JP3395448B2 - Material testing machine - Google Patents
Material testing machineInfo
- Publication number
- JP3395448B2 JP3395448B2 JP11726695A JP11726695A JP3395448B2 JP 3395448 B2 JP3395448 B2 JP 3395448B2 JP 11726695 A JP11726695 A JP 11726695A JP 11726695 A JP11726695 A JP 11726695A JP 3395448 B2 JP3395448 B2 JP 3395448B2
- Authority
- JP
- Japan
- Prior art keywords
- data
- sampling
- test
- ram
- stored
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
Description
【発明の詳細な説明】
【0001】
【産業上の利用分野】本発明は、材料の各種試験を行っ
た結果を所定のサンプリング周期でサンプリングした後
にデータ解析する材料試験機に関する。
【0002】
【従来の技術】材料試験機(以下、計測装置と呼ぶ)で
荷重−変位特性の試験等を行い、その試験結果をデータ
処理装置に伝送してデータ解析を行う材料試験機システ
ムが知られている(例えば、特公平5-20690号公報参
照)。
【0003】上記公報に記載された材料試験機システム
では、図10の実線で示す試験結果データを所定のサン
プリング周期(図示の黒丸)でサンプリングして計測装
置内部のRAMに逐次格納するとともに、n個に1個の
割合(図示の白丸)でサンプリングデータを抽出してデ
ータ処理装置に伝送し、試験終了後にRAMに格納され
ているすべてのデータをデータ処理装置に伝送してい
る。このようにすることで、計測装置で試験を行いなが
らデータ処理装置でリアルタイムに大雑把なデータ解析
を行うことができ、また、必要な部分については試験終
了後に細かいデータ解析を行うことができる。
【0004】
【発明が解決しようとする課題】例えば引張試験を行う
場合には、同一荷重をかけたときの試料の伸びは試料の
材質により異なるため、試料の材質を考慮に入れて伸び
をサンプリングするのが望ましい。すなわち、セラミッ
クスのように剛性の高い試料を試験する場合には、より
短い時間間隔でサンプリングした方が精度が向上する。
しかしながら、従来はサンプリング速度を常に一定にし
ていたため、試料の材質等によって精度がばらつく可能
性があった。
【0005】また、同一の試料を試験する場合でも、荷
重をかけ始めた直後とか、試料が破断する直前など、重
要な期間については短い時間間隔でサンプリングし、そ
れほど重要でない期間については大雑把にサンプリング
した方がメモリ容量を削減できる。しかしながら、従来
は試験中にサンプリング周期を変更できなかったため、
場合によっては試験終了前にRAMの記憶容量が満杯に
なるおそれがあった。また、仮に、サンプリング周期を
変更できるとしても、データ長およびRAMの記憶容量
がともに固定(例えば、データ長が20バイトでRAM
の記憶容量が512キロバイト)の場合、サンプリング
周期によってRAMが満杯になるまでの時間が異なるた
め、RAMが満杯になる時期を予測するのが難しかっ
た。
【0006】さらに、従来は、計測装置のRAMに格納
されているサンプリングデータを試験終了後にデータ処
理装置に伝送していたが、データ処理装置では、試験中
に計測装置から伝送されたデータと、試験終了後に計測
装置から伝送されたデータとを別々に管理していたた
め、一部のデータについては重複して持つことになり、
メモリ容量が増えるとともに、データの管理が複雑にな
るおそれがあった。
【0007】本発明の目的は、材料試験結果のサンプリ
ングおよびサンプリングデータの格納を効率よく行うこ
とができる材料試験機を提供することにある。
【0008】
【課題を解決するための手段】実施例を示す図1に対応
づけて本発明を説明すると、本発明は、計測装置10と
データ処理装置20とを備え、計測装置10側で所定の
サンプリング周期で各種データの採取を行うと同時に、
採取したデータを所定の時間間隔ごとにデータ処理装置
20に伝送する材料試験機において、計測装置10側に
設けられ第1のサンプリング周期で採取した各種データ
を記憶する第1の記憶手段18と、データ処理装置20
側に設けられ第1のサンプリング周期よりも長い第2の
サンプリング周期で採取した各種データを記憶する第2
の記憶手段23とを備え、第1および第2の記憶手段2
3に記憶されているサンプリングデータを重複データを
含まないように合成するデータ処理装置を設けることに
より、上記目的は達成される。
【0009】
【作用】請求項1に記載の発明では、計測装置10側に
第1の記憶手段18(例えば、RAMカード)を設け、
データ処理装置20側に第2の記憶手段23(例えば、
RAM)を設ける。第1の記憶手段18は第1のサンプ
リング周期で採取した各種データを記憶し、第2の記憶
手段23は第1のサンプリング周期よりも長い周期で採
取した各種データを記憶する。データ処理装置20は、
試験終了後に第1の記憶手段18に記憶されているサン
プリングデータを読み出して第2の記憶手段23に記憶
されているサンプリングデータと合成し、その際、重複
データを含まないようにする。
【0010】なお、本発明の構成を説明する上記課題を
解決するための手段と作用の項では、本発明を分かり易
くするために実施例の図を用いたが、これにより本発明
が実施例に限定されるものではない。
【0011】
【実施例】以下、図1〜9を参照して本発明の一実施例
を説明する。図1は、本実施例の材料試験機の概略構成
を示すブロック図である。同図に示す材料試験機は引張
・圧縮特性の試験などを行なうものであり、計測装置1
0およびデータ処理装置20で構成される。計測装置1
0およびデータ処理装置20はともにCPU11,21
ならびに読出し専用の固定メモリ(ROM)12,22
および書換え可能な可変メモリ(RAM)13,23を
備えている。また、計測装置10およびデータ処理装置
20は伝送インターフェース回路14,24を備えてお
り、伝送路Lを介して相互にデータの授受を行う。
【0012】計測装置10は、試料に働く荷重を測定す
るロードセル15と、荷重による試料の変形を測定する
伸び計16と、これら各計測器15,16のアナログ出
力をデジタル信号に変換するA/D変換器17と、RA
Mカード18の読出・書込を制御するカードリーダ19
とを備えている。このRAMカード18には、試験結果
を所定のサンプリング周期でサンプリングしたデータが
格納される。
【0013】一方、データ処理装置20はキーボード2
5と、CRT26と、X−Yプロッタ27とを備えてお
り、操作者は、このデータ処理装置20から計測装置1
0に対して各種の指令を出すとともに、CRT26によ
り解析結果を確認する。このデータ処理装置20は通
常、パーソナルコンピュータおよびその周辺装置で構成
される。
【0014】図2はデータ処理装置20のCPU21が
行う試験条件作成モード処理、図3,4はデータ処理装
置20のCPU21が行う試験モード処理、図5,6は
計測装置10のCPU11が行う試験制御処理を示すフ
ローチャートであり、以下これらのフローチャートに基
づいて本実施例の動作を説明する。
【0015】操作者がデータ処理装置20のキーボード
25を操作して試験条件作成モードを選択すると、CP
U21は図2の処理を開始する。図2のステップS1で
は、操作者のキーボード操作に基づいて通常の試験条
件、例えば試験内容や試料の種類等を設定する。ステッ
プS2では、操作者によるキーボード操作に基づいて、
試験結果データを採取する際のサンプリング周期、
計測装置10に接続されているRAMカード18の容
量、サンプリング1回当たりのサンプリングデータ長
を設定する。ステップS3では、ステップS1,S2で
設定した各種試験条件を、試験条件ファイルとしてRA
M23に格納してリターンする。
【0016】一方、操作者がキーボートにより試験モー
ドを選択すると、CPU21は図3の処理を開始する。
図3のステップS11では、RAM23に格納されてい
る試験条件ファイルを読み込む。ステップS12では、
計測装置10での試料取付けを制御する。ステップS1
3では、操作者がキーボード25により入力した試験に
関する一般情報やバッチ情報を取り込む。
【0017】ステップS14では、図2のステップS2
で設定した3項目の試験条件をCRT26に表示し、こ
れら試験条件を変更するか否かを確認する処理を行う。
例えば、操作者がキーボード25を介して新たな試験条
件を入力した場合には、試験条件を変更すべくRAM2
3の内容を書き換える。
【0018】ステップS15では、前述した3項目の試
験条件に基づいて、サンプリング周期Tsでサンプリン
グを行う期間Trと、RAMカード18に格納するサン
プリングデータ総数Ndとを演算する。
【0019】ステップS16では、以下の〜に示す
データを伝送インターフェース回路14,24を介して
計測装置10に伝送する。
通常の試験条件データ
図2のステップS2で設定した3項目データ、すなわ
ちサンプリング周期、RAMカード18の容量、および
サンプリングデータ長
RAMカード18に格納するサンプリングデータ総数
Nd
【0020】図4のステップS17では、試験開始を指
示する信号を伝送インターフェース回路14,24を介
して計測装置10に伝送する。この信号に応じて、計測
装置10は不図示のアクチュエータを駆動して試料に荷
重を加え、試験を開始する。ステップS18では、計測
装置10から伝送されたサンプリングデータを受信す
る。ステップS19では、受信したサンプリングデータ
をRAM23に格納する。ステップS20では、計測装
置10のアクチュエータを制御して試料に加える荷重を
変更する。
【0021】ステップS21では、試験が終了したか否
かを判定する。例えば、引張試験の場合、試料が破断し
たことを示す情報が計測装置10から伝送されてくれ
ば、試験終了と判断する。判定が否定されるとステップ
S18に戻り、判定が肯定されるとステップS22に進
む。
【0022】ステップS22では、試験終了を指示する
信号を計測装置10に伝送する。ステップS23では、
RAMカード18に格納されているサンプリングデータ
を伝送するように計測装置10に指示する。ステップS
24では、計測装置10から伝送されたRAMカード1
8からのサンプリングデータを受信する。
【0023】ステップS25では、RAM23に格納さ
れているサンプリングデータと、ステップS24で受信
したサンプリングデータとを用いて、後述するデータ整
理処理を行う。ステップS26では、各種データ解析や
データ処理、例えば試験結果をCRT26に表示した
り、XYプロッタ27に試験結果を示すグラフを表示し
た後、リターンする。
【0024】一方、操作者が計測装置10の電源を投入
すると、計測装置10内部のCPU11は図5,6の試
験制御処理を行う。図5のステップS51では、データ
処理装置20から伝送された試験条件が受信されたか否
かを判定する。判定が否定されるとステップS51に留
まり、判定が肯定されるとステップS52に進む。ステ
ップS52では、データ処理装置20から伝送された試
験開始を指示する信号が受信されたか否かを判定する。
判定が否定されるとステップS52に留まり、判定が肯
定されるとステップS53に進む。
【0025】ステップS53では、不図示のアクチュエ
ータを駆動して試料に荷重を加え、試験を開始する。ス
テップS54では、RAMカード18へのデータ格納数
を示す変数Nを「0」に初期設定する。ステップS55
では、変数Nが予め設定された最大数Ndと等しいか否
かを判定する。なお、最大数Ndは、図3のステップS
15の処理で設定される。
【0026】ステップS55の判定が否定されるとステ
ップS56に進み、直前にサンプリングしてから時間T
sが経過したか否かを判定する。判定が否定されるとス
テップS56に留まり、判定が肯定されるとステップS
57に進む。ステップS57では、試験結果をサンプリ
ングし、そのサンプリングデータを次のステップS58
でRAMカード18に格納する。ステップS59では、
変数Nを「1」加算する。
【0027】このように、ステップS55〜S59で
は、サンプリング時間Tsごとに試験結果をサンプリン
グしてその結果をRAMカード18に格納する。なお、
サンプリング時間Tsは例えば5msである。
【0028】図6のステップS60では、前回データ処
理装置20にサンプリングデータを伝送してから所定時
間Td、例えば50msが経過したか否かを判定する。
また、ステップS55の判定が肯定された場合、すなわ
ち、RAMカード18に格納したデータ数が予め設定し
たデータ総数Ndになった場合も、ステップS60の処
理を行う。このように、RAMカード18に格納されて
いるデータ数がNd個になった後は、短いサンプリング
周期(例えば5ms)でのサンプリングを行わずに、長
いサンプリング周期(例えば、50ms)でのサンプリ
ングのみを行う。
【0029】ステップS60の判定が否定されるとステ
ップS55に戻り、判定が肯定されるとステップS61
に進む。ステップS61では、試験結果をサンプリング
し、そのサンプリングデータを次のステップS62でデ
ータ処理装置20に伝送する。
【0030】このように、ステップS60〜S62で
は、サンプリング周期Tsよりも長い周期で試験結果を
サンプリングしてその結果をデータ処理装置20に伝送
する。以上により、計測装置10のRAMカード18に
は、短いサンプリング周期Tsでサンプリングしたデー
タが格納され、一方、データ処理装置20には、長いサ
ンプリング周期Tdでサンプリングしたデータが格納さ
れる。なお、データ処理装置20に伝送するサンプリン
グ周期Tdは、RAMカード18に格納するサンプリン
グ周期Tsの整数倍であることが望ましい。整数倍にす
ることにより、データ処理装置20に伝送したサンプリ
ングデータを、試験終了後にRAMカード18に格納し
たサンプリングデータと容易に置き換えることができ
る。
【0031】ステップS63では、試験が終了したか否
かを判定する。例えば、引張・圧縮試験の場合、試料が
破断すると試験終了と判断する。判定が否定されるとス
テップS55に戻り、判定が肯定されるとステップS6
4に進む。ステップS64では、試験終了を知らせる信
号をデータ処理装置20に伝送してリターンする。
【0032】図7は図4のステップS25のデータ整理
処理の詳細フローチャートである。図7のステップS1
01では、RAMカード18から伝送されたサンプリン
グデータの中から変位量が最大のデータを抽出する。ス
テップS102では、RAM23に格納されているサン
プリングデータを読み出す。ステップS103では、ス
テップS102で読み出したサンプリングデータのう
ち、変位量がステップS101で抽出したデータよりも
小さいデータを削除する。ステップS104では、RA
M23とRAMカード18に格納されている各サンプリ
ングデータを合成する。
【0033】このように、図7の処理では、RAM23
に格納されているサンプリングデータのうち変位量が最
大のデータを検索し、このデータ以前に採取されたデー
タをRAMカード18に格納されている詳細なデータに
置換することにより、サンプリング精度の向上を図って
いる。
【0034】なお、図7のデータ整理処理は、CPU2
1がRAM23を用いて行う内部処理であり、図7の処
理を行う以前に、CPU21はRAMカード18からサ
ンプリングデータを読み出してRAM23に格納してお
き、RAM23のみを用いて(RAMカード18にアク
セスすることなく)図7の処理を行う。以下に示す図
8、図9も同様である。
【0035】図8はデータ整理処理の変形例を示す詳細
フローチャートである。図8のステップS111では、
RAM23に格納されているサンプリングデータ(試験
中に計測装置10から伝送されたデータ)を読み出す。
ステップS112では、ステップS111で読み出した
サンプリングデータと、RAMカード18から伝送され
たサンプリングデータとを比較し、値の小さい順あるい
は大きい順に各サンプリングデータを整列させる。ステ
ップS113では、ステップS112で整列させたサン
プリングデータの中に重複したデータがあるか否かを検
出し、重複したデータを削除する。ステップS114で
は、ステップS113の処理結果をRAM23に格納し
てリターンする。これにより、RAM23内の重複デー
タがすべて削除され、メモリ容量を削減できる。
【0036】図9はデータ整理処理の別の変形例を示す
詳細フローチャートである。図9のステップS121で
は、RAM23に格納されているサンプリングデータ
(試験中に計測装置10から伝送されたデータ)を読み
出す。ステップS122では、ステップS121で読み
出したサンプリングデータのうち、同一サンプリング時
間のデータがRAMカード18に存在するか否かを検出
し、同一データがある場合には、そのデータをRAM2
3から削除する。ステップS123では、RAM23に
格納されているデータとRAMカード18から伝送され
たデータとを合成する。ステップS124では、ステッ
プS123の処理結果をRAM23に格納してリターン
する。
【0037】以上に説明した図2〜9の処理をまとめる
と、データ処理装置20は、計測装置10による試験を
開始する前に、3つの試験条件項目(サンプリング周
期、RAMカード18の容量、およびサンプリングデー
タ長)を予め設定し、これら試験条件に基づいて、短い
サンプリング周期Tsでサンプリングするデータ総数N
dを演算する。
【0038】計測装置10は、演算されたデータ総数N
dに達するまで、短いサンプリング周期Tsで試験結果
をサンプリングし、その結果をRAMカード18に格納
する。一方、試験の最中は、サンプリング周期Tsより
も長いサンプリング周期でサンプリングした結果をデー
タ処理装置20に伝送する。RAMカード18に格納さ
れたデータ数が試験終了前にデータ総数Ndに達する
と、その後はRAMカード18へのデータ格納を行わ
ず、サンプリング周期Tsよりも長い周期Tdでサンプ
リングしてデータ処理装置20にサンプリングデータを
伝送する。そして、試料が破断した時点で試験を終了す
る。
【0039】試験が終了すると、計測装置10はRAM
カード18に格納されているサンプリングデータをデー
タ処理装置20に伝送し、データ処理装置20はRAM
カード18からのサンプリングデータとRAM23に格
納されているサンプリングデータとを重複データを含ま
ないように合成し、合成結果をRAM23に格納する。
そして、データ処理装置20は、RAM23に格納され
ている合成データを用いて、データ解析を行う。
【0040】このように、本実施例によれば、RAMカ
ード18に格納可能なデータ数を試験開始前に予め演算
するため、試験終了前にRAMカード18が満杯になる
おそれが少なくなる。すなわち、演算したデータ数に基
づいてサンプリング周期を変更でき、試験終了前にRA
Mカードが満杯になるのを未然に防止できる。あるい
は、演算したデータ数をCRT26等に表示すること
で、操作者に注意を促してもよい。また、本実施例によ
れば、予め演算した数だけRAMカード18にデータを
格納した場合には、短いサンプリング周期Tsでのサン
プリングを中止して、長いサンプリング周期TdでRA
M23にサンプリングデータを格納するようにしたた
め、比較的長期間、試験を継続できる。一方、試験が終
了すると、RAMカード18に格納されているデータと
RAM23に格納されているデータとを合成して重複デ
ータを排除するため、メモリ容量を削減できる。
【0041】上記実施例では、データ処理装置20で予
め演算したデータ数だけRAMカード18にサンプリン
グデータを格納すると、RAMカード18へのデータ格
納を中止しているが、RAMカード18にある程度の空
き容量が残るようにデータ数を演算し、演算したデータ
数だけRAMカード18にサンプリングデータを格納す
ると、サンプリング周期を長くしてサンプリングしたデ
ータを、RAMカード18の空き容量に格納してもよ
い。このようにすれば、RAMカード18に全試験デー
タを格納でき、試験終了後にRAM23のデータと合成
する必要がなくなる。
【0042】上記実施例では、計測装置19側では、R
AMカード18内部にサンプリングデータを格納する例
を説明したが、RAM13に格納してもよい。また、R
AMカード18にサンプリングデータを格納する際、バ
ンク切換え等のメモリ管理手法を用いれば、より大容量
のRAMカードを使用できる。
【0043】このように構成した実施例にあっては、R
AMカード18が記憶手段および第1の記憶手段に、C
PU21がデータ総数演算手段に、RAM23が第2の
記憶手段に、それぞれ対応する。
【0044】
【発明の効果】以上詳細に説明したように、本発明によ
れば、第1の記憶手段に短いサンプリング周期で採取し
た各種データを記憶し、第2の記憶手段に長いサンプリ
ング周期で採取した各種データを記憶し、これら記憶手
段の記憶内容を重複データを含まないように合成するよ
うにしたため、少ないメモリ容量で試験結果データを格
納できる。Description: BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a material testing machine for analyzing the results of various tests on a material at a predetermined sampling period and then analyzing the data. 2. Description of the Related Art A material testing machine (hereinafter referred to as a measuring device) performs a load-displacement characteristic test and the like, and transmits a test result to a data processing device to analyze data. It is known (for example, see Japanese Patent Publication No. 5-20690). In the material testing machine system described in the above publication, test result data indicated by a solid line in FIG. 10 is sampled at a predetermined sampling cycle (black circles in the drawing) and sequentially stored in a RAM inside the measuring device. Sampling data is extracted one by one (open circles in the drawing) and transmitted to the data processing device, and after the test is completed, all data stored in the RAM is transmitted to the data processing device. By doing so, rough data analysis can be performed in real time by the data processing device while the test is being performed by the measurement device, and detailed data analysis can be performed on necessary portions after the test is completed. [0004] For example, when a tensile test is performed, the elongation of a sample under the same load is different depending on the material of the sample. Therefore, the elongation is sampled in consideration of the material of the sample. It is desirable to do. That is, when testing a sample having high rigidity such as ceramics, sampling at shorter time intervals improves the accuracy.
However, in the past, since the sampling speed was always kept constant, there was a possibility that the accuracy would vary depending on the material of the sample and the like. [0005] Even when testing the same sample, sampling is performed at short time intervals during an important period, such as immediately after starting to apply a load or immediately before the sample breaks, and roughly during a period that is not so important. This can reduce the memory capacity. However, since the sampling period could not be changed during the test in the past,
In some cases, there is a possibility that the storage capacity of the RAM becomes full before the end of the test. Even if the sampling period can be changed, both the data length and the storage capacity of the RAM are fixed (for example, if the data length is 20 bytes and the RAM is
In the case where the storage capacity of the RAM is 512 kilobytes), it is difficult to predict when the RAM will be full because the time until the RAM is full varies depending on the sampling cycle. Further, conventionally, the sampling data stored in the RAM of the measuring device has been transmitted to the data processing device after the test has been completed. Since the data transmitted from the measuring device after the test was managed separately, some data would be duplicated,
As the memory capacity increases, data management may be complicated. An object of the present invention is to provide a material testing machine which can efficiently sample material test results and store sampling data. The present invention will be described with reference to FIG. 1 showing an embodiment. The present invention comprises a measuring device 10 and a data processing device 20, and a predetermined At the same time as sampling various data
In a material testing machine for transmitting the collected data to the data processing device 20 at predetermined time intervals, a first storage means 18 provided on the measuring device 10 and storing various data collected at a first sampling cycle; Data processing device 20
The second memory is provided on the side and stores various data collected in a second sampling cycle longer than the first sampling cycle.
Storage means 23, and the first and second storage means 2
The above object is achieved by providing a data processing device for synthesizing the sampling data stored in 3 so as not to include duplicate data. According to the first aspect of the present invention, the first storage means (for example, a RAM card) is provided on the measuring device 10 side.
A second storage unit 23 (for example,
RAM). The first storage means 18 stores various data collected in the first sampling cycle, and the second storage means 23 stores various data collected in a cycle longer than the first sampling cycle. The data processing device 20
After completion of the test, the sampling data stored in the first storage means 18 is read out and combined with the sampling data stored in the second storage means 23 so that no duplicate data is included. [0010] In the means and means for solving the above problems which explain the constitution of the present invention, the drawings of the embodiments are used to make the present invention easy to understand. However, the present invention is not limited to this. An embodiment of the present invention will be described below with reference to FIGS. FIG. 1 is a block diagram illustrating a schematic configuration of the material testing machine of the present embodiment. The material testing machine shown in FIG. 1 is used for testing tensile / compression characteristics and the like.
0 and the data processing device 20. Measuring device 1
0 and the data processing device 20 are both CPUs 11 and 21
And read-only fixed memories (ROM) 12, 22
And rewritable variable memories (RAM) 13 and 23. The measuring device 10 and the data processing device 20 include transmission interface circuits 14 and 24, and exchange data with each other via the transmission line L. The measuring device 10 includes a load cell 15 for measuring the load applied to the sample, an extensometer 16 for measuring the deformation of the sample due to the load, and an A / A for converting the analog output of each of the measuring devices 15 and 16 into a digital signal. D converter 17 and RA
Card reader 19 for controlling reading / writing of M card 18
And The RAM card 18 stores data obtained by sampling the test results at a predetermined sampling cycle. On the other hand, the data processing device 20 is a keyboard 2
5, a CRT 26, and an XY plotter 27.
Various commands are issued to 0, and the analysis result is confirmed by the CRT 26. This data processing device 20 is usually composed of a personal computer and its peripheral devices. FIG. 2 shows test condition creation mode processing performed by the CPU 21 of the data processing apparatus 20, FIGS. 3 and 4 show test mode processing performed by the CPU 21 of the data processing apparatus 20, and FIGS. 5 is a flowchart showing control processing, and the operation of the present embodiment will be described below based on these flowcharts. When the operator operates the keyboard 25 of the data processing device 20 to select the test condition creation mode, the CP
U21 starts the processing of FIG. In step S1 of FIG. 2, normal test conditions, such as test contents and sample type, are set based on the keyboard operation of the operator. In step S2, based on the keyboard operation by the operator,
Sampling cycle when collecting test result data,
The capacity of the RAM card 18 connected to the measuring device 10 and the sampling data length per sampling are set. In step S3, various test conditions set in steps S1 and S2 are stored as a test condition file in RA.
It stores it in M23 and returns. On the other hand, when the operator selects the test mode using the keyboard, the CPU 21 starts the processing shown in FIG.
In step S11 of FIG. 3, the test condition file stored in the RAM 23 is read. In step S12,
The sample attachment in the measuring device 10 is controlled. Step S1
In step 3, general information and batch information relating to the test input by the operator through the keyboard 25 are fetched. In step S14, step S2 in FIG.
Are displayed on the CRT 26, and a process of confirming whether or not to change these test conditions is performed.
For example, when the operator inputs new test conditions via the keyboard 25, the RAM 2 is changed to change the test conditions.
3 is rewritten. In step S15, based on the three test conditions described above, a period Tr for sampling at the sampling period Ts and a total number Nd of sampling data stored in the RAM card 18 are calculated. In step S16, the following data are transmitted to the measuring device 10 via the transmission interface circuits 14 and 24. Normal test condition data Three items of data set in step S2 of FIG. 2, ie, sampling period, capacity of RAM card 18, and sampling data length Total number of sampling data stored in RAM card 18 Nd In step S17 of FIG. Then, a signal instructing the start of the test is transmitted to the measuring device 10 via the transmission interface circuits 14 and 24. In response to this signal, the measuring device 10 drives an actuator (not shown) to apply a load to the sample, and starts the test. In step S18, the sampling data transmitted from the measuring device 10 is received. In step S19, the received sampling data is stored in the RAM. In step S20, the load applied to the sample is changed by controlling the actuator of the measuring device 10. In step S21, it is determined whether or not the test has been completed. For example, in the case of a tensile test, if information indicating that the sample has been broken is transmitted from the measuring device 10, it is determined that the test has been completed. If the determination is negative, the process returns to step S18, and if the determination is positive, the process proceeds to step S22. In step S22, a signal instructing the end of the test is transmitted to the measuring device 10. In step S23,
It instructs the measuring device 10 to transmit the sampling data stored in the RAM card 18. Step S
24, the RAM card 1 transmitted from the measuring device 10
8 sampled data is received. In step S25, a data reduction process, which will be described later, is performed using the sampling data stored in the RAM 23 and the sampling data received in step S24. In step S26, various data analysis and data processing, for example, displaying the test results on the CRT 26 or displaying a graph showing the test results on the XY plotter 27, and then returning. On the other hand, when the operator turns on the power of the measuring device 10, the CPU 11 inside the measuring device 10 performs the test control processing shown in FIGS. In step S51 of FIG. 5, it is determined whether the test condition transmitted from the data processing device 20 has been received. If the determination is negative, the process remains at step S51, and if the determination is positive, the process proceeds to step S52. In step S52, it is determined whether or not a signal transmitted from the data processing device 20 and indicating a test start has been received.
If the determination is negative, the process remains at step S52, and if the determination is positive, the process proceeds to step S53. In step S53, a test is started by driving an actuator (not shown) to apply a load to the sample. In step S54, a variable N indicating the number of data stored in the RAM card 18 is initialized to "0". Step S55
Then, it is determined whether or not the variable N is equal to a preset maximum number Nd. Note that the maximum number Nd is determined in step S in FIG.
15 are set. If the determination in step S55 is negative, the process proceeds to step S56, where the time T
It is determined whether or not s has elapsed. If the determination is negative, the process stays at step S56. If the determination is positive, step S56 is reached.
Proceed to 57. In step S57, the test result is sampled, and the sampled data is used in the next step S58.
To store in the RAM card 18. In step S59,
“1” is added to the variable N. As described above, in steps S55 to S59, the test results are sampled every sampling time Ts, and the results are stored in the RAM card 18. In addition,
The sampling time Ts is, for example, 5 ms. In step S60 of FIG. 6, it is determined whether or not a predetermined time Td, for example, 50 ms, has elapsed since the previous transmission of the sampling data to the data processing device 20.
Also, when the determination in step S55 is affirmative, that is, when the number of data stored in the RAM card 18 reaches the preset total number Nd of data, the process of step S60 is also performed. As described above, after the number of data stored in the RAM card 18 becomes Nd, sampling at a long sampling cycle (for example, 50 ms) is performed without performing sampling at a short sampling cycle (for example, 5 ms). I do. If the determination in step S60 is negative, the process returns to step S55, and if the determination is affirmative, step S61.
Proceed to. In step S61, the test result is sampled, and the sampled data is transmitted to the data processing device 20 in the next step S62. As described above, in steps S60 to S62, the test result is sampled at a period longer than the sampling period Ts, and the result is transmitted to the data processing device 20. As described above, the data sampled at the short sampling period Ts is stored in the RAM card 18 of the measuring device 10, while the data sampled at the long sampling period Td is stored in the data processing device 20. Note that the sampling period Td transmitted to the data processing device 20 is preferably an integral multiple of the sampling period Ts stored in the RAM card 18. By setting the integral multiple, the sampling data transmitted to the data processing device 20 can be easily replaced with the sampling data stored in the RAM card 18 after the test is completed. In step S63, it is determined whether the test has been completed. For example, in the case of a tensile / compression test, when the sample breaks, it is determined that the test is completed. If the determination is negative, the process returns to step S55, and if the determination is positive, step S6
Proceed to 4. In step S64, a signal notifying the end of the test is transmitted to the data processing device 20, and the process returns. FIG. 7 is a detailed flowchart of the data reduction processing in step S25 in FIG. Step S1 in FIG.
In step 01, data having the largest displacement is extracted from the sampling data transmitted from the RAM card 18. In step S102, the sampling data stored in the RAM 23 is read. In step S103, of the sampling data read in step S102, data whose displacement is smaller than the data extracted in step S101 is deleted. In step S104, RA
M23 and each sampling data stored in the RAM card 18 are synthesized. As described above, in the processing of FIG.
Of the sampling data stored in the RAM card 18 is searched, and the data collected before this data is replaced with the detailed data stored in the RAM card 18 to improve the sampling accuracy. I'm trying. The data reduction processing of FIG.
7 is an internal process performed using the RAM 23. Before performing the process of FIG. 7, the CPU 21 reads out the sampling data from the RAM card 18 and stores it in the RAM 23, and uses only the RAM 23 (for accessing the RAM card 18). The processing of FIG. 7 is performed (without performing). 8 and 9 shown below are the same. FIG. 8 is a detailed flowchart showing a modification of the data reduction processing. In step S111 of FIG.
The sampling data (data transmitted from the measuring device 10 during the test) stored in the RAM 23 is read.
In step S112, the sampled data read in step S111 is compared with the sampled data transmitted from the RAM card 18, and each sampled data is sorted in ascending or descending order of value. In step S113, it is detected whether or not there is any duplicate data in the sampling data arranged in step S112, and the duplicate data is deleted. In step S114, the processing result of step S113 is stored in the RAM 23, and the process returns. Thereby, all the duplicate data in the RAM 23 is deleted, and the memory capacity can be reduced. FIG. 9 is a detailed flowchart showing another modification of the data reduction processing. In step S121 in FIG. 9, the sampling data (data transmitted from the measuring device 10 during the test) stored in the RAM 23 is read. In step S122, of the sampling data read out in step S121, it is detected whether or not data of the same sampling time exists in the RAM card 18. If the same data exists, the data is stored in the RAM2.
Delete from 3. In step S123, the data stored in the RAM 23 and the data transmitted from the RAM card 18 are combined. In step S124, the processing result of step S123 is stored in RAM 23, and the process returns. 2 to 9 described above, the data processing device 20 sets three test condition items (sampling period, capacity of the RAM card 18, and Sampling data length) is set in advance, and based on these test conditions, the total number N of data to be sampled at a short sampling cycle Ts
Calculate d. The measuring device 10 calculates the total number N of the calculated data.
The test result is sampled at a short sampling period Ts until the time reaches d, and the result is stored in the RAM card 18. On the other hand, during the test, the result of sampling at a sampling cycle longer than the sampling cycle Ts is transmitted to the data processing device 20. When the number of data stored in the RAM card 18 reaches the total number Nd of data before the end of the test, after that, the data is not stored in the RAM card 18 but is sampled at a period Td longer than the sampling period Ts. To transmit the sampling data. The test is terminated when the sample breaks. When the test is completed, the measuring device 10
The sampling data stored in the card 18 is transmitted to the data processing device 20, and the data processing device 20
The sampling data from the card 18 and the sampling data stored in the RAM 23 are combined so as not to include duplicate data, and the combined result is stored in the RAM 23.
Then, the data processing device 20 performs data analysis using the synthesized data stored in the RAM 23. As described above, according to the present embodiment, the number of data that can be stored in the RAM card 18 is calculated in advance before the start of the test, so that the possibility that the RAM card 18 becomes full before the end of the test is reduced. That is, the sampling period can be changed based on the calculated number of data, and RA
It is possible to prevent the M card from becoming full. Alternatively, the operator may be alerted by displaying the calculated number of data on the CRT 26 or the like. Further, according to the present embodiment, when data is stored in the RAM card 18 by the number calculated in advance, sampling at the short sampling period Ts is stopped, and RA is stopped at the long sampling period Td.
Since the sampling data is stored in M23, the test can be continued for a relatively long time. On the other hand, when the test is completed, the data stored in the RAM card 18 and the data stored in the RAM 23 are combined to eliminate duplicate data, so that the memory capacity can be reduced. In the above embodiment, when the sampling data is stored in the RAM card 18 by the number of data calculated in advance by the data processing device 20, the data storage in the RAM card 18 is stopped. If the number of data is calculated so that the capacity remains, and the sampling data is stored in the RAM card 18 by the calculated number of data, the sampling period may be lengthened and the sampled data may be stored in the free space of the RAM card 18. In this way, all test data can be stored in the RAM card 18 and there is no need to combine the data with the data in the RAM 23 after the test is completed. In the above embodiment, the measuring device 19
Although the example in which the sampling data is stored in the AM card 18 has been described, the sampling data may be stored in the RAM 13. Also, R
When storing the sampling data in the AM card 18, if a memory management technique such as bank switching is used, a larger capacity RAM card can be used. In the embodiment thus constructed, R
The AM card 18 stores C in the storage unit and the first storage unit.
The PU 21 corresponds to the data total number calculation means, and the RAM 23 corresponds to the second storage means. As described above in detail, according to the present invention, various data collected at a short sampling cycle are stored in the first storage means, and various data are collected at a long sampling cycle in the second storage means. Since the collected various data are stored and the storage contents of these storage means are combined so as not to include duplicate data, the test result data can be stored with a small memory capacity.
【図面の簡単な説明】
【図1】本実施例の材料試験機の概略構成を示すブロッ
ク図。
【図2】データ処理装置のCPUが行う試験条件作成モ
ード処理を示すフローチャート。
【図3】データ処理装置のCPUが行う試験モード処理
を示すフローチャート。
【図4】図3に続くフローチャート。
【図5】計測装置のCPUが行う試験制御処理を示すフ
ローチャート。
【図6】図5に続くフローチャート。
【図7】図4のステップS25のデータ整理処理の詳細
フローチャート。
【図8】データ整理処理の変形例を示す詳細フローチャ
ート。
【図9】データ整理処理の変形例を示す詳細フローチャ
ート。
【図10】従来の材料機試験機システムにおけるサンプ
リング方法を説明する図。
【符号の説明】
10 計測装置
11,21 CPU
18 RAMカード
20 データ処理装置
23 RAMBRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a block diagram showing a schematic configuration of a material testing machine according to the present embodiment. FIG. 2 is a flowchart illustrating test condition creation mode processing performed by a CPU of the data processing apparatus. FIG. 3 is a flowchart showing a test mode process performed by a CPU of the data processing device. FIG. 4 is a flowchart following FIG. 3; FIG. 5 is a flowchart showing a test control process performed by a CPU of the measuring device. FIG. 6 is a flowchart following FIG. 5; FIG. 7 is a detailed flowchart of a data reduction process in step S25 in FIG. 4; FIG. 8 is a detailed flowchart showing a modification of the data reduction processing. FIG. 9 is a detailed flowchart showing a modification of the data reduction processing. FIG. 10 is a diagram illustrating a sampling method in a conventional material machine testing machine system. [Description of Signs] 10 Measurement devices 11 and 21 CPU 18 RAM card 20 Data processing device 23 RAM
Claims (1)
記計測装置側で所定のサンプリング周期で各種データの
採取を行うと同時に、採取したデータを所定の時間間隔
ごとにデータ処理装置に伝送する材料試験機において、
前記計測装置側に設けられ第1のサンプリング周期で採
取した各種データを記憶する第1の記憶手段と、前記デ
ータ処理装置側に設けられ前記第1のサンプリング周期
よりも長い第2のサンプリング周期で採取した各種デー
タを記憶する第2の記憶手段とを備え、前記データ処理
装置は、前記第1および第2の記憶手段に記憶されてい
るサンプリングデータを重複データを含まないように合
成することを特徴とする材料試験機。(57) [Claim 1] A measuring device and a data processing device are provided, and the measuring device collects various data at a predetermined sampling cycle and simultaneously collects the collected data for a predetermined time. In a material testing machine that transmits data to the data processing device at intervals,
A first storage unit provided on the measurement device side for storing various data collected at a first sampling period; and a second storage period provided on the data processing device side, the second sampling period being longer than the first sampling period. A second storage unit that stores the collected various data, wherein the data processing device combines the sampling data stored in the first and second storage units so as not to include duplicate data. Characteristic material testing machine.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP11726695A JP3395448B2 (en) | 1995-05-16 | 1995-05-16 | Material testing machine |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP11726695A JP3395448B2 (en) | 1995-05-16 | 1995-05-16 | Material testing machine |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH08313421A JPH08313421A (en) | 1996-11-29 |
| JP3395448B2 true JP3395448B2 (en) | 2003-04-14 |
Family
ID=14707510
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP11726695A Expired - Fee Related JP3395448B2 (en) | 1995-05-16 | 1995-05-16 | Material testing machine |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3395448B2 (en) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| FR2898410B1 (en) * | 2006-03-07 | 2008-05-09 | Airbus France Sas | A METHOD OF CHARACTERIZING FATIGUE HOLDING OF A WORKPIECE FROM ITS SURFACE PROFILE |
| JP7452338B2 (en) * | 2020-09-04 | 2024-03-19 | 株式会社島津製作所 | Material testing machine and control method for material testing machine |
-
1995
- 1995-05-16 JP JP11726695A patent/JP3395448B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JPH08313421A (en) | 1996-11-29 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP3395448B2 (en) | Material testing machine | |
| JP3430723B2 (en) | Data processing equipment for material testing machines | |
| JP2004212172A (en) | Measuring device | |
| JP2756324B2 (en) | Material fatigue test equipment | |
| JPH0743732B2 (en) | Storage method of collected data | |
| JP3377396B2 (en) | Control device for material testing machine | |
| KR100442481B1 (en) | Control method of hot torsion deformation tester | |
| JP2940470B2 (en) | Structure analysis method and structure analysis device | |
| JP3329293B2 (en) | Material testing machine | |
| JPH0145014B2 (en) | ||
| JPH08328651A (en) | Data collection method and device | |
| JPH09138188A (en) | Material testing machine | |
| JP2518017B2 (en) | Material testing machine | |
| JP2007327828A (en) | Measuring equipment, material testing machine | |
| JP2632279B2 (en) | Device for collecting process data | |
| JP3749411B2 (en) | Control method and material test apparatus in material test apparatus | |
| JP2517576Y2 (en) | Material testing machine | |
| JPH07104007A (en) | Waveform data retrieval method in waveform recording apparatus | |
| JP3645653B2 (en) | Data analysis device for vehicle electronic control unit | |
| JPH11166878A (en) | Control method and apparatus for multi-axis testing machine | |
| JP2822502B2 (en) | Material testing machine | |
| JPH02150777A (en) | Waveform comparator | |
| JPH0643087B2 (en) | Measuring method of operating condition of injection molding machine | |
| JPH10160655A (en) | Method for data processing of material testing device | |
| JP2001208662A (en) | Control method and material testing device in material testing device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080207 Year of fee payment: 5 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090207 Year of fee payment: 6 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100207 Year of fee payment: 7 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100207 Year of fee payment: 7 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110207 Year of fee payment: 8 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110207 Year of fee payment: 8 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120207 Year of fee payment: 9 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120207 Year of fee payment: 9 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130207 Year of fee payment: 10 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140207 Year of fee payment: 11 |
|
| LAPS | Cancellation because of no payment of annual fees |