JP3379008B2 - Flow forecasting system - Google Patents
Flow forecasting systemInfo
- Publication number
- JP3379008B2 JP3379008B2 JP13202697A JP13202697A JP3379008B2 JP 3379008 B2 JP3379008 B2 JP 3379008B2 JP 13202697 A JP13202697 A JP 13202697A JP 13202697 A JP13202697 A JP 13202697A JP 3379008 B2 JP3379008 B2 JP 3379008B2
- Authority
- JP
- Japan
- Prior art keywords
- prediction
- flow
- traffic
- downstream
- predicting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Feedback Control In General (AREA)
- Traffic Control Systems (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Description
【0001】[0001]
【発明の属する技術分野】本発明は、流体や交通などの
流動状態を予測する流動予測システムに係り、特に、河
川網や管渠網などにおける流体の流動状態を監視して予
測したり、道路交通網における車両の流動状態を監視し
て予測する流動予測システムに関する。河川網や管渠網
などの流動予測システムに関して、より具体的には、都
市の管路網や河川およびその周辺流域における流動状態
や降雨の情報に基づいて、適切な運転状態を決定する排
水機場運転支援システムに関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a flow predicting system for predicting a flow condition of a fluid, traffic, etc., and particularly, for monitoring and predicting a flow condition of a fluid in a river network, a pipe network, etc., and a road. The present invention relates to a flow prediction system that monitors and predicts the flow state of vehicles in a transportation network. Regarding flow prediction systems such as river networks and pipe networks, more specifically, drainage pump stations that determine appropriate operating conditions based on the flow conditions and rainfall information in the pipeline networks of cities and rivers and their surrounding watersheds. Regarding driving support system.
【0002】[0002]
【従来の技術】従来、流体や交通などの流動状態を予測
する流動予測システムのうちで、例えば、交通の流動状
態の予測に関しては、道路網における渋滞の状況を予測
するシステムや、予測結果から交差点での信号を適切に
制御するシステムなどがあり、流体の流動状態の予測に
関しては、排水機場を運転支援する目的で機場への流入
状態を予測するシステムなどがあった。2. Description of the Related Art Conventional flow predicting systems for predicting the flow condition of fluids and traffic include, for example, predicting the flow condition of traffic based on a system for predicting the state of traffic congestion on a road network and a prediction result. There is a system that appropriately controls signals at intersections, and a system that predicts the state of fluid flow is one that predicts the state of inflow into the pumping station for the purpose of supporting driving of the pumping station.
【0003】道路網における渋滞の状況を予測するシス
テムとしては、特開平 8−249586号に記載の交通流予測
装置があり、ニューラルネットワークを用いて、予め各
区間の車両検知器からの検知データと渋滞区間との関係
を学習させておき、運用時には各区間の車両検知器から
の検知データに基づいて渋滞区間を予測していた。As a system for predicting the state of traffic congestion on a road network, there is a traffic flow predicting device described in Japanese Patent Laid-Open No. 8-249586, which uses a neural network to detect data from a vehicle detector in each section in advance. The relationship with the traffic jam section was learned, and during operation, the traffic jam section was predicted based on the detection data from the vehicle detector of each section.
【0004】交差点での信号を適切に制御するため流動
予測システムを用いる例としては、特開平 7−014093号
に記載の交通信号制御方法があり、交通情報を検出する
速度センサなどの情報と渋滞時間などとの関係から、最
適に交通信号を制御できるようにニューラルネットワー
クを学習させていた。As an example of using a flow prediction system to appropriately control a signal at an intersection, there is a traffic signal control method described in JP-A-7-014093, which includes information such as a speed sensor for detecting traffic information and traffic congestion. The neural network was trained so that the traffic signal could be controlled optimally from the relationship with the time.
【0005】排水機場の運転支援に関しては、排水区域
の市街化進行に伴い、雨水の不浸透域が増加し、大雨の
際には、雨水が排水機場に急激に流入する傾向にあるた
め、高度な運転支援システムが要求されている。すなわ
ち、従来の運転員の判断による排水機場運転において
は、運転員が機場での水位や降雨量などの時間的な推移
を過去の吐出し量と対応づけて、柔軟に判断していた
が、大雨時には運転員への負担が大きく、また、運転頻
度も少ないため、運転技術の向上が難しく、適切な運転
支援システムが必要である。Regarding the operation support of the drainage pumping station, the impervious area of rainwater increases with the progress of urbanization of the drainage area, and during heavy rain, the rainwater tends to rapidly flow into the drainage pumping station. Driving support system is required. That is, in conventional drainage pump station operation based on operator's judgment, the operator flexibly made judgments by associating temporal changes such as water level and rainfall at the pump station with past discharge amount, It is difficult to improve the driving skill because the burden on the operator is heavy and the driving frequency is low during heavy rain, and an appropriate driving support system is required.
【0006】特開平 6−026093号に記載の雨水ポンプ運
転支援システムにおいては、ポンプ井水位,予測降雨デ
ータ,管渠水位データなどから、排水施設への流入量に
対するガイダンスを出している。具体的には、降雨計か
ら送られてくる実測降雨量に基づいて30分先の降雨量
を予測し、雨水排水施設への流入量を予測して、雨水ポ
ンプのガイダンスをオンラインで表示している。In the rainwater pump operation support system described in JP-A-6-026093, guidance on the amount of inflow to the drainage facility is given from the pump well water level, the predicted rainfall data, the pipe water level data, and the like. Specifically, it predicts the rainfall 30 minutes ahead based on the measured rainfall sent from the rain gauge, predicts the inflow to the rainwater drainage facility, and displays the rainwater pump guidance online. There is.
【0007】特公平 8−033157号に記載の雨水ポンプの
運転制御装置においては、雨雲の状態と地上での雨量と
に基づいて将来の降雨量を予測し、都市域の下水管路網
について流出を解析し、排水ポンプを運転制御をしてい
る。流出解析では、例えば、非線形の双曲形偏微分方程
式を一様流の仮定の下で解き、雨水の移送時間を求めて
いる。In the rainwater pump operation controller described in Japanese Examined Patent Publication No. 8-033157, the future rainfall amount is predicted based on the state of the rain cloud and the amount of rainfall on the ground, and the drainage network of the urban area is drained. Is analyzed to control the operation of the drainage pump. In the runoff analysis, for example, a nonlinear hyperbolic partial differential equation is solved under the assumption of uniform flow to obtain the rainwater transfer time.
【0008】特開平 5−311727号に記載の雨水ポンプ運
転制御装置においては、降雨量および管渠の水位から、
ポンプ井への予測雨水流入量に対する吐出し量の余裕度
を予測し、ポンプの選択,起動停止,回転数などを制御
している。管轄地域の適当な箇所から取得した降雨量や
マンホール水位から、ファジー推論を用いて、ポンプ井
への予測雨水流入量に対する吐出し量の余裕度を決定し
ている。In the rainwater pump operation control device described in Japanese Patent Laid-Open No. 5-311727, from the rainfall amount and the water level in the pipe,
It predicts the margin of discharge amount to the predicted rainwater inflow to the pump well, and controls pump selection, start / stop, and rotation speed. From the rainfall and manhole water level acquired from appropriate places in the jurisdiction, fuzzy reasoning is used to determine the margin of discharge amount to the predicted rainwater inflow to the pump well.
【0009】また、『第28回下水道研究発表会講演
集』(平成3年6月)の785頁から787頁には、熟練運転員
の持つ柔軟な判断をニューラルネットに委ね、運転に反
映させる手法が記述されている。すなわち、排水機場へ
の流入量,流入渠水位,降雨量,排水機場からの吐出し
量の時系列データを入カデータとし、次の時刻における
排水機場からの吐出し量を出カデータとしてニューラル
ネットを構成する。実際の運転に先立ち、予め入カデー
タと出カデータとの関係を学習させておき、実際の運転
時には、現時刻までに得られた入カデータから次の時刻
の吐出し量を予測し、運転を支援している。Also, from page 785 to page 787 of the "28th Annual Sewerage Research Conference Lectures" (June 1991), the flexible judgment of skilled operators is entrusted to the neural network and reflected in driving. The method is described. That is, the time-series data of the inflow amount to the drainage pump station, the inflow water level, the rainfall amount, and the discharge amount from the drainage pump station are used as the input data, and the discharge amount from the drainage pump station at the next time is used as the output data, and a neural net is created. Constitute. Prior to the actual driving, the relationship between the input data and the output data is learned in advance, and during the actual driving, the amount of discharge at the next time is predicted from the input data obtained up to the current time to support the driving. is doing.
【0010】[0010]
【発明が解決しようとする課題】道路交通網の渋滞状況
は、曜日によって傾向が異なるため、各曜日毎にその傾
向を把握することが重要である。したがって、各曜日毎
の渋滞の状況と車両検知器などからの実測データとの関
係を予めニューラルネットワークで学習しておけば、通
常の交通渋滞の状況は、予測可能である。上記特開平 8
−249586号に記載の交通流予測装置および特開平 7−01
4093号に記載の交通信号制御方法は、ともにニューラル
ネットワークを用いて交通状態を事前に学習した後に、
交通状態の予測または制御にシステムを適用していた。
特に、特開平 7−014093号に記載の交通信号制御方法
は、1週間を試行期間として学習し、予測精度がある程
度向上するまで、前記試行期間を繰り返していた。[Problems to be Solved by the Invention] Since the tendency of traffic congestion on the road traffic network varies depending on the day of the week, it is important to grasp the tendency for each day of the week. Therefore, if the relationship between the traffic jam situation for each day of the week and the actual measurement data from the vehicle detector or the like is learned by a neural network in advance, the usual traffic jam situation can be predicted. Japanese Patent Laid-Open No. 8 above
-249586 and traffic flow prediction device described in JP-A-7-01
The traffic signal control method described in No. 4093, after learning the traffic state in advance using a neural network,
The system was applied to predict or control traffic conditions.
Particularly, in the traffic signal control method described in JP-A-7-014093, one week is learned as a trial period, and the trial period is repeated until the prediction accuracy is improved to some extent.
【0011】しかし、上記二つの従来技術では、学習後
に発生する突発的な交通状態を予測することはできな
い。突発的な交通状態とは、お盆やゴールデンウイーク
などに発生する帰省ラッシュ時の渋滞や道路工事による
一時的な渋滞など、予め学習が困難な状態をいう。この
ように突発的な交通状態に対応するには、事前に学習し
た結果を状態に合わせて柔軟に変更する必要がある。However, the above two conventional techniques cannot predict a sudden traffic condition that occurs after learning. Sudden traffic conditions mean conditions that are difficult to learn in advance, such as traffic jams during homecoming rush hours such as Obon and Golden Week, and temporary traffic jams due to road construction. In order to cope with such a sudden traffic condition, it is necessary to flexibly change the result learned in advance according to the condition.
【0012】次に、排水機場運転支援システムに関し述
べる。図16に示すように、舗装道路の普及に伴い、都
市に流れ込む雨水のほとんどは、大地に浸透せず、地下
の管路網に流入する。管路網の雨水は、さらに流入幹線
を通って、排水機場に流れ込み、排水機場から河川に吐
き出される。Next, a drainage pump operation support system will be described. As shown in FIG. 16, with the spread of paved roads, most of the rainwater flowing into the city does not permeate the ground and flows into the underground pipeline network. Rainwater in the pipeline network further flows into the drainage pump station through the inflow trunk line and is discharged to the river from the drainage pump station.
【0013】上記特開平 6−026093号に記載の雨水ポン
プ運転支援システムにおいては、降雨計から送られてく
る過去から現在までの15分または30分程度の実測降
雨量を平均化処理し、30分先の降雨量を予測してい
る。そのため、平均化処理による降雨量予測に大きく誤
差が生じる大雨時など、操作員の判断で明らかに異なる
運転が予想される場合は、手入力で運転しており、運転
員への負担が大きい。In the rainwater pump operation support system described in the above-mentioned JP-A-6-026093, the measured rainfall amount sent from the rain gauge for about 15 minutes or 30 minutes from the past to the present is averaged to obtain 30 It predicts the amount of rainfall ahead. Therefore, when a significantly different operation is predicted based on the operator's judgment, such as during heavy rain in which a large error occurs in the rainfall prediction due to the averaging process, the operator manually operates the vehicle, which imposes a heavy burden on the operator.
【0014】排水機場への雨水の流入は降雨量だけでな
く、管路網における流動状態にも大きく依存している。
雨水が流れ込む管路網は、複数の合流点で流入幹線と合
流しており、個々の管路網からの流入幹線への雨水の流
入量が、排水機場への流入量を決定している。しかも、
各合流点から排水機場までの距離に依存した時間遅れを
もって、雨水が排水機場に流れ込むため、現象をさらに
複雑にしている。The inflow of rainwater into the drainage pump station largely depends not only on the amount of rainfall but also on the flow state in the pipeline network.
The pipe network into which rainwater flows in merges with the inflow trunk line at a plurality of confluence points, and the inflow amount of rainwater from each individual pipe network to the inflow trunk line determines the inflow amount to the drainage pump station. Moreover,
This complicates the phenomenon because rainwater flows into the drainage station with a time delay depending on the distance from each confluence to the drainage station.
【0015】上記特公平 8−033157号に記載の雨水ポン
プの運転制御装置においては、ポンプ運転のために必要
な演算時間を考慮して、短時間で演算が終了する流出解
析として、時間空間的変化を無視した一様流解析を使用
し、下水管路網における雨水の移送時間を求めている。In the rainwater pump operation control device described in Japanese Patent Publication No. 8-033157, the outflow analysis in which the operation is completed in a short time is taken into consideration in terms of time and space in consideration of the operation time required for pump operation. A uniform flow analysis that ignores changes is used to determine the rainwater transfer time in the sewer network.
【0016】しかし、都市の複雑な管路網では、雨水の
流れは、時間空間的に変化しており、特に、排水機場の
運転負荷が大きい突発的な大雨時などは、流れの非一様
性が著しく、一様流解析では正確な移送時間を演算でき
ない。逆に、大雨時の時間空間的に変化する流動状態を
複雑な管路網について解くには、大規模に流動解析する
必要があり、緊急時の排水運転に対応できない。However, in a complicated network of pipes in a city, the flow of rainwater changes temporally and spatially, and especially during a sudden heavy rain when the operation load on the drainage pump station is large, the flow of rainwater is not uniform. Since the characteristics are remarkable, the accurate transfer time cannot be calculated by the uniform flow analysis. On the other hand, in order to solve the temporally and spatially varying flow state during heavy rain for a complicated pipeline network, it is necessary to perform a large-scale flow analysis, and it is not possible to handle drainage operation in an emergency.
【0017】上記特開平 5−311727号に記載の雨水ポン
プ運転制御装置においては、降雨量には、「少ない」,
「普通」,「多い」,「とても多い」、マンホール水位には、
「低い」,「普通」,「高い」,「とても高い」という関数を割
り当て、ファジー推論を用いて、ポンプ井への予測雨水
流入量に対する吐出し量の余裕度の関数「必要なし」,
「必要」,「大変必要」を決定し、ポンプの選択,起動停
止,回転数などを制御している。In the rainwater pump operation control device described in JP-A-5-311727, the amount of rainfall is "small",
"Normal", "many", "very many", manhole water level,
"Low", "Medium", "High", "Very high" functions are assigned, and fuzzy inference is used to calculate the discharge capacity margin function for the predicted rainwater inflow to the pump well "No need",
"Necessary" and "very necessary" are determined, and the selection of pumps, start / stop, and rotation speed are controlled.
【0018】しかし、複雑な管路網における突発的な大
雨時について、降雨量やマンホール水位などの計測デー
タとポンプ井への予測雨水流入量に対する吐出し量の余
裕度との対応関係を予め正確に記述しておくことは、困
難である。However, in the event of a sudden heavy rain in a complicated pipeline network, the correspondence between the measured data such as the rainfall amount and the manhole water level and the margin of the discharge amount with respect to the predicted rainwater inflow into the pump well is preliminarily accurate. It is difficult to describe in.
【0019】上記余裕度の対応関係を予め学習しておけ
ば、排水機場の予測制御は可能であるが、複雑な管路網
に対して、すべての流動状態を学習させるのは困難であ
る。上記『第28回下水道研究発表会講演集』に記載の
運転支援システムでは、入カデータとしての排水機場へ
の流入量,流入渠水位,降雨量,排水機場からの吐出し
量の時系列データと次の時刻での排水機場からの吐出し
量との関係を予め学習させておき、実際の運転時には、
現時刻までに得られた入カデータから次の時刻の吐出し
量を予測し、運転を支援している。Although it is possible to predict and control the drainage pump station by learning the correspondence relationship of the margins in advance, it is difficult to learn all the flow states for a complicated pipeline network. In the operation support system described in the "28th Sewer Research Conference Lecture Collection", the time series data of the inflow amount to the drainage pump station, the inflow water level, the rainfall amount, and the discharge amount from the drainage pump station are used as input data. Learn the relationship with the discharge amount from the drainage pump station at the next time in advance, and at the time of actual operation,
From the input data obtained up to the current time, the discharge amount at the next time is predicted to support driving.
【0020】しかし、予め入出力の関係をすべて学習さ
せておかなければならず、もし学習範囲外の現象が発生
した場合は、誤差を生じてしまう。However, all input / output relationships must be learned in advance, and if a phenomenon outside the learning range occurs, an error will occur.
【0021】また、市の拡張などにより管路網に変更が
あった場合、新たに学習をする必要がある。上記『第2
8回下水道研究発表会講演集』に記載の運転支援システ
ムでは、各管路網毎の影響を把握していないので、管路
網に1カ所でも変更があった場合、これまでの学習結果
を用いると、大きな誤差を生じる可能性がある。Further, when the pipeline network is changed due to the expansion of the city, it is necessary to newly learn. Above "Second
The operation support system described in "8th Sewer Research Conference Lecture Collection" does not understand the effect of each pipeline network, so if there is any change in the pipeline network, the learning results obtained so far will be used. If used, a large error may occur.
【0022】さらに、排水機場から雨水を吐き出す先の
河川の流動状態にも注意しなければならない。すなわ
ち、排水機場よりも下流における河川の水位などを予測
しながら、水位が限界値以上にならないように、機場か
ら河川への吐出し量を制御したり、吐き出す河川を選択
しなければならない。Furthermore, it is necessary to pay attention to the flow state of the river where the rainwater is discharged from the drainage pump station. That is, while predicting the water level of the river downstream from the drainage pumping station, it is necessary to control the discharge amount from the pumping station to the river and select the discharge river so that the water level does not exceed the limit value.
【0023】本発明の目的は、流体や交通などの上流の
流動状態から下流の流動状態を予測する予測手段を予測
値と実測値との比較から常に最適な状態に改善し、突発
的な流動現象に対しても下流の流動状態を適切に予測で
きる柔軟な構成の流動予測システムを提供することであ
る。The object of the present invention is to improve the predicting means for predicting the downstream flow state from the upstream flow state of fluid, traffic, etc., by comparing the predicted value and the measured value to the optimum state at all times, and sudden flow It is to provide a flow prediction system with a flexible configuration that can appropriately predict the flow state of the downstream side even for a phenomenon.
【0024】[0024]
【課題を解決するための手段】本発明は、上記目的を達
成するために、流体や交通などの上流の流動状態を監視
し流体や交通などの下流の流動状態を予測する流動予測
システムにおいて、流動予測システムが、流体や交通な
どの上流の流動状態および所定の予測パラメータに基づ
いて流体や交通などの下流の目標流動状態を予測する予
測手段と、流体や交通などの上流の流動状態および下流
の実測流動状態に基づいて予測手段で使用する予測パラ
メータを演算する演算手段とを備え、予測手段における
下流の目標流動状態の予測と演算手段における予測パラ
メータとを並列処理で作成し、予測手段による予測値と
下流の実測流動状態とを比較し、誤差が所定値より大き
い場合は実測流動状態値を予測パラメータとして用い、
誤差が所定値以内である場合は演算された予測パラメー
タを用いる判定手段を備える流動予測システムを提案す
る。In order to achieve the above object, the present invention provides a flow predicting system for monitoring a flow condition of an upstream such as fluid or traffic and predicting a flow condition of a downstream such as fluid or traffic. The flow prediction system predicts the target flow state of the downstream of the fluid or traffic based on the flow state of the upstream of the fluid or traffic and a predetermined prediction parameter, and the flow state of the upstream or downstream of the fluid or traffic. And a calculation means for calculating a prediction parameter to be used by the prediction means based on the actually measured flow state, and the prediction of the downstream target flow state in the prediction means and the prediction parameter in the calculation means are created by parallel processing, and the prediction means is used. Predicted value and
Compared with the measured flow state in the downstream, the error is larger than the specified value.
If not, use the measured flow state value as a prediction parameter,
If the error is within the specified value, the calculated prediction parameters
We propose a flow prediction system that includes a determination unit that uses a computer.
【0025】流動予測システムは、流体や交通などの上
流の流動状態および所定の予測パラメータに基づいて流
体や交通などの下流の目標流動状態を予測する予測手段
と、流体や交通などの上流の流動状態,下流の実測流動
状態,予測手段による下流の目標流動状態に基づいて予
測手段で使用する予測パラメータを演算する演算手段と
を備え、予測手段における下流の目標流動状態の予測と
演算手段における予測パラメータとを並列処理で作成
し、予測手段による予測値と下流の実測流動状態とを比
較し、誤差が所定値より大きい場合は実測流動状態値を
予測パラメータとして用い、誤差が所定値以内である場
合は演算された予測パラメータを用いる判定手段を備え
るようにしてもよい。The flow predicting system is a predicting means for predicting a target flow condition of a downstream such as a fluid or a traffic based on a flow condition of the upstream such as a fluid or a traffic and a predetermined prediction parameter, and an upstream flow condition such as a fluid or a traffic. And a calculation means for calculating a prediction parameter used by the prediction means on the basis of the state, the actually measured flow state of the downstream, and the target flow state of the downstream by the prediction means, and the prediction of the target flow state of the downstream in the prediction means and the prediction by the calculation means. Create parameters and in parallel processing
The predicted value by the prediction means and the measured flow state downstream.
If the error is larger than the specified value, the measured flow state value is
When used as a prediction parameter and the error is within the specified value
If there is a decision means that uses the calculated prediction parameters
May be that.
【0026】流動予測システムは、また、流体や交通な
どの上流の流動状態および所定の予測パラメータに基づ
いて流体や交通などの下流の目標流動状態を予測する予
測手段と、流体や交通などの上流の流動状態および下流
の実測流動状態に基づいて予測手段で使用する予測パラ
メータを演算する演算手段と、予測手段による予測値と
下流の実測流動状態とを比較し演算手段で予測パラメー
タを演算するか否かを判定する判定手段とを備え、比較
による誤差が所定値より大きい場合は実測流動状態値を
予測パラメータとして用い、誤差が所定値以内である場
合は演算された予測パラメータを用いることができる。The flow predicting system also includes a predicting means for predicting a target target flow condition of the downstream of the fluid or the traffic based on the upstream flow condition of the fluid or the traffic and a predetermined predictive parameter, and an upstream of the fluid or the traffic. Whether the calculation means for calculating the prediction parameter used in the prediction means based on the flow state of the above and the measured flow state in the downstream and the prediction value by the prediction means and the measured flow state in the downstream are calculated to calculate the prediction parameter in the calculation means Equipped with determination means to determine whether or not
If the error due to
When used as a prediction parameter and the error is within the specified value
If so, the calculated prediction parameter can be used .
【0027】流動予測システムは、さらに、流体や交通
などの上流の流動状態および所定の予測パラメータに基
づいて流体や交通などの下流の目標流動状態を予測する
予測手段と、流体や交通などの上流の流動状態,下流の
実測流動状態,予測手段による下流の目標流動状態に基
づいて予測手段で使用する予測パラメータを演算する演
算手段と、予測手段による予測値と下流の実測流動状態
とを比較し演算手段で予測パラメータを演算するか否か
を判定する判定手段とを備え、比較による誤差が所定値
より大きい場合は実測流動状態値を予測パラメータとし
て用い、誤差が所定値以内である場合は演算された予測
パラメータを用いることが可能である。The flow predicting system further comprises a predicting means for predicting a target flow condition of the downstream of the fluid or the traffic based on the flow condition of the upstream of the fluid or the traffic and a predetermined prediction parameter, and an upstream of the fluid or the traffic. The calculation means for calculating the prediction parameter used by the prediction means based on the flow state of the, the measured flow state of the downstream, and the target flow state of the downstream by the prediction means, and the predicted value by the prediction means and the measured flow state of the downstream are compared. And a determination unit that determines whether or not the prediction parameter is calculated by the calculation unit, and the error due to the comparison is a predetermined value.
If it is larger than the measured flow state value,
If the error is within the specified value, the calculated prediction
Parameters can be used .
【0028】上記いずれの場合も、予測手段は、各合流
部または各分岐部毎の流動状態を予測するための複数の
サブ予測手段と、下流の目標流動状態を予測するための
メイン予測手段とからなる構成を採用してもよい。In any of the above cases, the predicting means includes a plurality of sub predicting means for predicting the flow state of each confluence section or each branching section, and a main predicting means for predicting the downstream target flow state. The configuration may be adopted.
【0029】流動予測システムが、流体や交通などの上
流の流動状態および所定の予測パラメータに基づいて流
体や交通などの下流の目標流動状態を予測する予測手段
と、流体や交通などの上流の流動状態および下流の実測
流動状態に基づいて予測手段で使用する予測パラメータ
を演算する演算手段とを備え、予測手段が、各合流部ま
たは各分岐部毎の流動状態を予測する複数のサブ予測手
段と、下流の目標流動状態を予測するメイン予測手段と
からなり、予測手段による予測値と下流の実測流動状態
とを比較し、誤差が所定値より大きい場合は実測流動状
態値を予測パラメータとして用い、誤差が所定値以内で
ある場合は演算された予測パラメータを用いる判定手段
を備える構成とすることもできる。The flow predicting system predicts a target flow state of the downstream of the fluid or traffic based on the upstream flow state of the fluid or traffic and a predetermined prediction parameter, and an upstream flow of the fluid or traffic. And a plurality of sub-prediction means for predicting the flow state of each merging portion or each branching portion, and a calculation means for calculating a prediction parameter used in the prediction means based on the state and the downstream measured flow state. a main prediction means for predicting downstream target flow state
Consists of the predicted value by the prediction means and the measured flow state of the downstream
If the error is larger than the specified value, the measured flow state is compared.
If the market price is used as a prediction parameter and the error is within the specified value,
Determining means that uses the calculated prediction parameter if there is
It is also possible to have a configuration including.
【0030】予測手段は、上流側の合流部または分岐部
の流動状態の予測値に基づいて下流側の合流部または分
岐部の目標流動状態を予測する手段である。The predicting means is a means for predicting the target flow state of the merging portion or the branch portion on the downstream side based on the predicted value of the flow state of the merging portion or the branch portion on the upstream side.
【0031】また、予測手段は、各合流部または各分岐
部または下流の目標流動状態を予測するための固定パラ
メータを備えた固定サブ予測手段を含むことも可能であ
る。The predicting means can also include fixed sub-predicting means having a fixed parameter for predicting the target flow state at each of the merging portions or each of the branch portions or downstream.
【0032】本発明においては、予測した下流の目標流
動状態と下流の実測流動状態とを逐次比較し、比較結果
に基づいて、予測するための予測パラメータを更新し、
予測が所定の誤差以内になるようにしているので、突発
的な流動状態に対しても下流の流動状態を適切に予測で
きる流動予測システムが得られる。In the present invention, the predicted downstream target flow state and the downstream measured flow state are sequentially compared, and the prediction parameter for prediction is updated based on the comparison result.
Since the prediction is made within the predetermined error, it is possible to obtain a flow prediction system capable of appropriately predicting the downstream flow state even for a sudden flow state.
【0033】例えば、雨水集水区域からの信号および所
定の予測パラメータに基づいて排水機場の運転状態を予
測する予測手段は、各雨水管渠と流入幹線との合流部で
の流動状態を予測するサブ予測手段と運転支援情報を予
測するメイン予測手段とを備え、予測パラメータを演算
する演算手段は、合流部流動状態の予測に用いるサブパ
ラメータを演算するサブパラメータ演算手段と運転支援
情報の予測に用いるメインパラメータを演算するメイン
パラメータ演算手段とを備える。合流部での流動状態の
予測結果を実測した流動状態と逐次比較しながら、予測
パラメータ自体を修正し、排水機場の運転を予測するの
で、大雨などの突発的な現象についても排水機場の運転
を適切に支援できる。For example, the predicting means for predicting the operating condition of the drainage pump station based on the signal from the rainwater collecting area and a predetermined predictive parameter is a sub-device for predicting the flow condition at the confluence of each rainwater conduit and the inflow trunk line. The prediction means and the main prediction means for predicting the driving support information are provided, and the calculation means for calculating the prediction parameter is used for the prediction of the sub-parameter calculation means and the driving support information for calculating the sub-parameter used for the prediction of the merging section flow state. And a main parameter calculating means for calculating a main parameter. While sequentially comparing the predicted results of the flow condition at the merging section with the measured flow conditions, the prediction parameters themselves are modified to predict the operation of the drainage pump station, so the operation of the drainage pump station can be performed even for sudden events such as heavy rain. I can help you properly.
【0034】したがって、排水機場の運転のほかに、例
えば、交通流監視装置においては、平常時はもちろん、
事前には学習の困難な突発的な交通状態の変化すなわち
連休時などの交通渋滞も適切に予測できる流動予測シス
テムが得られる。Therefore, in addition to the operation of the drainage pump station, for example, in the traffic flow monitoring device, not only in normal times,
It is possible to obtain a flow prediction system that can appropriately predict sudden changes in traffic conditions that are difficult to learn in advance, that is, traffic congestion such as during consecutive holidays.
【0035】[0035]
【発明の実施の形態】
《実施例1》次に、図1〜図6を参照して、本発明によ
る流動予測システムを排水機場運転支援システムに適用
した一実施例を説明する。BEST MODE FOR CARRYING OUT THE INVENTION << Embodiment 1 >> Next, an embodiment in which the flow prediction system according to the present invention is applied to a drainage pump operation support system will be described with reference to FIGS.
【0036】図1は、本発明による排水機場運転支援シ
ステムの実施例1の構成を示すブロック図である。この
排水機場運転支援システムは、データ入力部102と、
データ入力部102からのデータおよび所定の予測パラ
メータAm,Asiに基づき流動状態を予測する予測手段
101と、予測手段101からの予測データに基づき排
水機場を運転支援する運転支援部103と、データ入力
部102からの入力データに基づいて予測パラメータを
演算し新しい予測パラメータを予測手段に送信する演算
手段201とを備えている。FIG. 1 is a block diagram showing the configuration of the drainage pump station driving support system according to the first embodiment of the present invention. This drainage pump station driving support system includes a data input unit 102,
Prediction means 101 for predicting the flow state based on the data from the data input part 102 and predetermined prediction parameters Am, Asi, a driving support part 103 for supporting the operation of the drainage pump station based on the prediction data from the prediction means 101, and data input The calculation unit 201 calculates a prediction parameter based on the input data from the unit 102 and transmits the new prediction parameter to the prediction unit.
【0037】図2は、図1の排水機場運転支援システム
の支援手順の一例を示すフローチャートである。FIG. 2 is a flow chart showing an example of a support procedure of the drainage pumping station operation support system of FIG.
【0038】手順10では、予測手段101で使用する
予測パラメータを初期設定する。このパラメータは、本
システムの稼働中に、演算手段201により、次々に新
しいパラメータに更新されていく。初期値としては、前
回の運用時に更新された最新のパラメータを使用すれば
よい。または、降雨の特徴毎に、例えば、梅雨時のパラ
メータや台風時のパラメータなどに分けて保存してお
き、選択してもよい。初めて運用する場合には、事前に
パラメータを求めておく必要があるが、従来技術として
述べたような、事前学習や非線形管路解析などを利用し
てもよい。In step 10, the prediction parameters used by the prediction means 101 are initialized. These parameters are updated to new parameters one after another by the arithmetic means 201 during the operation of this system. As the initial value, the latest parameter updated at the previous operation may be used. Alternatively, for each rain feature, for example, the rainy season parameters and the typhoon parameters may be separately stored and selected. When operating for the first time, it is necessary to obtain the parameters in advance, but it is also possible to use the pre-learning, the non-linear conduit analysis, etc. as described in the prior art.
【0039】手順20では、データを入力する。このデ
ータは、手順70で実測されるものである。データ入力
部102では、4種類の実測データを逐次読み込んでい
る。4種類の実測データとは、管渠網における第i番目
の管渠や複数の支流河川を備えた河川の第i番目の支流
河川の流動状態を示すデータまたは流動状態に影響を及
ぼす支流データIsiと、流入幹線や河川の流動状態を示
すデータまたは流動状態に影響を及ぼす本流データIm
と、排水機場およびその下流の流動状態を示す運転支援
情報Cmと、第i番目の管渠と流入幹線との合流部での流
動状態または第i番目の支流河川と河川との合流部での
流動状態を示す合流部流動状態Csiである。In step 20, data is input. This data is actually measured in the procedure 70. The data input unit 102 sequentially reads four types of actual measurement data. The four types of actual measurement data are data indicating the flow state of the i-th tributary in a pipe network or a river having a plurality of tributary rivers, or the tributary data Isi that affects the flow state. And the main stream data Im that affects the flow state of the inflow trunk line or the river or the flow state
And the operation support information Cm indicating the flow condition of the drainage pumping station and its downstream, the flow condition at the merging part of the i-th pipe and the inflow trunk line or the merging part of the i-th tributary river and the river. It is a joining part fluidized state Csi which shows a fluidized state.
【0040】図3は、運転支援システムのデータの入出
力関係を示す図である。例えば、支流データとしては、
第i番目の管渠での地点jにおける流量Isij,第i番
目の管渠周辺での地点kにおける降水量Isik,第j番
目の支流河川の地点kにおける水位Isjkなどを入力す
る。本流データとしては、流入幹線周辺での地点iにお
ける降水量Imi,河川での地点jにおける水位Imj,地
点kにおける気象データImkなどを入力する。運転支援
情報としては、排水機場での水位Cmi,排水機場から河
川への吐出し量Cmj,河川での排水機場下流の地点kに
おける水位Cmkなどを入力する。合流部流動状態として
は、第i番目の管渠と流入幹線との合流部で管渠から流
入幹線に流入する流量Csi,第j番目の支流河川と河川
との合流部で支流河川から河川に流入する流量Csjなど
を入力する。FIG. 3 is a diagram showing an input / output relationship of data of the driving support system. For example, as tributary data,
The flow rate Isij at the point j in the i-th pipe, the precipitation Isik at the point k around the i-th pipe, the water level Isjk at the point k of the j-th tributary river, etc. are input. As the mainstream data, the precipitation amount Imi at the point i around the inflow trunk line, the water level Imj at the point j in the river, the meteorological data Imk at the point k, and the like are input. As the operation support information, the water level Cmi at the drainage pumping station, the discharge amount Cmj from the drainage pumping station to the river, the water level Cmk at the point k downstream of the drainage pumping station in the river, and the like are input. The flow condition of the confluence is as follows: flow rate Csi flowing into the inflow trunk from the conduit at the confluence of the i-th conduit and the inflow trunk, and from the tributary river to the river at the confluence of the j-th tributary river and the river. Input the inflow rate Csj.
【0041】手順30では、予測手段101が、運転支
援情報および合流部流動状態を予測する。予測手段10
1は、合流部流動状態を予測するサブ予測手段121
と、運転支援情報を予測するメイン予測手段111とを
備えており、各予測手段は、それぞれ、合流部流動状態
を予測するサブパラメータと、運転支援情報を予測する
メインパラメータとを備えている。予測手段101は、
時刻T=T1に、本流データIm(T1),運転支援情報Cm
(T1),支流データIsi(T1),合流部流動状態Csi(T
1)を読み込む。予測手段101は、時刻T=T1に至る
までの過去のデータを記憶しており、これらの時系列デ
ータから将来の状態を予測する。In step 30, the predicting means 101 predicts the driving support information and the merging section flow state. Prediction means 10
1 is a sub-prediction unit 121 that predicts the flow state of the merge section.
And a main prediction unit 111 that predicts the driving support information, and each prediction unit includes a sub-parameter that predicts the flow state of the merging section and a main parameter that predicts the driving support information. The prediction means 101 is
At time T = T1, mainstream data Im (T1) and driving support information Cm
(T1), tributary data Isi (T1), confluence flow state Csi (T
Read 1). The prediction unit 101 stores past data up to time T = T1 and predicts a future state from these time series data.
【0042】まず、サブ予測手段121では、第i番目
の管渠または支流河川から支流データIsi(T1)と、前
記管渠と流入幹線との合流部または支流河川と河川との
合流部での流動状態Csi(T1)とを読み込み、時刻T=
T1に至るまでの過去のデータIsi(T),Csi(T)およ
び時刻T=T1におけるサブパラメータAsi(T1)を用い
て、ΔTsi後の時刻T=T1+ΔTsiでの合流部流動状
態の予測値Csi′(T1+ΔTsi)を予測する。First, in the sub-prediction means 121, the tributary data Isi (T1) from the i-th conduit or tributary river and the confluence of the conduit and the inflow trunk line or the tributary river / river confluence are collected. Flow state Csi (T1) is read and time T =
Using the past data Isi (T) and Csi (T) up to T1 and the subparameter Asi (T1) at time T = T1, the predicted value Csi of the confluent flow state at time T = T1 + ΔTsi after ΔTsi is used. Predict '(T1 + ΔTsi).
【0043】図4は、支流データと予測流量との関係の
一例を示す図である。支流データとして第i番目の管渠
の上流地点jでの流量Isij(T1)とその周辺での位置k
における降雨量Isik(T1)とが、時刻T=T1に予測手
段101に入力されたとき、時刻T=T1に至るまでの
過去のデータから、時刻T=T1+ΔTsiに管渠iから
流入幹線に流入する合流部iでの流量Csi′(T1+ΔT
si)を予測する。FIG. 4 is a diagram showing an example of the relationship between the tributary data and the predicted flow rate. As tributary data, the flow rate Isij (T1) at the upstream point j of the i-th pipe and the position k around it.
When the rainfall amount Isik (T1) at time T = T1 is input to the predicting means 101 at time T = T1, the past data from time t = T1 + ΔTsi to the inflow trunk line at time T = T1 + ΔTsi. Flow rate Csi ′ (T1 + ΔT
si) is predicted.
【0044】合流部流動状態Csi′(T1+ΔTsi)の予
測と同時に、メイン予測手段111で、本流データIm
(T1)と運転支援情報Cm(T1)とを読み込み、時刻T=
T1に至るまでの過去の本流データIm(T),運転支援情
報Cm(T),合流部流動状態Csi(T),さらに今予測し
た合流部流動状態の予測値Csi′の時刻T=T1からT1
+ΔTsiに至るまでの予測結果Cm′(T)を使用し、時
刻T=T1におけるメインパラメータAm(T1)を用い
て、ΔTm後の時刻T=T1+ΔTmでの運転支援情報C
m′(T1+ΔTm)を予測する。Simultaneously with the prediction of the flow state Csi '(T1 + ΔTsi) at the junction, the main prediction means 111 causes the mainstream data Im.
(T1) and driving support information Cm (T1) are read, and time T =
From the time T = T1 of the past mainstream data Im (T) up to T1, the driving support information Cm (T), the confluence flow state Csi (T), and the predicted value Csi ′ of the confluence flow state just predicted. T1
Using the prediction result Cm '(T) up to + ΔTsi and using the main parameter Am (T1) at time T = T1, the driving support information C at time T = T1 + ΔTm after ΔTm
Predict m '(T1 + ΔTm).
【0045】手順40では、予測手段101で予測され
た運転支援情報の予測値に基づき、排水機場を運転支援
する。例えば、運転支援情報として、現在時刻T=T1
からΔTm後の時刻T=T1+ΔTmにおける排水機場で
の水位Cmi′(T1+ΔTm),排水機場から河川への将来
の吐出し量Cmj′(T1+ΔTm),排水機場下流の河川に
おける将来の水位Cmk′(T1+ΔTm)などを予測し、運
転支援部103において、排水ポンプの運転台数や回転
数などの情報を出力する。In step 40, the driving of the drainage pump station is supported based on the predicted value of the driving support information predicted by the prediction means 101. For example, as the driving support information, the current time T = T1
From ΔTm after time T = T1 + ΔTm, the water level Cmi ′ (T1 + ΔTm) at the drainage pump station, the future discharge amount Cmj ′ (T1 + ΔTm) from the drainage pumping station to the future water level Cmk ′ (T1 + ΔTm) at the river downstream of the drainage pumping station ) And the like, and the driving support unit 103 outputs information such as the number of operating drainage pumps and the number of rotations.
【0046】手順50では、演算手段201において、
予測パラメータを演算する。演算手段201は、合流部
流動状態の予測に使用するサブパラメータを演算するサ
ブパラメータ演算手段221と、運転支援情報の予測に
使用するメインパラメータを演算するメインパラメータ
演算手段211とを備えている。サブパラメータ演算手
段221では、第i番目の管渠または支流河川からの支
流データを用いて、合流部流動状態を所定の基準値Si
以内の誤差で計算できるように、サブパラメータAsi′
(T1+ΔTsi+ΔT1si)を演算する。メインパラメータ
演算手段211では、本流データと合流部流動状態とか
ら、運転支援情報を所定の基準値M以内の誤差で計算で
きるように、メインパラメータAm′(T1+ΔTm+ΔT
1m)を演算する。例えば、サブパラメータAsi′(T1+
ΔTsi+ΔT1si)およびメインパラメータAm′(T1+
ΔTm+ΔT1m)の演算には、支流データおよび本流デー
タを入力信号とし、合流部流動状態および運転支援情報
を教師信号とするニューラルネットワークを構成すれば
よい。In step 50, the calculation means 201
Calculate prediction parameters. The calculation means 201 is provided with a sub-parameter calculation means 221 for calculating a sub-parameter used for predicting the merged part flow state, and a main parameter calculation means 211 for calculating a main parameter used for prediction of the driving support information. The sub-parameter calculation means 221 uses the tributary data from the i-th pipe or tributary river to determine the flow state of the confluence at a predetermined reference value Si.
Sub-parameter Asi 'so that it can be calculated with an error within
Calculate (T1 + ΔTsi + ΔT1si). In the main parameter calculating means 211, the main parameter Am ′ (T1 + ΔTm + ΔT) is calculated so that the driving support information can be calculated from the mainstream data and the flow state of the merging portion with an error within a predetermined reference value M.
1m) is calculated. For example, the subparameter Asi '(T1 +
ΔTsi + ΔT1si) and main parameter Am '(T1 +
For the calculation of ΔTm + ΔT1m), a neural network having the tributary data and the mainstream data as input signals and the junction flow state and driving support information as teacher signals may be configured.
【0047】なお、手順50の予測パラメータの演算と
手順30の予測データの予測とは、並列処理する。The calculation of the prediction parameter in step 50 and the prediction of the prediction data in step 30 are processed in parallel.
【0048】手順60では、演算手段201で演算され
た予測パラメータを予測手段101の予測パラメータと
入れ替える。このとき、演算後のメインパラメータA
m′(T1+ΔTm+ΔT1m)をメインパラメータAm(T1)
と入れ替え、演算後の各サブパラメータAsi′(T1+Δ
Tsi+ΔT1si)を各サブパラメータAsi(T1)と入れ替
える。合流部での現象が排水機場またはその下流河川に
伝わるまでに、各サブパラメータAsi′(T1+ΔTsi+
ΔT1si)の演算を終了させれば、合流部での現象が排水
機場またはその下流河川に伝わる前に、演算後の新しい
サブパラメータを使って運転支援情報を予測し、適切に
運転支援できる。In step 60, the prediction parameter calculated by the calculation means 201 is replaced with the prediction parameter of the prediction means 101. At this time, the main parameter A after calculation
m '(T1 + ΔTm + ΔT1m) is the main parameter Am (T1)
And each subparameter Asi '(T1 + Δ
Replace Tsi + ΔT1si) with each subparameter Asi (T1). By the time the phenomenon at the confluence is transmitted to the drainage pump station or its downstream river, each subparameter Asi '(T1 + ΔTsi +
If the calculation of ΔT1si) is completed, before the phenomenon at the confluence part is transmitted to the drainage pumping station or its downstream river, it is possible to predict the driving assistance information using the new subparameter after the computation and appropriately perform the driving assistance.
【0049】実施例1では、合流部流動状態および運転
支援情報の予測と並列に、実測データに基づいてそれぞ
れの予測パラメータを修正し、予測値が所定の誤差以内
になるようにしている。特に、各支流毎に予測パラメー
タを修正するため、現象が排水機場またはその下流河川
に伝わる前に予測パラメータを現象に合わせて修正し、
運転支援情報に反映できる。その結果、大雨などの突発
的な現象が発生した場合でも、その現象に合わせた運転
支援が可能となる。In the first embodiment, each prediction parameter is corrected based on the actual measurement data in parallel with the prediction of the confluence state and the driving support information so that the prediction value is within a predetermined error. In particular, in order to correct the prediction parameter for each tributary, correct the prediction parameter according to the phenomenon before the phenomenon is transmitted to the drainage pump station or its downstream river,
It can be reflected in driving support information. As a result, even if a sudden phenomenon such as heavy rain occurs, it becomes possible to provide driving assistance in accordance with the phenomenon.
【0050】実施例1の流動状態の予測手順30と予測
パラメータの演算手順50とは、常に並列処理されてい
る。しかし、予測手段101と演算手段201とが使用
するデータは、同一時刻のデータではない。時刻T=T
1において、最新のデータ、すなわち、支流データIsi
(T1),本流データIm(T1),合流部流動状態Csi(T
1),運転支援情報Cm(T1)が、データ入力部102に入
力されると、予測手段101は、最新のデータを読み込
み、合流部流動状態および運転支援情報を予測する。一
方のサブパラメータ演算手段221では、時刻T=T1
での最新の合流部流動状態Csi(T1)を読み込むと、既
に読み込んであるΔTsi過去の時刻T=T1−ΔTsiま
での支流データおよび合流部流動状態を用いて、時刻T
=T1での合流部流動状態Csi(T1)を所定の基準値以内
の誤差で計算できるように、サブパラメータを演算す
る。したがって、サブパラメータの演算に対して、現在
時刻からΔTsi過去の時刻までの実測値を活用していな
いことになる。The flow state prediction procedure 30 and the prediction parameter calculation procedure 50 of the first embodiment are always processed in parallel. However, the data used by the prediction means 101 and the calculation means 201 are not the data at the same time. Time T = T
In 1, the latest data, that is, tributary data Isi
(T1), main stream data Im (T1), flow state Csi (T
1) When the driving support information Cm (T1) is input to the data input unit 102, the prediction unit 101 reads the latest data and predicts the flow state at the junction and the driving support information. On the other hand, the sub-parameter calculating means 221 has time T = T1.
When the latest confluence flow state Csi (T1) at is read, the time T is calculated by using the tributary data and the confluence flow state until ΔTsi past time T = T1−ΔTsi already read.
The sub-parameters are calculated so that the junction flow state Csi (T1) at = T1 can be calculated with an error within a predetermined reference value. Therefore, the actual measured values from the current time to the past time ΔTsi are not used for the calculation of the subparameter.
【0051】そこでサブパラメータの演算に、サブ予測
手段121で予測した予測値を使用する。図1に示すよ
うに、サブ予測手段121は、時刻T=T1までの支流
データおよび合流部流動状態の実測値をもとに、時刻T
=T1+ΔTsiでの合流部流動状態Csi′(T1+ΔTsi)
を予測し、サブパラメータ演算手段221に送信する。
サブパラメータ演算手段221は、時刻T=T1までの
最新の支流データおよび合流部流動状態の実測値と、時
刻T=T1+ΔTsiまでの合流部流動状態の予測値Cs
i′(T1+ΔTsi)とに基づいて、サブパラメータAsi′
(T1+ΔTsi+ΔT1si)を演算する。Therefore, the predicted value predicted by the sub predictor 121 is used for the calculation of the sub parameter. As shown in FIG. 1, the sub-prediction unit 121 uses the tributary data up to time T = T1 and the measured value of the flow state of the merging portion to calculate the time T.
= Confluence state Csi '(T1 + ΔTsi) at T1 + ΔTsi
Is predicted and transmitted to the sub-parameter calculation means 221.
The sub-parameter calculation means 221 measures the latest tributary data up to time T = T1 and the actual measurement value of the confluence flow state, and the predicted value Cs of the confluence flow state up to time T = T1 + ΔTsi.
Based on i ′ (T1 + ΔTsi), the subparameter Asi ′
Calculate (T1 + ΔTsi + ΔT1si).
【0052】メインパラメータ演算手段211における
メインパラメータの演算についても同様である。すなわ
ち、メイン予測手段111は、時刻T=T1までの本流
データ,運転支援情報,合流部流動状態の実測値に基づ
いて、時刻T=T1+ΔTmでの運転支援情報Cm′(T1
+ΔTm)を予測し、メインパラメータ演算手段211に
送信する。メインパラメータ演算手段211は、時刻T
=T1までの最新の本流データ,運転支援情報,合流部
流動状態の実測値と、時刻T=T1+ΔTmまでの運転支
援情報の予測値Cm′(T1+ΔTm)に基づいて、メイン
パラメータAm′(T1+ΔTm+ΔT1m)を演算する。The same applies to the calculation of the main parameter in the main parameter calculation means 211. That is, the main prediction means 111, based on the mainstream data until time T = T1, the driving support information, and the actual measurement value of the flow state of the merging portion, the driving support information Cm ′ (T1 at time T = T1 + ΔTm.
+ ΔTm) is predicted and transmitted to the main parameter calculating means 211. The main parameter calculation means 211 determines the time T
= Main parameter Am '(T1 + ΔTm + ΔT1m) based on the latest mainstream data up to T1, actual measurement value of driving support information, flow state of the merging section, and predicted value Cm' (T1 + ΔTm) of driving support information up to time T = T1 + ΔTm. Is calculated.
【0053】実施例1では、予測パラメータの演算に予
測手段での予測値を用いて、最新の実測値を活用できる
ようにしている。そのために、より変化の激しい現象に
対しても、予測パラメータをその激しい現象に合わせて
修正し、運転支援情報に反映できる。In the first embodiment, the latest measured value can be utilized by using the predicted value of the prediction means for the calculation of the predicted parameter. Therefore, even for a phenomenon that changes more drastically, the prediction parameter can be corrected according to the phenomenon and reflected in the driving support information.
【0054】実施例1では、運転支援情報を予測するた
めに、流入幹線やその周辺で実測した本流データを使用
している。しかし、排水機場から遠く離れた上流のデー
タを直接運転支援情報に反映させるのは、予測精度の低
下,予測パラメータの演算時間の増加につながる。そこ
で、各管渠毎に流入幹線との合流部の流動状態を予測す
るのと同様に、合流部の上流側の流入幹線をその合流部
に対する支流とみなして、管渠と同様に予測し、流入幹
線による合流部での流動状態を予測する。In the first embodiment, in order to predict the driving support information, the mainstream data actually measured on the inflow trunk line and its surroundings is used. However, directly reflecting the upstream data far from the drainage pump station in the driving support information leads to a decrease in the prediction accuracy and an increase in the calculation time of the prediction parameters. Therefore, in the same way as predicting the flow state of the confluence with the inflow trunk for each conduit, the upstream main trunk of the confluence is regarded as a tributary to the confluence, and is predicted in the same way as the conduit. Predict the flow condition at the confluence of the inflow trunk line.
【0055】図4に示すように、複数の管渠が流入幹線
と合流している場合には、上流側の合流部流動状態の予
測値を用いて、下流側の合流部流動状態を予測すればよ
い。図5は、図1に示すサブ予測手段121を各管渠毎
に分割した構成を示すブロック図であり、図6は、その
支援手順を示すフローチャートであり、図2に示す手順
30を分割した手順を示している。As shown in FIG. 4, when a plurality of conduits merge with the inflow trunk line, it is possible to predict the flow state of the downstream merging portion by using the predicted value of the flow state of the merging portion on the upstream side. Good. FIG. 5 is a block diagram showing a configuration in which the sub-prediction unit 121 shown in FIG. 1 is divided for each conduit, FIG. 6 is a flowchart showing the support procedure, and the procedure 30 shown in FIG. 2 is divided. Shows the procedure.
【0056】管渠hと流入幹線との合流部hの下流に、
管渠iと流入幹線との合流部iが存在する場合は、管渠
hの上流地点jでの流量Ishj(T1),その周辺での位置
kにおける降雨量Ishk(T1)、流入幹線を支流とみなし
た場合の上流地点gでの流量Isgj(T1)などの支流デー
タをデータ入力部102から読み込み、合流部hでの流
動状態Csh′(T1+ΔTsh)を予測し、管渠iの上流地
点jでの流量Isij(T1)やその周辺での位置kにおける
降雨量Isik(T1)などの支流データ,合流部hでの流動
状態の予測値Csh′(T1+ΔTsh)に基づいて、合流部
iでの流動状態Csi′(T1+ΔTsi)を予測する。同様
に、合流部iでの流動状態の予測値Csi′(T1+ΔTs
i)を用いて、その下流の合流部jでの流動状態の予測値
Csj′(T1+ΔTsj)を予測する。このように、上流側
の合流部流動状態から下流側の流動状態を予測し、排水
機場直前の合流部流動状態から運転支援情報を予測す
る。Downstream of the confluence section h between the pipe h and the inflow trunk line,
When there is a confluence part i between the pipe i and the inflow trunk, the flow rate Ishj (T1) at the upstream point j of the pipe h, the rainfall Ishk (T1) at the position k in the vicinity, and the tributary of the inflow trunk. The tributary data such as the flow rate Isgj (T1) at the upstream point g when it is regarded as is read from the data input unit 102, the flow state Csh ′ (T1 + ΔTsh) at the merging portion h is predicted, and the upstream point j of the pipe i Based on the tributary data such as the flow rate Isij (T1) and the rainfall amount Isik (T1) at the position k in the vicinity thereof, and the predicted value Csh ′ (T1 + ΔTsh) of the flow state at the confluence h. Predict the flow state Csi '(T1 + ΔTsi). Similarly, the predicted value Csi ′ (T1 + ΔTs) of the flow state at the merging portion i
i) is used to predict the predicted value Csj ′ (T1 + ΔTsj) of the flow state at the downstream confluence j. In this way, the flow state on the downstream side is predicted from the flow state on the merge section on the upstream side, and the driving support information is predicted from the flow state on the merge section immediately before the drainage pumping station.
【0057】この実施例によれば、各合流部間の流入幹
線も支流とみなして合流部流動状態を予測し、上流側の
流動状態から下流側の流動状態を予測していくので、遠
く離れた上流地点での実測データから運転支援情報を予
測する必要がなく、高精度に運転支援情報を予測でき、
予測パラメータの演算も短時間で実行できる。According to this embodiment, since the inflow trunk line between the merging portions is also regarded as a tributary, the flow state of the merging portion is predicted, and the flow state of the downstream side is predicted from the flow state of the upstream side. It is not necessary to predict the driving support information from the measured data at the upstream point, and the driving support information can be predicted with high accuracy,
The calculation of the prediction parameter can also be executed in a short time.
【0058】《実施例2》図7〜図11を参照して、本
発明を排水機場運転支援システムに適用した実施例2を
説明する。Second Embodiment A second embodiment in which the present invention is applied to a drainage pump station operation support system will be described with reference to FIGS. 7 to 11.
【0059】図7は、本発明による排水機場運転支援シ
ステムの実施例2の構成を示すブロック図である。この
流動予測システムは、データ入力部102と、データ入
力部102からのデータおよび所定の予測パラメータA
m,Asiに基づき流動状態を予測する予測手段101
と、予測手段101からの予測データに基づき排水機場
を運転支援する運転支援部103と、データ入力部10
2からのデータおよび予測手段101からの予測データ
に基づき運転支援情報を修正すべきかどうかを判定する
とともに予測手段101で使用する予測パラメータを修
正するかどうかを判定する判定手段104と、データ入
力部102からの入力データに基づいて予測パラメータ
を演算し新しい予測パラメータを予測手段に送信する演
算手段201とを備えている。すなわち、図1に示す実
施例1とは、判定手段104に関する部分の構成のみが
異なる。FIG. 7 is a block diagram showing the configuration of the drainage pump station driving support system according to the second embodiment of the present invention. This flow prediction system includes a data input unit 102, data from the data input unit 102 and a predetermined prediction parameter A.
Prediction means 101 for predicting the flow state based on m and Asi
And a driving support unit 103 that supports driving of a drainage pump station based on prediction data from the prediction unit 101, and a data input unit 10
A determination unit 104 that determines whether to correct the driving support information based on the data from 2 and the prediction data from the prediction unit 101 and determines whether to correct the prediction parameter used by the prediction unit 101, and a data input unit. The calculation means 201 calculates a prediction parameter based on the input data from 102 and transmits a new prediction parameter to the prediction means. That is, it differs from the first embodiment shown in FIG. 1 only in the configuration of the part relating to the determination means 104.
【0060】図8は、図7に示す排水機場運転支援シス
テムの支援手順を示すフローチャートである。手順10
から手順40までは、図2の手順10から手順40まで
とほぼ同じ手順である。FIG. 8 is a flow chart showing a support procedure of the drainage pumping station operation support system shown in FIG. Step 10
2 to 40 are almost the same as steps 10 to 40 in FIG.
【0061】手順10では、予測手段101で使用する
予測パラメータを初期設定し、手順20では、手順70
で実測したデータを入力する。データ入力部102で
は、図1の実施例1と同様に、管渠網における第i番目
の管渠や複数の支流河川を備えた河川の第i番目の支流
河川の流動状態を示すデータまたは流動状態に影響を及
ぼす支流データIsi,流入幹線や河川の流動状態を示す
データまたは流動状態に影響を及ぼす本流データIm,
排水機場およびその下流の流動状態を示す運転支援情報
Cm,第i番目の管渠と流入幹線との合流部での流動状
態または第i番目の支流河川と河川との合流部での流動
状態を示す合流部流動状態Csiの4種類を入力する。In procedure 10, the prediction parameters used in the prediction means 101 are initialized, and in procedure 20, the procedure 70
Enter the data actually measured in. In the data input unit 102, similar to the first embodiment of FIG. 1, data or flow indicating the flow state of the i-th tributary river of the i-th divert or a plurality of tributary rivers in the pipe network. Tributary data Isi that influences the state, data indicating the flow state of an inflow trunk line or river, or main stream data Im that affects the flow state,
The operation support information Cm indicating the flow condition of the drainage pumping station and its downstream, the flow condition at the confluence of the i-th pipe and the inflow trunk or the flow condition at the confluence of the i-th tributary river and the river. Four types of flow conditions Csi at the junction are shown.
【0062】手順30では、予測手段101が、運転支
援情報および合流部流動状態を予測する。図1の実施例
1と同様に、予測手段101は、サブ予測手段121と
メイン予測手段111とを備えており、各予測手段は、
それぞれ合流部流動状態を予測するサブパラメータと、
運転支援情報を予測するメインパラメータを備えてい
る。サブ予測手段121は、時刻T=T1に支流データ
Isi(T1)および合流部流動状態Csi(T1)とを読み込
み、時刻T=T1に至るまでの過去のデータIsi(T),
Csi(T)および時刻T=T1におけるサブパラメータAs
i(T1)に基づいて、ΔTsi後の時刻T=T1+ΔTsiで
の合流部流動状態の予測値Csi′(T1+ΔTsi)を予測
する。メイン予測手段111は、時刻T=T1に本流デ
ータIm(T1)と運転支援情報Cm(T1)とを読み込み、時
刻T=T1に至るまでの過去の本流データIm(T),運転
支援情報Cm(T),合流部流動状態Csi(T),さらに今
予測した合流部流動状態の予測値Csi′の時刻T=T1
からT1+ΔTsiに至るまでの予測結果Cm′(T)に基づ
き、時刻T=T1におけるメインパラメータAm(T1)を
用いて、ΔTm後の時刻T=T1+ΔTmにおける運転支
援情報Cm′(T1+ΔTm)を予測する。In step 30, the predicting means 101 predicts the driving support information and the merging section flow state. Similar to the first embodiment of FIG. 1, the prediction unit 101 includes a sub prediction unit 121 and a main prediction unit 111, and each prediction unit is
Sub-parameters for predicting the flow condition at the junction respectively,
It has main parameters for predicting driving support information. The sub-prediction unit 121 reads the tributary data Isi (T1) and the junction flow state Csi (T1) at time T = T1, and the past data Isi (T) until time T = T1 is read.
Csi (T) and subparameter As at time T = T1
Based on i (T1), the predicted value Csi '(T1 + ΔTsi) of the flow state at the merging portion at the time T = T1 + ΔTsi after ΔTsi is predicted. The main prediction means 111 reads the mainstream data Im (T1) and the driving support information Cm (T1) at time T = T1, and the past mainstream data Im (T) and driving support information Cm until the time T = T1. (T), the merging portion flow state Csi (T), and the time T = T1 of the predicted value Csi 'of the merging portion flow state just predicted.
Based on the prediction result Cm '(T) from T1 to ΔTsi, the driving assist information Cm' (T1 + ΔTm) at time T = T1 + ΔTm after ΔTm is predicted using the main parameter Am (T1) at time T = T1. .
【0063】手順40では、予測手段101で予測され
た運転支援情報の予測値に基づき、排水機場を運転支援
する。In step 40, the drainage pump station is drivingly supported based on the predicted value of the driving support information predicted by the prediction means 101.
【0064】手順80では、判定手段104において、
予測手段101で予測した予測データの誤差を計算す
る。予測データは、現在時刻T=T1からΔTsi後の時
刻T=T1+ΔTsiにおける合流部流動状態Csi′(T1
+ΔTsi)と、ΔTm後の時刻T=T1+ΔTmにおける運
転支援情報Cm′(T1+ΔTm)である。これらの予測デ
ータの誤差を計算するため、時刻T=T1+ΔTsiでの
合流部流動状態Csi(T1+ΔTsi)の実測値と、時刻T
=T1+ΔTmでの運転支援情報Cm(T1+ΔTm)の実測
値とを読み込む。次に、運転支援情報の実測値Cm(T1
+ΔTm)とその予測値Cm′(T1+ΔTm)とを比較し、
運転支援情報の誤差
Em(T1+ΔTm)=|Cm(T1+ΔTm)−Cm′(T1+ΔTm)| (1)
および各合流部における合流部流動状態の実測値Csi
(T1+ΔTsi)とその予測値Csi′(T1+ΔTsi)とを
比較し、合流部流動状態の誤差
Esi(T1+ΔTsi)=|Csi(T1+ΔTsi)−Csi′(T1+ΔTsi)| (2)
を計算する。At step 80, the judging means 104
The error of the prediction data predicted by the prediction means 101 is calculated. The predicted data is the flow state Csi '(T1) of the merging portion at time T = T1 + ΔTsi after ΔTsi from the current time T = T1.
+ ΔTsi) and the driving support information Cm ′ (T1 + ΔTm) at time T = T1 + ΔTm after ΔTm. In order to calculate the error of these prediction data, the actual measurement value of the confluence state Csi (T1 + ΔTsi) at time T = T1 + ΔTsi and the time T
= The measured value of the driving support information Cm (T1 + ΔTm) at T1 + ΔTm is read. Next, the measured value Cm (T1
+ ΔTm) and its predicted value Cm ′ (T1 + ΔTm) are compared,
Error of driving support information Em (T1 + ΔTm) = | Cm (T1 + ΔTm) −Cm ′ (T1 + ΔTm) | (1) and the measured value Csi of the flow state at the merging portion at each merging portion
(T1 + ΔTsi) and its predicted value Csi ′ (T1 + ΔTsi) are compared, and the error Esi (T1 + ΔTsi) = | Csi (T1 + ΔTsi) −Csi ′ (T1 + ΔTsi) |
【0065】実際には、時刻T=T1+ΔTsiおけるに
数式(2)の誤差を計算し、その後時刻T=T1+ΔTmに
おける数式(1)の誤差を計算し、誤差の大きさをそのた
びに判定し、次の手順に移行する。図8では、この判定
の手順を、手順80として示してあるが、詳細には図9
に示す手順となる。Actually, the error of the equation (2) is calculated at the time T = T1 + ΔTsi, then the error of the equation (1) at the time T = T1 + ΔTm is calculated, and the magnitude of the error is determined each time. Move to the next step. Although the procedure of this determination is shown as procedure 80 in FIG. 8, the details are shown in FIG.
The procedure is as shown in.
【0066】手順81では、時刻T=T1にサブ予測手
段121から合流部流動状態の予測値Csi′(T1+ΔT
si)を読み込み、時刻T=T1+ΔTsiにデータ入力部1
02から合流部流動状態の実測値Csi(T1+ΔTsi)を
読み込み、数式(2)により、誤差Esi(T1+ΔTsi)を
計算する。In step 81, the predicted value Csi '(T1 + ΔT) of the confluence flow state from the sub prediction means 121 at time T = T1.
si) is read, and at time T = T1 + ΔTsi, data input section 1
The measured value Csi (T1 + ΔTsi) of the flow state of the merging portion is read from No. 02, and the error Esi (T1 + ΔTsi) is calculated by the mathematical expression (2).
【0067】誤差Esi(T1+ΔTsi)が所定の基準値Si
以内であれば、運転支援情報,予測パラメータともに修
正の必要がないので、手順20に戻り、新たなデータを
入力する。The error Esi (T1 + ΔTsi) is a predetermined reference value Si
If it is within the range, it is not necessary to correct both the driving support information and the prediction parameter, so the procedure returns to step 20 and new data is input.
【0068】誤差Esi(T1+ΔTsi)が所定の基準値Si
より大きければ、合流部流動状態の予測精度を上げる必
要があり、サブパラメータAsi(T1)の修正命令を演算
手段201のサブパラメータ演算手段221に送信す
る。合流部流動状態の予測値は、運転支援情報の予測に
用いるので、合流部流動状態の実測値を使ってメインパ
ラメータAm(T1)も修正することが望ましいから、メイ
ンパラメータAm(T1)の修正命令も演算手段101のメ
インパラメータ演算手段211に送信する。さらに、メ
イン予測手段111では、誤差の大きな合流部流動状態
の予測値Csi′(T1+ΔTsi)を用いて、運転支援情報
Cm′(T1+ΔTm)を予測し、その結果に基づいて運転
支援しているので、適切に運転していない可能性があ
る。そこで、適切な運転に近づけるため、運転支援情報
の修正命令をメインパラメータ演算手段211に送信す
る。The error Esi (T1 + ΔTsi) is a predetermined reference value Si
If it is larger, it is necessary to improve the prediction accuracy of the flow state of the merging portion, and a correction command of the subparameter Asi (T1) is transmitted to the subparameter calculation means 221 of the calculation means 201. Since the predicted value of the merging section flow state is used to predict the driving support information, it is desirable to correct the main parameter Am (T1) by using the actual measurement value of the merging section flow state. Therefore, the main parameter Am (T1) is corrected. The command is also transmitted to the main parameter calculating means 211 of the calculating means 101. Further, the main predicting means 111 predicts the driving support information Cm '(T1 + ΔTm) using the predicted value Csi ′ (T1 + ΔTsi) of the flow state at the merging portion with a large error, and performs the driving support based on the result. , You may not be driving properly. Therefore, in order to bring the vehicle closer to the appropriate driving, a command for correcting the driving support information is transmitted to the main parameter calculating means 211.
【0069】手順82では、時刻T=T1にメイン予測
手段111から運転支援情報の予測値Cm′(T1+ΔT
m)を読み込み、時刻T=T1+ΔTmにデータ入力部10
2から運転支援情報の実測値Cm(T1+ΔTm)を、式
(1)で誤差Em(T1+ΔTm)を計算する。In step 82, the predicted value Cm '(T1 + ΔT of the driving support information from the main prediction means 111 at time T = T1.
m) is read, and at time T = T1 + ΔTm, the data input unit 10
From 2 the measured value Cm (T1 + ΔTm) of the driving support information
The error Em (T1 + ΔTm) is calculated in (1).
【0070】誤差Em(T1+ΔTm)が所定の基準値M以
内であれば、運転支援情報,予測パラメータともに修正
の必要はなく、手順20に戻り、新たなデータを入力す
る。If the error Em (T1 + ΔTm) is within the predetermined reference value M, it is not necessary to correct both the driving support information and the prediction parameter, and the process returns to step 20 to input new data.
【0071】誤差Em(T1+ΔTm)が所定の基準値Mよ
り大きければ、運転支援情報の予測精度を上げる必要が
あり、メインパラメータAm(T1)の修正命令を演算手段
101のメインパラメータ演算手段211に送信する。If the error Em (T1 + ΔTm) is larger than the predetermined reference value M, it is necessary to improve the prediction accuracy of the driving support information, and a correction command for the main parameter Am (T1) is sent to the main parameter calculating means 211 of the calculating means 101. Send.
【0072】手順90では、メインパラメータ演算手段
211において、時刻T=T1+ΔTsiに判定手段10
4からの運転支援情報の修正命令を受けると、時刻T=
T1+ΔTsiまでの本流データ,運転支援情報,合流部
流動状態の各実測値に基づいて、運転支援情報の修正値
Cm″(T1+ΔTm)を予測し、運転支援部103に送信
する。運転支援部103では修正された運転支援情報に
基づいて、再度、運転支援する。In step 90, the main parameter calculation means 211 determines at time T = T1 + ΔTsi the determination means 10
When a command to correct the driving support information is received from 4, time T =
The correction value Cm ″ (T1 + ΔTm) of the driving support information is predicted based on the measured values of the mainstream data up to T1 + ΔTsi, the driving support information, and the flow state of the merge section, and the corrected value Cm ″ (T1 + ΔTm) is transmitted to the driving support unit 103. Based on the corrected driving support information, driving support is provided again.
【0073】したがって、手順90では、運転支援情報
の修正値Cm″(T1+ΔTm)を予測する際に、誤差の大
きい合流部流動状態の予測値Csi′(T1+ΔTsi)の代
わりに、実測値Csi(T1+ΔTsi)を使用し、時刻T=
T1からT=T1+ΔTsiの実測データを付加して、運転
支援情報の予測値の精度を上げることができる。Therefore, in step 90, when predicting the correction value Cm ″ (T1 + ΔTm) of the driving support information, the actual measurement value Csi (T1 + ΔTsi) is used instead of the predicted value Csi ′ (T1 + ΔTsi) of the flow state at the merging portion with a large error. ), Time T =
It is possible to increase the accuracy of the predicted value of the driving support information by adding the measured data of T1 to T = T1 + ΔTsi.
【0074】実施例2では、予測手段を各合流部の流動
状態を予測するサブ予測手段121と機場周辺およびそ
の下流での流動状態を予測するメイン予測手段111と
に分けている。手順90では、各合流部での流動状態の
予測値を実測値と比較して、その予測精度を調べてい
る。合流部での流動状態は、その後は流入幹線や河川を
通って、ある時間経過の後に排水機場やその下流に到達
する。したがって、合流部流動状態の予測値の誤差が大
きい場合でも、実測値をもとに運転支援情報を修正する
と、現象が排水機場やその下流河川に到達する前に再度
運転支援できる。すなわち、実施例2によれば、各支流
およびその周辺の情報から、排水機場の運転支援情報を
予測するだけでなく、合流部で予測値の誤差を確認し、
誤差の大きい場合には合流部での実測値を用いて運転支
援情報を修正するので、必要な場合に、従来よりも高精
度の運転支援を実行できる。In the second embodiment, the predicting means is divided into the sub predicting means 121 for predicting the flow state of each confluence and the main predicting means 111 for predicting the flow state around the machine area and downstream thereof. In step 90, the predicted value of the flow state at each merging portion is compared with the actual measured value to check the prediction accuracy. The flow state at the confluence then reaches the drainage pump station and its downstream after a certain time passes through the inflow trunk line and the river. Therefore, even if the error in the predicted value of the flow state at the junction is large, if the driving support information is corrected based on the measured value, the driving support can be carried out again before the phenomenon reaches the drainage pumping station or its downstream river. That is, according to the second embodiment, not only the driving support information of the drainage pump station is predicted from the information of each tributary and its surroundings, but also the error of the predicted value is confirmed at the merging portion,
When the error is large, the driving support information is corrected using the actual measurement value at the merging portion, so that the driving support can be performed with higher accuracy than before when necessary.
【0075】手順50では、判定手段104から予測パ
ラメータの修正命令を受けると、演算手段201におい
て、予測パラメータを演算する。演算手段の構成および
演算手順は図1の実施例1と同じである。すなわち、演
算手段201は、合流部流動状態の予測に使用するサブ
パラメータを演算するサブパラメータ演算手段221
と、運転支援情報の予測に使用するメインパラメータを
演算するメインパラメータ演算手段211を備えてい
る。サブパラメータ演算手段221では、第i番目の支
流データを用いて、合流部流動状態を所定の基準値Si
以内の誤差で計算できるように、サブパラメータAsi′
(T1+ΔTsi+ΔT1si)を演算する。メインパラメータ
演算手段211では、本流データと合流部流動状態か
ら、運転支援情報を所定の基準値M以内の誤差で計算で
きるように、メインパラメータAm′(T1+ΔTm+ΔT
1m)を演算する。In step 50, when the prediction parameter correction command is received from the determination means 104, the calculation means 201 calculates the prediction parameter. The configuration of the calculation means and the calculation procedure are the same as in the first embodiment of FIG. That is, the calculation means 201 calculates the sub-parameter used for the prediction of the flow state of the merging portion, and the sub-parameter calculation means 221.
And a main parameter calculating means 211 for calculating a main parameter used for prediction of driving support information. The sub-parameter calculator 221 uses the i-th tributary data to determine the flow state of the merging portion to a predetermined reference value Si.
Sub-parameter Asi 'so that it can be calculated with an error within
Calculate (T1 + ΔTsi + ΔT1si). In the main parameter calculating means 211, the main parameter Am ′ (T1 + ΔTm + ΔT) is calculated so that the driving support information can be calculated with an error within a predetermined reference value M from the mainstream data and the merging section flow state.
1m) is calculated.
【0076】手順60では、演算手段201で演算され
た予測パラメータを、予測手段101の予測パラメータ
と入れ替える。このとき演算後のメインパラメータA
m′(T1+ΔTm+ΔT1m)をメインパラメータAm(T1)
と入れ替え、演算後の各サブパラメータAsi′(T1+Δ
Tsi+ΔT1si)を各サブパラメータAsi(T1)と入れ替
える。合流部での現象が排水機場またはその下流河川に
伝わるまでに、各サブパラメータAsi′(T1+ΔTsi+
ΔT1si)の演算を終了させれば、合流部での現象が排水
機場またはその下流河川に伝わる前に、演算後の新しい
サブパラメータを使って、運転支援情報を予測し、適切
に運転支できる。In step 60, the prediction parameter calculated by the calculation means 201 is replaced with the prediction parameter of the prediction means 101. Main parameter A after calculation at this time
m '(T1 + ΔTm + ΔT1m) is the main parameter Am (T1)
And each subparameter Asi '(T1 + Δ
Replace Tsi + ΔT1si) with each subparameter Asi (T1). By the time the phenomenon at the confluence is transmitted to the drainage pump station or its downstream river, each subparameter Asi '(T1 + ΔTsi +
If the calculation of ΔT1si) is completed, before the phenomenon at the confluence part is transmitted to the drainage pumping station or its downstream river, the new sub-parameter after the calculation can be used to predict the driving support information and appropriately support the operation.
【0077】実施例2では、各予測値すなわち合流部流
動状態および運転支援情報の予測値を実測値と逐次比較
し、予測パラメータの修正が必要な場合にのみ、予測パ
ラメータを演算すればよい。そのために、不要な予測パ
ラメータの演算を排除して、運転支援システムの負荷を
軽減できる。In the second embodiment, each predicted value, that is, the predicted value of the confluence state and the driving support information is sequentially compared with the measured value, and the predicted parameter may be calculated only when the predicted parameter needs to be corrected. Therefore, the calculation of unnecessary prediction parameters can be eliminated, and the load on the driving support system can be reduced.
【0078】実施例1と同様に、予測パラメータの演算
に予測データを使用してもよい。すなわち、図7に示す
ように、サブ予測手段121は、時刻T=T1までの支
流データおよび合流部流動状態の実測値に基づいて、時
刻T=T1+ΔTsiでの合流部流動状態Csi′(T1+Δ
Tsi)を予測し、サブパラメータ演算手段221に送信
する。サブパラメータ演算手段221は、時刻T=T1
までの最新の支流データおよび合流部流動状態の実測値
と、時刻T=T1+ΔTsiまでの合流部流動状態の予測
値Csi′(T1+ΔTsi)に基づいて、サブパラメータAs
i′(T1+ΔTsi+ΔT1si)を演算する。また、メイン
予測手段111は、時刻T=T1までの本流データ,運
転支援情報,合流部流動状態の実測値に基づいて、時刻
T=T1+ΔTmでの運転支援情報Cm′(T1+ΔTm)を
予測し、メインパラメータ演算手段211に送信する。
メインパラメータ演算手段211は、時刻T=T1まで
の最新の本流データ,運転支援情報,合流部流動状態の
実測値と、時刻T=T1+ΔTmまでの運転支援情報の予
測値Cm′(T1+ΔTm)に基づいて、メインパラメータ
Am′(T1+ΔTm+ΔT1m)を演算する。Similar to the first embodiment, the prediction data may be used for the calculation of the prediction parameter. That is, as shown in FIG. 7, the sub-prediction unit 121, based on the tributary data up to time T = T1 and the actual measurement value of the confluence flow state, merges flow state Csi ′ (T1 + ΔTsi at time T = T1 + ΔTsi.
Tsi) is predicted and transmitted to the sub-parameter calculation means 221. The sub-parameter calculation means 221 has a time T = T1.
Based on the latest tributary data up to and the actual measurement value of the confluent flow state and the predicted value Csi ′ (T1 + ΔTsi) of the confluent flow state until time T = T1 + ΔTsi.
i '(T1 + ΔTsi + ΔT1si) is calculated. Further, the main prediction means 111 predicts the driving support information Cm ′ (T1 + ΔTm) at the time T = T1 + ΔTm based on the mainstream data until the time T = T1, the driving support information, and the actual measurement value of the flow state of the merging portion, It is transmitted to the main parameter calculation means 211.
The main parameter calculation means 211 is based on the latest mainstream data up to time T = T1, the driving assistance information, the actual measurement value of the merging section flow state, and the predicted value Cm ′ (T1 + ΔTm) of the driving assistance information until time T = T1 + ΔTm. Then, the main parameter Am ′ (T1 + ΔTm + ΔT1m) is calculated.
【0079】実施例2では、予測パラメータの演算に予
測手段での予測値を用いることで、最新の実測値を活用
できるようにしている。そのために、より変化の激しい
現象に対しても、予測パラメータを現象に合わせて修正
し、運転支援情報に反映できる。In the second embodiment, the latest measured value can be utilized by using the predicted value of the prediction means for the calculation of the predicted parameter. Therefore, even for a phenomenon that changes more drastically, the prediction parameter can be corrected according to the phenomenon and reflected in the driving support information.
【0080】また、実施例1と同様に、合流部の上流側
の流入幹線をその合流部に対する支流とみなして、管渠
と同様に予測し、流入幹線による合流部での流動状態を
予測してもよい。すなわち、図4に示すように、複数の
管渠が流入幹線と合流している場合には、上流側の合流
部流動状態の予測値を用いて下流側の合流部流動状態を
予測すればよい。As in the first embodiment, the inflow trunk upstream of the confluence is regarded as a tributary to the confluence, and it is predicted in the same manner as the conduit, and the flow state at the confluence by the inflow trunk is predicted. May be. That is, as shown in FIG. 4, when a plurality of conduits merge with the inflow trunk, the downstream merged flow state may be predicted by using the predicted value of the upstream merged flow state. .
【0081】図10は、図7に示すサブ予測手段121
を各管渠毎に分割した構成を示す図であり、図11は、
その支援手順を示すフローチャートであり、図8に示す
手順30を分割したものである。構成および手順は、そ
れぞれ、実施例1の図5に示した構成および図6に示し
た手順とほとんど同じである。合流部流動状態の予測結
果を判定手段104に送信し、各合流部について予測結
果の誤差を判定する手順のみが異なる。FIG. 10 is a sub prediction means 121 shown in FIG.
FIG. 11 is a diagram showing a configuration in which is divided into pipes, and FIG.
9 is a flowchart showing the support procedure, which is a division of the procedure 30 shown in FIG. 8. The configuration and the procedure are almost the same as the configuration shown in FIG. 5 and the procedure shown in FIG. 6 of the first embodiment, respectively. Only the procedure of transmitting the prediction result of the flow state of the merging portion to the determining unit 104 and determining the error of the prediction result for each merging portion is different.
【0082】実施例2によれば、各合流部間の流入幹線
も支流とみなして合流部流動状態を予測し、上流側の流
動状態から下流側の流動状態を予測していくので、遠く
離れた上流地点での実測データから運転支援情報を予測
する必要がなく、運転支援情報を高精度に予測でき、予
測パラメータの演算も短時間で実行できる。According to the second embodiment, since the inflow trunk line between the merging portions is also regarded as a tributary, the flow state of the merging portion is predicted, and the flow state of the downstream side is predicted from the flow state of the upstream side. Further, it is not necessary to predict the driving support information from the actual measurement data at the upstream point, the driving support information can be predicted with high accuracy, and the calculation of the prediction parameter can be executed in a short time.
【0083】《実施例3》図12,図13を参照して、
本発明を排水機場運転支援システムに適用した実施例3
を説明する。図12は、本発明を排水機場運転支援シス
テムに適用した実施例3の構成を示すブロック図であ
る。Example 3 Referring to FIGS. 12 and 13,
Example 3 in which the present invention is applied to a drainage pump operation support system
Will be explained. FIG. 12 is a block diagram showing the configuration of the third embodiment in which the present invention is applied to the drainage pumping station operation support system.
【0084】複雑な管渠網または河川網を各支流毎に分
割すれば、単一の管渠と合流部および流入幹線または河
川で構成できる。このような単一の支流から流入幹線ま
たは河川への流出状態を予測する場合、支流の上流地点
での流動状態による影響と、その地点から合流部までの
支流への流入状態による影響とに分けて考えることがで
きる。If a complicated conduit network or river network is divided for each tributary, it can be composed of a single conduit and a junction and an inflow trunk or river. When predicting the outflow state from such a single tributary to the inflow trunk or river, it is divided into the influence of the flow state at the upstream point of the tributary and the influence of the inflow state of the tributary from that point to the junction. You can think about it.
【0085】例えば、図4の場合、第i番目の支流の上
流地点jでの流動状態(例えば流量)Isij(T1)が、距離
Δxだけ離れた合流部iに及ぼす影響(例えば流出量)お
よび時刻は、地点jから合流部iまでの支流への流入状
態による影響を無視すれば、簡単な経験式Fsで表現で
きる。すなわち合流部iでの流動状態の上流地点jでの
流動状態のみを考慮した予測値Csij″(T1+ΔTsi)
は、
Csij″(T1+ΔTsi)=Fs(Isij(T1),Δx) (3)
で表現できる。一般に経験式Fsは、上流地点での流動
状態と合流部までの距離との関数である。For example, in the case of FIG. 4, the influence (for example, outflow amount) of the flow state (for example, flow rate) Isij (T1) at the upstream point j of the i-th tributary on the confluence part i separated by the distance Δx (for example, outflow amount) and The time can be expressed by a simple empirical formula Fs, ignoring the influence of the state of inflow into the tributary from the point j to the junction i. That is, the predicted value Csij ″ (T1 + ΔTsi) considering only the flow state at the upstream point j of the flow state at the junction i
Can be expressed by Csij ″ (T1 + ΔTsi) = Fs (Isij (T1), Δx) (3). Generally, the empirical formula Fs is a function of the flow state at the upstream point and the distance to the confluence.
【0086】図12に示す実施例3は、図1または図7
のサブ予測手段121およびサブパラメータ演算手段2
21をそれぞれ2種類の予測手段と演算手段とに分割し
て、上流地点での流動状態による合流部への影響を数式
(3)で予測し、図1の実施例1または図7の実施例2と
同様に、支流への流入状態による影響を流動状態ととも
に修正可能な予測パラメータAsisで予測する。The third embodiment shown in FIG. 12 corresponds to FIG.
Sub predicting means 121 and sub parameter calculating means 2
21 is divided into two kinds of prediction means and calculation means, respectively, and the influence of the flow state at the upstream point on the merging portion is calculated by a mathematical formula.
The prediction is performed in (3), and similarly to the first embodiment of FIG. 1 or the second embodiment of FIG. 7, the influence of the inflow state into the tributary is predicted with the flow state and the predictable parameter Asis.
【0087】図12において、サブ予測手段121は、
数式(3)の関数Fsを用いて、上流地点での流動状態の
みを考慮した合流部流動状態を予測する固定サブ予測手
段122と、可変予測パラメータを用いて上流地点から
合流部までの支流への流入状態も考慮した合流部流動状
態を予測する可変サブ予測手段123を備えている。In FIG. 12, the sub prediction means 121 is
Fixed sub-prediction means 122 for predicting the flow state of the merging part considering only the flow state at the upstream point by using the function Fs of the mathematical expression (3), and the tributary from the upstream point to the merging point using the variable prediction parameter. The variable sub-prediction unit 123 for predicting the flow state of the merged portion is also provided in consideration of the inflow state of the.
【0088】固定サブ予測手段122は、データ入力部
102から支流の上流地点での流動状態を与える上流デ
ータIsij(T1)を読み込み、数式(3)の関数Fsによっ
て、上流地点での流動状態のみを考慮した合流部流動状
態Csij″(T1+ΔTsi)を予測する。The fixed sub-prediction means 122 reads the upstream data Isij (T1) giving the flow state at the upstream point of the tributary from the data input unit 102, and only the flow state at the upstream point is read by the function Fs of the equation (3). The flow state Csij ″ (T1 + ΔTsi) of the merging portion in consideration of the above is predicted.
【0089】可変サブ予測手段123は、固定サブ予測
手段122で予測された上流地点での流動状態のみを考
慮した合流部流動状態Csij″(T1+ΔTsi)と、上流地
点から合流部までの支流への流入状態を与える流域デー
タIsik(T1)から、可変予測パラメータAsis(T1)を用
いて、合流部流動状態Csij′(T1+ΔTsi)を予測す
る。The variable sub-prediction unit 123 considers only the flow state at the upstream point predicted by the fixed sub-prediction unit 122, and the confluence state Csij ″ (T1 + ΔTsi) and the tributary from the upstream point to the confluence. From the basin data Isik (T1) giving the inflow state, the confluence state Csij '(T1 + ΔTsi) is predicted using the variable prediction parameter Asis (T1).
【0090】合流部流動状態の予測値Csij′(T1+Δ
Tsi)は、メイン予測手段111に送信され、図1の実
施例1または図7の実施例2と同様に、運転支援情報を
予測して、運転支援部103で運転支援を実行する際に
用いられる。Prediction value Csij '(T1 + Δ
Tsi) is transmitted to the main prediction means 111, and is used when predicting the driving support information and executing the driving support in the driving support unit 103, as in the first embodiment of FIG. 1 or the second embodiment of FIG. 7. To be
【0091】一方、サブパラメータ演算手段221は、
数式(3)の関数Fsを用いて、上流地点での流動状態の
みを考慮した合流部流動状態を予測する固定サブ予測手
段122と、可変サブ予測手段123で使用する可変予
測パラメータを演算する可変サブパラメータ演算手段2
23とを備えている。On the other hand, the sub-parameter calculation means 221
Using the function Fs of Equation (3), the variable sub-prediction means 122 for predicting the confluence flow state that considers only the flow state at the upstream point, and the variable sub-prediction means 123 for calculating the variable prediction parameters used Sub-parameter calculation means 2
And 23.
【0092】サブパラメータ演算手段221において、
固定サブ予測手段122は、上流データIsij(T1)を読
み込み、上流地点での流動状態のみを考慮した合流部流
動状態Csij″(T1+ΔTsi)を予測する。可変サブパラ
メータ演算手段223は、固定サブ予測手段122が予
測した上流地点での流動状態のみを考慮した合流部流動
状態Csij″(T1+ΔTsi)および流域データIsik(T1)
から、合流部流動状態Csij(T1+ΔTsi)を誤差Si以
内で予測できるように、可変予測パラメータAsis′(T
1+ΔTsi+ΔT1si)を演算し、可変サブ予測手段12
3の可変サブパラメータAsis(T1)と入れ替える。In the sub-parameter calculation means 221,
The fixed sub-prediction means 122 reads the upstream data Isij (T1) and predicts the merged part flow state Csij ″ (T1 + ΔTsi) considering only the flow state at the upstream point. The merging section flow state Csij ″ (T1 + ΔTsi) and the basin data Isik (T1) considering only the flow state at the upstream point predicted by the means 122
From the above, the variable prediction parameter Asis' (T is set so that the flow state Csij (T1 + ΔTsi) of the merging portion can be predicted within the error Si.
1 + ΔTsi + ΔT1si), and the variable sub-prediction unit 12
Replace with the variable sub-parameter Asis (T1) of 3.
【0093】または、図7の実施例2と同様に、合流部
流動状態の予測値Csij′(T1+ΔTsi)を判定手段10
4に送信し、運転支援情報および合流部流動状態の予測
値と各実測値とから、数式(1)および数式(2)に基づ
き、運転支援情報の誤差および合流部流動状態の誤差を
計算してもよい。合流部流動状態の誤差が予め定めた基
準値Siよりも大きい場合、合流部流動状態の予測精度
を上げる必要があるので、可変予測パラメータAsis(T
1)の修正命令をサブパラメータ演算手段221に送信す
る。この修正命令をサブパラメータ演算手段221が読
み込むと、判定手段104がない場合と同様に、可変予
測パラメータAsis′(T1+ΔTsi+ΔT1si)を演算
し、可変サブ予測手段123の可変サブパラメータAsi
s(T1)と入れ替える。Alternatively, as in the second embodiment shown in FIG. 7, the determination means 10 determines the predicted value Csij ′ (T1 + ΔTsi) of the flow state at the junction.
4 to calculate the error of the driving support information and the error of the merging section flow state from the driving support information and the predicted value of the merging section flow state and each measured value, based on Equations (1) and (2). May be. If the error in the flow condition at the junction is larger than a predetermined reference value Si, it is necessary to improve the prediction accuracy of the flow condition at the junction, so the variable prediction parameter Asis (T
The correction command of 1) is transmitted to the sub-parameter calculation means 221. When the sub-parameter calculation means 221 reads this correction instruction, the variable prediction parameter Asis ′ (T1 + ΔTsi + ΔT1si) is calculated as in the case where the determination means 104 is not provided, and the variable sub-parameter Asi of the variable sub-prediction means 123 is calculated.
Replace with s (T1).
【0094】さらに、図5の実施例と同様に、上流側の
合流部流動状態の予測値を用いて下流側の合流部流動状
態を予測してもよい。このとき、図4に示すように、合
流部hから合流部iにかけての流入幹線の上流端を合流
部hとし下流端を合流部iとすれば、合流部hでの流動
状態(例えば流量)Csh(T1)が距離Δyだけ離れた合流部
iに及ぼす影響(例えば流出量)および時刻は、合流部h
から合流部iまでの流入幹線への流入状態による影響を
無視すれば、簡単な経験式Fmで表現できる。すなわ
ち、合流部iでの流動状態の合流部hでの流動状態のみ
を考慮した予測値Csih″(T1+ΔTsh)は、
Csih″(T1+ΔTsh)=Fm(Csh(T1),Δy) (4)
で表現できる。一般に、経験式Fmは、上流地点での流
動状態と合流部までの距離との関数である。Further, similar to the embodiment of FIG. 5, the downstream merged portion flow state may be predicted by using the predicted value of the upstream merged fluid state. At this time, as shown in FIG. 4, if the upstream end of the inflow trunk line from the merging portion h to the merging portion i is the merging portion h and the downstream end is the merging portion i, the flow state (eg, flow rate) at the merging portion h The influence of Csh (T1) on the confluence part i separated by the distance Δy (for example, the outflow amount) and the time are as follows.
If ignoring the effect of the inflow state on the inflow trunk line from the to the confluence part i, it can be expressed by a simple empirical formula Fm. That is, the predicted value Csih ″ (T1 + ΔTsh) considering only the flow state of the flow state at the merge portion i is expressed by Csih ″ (T1 + ΔTsh) = Fm (Csh (T1), Δy) (4) it can. In general, the empirical formula Fm is a function of the flow state at the upstream point and the distance to the junction.
【0095】各合流部間の流入幹線が下流端の合流部に
及ぼす影響は、上流端の合流部での流動状態と合流部間
での流入幹線の流動状態に影響する周辺の状態を考慮す
ればよいので、支流と同様に扱うことができる。すなわ
ち、図12において、上流データとして上流側の合流部
流動状態を使用し、合流部流動状態として下流側の合流
部流動状態を使用し、固定サブ予測手段では、関数Fs
に変えてFmを使用すればよい。The influence of the inflow trunk line between the merging portions on the merging portion at the downstream end should be considered in consideration of the flow state at the merging portion at the upstream end and the peripheral state that affects the flow state of the inflow trunk line between the merging portions. It can be treated like a tributary, since it is enough. That is, in FIG. 12, the upstream merging portion flow state is used as the upstream data, and the downstream merging portion flow state is used as the merging portion flow state, and the fixed sub-prediction means uses the function Fs.
You can use Fm instead of.
【0096】図13は、各合流部の流入幹線を支流と同
様に扱い、上流側の合流部流動状態の予測値を用いて、
下流側の合流部流動状態を予測する手段の構成の一例を
示すブロック図である。図13において、予測手段10
1は、複数の下流端流動状態予測手段124を備えてい
る。例えば、下流端iの流動状態を予測する場合に、下
流端流動状態予測手段124は、上流側での合流部流動
状態の予測値Csh″(T1+ΔTsh)を読み込み、関数Fm
を用いて、上流側での合流部流動状態による下流側での
合流部流動状態Csi″(T1+ΔTsh)を予測する。次
に、上記予測値Csi″(T1+ΔTsh)と、サブ予測手段
121で予測された支流の影響による合流部流動状態の
予測値とから、下流端での合流部流動状態Csi′(T1+
ΔTsi)を予測する。この予測値Csi′(T1+ΔTsi)
は、さらに、下流の合流部流動状態Csj′(T1+ΔTs
j)を予測するために用いる。最後の下流端は、排水機場
の直前であり、ここでの流動状態は、運転支援情報に対
応する。In FIG. 13, the inflow trunk line of each junction is treated in the same manner as a tributary, and the predicted value of the flow state of the upstream junction is used to
It is a block diagram which shows an example of a structure of the means which estimates the downstream junction flow state. In FIG. 13, the prediction means 10
1 includes a plurality of downstream end flow state prediction means 124. For example, when predicting the flow state of the downstream end i, the downstream end flow state predicting means 124 reads the predicted value Csh ″ (T1 + ΔTsh) of the flow state at the merging portion on the upstream side, and the function Fm.
Is used to predict the confluent flow state Csi ″ (T1 + ΔTsh) on the downstream side due to the confluent flow state on the upstream side. Next, the predicted value Csi ″ (T1 + ΔTsh) is predicted by the sub-prediction means 121. From the predicted value of the confluence flow state due to the effect of the tributary, the confluence state Csi ′ (T1 +
Predict ΔTsi). This predicted value Csi ′ (T1 + ΔTsi)
Is the flow state Csj ′ (T1 + ΔTs
Used to predict j). The last downstream end is just before the drainage pump station, and the flow state here corresponds to the driving support information.
【0097】実施例3では、サブ予測手段を、上流地点
での流動状態のみを考慮した固定サブ予測手段と、上流
地点から合流部までの支流への流入状態を考慮する可変
サブ予測手段とに分割している。固定サブ予測手段は、
予め定めた物理モデルを使用して合流部の流動状態を予
測し、可変サブ予測手段では、過去の流動状態から演算
した可変サブパラメータを使用して予測する。過去の流
動状態に依存する可変サブパラメータだけで予測する場
合には、過去の流動状態と全く異なる流動状態に対して
は、予測誤差が大きくなる可能性がある。固定サブ予測
手段を使用すると、合流部の流動状態に対して支配的な
上流地点での流動状態の影響を普遍的な物理モデルで予
測するので、突発的な流動状態に対しても予測誤差は小
さく、台風時などにも、適切に運転支援できる。ただ
し、物理モデルだけで全ての流動状態に対して高精度に
予測することは困難なので、物理モデルの結果に対する
修正および上流地点から合流部までの支流への流入状態
を考慮するため、可変サブ予測手段を併用することが望
ましい。In the third embodiment, the sub-prediction means is a fixed sub-prediction means considering only the flow state at the upstream point, and a variable sub-prediction means considering the inflow state into the tributary from the upstream point to the confluence. It is divided. The fixed sub-prediction means
The flow state of the merging portion is predicted using a predetermined physical model, and the variable sub-prediction means uses the variable sub-parameter calculated from the past flow state to make the prediction. When the prediction is performed using only the variable subparameters that depend on the past flow state, the prediction error may be large for a flow state that is completely different from the past flow state. When the fixed sub-prediction method is used, the influence of the flow state at the upstream point, which is dominant on the flow state at the confluence, is predicted by a universal physical model, so there is no prediction error even for sudden flow states. It is small and can provide appropriate driving assistance even during typhoons. However, since it is difficult to predict all flow states with high accuracy using only the physical model, the variable sub-prediction is used in order to correct the results of the physical model and to consider the inflow state into the tributary from the upstream point to the confluence. It is desirable to use the means together.
【0098】《実施例4》図14と図15とを参照し
て、本発明の流動予測システムを交通流動予測システム
に適用した実施例4を説明する。Fourth Embodiment A fourth embodiment in which the flow prediction system of the present invention is applied to a traffic flow prediction system will be described with reference to FIGS. 14 and 15.
【0099】図14は、本発明の流動予測システムを交
通流動予測システムに適用した実施例4の予測対象であ
る交差点周辺の流動状態を説明する図である。複数の交
差点がある場合、各交差点での支線道路から本線道路へ
の車の合流,分岐を予測し、下流側での本線道路におけ
る本流状態すなわち交通状態を予測する。FIG. 14 is a diagram for explaining a flow state around an intersection which is a prediction target of the fourth embodiment in which the flow prediction system of the present invention is applied to the traffic flow prediction system. When there are a plurality of intersections, the merging and branching of vehicles from the branch road to the main road at each intersection is predicted, and the mainstream condition, that is, the traffic condition on the downstream main road is predicted.
【0100】図15は、本発明による交通流動予測シス
テムの実施例4の構成の一例を示すブロック図である。
図15の交通流動予測システムは、データ入力部102
と、データ入力部102からのデータおよび所定の予測
パラメータAm,Asiに基づき流動状態を予測する予測
手段101と、予測手段101で予測した流動状態を出
力するデータ出力部105と、データ入力部102から
のデータおよび予測手段101からの予測データに基づ
いて予測手段101で使用する予測パラメータを修正す
るかどうかの判定をする判定手段104と、データ入力
部102からの入力データに基づいて予測パラメータを
演算し新しい予測パラメータを予測手段に送信する演算
手段201とを備えている。FIG. 15 is a block diagram showing an example of the configuration of the fourth embodiment of the traffic flow prediction system according to the present invention.
The traffic flow prediction system of FIG.
Predicting means 101 for predicting a flow state based on the data from the data input section 102 and predetermined prediction parameters Am, Asi, a data output section 105 for outputting the flow state predicted by the predicting means 101, and a data input section 102. Determination means 104 for determining whether to correct the prediction parameter used in the prediction means 101 based on the data from the data and the prediction data from the prediction means 101, and the prediction parameter based on the input data from the data input unit 102. And a calculation means 201 for calculating and transmitting a new prediction parameter to the prediction means.
【0101】予測手段101は、サブ予測手段121と
メイン予測手段111とを備えており、各予測手段は、
それぞれ交差点での流入,流出状態を予測するサブパラ
メータと本流状態を予測するメインパラメータを備えて
いる。サブ予測手段121では、時刻T=T1に交差点
の上流状態Ui(T1),流入状態IDi(T1),IUi(T
1),流出状態ODi(T1),OUi(T1)を読み込み、時刻
T=T1に至るまでの過去の上流状態,流入状態,流出
状態,時刻T=T1におけるサブパラメータAsi(T1)に
基づいて、ΔTi後の時刻T=T1+ΔTiでの流入状
態,流出状態の予測値IDi′(T1+ΔTi),IUi′
(T1+ΔTi),ODi′(T1+ΔTi),OUi′(T1+Δ
Ti)を予測する。メイン予測手段111では、時刻T=
T1に流入,流出状態IDi(T1),IUi(T1),ODi
(T1),OUi(T1)と本流状態Ri(T1)とを読み込み、
時刻T=T1に至るまでの過去の流入,流出状態と本流
状態,さらに今予測した本流状態の予測値の時刻T=T
1からT1+ΔTiに至るまでの予測結果を使用し、時刻
T=T1におけるメインパラメータAm(T1)を用いて、
ΔTri後の時刻T=T1+ΔTriでの本流状態Ri′(T1
+ΔTri)を予測する。予測された本流状態は、データ
出力部105に送信され、外部に出力される。The predicting means 101 comprises a sub predicting means 121 and a main predicting means 111, and each predicting means is
Each has subparameters that predict the inflow and outflow conditions at the intersection and main parameters that predict the mainstream condition. In the sub-prediction means 121, at time T = T1, the intersection upstream state Ui (T1), inflow state IDi (T1), IUi (T
1), the outflow state ODi (T1), OUi (T1) is read, and based on the past upstream state until the time T = T1, the inflow state, the outflow state, and the subparameter Asi (T1) at the time T = T1. , Predicted value IDi ′ (T1 + ΔTi) of inflow state and outflow state at time T = T1 + ΔTi after ΔTi, IUi ′
(T1 + ΔTi), ODi ′ (T1 + ΔTi), OUi ′ (T1 + ΔTi
Predict Ti). In the main prediction means 111, time T =
Inflow / outflow status IDi (T1), IUi (T1), ODi
(T1), OUi (T1) and mainstream state Ri (T1) are read,
Time T = T of the predicted value of the past inflow / outflow state and the mainstream state until the time T = T1 and the mainstream state just predicted.
Using the prediction results from 1 to T1 + ΔTi, using the main parameter Am (T1) at time T = T1,
The mainstream state Ri ′ (T1 at time T = T1 + ΔTri after ΔTri
Predict + ΔTri). The predicted mainstream state is transmitted to the data output unit 105 and output to the outside.
【0102】判定手段104においては、予測手段10
1で予測した予測データの誤差を計算する。誤差判定に
ついては、実施例2と同様になされ、各流入,流出状態
の実測値と予測値を比較しまたは本流状態の予測値と実
測値を比較し、その誤差が所定の基準値より大きけれ
ば、サブパラメータまたはメインパラメータの演算を実
行するような修正命令を演算手段201に送る。In the judging means 104, the predicting means 10
The error of the prediction data predicted in 1 is calculated. The error determination is performed in the same manner as in the second embodiment, and the measured value and the predicted value of each inflow and outflow state are compared, or the predicted value and the measured value of the mainstream state are compared, and if the error is larger than a predetermined reference value. , A correction command for executing the calculation of the sub parameter or the main parameter is sent to the calculation means 201.
【0103】演算手段201は、サブパラメータを演算
するサブパラメータ演算手段221と、メインパラメー
タを演算するメインパラメータ演算手段211とを備え
ている。サブパラメータ演算手段221では、上流状態
から流入,流出状態が所定の基準値以内の誤差で計算で
きるように、サブパラメータを演算する。メインパラメ
ータ演算手段211では、流入,流出状態および上流の
本流状態から、下流側の本流状態が所定の基準値以内の
誤差で計算できるように、メインパラメータを演算す
る。演算後のサブパラメータまたはメインパラメータを
予測手段101のサブパラメータおよびメインパラメー
タと入れ替える。The calculating means 201 comprises a sub-parameter calculating means 221 for calculating a sub-parameter and a main parameter calculating means 211 for calculating a main parameter. The sub-parameter calculation means 221 calculates the sub-parameter so that the inflow and outflow states can be calculated with an error within a predetermined reference value from the upstream state. The main parameter calculation means 211 calculates the main parameter from the inflow / outflow state and the upstream mainstream state so that the downstream mainstream state can be calculated with an error within a predetermined reference value. The calculated sub-parameters or main parameters are replaced with the sub-parameters and main parameters of the prediction means 101.
【0104】以上の実施例によれば、流入,流出状態お
よび本流状態の予測と並列に、実測データに基づいてそ
れぞれの予測パラメータを修正し、予測が所定の誤差以
内になるようにできる。そのため、事前には学習の困難
な突発的な交通状態の変化,例えばゴールデンウイーク
やお盆の帰省ラッシュ等の交通渋滞も適切に予測でき
る。According to the above embodiment, the prediction parameters can be corrected in parallel with the prediction of the inflow / outflow state and the mainstream state based on the actually measured data so that the prediction is within a predetermined error. Therefore, it is possible to appropriately predict sudden changes in traffic conditions that are difficult to learn in advance, such as traffic jams such as Golden Week and homecoming rush hours at Obon.
【0105】[0105]
【発明の効果】本発明によれば、予測した下流の目標流
動状態と下流の実測流動状態とを逐次比較し、比較結果
に基づいて、予測するための予測パラメータを更新する
ので、突発的な流動状態に対しても下流の流動状態を適
切に予測できる流動予測システムが得られる。例えば、
流入,流出状態および本流状態の予測と並列で、実測デ
ータに基づいてそれぞれの予測パラメータを修正し、予
測が所定の誤差以内になるようにしている。そのため、
事前には学習の困難な突発的な交通状態の変化すなわち
連休時などの交通渋滞も適切に予測できる。According to the present invention, the predicted downstream target flow state and the downstream actually measured flow state are sequentially compared, and the prediction parameter for prediction is updated based on the comparison result. It is possible to obtain a flow prediction system that can appropriately predict the downstream flow condition even with respect to the flow condition. For example,
In parallel with the prediction of the inflow / outflow state and the mainstream state, each prediction parameter is corrected based on the actual measurement data so that the prediction falls within a predetermined error. for that reason,
It is possible to appropriately predict sudden changes in traffic conditions that are difficult to learn in advance, that is, traffic congestion such as during consecutive holidays.
【図1】本発明による排水機場運転支援システムの実施
例1の構成を示すブロック図である。FIG. 1 is a block diagram showing a configuration of a drainage pump station driving support system according to a first embodiment of the present invention.
【図2】図1の排水機場運転支援システムの支援手順の
一例を示すフローチャートである。FIG. 2 is a flowchart showing an example of a support procedure of the drainage pumping station operation support system of FIG.
【図3】運転支援システムのデータの入出力関係を示す
図である。FIG. 3 is a diagram showing a data input / output relationship of a driving support system.
【図4】支流データと予測流量との関係の一例を示す図
である。FIG. 4 is a diagram showing an example of a relationship between tributary data and a predicted flow rate.
【図5】図1に示すサブ予測手段を各管渠毎に分割した
構成を示すブロック図である。5 is a block diagram showing a configuration in which the sub-prediction unit shown in FIG. 1 is divided into pipes.
【図6】図5のシステムの支援手順を示すフローチャー
トである。FIG. 6 is a flowchart showing a support procedure of the system of FIG.
【図7】本発明による排水機場運転支援システムの実施
例2の構成を示すブロック図である。FIG. 7 is a block diagram showing a configuration of a drainage pump station driving support system according to a second embodiment of the present invention.
【図8】図7の排水機場運転支援システムの支援手順を
示すフローチャートである。8 is a flowchart showing a support procedure of the drainage pumping station operation support system of FIG.
【図9】判定手順の詳細を示す図である。FIG. 9 is a diagram showing details of a determination procedure.
【図10】図7に示すサブ予測手段を各管渠毎に分割し
た構成を示す図である。10 is a diagram showing a configuration in which the sub-prediction unit shown in FIG. 7 is divided into pipes.
【図11】図7のシステムの支援手順を示すフローチャ
ートである。11 is a flowchart showing a support procedure of the system of FIG.
【図12】本発明による排水機場運転支援システムの実
施例3の構成を示すブロック図である。FIG. 12 is a block diagram showing a configuration of a drainage pump station driving support system according to a third embodiment of the present invention.
【図13】各合流部の流入幹線を支流と同様に扱い、上
流側の合流部流動状態の予測値を用いて、下流側の合流
部流動状態を予測する手段の構成の一例を示すブロック
図である。FIG. 13 is a block diagram showing an example of a configuration of means for predicting a downstream junction flow state by using an upstream main junction flow state as a tributary and using an upstream junction flow state prediction value; Is.
【図14】本発明の流動予測システムを交通流動予測シ
ステムに適用した実施例4の予測対象である交差点周辺
の流動状態を説明する図である。FIG. 14 is a diagram illustrating a flow state around an intersection, which is a prediction target of Example 4 in which the flow prediction system of the present invention is applied to a traffic flow prediction system.
【図15】本発明による交通流動予測システムの実施例
4の構成の一例を示すブロック図である。FIG. 15 is a block diagram showing an example of the configuration of a fourth embodiment of the traffic flow prediction system according to the present invention.
【図16】管渠網および河川網と排水機場の関係を示す
図である。FIG. 16 is a diagram showing a relationship between a pipe network and a river network and a drainage pump station.
101 予測手段 102 データ入力部 103 運転支援部 104 判定手段 111 メイン予測手段 121 サブ予測手段 122 固定合流部流動状態予予測手段 123 可変合流部流動状態予予測手段 124 下流端流動状態予測手段 201 演算手段 211 メインパラメータ演算手段 221 サブパラメータ演算手段 223 可変予測パラメータ演算手段 101 Prediction means 102 data input section 103 Driving Support Department 104 determination means 111 Main prediction means 121 Sub prediction means 122 Fixed Confluence Part Flow Condition Prediction Means 123 Variable Confluence Part Flow State Prediction Means 124 Downstream end flow state prediction means 201 computing means 211 Main parameter calculation means 221 Sub-parameter calculation means 223 Variable prediction parameter calculation means
───────────────────────────────────────────────────── フロントページの続き (56)参考文献 特開 平3−134703(JP,A) 特開 平9−95917(JP,A) 特開 平5−250007(JP,A) 特開 平4−34602(JP,A) 特開 平7−98794(JP,A) 特開 平8−123538(JP,A) (58)調査した分野(Int.Cl.7,DB名) G05B 13/04 E02B 1/00 G08G 1/00 G06F 17/00 ─────────────────────────────────────────────────── --Continued front page (56) Reference JP-A-3-134703 (JP, A) JP-A-9-95917 (JP, A) JP-A-5-250007 (JP, A) JP-A-4- 34602 (JP, A) JP-A-7-98794 (JP, A) JP-A-8-123538 (JP, A) (58) Fields investigated (Int.Cl. 7 , DB name) G05B 13/04 E02B 1 / 00 G08G 1/00 G06F 17/00
Claims (8)
し流体や交通などの下流の流動状態を予測する流動予測
システムにおいて、 前記流動予測システムが、流体や交通などの上流の流動
状態および所定の予測パラメータに基づいて流体や交通
などの下流の目標流動状態を予測する予測手段と、流体
や交通などの上流の流動状態および下流の実測流動状態
に基づいて前記予測手段で使用する前記予測パラメータ
を演算する演算手段とを備え、 前記予測手段における下流の目標流動状態の予測と演算
手段における予測パラメータとを並列処理で作成し、 前記予測手段による予測値と前記下流の実測流動状態と
を比較し、誤差が所定値より大きい場合は前記実測流動
状態値を前記予測パラメータとして用い、前記誤差が所
定値以内である場合は前記演算された予測パラメータを
用いる判定手段を備えた ことを特徴とする流動予測シス
テム。1. The upstream flow condition of fluid, traffic, etc. is monitored.
Flow prediction for predicting downstream flow conditions such as fluid and traffic
In the system, The flow prediction system is used for upstream flows such as fluid and traffic.
Fluids and traffic based on conditions and predetermined predictive parameters
Prediction means for predicting downstream target flow conditions such as
Flow condition of upstream and traffic and measured flow condition of downstream
The prediction parameter used in the prediction means based on
And a calculation means for calculating Prediction and calculation of downstream target flow state in the prediction means
Parallel processing with prediction parametersmake, The predicted value by the predicting means and the measured flow state of the downstream
If the error is larger than the specified value, the measured flow
Using the state value as the prediction parameter, the error
If it is within the fixed value, the calculated prediction parameter is
Equipped with determination means to use Flow prediction system characterized by
Tem.
し流体や交通などの下流の流動状態を予測する流動予測
システムにおいて、 前記流動予測システムが、流体や交通などの上流の流動
状態および所定の予測パラメータに基づいて流体や交通
などの下流の目標流動状態を予測する予測手段と、流体
や交通などの上流の流動状態,下流の実測流動状態,前
記予測手段による下流の目標流動状態に基づいて前記予
測手段で使用する前記予測パラメータを演算する演算手
段とを備え、 前記予測手段における下流の目標流動状態の予測と演算
手段における予測パラメータとを並列処理で作成し、 前記予測手段による予測値と前記下流の実測流動状態と
を比較し、誤差が所定値より大きい場合は前記実測流動
状態値を前記予測パラメータとして用い、前記誤差が所
定値以内である場合は前記演算された予測パラメータを
用いる判定手段を備えた ことを特徴とする流動予測シス
テム。2. The upstream flow condition of fluid, traffic, etc. is monitored.
Flow prediction for predicting downstream flow conditions such as fluid and traffic
In the system, The flow prediction system is used for upstream flows such as fluid and traffic.
Fluids and traffic based on conditions and predetermined predictive parameters
Prediction means for predicting downstream target flow conditions such as
Flow condition of upstream such as traffic and traffic, measured flow condition of downstream, before
Based on the target flow state of the downstream by the prediction means,
A calculator for calculating the prediction parameters used in the measuring means
With steps and Prediction and calculation of downstream target flow state in the prediction means
Parallel processing with prediction parametersmake, The predicted value by the predicting means and the measured flow state of the downstream
If the error is larger than the specified value, the measured flow
Using the state value as the prediction parameter, the error
If it is within the fixed value, the calculated prediction parameter is
Equipped with determination means to use Flow prediction system characterized by
Tem.
し流体や交通などの下流の流動状態を予測する流動予測
システムにおいて、 前記流動予測システムが、流体や交通などの上流の流動
状態および所定の予測パラメータに基づいて流体や交通
などの下流の目標流動状態を予測する予測手段と、流体
や交通などの上流の流動状態および下流の実測流動状態
に基づいて前記予測手段で使用する前記予測パラメータ
を演算する演算手段と、前記予測手段による予測値と前
記下流の実測流動状態とを比較し前記演算手段で予測パ
ラメータを演算するか否かを判定する判定手段とを備
え、 前記比較による誤差が所定値より大きい場合は前記実測
流動状態値を前記予測パラメータとして用い、前記誤差
が所定値以内である場合は前記演算された予測パラメー
タを用いる ことを特徴とする流動予測システム。3. An upstream flow condition of fluid, traffic, etc. is monitored.
Flow prediction for predicting downstream flow conditions such as fluid and traffic
In the system, The flow prediction system is used for upstream flows such as fluid and traffic.
Fluids and traffic based on conditions and predetermined predictive parameters
Prediction means for predicting downstream target flow conditions such as
Flow condition of upstream and traffic and measured flow condition of downstream
The prediction parameter used in the prediction means based on
Calculating means for calculating
The flow rate is measured by comparing the measured flow state in the downstream with the calculation means.
And a determination means for determining whether or not to calculate the parameterEquipment
e, If the error due to the comparison is larger than a predetermined value, the actual measurement is performed.
Using the flow state value as the prediction parameter, the error
If is within a predetermined value, the calculated prediction parameter is calculated.
Use A flow prediction system characterized in that
し流体や交通などの下流の流動状態を予測する流動予測
システムにおいて、 前記流動予測システムが、流体や交通などの上流の流動
状態および所定の予測パラメータに基づいて流体や交通
などの下流の目標流動状態を予測する予測手段と、流体
や交通などの上流の流動状態,下流の実測流動状態,前
記予測手段による下流の目標流動状態に基づいて前記予
測手段で使用する前記予測パラメータを演算する演算手
段と、前記予測手段による予測値と前記下流の実測流動
状態とを比較し前記演算手段で予測パラメータを演算す
るか否かを判定する判定手段とを備え、 前記比較による誤差が所定値より大きい場合は前記実測
流動状態値を前記予測パラメータとして用い、前記誤差
が所定値以内である場合は前記演算された予測パラメー
タを用いる ことを特徴とする流動予測システム。4. The upstream flow condition of fluid, traffic, etc. is monitored.
Flow prediction for predicting downstream flow conditions such as fluid and traffic
In the system, The flow prediction system is used for upstream flows such as fluid and traffic.
Fluids and traffic based on conditions and predetermined predictive parameters
Prediction means for predicting downstream target flow conditions such as
Flow condition of upstream such as traffic and traffic, measured flow condition of downstream, before
Based on the target flow state of the downstream by the prediction means,
A calculator for calculating the prediction parameters used in the measuring means
Stage, the predicted value by the predicting means and the measured flow downstream
Comparing with the state and calculating the prediction parameter by the calculating means
And the determination means to determine whether or notPrepare, If the error due to the comparison is larger than a predetermined value, the actual measurement is performed.
Using the flow state value as the prediction parameter, the error
If is within a predetermined value, the calculated prediction parameter is calculated.
Use A flow prediction system characterized in that
の流動予測システムにおいて、 前記予測手段が、各合流部または各分岐部毎の流動状態
を予測するための複数のサブ予測手段と、下流の目標流
動状態を予測するためのメイン予測手段とからなること
を特徴とする流動予測システム。5. The flow prediction system according to any one of claims 1 to 4, wherein the prediction means includes a plurality of sub-prediction means for predicting a flow state of each confluence part or each branch part. And a main prediction means for predicting a downstream target flow state.
し流体や交通などの下流の流動状態を予測する流動予測
システムにおいて、 前記流動予測システムが、流体や交通などの上流の流動
状態および所定の予測パラメータに基づいて流体や交通
などの下流の目標流動状態を予測する予測手段と、流体
や交通などの上流の流動状態および下流の実測流動状態
に基づいて前記予測手段で使用する前記予測パラメータ
を演算する演算手段とを備え、 前記予測手段が、各合流部または各分岐部毎の流動状態
を予測する複数のサブ予測手段と、下流の目標流動状態
を予測するメイン予測手段とからなり、 前記予測手段による予測値と前記下流の実測流動状態と
を比較し、誤差が所定値より大きい場合は前記実測流動
状態値を前記予測パラメータとして用い、前記誤差が所
定値以内である場合は前記演算された予測パラメータを
用いる判定手段を備えた ことを特徴とする流動予測シス
テム。6. The upstream flow condition of fluid, traffic, etc. is monitored.
Flow prediction for predicting downstream flow conditions such as fluid and traffic
In the system, The flow prediction system is used for upstream flows such as fluid and traffic.
Fluids and traffic based on conditions and predetermined predictive parameters
Prediction means for predicting downstream target flow conditions such as
Flow condition of upstream and traffic and measured flow condition of downstream
The prediction parameter used in the prediction means based on
And a calculation means for calculating The predicting means is a flow state of each merging portion or each branching portion.
Of multiple sub-prediction means for predicting the
Main prediction means to predictConsists of The predicted value by the predicting means and the measured flow state of the downstream
If the error is larger than the specified value, the measured flow
Using the state value as the prediction parameter, the error
If it is within the fixed value, the calculated prediction parameter is
Equipped with determination means to use Flow prediction system characterized by
Tem.
いて、 前記予測手段が、上流側の合流部または分岐部の流動状
態の予測値に基づいて下流側の合流部または分岐部の目
標流動状態を予測する手段であることを特徴とする流動
予測システム。7. The flow predicting system according to claim 6, wherein the predicting unit is a target flow state of the downstream merging portion or the branch portion based on a predicted value of a flow state of the upstream merging portion or the branch portion. A flow forecasting system characterized by being a means for forecasting.
の流動予測システムにおいて、 前記予測手段が、各合流部または各分岐部または下流の
目標流動状態を予測するための固定パラメータを備えた
固定サブ予測手段を含むことを特徴とする流動予測シス
テム。8. The flow predicting system according to claim 5, wherein the predicting unit includes a fixed parameter for predicting a target flow state at each of the merging portions, each of the branch portions, or the downstream. A flow forecasting system comprising fixed sub forecasting means.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP13202697A JP3379008B2 (en) | 1997-05-22 | 1997-05-22 | Flow forecasting system |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP13202697A JP3379008B2 (en) | 1997-05-22 | 1997-05-22 | Flow forecasting system |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH10320007A JPH10320007A (en) | 1998-12-04 |
| JP3379008B2 true JP3379008B2 (en) | 2003-02-17 |
Family
ID=15071773
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP13202697A Expired - Fee Related JP3379008B2 (en) | 1997-05-22 | 1997-05-22 | Flow forecasting system |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3379008B2 (en) |
Families Citing this family (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2002001381A (en) * | 2000-06-27 | 2002-01-08 | Mitsubishi Electric Corp | Sewage treatment system and drainage control system |
| JP4988789B2 (en) * | 2009-05-19 | 2012-08-01 | インターナショナル・ビジネス・マシーンズ・コーポレーション | Simulation system, method and program |
| CN103245980A (en) * | 2012-02-10 | 2013-08-14 | 王学永 | Portable rain gauge calibration system |
| JP5801227B2 (en) * | 2012-03-13 | 2015-10-28 | 株式会社東芝 | Rainwater treatment system and rainwater treatment method |
| WO2018131311A1 (en) | 2017-01-10 | 2018-07-19 | 日本電気株式会社 | Sensing system, sensor node device, sensor measurement value processing method, and program |
| WO2018216051A1 (en) * | 2017-05-22 | 2018-11-29 | 日本電気株式会社 | Estimation device, estimation method, and program recording medium |
| JP7347918B2 (en) * | 2017-11-20 | 2023-09-20 | 日本無線株式会社 | Water level prediction method, water level prediction program, and water level prediction device |
| JP2022087906A (en) * | 2020-12-02 | 2022-06-14 | 株式会社東芝 | Traffic state prediction device and traffic state prediction method |
| CN116029467A (en) * | 2023-03-29 | 2023-04-28 | 清华大学 | Flow Prediction Method of Ditch Pond Gate Based on Sequence Model |
-
1997
- 1997-05-22 JP JP13202697A patent/JP3379008B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JPH10320007A (en) | 1998-12-04 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR910009261B1 (en) | Apparatus and method for controlling operation of storm sewage pump | |
| Nanthawichit et al. | Application of probe-vehicle data for real-time traffic-state estimation and short-term travel-time prediction on a freeway | |
| KR100981331B1 (en) | Comprehensive monitoring diagnostic device | |
| JP5289474B2 (en) | Rainwater drainage support control device | |
| CN108009736A (en) | A kind of water quality early-warning and predicting system and water quality early-warning and predicting method | |
| JP3379008B2 (en) | Flow forecasting system | |
| JP6976198B2 (en) | Simulation device and rainwater monitoring system using the simulation device | |
| JP7795450B2 (en) | Inflow prediction system | |
| JP4399122B2 (en) | Rainwater inflow prediction device | |
| JP2000087433A (en) | Operation control system for rainwater storage facilities | |
| JP5270322B2 (en) | Sewerage facility inundation countermeasure system | |
| CN116380153A (en) | An urban waterlogging monitoring and early warning system and early warning method | |
| JP4755912B2 (en) | Rainwater drainage support control device | |
| JP3279703B2 (en) | Inflow water prediction method and inflow water prediction device | |
| TWM607552U (en) | Intelligent monitoring and control system for sewage | |
| JP3294074B2 (en) | Rainwater pump control device and control method | |
| JPH0626093A (en) | Rain water pump operation supporting system | |
| JP3437700B2 (en) | Pump station inflow prediction support device | |
| JP2007016551A (en) | Operation management system for combined sewage systems | |
| JP2002001381A (en) | Sewage treatment system and drainage control system | |
| JPH09204218A (en) | Plant monitoring equipment | |
| JPH08100771A (en) | River drainage pump operation support system | |
| JP2000204642A (en) | Method and apparatus for detecting unknown water in relay pumping station | |
| JPH0476637B2 (en) | ||
| CN115538550A (en) | Rainwater regulation and storage control system and method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| LAPS | Cancellation because of no payment of annual fees |