Work management device

Info

Publication number
JP3351209B2
JP3351209B2 JP33047795A JP33047795A JP3351209B2 JP 3351209 B2 JP3351209 B2 JP 3351209B2 JP 33047795 A JP33047795 A JP 33047795A JP 33047795 A JP33047795 A JP 33047795A JP 3351209 B2 JP3351209 B2 JP 3351209B2
Authority
JP
Japan
Prior art keywords
work
time
tact time
total
tact
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP33047795A
Other languages
Japanese (ja)
Other versions
JPH09168946A (en
Inventor
実 能丸
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nissan Motor Co Ltd
Original Assignee
Nissan Motor Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nissan Motor Co Ltd filed Critical Nissan Motor Co Ltd
Priority to JP33047795A priority Critical patent/JP3351209B2/en
Publication of JPH09168946A publication Critical patent/JPH09168946A/en
Application granted granted Critical
Publication of JP3351209B2 publication Critical patent/JP3351209B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • General Factory Administration (AREA)
  • Control By Computers (AREA)
  • Numerical Control (AREA)
  • Feedback Control In General (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Multi-Process Working Machines And Systems (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、複数の生産機械に
共同して作業を行わせる作業管理装置に係り、特に、生
産計画が遵守できるように作業速度などを自動的に設定
する作業管理装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a work management device for causing a plurality of production machines to work in cooperation, and more particularly to a work management device for automatically setting a work speed and the like so that a production plan can be observed. About.

【0002】[0002]

【従来の技術】従来から、作業効率の向上を目指して、
1つのワーク対し複数の生産機械で異なる作業を同時に
行うようにした生産ラインが稼働している。
2. Description of the Related Art Conventionally, with the aim of improving work efficiency,
2. Description of the Related Art A production line is being operated in which a plurality of production machines simultaneously perform different operations on one work.

【0003】この生産ラインの制御は、生産管理装置に
よって行われている。
[0003] The control of this production line is performed by a production management device.

【0004】生産管理装置が生産計画を入力すると、そ
の日に製造しなければならない車種や台数などを演算
し、この演算結果に基づいてライン速度などを設定して
いる。したがって、生産ラインに故障が起こるなどの事
故が発生しない限りは、生産計画通りの生産が可能であ
る。
When the production management device inputs a production plan, the type of vehicle and the number of vehicles to be manufactured on that day are calculated, and the line speed and the like are set based on the calculation result. Therefore, as long as an accident such as a failure in the production line does not occur, production according to the production plan is possible.

【0005】[0005]

【発明が解決しようとする課題】しかしながら、最近で
は、この生産ラインに、たとえば力覚センサを備えた知
能ロボットなどが配置されるようになり、このような知
能ロボットは与えられた作業がスムースに行われなかっ
た場合には、同一作業を繰り返し行うようになっている
ため、1つの作業が確実に行われるようになって生産ラ
インの停止が少なくなったという点では生産計画を遵守
しやすくなったと言えるが、逆に、繰り返し行う作業が
多くなると、序々に生産速度が遅れぎみとなって生産計
画の遵守が困難になるという新たな問題が発生する。
However, recently, for example, an intelligent robot equipped with a force sensor has been arranged on this production line, and such an intelligent robot can smoothly perform a given task. If not performed, the same operation is repeated, so that one operation can be performed reliably, and the production plan can be easily observed in terms of fewer stoppages of the production line. On the contrary, when the number of repetitive operations increases, a new problem arises in that the production speed gradually becomes slow and it becomes difficult to comply with the production plan.

【0006】もちろん、人間が常に生産計画と生産実績
を監視してライン速度の変更を行えば、この問題はある
程度は解消されると思われるが、常に監視することは実
際には困難である。
Of course, if a human constantly monitors the production plan and production results and changes the line speed, this problem may be solved to some extent, but it is actually difficult to always monitor.

【0007】本発明は、以上のような問題点を解消する
ためになされたものであり、生産計画が遵守できるよう
に作業速度などを自動的に設定する生産管理装置の提供
を目的とする。
SUMMARY OF THE INVENTION The present invention has been made to solve the above problems, and has as its object to provide a production management apparatus for automatically setting a work speed and the like so as to comply with a production plan.

【0008】[0008]

【課題を解決するための手段】請求項1記載の発明は、
複数の生産機械(20,25A,25B,15A,15
F)に共同して作業を行わせる作業管理装置(60)で
あって、生産計画に基づいてワーク種ごとに要求される
要求タクトタイムを算出する要求タクトタイム算出手段
(62)と、前記複数の生産機械(20,25A,25
B,15A,15F)に予め設定されている作業条件に
基づいて、作業管理の基準となる基準タクトタイムをワ
ーク種ごとに算出する基準タクトタイム算出手段(6
4)と、当該基準タクトタイム算出手段(64)により
算出された基準タクトタイムが前記要求タクトタイム算
出手段(62)により算出された要求タクトタイムより
も長い場合には、前記複数の生産機械(20,25A,
25B,15A,15F)のそれぞれの作業速度を、前
記基準タクトタイムが前記要求タクトタイム内に収まる
ように予め設定した範囲内で変更する作業速度変更手段
(65A)と、当該作業速度変更手段(65A)によっ
て前記複数の生産機械(20,25A,25B,15
A,15F)のそれぞれの作業速度を最大限まで上昇し
てもなお前記基準タクトタイムを前記要求タクトタイム
内に収めることができない場合には、前記複数の生産機
械(20,25A,25B,15A,15F)のそれぞ
れに割り付ける作業を変更して前記基準タクトタイムが
前記要求タクトタイムに近付くように、あるいは収まる
ようにする作業割付変更手段(65B)とを有すること
を特徴とする作業管理装置である。
According to the first aspect of the present invention,
A plurality of production machines (20, 25A, 25B, 15A, 15
(F) a work management device (60) for performing a work in cooperation with the required tact time calculation means (62) for calculating a required tact time required for each work type based on a production plan; Production machines (20, 25A, 25
(B, 15A, 15F) based on work conditions set in advance, a reference tact time calculating means (6) for calculating a reference tact time as a reference for work management for each work type.
4) and if the reference tact time calculated by the reference tact time calculation means (64) is longer than the required tact time calculated by the required tact time calculation means (62), the plurality of production machines ( 20, 25A,
25B, 15A, 15F)
The reference tact time falls within the required tact time
Work speed changing means to change within a preset range
(65A) and the working speed changing means (65A).
The plurality of production machines (20, 25A, 25B, 15
A, 15F) to increase the working speed of each
The reference takt time is still required by the required takt time.
If it is not possible to fit in the
Machines (20, 25A, 25B, 15A, 15F)
Change the work to be assigned to
To approach or fall within the required takt time
And a work allocation changing means (65B) for performing the above operation.

【0009】たとえば、生産計画に基づいて、A車につ
いては1日に200台生産する必要があるから2分/
台、またB車については1日に100台生産する必要が
あるから3分/台の割合で生産しなければならないとい
うように、生産にかけられる時間、すなわち要求タクト
タイムを求め、また、たとえば1つ1つの部品の組み付
けに要する作業速度やどのロボットにどの作業をさせる
かという作業割付といった予め設定してある作業条件か
ら、この作業条件ではA車については2.5分/台の割
合で生産でき、B車については2.7分/台の割合で生
産できるというように、生産にかかるであろう時間、す
なわち基準タクトタイムを求める。
For example, based on a production plan, it is necessary to produce 200 vehicles per day for car A, so that 2 minutes /
The time required for production, that is, the required tact time, is calculated. For example, the required production time is 3 minutes per vehicle. Based on the preset work conditions such as the work speed required for assembling each part and the work assignment of which robot to perform, under these work conditions, the car A is produced at a rate of 2.5 minutes / vehicle. Then, the time required for the production, that is, the reference tact time, is determined so that the car B can be produced at a rate of 2.7 minutes / vehicle.

【0010】上記の例では、A車を2分/台で生産する
必要があるのに、予め設定してある作業条件では2.5
分/台の割合でしか生産できないのであるから、この車
種に対しては、作業速度を優先して基準タクトタイムが
要求タクトタイム内に収まるようにし、さらに、作業速
度だけでは不足の場合に、作業割付を変更して基準タク
トタイムが要求タクトタイム内に収まるようにする。
In the above example, although it is necessary to produce the A-vehicle at 2 minutes / vehicle, under the preset working conditions, 2.5
Because the car can be produced only at the rate of min / vehicle, the standard tact time is
Within the required tact time, and work speed
If only the degree is insufficient, change the work assignment and
Time within the required takt time.

【0011】このように、作業条件を変更することで生
産計画を遵守した生産が行えるようになる。また、生産
計画が大きく変動した場合でもその要求に応えることが
できるようになる。
As described above, by changing the working conditions, it becomes possible to carry out production in compliance with the production plan. Also production
Meet the demands even if the plan fluctuates greatly
become able to.

【0012】請求項2に記載の発明においては、複数の
生産機械(20,25A,25B,15A,15F)に
共同して作業を行わせる作業管理装置(60)であっ
て、生産計画に基づいてワーク種ごとに要求される要求
タクトタイムを算出する要求タクトタイム算出手段(6
2)と、前記複数の生産機械(20,25A,25B,
15A,15F)に予め設定されている作業条件に基づ
いて、作業管理の基準となる基準タクトタイムをワーク
種ごとに算出する基準タクトタイム算出手段(64)
と、当該基準タクトタイム算出手段(64)により算出
された基準タクトタイムが前記要求タクトタイム算出手
段(62)により算出された要求タクトタイムよりも長
い場合には、前記複数の生産機械(20,25A,25
B,15A,15F)のそれぞれに割り付ける作業を、
前記基準タクトタイムが前記要求タクトタイムよりも小
さくなるように変更する作業割付変更手段(65B)
と、当該作業割付変更手段(65B)によって前記基準
タクトタイムを最短としてもなお前記基準タクトタイム
が前記要求タクトタイムよりも小さくできない場合に
は、前記複数の生産機械(20,25A,25B,15
A,15F)のそれぞれの作業速度を所望の範囲内で変
更して前記基準タクトタイムが前記要求タクトタイムに
近付くように、あるいは短くなるようにする作業速度変
更手段(65A)とを有することを特徴とする作業管理
装置である。
According to the second aspect of the present invention, a plurality of
For production machines (20, 25A, 25B, 15A, 15F)
A work management device (60) for performing work jointly.
Required for each work type based on the production plan
Request tact time calculation means (6) for calculating tact time
2) and the plurality of production machines (20, 25A, 25B,
15A, 15F) based on the work conditions set in advance.
And set a standard tact time as a standard for work management.
Reference tact time calculation means (64) for each species
And the reference tact time calculation means (64)
The calculated reference tact time is calculated by the required tact time.
Longer than the required takt time calculated by step (62)
In this case, the plurality of production machines (20, 25A, 25
B, 15A, 15F)
The reference takt time is smaller than the required takt time
Work assignment changing means (65B) for changing so that it becomes easier
And the work allocation changing means (65B)
Even if the tact time is the shortest, the reference tact time
Is not smaller than the required tact time
Are the plurality of production machines (20, 25A, 25B, 15
A, 15F) are changed within a desired range.
In addition, the reference takt time becomes the required takt time.
Change the working speed to get closer or shorter.
A work management device comprising a further means (65A) .

【0013】このように、作業割付を優先して基準タク
トタイムが要求タクトタイム内に収まるようにし、さら
に、作業割付だけでは不足の場合に、作業速度を変更し
て基準タクトタイムが要求タクトタイム内に収まるよう
にすれば、生産計画が大きく変動した場合でもその要求
に応えることができるようになる。
As described above, the work assignment is prioritized so that the reference takt time falls within the required takt time. Further, if the work assignment alone is insufficient, the work speed is changed to change the reference takt time to the required takt time. If it falls within the range, even if the production plan fluctuates greatly, it becomes possible to respond to the demand.

【0014】請求項3記載の発明においては、さらに、
前記複数の生産機械(20,25A,25B,15A,
15F)が行う作業の各作業要素ごとの実績作業時間を
ワーク種別に記憶する実績作業時間記憶手段(68)
と、当該実績作業時間記憶手段(68)に記憶されてい
る実績作業時間から前記複数の生産機械(20,25
A,25B,15A,15F)の各作業要素ごとの作業
要素別タクトタイムをワーク種別に統計処理によって求
める統計処理手段(69)と、入力したワーク種ごとの
基準タクトタイムから残り作業にかけることができる総
タクトタイムを算出する総タクトタイム算出手段(6
6)と、前記統計処理手段(69)によって求められた
前記ワーク種ごとの作業要素別タクトタイムから残り作
業にかかる総作業タクトタイムを算出する総作業タクト
タイム算出手段(67)と、当該総作業タクトタイム算
出手段(67)により算出された総作業タクトタイムが
前記総タクトタイム算出手段(66)により算出された
総タクトタイムよりも長い場合には、当該総作業タクト
タイムが総タクトタイムより短くなるように、以降の作
業については前記複数の生産機械(20,25A,25
B,15A,15F)のそれぞれの作業条件を設定され
ている作業条件から新たな作業条件に変更する作業条件
変更手段(65)とを有することを特徴とする作業管理
装置である。
According to the third aspect of the present invention, there is further provided:
The plurality of production machines (20, 25A, 25B, 15A,
15F) The actual work time for each work element of the work performed
Actual work time storage means (68) for storing the work type
Is stored in the actual work time storage means (68).
From the actual working hours of the production machines (20, 25)
A, 25B, 15A, 15F) for each work element
Tact time for each element is calculated for each work type by statistical processing
Statistical processing means (69), and for each input work type
Total work that can be performed from the reference tact time to the remaining work
Total tact time calculation means (6) for calculating tact time
6) and calculated by the statistical processing means (69).
From the tact time for each work element for each work type,
Total work tact to calculate total work tact time related to the industry
Time calculation means (67) and the total work tact time calculation
The total work tact time calculated by the delivery means (67) is
Calculated by the total tact time calculation means (66)
If it is longer than the total takt time,
Subsequent work so that the time is shorter than the total takt time
Business, the production machines (20, 25A, 25
B, 15A, 15F)
Work conditions to change from existing work conditions to new work conditions
A work management device comprising a change unit (65) .

【0015】力覚センサを持つロボットでは、同一の作
業であっても必ず同一の時間で終わるとは限らないこと
から、作業の途中において、以降の作業にかけることが
できる総タクトタイムと、以降の作業においてかかって
しまうであろう総作業タクトタイムとを求めるようにし
いる。総作業タクトタイムは、これから行われる作業
での動作補正の状況によって大きく異なることがあるの
で、できるだけ正確な数値を求める必要がある。
In a robot having a force sensor, even if the same operation is performed, the same operation does not always end in the same time. And the total work tact time that would be required in the work. Since the total work tact time may vary greatly depending on the situation of motion correction in the work to be performed, it is necessary to obtain a numerical value that is as accurate as possible.

【0016】このために、過去に行われた作業要素ごと
の実績作業時間をワーク種別に蓄積し、これを統計処理
することによって、より正確な総作業タクトタイムを求
めることができるようにしている。
For this reason, the actual work time of each work element performed in the past is accumulated in the work type, and the accumulated work time is statistically processed, so that a more accurate total work tact time can be obtained. .

【0017】このようにすれば、補正動作などが原因で
作業が遅れぎみとなっても、基準タクトタイム内でその
作業をより確実に完了させることができるようになり、
結果として生産計画を遵守した生産が行えるようにな
る。
In this way, even if the work is delayed due to a correction operation or the like, the work can be completed more reliably within the reference tact time.
As a result, production can be performed in compliance with the production plan.

【0018】請求項4に記載の発明においては、前記作
業条件変更手段は、前記複数の生産機械(20,25
A,25B,15A,15F)のそれぞれの作業速度
を、前記総作業タクトタイムが前記総タクトタイム内に
収まるように予め設定した範囲内で変更する作業速度変
更手段(65A)と、当該作業速度変更手段(65A)
によって前記複数の生産機械(20,25A,25B,
15A,15F)のそれぞれの作業速度を最大限まで上
昇してもなお前記総作業タクトタイムが前記総タクトタ
イム内に収めることができない場合には、前記複数の生
産機械のそれぞれに割り付ける作業を変更して前記総作
業タクトタイムが前記総タクトタイムに近付くように、
あるいは収まるようにする作業割付変更手段(65B)
とを有することを特徴とする作業管理装置である。
In the invention described in claim 4, the work
The business condition changing means includes the plurality of production machines (20, 25).
A, 25B, 15A, 15F)
The total work tact time is within the total tact time.
Work speed change within a preset range to fit
Changing means (65A) and the working speed changing means (65A)
The plurality of production machines (20, 25A, 25B,
15A, 15F) each work speed to the maximum
Even if it rises, the total work takt time still
If it is not possible to fit in the
Change the work assigned to each production machine to
As the work tact time approaches the total tact time,
Or work assignment changing means (65B) to make it fit
And a work management device comprising:

【0019】このように、作業速度を優先して総作業タ
クトタイムが総タクトタイム内に収まるようにし、さら
に、作業速度だけでは不足の場合に、作業割付を変更し
総作業タクトタイムが総タクトタイムに近付くよう
に、あるいは収まるようにすれば、生産計画が大きく変
動した場合でもその要求に応えることができるようにな
る。
As described above, the total work time is given priority to the work speed .
Work time within the total takt time, and if the work speed alone is not enough, change the work assignment so that the total work takt time approaches the total takt time.
To, or if so fit, it is possible to meet the requirements even when the production plan is varied greatly.

【0020】請求項5記載の発明においては、前記作業
条件変更手段は、前記複数の生産機械(20,25A,
25B,15A,15F)のそれぞれに割り付ける作業
を、前記総作業タクトタイムが前記総タクトタイムより
も小さくなるように変更する作業割付変更手段(65
B)と、当該作業割付変更手段(65B)によって前記
総作業タクトタイムを最短としてもなお前記総作業タク
トタイムが前記総タクト タイムよりも小さくできない場
合には、前記複数の生産機械(20,25A,25B,
15A,15F)のそれぞれの作業速度を所望の範囲内
で変更して前記総作業タクトタイムが前記総タクトタイ
ムに近付くように、あるいは短くなるようにする作業速
度変更手段(65A)とを有することを特徴とする作業
管理装置である。
According to the fifth aspect of the present invention , the work
The condition changing means includes a plurality of the production machines (20, 25A,
25B, 15A, 15F)
The total work tact time is greater than the total tact time
Allocation change means (65) for changing the
B) and said work assignment changing means (65B)
Even if the total work tact time is minimized,
If the total time cannot be less than the total takt time
In this case, the plurality of production machines (20, 25A, 25B,
15A, 15F) within the desired range
To change the total work tact time to the total tact time.
Working speed to approach or shorten
A work management device comprising a degree changing means (65A) .

【0021】このように、作業割付を優先して総作業タ
クトタイムが総タクトタイム内に収まるようにし、さら
に、作業割付だけでは不足の場合に、作業速度を変更し
総作業タクトタイムが総タクトタイムに近付くよう
に、あるいは収まるようにすれば、生産計画が大きく変
動した場合でもその要求に応えることができるようにな
る。
In this way, the total work
The work time within the total takt time, and if the work assignment alone is not enough, change the work speed so that the total work takt time approaches the total takt time.
To, or if so fit, it is possible to meet the requirements even when the production plan is varied greatly.

【0022】[0022]

【発明の実施の形態】以下に、本発明の実施例を図面に
基づいて詳細に説明する。
Embodiments of the present invention will be described below in detail with reference to the drawings.

【0023】図1は、本発明の作業管理装置が適用され
る生産ラインの一例を示したものである。
FIG. 1 shows an example of a production line to which the work management device of the present invention is applied.

【0024】図示されているように、この生産ライン
は、作業ステージ5の周囲に設けられた走行軌道10
A,10B,10C上をワークである部品を搬送する自
動搬送車(以下、AGVという)15A〜15Fと、作
業ステージ5に設けられている両腕ロボット20と、多
軸型のロボット25A,25Bとから構成されている。
As shown, the production line includes a traveling track 10 provided around a work stage 5.
Automatic transfer vehicles (hereinafter, referred to as AGVs) 15A to 15F for transferring parts as works on A, 10B, and 10C, a double-arm robot 20 provided on the work stage 5, and multi-axis robots 25A and 25B. It is composed of

【0025】AGV15A〜15Dは、単に部品の搬送
を行うために設けられているものであり、AGV15
E,15Fは、単に部品を搬送するのみならず、載置し
ている部品を必要に応じて上下させたり、左右にスライ
ドさせたりしてロボット20,25A,25Bの作業を
助けるように動作する。これらAGV15A〜15Fお
よびロボット20,25A,25Bの動作は、統合コン
トローラ30によって総合的に制御される。また、この
統合コントローラ30には、後述する作業管理装置60
が接続され、この作業管理装置60からの指令によって
生産管理が行われる。請求項における複数の生産機械と
は、両腕ロボット20と多軸型のロボット25A,25
Bと、AGV15E,15Fに相当する。
The AGVs 15A to 15D are provided merely for carrying parts,
E and 15F operate not only to convey the parts but also to move the placed parts up and down or slide left and right as needed to assist the robots 20, 25A and 25B in their operations. . The operations of the AGVs 15A to 15F and the robots 20, 25A, 25B are comprehensively controlled by the integrated controller 30. The integrated controller 30 includes a work management device 60 described later.
Are connected, and production management is performed according to a command from the work management device 60. The plurality of production machines in the claims are the double-arm robot 20 and the multi-axis robots 25A and 25A.
B and AGV15E, 15F.

【0026】なお、両腕ロボット20はCR制御盤35
によって、また、多軸型ロボット25A,25BはAR
制御盤40によってそれぞれ個別的に制御される。
The two-armed robot 20 has a CR control panel 35
And the multi-axis robots 25A and 25B are AR
Each is individually controlled by the control panel 40.

【0027】両腕ロボット20は、走行軌道10C上を
走行するAGV15E,15Fと協調して作業を行う協
調型のロボットであり、作業の内容に応じて作業ツール
を自動的に取り替える機能を有している。また、視覚セ
ンサや力覚センサを備えているので、ある程度の力が加
わると弾性変形してしまうような柔らかい部品の組立も
視覚コントローラ17や力覚コントローラ19の制御に
よって繰り返し作業を行うことが可能となっているた
め、容易に行うことができるようになっている。AGV
15E,15Fは、協調型の両腕ロボット20と協調し
て動作する協調型のAGVである。
The double-armed robot 20 is a cooperative robot that works in cooperation with the AGVs 15E and 15F running on the running track 10C, and has a function of automatically changing work tools according to the contents of the work. ing. In addition, since a visual sensor and a force sensor are provided, it is possible to perform repetitive operations under the control of the visual controller 17 and the force controller 19 for assembling soft parts that are elastically deformed when a certain amount of force is applied. Therefore, it can be easily performed. AGV
15E and 15F are cooperative AGVs that operate in cooperation with the cooperative two-armed robot 20.

【0028】図2は、作業管理装置60の概略構成を示
すブロック図である。
FIG. 2 is a block diagram showing a schematic configuration of the work management device 60.

【0029】図に示すホストコンピュータ70は、販売
会社などから送られてくる受注状況から、本日生産しな
ければならない車種、仕様、台数に関する生産計画を演
算するコンピュータであり、このホストコンピュータ7
0によって演算された生産計画は生産計画入力部61を
介して作業管理装置60内に入力される。
The host computer 70 shown in the figure is a computer for calculating a production plan relating to the type of vehicle, specification, and number of vehicles to be produced today based on the order status sent from a sales company or the like.
The production plan calculated by 0 is input into the work management device 60 via the production plan input unit 61.

【0030】要求タクトタイム算出部62は、生産計画
入力部61を介して入力した生産計画から、どの車種の
どの仕様は一台当たり何分で生産すべきかという要求タ
クトタイムを、その日の生産ラインの稼働時間などに基
づいて算出する部分であり、要求タクトタイム算出手段
として機能する。
The required tact time calculation unit 62 calculates the required tact time from the production plan input through the production plan input unit 61, which specification of which model should be produced in what time per car, and the production line of the day. And calculates the required tact time calculation means.

【0031】作業条件記憶部63には、基準となる作業
条件の下で、力覚センサ18を備えた両腕ロボット2
0、多軸型のロボット25A,25B、AGV15E,
15Fを用いて生産した場合に、どの車種のどの仕様は
どの程度の時間で生産可能であるかという基準タクトタ
イムが過去の生産履歴などに基づいて記憶されている。
また、両腕ロボット20、多軸型のロボット25A,2
5B、AGV15E,15Fのそれぞれの作業速度もオ
ーバーライドとして3段階に分けて記憶している。さら
に、両腕ロボット20、多軸型のロボット25A,25
B、AGV15E,15Fのそれぞれに割り付けが可能
な作業要素と、その作業要素を割り当てた場合にかかる
作業タクトタイムも各生産機械ごとおよび車種ごとに記
憶している。また、後述の統計処理部69の統計処理に
よって得られる,たとえば、車種Aに対して、両腕ロボ
ット20でボルト締めを行った場合に、かかる時間が2
0秒であるとか、同一の作業を多軸型のロボット25
A,25Bで行った場合に、かかる時間が15秒である
とかいったような各作業要素ごとの作業要素別タクトタ
イムも記憶している。
The work condition storage unit 63 stores the two-armed robot 2 having the force sensor 18 under the work condition as a reference.
0, multi-axis robots 25A, 25B, AGV15E,
When the vehicle is manufactured using the 15F, a reference tact time indicating which specification of which model can be produced in what time is stored based on past production history and the like.
In addition, the double-arm robot 20, the multi-axis robot 25A, 2
The working speed of each of the 5B and the AGVs 15E and 15F is also stored in three stages as overrides. Further, the double-arm robot 20 and the multi-axis robots 25A and 25A
B, work elements that can be assigned to each of the AGVs 15E and 15F, and work tact times required when the work elements are assigned are also stored for each production machine and each vehicle type. Further, for example, when the bolting is performed on the vehicle type A by the double-armed robot 20 by the statistical processing of the statistical processing unit 69 described later, the time required is 2
0 seconds or the same work is performed by a multi-axis robot 25
A and 25B also store work element-specific tact times for each work element, such as 15 seconds.

【0032】また、本発明の作業管理装置60は、力覚
センサ18や視覚センサを備えた生産機械の生産管理も
行えるようにしているので、図8および図9に示すよう
に、力覚センサなどの補正動作を行うことなく作業が行
われた場合にかかるであろう作業タクトタイムと、補正
動作が行われた場合の許容時間も記憶されている。
Further, since the work management device 60 of the present invention can also perform production management of a production machine provided with the force sensor 18 and the visual sensor, as shown in FIGS. Also, a work tact time that would be required if the work was performed without performing a correction operation such as a correction operation, and an allowable time when the correction operation was performed are stored.

【0033】基準タクトタイム算出部64は、この作業
条件記憶部63に記憶されている車種や仕様ごとの基準
タクトタイムに基づいて、作業管理の基準となる基準タ
クトタイムをワーク種ごと,すなわち車種や仕様ごとに
算出する基準タクトタイム算出手段として機能するもの
である。
Based on the reference tact time for each vehicle type and specification stored in the work condition storage unit 63, the reference tact time calculation unit 64 calculates a reference tact time as a work management reference for each work type, that is, for each vehicle type. And functions as a reference tact time calculation means for calculating for each specification.

【0034】作業条件変更部65は、基準タクトタイム
算出部64により算出された基準タクトタイムと要求タ
クトタイム算出部62により算出された要求タクトタイ
ムとを比較して、基準タクトタイムが要求タクトタイム
よりも長い場合には、本日の生産計画にしたがった生産
は行えないことになるので、この生産計画を遵守できる
ように、生産ラインのスピードをアップしたり、両腕ロ
ボット20、多軸型のロボット25A,25B、AGV
15E,15Fのそれぞれに割り付けてある基準となる
作業条件を組み替えたりするものであり、作業条件変更
手段として機能するものである。
The work condition changing unit 65 compares the reference tact time calculated by the reference tact time calculation unit 64 with the required tact time calculated by the required tact time calculation unit 62, and determines that the reference tact time is the required tact time. If the length is longer than that, production according to today's production plan cannot be performed. Therefore, to comply with the production plan, the speed of the production line is increased or the double-arm robot 20 or the multi-axis type is used. Robot 25A, 25B, AGV
The reference condition is assigned to each of 15E and 15F, and the reference condition is rearranged, and functions as a work condition changing unit.

【0035】作業速度変更部65Aは、基準タクトタイ
ムが要求タクトタイムよりも長い場合に、両腕ロボット
20、多軸型のロボット25A,25B、AGV15
E,15Fのそれぞれの作業速度を作業条件記憶部63
に予め設定されている範囲内で変更するものであって、
作業速度変更手段として機能する。
When the reference tact time is longer than the required tact time, the work speed changing unit 65A controls the double-arm robot 20, the multi-axis robots 25A and 25B, and the AGV 15
The work speeds of E and 15F are stored in the work condition storage unit 63.
To be changed within a preset range,
It functions as a work speed changing means.

【0036】作業割付変更部65Bは、基準タクトタイ
ムが要求タクトタイムよりも長い場合に、両腕ロボット
20、多軸型のロボット25A,25B、AGV15
E,15Fのそれぞれに割り付けた作業を作業条件記憶
部63に記憶されている作業割り付けに関するデータに
基づいて変更するもので、作業割付変更手段として機能
するものである。
When the reference tact time is longer than the required tact time, the work assignment changing unit 65B controls the double-arm robot 20, the multi-axis robots 25A and 25B, and the AGV 15
The work assigned to each of E and 15F is changed based on the work assignment data stored in the work condition storage unit 63, and functions as a work assignment change unit.

【0037】基準タクトタイムを要求タクトタイム以内
に収めるためには、両腕ロボット20、多軸型のロボッ
ト25A,25B、AGV15E,15Fのそれぞれの
作業速度を上げるだけでもよいし、また、これらの作業
割り付けを変更することによってもよい。さらには作業
速度の上昇と作業割り付けの変更を併用してもよい。総
タクトタイム算出部66は、統合コントローラ30から
入力する作業の進行状況と、現在生産しつつある車種の
要求タクトタイムから残り作業にかけることができる総
タクトタイムを算出するものであり、総タクトタイム算
出手段として機能するものである。
In order to keep the reference tact time within the required tact time, it is only necessary to increase the working speed of each of the two-armed robot 20, the multi-axis robots 25A and 25B, and the AGVs 15E and 15F. The work assignment may be changed. Further, the increase of the work speed and the change of the work assignment may be used together. The total tact time calculation unit 66 calculates the total tact time that can be applied to the remaining work from the progress of the work input from the integrated controller 30 and the required tact time of the vehicle type currently being manufactured. It functions as time calculation means.

【0038】総作業タクトタイム算出部67は、総タク
トタイム算出部66を介して入力した作業の進行状況と
作業条件記憶部63に記憶されている車種ごと作業要素
ごとの作業タクトタイムおよび後述する作業要素別タク
トタイムとから、現在生産しつつある車種の残り作業に
かかってしまうであろう総作業タクトタイムを算出する
ものであって、総作業タクトタイム算出手段として機能
するものである。
The total work tact time calculation unit 67 calculates the work progress status input through the total tact time calculation unit 66, the work tact time for each vehicle type and each work element stored in the work condition storage unit 63, and will be described later. It calculates the total work tact time that would take the remaining work of the vehicle type currently being produced from the work element tact time, and functions as a total work tact time calculation means.

【0039】作業条件変更部65はまた、総作業タクト
タイム算出部67により算出された総作業タクトタイム
と総タクトタイム算出部66により算出された総タクト
タイムとを比較して、総作業タクトタイムが総タクトタ
イムよりも長い場合には、現在生産中の車種は、生産計
画から計算された要求タクトタイム内での生産は行えな
いことになるので、要求タクトタイム内での生産ができ
るように、生産ラインのスピードをアップしたり、両腕
ロボット20、多軸型のロボット25A,25B、AG
V15E,15Fのそれぞれに割り付けてある基準とな
る作業条件を組み替えたりする。
The work condition changing unit 65 also compares the total work tact time calculated by the total work tact time calculation unit 67 with the total tact time calculated by the total tact time calculation unit 66 to determine the total work tact time. If is longer than the total takt time, the vehicle currently being produced cannot be produced within the required takt time calculated from the production plan. , Increase the speed of the production line, or use the double-arm robot 20, multi-axis robots 25A, 25B, AG
The reference work condition assigned to each of V15E and 15F is rearranged.

【0040】実績作業時間記憶部68には、統合コント
ローラ30を介して入力される各種の作業にかかった実
績作業時間を、各車種ごと、生産機械ごと、作業要素ご
とに入力し、これを記憶するものであり、実績作業時間
記憶手段として機能するものである。
The actual work time stored in the actual work time storage section 68 is inputted for each type of vehicle, each production machine, and each work element, and is stored. And functions as an actual work time storage unit.

【0041】統計処理部69は、実績作業時間記憶部6
8に蓄積された実績作業時間から、実際の作業でかかる
時間を各車種ごと、生産機械ごと、作業要素ごとに統計
処理し、この処理結果を作業要素別タクトタイムとして
作業条件記憶部63に記憶させておくものであり、統計
処理手段として機能するものである。
The statistical processing unit 69 stores the actual work time storage unit 6
8, the time required for the actual work is statistically processed for each vehicle type, each production machine, and each work element, and the processing result is stored in the work condition storage unit 63 as the tact time for each work element. It functions as a statistical processing means.

【0042】以上のように構成されている本発明の作業
管理装置は、図3以降のフローチャートに基づいて次の
ように動作する。
The work management apparatus of the present invention configured as described above operates as follows based on the flowcharts shown in FIG.

【0043】まず、ホストコンピュータ70から生産計
画入力部61が生産計画を入力すると、要求タクトタイ
ム算出部62では、工場の稼動時間などを勘案して各車
種別、仕様別に要求タクトタイムを算出する。
First, when the production plan input unit 61 inputs a production plan from the host computer 70, the required tact time calculation unit 62 calculates the required tact time for each vehicle type and specification in consideration of the factory operation time and the like. .

【0044】たとえば、生産計画に基づいて、A車につ
いては1日に200台生産する必要があるから2分/
台、またB車については1日に100台生産する必要が
あるから3分/台の割合で生産しなければならないとい
うように、生産にかけられる時間、すなわち要求タクト
タイムを求める(S1,S2)。
For example, based on the production plan, it is necessary to produce 200 vehicles per day for car A, so that 2 minutes /
The time required for the production, that is, the required tact time, is obtained (S1, S2) such that the production of 100 vehicles or B vehicles must be produced at a rate of 3 minutes / vehicles per day because 100 vehicles need to be produced per day. .

【0045】また、基準タクトタイム算出部64は、作
業条件記憶部63に記憶されている車種ごと仕様ごとの
基準タクトタイムを算出する。たとえば1つ1つの部品
の組み付けに要する作業速度やどのロボットにどの作業
をさせるかという作業割付といった予め設定してある作
業条件から、この作業条件ではA車については2.5分
/台の割合で生産でき、B車については2.7分/台の
割合で生産できるというように、生産にかかるであろう
時間、すなわち基準タクトタイムを求める。(S3)。
The reference tact time calculation section 64 calculates a reference tact time for each vehicle type and each specification stored in the work condition storage section 63. For example, from the preset work conditions such as the work speed required for assembling each part and the work assignment of which robot is to be performed, under the work conditions, a ratio of 2.5 minutes / vehicle is used for the vehicle A. The time required for the production, that is, the reference tact time, is determined so that the vehicle B can be produced at a rate of 2.7 minutes / vehicle. (S3).

【0046】作業条件変更部65は、以上のステップで
算出された要求タクトタイムと基準タクトタイムとを比
較して、基準タクトタイムが要求タクトタイムよりも長
い場合には、本日の生産計画にしたがった生産は行えな
いことになるので、図9に示すように、作業速度変更部
65Aにより、3段階に設定されているオーバーライ
ド,すなわち、各作業要素別の速度を1段階上げ、基準
タクトタイム算出部62では、この1段階上げたオーバ
ーライドで、再度、基準タクトタイムを演算する。この
結果、まだ要求タクトタイムよりも短くならない場合に
は、さらにオーバーライドを1段上げる。このようにオ
ーバーライドを上げる処理は、基準タクトタイムが要求
タクトタイムよりも短くなるまで、または、用意されて
いるオーバーライドが最大になるまで行われる。本実施
の形態では、このオーバーライドは図9に示すように三
段階であるので、第三段階の一番早い速度になるまで設
定が変更される。また、このオーバーライドは、単に車
種ごとの作業に基づいて一律に設定されているのではな
く、図8に示すように各作業要素ごとに細かく設定され
ているので、オーバーライドの設定変更は、実際には、
このように全ての作業要素を勘案して行われる(S4〜
S7)。
The work condition changing section 65 compares the required tact time calculated in the above steps with the reference tact time, and if the reference tact time is longer than the required tact time, it follows the production plan of today. As shown in FIG. 9, the work speed changing unit 65A increases the override set in three stages, that is, increases the speed of each work element by one stage, and calculates the reference tact time as shown in FIG. The unit 62 calculates the reference tact time again with the override raised by one step. As a result, if the required tact time has not yet become shorter, the override is further increased by one step. The process of raising the override in this manner is performed until the reference tact time becomes shorter than the required tact time, or until the prepared override becomes the maximum. In the present embodiment, since this override has three stages as shown in FIG. 9, the setting is changed until the speed becomes the fastest in the third stage. In addition, this override is not set uniformly based on the work for each vehicle type, but is set finely for each work element as shown in FIG. 8. Is
As described above, the operation is performed in consideration of all work elements (S4 to S4).
S7).

【0047】一方、最初に基準タクトタイムを算出した
時点で、要求タクトタイムよりも短かければ生産計画に
則した生産ができるので、基準となるオーバーライドお
よび作業割り付けを作業条件として各生産機械に設定
し、その作業条件で生産を行わせる(S8,S9)。
On the other hand, when the reference tact time is first calculated, if the time is shorter than the required tact time, the production can be performed in accordance with the production plan. Therefore, the reference override and work assignment are set to each production machine as work conditions. Then, the production is performed under the working conditions (S8, S9).

【0048】上記のように、オーバーライドを変更して
も、生産計画を遵守できない場合には、各生産機械に予
め設定してある作業割り付け、たとえば、どのマニピュ
レータにはどの作業を行わせるかという作業の割り付け
を生産速度が上昇できるように変更する。この作業割り
付けの変更は、作業割り付け変更部65Bによって行
う。基準タクトタイム算出部64では、変更された作業
割り付けに基づいて、再度基準タクトタイムを演算す
る。この結果、まだ要求タクトタイムよりも長い場合に
は、さらに別の作業割り付けに変更する。このように作
業割り付けを変更する処理は、基準タクトタイムが要求
タクトタイムよりも短くなるまで、または、変更可能な
作業割り付けがなくなるまで行われる(S10〜S1
2)。
As described above, when the production plan cannot be complied with even if the override is changed, a work assignment preset for each production machine, for example, a work to determine which manipulator performs which work. Is changed so that the production speed can be increased. This change of the work assignment is performed by the work assignment change unit 65B. The reference tact time calculation unit 64 calculates the reference tact time again based on the changed work assignment. As a result, if it is still longer than the required takt time, the work is changed to another work assignment. The process of changing the work assignment is performed until the reference tact time becomes shorter than the required tact time or until there is no changeable work assignment (S10 to S1).
2).

【0049】オーバーライドを最大まで上げ、また、最
短の作業時間となる作業割り付けとしてもなお要求タク
トタイムよりも短くならない場合には、基準タクトタイ
ムが最小となるオーバーライドおよび作業割り付けを設
定する(S13)。
If the override is raised to the maximum and the work assignment with the shortest work time still does not become shorter than the required takt time, the override and the work assignment with the minimum reference tact time are set (S13). .

【0050】オーバーライドを変更したり、作業割り付
けを変更したりして、基準タクトタイムが要求タクトタ
イムよりも短くなると、その時点でのオーバーライドと
作業割り付けを各生産機械に作業条件として設定し、そ
の作業条件で生産を行わせる(S8)。
When the reference tact time is shorter than the required tact time by changing the override or the work assignment, the override and the work assignment at that time are set as work conditions in each production machine. The production is performed under the working conditions (S8).

【0051】以上の処理は、各車種ごとあるいは仕様ご
とに行い、生産計画の対象とされた全ての車種などにつ
いて行われると、工場での生産が開始される(S9)。
The above processing is performed for each vehicle type or specification, and when the processing is performed for all the vehicle types targeted for the production plan, the production at the factory is started (S9).

【0052】以上の処理は、生産計画が遵守できるよう
に、工場が稼動する前に、車種ごとの生産速度や各生産
機械がどの作業を受け持つかという作業条件を定める処
理である。
The above process is a process for determining the production speed for each vehicle type and the work conditions such as which work each production machine is responsible for before the factory is operated so that the production plan can be observed.

【0053】しかしながら、このようにして生産計画を
守れるようにしても、工場の稼動中にこの計画を守れな
いような事態が生じる事があるが、図4に示すフローチ
ャートでは、そのような場合でも生産計画に沿った生産
が行えるような処理を行っている。
However, even if the production plan can be adhered to in this way, a situation may occur in which the production plan cannot be adhered to during operation of the factory. In the flowchart shown in FIG. Processing is performed so that production can be performed according to the production plan.

【0054】図4に示すフローチャートは、各作業機械
に対して行われる処理である。
The flowchart shown in FIG. 4 is a process performed for each work machine.

【0055】まず、図3のフローチャートの処理によっ
て決定された作業条件を入力し、この作業条件で生産が
開始されると、各生産機械の作業要素ごとにかかる時間
を測定するためのカウントをスタートさせる(S2
1)。
First, the work conditions determined by the processing of the flowchart of FIG. 3 are input, and when production is started under these work conditions, a count for measuring the time required for each work element of each production machine is started. (S2
1).

【0056】ある作業要素を完了したマニピュレータが
ある場合には、その作業要素の作業に要した時間が、そ
の作業要素に設定されている基準タクトとセンサ補正に
よる繰り返し作業の許容値とを足した時間以内であるか
どうかの判断がされる。
When there is a manipulator that has completed a certain work element, the time required for the work of the work element is added to the reference tact set for the work element and the allowable value of the repetitive work by sensor correction. It is determined whether it is within the time.

【0057】たとえば、図9においてダクト把持という
作業をある作業機械のマニピュレータで行った場合に、
基準タクトが5秒であり、センサ補正によってダクト把
持をやり直すというような作業の許容時間の最大値が5
秒であるから、最大限10秒以内にこの作業が行われた
かどうかが判断される。この判断は、いずれかの作業機
械のマニピュレータが所定の作業を終了する度に行われ
る(S22〜S24)。
For example, in FIG. 9, when the work of holding a duct is performed by a manipulator of a certain working machine,
The reference tact is 5 seconds, and the maximum value of the permissible time of the operation of re-gripping the duct by sensor correction is 5 seconds.
Since this is seconds, it is determined whether or not this operation has been performed within a maximum of 10 seconds. This determination is made each time the manipulator of any of the work machines completes the predetermined work (S22 to S24).

【0058】もし、許容値を勘案した作業時間内で作業
が完了しなかった場合には、最初に設定した作業条件の
ままでは、その日の生産計画を守れなくなる恐れがある
ので、総作業タクトタイム算出部67は、この作業機械
が残りの作業を行うに当たって、どの程度の時間が必要
となるか,つまり総タクトタイムがどの程度の時間とな
るのかを算出する。
If the work is not completed within the work time in consideration of the allowable value, the production plan of the day may not be maintained under the initially set work conditions. The calculation unit 67 calculates how much time is required for the work machine to perform the remaining work, that is, how long the total tact time is.

【0059】作業条件記憶部63には、どの作業をどの
マニピュレータで行った場合には、どの程度の時間が必
要かという作業タクトタイムが車種別に記憶されている
が、総作業タクトタイム算出部67では、この作業タク
トタイムをみて総作業タクトタイムを演算する。
The work condition storage unit 63 stores, for each vehicle type, a work tact time indicating how much work is required when performing a work using which manipulator. Then, the total work tact time is calculated based on the work tact time.

【0060】一方、総タクトタイム算出部66は、その
車種の生産にかけることができる要求タクトタイムを入
力し、この要求タクトタイムを遵守するには後工程にか
けることができる作業時間がどの程度であるかを演算し
て総タクトタイムを演算する。
On the other hand, the total tact time calculation unit 66 inputs a required tact time that can be used for the production of the vehicle type, and how much work time can be spent in the post-process in order to comply with the required tact time. To calculate the total tact time.

【0061】作業条件変更部65では、総作業タクトタ
イムと総タクトタイムとを比較して、総作業タクトタイ
ムが総タクトタイムよりも長い場合には、その車種の生
産に与えられた要求タクトタイム内での生産を行うこと
が困難であるから、作業速度変更部65Aにより、3段
階に設定されているオーバーライド,すなわち、各作業
要素別の速度を1段階上げ、総作業タクトタイム算出部
67では、この1段階上げたオーバーライドで、再度、
総作業タクトタイムを演算する。この結果、まだ総タク
トタイムよりも短くならない場合には、さらにオーバー
ライドを1段上げる。このようにオーバーライドを上げ
る処理は、総作業タクトタイムが総タクトタイムよりも
短くなるまで、または、用意されているオーバーライド
が最大になるまで行われる。本実施の形態では、このオ
ーバーライドは図9に示すように三段階であるので、第
三段階の一番早い速度になるまで設定が変更される(S
25〜S27)。
The work condition changing unit 65 compares the total work tact time with the total tact time. If the total work tact time is longer than the total tact time, the required tact time given to the production of the vehicle type is determined. Since it is difficult to perform production within the work, the override set in three stages by the work speed change unit 65A, that is, the speed of each work element is increased by one stage, and the total work tact time calculation unit 67 , With this one-step override,
Calculate the total work tact time. As a result, if it is not shorter than the total takt time, the override is further increased by one step. The process of increasing the override in this manner is performed until the total work tact time becomes shorter than the total tact time or until the prepared override becomes the maximum. In the present embodiment, since this override has three stages as shown in FIG. 9, the setting is changed until the fastest speed of the third stage is reached (S
25-S27).

【0062】上記のように、オーバーライドを変更して
も、要求タクトタイムを遵守できない場合には、各生産
機械の後工程の作業割り付けを生産速度が上昇できるよ
うに変更する。この作業割り付けの変更は、作業割り付
け変更部65Bによって行う。総作業タクトタイム算出
部67では、変更された作業割り付けに基づいて、再度
総作業タクトタイムを演算する。この結果、まだ総タク
トタイムよりも長い場合には、さらに別の作業割り付け
に変更する。このように作業割り付けを変更する処理
は、総作業タクトタイムが総タクトタイムよりも短くな
るまで、または、変更可能な作業割り付けがなくなるま
で行われる(S28〜S30)。
As described above, if the required tact time cannot be complied with even if the override is changed, the work allocation in the post-process of each production machine is changed so that the production speed can be increased. This change of the work assignment is performed by the work assignment change unit 65B. The total work tact time calculation section 67 calculates the total work tact time again based on the changed work assignment. As a result, if it is still longer than the total takt time, it is changed to another work assignment. The process of changing the work assignment in this manner is performed until the total work tact time becomes shorter than the total tact time or until there is no changeable work assignment (S28 to S30).

【0063】オーバーライドを最大まで上げ、また、最
短の作業時間となる作業割り付けとしてもなお要求タク
トタイムよりも短くならない場合には、総作業タクトタ
イムが最小となるオーバーライドおよび作業割り付けを
設定する(S31)。
If the override is raised to the maximum and the work assignment with the shortest work time still does not become shorter than the required takt time, the override and the work assignment with the smallest total work tact time are set (S31). ).

【0064】オーバーライドを変更したり、作業割り付
けを変更したりして、総作業タクトタイムが総タクトタ
イムよりも短くなると、その時点でのオーバーライドと
作業割り付けを各生産機械に作業条件として設定し、以
降の作業については、その作業条件で生産を行わせる
(S32)。
When the total work tact time becomes shorter than the total tact time by changing the override or the work assignment, the override and the work assignment at that time are set as work conditions in each production machine. For the subsequent work, production is performed under the work conditions (S32).

【0065】このように、予め予定されていた時間内に
ある作業要素の作業が完了できなかった場合には、設定
されている作業条件のままでは要求タクトタイムが守れ
なくなるであろうとの予測の下に、後工程でかかる時間
が短くなるように速度を変更したり、作業割り付けを変
更したりして、要求タクトタイム内に収まるようにして
いる。
As described above, if the work of a work element cannot be completed within a predetermined time, it is predicted that the required tact time will not be kept under the set work conditions. Below, the speed is changed or the work assignment is changed so as to shorten the time required in the post-process, so that the required tact time is kept within the required tact time.

【0066】図5は、図4の作業割り付けの変更の処理
を示すフローチャートである。
FIG. 5 is a flowchart showing the process of changing the work assignment of FIG.

【0067】作業割り付けを変更する必要が生じた場合
には、その車種に対してその作業機械が行うべき残りの
作業要素を抽出して(S40)、この抽出した作業要素
を実行することができるマニピュレータの内、作業要素
の交換が可能なマニピュレータであって、最も短い時間
で実行可能なマニピュレータをその作業に割り当て(S
41)、マニピュレータの作業要素の入れ替えを行う
(S42)。
When it is necessary to change the work assignment, the remaining work elements to be performed by the work machine for the vehicle type are extracted (S40), and the extracted work elements can be executed. Among the manipulators, a manipulator capable of exchanging work elements and which can be executed in the shortest time is assigned to the work (S
41), the work elements of the manipulator are replaced (S42).

【0068】このようにして作業要素の交換が可能なマ
ニピュレータを捜し出して、要求タクトタイムを守れる
ようにしている。
In this way, a manipulator capable of exchanging work elements is searched for so that the required tact time can be kept.

【0069】図6に示すフローチャートは、作業タクト
を書き替える処理を示している。
The flowchart shown in FIG. 6 shows a process for rewriting the work tact.

【0070】1つの作業要素に要する時間である作業タ
クトタイムは、作業条件記憶部63に記憶されている
が、この作業タクトタイムを固定値として与えたので
は、1台の車両の生産にかかる基準タクトタイムを正確
に把握することが困難となる場合があるので、この基準
タクトタイムをより正確な時間とできるように、作業タ
クトタイムを実際に生産に要した時間から順次更新して
行くものである。
The work tact time, which is the time required for one work element, is stored in the work condition storage section 63. However, if this work tact time is given as a fixed value, it takes one vehicle to produce. Since it is sometimes difficult to accurately grasp the reference tact time, the work tact time is updated sequentially from the time actually required for production so that the reference tact time can be made more accurate. It is.

【0071】まず、統計処理部69では、1つの作業要
素の終了までにかかった実績時間と、センサ補正により
作業が行われた場合にはそのセンサ補正作業に要した時
間を、全ての作業要素ごとに計測し(S50)、これを
実績作業時間記憶部68に記憶させておき、このデータ
数がそれぞれの作業要素についてN個になった時点で、
その作業要素のデータを取り出して統計処理をし、図7
に示すような分布曲線を描き、その分布の基準値と許容
値とを求める(S51,S52)。
First, the statistical processing section 69 calculates the actual time taken to complete one work element and the time required for the sensor correction work if the work was performed by sensor correction, for all work elements. (S50), and this is stored in the actual work time storage unit 68. When the number of data becomes N for each work element,
The data of the work element is extracted and statistically processed.
Is drawn, and a reference value and an allowable value of the distribution are obtained (S51, S52).

【0072】求められた基準値は、その作業要素を実行
する上で掛かるであろう平均値であるから、統計処理部
69は、この基準値をその作業要素の新たな作業タクト
タイムとして、作業条件記憶部63に記憶されているそ
の作業要素の作業タクトタイムから書き替える。
Since the determined reference value is an average value that would be required for executing the work element, the statistical processing unit 69 sets the reference value as a new work tact time of the work element and It is rewritten from the work tact time of the work element stored in the condition storage unit 63.

【0073】同様に、許容値も求められた許容値に書き
替えることになる。したがって、図9の各作業要素ごと
の基準値と許容値とは、実際の作業で得られた最新の情
報に基づいて書き替えられることになる。
Similarly, the allowable value is rewritten to the obtained allowable value. Therefore, the reference value and the permissible value for each work element in FIG. 9 are rewritten based on the latest information obtained in the actual work.

【0074】以上のように、工場が稼動する前に、生産
計画が遵守できるように、車種ごとの生産速度や各生産
機械がどの作業を受け持つかという作業条件を定め、作
業中には、与えられた要求タクトタイム内で作業が終わ
るかどうかを常に監視し、終わらない恐れがあれば、終
えることができるように作業速度などを変更し、また、
実際の作業において収集したデータに基づいて、1台当
たりどの程度の時間が必要であるか等を車種ごとに把握
できるようにしているので、生産ラインを生産計画が遵
守できるように稼動させることができる。
As described above, before the factory is started, the production speed for each type of vehicle and the work conditions such as which work each production machine is responsible for are determined so that the production plan can be observed. Always monitor whether the work is completed within the required takt time, and if there is a danger that it will not be completed, change the work speed etc. so that it can be completed,
Based on the data collected in actual work, it is possible to know how much time is required for each vehicle, etc., so that production lines can be operated so that production plans can be complied with. it can.

【0075】[0075]

【発明の効果】請求項1記載の発明では、複数の生産機
械のそれぞれの作業速度を、基準タクトタイムが要求タ
クトタイム内に収まるように予め設定した範囲内で変更
し、複数の生産機械のそれぞれの作業速度を最大限まで
上昇してもなお前記基準タクトタイムを前記要求タクト
タイム内に収めることができない場合には、前記複数の
生産機械のそれぞれに割り付ける作業を変更して前記基
準タクトタイムが前記要求タクトタイムに近付くよう
に、あるいは収まるようにしたので、生産計画が大きく
変動した場合でもその要求に応えることができるように
なる。
According to the first aspect of the present invention, a plurality of production machines are provided.
The reference takt time determines the working speed of each machine.
Within the preset range to fit within the project time
To maximize the working speed of each of multiple production machines
Even if it rises, the reference tact time still exceeds the required tact
If you cannot fit within the time,
Change the work assigned to each production machine to
So that the quasi-tact time approaches the required tact time
Production plan
Be able to respond to the demand even if it fluctuates
Become.

【0076】請求項2記載の発明では、作業割付を優先
して基準タクトタイムが要求タクトタイム内に収まるよ
うにし、さらに、作業割付だけでは不足の場合に、作業
速度を変更して基準タクトタイムが要求タクトタイム内
に収まるようしたので、生産計画が大きく変動した場合
でもその要求に応えることができるようになる。
According to the second aspect of the present invention, priority is given to work assignment.
And the standard takt time falls within the required takt time
And if work assignment alone is not enough,
Change the speed and the reference takt time is within the required takt time
If the production plan fluctuates greatly because
But you will be able to meet that demand.

【0077】請求項3記載の発明では、複数の生産機械
が行う作業の各作業要素ごとの実績作業時間から複数の
生産機械の各作業要素ごとの作業要素別タクトタイムを
ワーク種別に統計処理によって求め、求められた前記ワ
ーク種ごとの作業要素別タクトタイムから残り作業にか
かる総作業タクトタイム求め、この総作業タクトタイム
が総タクトタイムよりも長い場合には、当該総作業タク
トタイムが総タクトタイムより短くなるように、以降の
作業については前記複数の生産機械のそれぞれの作業条
件を設定されている作業条件から新たな作業条件に変更
するようにしたので、過去に行われた作業要素ごとの実
績作業時間をワーク種別に蓄積し、これを統計処理する
ことによって、より正確な総作業タクトタイムを求める
ことができ、補正動作などが原因で作業が遅れぎみとな
っても、基準タクトタイム内でその作業をより確実に完
了させることができるようになり、結果として生産計画
を遵守した生産が行えるようになる。
According to the third aspect of the present invention, a plurality of production machines
From the actual work time for each work element
Tact time for each work element of each production machine
The work type is determined by statistical processing,
From the takt time for each work element to the remaining work
The total work tact time is calculated and this total work tact time
Is longer than the total takt time,
So that the total time is shorter than the total takt time,
For the work, the work conditions of each of the plurality of production machines
Change the work condition from the set work condition to a new work condition
In each work element performed in the past.
Accumulation work time is accumulated for each work type, and this is statistically processed.
For a more accurate total work tact time
Work can be delayed due to correction operations, etc.
Even more reliably within the standard takt time.
Can be completed, resulting in production planning
Production can be performed.

【0078】請求項4記載の発明では、複数の生産機械
のそれぞれの作業速度を、総作業タクトタイムが総タク
トタイム内に収まるように予め設定した範囲内で変更
し、複数の生産機械のそれぞれの作業速度を最大限まで
上昇してもなお前記総作業タクトタイムを前記総タクト
タイム内に収めることができない場合には、前記複数の
生産機械のそれぞれに割り付ける作業を変更して前記総
作業タクトタイムが前記総タクトタイムに近付くよう
に、あるいは収まるようにしたので、生産計画が大きく
変動した場合でもその要求に応えることができるように
なる。
According to the fourth aspect of the present invention, a plurality of production machines
The total work tact time is the total
Within the preset range to fit within the required time
To maximize the working speed of each of multiple production machines
Even if it rises, the total work tact time still
If you cannot fit within the time,
Change the work assigned to each production machine to
Work tact time approaches the total tact time
Production plan
Be able to respond to the demand even if it fluctuates
Become.

【0079】請求項5記載の発明では、作業割付を優先
して総作業タクトタイムが総タクトタイム内に収まるよ
うにし、さらに、作業割付だけでは不足の場合に、作業
速度を変更して総作業タクトタイムが総タクトタイム内
に収まるようしたので、生産計画が大きく変動した場合
でもその要求に応えることができるようになる。
According to the fifth aspect of the invention, priority is given to work assignment.
And the total work tact time falls within the total tact time
And if work assignment alone is not enough,
Change the speed so that the total work takt time is within the total takt time
If the production plan fluctuates greatly because
But you will be able to meet that demand.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 本発明の作業管理装置が適用される生産ライ
ンを示す図である。
FIG. 1 is a diagram showing a production line to which a work management device of the present invention is applied.

【図2】 本発明の作業管理装置のブロック図である。FIG. 2 is a block diagram of a work management device of the present invention.

【図3】 本発明の生産管理装置の動作フローチャート
である。
FIG. 3 is an operation flowchart of the production management device of the present invention.

【図4】 本発明の生産管理装置の動作フローチャート
である。
FIG. 4 is an operation flowchart of the production management device of the present invention.

【図5】 本発明の生産管理装置の動作フローチャート
である。
FIG. 5 is an operation flowchart of the production management device of the present invention.

【図6】 本発明の生産管理装置の動作フローチャート
である。
FIG. 6 is an operation flowchart of the production management device of the present invention.

【図7】 統計処理を行う場合の説明図である。FIG. 7 is an explanatory diagram when performing statistical processing.

【図8】 作業条件記憶部に記憶されているタクトタイ
ムの一例を示す図である。
FIG. 8 is a diagram illustrating an example of a tact time stored in a work condition storage unit.

【図9】 作業条件記憶部に記憶されているタクトタイ
ムの一例を示す図である。
FIG. 9 is a diagram illustrating an example of a tact time stored in a work condition storage unit.

【符号の説明】[Explanation of symbols]

5…作業ステージ、15A〜15D…AGV、18…力
覚センサ、20…両腕ロボット、25A,25B…多軸
型のロボット、30…統合コントローラ、65…作業条
件変更部。
5 work stage, 15A to 15D AGV, 18 force sensor, 20 double-arm robot, 25A, 25B multi-axis robot, 30 integrated controller, 65 work condition change unit.

フロントページの続き (58)調査した分野(Int.Cl.7,DB名) G05B 19/418 G06F 17/60 Continuation of the front page (58) Field surveyed (Int.Cl. 7 , DB name) G05B 19/418 G06F 17/60

Claims (5)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 複数の生産機械(20,25A,25
B,15A,15F)に共同して作業を行わせる作業管
理装置(60)であって、 生産計画に基づいてワーク種ごとに要求される要求タク
トタイムを算出する要求タクトタイム算出手段(62)
と、 前記複数の生産機械(20,25A,25B,15A,
15F)に予め設定されている作業条件に基づいて、作
業管理の基準となる基準タクトタイムをワーク種ごとに
算出する基準タクトタイム算出手段(64)と、 当該基準タクトタイム算出手段(64)により算出され
た基準タクトタイムが前記要求タクトタイム算出手段
(62)により算出された要求タクトタイムよりも長い
場合には、前記複数の生産機械(20,25A,25
B,15A,15F)のそれぞれの作業速度を、前記基
準タクトタイムが前記要求タクトタイム内に収まるよう
に予め設定した範囲内で変更する作業速度変更手段(6
5A)と、 当該作業速度変更手段(65A)によって前記複数の生
産機械(20,25A,25B,15A,15F)のそ
れぞれの作業速度を最大限まで上昇してもなお前記基準
タクトタイムを前記要求タクトタイム内に収めることが
できない場合には、前記複数の生産機械(20,25
A,25B,15A,15F)のそれぞれに割り付ける
作業を変更して前記基準タクトタイムが前記要求タクト
タイムに近付くように、あるいは収まるようにする作業
割付変更手段(65B) とを有することを特徴とする作
業管理装置。
A plurality of production machines (20, 25A, 25
B, 15A, 15F) for performing work in cooperation with each other, and a required tact time calculating means (62) for calculating a required tact time required for each work type based on a production plan.
And the plurality of production machines (20, 25A, 25B, 15A,
15F), a reference tact time calculating means (64) for calculating a reference tact time as a reference for work management for each work type based on a work condition set in advance, and a reference tact time calculating means (64). If the calculated reference tact time is longer than the required tact time calculated by the required tact time calculating means (62), the plurality of production machines (20, 25A, 25)
B, 15A and 15F),
Ensure that the quasi-tact time falls within the required tact time
Work speed changing means (6) for changing the work speed within a preset range.
5A) and the work speed changing means (65A).
Industrial machinery (20, 25A, 25B, 15A, 15F)
Even if each work speed is increased to the maximum,
It is possible to keep the takt time within the required takt time.
If not, the plurality of production machines (20, 25)
A, 25B, 15A, 15F)
Change the work and make the reference tact time equal to the required tact
Work to get closer to or fit in time
A work management device comprising: an assignment change unit (65B) .
【請求項2】 複数の生産機械(20,25A,25
B,15A,15F)に共同して作業を行わせる作業管
理装置(60)であって、 生産計画に基づいてワーク種ごとに要求される要求タク
トタイムを算出する要求タクトタイム算出手段(62)
と、 前記複数の生産機械(20,25A,25B,15A,
15F)に予め設定されている作業条件に基づいて、作
業管理の基準となる基準タクトタイムをワーク種ごとに
算出する基準タクトタイム算出手段(64)と、 当該基準タクトタイム算出手段(64)により算出され
た基準タクトタイムが前記要求タクトタイム算出手段
(62)により算出された要求タクトタイムよりも長い
場合には、前記複数の生産機械(20,25A,25
B,15A,15F)のそれぞれに割り付ける作業を、
前記基準タクトタイムが前記要求タクトタイムよりも小
さくなるように変更する作業割付変更手段(65B)
と、 当該作業割付変更手段(65B)によって前記基準タク
トタイムを最短としてもなお前記基準タクトタイムが前
記要求タクトタイムよりも小さくできない場合には、前
記複数の生産機械(20,25A,25B,15A,1
5F)のそれぞれの作業速度を所望の範囲内で変更して
前記基準タクトタイムが前記要求タクトタイムに近付く
ように、あるいは短くなるようにする作業速度変更手段
(65A) とを有することを特徴とする作業管理装置。
2. A plurality of production machines (20, 25A, 25
B, 15A, 15F) to work jointly
A management apparatus (60), the request Tak required for each work type based on the production plan
Request tact time calculating means (62) for calculating the required time
And the plurality of production machines (20, 25A, 25B, 15A,
15F) based on the work conditions set in advance.
Standard tact time, which is the standard for business management, for each work type
The calculated reference tact time calculating means (64) and the calculated reference tact time calculating means (64)
The required tact time is calculated by the required tact time
It is longer than the required tact time calculated by (62)
In this case, the plurality of production machines (20, 25A, 25
B, 15A, 15F)
The reference takt time is smaller than the required takt time
Work assignment changing means (65B) for changing so that it becomes easier
And the reference assignment by the work assignment changing means (65B).
The reference tact time before
If the required tact time cannot be reduced,
The plurality of production machines (20, 25A, 25B, 15A, 1
5F) Change the working speed within the desired range
The reference tact time approaches the required tact time
Work speed changing means to shorten or shorten
(65A) .
【請求項3】 さらに、 前記複数の生産機械(20,25A,25B,15A,
15F)が行う作業の各作業要素ごとの実績作業時間を
ワーク種別に記憶する実績作業時間記憶手段(68)
と、 当該実績作業時間記憶手段(68)に記憶されている実
績作業時間から前記複数の生産機械(20,25A,2
5B,15A,15F)の各作業要素ごとの作業要素別
タクトタイムをワーク種別に統計処理によって求める統
計処理手段(69)と、 入力したワーク種ごとの基準タクトタイムから残り作業
にかけることができる総タクトタイムを算出する総タク
トタイム算出手段(66)と、前記統計処理手段(6
9)によって求められた前記ワーク種ごとの作業要素別
タクトタイムから残り作業にかかる総作業タクトタイム
を算出する総作業タクトタイム算出手段(67)と、 当該総作業タクトタイム算出手段(67)により算出さ
れた総作業タクトタイムが前記総タクトタイム算出手段
(66)により算出された総タクトタイムよりも長い場
合には、当該総作業タクトタイムが総タクトタイムより
短くなるように、以降の作業については前記複数の生産
機械(20,25A,25B,15A,15F)のそれ
ぞれの作業条件を設定されている作業条件から新たな作
業条件に 変更する作業条件変更手段(65)とを有する
ことを特徴とする請求項1または2記載の 作業管理装
置。
Wherein further, said plurality of production machines (20,25A, 25B, 15A,
15F) The actual work time for each work element of the work performed
Actual work time storage means (68) for storing the work type
The actual work time stored in the actual work time storage means (68).
From the operation time, the production machines (20, 25A, 2
5B, 15A, 15F) for each work element
The tact time is calculated by statistical processing for the work type.
Total processing means (69) and remaining work from the input standard tact time for each type of work
Total tact to calculate total tact time that can be applied to
Time calculation means (66) and the statistical processing means (6
9) Each work element for each type of work obtained according to 9)
Total work tact time from tact time to remaining work
Calculated by the total work tact time calculating means (67) and the total work tact time calculating means (67).
The total work tact time calculated is the total tact time calculation means.
If it is longer than the total takt time calculated by (66)
In this case, the total work tact time is
In order to shorten the time, the following work
Machine (20, 25A, 25B, 15A, 15F)
Each work condition is set based on the set work condition.
Work condition changing means (65) for changing to work conditions.
The work management device according to claim 1 or 2, wherein:
【請求項4】 前記作業条件変更手段は、 前記複数の生産機械(20,25A,25B,15A,
15F)のそれぞれの作業速度を、前記総作業タクトタ
イムが前記総タクトタイム内に収まるように予め設定し
た範囲内で変更する作業速度変更手段(65A)と、 当該作業速度変更手段(65A)によって前記複数の生
産機械(20,25A,25B,15A,15F)のそ
れぞれの作業速度を最大限まで上昇してもなお前記総作
業タクトタイムが前記総タクトタイム内に収めることが
できない場合には、前記複数の生産機械のそれぞれに割
り付ける作業を変更して前記総作業タクトタイムが前記
総タクトタイムに近付くように、あるいは収まるように
する作業割付変更手段(65B)とを有することを特徴
とする請求項3記載の 作業管理装置。
4. The work condition changing means, wherein the plurality of production machines (20, 25A, 25B, 15A,
15F), the total working speed
Time is set in advance so that it falls within the total takt time.
Working speed changing means (65A) for changing within the range, and the plurality of
Industrial machinery (20, 25A, 25B, 15A, 15F)
Even if the work speed is increased to the maximum,
Industry takt time can be within the total takt time.
If it is not possible, assign to each of the production machines
The total work tact time
To approach or fit in the total takt time
And a work assignment changing means (65B) for performing
The work management device according to claim 3, wherein
【請求項5】 前記作業条件変更手段は、 前記複数の生産機械(20,25A,25B,15A,
15F)のそれぞれに割り付ける作業を、前記総作業タ
クトタイムが前記総タクトタイムよりも小さくなるよう
に変更する作業割付変更手段(65B)と、 当該作業割付変更手段(65B)によって前記総作業タ
クトタイムを最短としてもなお前記総作業タクトタイム
が前記総タクトタイムよりも小さくできない場合には、
前記複数の生産機械(20,25A,25B,15A,
15F)のそれぞれの作業速度を所望の範囲内で変更し
て前記総作業タクトタイムが前記総タクトタイムに近付
くように、あるいは短くなるようにする作業速度変更手
段(65A)とを有することを特徴とする請求項3記載
作業管理装置。
5. The work condition changing means, wherein the plurality of production machines (20, 25A, 25B, 15A,
15F) is assigned to the total work
Tact time is smaller than the total tact time
(65B), and the total work time is changed by the work assignment changing means (65B) .
The total work tact time
Is not smaller than the total takt time,
The plurality of production machines (20, 25A, 25B, 15A,
15F) change the working speed within the desired range.
The total work tact time approaches the total tact time
Work speed change hand to make it shorter or shorter
4. The method according to claim 3, further comprising a step (65A).
Work management device.
JP33047795A 1995-12-19 1995-12-19 Work management device Expired - Fee Related JP3351209B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP33047795A JP3351209B2 (en) 1995-12-19 1995-12-19 Work management device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP33047795A JP3351209B2 (en) 1995-12-19 1995-12-19 Work management device

Publications (2)

Publication Number Publication Date
JPH09168946A JPH09168946A (en) 1997-06-30
JP3351209B2 true JP3351209B2 (en) 2002-11-25

Family

ID=18233068

Family Applications (1)

Application Number Title Priority Date Filing Date
JP33047795A Expired - Fee Related JP3351209B2 (en) 1995-12-19 1995-12-19 Work management device

Country Status (1)

Country Link
JP (1) JP3351209B2 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002149218A (en) * 2000-11-14 2002-05-24 Heiwa Corp Production management support device, production line control terminal device, production management supporting method, and recording medium
JP4675046B2 (en) * 2004-01-29 2011-04-20 株式会社レクサー・リサーチ Production design support equipment
JP2006309610A (en) * 2005-04-28 2006-11-09 Asahi Kasei Homes Kk Construction work planning system for building
JP6082268B2 (en) * 2012-06-19 2017-02-15 株式会社神戸製鋼所 Schedule creation device, schedule creation method, and schedule creation program
JP2017199077A (en) * 2016-04-25 2017-11-02 ファナック株式会社 Cell controller optimizing operation of production system having plurality of industrial machines
JP7067518B2 (en) * 2019-03-28 2022-05-16 ブラザー工業株式会社 Numerical control device and control method

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6104295B2 (en) 2008-11-13 2017-03-29 ザ・ジェネラル・ホスピタル・コーポレイションThe General Hospital Corporation Methods and compositions for controlling iron homeostasis by modulation of BMP-6

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6104295B2 (en) 2008-11-13 2017-03-29 ザ・ジェネラル・ホスピタル・コーポレイションThe General Hospital Corporation Methods and compositions for controlling iron homeostasis by modulation of BMP-6

Also Published As

Publication number Publication date
JPH09168946A (en) 1997-06-30

Similar Documents

Publication Publication Date Title
KR100333454B1 (en) Production estimate management system
US4616322A (en) Method and apparatus for preparing spare tools for a machine tool
US7031893B2 (en) Apparatus and method for multi-part setup planning for sheet metal bending operations
EP0384497B1 (en) Machine tool controlling system for use with a distributed system
JP6797331B1 (en) Numerical control device and numerical control method
EP4016217A1 (en) Planning system and method for processing workpieces
CN101303585B (en) Controller
US20170343994A1 (en) Manufacturing management device for controlling manufacturing cells in which maintenance work is conducted
JP7015261B2 (en) Management equipment and management system
JP3351209B2 (en) Work management device
JPH05324046A (en) Multi-system numerical control method and apparatus
CN107390640A (en) Numerical control device
JP2980182B2 (en) Tool management device
GB2344439A (en) Lot carrier control system
Jiang et al. An adaptive agile manufacturing control infrastructure based on TOPNs-CS modelling
US20170371323A1 (en) Cell production system including manufacturing cell for autonomous manufacturing
KR102188017B1 (en) Measurement and Management System for Mold Manufacture Machine
JPH02254503A (en) Execution data transmission system for offline teaching system
Setiawan et al. An object-oriented modeling approach for production scheduling on CNC-machines in flexible manufacturing system to maximize cutting tool utilization
JP2002215214A (en) Control method and control device
JP3489292B2 (en) Tool management device in machining system
JPH04348856A (en) Work start order determination method
CN112525193A (en) Method for distributing navigation map data to a plurality of working machines
JP2743688B2 (en) Cell controller
JPS61184609A (en) Method for displaying situation of working progress

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20020820

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080920

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090920

Year of fee payment: 7

LAPS Cancellation because of no payment of annual fees