Concrete box construction method

Info

Publication number
JP3375596B2
JP3375596B2 JP2000105788A JP2000105788A JP3375596B2 JP 3375596 B2 JP3375596 B2 JP 3375596B2 JP 2000105788 A JP2000105788 A JP 2000105788A JP 2000105788 A JP2000105788 A JP 2000105788A JP 3375596 B2 JP3375596 B2 JP 3375596B2
Authority
JP
Japan
Prior art keywords
handhole
concrete box
buried
pipe
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2000105788A
Other languages
Japanese (ja)
Other versions
JP2000314126A (en
Inventor
悦二 大池
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ooike Inc
Original Assignee
Ooike Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from JP7193099A external-priority patent/JPH11313432A/en
Application filed by Ooike Inc filed Critical Ooike Inc
Priority to JP2000105788A priority Critical patent/JP3375596B2/en
Publication of JP2000314126A publication Critical patent/JP2000314126A/en
Application granted granted Critical
Publication of JP3375596B2 publication Critical patent/JP3375596B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Laying Of Electric Cables Or Lines Outside (AREA)

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、電線、電話線等の埋設
工事に用いられるハンドホールなどのコンクリート製ボ
ックスの構造に関し、特に、排水のための構造に関する
ものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a structure of a concrete box such as a handhole used for burying electric wires and telephone lines, and more particularly to a structure for draining water.

【0002】[0002]

【従来の技術】図7に、電線、電話線等を地中に埋設す
る際に用いられるハンドホール10を示してある。この
ハンドホール10は地面1に埋設され、電線を敷設する
ための埋設電線管40等が側面11に接続されるもので
ある。このようなハンドホール10は、電線を埋設電線
管40内に敷設するために、電線の埋設ライン上に所定
の距離をおいて埋設されたり、各埋設ラインのコーナー
部に埋設される。そして、電線敷設後は、電線等の定期
検査を行う点検口としての機能も果たすものである。
2. Description of the Related Art FIG. 7 shows a handhole 10 used for burying an electric wire, a telephone wire or the like in the ground. The handhole 10 is buried in the ground 1, and a buried conduit 40 for laying an electric wire is connected to the side surface 11. In order to lay an electric wire in the buried conduit 40, the handhole 10 is buried at a predetermined distance on the burying line of the wire or at a corner portion of each burying line. After the electric wires are laid, they also function as an inspection port for conducting regular inspections of electric wires and the like.

【0003】ハンドホール10の形状としては、方形の
ものから円筒状のものなど多種多様なものがあるが、電
線管40からハンドホール10内に露出した電線に水、
塵等が付着することを防止するため、底面を有する形状
のハンドホール10が多く採用されている。そして、側
面には、電線管40などが貫通して接続し易いように、
薄肉の穴開け部13が用意されているものが多い。図8
に、一般的なハンドホール10の断面を示してある。こ
のハンドホール10は、図7に示したような方形のハン
ドホール10であり、底面12を有し、側面11には、
薄肉の穴開け部13が構成されている。そして、底面1
2と対峙する上面には、電線等を敷設するために手を入
れられる程度、ハンドホール10の大きさによっては、
人間が入り込める程度の進入口14が用意されている。
There are various shapes of the handhole 10, such as a rectangular shape and a cylindrical shape, and the electric wire exposed from the conduit 40 into the handhole 10 is filled with water,
In order to prevent dust and the like from adhering, a handhole 10 having a bottom surface is often used. Then, on the side surface, in order that the conduit 40 or the like may easily penetrate therethrough,
In many cases, a thin hole punching portion 13 is prepared. Figure 8
A cross section of a general handhole 10 is shown in FIG. This hand hole 10 is a rectangular hand hole 10 as shown in FIG. 7, has a bottom surface 12, and a side surface 11 has
A thin perforated portion 13 is configured. And the bottom surface 1
Depending on the size of the handhole 10, depending on the size of the handhole 10, a hand can be put to lay an electric wire on the upper surface facing the
The entrance 14 is prepared so that humans can enter.

【0004】このような底面12を有するハンドホール
10として問題となる点に、地下水との関係がある。底
面12は、水の侵入などを防止するために、用意されて
いるが、地下水位2がハンドホール10の埋設レベルよ
り低い場合は、進入口14から漏れ込む雨水を排出する
ために、底面12には、排水用の穴を用意しておくこと
が望ましい。一方、地下水位2がハンドホール10と同
じレベル、あるいは高い場合は、地下水の侵入を防止す
るために、排水用の穴を用意することはできない。この
ような条件に対応するため、地下水位によってハンドホ
ール10の底面の形状を排水口があるもの、あるいはな
いものに変更しても良い。しかしながら、製造コストが
上がること、また、発注、在庫管理などが煩雑となるこ
とから、図8に示すように、底面12に薄肉の部分15
を設け、排水用の穴が必要な場合は、この部分15を打
ち破り、排水用の穴を形成するようなハンドホールも発
明されている。
A problem with the handhole 10 having such a bottom surface 12 is the relationship with groundwater. The bottom surface 12 is prepared in order to prevent water from entering, but when the groundwater level 2 is lower than the burying level of the handhole 10, the bottom surface 12 is discharged to drain rainwater leaking from the entrance 14. It is desirable to prepare a hole for drainage. On the other hand, if the groundwater level 2 is at the same level as or higher than that of the handhole 10, it is impossible to prepare a hole for drainage in order to prevent the intrusion of groundwater. In order to cope with such a condition, the shape of the bottom surface of the handhole 10 may be changed to have a drain port or not have a drain port depending on the groundwater level. However, as the manufacturing cost increases and ordering and inventory management become complicated, as shown in FIG.
Is also provided, and a hole for drainage is required when the hole for drainage is required, the part 15 is broken to form a hole for drainage.

【0005】[0005]

【発明が解決しようとする課題】しかし、このような地
下水位の高低に対応可能なハンドホールであっても、ス
トックヤードにおける管理、特に野積み等の場合が問題
となる。すなわち、このようなハンドホールはコンクリ
ート等にて工場、あるいは現場で、埋設工程に先立って
必要な数量がプレキャストされる。従って、製造された
ハンドホールは、現場に運送されるまで、あるいは、埋
設されるまで、野積みの状態で保管されることが多い。
そして、この保管中に雨が降ると、ハンドホール内に水
が溜、この排水が問題となる。ハンドホール自体の重量
もさるものながら、ハンドホールの容量が大きいため、
内部に水が溜まったハンドホールのハンドリングは大変
であり、大型の重機が必要となる場合がある。内部に溜
まった水をくみ出すことも容易ではない。薄肉の部分を
打ち破り、水を排出してから補修して埋設することも可
能であるが、コンクリートの補修部分に沿って水が侵入
し易くなり、埋設後の水止め能力が低下することが多
い。また、このような補修中に、再度雨が降るようなこ
ともある。
However, even with such a handhole that can cope with high and low groundwater levels, there is a problem in management in the stockyard, especially in the case of open storage. That is, such a handhole is precast in concrete or the like in a factory or on-site in a required quantity prior to the burying process. Therefore, the manufactured handhole is often stored in an open field until it is transported to the site or buried.
Then, if it rains during this storage, water will accumulate in the handhole, and this drainage becomes a problem. Although the weight of the handhole itself is irrelevant, since the capacity of the handhole is large,
It is difficult to handle a handhole with water inside, and large heavy equipment may be required. It is not easy to pump out the water accumulated inside. Although it is possible to break through a thin part and drain water and then repair and bury it, it is easy for water to enter along the repaired part of the concrete and the water stopping ability after burying often decreases. . In addition, it may rain again during such repairs.

【0006】そこで、本発明においては、上記の問題に
鑑みて、保管および運送中の排水が可能であり、さら
に、埋設時には、止水できるハンドホール等のコンクリ
ート製ボックスを提供することを目的としている。
In view of the above problems, the present invention has an object to provide a concrete box such as a handhole which can be drained during storage and transportation and can be stopped when buried. There is.

【0007】[0007]

【課題を解決するための手段】上記の課題を解決するた
めに、本発明においては、プレキャスト時にコンクリー
ト製ボックスの底部に管を埋設するようにしている。す
なわち、本発明では、底部と、その底部を取り囲む筒状
の側面とを有するコンクリート製ボックスをプレキャス
トする際に、底部を貫通するように少なくとも1つの止
水可能な管を埋設し、その管が排水口となるようにコン
クリート製ボックスを保管および/または運送し、コン
クリート製ボックスを埋設する際にその管を止水する。
管として配管継手を埋設すれば止水栓を設置することに
より止水できる。
In order to solve the above problems, in the present invention, a pipe is buried in the bottom of a concrete box during precasting. That is, in the present invention, when precasting a concrete box having a bottom and a cylindrical side surface surrounding the bottom, at least one water-stoppable pipe is buried so as to penetrate the bottom, and the pipe is The concrete box is stored and / or transported so as to serve as a drainage port, and the pipe is stopped when the concrete box is buried.
If a pipe joint is buried as a pipe, water can be stopped by installing a water stopcock.

【0008】[0008]

【作用】プレキャスト時に底部に排水口を用意すること
により、保管中に雨などが降っても、コンクリート製ボ
ックスの内部に水が溜まることはない。このため、雨を
避けて屋内に保管する必要もなく、また、野積みにして
おいてもよい。また、その後の横持ちなどの運送すると
きにも、コンクリート製ボックス内部に雨水が溜まるこ
とによる重量増などの障害が発生することもない。
[Operation] By providing a drainage port at the bottom during precasting, water will not collect inside the concrete box even if it rains during storage. For this reason, it is not necessary to avoid rain and store indoors, and they may be stored in the open field. In addition, even when the product is transported laterally thereafter, there is no problem such as an increase in weight due to the accumulation of rainwater inside the concrete box.

【0009】さらに、コンクリート製ボックスの底部に
配管継手を埋設することにより確保された保管等におけ
る排水口は、地下水位が高いなど、止水を考慮してコン
クリート製ボックスを埋設する場合は、この継手に止水
栓を設置するという簡単な方法で水の侵入を完全に防止
できる。
Furthermore, the drainage port for storage, etc., secured by burying a pipe joint at the bottom of the concrete box, has a high groundwater level. Water can be completely prevented by the simple method of installing a water stopcock in the joint.

【0010】[0010]

【実施例】以下に図面を参照して、本発明の実施例を説
明する。
Embodiments of the present invention will be described below with reference to the drawings.

【0011】図1に、本実施例におけるハンドホール1
0の構造を一部欠いて示してある。本例のハンドホール
10は、先に説明した従来のハンドホールと同様に、略
正方形の底面12の回りに略長方形の4面からなる筒状
の側面11が形成されており、底面12と対峙した上面
に進入口14が用意されている。また、側面11の下部
には、電線管等の設置のための薄肉の穴開け部13が用
意されている。本例のハンドホール10においては、底
面12の略中央には、排水性を良くするために若干低く
なった円形の排水部16が形成されている。そして、図
2に示すように、その中央に塩化ビニール製のソケット
継手20が埋設され、排水口が構成されている。従っ
て、本例のハンドホール10においては、製造時に排水
口が用意されているので、保管中において雨などが降っ
ても、ハンドホール10の内部に水が溜まることはな
い。このため、雨を避けて屋内に保管する必要もなく、
また、野積みにしておいても、その後の横持ちなどに、
ハンドホール10内部に雨水が溜まることによる重量増
などの障害が発生することもない。
FIG. 1 shows a handhole 1 in this embodiment.
The structure of 0 is partially omitted. Similar to the conventional handhole described above, the handhole 10 of the present example has a cylindrical side surface 11 formed of four substantially rectangular surfaces around a substantially square bottom surface 12 and faces the bottom surface 12. An entrance 14 is prepared on the upper surface. In addition, at the lower part of the side surface 11, a thin hole punching portion 13 for installing a conduit or the like is prepared. In the handhole 10 of the present example, a circular drainage portion 16 which is slightly lowered to improve drainage is formed at approximately the center of the bottom surface 12. Then, as shown in FIG. 2, a socket joint 20 made of vinyl chloride is embedded in the center thereof to form a drainage port. Therefore, in the handhole 10 of the present example, since the drainage port is prepared at the time of manufacturing, even if it rains during storage, water does not collect inside the handhole 10. Therefore, it is not necessary to avoid rain and store indoors,
Also, even if you leave it open, you can hold it horizontally later.
There is no problem such as an increase in weight due to the accumulation of rainwater inside the handhole 10.

【0012】図3に、ソケット継手20の埋設された部
分を拡大して示してある。本例のハンドホール10にお
いては、断面が略凸字形をした円柱状のソケット20
が、その広い方の接続口21を下向き、すなわち、ハン
ドホール10の外側に面して埋設されている。そして、
このハンドホール10を地下水位が高い箇所に埋設する
場合など、止水が必要な場合は、この接続口21に盲栓
25を挿入し、接着する、あるいはPVC溶接機などを
用いて溶接するなどにより、接合させることができ、完
全な止水を行うことが可能である。
FIG. 3 is an enlarged view of the buried portion of the socket joint 20. In the handhole 10 of this example, a cylindrical socket 20 having a substantially convex cross section is used.
However, it is buried so that the wider connection port 21 faces downward, that is, facing the outside of the handhole 10. And
When the handhole 10 is buried in a place where the groundwater level is high, etc., when water stoppage is required, a blind plug 25 is inserted into this connection port 21 and bonded, or welded using a PVC welding machine or the like By this, it is possible to join them, and it is possible to completely stop the water.

【0013】また、本例においては、口径の異なるソケ
ット状の継手20を、その広い方の接続口21を下向き
として、その接続口21に盲栓25を設定するため、地
下水の圧力により防水がさらに完全となるセルフタイト
な構造が実現されている。すなわち、ハンドホール10
が地下水位の高い地盤に埋設された場合に、地下水の圧
力は、ハンドホール10の底面12に下方から上方にか
かる。このため、盲栓25は、下方からソケット20の
方向に圧迫される。従って、ソケット20と盲栓25の
接続部はより強固に接続され、この部分からの水の侵入
を防止することができる。
Further, in this embodiment, since the socket-like joints 20 having different diameters are set so that the wider connection port 21 faces downward and the blind plug 25 is set in the connection port 21, it is waterproofed by the pressure of groundwater. In addition, a completely self-tight structure has been realized. That is, the handhole 10
When is buried in the ground where the groundwater level is high, the pressure of the groundwater is exerted on the bottom surface 12 of the handhole 10 from below to above. Therefore, the blind plug 25 is pressed from below toward the socket 20. Therefore, the connection portion between the socket 20 and the blind plug 25 is more firmly connected, and water can be prevented from entering from this portion.

【0014】図4および図5に、本例のハンドホール1
0を埋設する様子を示してある。先ず、図4に、地下水
位2がハンドホール10の埋設レベルより低い場合の設
置方法を示してある。ハンドホール10は、埋設レベル
を出す基礎コンクリート(レベルコンクリート)30の
上部に設置され、その周囲が土1により埋め戻され埋設
される。そして、地下水位2が低い場合は、進入口14
などから侵入する雨水などを下方から排出することが望
ましい。そのため、本例においては、底面12に埋設さ
れたソケット20に側面に複数の孔が開いた有孔塩化ビ
ニール管31を接続している。そして、この有孔塩化ビ
ニール管31は、砕石などからなる浸透基礎32に導か
れている。従って、ハンドホール10内部に侵入した水
は、ソケット20から有孔塩化ビニール管31を通って
浸透基礎32から地中1に排出できる。このように地下
水位の低い場合であっても、本例のハンドホール10に
おいては、ソケット継手20が底面12に埋設されてい
るので、有孔塩化ビニール管31を容易に接続すること
ができる。これに対し、ソケット20の埋め込まれてい
ない従来のハンドホールにあっては、底面に孔を開け、
そこに有孔塩化ビニール管31を設置しなければならな
い。そして、コンクリートに有孔塩化ビニール管31に
対応した円筒状の孔を開けることは不可能であるので、
有孔塩化ビニール管31を設置した後にモルタルなどに
よりシーリングを行わなければならず、手間の掛かる工
事である。
FIGS. 4 and 5 show the handhole 1 of this example.
It is shown that 0 is buried. First, FIG. 4 shows an installation method when the groundwater level 2 is lower than the buried level of the handhole 10. The handhole 10 is installed on the upper part of the basic concrete (level concrete) 30 which raises the burial level, and the periphery thereof is backfilled with the soil 1 and buried. And when the groundwater level 2 is low, the entrance 14
It is desirable to drain rainwater, etc. that invades from below from below. Therefore, in this example, a perforated vinyl chloride pipe 31 having a plurality of holes on its side surface is connected to the socket 20 buried in the bottom surface 12. Then, the perforated vinyl chloride pipe 31 is guided to the infiltration base 32 made of crushed stone or the like. Therefore, the water that has entered the inside of the handhole 10 can be discharged from the socket 20 through the perforated vinyl chloride pipe 31 to the underground 1 from the infiltration foundation 32. Even when the groundwater level is low as described above, in the handhole 10 of this example, the socket joint 20 is embedded in the bottom surface 12, so that the perforated vinyl chloride pipe 31 can be easily connected. On the other hand, in the conventional hand hole in which the socket 20 is not embedded, a hole is opened on the bottom surface,
A perforated vinyl chloride pipe 31 must be installed there. Since it is impossible to make a cylindrical hole corresponding to the perforated vinyl chloride pipe 31 in the concrete,
After the perforated vinyl chloride pipe 31 is installed, sealing must be performed with mortar or the like, which is a troublesome work.

【0015】図5に、本例のハンドホール10を地下水
位2の高い地盤に埋設する場合を示してある。この場合
においても、設定レベルを出すレベルコンクリート30
上にハンドホール10が設定され、周囲が土1により埋
め戻される。そして、地下水位2がハンドホール10と
同じレベル、あるいは高いレベルにあるため、排水口か
らの地下水の侵入を避けるべく、ソケット20に盲栓2
5が挿入されている。
FIG. 5 shows a case where the handhole 10 of this example is buried in the ground where the groundwater level 2 is high. Even in this case, the level concrete 30 that gives the set level
The handhole 10 is set on the top, and the surrounding area is backfilled with the soil 1. Since the groundwater level 2 is at the same level as the handhole 10 or at a high level, the socket 20 is provided with a blind plug 2 in order to avoid intrusion of groundwater from the drainage port.
5 is inserted.

【0016】本例においては、ソケット20として塩化
ビニール製のソケットが用いられており、これに対応し
て盲栓25としても塩化ビニール製の盲栓を用いること
が可能である。従って、ソケット20と盲栓25の接続
は接着剤を用いても良く、また、溶接などを行うことも
可能である。さらに、地下水位がそれ程高くない場合
は、盲栓25を挿入するだけで止水効果を得ることが可
能である。そして、上記にて説明したように、接続面を
調整することによりセルフタイトな構造とすることも勿
論可能である。このように、塩化ビニール製などの樹脂
製のソケットを用いることにより、盲栓、排水パイプの
接続を容易に行うことができる。そして、地下水、ある
いは地盤中の水分などによる錆などの発生を防止するこ
とも可能である。
In the present embodiment, a vinyl chloride socket is used as the socket 20, and correspondingly, the vinyl chloride blind plug can be used as the blind plug 25. Therefore, an adhesive may be used to connect the socket 20 and the blind plug 25, or welding or the like may be performed. Furthermore, when the groundwater level is not so high, it is possible to obtain the water-stopping effect simply by inserting the blind plug 25. And, as described above, of course, a self-tight structure can be obtained by adjusting the connection surface. Thus, by using the resin socket such as vinyl chloride, the blind plug and the drainage pipe can be easily connected. It is also possible to prevent the generation of rust due to groundwater or water in the ground.

【0017】図6に、本例のハンドホール10を製造す
る型枠35を示してある。本例の型枠35は、ハンドホ
ール10の内面を規定する内面型枠36と、外面を規定
する外面型枠37とにより構成されている。そして、こ
の内面型枠36と外面型枠37により設定されたコンク
リート打施空間にコンクリート39を流し込むことによ
り、ハンドホール10を製作することができる。また、
本例の内面型枠36においては、ハンドホール10の底
面を規定する箇所に、ソケット20を設定するための突
起38が用意されている。従って、コンクリート39を
流し込む際に、この突起38にソケット20を設定する
ことにより、ハンドホール10の所定の位置にソケット
20を埋設することが可能である。
FIG. 6 shows a mold 35 for manufacturing the handhole 10 of this example. The formwork 35 of this example includes an inner formwork 36 that defines the inner surface of the handhole 10 and an outer formwork 37 that defines the outer surface. Then, the handhole 10 can be manufactured by pouring concrete 39 into the concrete application space set by the inner surface form 36 and the outer surface form 37. Also,
In the inner surface form 36 of this example, a protrusion 38 for setting the socket 20 is prepared at a position defining the bottom surface of the handhole 10. Therefore, when the concrete 39 is poured, by setting the socket 20 on the protrusion 38, the socket 20 can be embedded at a predetermined position of the handhole 10.

【0018】なお、本例においては、方形のハンドホー
ルに基づき説明してきたが、円筒状のハンドホールな
ど、底面を有するハンドホールであれば、継手を埋設す
ることにより上記のような効果を得ることが可能であ
る。また、継手としても、ソケットに限らず、スクリュ
ー、フランジなどの継手も勿論用いることができる。そ
して、埋設される継手の数量は、ハンドホールの大きさ
等により自由に選択可能である。さらに、ハンドホール
など埋設電線管を敷設するためのものに限らず、アース
線の検査を行うインスペクションチェンバーなど、プレ
キャストして埋設されるボックス類の全てに対して適用
することができる。
Although the present embodiment has been described based on a rectangular handhole, if the handhole has a bottom surface such as a cylindrical handhole, the above effect can be obtained by burying the joint. It is possible. Further, the joint is not limited to the socket, and of course, a joint such as a screw or a flange can be used. The number of joints to be buried can be freely selected depending on the size of the handhole and the like. Further, the present invention is not limited to laying a buried conduit such as a handhole, but can be applied to all precast buried boxes such as an inspection chamber for inspecting a ground wire.

【0019】[0019]

【発明の効果】以上にて説明したように、本発明に係る
ハンドホールなどのコンクリート製ボックスにおいて
は、その底部に管が埋設されており、保管時等の排水口
を形成してある。従って、雨水などがボックス内部に溜
って横持ちが困難となるようなトラブルを未然に防止す
ることができる。そして、底部に埋め込まれている管
は、止水栓などにより容易に、また、完全に止水を行う
ことができるので、地下水位の高い地盤にボックスを埋
め込む際も、容易に漏水を防止することができる。
As described above, in the concrete box such as the handhole according to the present invention, the pipe is buried in the bottom portion thereof to form the drainage port for storage. Therefore, it is possible to prevent the trouble that rainwater or the like collects inside the box and becomes difficult to hold horizontally. And the pipe embedded in the bottom part can easily and completely stop the water with a water stopcock, etc., so that the water leakage can be easily prevented even when the box is buried in the ground with a high groundwater level. be able to.

【0020】このように、本発明に係るコンクリート製
ボックスは、雨を気にせずに保管することができ、さら
に、地下水位の高低にフレキシブルに対応することがで
きるため、保管、発注などの管理が容易となる。そし
て、止水作業を短時間に確実に行うことができるので、
コンクリート製ボックスの設定にかかる工程を短縮する
ことが可能となり、同時に漏水に対し信頼性の高い施工
を行うことができる。
As described above, the concrete box according to the present invention can be stored without worrying about rain, and can flexibly cope with high and low groundwater levels, so that storage, ordering, etc. can be managed. Will be easier. And since the water stoppage work can be reliably performed in a short time,
It is possible to shorten the process of setting the concrete box, and at the same time, it is possible to perform highly reliable construction against water leakage.

【図面の簡単な説明】[Brief description of drawings]

【図1】本実施例に係るハンドホールを一部欠いて示す
斜視図である。
FIG. 1 is a perspective view showing a part of a hand hole according to an embodiment of the present invention.

【図2】図1に示すハンドホールの構造を示す断面図で
ある。
FIG. 2 is a cross-sectional view showing the structure of the handhole shown in FIG.

【図3】図2に示すハンドホールの排水部の構造を示す
拡大図である。
FIG. 3 is an enlarged view showing a structure of a drainage part of the handhole shown in FIG.

【図4】本実施例に係るハンドホールを地下水位の低い
地盤に埋設するようすを示す断面図である。
FIG. 4 is a cross-sectional view showing how the handhole according to the present embodiment is buried in the ground having a low groundwater level.

【図5】本実施例に係るハンドホールを地下水位の高い
地盤に埋設するようすを示す断面図である。
FIG. 5 is a cross-sectional view showing how the handhole according to the present embodiment is buried in the ground having a high groundwater level.

【図6】本実施例に係るハンドホールを製造する型枠の
構造を示す断面図である。
FIG. 6 is a cross-sectional view showing the structure of a mold for manufacturing a handhole according to this embodiment.

【図7】従来のハンドホールが埋設された状態を示す斜
視図である。
FIG. 7 is a perspective view showing a state in which a conventional handhole is buried.

【図8】図7に示すハンドホールの構造を示す断面図で
ある。
8 is a sectional view showing the structure of the handhole shown in FIG.

【符号の説明】[Explanation of symbols]

1 ・・・地盤 2 ・・・地下水位 10・・・ハンドホール 11・・・側面 12・・・底面 13・・・穴開け部 14・・・進入口 15・・・薄肉部 16・・・排水部 20・・・ソケット継手 21・・・ソケット継手の広い口 25・・・盲栓 30・・・レベルコンクリート 31・・・有孔配管 32・・・浸透基礎 35・・・型枠 36・・・内面型枠 37・・・外面型枠 38・・・ソケット設定用の突起 39・・・コンクリート 40・・・電線管 1 ... Ground 2 ... Groundwater level 10-Hand hole 11 ... Side 12 ... Bottom 13 ... Drilling part 14 ... Entrance 15 ... Thin wall 16 ... Drainage section 20 ... Socket joint 21 ... Wide mouth of socket joint 25 ... Blind plug 30: Level concrete 31: Perforated piping 32 ... Penetration basis 35 ... Formwork 36 ... Internal formwork 37 ... External formwork 38: Protrusion for socket setting 39 ... Concrete 40 ... Conduit

Claims (4)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 底部と、その底部を取り囲む筒状の側面
とを有するコンクリート製ボックスをプレキャストする
際に、前記底部を貫通するように少なくとも1つの止水
可能な管を埋設し、前記管が排水口となるように前記コ
ンクリート製ボックスを保管および/または運送し、前
記コンクリート製ボックスを埋設する際に前記管を止水
するコンクリート製ボックスの施工方法。
1. When precasting a concrete box having a bottom and a cylindrical side surface surrounding the bottom, at least one water-stoppable pipe is buried so as to penetrate the bottom, and the pipe is A method for constructing a concrete box in which the concrete box is stored and / or transported so as to serve as a drainage port, and the pipe is stopped when the concrete box is buried.
【請求項2】 請求項1において、前記管は配管継手で
あり、前記コンクリート製ボックスを埋設する際に前記
配管継手に止水栓を設置するコンクリート製ボックスの
施工方法。
2. The method for constructing a concrete box according to claim 1, wherein the pipe is a pipe joint, and a water stop plug is installed in the pipe joint when the concrete box is buried.
【請求項3】 底部と、その底部を取り囲む筒状の側面
とを有するコンクリート製ボックスをプレキャストする
際に、前記底部を貫通するように少なくとも1つの止水
可能な管を埋設し、前記管が排水口となるように前記コ
ンクリート製ボックスを保管するコンクリート製ボック
スの保管方法。
3. When precasting a concrete box having a bottom and a cylindrical side surface surrounding the bottom, at least one water-stoppable pipe is buried so as to penetrate the bottom, and the pipe is A method for storing a concrete box in which the concrete box is stored so as to serve as a drainage port.
【請求項4】 底部と、その底部を取り囲む筒状の側面
とを有するコンクリート製ボックスをプレキャストする
際に、前記底部を貫通するように少なくとも1つの止水
可能な管を埋設し、前記管が排水口となるように前記コ
ンクリート製ボックスを運送するコンクリート製ボック
スの運送方法。
4. When precasting a concrete box having a bottom and a cylindrical side surface surrounding the bottom, at least one water-stoppable pipe is buried so as to penetrate the bottom, and the pipe is A method of transporting a concrete box in which the concrete box is transported so as to serve as a drainage port.
JP2000105788A 1992-06-24 2000-04-07 Concrete box construction method Expired - Fee Related JP3375596B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000105788A JP3375596B2 (en) 1992-06-24 2000-04-07 Concrete box construction method

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP7193099A JPH11313432A (en) 1992-06-24 1999-03-17 Underground box
JP2000105788A JP3375596B2 (en) 1992-06-24 2000-04-07 Concrete box construction method

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
JP7193099A Division JPH11313432A (en) 1992-06-24 1999-03-17 Underground box

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP2001390285A Division JP2002238118A (en) 2001-12-21 2001-12-21 Underground line box

Publications (2)

Publication Number Publication Date
JP2000314126A JP2000314126A (en) 2000-11-14
JP3375596B2 true JP3375596B2 (en) 2003-02-10

Family

ID=26413053

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000105788A Expired - Fee Related JP3375596B2 (en) 1992-06-24 2000-04-07 Concrete box construction method

Country Status (1)

Country Link
JP (1) JP3375596B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6807798B2 (en) * 2017-04-25 2021-01-06 株式会社九電工 Anti-termite structure for drainage holes in underground boxes

Also Published As

Publication number Publication date
JP2000314126A (en) 2000-11-14

Similar Documents

Publication Publication Date Title
US6230468B1 (en) Foundation waterproofing system
US4185429A (en) Apparatus for waterproofing a basement or similar structure
JP4079280B2 (en) Hollow foundation for street light
CN111206624B (en) Pressure-reducing anti-floating structure for underground building and construction method
JP3375596B2 (en) Concrete box construction method
KR100712394B1 (en) Water-proof manhole with supervisory equipment
KR200222430Y1 (en) Protecting tube of manhole
KR20210157707A (en) mathod for installing faucet field of concrete
JPH065336U (en) Underground box
KR101965801B1 (en) Assembly manhole apparatus for connecting hume pipe and constructing method thereof
JPH11313432A (en) Underground box
JP2002238118A (en) Underground line box
JP7572030B2 (en) Hand holes with integrated foundations and hand holes with weights
US5345728A (en) Sewer chimney coupling
KR20110139901A (en) Sump installation structure of valve chamber structure
JP7587427B2 (en) Road construction using underground structure cover device
JP2525890Y2 (en) Masu for manhole formation
JPH04113100A (en) Draining method and structure for construction of double grain storage tank
KR20010016306A (en) Method for constructing of assembly type manhole
KR100377690B1 (en) A valve room structure and method of constructing valve room
JP7470423B2 (en) Water-resistant wall, water-resistant wall construction method, and precast concrete wall
KR100736631B1 (en) Foundation floor permanent drainage structure and permanent drainage method
JP3026062U (en) Height adjustment block
KR200407181Y1 (en) Watertight, sealed manhole
JPS6375229A (en) Concrete block connection method

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091129

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091129

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111129

Year of fee payment: 9

LAPS Cancellation because of no payment of annual fees