、測定器14によりヘリウムガスが
検出されるので、冷却水路106に対する吸込みプロー
ブ12の送り長さに基づき、冷却水路106を形成する
角パイプ105の水しみだし部分を特定する(ステップ
41)。そして、このヘリウムガスの検査が冷却水路1
06の全経路に亘り行うことにより(ステップ42)、
検査を終了する。
Therefore, since the helium gas is detected by the measuring device 14, the bleeding portion of the square pipe 105 forming the cooling water passage 106 is specified based on the feed length of the suction probe 12 to the cooling water passage 106 (step). 41). The inspection of the helium gas is performed in the cooling water channel 1
06 (step 42).
End the inspection.

【0031】本発明方法では、上記の如く、冷却水路1
06を形成する角パイプ105の周壁に水しみだし部分
が存在する場合、角パイプ周壁の水しみだし部分及びそ
のコイル外周側の絶縁物(包囲材)にヘリウムガスを一
旦押し出し、その後、前記押し出したヘリウムガスを、
冷却水路106内の水しみだし部分側に引き出して粘性
流状態にさせ、その状態で冷却水路106を移動させた
吸込みプローブ12がヘリウムガスを吸込むと、冷却水
路106における吸込みプローブ12の移動量に基づき
冷却水路の水しみだし部分の位置を特定するように構成
したので、水しみだし部分の位置が正確にわかる。この
ため、冷却水路内のガス圧の変動を監視する従来技術に
比較すると、水しみだし部分の位置を確実に特定するこ
とができ、また冷却水路の面積の増大や温度変化に拘わ
ることなく特定できる。
In the method of the present invention, as described above,
In the case where there is a water seepage portion on the peripheral wall of the square pipe 105 forming the helium gas 06, the helium gas is once extruded into the water seepage portion of the square pipe peripheral wall and the insulator (surrounding material) on the outer periphery of the coil. Helium gas
When the suction probe 12 that has moved the cooling water passage 106 sucks helium gas in this state, the amount of movement of the suction probe 12 in the cooling water passage 106 is reduced. Since the position of the bleeding part of the cooling water channel is specified based on this, the position of the bleeding part can be known accurately. For this reason, compared to the conventional technology of monitoring the fluctuation of the gas pressure in the cooling water channel, the position of the water seepage portion can be specified more reliably, and the specified value can be specified regardless of the increase in the area of the cooling water channel or the temperature change. it can.

【0032】なお、図5においては、吸込みプローブ1
2を冷却水路106の一端(上流)から他端(下流)側
に移動するだけの例を示したが、水しみだし部分を特定
する場合、吸込みプローブ12を冷却水路106に対し
逆方向からも移動し、水しみだし部分の位置を確認する
こともある。即ち、冷却水路106の一端にガス排気管
4,真空ポンプ5等を接続すると共に、冷却水路の他端
にガス供給管1,ガス供給源2・3等を接続し、冷却水
路106の他端側から吸込みプローブ12を挿入しかつ
移動することにより、水しみだし部分の位置を確認す
る。図4に示す破線Cは、このような逆の接続状態であ
って、吸込みプローブ12を冷却水路106の他端側か
ら一端側に移動させて検出したときの測定器14の出力
を示している。このような逆接続での確認作業を行う
と、水しみだし部分の特定精度を高めることができるの
で、いっそう有効となる。因みに、このときの測定精度
は、水しみだし部分の特定位置として、冷却水路106
の上流側(一端)から5.89〜5.90mであり、約
10mmの精度での測定することができた。
In FIG. 5, the suction probe 1
2 is only moved from one end (upstream) to the other end (downstream) of the cooling water passage 106. However, when specifying a bleeding portion, the suction probe 12 is moved from the opposite direction to the cooling water passage 106. They may move and check the location of the spill. That is, the gas exhaust pipe 4, the vacuum pump 5, and the like are connected to one end of the cooling water passage 106, and the gas supply pipe 1, the gas supply sources 2, 3, and the like are connected to the other end of the cooling water passage 106. By inserting and moving the suction probe 12 from the side, the position of the draining portion is confirmed. A broken line C shown in FIG. 4 indicates the output of the measuring device 14 when the suction probe 12 is detected by moving the suction probe 12 from the other end to the one end of the cooling water passage 106 in such a reverse connection state. . Performing such a check operation with the reverse connection is more effective because the accuracy of specifying the draining portion can be improved. Incidentally, the measurement accuracy at this time is determined by the cooling water passage 106
5.89 to 5.90 m from the upstream side (one end) of the sample, and could be measured with an accuracy of about 10 mm.

【0033】一方、実施例の漏れ位置検査装置において
は、ヘリウムガス供給源3及び窒素ガス供給源2からな
るガス供給源と、各パイプ105の冷却水路106に対
しガス供給源からのガスを冷却水路106に対し給排す
る一方、冷却水路106内を流通するガスの流量及び圧
力を調整し、流量調整弁6,複数の開閉弁8・10・1
5,真空ポンプ5等からなる給排手段と、冷却水路内を
移動しながら冷却水路内のガスを吸込み,かつ該吸込ん
だガスのうち、冷却水路内の水しみだし部分と下流側に
存在している検査用ガスを測定し、吸込みプローブ1
2,検査ポンプ13,測定器14からなる検査手段とを
有して構成しているので、上記方法を的確に実施し得
る。しかも、吸込みプローブ12は極めて細く、しかも
柔軟性があるので、冷却水路106のように内径が狭く
かつ彎曲した細管内を確実に移動することができ、狭い
空間内でも良好な機能を果たすことができる。
On the other hand, in the leak position inspection apparatus according to the embodiment, the gas from the gas supply source is cooled by the gas supply source including the helium gas supply source 3 and the nitrogen gas supply source 2 and the cooling water passage 106 of each pipe 105. While supplying and discharging to and from the water passage 106, the flow and pressure of the gas flowing through the cooling water passage 106 are adjusted, and the flow control valve 6 and the plurality of on-off valves 8.10.
5, a supply / discharge means comprising a vacuum pump 5 and the like, a gas in the cooling water channel is sucked while moving in the cooling water channel, and a part of the sucked gas is present on a water bleeding portion in the cooling water channel and on the downstream side. Inspection probe 1
2, since it is configured to include the inspection means including the inspection pump 13 and the measuring device 14, the above method can be performed accurately. Moreover, since the suction probe 12 is extremely thin and flexible, the suction probe 12 can surely move in a narrow tube having a small inside diameter and a curved line like the cooling water passage 106, and can perform a good function even in a narrow space. it can.

【0034】なお図示実施例では、吸込みプローブ12
がヘリウムガスを吸込み、該ヘリウムガスを測定器14
により検出した時点で、冷却水路106の水しみだし部
分の位置を演算により求めるようにすることも可能であ
る。そのため、冷却水路106に対する吸込みプローブ
12の移動量を検出する手段と、測定器14がヘリウム
ガスを検出した時点で、吸込みプローブ12の移動量に
基づき冷却水路106における水しみだし部分の位置を
演算する手段とを有すればよい。
In the illustrated embodiment, the suction probe 12
Sucks helium gas, and the helium gas is
The position of the water seepage portion of the cooling water passage 106 can be obtained by calculation at the time of detection. Therefore, means for detecting the amount of movement of the suction probe 12 with respect to the cooling water channel 106, and when the measuring device 14 detects helium gas, calculates the position of the water seepage portion in the cooling water channel 106 based on the amount of movement of the suction probe 12. And means for performing the operation.

【0035】[0035]

【発明の効果】以上述べたように、本発明の請求項1に
よれば、冷却水路内に加圧された検査用ガスを充満さ
せ、細管の周壁に存在している水しみだし部分と導体を
包囲している包囲材とに検査用ガスを押し出し、次い
で、冷却水路内の検査用ガスを除去した後、細管周壁の
水しみだし部分と包囲材とにしみこんでいる検査用ガス
を、冷却水路内に引き出すと共に、該引き出した検査用
ガスが、冷却水路内にキャリアガスを流すことによっ
て、水しみだし部より上流にはなく下流側にのみ存在す
る状態をつくり、その後、予め形成された吸込みプロー
ブを冷却水路に沿い移動しながら、該吸込みプローブに
冷却水路内のガスを吸込ませ、該吸込んだガスのうち、
冷却水路内の水しみだし部分から下流側にのみ存在して
いる検査用ガスを検出した時点で、冷却水路における吸
込みプローブの移動量に基づき細管周壁の水しみだし部
分を特定するようにしたので、水しみだし部分の位置が
正確にわかり、水しみだし部分の位置を確実に特定する
ことができ、また冷却水路の面積の増大や温度変化に拘
わることなく特定できる効果がある。
As described above, according to the first aspect of the present invention, the cooling water channel is filled with the test gas pressurized, and the draining portion and the conductor existing on the peripheral wall of the thin tube are formed. To
Extrude the test gas with the surrounding surrounding material, and then
After removing the inspection gas in the cooling water channel,
Inspection gas soaked in the water seepage and surrounding material
To the cooling water channel and for the inspection
The gas is caused by flowing the carrier gas into the cooling channel.
And exists only downstream, not upstream
Condition, then the pre-formed suction probe
While moving the valve along the cooling channel,
The gas in the cooling water passage is sucked, and of the sucked gas,
It exists only downstream from the water seepage in the cooling channel.
When the test gas is detected,
Bleeding part of the capillary wall based on the amount of movement of the probe
Since so as to identify the partial position of's a water stain portion know exactly, to it water stains can be reliably identify the position of the portion, also identified without involving the increase or the temperature change of the area of the cooling water passage There is an effect that can be done.

【0036】また本発明の請求項2によれば、検査用ガ
ス及びキャリアガスのガス供給源と、細管の冷却水路内
に対しガス供給源からのガスを給排すると共に、冷却水
路内を流通するガスの流量及び圧力を調整し、冷却水路
内から、細管の周壁に存在している水しみだし部分と導
体を包囲している包囲材とに検査用ガスを押し出させ、
かつ該押し出した検査用ガスを冷却水路内の水しみだし
部分で粘性流にさせる手段と、冷却水路内を移動しなが
ら該冷却水路内のガスを吸込み、吸込んだガスのうち、
冷却水路内の水しみだし部分で検査用ガスを測定する検
査手段とを有して構成したので、上記方法を的確に実施
し得る効果がある。
According to the second aspect of the present invention, the gas from the gas supply source is supplied to and discharged from the gas supply source of the inspection gas and the carrier gas to the cooling water channel of the narrow tube, and the gas flows through the cooling water channel. The flow rate and pressure of the gas to be adjusted are adjusted, and from the inside of the cooling water channel, the test gas is pushed out to the oozing part existing on the peripheral wall of the thin tube and the surrounding material surrounding the conductor,
And a means for causing the extruded test gas to become viscous at a bleeding portion in the cooling channel, and sucking the gas in the cooling channel while moving in the cooling channel.
Since it is configured to include the inspection means for measuring the inspection gas at the water bleeding portion in the cooling water channel, there is an effect that the above method can be performed accurately.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明方法を実施するための漏れ位置検査装置
の一実施例を示す配管系統図。
FIG. 1 is a piping diagram showing an embodiment of a leak position inspection device for carrying out the method of the present invention.

【図2】冷却水路を内蔵したトロイダルコイルの一部分
を示す断面説明図。
FIG. 2 is an explanatory sectional view showing a part of a toroidal coil having a built-in cooling water passage;

【図3】同じく図2の要部の拡大図。FIG. 3 is an enlarged view of a main part of FIG. 2;

【図4】測定器の測定状態を示す説明図。FIG. 4 is an explanatory diagram showing a measurement state of a measuring device.

【図5】本発明方法を工程順に示すフローチャート。FIG. 5 is a flowchart showing the method of the present invention in the order of steps.

【符号の説明】[Explanation of symbols]

1…ガス供給管、2…窒素ガス供給源、3…検査用ガス
としてのヘリウムガス供給源、4…ガス排気管、5…真
空ポンプ、6…流量調整弁、7…流量計、8,10,1
5…開閉弁、9…連成計、11…真空計、12…吸込み
プローブ、13…検査ポンプ、14…測定器。
DESCRIPTION OF SYMBOLS 1 ... Gas supply pipe, 2 ... Nitrogen gas supply source, 3 ... Helium gas supply source as inspection gas, 4 ... Gas exhaust pipe, 5 ... Vacuum pump, 6 ... Flow control valve, 7 ... Flow meter, 8, 10 , 1
5 ... open / close valve, 9 ... compound gauge, 11 ... vacuum gauge, 12 ... suction probe, 13 ... inspection pump, 14 ... measuring instrument.

───────────────────────────────────────────────────── フロントページの続き (72)発明者 笹島 弘 茨城県日立市幸町三丁目1番1号 株式 会社 日立製作所 日立工場内 (72)発明者 清水 正亜 茨城県那珂郡那珂町大字向山801番地の 1 日本原子力研究所 那珂研究所内 (72)発明者 新井 貴 茨城県那珂郡那珂町大字向山801番地の 1 日本原子力研究所 那珂研究所内 (72)発明者 松本 潔 茨城県日立市幸町三丁目2番2号 株式 会社 日立エンジニアリングサービス内 (72)発明者 鈴木 政己 茨城県日立市幸町三丁目2番1号 日立 エンジニアリング 株式会社内 (56)参考文献 特開 平4−145340(JP,A) 特開 昭58−147628(JP,A) 特開 平5−27649(JP,A) 特開 昭61−184437(JP,A) 特開 平9−133602(JP,A) (58)調査した分野(Int.Cl.7,DB名) G01M 3/20 G01M 3/02 G01M 3/04 G21C 17/025 GDF ──────────────────────────────────────────────────続 き Continuing on the front page (72) Inventor Hiroshi Sasashima 3-1-1, Saimachi, Hitachi-shi, Ibaraki Pref. Hitachi, Ltd. Hitachi Plant (72) Inventor Masaa Shimizu 801 Mukoyama, Nakamachi, Naka-gun, Naka-gun, Ibaraki Prefecture No. 1 in the Japan Atomic Energy Research Institute Naka Research Laboratory (72) Inventor Takashi Arai 801 in Mukaiyama, Naka-machi, Naka-gun, Naka-gun, Ibaraki Prefecture 1 in Japan Nuclear Research Institute Naka Research Laboratory (72) Inventor Kiyoshi Matsumoto Sachiko Hitachi, Ibaraki Prefecture No. 2-2 Hitachi Engineering Services Co., Ltd. (72) Inventor Masami Suzuki 3-2-1 Sayukicho, Hitachi City, Ibaraki Pref. Hitachi Engineering Co., Ltd. (56) References JP-A-4-145340 (JP, A JP-A-58-147628 (JP, A) JP-A-5-27649 (JP, A) JP-A-61-184437 (JP, A) 133602 (JP, A) (58) Field surveyed (Int. Cl. 7 , DB name) G01M 3/20 G01M 3/02 G01M 3/04 G21C 17/025 GDF

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 冷却水路を形成しかつ環状をなす細管の
周壁に存在する水しみだし部分を検査する方法であっ
て、 A)空になっている状態の冷却水路内に加圧された検査
用ガスを充満し、細管の周壁に存在している水しみだし
部分と導体を包囲している包囲材とに検査用ガスを押し
出させ、 B)次いで、冷却水路内の検査用ガスを除去した後、 C)細管周壁の水しみだし部分と包囲材とにしみこんで
いる検査用ガスを、冷却水路内に引き出すと共に、該引
き出した検査用ガスが、冷却水路内にキャリアガスを流
すことによって、水しみだし部より上流にはなく下流側
にのみ存在する状態をつくり、 D)その状態で、予め形成された吸込みプローブを冷却
水路に沿い移動しながら、該吸込みプローブに冷却水路
内のガスを吸込ませ、 E)該吸込んだガスのうち、冷却水路内の水しみだし部
分から下流側にのみ存在している検査用ガスを検出した
時点で、冷却水路における吸込みプローブの移動量に基
づき細管周壁の水しみだし部分を特定することを特徴と
する細管の漏れ位置検査方法。
1. A thin tube forming a cooling water passage and forming an annular shape.
This is a method to inspect the water seepage on the surrounding wall.
A) Inspection pressurized in the empty cooling water channel
Filled with cleaning gas and seeps on the peripheral wall of the capillary
Part andSurrounds the conductorPress the test gas with the surrounding material
B) Then, after removing the gas for inspection in the cooling water channel, C) soak into the oozing part of the peripheral wall of the thin tube and the surrounding material.
Inspection gas in the cooling water channelAnd pull out the
The test gas that flows out flows carrier gas into the cooling water channel.
By doing so, it is not upstream but downstream
Create a state that only exists in  D) In that state, cool the preformed suction probe
While moving along the water channel, the suction probe
Inhale the gas inside, E)A part of the sucked gas that oozes out in the cooling water channel
Only exists downstream from the minuteInspection gas detected
At this point, the amount of suction probe movement in the cooling
The feature is to identify the bleeding part of the capillary peripheral wall
Inspection method of the leak position of the thin tube to be used.
【請求項2】 冷却水路を形成しかつ環状をなす細管の
周壁に存在する水しみだし部分を検査する装置であっ
て、検査用ガス及びキャリアガスのガス供給源と、細管
の冷却水路内に対しガス供給源からのガスを給排すると
共に、冷却水路内を流通するガスの流量及び圧力を調整
し、冷却水路内から、細管の周壁に存在している水しみ
だし部分と導体を包囲している包囲材とに検査用ガスを
押し出させ、かつ該押し出した検査用ガスを冷却水路内
の水しみだし部分で粘性流状態にさせる手段と、冷却水
路内を移動しながら冷却水路内のガスを吸込み,かつ該
吸込んだガスのうち、冷却水路内の水しみだし部分に引
き出された検査用ガスを測定する検査手段とを有するこ
とを特徴とする細管の漏れ位置検査装置。
2. An apparatus for inspecting a bleeding portion existing on a peripheral wall of a narrow tube forming a cooling water passage and forming an annular shape, comprising: a gas supply source of an inspection gas and a carrier gas; On the other hand, while supplying and discharging the gas from the gas supply source, the flow rate and the pressure of the gas flowing in the cooling water channel are adjusted, and the water seeping portion and the conductor existing on the peripheral wall of the thin tube are surrounded from the cooling water channel. Means for extruding the inspection gas with the surrounding material, and causing the extruded inspection gas to be in a viscous flow state at a bleeding portion in the cooling channel, and a gas in the cooling channel while moving in the cooling channel. And a test means for measuring a test gas drawn into a water bleeding portion of the cooling water passage from the sucked gas.
JP25660097A 1997-09-22 1997-09-22 Method and apparatus for inspecting leak position of thin tube Expired - Fee Related JP3349655B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP25660097A JP3349655B2 (en) 1997-09-22 1997-09-22 Method and apparatus for inspecting leak position of thin tube

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP25660097A JP3349655B2 (en) 1997-09-22 1997-09-22 Method and apparatus for inspecting leak position of thin tube

Publications (2)

Publication Number Publication Date
JPH1194683A JPH1194683A (en) 1999-04-09
JP3349655B2 true JP3349655B2 (en) 2002-11-25

Family

ID=17294894

Family Applications (1)

Application Number Title Priority Date Filing Date
JP25660097A Expired - Fee Related JP3349655B2 (en) 1997-09-22 1997-09-22 Method and apparatus for inspecting leak position of thin tube

Country Status (1)

Country Link
JP (1) JP3349655B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103616317B (en) * 2013-12-16 2016-03-30 南京工业大学 Full-automatic equipment and method for measuring helium diffusion coefficient of material for reactor

Also Published As

Publication number Publication date
JPH1194683A (en) 1999-04-09

Similar Documents

Publication Publication Date Title
JP4499332B2 (en) Method for inspecting and locating leaks and apparatus suitable for carrying out the method
JP6791944B2 (en) Method to control leakage resistance of sealed products and leakage detection device
CN102272570B (en) Leak detection method
EP0632258A2 (en) Methods and apparatus for detection of large leaks
KR950033456A (en) Leak test method and device
US4704897A (en) Locating method of and the locating unit for leaks on piping
JPS56126733A (en) Detecting method for leakage of helium
TWI582401B (en) Helium leak detector
JP4374241B2 (en) System and method for measuring the sealability of an object
JP3349655B2 (en) Method and apparatus for inspecting leak position of thin tube
JP3348147B2 (en) Airtightness inspection machine for temperature control part of temperature type expansion valve
JP2003240670A (en) Airtight leak inspection method and device
JP4395262B2 (en) Method for operating sheet leak detector and sheet leak detector suitable for carrying out the method
JP2008241265A (en) Airtight test method and airtight test collection container
JP4402427B2 (en) Helium gas leak detector
JP4026579B2 (en) Airtight leak inspection method and apparatus
JP2650475B2 (en) Airtight test equipment
JPH06201508A (en) Gas concentration calibration method and calibration instrument applied to mass spectrometric gas leak detector
JPH10281915A (en) How to identify the leak location from the inner pipe in a double pipe
JP4789666B2 (en) Gas pipeline monitoring equipment
JP2002277342A (en) Leakage testing device
JPH10213516A (en) Helium leak detector
JP3028898B2 (en) Pipe leak defect location measurement method
JPH0643938B2 (en) Pinhole position detection method for hollow elongated body
JPS6093936A (en) Leak detector

Legal Events

Date Code Title Description
S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313115

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20070913

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080913

Year of fee payment: 6

LAPS Cancellation because of no payment of annual fees