Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP3364426B2 - How to build pillars - Google Patents
[go: Go Back, main page]

JP3364426B2 - How to build pillars - Google Patents

How to build pillars

Info

Publication number
JP3364426B2
JP3364426B2 JP04965398A JP4965398A JP3364426B2 JP 3364426 B2 JP3364426 B2 JP 3364426B2 JP 04965398 A JP04965398 A JP 04965398A JP 4965398 A JP4965398 A JP 4965398A JP 3364426 B2 JP3364426 B2 JP 3364426B2
Authority
JP
Japan
Prior art keywords
column
hollow
pillar
formwork
main bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP04965398A
Other languages
Japanese (ja)
Other versions
JPH11247448A (en
Inventor
耕平 田中
和久 末岡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Okumura Corp
Original Assignee
Okumura Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Okumura Corp filed Critical Okumura Corp
Priority to JP04965398A priority Critical patent/JP3364426B2/en
Publication of JPH11247448A publication Critical patent/JPH11247448A/en
Application granted granted Critical
Publication of JP3364426B2 publication Critical patent/JP3364426B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Rod-Shaped Construction Members (AREA)

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】この発明は、柱主筋および梁
主筋を先組した中空プレキャストコンクリート柱(以
下、中空PC柱と言う)ユニットを用いた柱の構築方法
に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of constructing a column using a hollow precast concrete column (hereinafter referred to as hollow PC column) unit in which a column main bar and a beam main bar are assembled in advance.

【0002】[0002]

【従来の技術】従来、コンクリート柱構築用の型枠を使
用した柱の構築工法として特開平4−216747号公
報に開示されているような方法がある。この柱の構築工
法においては、図12に示すような4工程によって中空
PC柱型枠を使用して柱を構築する。
2. Description of the Related Art Conventionally, there is a method disclosed in Japanese Patent Application Laid-Open No. 4-216747 as a method of constructing a column using a formwork for constructing a concrete column. In this pillar construction method, a pillar is constructed using a hollow PC pillar formwork by four steps as shown in FIG.

【0003】すなわち、 図12(a)および12(b)に示すように、柱設置位置
の床面から突出している柱主筋1の上端に、当該階の柱
主筋2の下端を接続する。 図12(c)に示すように、上記柱主筋2の上方から、
この柱主筋2に外挿して内側にフープ筋を内蔵した中空
断面の中空PC柱型枠3を吊り込む。 図12(d)に示すように、上記中空PC柱型枠3の垂
直度を下側で調整してサポータ4で支持する。 図12(e)に示すように、上記中空PC柱型枠3上に
梁主筋および梁剪断補強筋で梁鉄筋籠5を組み立て、さ
らに梁型枠6を組み立てる。そして、中空PC柱型枠3
および梁型枠6の内部に現場打ちのコンクリート7を打
設する。
That is, as shown in FIGS. 12 (a) and 12 (b), the lower end of the column main reinforcement 2 of the floor is connected to the upper end of the column main reinforcement 1 protruding from the floor surface at the column installation position. As shown in FIG. 12 (c), from above the pillar main bar 2
A hollow PC column formwork 3 having a hollow cross section having a hoop line built therein is suspended by being extrapolated to the column main bar 2. As shown in FIG. 12D, the verticality of the hollow PC column form 3 is adjusted on the lower side and supported by the supporter 4. As shown in FIG. 12 (e), the beam rebar cage 5 is assembled on the hollow PC column form 3 with the beam main reinforcement and the beam shear reinforcement, and the beam form 6 is further assembled. And hollow PC pillar formwork 3
And the cast-in-place concrete 7 is placed inside the beam form 6.

【0004】ところが、上記従来のPC柱型枠を使用し
た柱の構築工法では、 (a)地上から各施工階まで柱主筋2や梁主筋等の鉄筋
と中空PC柱型枠3とを揚重しなければならず、高層建
築物に適用する場合には、施工高さ(揚重高さ)が高くな
るために揚重に要する時間が長くなり、施工効率が悪く
なってしまう。 (b)上記柱主筋2の長さは1階分階高長さであるの
で、総ての階で柱主筋2と柱主筋1との接続を行わなけ
ればならず、柱構築に時間と労力を要する。 (c)上記柱主筋2はなるべくフープ筋に近づけるのが
有利であるために、中空PC柱型枠3の内壁面を柱主筋
2に近接させた状態で中空PC柱型枠3を柱主筋2に外
挿する必要がある。ところが、床面から突出する柱主筋
1の上端に接続された当該階の柱主筋2の先端の位置は
高く、その高い位置にある当該階の柱主筋2の先端から
この柱主筋2の外側すれすれに中空PC柱型枠3を外挿
するためには人手による調整が必要である。したがっ
て、高所作業のための足場8を施工階毎に組み立て/解
体しなければならず、そのための時間と経費を要する。
等の問題がある。
However, in the conventional method of constructing a column using the PC column formwork, (a) hoisting the reinforcing rods such as the column main bar 2 and the beam main bar and the hollow PC column formwork 3 from the ground to each construction floor. When it is applied to a high-rise building, the construction height (lifting height) becomes high, so that the time required for lifting becomes long and the construction efficiency becomes poor. (b) Since the length of the column main reinforcement 2 is the height of the first floor, the column main reinforcement 2 and the column main reinforcement 1 must be connected on all floors, and it takes time and effort to construct the column. Requires. (c) Since it is advantageous to bring the main pillar rebar 2 closer to the hoop muscle as much as possible, the hollow PC pillar formwork 3 is moved to the main pillar rebar 2 with the inner wall surface of the hollow PC pillar formwork 3 being close to the main pillar rebar 2. Must be extrapolated to. However, the position of the end of the column main reinforcement 2 of the floor connected to the upper end of the column main reinforcement 1 protruding from the floor is high, and the tip of the column main reinforcement 2 of the floor at the higher position is outside the column main reinforcement 2. In order to extrapolate the hollow PC column form 3 to the above, manual adjustment is required. Therefore, the scaffold 8 for work at high places must be assembled / disassembled for each construction floor, which requires time and expense.
There is a problem such as.

【0005】そこで、図13に示すような、柱梁主筋先
組中空PC柱ユニットを用いた柱の構築方法が提案され
ている。この柱構築方法は、以下のような手順によって
行われる。
Therefore, there has been proposed a method for constructing a column using a hollow PC column unit having a column-beam main bar tip as shown in FIG. This pillar construction method is performed by the following procedure.

【0006】 図13(a)に示すように、柱剪断補強筋
が埋設された1階分の中空PC柱型枠12を地上のスト
ックヤード床面15上に立設し、この中空PC柱型枠1
2の上端部に、複数の梁主筋と梁剪断補強筋とで組み立
てられた梁主筋先組鉄筋籠13を載置する。そして、2
階分階高長さの複数の先組柱主筋14を、梁主筋先組鉄
筋籠13を貫通して所定の配列で中空PC柱型枠12中
に挿入して、柱梁主筋先組中空PC柱ユニット11が組
み立てられる。こうして、組み立てられた柱梁主筋先組
中空PC柱ユニット11は、そのままストックヤード床
面15上に保管される。 図13(b)〜図13(d)に示すように、上記中空PC
柱型枠12,梁主筋先組鉄筋籠13および先組柱主筋1
4が一体化された状態で柱梁主筋先組中空PC柱ユニッ
ト11をN階に揚重し、先組柱主筋14の下端を(N−
1)階からの柱主筋16の上端に接続する。そして、梁
主筋先組鉄筋籠13が載置された状態の中空PC柱型枠
12をN階の床面に当接させる。 図13(e)に示すように、N階分の梁型枠17を揚重
して組み立てる。 図13(e)に示すように、上記中空PC柱型枠12お
よび梁型枠17の内部にコンクリート18を打設する。 図13(f)に示すように、(N+1)階分の中空PC柱
型枠19を先組柱主筋14に外挿する。 (N+1)階分の梁主筋先組鉄筋籠(図示せず)および
梁型枠(図示せず)を揚重して組み立てる。 上記(N+1)階分の中空PC柱型枠19および(N+
1)階分の梁型枠の内部にコンクリートを打設する。
As shown in FIG. 13 (a), the hollow PC column formwork 12 for the first floor in which the column shear reinforcement is embedded is erected on the floor 15 of the above-ground stockyard. Frame 1
On the upper end portion of 2, the beam main bar pre-assembled rebar cage 13 assembled with a plurality of beam main bars and beam shear reinforcing bars is placed. And 2
A plurality of pre-assembled column main bars 14 having a floor height of each floor are inserted into the hollow PC column form 12 through the beam main bar pre-assembled rebar cages 13 in a predetermined arrangement to form a column beam main bar pre-assembled hollow PC. The pillar unit 11 is assembled. In this way, the assembled pillar / beam main bar front assembled hollow PC pillar unit 11 is stored as it is on the floor 15 of the stockyard. As shown in FIGS. 13 (b) to 13 (d), the hollow PC
Column formwork 12, beam main bars, pre-assembled rebar cages 13, and pre-assembled column main bars 1
In the state where 4 are integrated, the column beam main bar front assembly hollow PC column unit 11 is lifted to the N floor, and the lower end of the front assembly column main bar 14 is (N-
1) Connect to the upper end of the column main bar 16 from the floor. Then, the hollow PC pillar formwork 12 in a state where the beam main reinforcement first set rebar cage 13 is placed is brought into contact with the floor surface of the Nth floor. As shown in FIG. 13E, the beam form 17 for N floors is lifted and assembled. As shown in FIG. 13E, concrete 18 is placed inside the hollow PC column form 12 and the beam form 17. As shown in FIG. 13 (f), the hollow PC column formwork 19 for the (N + 1) th floor is extrapolated to the main post 14 of the assembled post. (N + 1) floors of the main beam reinforcement front assembly rebar cage (not shown) and beam form (not shown) are lifted and assembled. Hollow PC pillar formwork 19 for the (N + 1) th floor and (N +
1) Place concrete inside the beam formwork on the floor.

【0007】このように、上記柱梁主筋先組中空PC柱
ユニット11を用いれば、柱施工階に柱梁主筋先組中空
PC柱ユニット11を揚重することによって、中空PC
柱型枠12,梁主筋先組鉄筋籠13および先組柱主筋1
4を個別に揚重する場合の揚重に要する時間が長くなる
問題や、各階での足場の組み立て/解体の問題が解決さ
れるのである。さらに、先組柱主筋14の長さは2階分
階高長さを有しているので、(N+1)階では、先組柱主
筋14と床から突出して柱主筋16との接続を省略で
き、上記接続に要する時間と労力とを略半減できるので
ある。
As described above, by using the above-mentioned hollow PC column unit 11 for the main beam / column reinforcement, the hollow PC column unit 11 for the main beam / column main frame is lifted to the hollow PC.
Column formwork 12, beam main bars, pre-assembled rebar cages 13, and pre-assembled column main bars 1
It solves the problem of longer lifting time when lifting 4 individually and the problem of assembling / disassembling scaffolding on each floor. Furthermore, since the length of the pre-assembled column main reinforcement 14 has the height of the second floor, on the (N + 1) th floor, the connection between the front-assembled column main reinforcement 14 and the column main reinforcement 16 can be omitted. The time and labor required for the above connection can be reduced to approximately half.

【0008】[0008]

【発明が解決しようとする課題】上述のように、上記柱
梁主筋先組中空PC柱ユニット11を使用した柱の構築
方法においては、先組柱主筋14の長さは柱施工階とそ
の上階との2階分階高長さになっているので、上記上階
の柱を施工する場合には中空PC柱型枠19および上階
用の梁主筋先組鉄筋籠を吊り込むだけでよく、建物の施
工手順を簡略化できるという利点はある。
As described above, in the method of constructing a column using the above-mentioned column-column main bar pre-assembled hollow PC column unit 11, the length of the pre-assembled column main bar 14 is the column construction floor and above. Since the floor height for the second floor is the same as that of the second floor, when constructing the pillars of the upper floor, it is sufficient to suspend the hollow PC pillar formwork 19 and the beam main bar front assembly rebar cage for the upper floor. There is an advantage that the construction procedure of the building can be simplified.

【0009】ところが、その場合に、上記柱梁主筋先組
中空PC柱ユニット11の立設階およびその上階全体の
作業状態を考えると、上記立設階(すなわち、柱施工階)
においては、上記柱梁主筋先組PC柱ユニット11の立
設作業と梁型枠17の組み立て作業が行われるのに対し
て、上記柱施工階の上階においては、中空PC柱型枠1
9の外挿作業と上階用の梁主筋先組鉄筋籠および梁型枠
の組み立て作業が行われる。つまり、柱施工階とその上
階とでは異なる作業が行われることになる。
However, in that case, considering the working condition of the standing floor of the pillar / beam main bar front assembled hollow PC pillar unit 11 and the entire upper floor thereof, the standing floor (that is, the pillar construction floor).
In the above, while the standing work of the above-mentioned pillar / beam main bar pre-assembled PC pillar unit 11 and the assembling work of the beam formwork 17 are performed, in the upper floor of the pillar construction floor, the hollow PC pillar formwork 1 is used.
The extrapolation work of No. 9 and the work of assembling the beam main bar front braces and the beam formwork for the upper floor are performed. That is, different works are performed on the pillar construction floor and the upper floor.

【0010】通常、各階が同様の構造を有する高層建物
を建築する場合には、作業工程の計画を立てやすくする
ために各階の作業の平準化を図るようにする。ところ
が、柱梁主筋先組PC柱ユニット11の立設作業、中空
PC柱型枠19の外挿作業、および、上階用の梁主筋先
組鉄筋籠の組み立て作業の夫々に必要な作業人員や作業
機器が異なるために、柱施工階とその上階とで作業が異
なるような上記柱の構築工法においては、柱施工階とそ
の上階との作業は平準化されないのである。したがっ
て、作業工程の計画が面倒であり、施工効率が悪くなる
という問題がある。
Normally, when a high-rise building having the same structure on each floor is constructed, the work on each floor is leveled in order to facilitate the planning of the work process. However, the number of workers required for the standing work of the column-column main bar pre-assembled PC column unit 11, the extrapolation work of the hollow PC column formwork 19, and the assembly work of the beam main bar pre-assembled rebar cage for the upper floor, In the above-described construction method of the pillar in which the work is different between the pillar construction floor and the upper floor because the work equipment is different, the work between the pillar construction floor and the upper floor is not leveled. Therefore, there is a problem that the planning of the work process is troublesome and the construction efficiency is deteriorated.

【0011】そこで、この発明の目的は、従来の技術の
項で述べたような柱梁主筋先組中空PC柱ユニットの利
点を損なうことなく各階の作業の平準化を図ることがで
き、したがって、作業工程の計画が容易で、施工効率の
良い柱の構築方法を提供することにある。
Therefore, an object of the present invention is to level the work on each floor without impairing the advantages of the column-column main bar front-end hollow PC column unit as described in the section of the prior art. The purpose of the present invention is to provide a method for constructing a pillar that facilitates work process planning and has high construction efficiency.

【0012】[0012]

【課題を解決するための手段】上記目的を達成するた
め、請求項1に係る発明の柱の構築方法は、柱剪断補強
筋が埋設された鉄筋コンクリート構造の筒体を成す第1
中空PC柱型枠と,この第1中空PC柱型枠の上端部に
載置された第1梁主筋先組鉄筋籠と,所定の配列で先組
されると共に上記第1梁主筋先組鉄筋籠を貫通して上記
第1中空PC柱型枠中に全長に亘って上記第1梁主筋先
組鉄筋籠及び第1中空PC柱型枠と相対移動可能に挿入
された2階分階高長さを有する複数の先組柱主筋とで,
柱梁主筋先組中空PC柱ユニットを作成し,さらに,上記
第1中空PC柱型枠と同じ構成を成す第2中空PC柱型
枠を作成しておく第1工程と、上記柱梁主筋先組中空P
C柱ユニットを吊り上げて移動し,上記第1中空PC柱
型枠を貫通している上記先組柱主筋の下端部を施工階床
面から所定の柱筋連結長だけ突出している第1柱主筋の
上端部に連結した後,上記第1中空PC柱型枠を第1梁
主筋先組鉄筋籠と共に下降させて上記施工階床面に設置
させる第2工程と、上記第2中空PC柱型枠を吊り上げ
て移動し,施工階床面から上記柱筋連結長に施工階階高
を加えた長さだけ突出している第2柱主筋に外挿して上
記施工階床面に設置させる第3工程と、上記柱梁主筋先
組中空PC柱ユニットおよび第2中空PC柱型枠にコン
クリートを打設して,上記第1,第2中空PC柱型枠と上
記施工階床面とを一体構造にする第4工程を備えて、上
記第1柱主筋と第2柱主筋とは、建物の2つの桁行き方
向の少なくとも何れか一方に交互に配列されていること
を特徴としている。
In order to achieve the above object, a method of constructing a pillar according to a first aspect of the present invention is such that a pillar of a reinforced concrete structure in which a pillar shear reinforcing bar is buried is formed.
A hollow PC column formwork, a first beam main bar pre-assembled rebar cage mounted on an upper end portion of the first hollow PC column form, preassembled in a predetermined arrangement, and the first beam main bar pre-assembled rebar The first beam main bar tip over the entire length through the cage into the first hollow PC column formwork
With the assembled rebar cage and the first hollow PC pillar formwork, and a plurality of pre-assembled pillar main bars having the height height of the second floor inserted so as to be relatively movable,
The first step of creating a column / beam main bar front set hollow PC column unit, and further creating a second hollow PC column formwork having the same configuration as the first hollow PC column formwork, and the above-mentioned column / beam main bar point Pair hollow P
C pillar unit is lifted and moved, and the lower end part of the above-mentioned pre-assembled column main bar which penetrates the above-mentioned 1st hollow PC column formwork is projected from the construction floor by a predetermined column bar connection length. Second hollow PC column formwork, after the first hollow PC column formwork is lowered together with the first beam main rebar front assembled rebar cage and installed on the construction floor after connecting to the upper end of the The third step of lifting and moving the second pillar to install it on the construction floor by extrapolating it to the second pillar main bar protruding from the construction floor by the length obtained by adding the construction floor height to the connection length of the pillar , Concrete is placed on the above-mentioned column / beam main bar front-end hollow PC column unit and second hollow PC column form to make the first and second hollow PC column forms and the construction floor surface into an integral structure A fourth step is provided, and the first pillar main bar and the second pillar main bar are at least one of two girder directions of the building. It is characterized by being arranged alternately towards.

【0013】上記構成によれば、施工階床面から所定の
柱筋連結長だけ突出する第1柱主筋と上記柱筋連結長に
施工階階高を加えた長さだけ突出する第2柱主筋とが、
建物の2つの桁行き方向の少なくとも何れか一方に交互
に配列されている。そして、上記第1柱主筋の上端部に
は柱梁主筋先組中空PC柱ユニットが立設される。一
方、上記第2柱主筋には第2中空PC柱型枠が外挿され
る。こうして、施工階においては、上記柱梁主筋先組P
C柱ユニットの立設作業と上記第2中空PC柱型枠の外
挿作業とが並行してあるいは順次行われる。したがっ
て、上記柱梁主筋先組中空PC柱ユニットにおける2階
分階高長さを有する先組柱主筋の上階への突出部分を上
記上階での第2柱主筋とする一方、上記柱筋連結長に施
工階階高を加えた長さの第2柱主筋の上記上階への突出
部分を上記上階での第1柱主筋とすることによって、上
記柱梁主筋先組中空PC柱ユニットの利点を損なうこと
なく総ての施工階における柱構築作業の平準化が図られ
て、作業工程の計画が容易になり、施工効率が良くな
る。
According to the above construction, the first pillar main bar projecting from the construction floor by a predetermined column reinforcing bar connecting length and the second pillar main bar projecting by a length obtained by adding the working floor height to the column reinforcing bar connecting length. And
They are alternately arranged in at least one of the two girder directions of the building. And, a column-column main bar front-end hollow PC column unit is erected on the upper end portion of the first main column bar. On the other hand, a second hollow PC column form is externally inserted on the second column main bar. In this way, on the construction floor, the above-mentioned pillar beam main bar front set P
The standing work of the C pillar unit and the extrapolation work of the second hollow PC pillar formwork are performed in parallel or sequentially. Therefore, the protruding portion of the pre-assembled column main bar having the floor height of the second floor in the pre-assembled hollow PC post unit to the upper floor is the second post main bar on the upper floor, while the post bar is By making the projecting portion of the second pillar main bar having a length obtained by adding the construction floor height to the connection length to the above upper floor as the first pillar main bar on the above floor, the above-mentioned column beam main bar front assembly hollow PC column unit The column construction work can be leveled on all construction floors without impairing the advantages of the above, and the work process can be easily planned and the construction efficiency can be improved.

【0014】また、請求項2に係る発明は、請求項1に
係る発明の柱の構築方法において、上記第1工程におい
て作成される柱梁主筋先組中空PC柱ユニットは,上記
第1中空PC柱型枠の側面における上端部に上記第1梁
主筋先組鉄筋籠の下側を覆うように第1梁型枠が取り付
けられた柱梁主筋先組中空PC柱ユニットであり、上記
第1工程において作成される第2中空PC柱型枠は,側
面の上端部に第2梁型枠が取り付けられた第2中空PC
柱型枠であることを特徴としている。
According to a second aspect of the present invention, in the method of constructing a column according to the first aspect of the present invention, the column beam main bar front assembled hollow PC column unit produced in the first step is the first hollow PC. A pillar-beam main bar pre-assembled hollow PC pillar unit in which a first beam form is attached to an upper end portion on a side surface of a column form so as to cover a lower side of the first beam main bar pre-assembled rebar cage. The second hollow PC pillar formwork made in is a second hollow PC with a second beam formwork attached to the upper end of the side surface.
It is characterized by being a pillar formwork.

【0015】上記構成によれば、上記柱梁主筋先組中空
PC柱ユニットおよび第2中空PC柱型枠に梁型枠が予
め取り付けられている。したがって、施工階において上
記第1,第2中空PC柱型枠近傍の梁型枠を組み立てる
必要がなく、建物の施工効率が更に高められる。
According to the above construction, the beam form is preliminarily attached to the above-mentioned column-beam main bar front assembled hollow PC column unit and second hollow PC column form. Therefore, it is not necessary to assemble the beam forms near the first and second hollow PC column forms on the construction floor, and the construction efficiency of the building is further enhanced.

【0016】また、請求項3に係る発明は、請求項1に
係る発明の柱の構築方法において、上記第1工程におい
て作成される柱梁主筋先組中空PC柱ユニットは、上記
第1中空PC柱型枠が所定間隔で複数本並設されると共
に、上記第1梁主筋先組鉄筋籠が上記複数本の第1中空
PC柱型枠の上端部に架設されて成る柱梁主筋先組中空
PC柱ユニットであることを特徴としている。
According to a third aspect of the present invention, in the method of constructing a column according to the first aspect of the present invention, the column beam main bar front assembled hollow PC column unit produced in the first step is the first hollow PC. A plurality of column formwork is installed side by side at a predetermined interval, and the first beam main bar pre-assembled rebar cage is erected on the upper ends of the plurality of first hollow PC column form frames. It is a PC pillar unit.

【0017】上記構成によれば、施工階に1つの柱梁主
筋先組中空PC柱ユニットが立設されると、複数本の第
1中空PC柱型枠が施工階床面に同時に平行に立設され
ることになる。こうして、建物の施工効率が更に高めら
れる。
According to the above construction, when one pillar beam main bar front assembly hollow PC pillar unit is erected on the construction floor, a plurality of first hollow PC pillar formwork are erected at the same time in parallel with the construction floor. Will be installed. In this way, the construction efficiency of the building is further enhanced.

【0018】[0018]

【発明の実施の形態】以下、この発明を図示の実施の形
態により詳細に説明する。図1及び図2は、本実施の形
態の柱の構築方法における作業手順を示す。ここで、本
実施の形態においては、図13に示す柱梁主筋先組中空
PC柱ユニット11と同様に、矩形の柱剪断補強筋が埋
設された四角筒体である第1中空PC柱型枠22と、こ
の中空PC柱型枠22の上端部に載置された第1梁主筋
先組鉄筋籠23と、所定の配列で先組された2階分階高
長さの複数の先組柱主筋24で組み立てられた柱梁主筋
先組中空PC柱ユニット21を用いる。尚、第1中空P
C柱型枠22は必ずしも四角筒体である必要はなく、円
筒体等の他の筒体であっても差し支えない。
BEST MODE FOR CARRYING OUT THE INVENTION The present invention will be described in detail below with reference to the embodiments shown in the drawings. 1 and 2 show a work procedure in the method of constructing a pillar according to the present embodiment. Here, in the present embodiment, similar to the column-beam main bar tip assembled hollow PC column unit 11 shown in FIG. 13, a first hollow PC column formwork that is a square tubular body in which rectangular column shear reinforcement bars are embedded. 22 and the first beam main bar pre-assembled rebar cage 23 placed on the upper end of the hollow PC column formwork 22, and a plurality of pre-assembled columns of two floors in height which are pre-assembled in a predetermined arrangement. The column-beam main reinforcement tip assembled hollow PC pillar unit 21 assembled with the main reinforcement 24 is used. The first hollow P
The C-column form 22 does not necessarily have to be a rectangular cylinder, and may be another cylinder such as a cylinder.

【0019】上記柱梁主筋先組中空PC柱ユニット21
を用いた柱の構築方法は、次のような手順によって行わ
れる。
The above-mentioned column-beam main bar front assembly hollow PC column unit 21
The method of constructing a pillar using is performed by the following procedure.

【0020】先ず、図1(a)に示すように、地上のスト
ックヤード床面25上に下1階分の第1中空PC柱型枠
22が立設される。次に、第1梁主筋先組鉄筋籠23
が、先組柱主筋24との交差部であるパネルゾーン部を
第1中空PC柱型枠22の上端面に位置させて第1中空
PC柱型枠22上に水平に載置される。次に、吊込治具
26に取り付けられて第1中空PC柱型枠22の内壁面
に沿うように配列された先組柱主筋24が、第1中空P
C柱型枠22の内壁面に沿って挿入されて、柱梁主筋先
組中空PC柱ユニット21が組み立てられる。また、第
1中空PC柱型枠22と同一構造を有する第2中空PC
柱型枠36がストックヤード床面25上に立設される。
そして、上述のようにして組み立てられた柱梁主筋先組
中空PC柱ユニット21と第2中空PC柱型枠36と
は、そのままストックヤード床面25上に保管される。
尚、柱梁主筋先組中空PC柱ユニット21においては、
第1中空PC柱型枠22と第1梁主筋先組鉄筋籠23と
は、先組柱主筋24に対して垂直方向に移動可能になっ
ている。また、ストックヤード床面25は、地上以外に
設定しても差し支えない。尚、先組柱主筋24は、上述
のように全部を一度に第1中空PC柱型枠22内に挿入
してもよいし、1本ずつ別々に挿入した後に全先組柱主
筋24の上端部を吊込治具26で保持してもよい。
First, as shown in FIG. 1 (a), the first hollow PC pillar formwork 22 for the lower first floor is erected on the floor surface 25 of the stockyard above the ground. Next, the first beam main reinforcing bar front assembly rebar cage 23
However, the panel zone portion, which is an intersection with the pre-assembled column main reinforcement 24, is positioned on the upper end surface of the first hollow PC column form 22, and is horizontally placed on the first hollow PC column form 22. Next, the pre-assembled column main bars 24 attached to the hanging jig 26 and arranged along the inner wall surface of the first hollow PC column formwork 22 are
The C-column formwork 22 is inserted along the inner wall surface of the C-column formwork 22 to assemble the column-beam main reinforcement tip assembled hollow PC column unit 21. Also, a second hollow PC having the same structure as the first hollow PC pillar formwork 22.
A pillar form 36 is erected on the floor surface 25 of the stockyard.
Then, the column-beam main reinforcement tip assembled hollow PC column unit 21 and the second hollow PC column form 36 assembled as described above are stored as they are on the stockyard floor surface 25.
In addition, in the column beam main bar front assembled hollow PC column unit 21,
The first hollow PC column formwork 22 and the first beam main reinforcing bar pre-assembled rebar cage 23 are movable in the vertical direction with respect to the pre-assembled column main reinforcing bar 24. Further, the stockyard floor surface 25 may be set to a place other than the ground. It should be noted that all of the pre-assembled column main bars 24 may be inserted all at once into the first hollow PC column form 22 as described above, or the upper ends of all the pre-assembled column main bars 24 may be inserted individually. The portion may be held by the hanging jig 26.

【0021】図1(b)に示すように、柱立設作業を行う
N階の床面からは、(N−1)階に立設された柱梁主筋先
組PC柱ユニット21の先組柱主筋24の上階部分が突
出している。以下、この(N−1)階に立設された柱梁主
筋先組PC柱ユニット21の突出部分を長柱主筋27と
言う。さらに、(N−2)階に立設された柱梁主筋先組
PC柱ユニット21の先組柱主筋24の先端部分が突出
している。以下、この(N−2)階に立設された柱梁主筋
先組PC柱ユニット21の突出部分を短柱主筋28と言
う。ここで、長柱主筋27と短柱主筋28とは、建築す
る建物の2つの桁行き方向の少なくとも何れか一方に交
互に配置されて、略半々になるようになっている。尚、
上記N階が最下階である場合には、その最下階の床面
に、所定の柱主筋連結長を有する柱主筋を上記短柱主筋
28として予め立設しておく。同様に、上記柱主筋連結
長に1階分階高長を加えた長さの柱主筋を上記長柱主筋
27として予め立設しておく。
As shown in FIG. 1 (b), from the floor surface of the N-th floor where the pillar is erected, the pre-assembly of the column-beam main bar pre-assembled PC post unit 21 which is erected on the (N-1) th floor. The upper floor portion of the pillar main bar 24 projects. Hereinafter, the projecting portion of the column-column main bar pre-assembled PC column unit 21 erected on the (N-1) th floor will be referred to as a long column main bar 27. Further, the tip portion of the front-end column main bar 24 of the column-beam main bar front-column PC column unit 21 which is erected on the (N-2) th floor is projected. Hereinafter, the projecting portion of the column-beam main bar pre-assembled PC column unit 21 erected on the (N-2) th floor will be referred to as a short column main bar 28. Here, the long column main reinforcements 27 and the short column main reinforcements 28 are alternately arranged in at least one of the two girder directions of the building to be constructed, and are approximately half and half. still,
When the Nth floor is the lowest floor, a column main bar having a predetermined column main bar connection length is erected in advance as the short column main bar 28 on the floor surface of the lowest floor. Similarly, a column main bar having a length obtained by adding a floor height for one floor to the column main bar connection length is erected in advance as the long column main bar 27.

【0022】上述したように、上記ストックヤード床面
25上に第1中空PC柱型枠22,第1梁主筋先組鉄筋
籠23および先組柱主筋24が一体となって保管されて
いる柱梁主筋先組中空PC柱ユニット21が、図1(c)
−(ニ)に示すように、クレーン29によって吊り上げら
れてN階まで揚重される。ここで、先組柱主筋24は吊
込治具26を介して吊り上げられる一方、第1中空PC
柱型枠22および第1梁主筋先組鉄筋籠23は吊込治具
30と吊りワイヤロープ31a,31bとを介して吊り上
げられるのであるが、その場合に、吊込治具26用の吊
りワイヤロープ32の長さと吊込治具30用の吊りワイ
ヤロープ33の長さは、第1中空PC柱型枠22,第1
梁主筋先組鉄筋籠23および先組柱主筋24が吊り上げ
られた状態で、第1中空PC柱型枠22および第1梁主
筋先組鉄筋籠23が先組柱主筋24に対して上方にスラ
イドして、先組柱主筋24の下端部34が第1中空PC
柱型枠22の下端から接合作業代分だけ突出するように
設定されている。
As described above, the column in which the first hollow PC column formwork 22, the first beam main bar pre-assembled rebar cage 23 and the pre-assembled column main bar 24 are integrally stored on the stockyard floor surface 25 as described above. The beam main bar tip assembly hollow PC column unit 21 is shown in Fig. 1 (c).
-As shown in (d), it is hoisted by the crane 29 and lifted to the Nth floor. Here, the pre-assembled column main reinforcement 24 is hoisted via the hoisting jig 26, while the first hollow PC
The column formwork 22 and the first beam main reinforcing bar pre-assembled rebar cage 23 are hoisted via the hanging jig 30 and the hanging wire ropes 31a and 31b. In that case, the hanging wire for the hanging jig 26 is used. The length of the rope 32 and the length of the hanging wire rope 33 for the hanging jig 30 are the same as those of the first hollow PC pillar formwork 22 and the first hollow PC pillar formwork 22.
The first hollow PC column formwork 22 and the first beam main bar pre-assembled rebar cage 23 slide upward with respect to the pre-assembled column main bar 24 while the beam main bar pre-assembled rebar basket 23 and the pre-assembled column main bar 24 are suspended. Then, the lower end 34 of the main post 24 of the pillar assembly is the first hollow PC.
It is set so as to project from the lower end of the column form 22 by the amount of the joining work.

【0023】そして、上記クレーン29によってN階ま
で揚重された柱梁主筋先組中空PC柱ユニット21にお
ける先組柱主筋24の下端(上記接合作業代分だけ突出
している)が、N階の床面から突出している短柱主筋2
8の上端に溶接等によって接合される。そうした後、ク
レーン29の吊りフックが更に下降されて、第1中空P
C柱型枠22が、第1梁主筋先組鉄筋籠23を載置した
状態で先組柱主筋24に沿って施工階床面35に当接す
るまで下降する。そして、吊込治具26が除去されて、
図1(c)−(ヘ)に示す状態となる。また、図1(c)−(ハ)
に示すように、ストックヤード床面25上に保管されて
いる第2中空PC柱型枠36がクレーン29で吊り上げ
られる。そして、図1(c)−(ホ)に示すように、長柱主
筋27に外挿される。以下、上述の作業が総ての長柱主
筋27および短柱主筋28に対して並行して行われる。
Then, the lower end (protruding by the above-mentioned joining work allowance) of the pre-assembled column main bar 24 in the column beam main bar pre-assembled hollow PC column unit 21 hoisted to the N-th floor by the crane 29 is located on the N-th floor. Short column main bar 2 protruding from the floor
It is joined to the upper end of 8 by welding or the like. After that, the suspension hook of the crane 29 is further lowered, and the first hollow P
The C-column formwork 22 descends along the first-column main reinforcing bar 24 until it comes into contact with the construction floor surface 35 with the first beam main reinforcing bar front-reinforcing bar cage 23 placed thereon. Then, the hanging jig 26 is removed,
The state shown in FIG. 1 (c)-(f) is obtained. In addition, Fig. 1 (c)-(c)
As shown in, the second hollow PC pillar formwork 36 stored on the floor surface 25 of the stockyard is lifted by the crane 29. Then, as shown in FIGS. 1 (c)-(e), it is extrapolated to the long column main bar 27. Hereinafter, the above-mentioned work is performed in parallel with respect to all the long column main bars 27 and the short column main bars 28.

【0024】次に、図2(d)−(イ),(ハ),(ホ)に示すよ
うに、上記柱梁主筋先組中空PC柱ユニット21の第1
梁主筋先組鉄筋籠23と同様に形成された第2梁主筋先
組鉄筋籠37が、第2中空PC柱型枠36が外挿された
長柱型枠27を挿通させて、第2中空PC柱型枠36上
に載置される。そして、夫々の第2梁主筋先組鉄筋籠3
7の両端と隣接する柱梁主筋先組中空PC柱ユニット2
1の第1梁主筋先組鉄筋籠23の先端とが、溶接や圧接
や機械式鉄筋継手や重ね継手等によって接続される。
Next, as shown in FIGS. 2 (d)-(a), (c), and (e), the first of the above-mentioned column / beam main bar front assembled hollow PC column unit 21 is first.
The second beam main reinforcement point assembly rebar cage 37 formed in the same manner as the beam main reinforcement point assembly rebar cage 23 is inserted into the long column form 27 to which the second hollow PC column form 36 is externally inserted, and the second hollow It is placed on the PC pillar form 36. And each of the second beam main bar front set rebar cage 3
Hollow PC column unit 2 which is adjacent to both ends of 7
The tip of the first first beam main reinforcing bar front assembly rebar cage 23 is connected by welding, pressure welding, mechanical rebar joint, lap joint, or the like.

【0025】その後、図2(e)に示すように、上記第1
梁主筋先組鉄筋籠23および第2梁主筋先組鉄筋籠37
に沿って梁型枠38が形成されて、第1中空PC柱型枠
22,第2中空PC柱型枠36および梁型枠38の内部
にコンクリート39が打設される。このようにして、N
階の柱と梁および(N+1)階の床が構築されるのであ
る。
Then, as shown in FIG. 2 (e), the first
Beam main bar front set rebar cage 23 and second beam main bar front set rebar basket 37
A beam form 38 is formed along the above, and concrete 39 is placed inside the first hollow PC column form 22, the second hollow PC column form 36, and the beam form 38. In this way, N
The columns and beams on the floor and the floor on the (N + 1) th floor are constructed.

【0026】以後、図1(b)に戻って、N階に立設され
た柱梁主筋先組PC柱ユニット21の先組柱主筋24に
おける(N+1)階への突出部分を新たな長柱主筋と見な
す一方、長柱主筋27の(N+1)階への突出部分を新た
な短柱主筋と見なして、(N+1)階の柱と梁および(N
+2)階の床を構築するのである。
Thereafter, returning to FIG. 1 (b), the projecting portion of the pre-assembled column main bar 24 of the column beam main bar pre-assembled PC column unit 21 erected on the N-th floor to the (N + 1) th floor is a new long column. While considering it as the main bar, the projecting portion of the long column main bar 27 to the (N + 1) th floor is regarded as a new short column main bar, and the columns and beams of the (N + 1) th floor and (N
+2) Build the floor on the floor.

【0027】尚、本実施の形態において使用する柱梁主
筋先組中空PC柱ユニットは、上述の如く第1梁主筋先
組鉄筋籠23の中央部を第1中空PC柱型枠22の上端
面に載置した構成を有する柱梁主筋先組中空PC柱ユニ
ット21に限定されるものではない。
As described above, in the column / beam main rebar first set hollow PC post unit used in this embodiment, the central portion of the first beam main rebar front set rebar cage 23 is located at the upper end surface of the first hollow PC post form 22. However, the present invention is not limited to the column-beam main bar tip assembled hollow PC column unit 21 having the configuration mounted on.

【0028】例えば、図3は、第1中空PC梁型枠42
の上端面を起点として90度の角度で2本の第1梁主筋
先組鉄筋籠43,44が延在している柱梁主筋先組中空
PC柱ユニット41である。また、図4は、互いに直交
する2本の第1梁主筋先組鉄筋籠46,47の交差部を
第1中空PC柱主筋48の上端面に載置した柱梁主筋先
組中空PC柱ユニット45である。また、図5は、柱梁
主筋先組中空PC柱ユニット45と同じ構成を有する2
つの柱梁主筋先組中空PC柱ユニット52,53の第1
梁主筋先組鉄筋籠54,55の先端同士を接続した柱梁
主筋先組中空PC柱ユニット51である。尚、図5にお
いては2つの柱梁主筋先組中空PC柱ユニット52,5
3を連結しているが、3以上の柱梁主筋先組中空PC柱
ユニットを連結しても差し支えない。また、特に図示は
しないが、第1梁主筋先組鉄筋籠を建物の外壁に沿って
配設させるために、柱梁主筋先組中空PC柱ユニット4
5,51から不必要な第1梁主筋先組鉄筋籠を削除した
変形体であっても差し支えない。
For example, FIG. 3 shows a first hollow PC beam form 42.
Is a column beam main bar front set hollow PC column unit 41 in which two first beam main bar front set rebar cages 43, 44 extend at an angle of 90 degrees from the upper end surface of the above. In addition, FIG. 4 is a pillar-beam main bar pre-assembled hollow PC column unit in which the intersection of two first beam main bar pre-assembled rebar cages 46, 47 orthogonal to each other is placed on the upper end surface of the first hollow PC column main bar 48. 45. In addition, FIG. 5 has the same configuration as the column beam main bar front assembled hollow PC column unit 45.
The first of the two pillars and beams, the main bar and the front hollow PC pillar units 52 and 53
It is a column beam main bar front set hollow PC column unit 51 in which the tips of the beam main bar front set rebar cages 54, 55 are connected to each other. In addition, in FIG. 5, two column beam main reinforcement front assembled hollow PC column units 52, 5
Although 3 are connected, it is possible to connect 3 or more column-beam main bar front assembled hollow PC column units. Further, although not particularly shown, in order to dispose the first beam main reinforcing bar front assembled rebar cage along the outer wall of the building, the column beam main reinforcing bar front assembled hollow PC pillar unit 4
It does not matter even if it is a deformed body in which unnecessary unnecessary first beam main bar front braided cages are removed from 5,51.

【0029】図6は、上記柱梁主筋先組中空PC柱ユニ
ット41,45,51およびそれらの変形体を用いて柱を
構築する場合に、柱梁主筋先組中空PC柱ユニット4
1,45,51等の立設と第2中空PC柱型枠36の長柱
主筋27への外挿とが終了した状態(図1(c)に示す状
態)における柱施工階の平面図である。図6において、
閉曲線f内は柱梁主筋先組中空PC柱ユニット41であ
り、閉曲線g,h内は柱梁主筋先組中空PC柱ユニット
45とその変形体であり、閉曲線i,j,k内は柱梁主筋
先組中空PC柱ユニット51とその変形体である。
FIG. 6 shows a case where a pillar is constructed by using the above-mentioned column / beam main bar pre-assembled hollow PC column units 41, 45, 51 and their deformed bodies.
A plan view of the pillar construction floor in a state (the state shown in FIG. 1 (c)) in which the standing of 1, 45, 51, etc. and the extrapolation of the second hollow PC column form 36 to the long column main bar 27 have been completed. is there. In FIG.
Inside the closed curve f is the column-beam main bar pre-assembled hollow PC column unit 41, inside the closed curves g and h is the column-beam main bar pre-assembled hollow PC column unit 45 and its modification, and inside the closed curve i, j, k is the column beam. It is a main bar front set hollow PC pillar unit 51 and its deformation body.

【0030】また、図7は、図6におけるA−A矢視断
面図である。また、図8は、図6におけるB−B矢視断
面図である。また、図9は、図6におけるC−C矢視断
面図である。また、図10は、図6におけるD−D矢視
断面図である。尚、図6においては、説明のために柱梁
主筋先組中空PC柱ユニット45と柱梁主筋先組中空P
C柱ユニット51との2種類の柱梁主筋先組中空PC柱
ユニットを混在させているが、通常は何れか一方の柱梁
主筋先組中空PC柱ユニットとその変形体とにそろえる
ようにする。
FIG. 7 is a sectional view taken along the line AA in FIG. 8 is a cross-sectional view taken along the line BB in FIG. 9 is a sectional view taken along the line CC in FIG. 10 is a sectional view taken along the line DD in FIG. Note that, in FIG. 6, for the sake of explanation, the column-beam main bar pre-assembly hollow PC column unit 45 and the column-beam main bar pre-assembly hollow P
Two types of column beam main rebar first set hollow PC column units together with the C column unit 51 are mixed, but normally one of the column beam main rebar first set hollow PC column units and its deformed body are arranged. .

【0031】図6〜図10から分かるように、本実施の
形態によれば、N階において、柱梁主筋先組PC柱ユニ
ット41,45,51の立設作業と、長柱主筋27に対す
る第2中空PC柱型枠36の外挿作業とが並行してまた
は順次行われる。つまり、上述したように、長柱主筋2
7と短柱主筋28とが略半々に配置されているのである
から、図13に示す従来の柱の構築におけるN階の作業
と(N+1)階の作業とが略同じ割合で並行してまたは順
次行われることになる。このことは、他の階の場合も同
様である。したがって、本実施の形態によれば各施工階
では同じ作業が行われることになる。
As can be seen from FIGS. 6 to 10, according to the present embodiment, in the N-th floor, the standing work of the column-beam main bar pre-assembled PC column units 41, 45, 51 and the first column main bar 27 are performed. (2) The extrapolation work of the hollow PC column form 36 is performed in parallel or sequentially. That is, as described above, the long pillar main bar 2
Since 7 and the short column main bars 28 are arranged in approximately half, the work of the Nth floor and the work of the (N + 1) th floor in the construction of the conventional column shown in FIG. It will be done sequentially. This also applies to other floors. Therefore, according to this embodiment, the same work is performed on each construction floor.

【0032】上述のように、本実施の形態においては、 (1) 上記ストックヤード床面25上で、第1中空PC
柱型枠22を立設し、この第1中空PC柱型枠22上に
水平方向に第1梁主筋先組鉄筋籠23を載置し、上方か
ら第1梁主筋先組鉄筋籠23を貫通して第1中空PC柱
型枠22内に2階分階高長さを有する先組柱主筋24を
挿通して、柱梁主筋先組中空PC柱ユニット21を組み
立てて保管する。また、第1中空PC柱型枠22と同一
構造の第2中空PC柱型枠36をストックヤード床面2
5上に立設して保管する。 (2) 上記柱梁主筋先組中空PC柱ユニット21をN階
に揚重し、先組柱主筋24の下端を、施工床面35から
長柱主筋27と交互に略半々の割り合いで突出している
短柱主筋28の上端に接続する。そして、第1梁主筋先
組鉄筋籠23が載置された状態の第1中空PC柱型枠2
2を施工床面35に設置させる。 (3) 上記第2中空PC柱型枠36をN階に揚重して施
工床面35から突出している長柱主筋27に外挿する。 (4) 上記第2梁主筋先組鉄筋籠37を揚重して長柱主
筋27を貫通させて第2中空PC柱型枠36上に載置
し、この第2梁主筋先組鉄筋籠37の両端を隣接する第
1梁主筋先組鉄筋籠23の先端に接続する。 (5) 上記第1梁主筋先組鉄筋籠23および第2梁主筋
先組鉄筋籠37に沿って梁型枠38を組み立てる。尚、
(4)と(5)の作業手順を入れ替えることも可能である。 (6) 上記第1中空PC柱型枠22,第2中空PC柱型枠
36および梁型枠38の内部にコンクリート39を打設
する。 (7) 以下、上記柱梁主筋先組PC柱ユニット21にお
ける先組柱主筋24の(N+1)階への突出部分を新たな
長柱主筋と見なす一方、長柱主筋27の(N+1)階への
突出部分を新たな短柱主筋と見なして、(1)〜(8)を繰
り返す。ことによって、柱および梁を構築する。
As described above, in the present embodiment, (1) the first hollow PC is placed on the floor surface 25 of the stockyard.
The column formwork 22 is erected, and the first beam main bar pre-assembled rebar cage 23 is placed horizontally on the first hollow PC column form frame 22 and penetrates the first beam main bar pre-assembled rebar basket 23 from above. Then, the pre-assembled column main reinforcement 24 having the second floor height is inserted into the first hollow PC column form 22 to assemble and store the column beam main reinforcement pre-assembled hollow PC column unit 21. In addition, the second hollow PC pillar formwork 36 having the same structure as the first hollow PC pillar formwork 22 is attached to the floor 2 of the stockyard.
5 Stand up and store. (2) The above-mentioned column-beam main reinforcement pre-assembled hollow PC column unit 21 is lifted to the Nth floor, and the lower end of the front-assembly main column reinforcement 24 is projected from the construction floor surface 35 alternately with the long-column main reinforcement 27 at approximately a half ratio. It is connected to the upper end of the short column main bar 28 which is connected. And the 1st hollow PC pillar formwork 2 in the state where the 1st beam main reinforcement front set rebar cage 23 was mounted.
2 is installed on the construction floor surface 35. (3) The second hollow PC column form 36 is lifted up to the Nth floor and extrapolated to the long column main bar 27 protruding from the construction floor 35. (4) The second beam main reinforcing bar pre-assembled rebar cage 37 is lifted up and the long column main bar 27 is penetrated to be placed on the second hollow PC column form 36. Both ends of are connected to the tips of the adjacent first beam main bar front braces 23. (5) Assemble the beam form 38 along the above-mentioned first beam main reinforcing bar front assembly reinforcing bar cage 23 and second beam main reinforcing bar front assembly reinforcing bar cage 37. still,
It is also possible to switch the work procedure of (4) and (5). (6) Concrete 39 is placed inside the first hollow PC column form 22, the second hollow PC column form 36, and the beam form 38. (7) In the following, the protruding portion of the pre-assembled column main reinforcement 24 to the (N + 1) th floor of the above-mentioned column beam main reinforcement pre-assembled PC column unit 21 is regarded as a new long column main reinforcement, while it extends to the (N + 1) th floor of the long pillar main reinforcement 27. The protruding part of is regarded as a new short column main muscle, and (1) to (8) are repeated. To build columns and beams.

【0033】したがって、各施工階において、上記柱梁
主筋先組PC柱ユニット21の立設作業と、長柱主筋2
7に対する第2中空PC柱型枠36の外挿作業および第
2梁主筋先組鉄筋籠37の載置作業とが並行して行われ
る。すなわち、本実施の形態によれば、各施工階におけ
る柱,梁構築作業の平準化を図ることができ、以て、作
業工程の計画を容易にし、施工効率を良くすることがで
きるのである。
Therefore, in each construction floor, the work of standing up the above-mentioned post-column main bar pre-assembled PC column unit 21 and the long post main bar 2
The outer insertion work of the second hollow PC pillar formwork 36 and the placement work of the second beam main reinforcing bar front assembled rebar cage 37 for 7 are performed in parallel. That is, according to the present embodiment, the work of constructing columns and beams on each construction floor can be leveled, so that the work process can be easily planned and the construction efficiency can be improved.

【0034】尚、上記実施の形態においては、図6〜図
9に示すように、上記柱梁主筋先組PC柱ユニット4
1,45,51を列状に配列している。しかしながら、こ
の発明はこれに限定されるものではなく、例えば図11
に示すように、上記柱梁主筋先組PC柱ユニットを千鳥
に配列しても差し支えない。要は、上記柱梁主筋先組P
C柱ユニットと第2中空PC柱型枠36とが、略半々に
なるように建物の2つの桁行き方向の少なくとも何れか
一方に交互に配置されていればよいのである。
Incidentally, in the above-mentioned embodiment, as shown in FIGS. 6 to 9, the above-mentioned column / beam main reinforcement front assembled PC column unit 4 is used.
1,45,51 are arranged in rows. However, the present invention is not limited to this, and for example, FIG.
As shown in FIG. 7, the above-mentioned main post-column main PC column units may be arranged in a staggered manner. The point is that the above-mentioned pillar-beam main reinforcement point assembly P
It is only necessary that the C pillar units and the second hollow PC pillar forms 36 be alternately arranged in at least one of the two girder directions of the building so as to be approximately half.

【0035】また、上記実施の形態においては、上記柱
梁主筋先組中空PC柱ユニット21を立設し、長梁主筋
27に第2中空PC柱型枠36を外挿し、第2梁主筋先
組鉄筋籠37を第2中空PC柱型枠36上に載置して第
1梁主筋先組鉄筋籠23と連結した後に、第1,第2梁
主筋先組鉄筋籠23,37に沿って梁型枠38を組み立
てるようにしている。しかしながら、柱梁主筋先組中空
PC柱ユニット21における中空PC柱型枠22と梁主
筋先組鉄筋籠23との交差部に、梁型枠を予め組み込ん
でおくことも可能である。このような柱梁主筋先組中空
PC柱ユニットの形成は、ストックヤード床面上に立設
された第1中空PC梁型枠の両側面における上端部に梁
型枠の一端側を取り付ける。そうした後に、この梁型枠
の上から第1梁主筋先組鉄筋籠を載置し、第1中空PC
柱型枠内に先組柱主筋を挿入することによって行われ
る。同様に、長梁主筋27に外挿される第2中空PC梁
型枠の両側面における上端部に、予め梁型枠の一端側を
取り付けておいてもよい。
In addition, in the above-mentioned embodiment, the above-mentioned hollow beam main bar post assembly 21 of the main post of the beam and column is erected, and the second hollow PC post form 36 is externally inserted to the main beam 27 of the long beam. After placing the assembled rebar cage 37 on the second hollow PC pillar formwork 36 and connecting it to the first beam main bar pre-assembled bar cage 23, along the first and second beam main bar pre-assembled rebar cages 23, 37 The beam form 38 is assembled. However, it is also possible to previously incorporate the beam formwork at the intersection of the hollow PC column formwork 22 and the beam main reinforcement formwork rebar cage 23 in the column-beam main reinforcement front assembly hollow PC column unit 21. In the formation of such a column-beam main bar front assembled hollow PC column unit, one end side of the beam form is attached to the upper ends of both side faces of the first hollow PC beam form installed upright on the floor surface of the stockyard. After doing so, the first beam main bar front bracing bar cage is placed on the beam form, and the first hollow PC
This is done by inserting the pre-assembled column main bars into the column formwork. Similarly, one end side of the beam form may be attached in advance to the upper end portions on both side faces of the second hollow PC beam form frame externally inserted to the long beam main reinforcement 27.

【0036】[0036]

【発明の効果】以上より明らかなように、請求項1に係
る発明の柱の構築方法は、第1工程において、第1中空
PC柱型枠と第1梁主筋先組鉄筋籠と2階分階高長さを
有する複数の先組柱主筋とで柱梁主筋先組中空PC柱ユ
ニットを作成し、さらに、第2中空PC柱型枠を作成し
ておき、第2工程において、上記柱梁主筋先組中空PC
柱ユニットを吊り上げて移動して上記先組柱主筋を施工
階床面から所定の柱筋連結長だけ突出している第1柱主
筋に連結した後、上記第1中空PC柱型枠を下降させて
上記施工階床面に設置させ、第3工程において、上記第
2中空PC柱型枠を吊り上げて移動し、施工階床面から
上記柱筋連結長に施工階階高を加えた長さだけ突出して
いる第2柱主筋に外挿して上記施工階床面に設置させ、
第4工程において、上記柱梁主筋先組中空PC柱ユニッ
トおよび第2中空PC柱型枠にコンクリートを打設して
上記第1,第2中空PC柱型枠と施工階床面とを一体構
造にする。その際に、上記第1柱主筋と第2柱主筋と
は、略半々になるように建物の2つの桁行き方向の少な
くとも何れか一方に交互に配列されているので、上記施
工階においては、上記柱梁主筋先組PC柱ユニットの立
設作業と上記第2中空PC柱型枠の外挿作業とを並行し
て行うことができる。したがって、上記柱梁主筋先組P
C柱ユニットにおける2階分階高長さを有する先組柱主
筋の上階への突出部分を上記上階での第2柱主筋とする
一方、上記柱筋連結長に施工階階高を加えた長さの第2
柱主筋の上記上階への突出部分を上記上階での第1柱主
筋とすることによって、上記柱梁主筋先組PC柱ユニッ
トの利点を損なうことなく総ての施工階における柱構築
作業の平準化を図ることができる。すなわち、この発明
によれば、作業工程の計画を容易にでき、施工効率を良
くできる。
As is apparent from the above, in the method of constructing a pillar according to the first aspect of the present invention, in the first step, the first hollow PC pillar formwork, the first beam main bar front bracing bar and the second floor In the second step, in the second step, the above-mentioned pillar beam is created by creating a pillar-beam main bar pre-assembled hollow PC pillar unit with a plurality of front-assembled pillar main bars having a floor height length. Main bar tip assembly hollow PC
After lifting and moving the pillar unit and connecting the above-mentioned pre-assembled pillar main bar to the first pillar main bar projecting from the construction floor surface by a predetermined column bar connecting length, lower the first hollow PC pillar formwork. It is installed on the floor of the construction floor, and in the third step, the second hollow PC pillar formwork is hoisted and moved to project from the construction floor surface by the length obtained by adding the construction floor height to the column reinforcement connection length. It is installed on the floor of the above construction floor by extrapolating to the main pillar of the second pillar
In the fourth step, concrete is placed in the above-mentioned column beam main bar front-end hollow PC column unit and second hollow PC column form to integrally structure the first and second hollow PC column forms and the construction floor surface. To At that time, since the first pillar main bars and the second pillar main bars are alternately arranged in at least one of the two girder directions of the building so as to be approximately half and half, on the construction floor, It is possible to perform the standing work of the column-column main-bar pre-assembled PC column unit and the extrapolation work of the second hollow PC column formwork in parallel. Therefore, the above-mentioned column-beam main bar tip assembly P
The projecting part to the upper floor of the pre-assembled pillar main bar having the floor height length of the second floor in the C pillar unit is used as the second pillar main bar on the upper floor, while the construction floor height is added to the column bar connection length. Length of second
By making the projecting portion of the pillar main bar to the upper floor the first pillar main bar on the upper floor, the pillar construction work on all construction floors can be performed without impairing the advantages of the above-mentioned pillar beam main bar pre-assembled PC column unit. Leveling can be achieved. That is, according to the present invention, the work process can be easily planned and the construction efficiency can be improved.

【0037】また、請求項2に係る発明の柱の構築方法
における上記第1工程で作成される柱梁主筋先組中空P
C柱ユニットは、上記第1中空PC柱型枠の側面におけ
る上端部に上記第1梁主筋先組鉄筋籠の下側を覆うよう
に第1梁型枠が取り付けられている柱梁主筋先組中空P
C柱ユニットであり、上記第1工程で作成される第2中
空PC柱型枠は、側面の上端部に第2梁型枠が取り付け
られている第2中空PC柱型枠であるので、柱と梁を同
時に構築する際に、施工階において上記中空PC柱型枠
近傍の梁型枠を組み立てる必要がなく、建物の施工効率
を更に高めることができる。
In addition, the pillar-beam main bar tip prefabricated hollow P created in the first step in the method of constructing a pillar according to the second aspect of the present invention.
The C-column unit is a column-beam main bar pre-assembly in which the first beam form is attached to the upper end of the side surface of the first hollow PC column form so as to cover the lower side of the first beam main bar pre-assembly rebar basket. Hollow P
Since the second hollow PC pillar formwork, which is a C pillar unit and is made in the first step, is the second hollow PC pillar formwork in which the second beam formwork is attached to the upper end portion of the side surface, It is not necessary to assemble the beam formwork in the vicinity of the hollow PC column formwork on the construction floor when simultaneously constructing the and beam, and the construction efficiency of the building can be further enhanced.

【0038】また、請求項3に係る発明の柱の構築方法
における上記第1工程で作成される柱梁主筋先組中空P
C柱ユニットは、上記第1中空PC柱型枠が所定間隔で
複数本並設されると共に、上記第1梁主筋先組鉄筋籠が
上記複数本の第1中空PC柱型枠の上端部に架設されて
成る柱梁主筋先組中空PC柱ユニットであるので、施工
階に1つの柱梁主筋先組中空PC柱ユニットが立設され
ると、複数本の第1中空PC柱型枠が施工床面に同時に
平行に立設される。したがって、この発明によれば、建
物の施工効率を更に高めることができる。
[0038] Further, the column beam main bar pre-assembled hollow P produced in the first step in the method of constructing a column of the invention according to claim 3
In the C pillar unit, a plurality of the first hollow PC pillar formwork are arranged side by side at a predetermined interval, and the first beam main reinforcing bar pre-assembled rebar cage is provided on an upper end portion of the plurality of first hollow PC pillar formwork. Since it is a pillar-beam main bar pre-assembled hollow PC pillar unit constructed by being erected, when one pillar beam main bar pre-assembled hollow PC pillar unit is erected on the construction floor, a plurality of first hollow PC pillar formwork is constructed. It is erected in parallel with the floor at the same time. Therefore, according to this invention, the construction efficiency of the building can be further improved.

【図面の簡単な説明】[Brief description of drawings]

【図1】この発明の柱の構築方法における作業手順の説
明図である。
FIG. 1 is an explanatory diagram of a work procedure in a method of constructing a pillar according to the present invention.

【図2】図1に続く作業手順の説明図である。FIG. 2 is an explanatory diagram of a work procedure following FIG.

【図3】図1における柱梁主筋先組PC柱ユニットとは
異なる柱梁主筋先組PC柱ユニットの平面図である。
FIG. 3 is a plan view of a column / column main reinforcement first PC column unit different from the column / beam main reinforcement first PC column unit in FIG. 1;

【図4】図1〜図3とは異なる柱梁主筋先組PC柱ユニ
ットの平面図である。
FIG. 4 is a plan view of a column-column main bar tip assembled PC column unit different from FIGS. 1 to 3;

【図5】図1〜図4とは異なる柱梁主筋先組PC柱ユニ
ットを吊り上げた状態を示す図である。
FIG. 5 is a view showing a state in which a column-column main-bar pre-assembled PC column unit different from FIGS. 1 to 4 is lifted.

【図6】柱梁主筋先組PC柱ユニットおよび第2中空P
C柱型枠の配列形態の一例を示す図である。
FIG. 6 is a column-column main bar pre-assembled PC column unit and second hollow P
It is a figure which shows an example of the array form of a C pillar formwork.

【図7】図6におけるA−A矢視断面図である。FIG. 7 is a sectional view taken along the line AA in FIG.

【図8】図6におけるB−B矢視断面図である。FIG. 8 is a sectional view taken along the line BB in FIG.

【図9】図6におけるC−C矢視断面図である。9 is a sectional view taken along the line CC in FIG.

【図10】図6におけるD−D矢視断面図である。10 is a sectional view taken along the line DD in FIG.

【図11】図6とは異なる柱梁主筋先組PC柱ユニット
および第2中空PC柱型枠の配列形態を示す図である。
FIG. 11 is a view showing an arrangement form of a post-column main bar pre-assembled PC post unit and a second hollow PC post form different from those in FIG. 6;

【図12】従来の中空PC柱型枠を使用した柱の構築工
法の説明図である。
FIG. 12 is an explanatory view of a method of constructing a column using a conventional hollow PC column formwork.

【図13】従来の柱梁主筋先組中空PC柱ユニットを使
用した柱の構築方法の説明図である。
FIG. 13 is an explanatory diagram of a method of constructing a column using a conventional column / beam main reinforcement tip assembled hollow PC column unit.

【符号の説明】[Explanation of symbols]

21,41,45,51…柱梁主筋先組PC柱ユニット、
22,42,48…第1中空PC柱型枠、23,43,4
4,46,47,54,55…第1梁主筋先組鉄筋籠、24
…先組柱主筋、 27…長柱主筋、28
…短柱主筋、 36…第2中空PC柱
型枠、37…第2梁主筋先組鉄筋籠、 38…梁型
枠。
21,41,45,51 ... PC beam unit with pillar beam main bars
22, 42, 48 ... First hollow PC column formwork, 23, 43, 4
4,46,47,54,55 ... 1st beam main reinforcement point assembly braces, 24
… Leading pillar main bars, 27… Long pillar main bars, 28
… Short pillar main bar, 36… Second hollow PC column formwork, 37… Second beam main bar front assembled rebar cage, 38… Beam formwork

───────────────────────────────────────────────────── フロントページの続き (56)参考文献 特開 平5−239884(JP,A) 特開 昭62−55377(JP,A) 特開 平7−18785(JP,A) 特開 平3−233059(JP,A) 特開 平1−226982(JP,A) 特開 平4−272344(JP,A) 特開 平6−158712(JP,A) (58)調査した分野(Int.Cl.7,DB名) E04G 21/12 105 E04C 3/34 E04B 1/38 - 1/60 ─────────────────────────────────────────────────── ─── Continuation of the front page (56) Reference JP-A-5-239884 (JP, A) JP-A-62-55377 (JP, A) JP-A-7-18785 (JP, A) JP-A-3- 233059 (JP, A) JP-A-1-226982 (JP, A) JP-A-4-272344 (JP, A) JP-A-6-158712 (JP, A) (58) Fields investigated (Int.Cl. 7 , DB name) E04G 21/12 105 E04C 3/34 E04B 1/38-1/60

Claims (3)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 柱剪断補強筋が埋設された鉄筋コンクリ
ート構造の筒体を成す第1中空プレキャストコンクリー
ト柱型枠と、この第1中空プレキャストコンクリート柱
型枠の上端部に載置された第1梁主筋先組鉄筋籠と、所
定の配列で先組されると共に上記第1梁主筋先組鉄筋籠
を貫通して上記第1中空プレキャストコンクリート柱型
枠中に全長に亘って上記第1梁主筋先組鉄筋籠及び第1
中空プレキャストコンクリート柱型枠と相対移動可能に
挿入された2階分階高長さを有する複数の先組柱主筋と
で、柱梁主筋先組中空プレキャストコンクリート柱ユニ
ットを作成し、さらに、上記第1中空プレキャストコン
クリート柱型枠と同じ構成を成す第2中空プレキャスト
コンクリート柱型枠を作成しておく第1工程と、 上記柱梁主筋先組中空プレキャストコンクリート柱ユニ
ットを吊り上げて移動し、上記第1中空プレキャストコ
ンクリート柱型枠を貫通している上記先組柱主筋の下端
部を施工階床面から所定の柱筋連結長だけ突出している
第1柱主筋の上端部に連結した後、上記第1中空プレキ
ャストコンクリート柱型枠を第1梁主筋先組鉄筋籠と共
に下降させて上記施工階床面に設置させる第2工程と、 上記第2中空プレキャストコンクリート柱型枠を吊り上
げて移動し、施工階床面から上記柱筋連結長に施工階階
高を加えた長さだけ突出している第2柱主筋に外挿して
上記施工階床面に設置させる第3工程と、 上記柱梁主筋先組中空プレキャストコンクリート柱ユニ
ットおよび上記第2中空プレキャストコンクリート柱型
枠にコンクリートを打設して、上記第1,第2中空プレ
キャストコンクリート柱型枠と上記施工階床面とを一体
構造にする第4工程を備えて、 上記第1柱主筋と第2柱主筋とは、建物の2つの桁行き
方向の少なくとも何れか一方に交互に配列されているこ
とを特徴とする柱の構築方法。
1. A first hollow precast concrete column formwork forming a tubular body of a reinforced concrete structure in which column shear reinforcements are embedded, and a first beam placed on the upper end of the first hollow precast concrete column formwork. The first beam main rebar cage is preassembled in a predetermined arrangement with the main bar front rebar cage and penetrates through the first beam main bar front rebar cage to be inserted into the first hollow precast concrete column formwork over the entire length thereof . Gumi Reinforcement Basket and 1st
A hollow precast concrete column formwork and a plurality of pre-assembled column main bars having a floor height of two floors inserted to be movable relative to each other are used to create a column beam main bar pre-assembled hollow precast concrete column unit, and 1 a first step to have created a second hollow precast concrete pillar formwork forming the same configuration as the hollow precast concrete pillar formwork travels lifting the beam-column longitudinal reinforcement destination sets hollow precast concrete column unit, the first After connecting the lower end part of the above-mentioned pre-assembled column main bar penetrating the hollow precast concrete column formwork to the upper end part of the first column main bar projecting from the construction floor surface by a predetermined column bar connection length, A second step in which the hollow precast concrete column formwork is lowered together with the first beam main rebar tip assembly rebar cage and installed on the construction floor surface; and the second hollow precast The concrete pillar formwork is hoisted and moved, and it is installed on the floor of the construction floor by extrapolating it to the second pillar main bar that protrudes from the construction floor by the length obtained by adding the construction floor height to the column reinforcement connection length. The third step to perform, and concrete is placed in the above-mentioned column beam main bar pre-assembled hollow precast concrete column unit and the above-mentioned second hollow precast concrete column formwork, and the above-mentioned first and second hollow precast concrete column formwork and the above-mentioned construction It is provided with the 4th process which makes a floor and floor an integrated structure, and said 1st pillar main reinforcement and 2nd pillar main reinforcement are arranged alternately in at least one of the two girder directions of a building. How to build a characteristic pillar.
【請求項2】 請求項1に記載の柱の構築方法におい
て、 上記第1工程において作成される柱梁主筋先組中空プレ
キャストコンクリート柱ユニットは、上記第1中空プレ
キャストコンクリート柱型枠の側面における上端部に上
記第1梁主筋先組鉄筋籠の下側を覆うように第1梁型枠
が取り付けられている柱梁主筋先組中空プレキャストコ
ンクリート柱ユニットであり、上記第1工程において作
成される第2中空プレキャストコンクリート柱型枠は、
側面の上端部に第2梁型枠が取り付けられている第2中
空プレキャストコンクリート柱型枠であることを特徴と
する柱の構築方法。
2. The method for constructing a column according to claim 1, wherein the column beam main bar pre-assembled hollow precast concrete column unit produced in the first step has an upper end on a side surface of the first hollow precast concrete column formwork. Is a hollow beam precast concrete pillar unit with a first beam main bar to which the first beam form is attached so as to cover the underside of the first beam main bar to the front rebar basket, and is formed in the first step. 2 Hollow precast concrete pillar formwork
A method for constructing a column, which is a second hollow precast concrete column formwork in which a second beam formwork is attached to an upper end portion of a side surface.
【請求項3】 請求項1に記載の柱の構築方法におい
て、 上記第1工程において作成される柱梁主筋先組中空プレ
キャストコンクリート柱ユニットは、上記第1中空プレ
キャストコンクリート柱型枠が所定間隔で複数本並設さ
れると共に、上記第1梁主筋先組鉄筋籠が上記複数本の
第1中空プレキャストコンクリート柱型枠の上端部に架
設されて成る柱梁主筋先組中空プレキャストコンクリー
ト柱ユニットであることを特徴とする柱の構築方法。
3. The method for constructing columns according to claim 1, wherein in the column beam main bar pre-assembled hollow precast concrete column unit created in the first step, the first hollow precast concrete column formwork is arranged at predetermined intervals. A pillar beam main bar pre-assembled hollow precast concrete pillar unit in which a plurality of the first beam main bar pre-assembled rebar cages are erected on the upper ends of the plurality of first hollow precast concrete pillar formwork while being arranged in parallel. A method of constructing a pillar characterized by that.
JP04965398A 1998-03-02 1998-03-02 How to build pillars Expired - Lifetime JP3364426B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP04965398A JP3364426B2 (en) 1998-03-02 1998-03-02 How to build pillars

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP04965398A JP3364426B2 (en) 1998-03-02 1998-03-02 How to build pillars

Publications (2)

Publication Number Publication Date
JPH11247448A JPH11247448A (en) 1999-09-14
JP3364426B2 true JP3364426B2 (en) 2003-01-08

Family

ID=12837160

Family Applications (1)

Application Number Title Priority Date Filing Date
JP04965398A Expired - Lifetime JP3364426B2 (en) 1998-03-02 1998-03-02 How to build pillars

Country Status (1)

Country Link
JP (1) JP3364426B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103726653A (en) * 2014-01-08 2014-04-16 成军 Full-prefabricated structure column steel sleeve cylinder grouting connecting construction method

Also Published As

Publication number Publication date
JPH11247448A (en) 1999-09-14

Similar Documents

Publication Publication Date Title
JP2006063718A (en) Construction method of overhanging bridge using corrugated steel web
KR100694493B1 (en) Reverse casting method to use the temporary structure supported by brackets as a workbench
JP3426492B2 (en) Hollow precast concrete precast concrete column unit with column and beam reinforcement and column construction method using this column unit
JP3078931B2 (en) Climbing stage method and chimney construction method for tubular structures
JP3364426B2 (en) How to build pillars
JPH0673783A (en) Construction of steel framed reinforced concrete column and steel beam
JP4005259B2 (en) How to build columns and beams
JP7627639B2 (en) How to build the structure
JP2004270377A (en) Column-beam preassembled reinforcement body, and preassembled reinforcement method using the same
JP3187618B2 (en) How to assemble beam reinforcement
JPH05156654A (en) Top-down construction method
JP3981496B2 (en) Precast pillar unit
JP7438313B1 (en) External steel reinforcement structure for existing buildings
JPH06104993B2 (en) Construction method of steel pipe precast concrete columns
JP3046779B2 (en) How to build a house
JP3364185B2 (en) Temporary scaffold for assembling wooden ramen and method of assembling wooden ramen using the temporary scaffold
RU2714777C1 (en) Prefabricated-monolithic frame of building of reinforcement-loop assembly with its bearing elements
JPH0598653A (en) Steel pipe concrete pillar in underground inverter construction method
JPH03293445A (en) Construction method of building structure
JPH0726574A (en) Reverse driving method with prior excavation for column
JP2001020297A (en) Sc-structured footing beam method for building
JPH0528248Y2 (en)
JP2804219B2 (en) Reinforced steel pipe unit and building construction method using the same
JPH06108536A (en) Framework by means of hollow precast concrete pole whose connecting part is formed into steel construction
JP2984626B2 (en) PC pillar construction method and its PC pillar

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111025

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111025

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20141025

Year of fee payment: 12

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term