JP3395995B2 - Wall construction method - Google Patents
[go: Go Back, main page]

JP3395995B2 - Wall construction method - Google Patents

Wall construction method

Info

Publication number
JP3395995B2
JP3395995B2 JP08281994A JP8281994A JP3395995B2 JP 3395995 B2 JP3395995 B2 JP 3395995B2 JP 08281994 A JP08281994 A JP 08281994A JP 8281994 A JP8281994 A JP 8281994A JP 3395995 B2 JP3395995 B2 JP 3395995B2
Authority
JP
Japan
Prior art keywords
cage
excavated
wall groove
excavating
continuous
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP08281994A
Other languages
Japanese (ja)
Other versions
JPH07292659A (en
Inventor
光弘 柴崎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chemical Grouting Co Ltd
Original Assignee
Chemical Grouting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chemical Grouting Co Ltd filed Critical Chemical Grouting Co Ltd
Priority to JP08281994A priority Critical patent/JP3395995B2/en
Publication of JPH07292659A publication Critical patent/JPH07292659A/en
Application granted granted Critical
Publication of JP3395995B2 publication Critical patent/JP3395995B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は連壁工法に関し、特に、
先行パネルと後行パネルとの接合面から水が漏洩するこ
とを防止する止水膜の設置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a wall construction method, and in particular,
The present invention relates to installation of a water blocking film that prevents water from leaking from the joint surface between the preceding panel and the following panel.

【0002】[0002]

【従来の技術】連壁工法の施工に当たっては、所定の間
隔を隔てて複数の先行パネルを造成し、その後、先行パ
ネル間に後行パネルを造成している。そして、先行パネ
ルと後行パネルとの接合面(継ぎ目)にベントナイトの
被膜が形成されてしまうことに起因して当該接合面から
漏水してしまうことを防止するため、止水膜或いは止水
版を設置している。先行パネルと後行パネルの接合面か
らの漏水は、連壁の強度に悪影響を与えるからであり、
特に連壁の壁厚が薄い程、その(悪)影響は顕著とな
る。
2. Description of the Related Art In the construction of a continuous wall construction method, a plurality of leading panels are formed at predetermined intervals, and then a trailing panel is formed between the leading panels. Then, in order to prevent water from leaking from the joint surface due to the formation of a bentonite coating film on the joint surface (joint) between the preceding panel and the following panel, a water blocking film or a water blocking plate. Has been installed. This is because water leakage from the joint surface of the leading panel and the trailing panel adversely affects the strength of the connecting wall,
In particular, the thinner the wall thickness of the connecting wall, the more pronounced the (bad) effect.

【0003】[0003]

【発明が解決しようとする課題】しかし、従来技術にお
いては、止水膜の設置が非常に困難であり、煩雑な作業
を繰り返す必要があった。そのため、連壁工法施工の際
に止水膜を容易に設置することが出来る技術が望まれて
いたが、その様な技術は未だに提案されていない。
However, in the prior art, it was very difficult to install the water blocking film, and it was necessary to repeat the complicated work. Therefore, there has been a demand for a technique capable of easily installing a water blocking film at the time of construction of a continuous wall construction method, but such a technique has not been proposed yet.

【0004】本発明はその様な従来技術の問題点に鑑み
て提案されたもので、連壁工法施工の際に止水膜の設置
を容易に行うことが出来る技術の提供を目的としてい
る。
The present invention has been proposed in view of the above problems of the prior art, and an object of the present invention is to provide a technology capable of easily installing a water blocking film during construction of a wall construction method.

【0005】[0005]

【課題を解決するための手段】本発明の連壁工法は、先
行パネルとなるべき連壁溝を掘削する連壁溝掘削工程
と、掘削された連壁溝中に篭体を建て込む篭体建て込み
工程とを含み、該篭体は連続する縦方向条材と横方向条
材及び間隔保持材とから構成されており、前記篭体建て
込み工程の際に、掘削された連壁溝の後行パネルと接続
される側の掘削面の一部を交差噴流により所定距離だけ
掘削し、該交差噴流により掘削された部分に止水膜を挿
入している。
According to the method of the present invention for connecting walls, a connecting wall groove excavating step for excavating a connecting wall groove to be a preceding panel and a cage for building a cage in the excavated connecting wall groove. Including the building step, the cage is composed of a continuous vertical strip, a horizontal strip and a spacing member, and during the cage building step, A part of the excavation surface on the side connected to the trailing panel is excavated by a cross jet for a predetermined distance, and a water stop film is inserted in the part excavated by the cross jet.

【0006】また、本発明の連壁工法は、先行パネルと
なるべき連壁溝を掘削するのと同時に、後行パネルと接
続される側の掘削面の一部を交差噴流により所定距離だ
け掘削し、該交差噴流により掘削された部分に止水膜を
挿入する工程と、掘削された連壁溝中に篭体を建て込む
篭体建て込み工程とを含み、該篭体は連続する縦方向条
材と横方向条材及び間隔保持材とから構成されている。
Further, according to the wall method of the present invention, the wall groove to be the leading panel is excavated, and at the same time, a part of the excavation surface on the side connected to the trailing panel is excavated by the cross jet for a predetermined distance. However, the method includes a step of inserting a water blocking film into a portion excavated by the cross jet and a step of constructing a cage in the excavated connecting wall groove, wherein the cage is continuous in a longitudinal direction. It is composed of a strip, a transverse strip and a spacing member.

【0007】さらに、本発明の連壁工法では、先行パネ
ルとなるべき連壁溝を掘削するのと同時に、後行パネル
と接続される側の掘削面の一部を交差噴流により所定距
離だけ掘削する工程と、掘削された連壁溝中に篭体を建
て込むのと同時に、前記交差噴流によって掘削された領
域内に止水膜を挿入する工程とを含み、該篭体は連続す
る縦方向条材と横方向条材及び間隔保持材とから構成さ
れている。
Further, according to the wall construction method of the present invention, at the same time as excavating the wall groove to be the preceding panel, a part of the excavation surface on the side connected to the trailing panel is excavated by the cross jet for a predetermined distance. And a step of building a cage in the excavated communicating wall groove and at the same time inserting a water stop film in the region excavated by the cross jet, the cage having a continuous longitudinal direction. It is composed of a strip, a transverse strip and a spacing member.

【0008】本発明の実施に際して、連壁溝掘削工程を
実施するための掘削手段としては、公知の掘削機器であ
れば使用可能であるが、所謂「バケット式」の掘削機以
外のものを使用するのが好ましい。
In carrying out the present invention, as the excavating means for carrying out the continuous wall trench excavating step, any known excavating equipment can be used, but other than the so-called "bucket type" excavating machine is used. Preferably.

【0009】また、止水膜を挿入する工程を実施するに
際しては、止水膜をリール等に巻き回し該リールを作業
現場に設置し、そのリールを回転することにより止水膜
を挿入するのが好ましい。
Further, in carrying out the step of inserting the water blocking film, the water blocking film is wound around a reel or the like, the reel is installed at a work site, and the water blocking film is inserted by rotating the reel. Is preferred.

【0010】そして、後行パネルと接続される側の掘削
面の一部を交差噴流により所定距離だけ掘削するに際し
て、当該掘削面に止水膜を挿入するのに必要且つ十分な
幅及び奥行きを有するスリットを形成するように、交差
噴流を噴射するのが好ましい。より具体的には、交差噴
流により掘削される前記「掘削面の一部」は、止水膜の
厚さ寸法よりも若干大きい寸法の幅を有する領域を意味
しており、前記「所定距離」は止水膜の幅寸法の概略1
/2の掘削距離を意味している。
When excavating a part of the excavation surface on the side connected to the trailing panel by the cross jet for a predetermined distance, a width and depth necessary and sufficient for inserting the water stop film on the excavation surface are provided. The cross jets are preferably jetted so as to form the slits that they have. More specifically, the "part of the excavation surface" excavated by the cross jet means a region having a width slightly larger than the thickness dimension of the water stop film, and the "predetermined distance". Is an outline of the width dimension of the waterproof membrane 1
This means a digging distance of / 2.

【0011】本発明の実施に際して、止水膜はリール等
に巻回されてるのが好ましい。
In carrying out the present invention, the water blocking film is preferably wound around a reel or the like.

【0012】ここで、篭体建て込み工程については、本
出願人が先に出願した特願平6−5534号で開示した
技術を用いるのが好適である。
Here, it is preferable to use the technique disclosed in Japanese Patent Application No. 6-5534 previously filed by the applicant of the present invention for the cage building step.

【0013】[0013]

【作用】上述したような構成を具備する本発明の連壁工
法によれば、先行パネルとして連壁溝を掘削し、掘削さ
れた連壁溝中に篭体を建て込む。ここで、該篭体は連続
する縦方向条材と横方向条材及び間隔保持材とから構成
されているので、前記篭体建て込み工程の際しては、連
壁溝内に連続する縦方向条材が挿入される。この縦方向
条材の挿入の際に、上下方向に間隔を空けて配置された
一対のノズルから所謂交差噴流を噴出して、掘削された
連壁溝の後行パネルと接続される側の掘削面の一部を交
差噴流により所定距離だけ掘削し、止水膜挿入用のスリ
ットを形成する。そして、形成されたスリット中に止水
膜を挿入すれば良い。
According to the continuous wall construction method of the present invention having the above-mentioned structure, the continuous wall groove is excavated as the preceding panel, and the cage is built in the excavated continuous wall groove. Here, since the cage is composed of a continuous vertical strip, a horizontal strip, and a spacing member, a continuous vertical strip is formed in the continuous wall groove during the cage building step. Directional strips are inserted. When this vertical strip is inserted, a so-called cross jet is ejected from a pair of nozzles arranged at intervals in the vertical direction to excavate the side connected to the trailing panel of the excavated wall groove. A part of the surface is excavated by a cross jet for a predetermined distance to form a slit for inserting a water stop film. Then, a water blocking film may be inserted into the formed slit.

【0014】また、本発明の連壁工法は、先行パネルと
なるべき連壁溝を掘削するのと同時に、後行パネルと接
続される側の掘削面の一部を交差噴流により所定距離だ
け掘削し、該交差噴流により前記スリットを形成し且つ
そのスリット内に止水膜を挿入する事が出来る。
Further, according to the connecting wall construction method of the present invention, at the same time as excavating the connecting wall groove to be the preceding panel, a part of the excavation surface on the side connected to the trailing panel is excavated by the cross jet for a predetermined distance. However, it is possible to form the slit by the cross jet and insert the water blocking film into the slit.

【0015】さらに本発明によれば、連壁溝の削孔と同
時に交差噴流により前記スリットを掘削し、縦方向条材
の建て込みと同時に該スリット内に止水膜を挿入してい
る。
Further, according to the present invention, the slit is excavated by the cross jet at the same time as the drilling of the continuous wall groove, and the waterproof film is inserted into the slit at the same time when the longitudinal strip is built.

【0016】すなわち本発明によれば、止水膜の挿入に
必要且つ十分な幅及び奥行きを有するスリットが、連壁
溝掘削工程により掘削された連壁溝の掘削面(後行パネ
ルとの接合面となる)に形成され、その箇所に止水膜が
挿入される。従って、仕切板の設置、砕石の投入、後行
パネル用の連壁溝掘削時における部材の除去等を行う必
要が無くなり、その分だけ作業が容易になる。
That is, according to the present invention, the slit having a width and a depth necessary and sufficient for inserting the water blocking film is formed in the excavation surface of the continuous wall groove excavated in the continuous wall groove excavation step (joining with the trailing panel). Surface), and a water blocking film is inserted at that location. Therefore, it is not necessary to install a partition plate, throw in crushed stones, remove members when excavating a connecting wall groove for a trailing panel, and the like, which makes the work easier.

【0017】ここで、止水膜が挿入されるスリットの掘
削に際して、当該スリットの奥行きが深すぎると、後行
パネル用の連壁溝の掘削作業、その他において悪影響が
あり、非常に不都合である。しかし、本発明においては
当該スリットの掘削は交差噴流を用いており、交差噴流
は掘削距離を極めて高精度にて制御する事が出来る。従
って、スリットの奥行きは適正な数値となる。
Here, when excavating the slit into which the water blocking film is inserted, if the depth of the slit is too deep, the excavation work of the connecting wall groove for the trailing panel and the like will be adversely affected, which is very inconvenient. . However, in the present invention, excavation of the slit uses a cross jet, and the cross jet can control the excavation distance with extremely high accuracy. Therefore, the depth of the slit has an appropriate value.

【0018】[0018]

【実施例】以下、添付図面を参照して本発明の実施例を
説明する。
Embodiments of the present invention will be described below with reference to the accompanying drawings.

【0019】図1において、連壁を造成するべき地盤G
に、先行パネル用の連壁溝Hを掘削する。ここで連壁溝
Hの掘削は、全体を符号10で示す公知の掘削装置によ
り行われる。この掘削装置10は、所謂「バケット式」
の掘削機以外のものであれば、どのようなタイプのもの
でも使用可能である。
In FIG. 1, the ground G on which the connecting wall is to be constructed.
First, the continuous wall groove H for the preceding panel is excavated. Here, the excavation of the continuous wall groove H is performed by a known excavating device indicated by reference numeral 10 as a whole. The excavator 10 is a so-called "bucket type".
Any type of excavator other than the above excavators can be used.

【0020】所定の深度レベルまで掘削溝Hを掘削した
ならば、掘削装置10を引き上げて、図2で示す様な条
材取付装置12を該掘削溝H内に挿入・下降する。な
お、図示の実施例において、条材或いは篭体の建て込み
については、例えば本出願人が先に出願した特願平6−
5534号で開示した技術が用いられるが、当該建て込
み工程については後述する。
When the excavation trench H has been excavated to a predetermined depth level, the excavation device 10 is pulled up, and the strip material attaching device 12 as shown in FIG. In the illustrated embodiment, regarding the construction of the strip material or the cage, for example, Japanese Patent Application No. 6-
The technology disclosed in No. 5534 is used, and the building process will be described later.

【0021】図2において、全体を符号12で示す条材
取付装置は、複数の縦方向条材6・・・(この縦方向条
材6を用いて篭体を構成する態様は後述する)を取り付
けてある支持材14と、モニタ部16、とを含んでい
る。このモニタ部16は、上下方向に所定間隔を隔てて
配置された一対のノズル18A、18Bを備えており、
該ノズル18A、18Bからそれぞれ噴流JA、JBが
噴射される。そして、噴流JA、JBは所謂「交差噴
流」を構成している。この噴流JA、JB(交差噴流)
により、連壁溝Hの両端部側(後行パネルと接続される
面側)にはスリットH2が掘削される。
In FIG. 2, a strip attaching apparatus indicated by reference numeral 12 has a plurality of vertical strips 6 ... (A mode for constructing a cage using these vertical strips 6 will be described later). It includes a support member 14 attached and a monitor unit 16. The monitor unit 16 includes a pair of nozzles 18A and 18B arranged at a predetermined interval in the vertical direction,
Jets JA and JB are jetted from the nozzles 18A and 18B, respectively. The jets JA and JB form a so-called "crossed jet". This jet JA, JB (cross jet)
As a result, the slits H2 are excavated on both end sides (surface sides connected to the trailing panel) of the communicating wall groove H.

【0022】また、このモニタ部16には止水膜保持部
20が設けられており、該保持部20には止水膜22が
取り付けられている。そして止水膜保持部20は、条材
取付装置12が連壁溝H内を下降すると同時に、前記交
差噴流JA、JBにより掘削されたスリットH2内に止
水膜22と共に挿入される様に配置されている。なお、
符号24で示すのは、ノズル18A、18Bからの噴流
を構成する液体を供給するためのホースである。
The monitor 16 is provided with a water blocking film holding portion 20, and a water blocking film 22 is attached to the holding portion 20. The waterproof film holding portion 20 is arranged so that the strip attaching device 12 descends in the communicating wall groove H and, at the same time, is inserted together with the waterproof film 22 into the slit H2 excavated by the cross jets JA and JB. Has been done. In addition,
Reference numeral 24 is a hose for supplying the liquid forming the jets from the nozzles 18A and 18B.

【0023】上述した様な条材取付装置12が連壁溝H
の底部HBに到達して篭体(図示せず)が建て込まれ、
且つ、止水膜22とが連壁溝H内に配置されたならば、
コンクリートの打設を行う。なお、止水膜22は図3で
示す様に、連壁溝Hの開口部近傍に設けられたリール3
0に巻回されており、リール30を矢印CW方向に回動
する事により連壁溝H内に挿入・降下される。
The strip attachment device 12 as described above is used as the connecting wall groove H.
Reaches the bottom HB of the cage and a cage (not shown) is built in
Further, if the water blocking film 22 and the water blocking film 22 are arranged in the communicating wall groove H,
Place concrete. As shown in FIG. 3, the water blocking film 22 is provided on the reel 3 provided near the opening of the connecting wall groove H.
It is wound around 0 and is inserted into and lowered into the connecting wall groove H by rotating the reel 30 in the direction of arrow CW.

【0024】次に、図4を参照して篭体建て込み工程を
より詳細に説明する。なお、説明の簡略化のため、図4
においてスリットH2及び止水膜22の図示は省略す
る。
Next, with reference to FIG. 4, the cage building process will be described in more detail. In addition, for simplification of description, FIG.
The slit H2 and the water blocking film 22 are not shown in FIG.

【0025】図4において、連壁溝Hの開口部の上方に
は、開口部より若干小形の上下方開口のスペーサホルダ
101が図示しない手段で設置されている。そのスペー
サホルダ101の内部には、スペーサ110が積み重ね
て収納され、これらスペーサ110の4隅は高張力線
(例えばテグス)102で相互に所定間隔Cで連結され
ている。そして、スペーサ110に穿設された複対の透
孔114には、リール(図4では図示せず)に巻回され
た耐張力性と可撓性を有する例えばカーボンファイバ製
の縦方向条材6が挿通されている。なお、透孔114の
内径は、縦方向条材6の外径より十分に大きく形成され
ている。
In FIG. 4, above the opening of the connecting wall groove H, a spacer holder 101 having upper and lower openings slightly smaller than the opening is installed by means not shown. Spacers 110 are stacked and housed inside the spacer holder 101, and the four corners of the spacers 110 are connected to each other at predetermined intervals C by high tension wires (for example, Tegs) 102. The pair of through-holes 114 formed in the spacer 110 has a tensile strength and flexibility wound around a reel (not shown in FIG. 4) and made of, for example, a carbon fiber vertical strip. 6 is inserted. The inner diameter of the through hole 114 is formed sufficiently larger than the outer diameter of the vertical strip 6.

【0026】篭体Dの建て込みに際して、例えば隣接す
るスペーサ110の間隔Cが長すぎる場合、位置決め部
材4を用いて条材6の撓み等を防止するのが好ましい。
なおスペーサ110は耐張力と可撓性とを有する材料で
構成されているが、位置決め部材4は普通プラスチック
等で充分である。
When the cage D is built, for example, when the space C between the adjacent spacers 110 is too long, it is preferable to prevent the bending of the strip 6 by using the positioning member 4.
The spacer 110 is made of a material having tensile strength and flexibility, but the positioning member 4 is usually made of plastic or the like.

【0027】図4で示す態様で篭体Dを建て込むに際し
ては、図示しないリールに巻回された複数の条材6、6
・・・を、スペーサホルダ101に収納された複数のス
ペーサ110、110・・・の透孔114に挿通し、下
端部を最下位のスペーサ(図示せず)に任意の手段で止
着する。そして、前記リールを回動して、縦方向条材
6、6・・・を繰り出してスペーサ110・・・をスペ
ーサホルダ1から順次引き下ろして降下させる。
When the cage D is built in the manner shown in FIG. 4, a plurality of strips 6 and 6 wound around a reel (not shown).
, Are inserted into the through holes 114 of the plurality of spacers 110, 110 accommodated in the spacer holder 101, and the lower end portion is fixed to the lowest spacer (not shown) by any means. Then, by rotating the reel, the longitudinal strips 6, 6 ... Are drawn out, and the spacers 110 ... Are sequentially pulled down from the spacer holder 1 and lowered.

【0028】縦方向条材6、6・・・の下端が連壁溝H
の底部に到達したら、条材6、6の頂部と最上部のスペ
ーサ110Zとを、公知のコーン状くさび109で固定
し、全体を符号Dで示す篭体を組み立てる。そして、コ
ンクリートを打設して図示しない連壁を造成するのであ
る。このコンクリート打設時に、最下位のスペーサの上
位のスペーサはコンクリートにより押し上げられるが、
4本の高張力線102が押し上げ力に抗してスペーサ間
の距離を所定間隔Cに保持する。
The lower ends of the longitudinal strips 6, 6 ...
When the bottom of the strip 6 is reached, the tops of the strips 6 and the uppermost spacer 110Z are fixed by a known cone-shaped wedge 109, and a cage indicated by reference numeral D is assembled. Then, concrete is poured to form a connecting wall (not shown). When placing this concrete, the upper spacers of the lowest spacers are pushed up by the concrete,
The four high tension wires 102 maintain the distance between the spacers at a predetermined distance C against the pushing force.

【0029】次に、図5を参照して本発明の第2実施例
を説明する。なお、図1−4の実施例と同様な構成要素
には、類似する符号を付してある。
Next, a second embodiment of the present invention will be described with reference to FIG. It should be noted that the same components as those in the embodiment of FIGS. 1-4 are designated by similar reference numerals.

【0030】図5において、連壁溝Hを掘削する掘削装
置10Aは図1で示す掘削装置10と概略同様である
が、この掘削装置10Aには、交差噴流を構成する噴流
J1、J2を噴出する一対のノズル(図5において、ノ
ズル事態は明確には図示せず)と、止水膜22を支持す
るための止水膜保持部20Aが設けられている。
In FIG. 5, the excavating device 10A for excavating the continuous wall groove H is substantially the same as the excavating device 10 shown in FIG. 1, but jets J1 and J2 forming a cross jet are ejected to the excavating device 10A. A pair of nozzles (in FIG. 5, the nozzle state is not clearly shown) and a water blocking film holding portion 20A for supporting the water blocking film 22 are provided.

【0031】該ノズルから噴出される交差噴流により、
後行パネルと接続される側が所定幅で且つ所定の奥行寸
法にて掘削され、掘削装置10Aが下降する事によりス
リットH2が形成される。そして、このスリットH2内
に、止水膜保持部20A及び止水膜22が挿入される。
そして、図示しない離脱機構により、止水膜22と止水
膜保持部20Aとの係合を解除すれば、連壁溝H内は、
止水膜22がスリットH2(図5)に配置された状態と
なる。その後、図4で示す態様にて鉄筋篭の建て込みが
行われるのである。
By the cross jets jetted from the nozzle,
The side connected to the trailing panel is excavated with a predetermined width and a predetermined depth dimension, and the slit H2 is formed by lowering the excavation device 10A. Then, the water blocking film holding portion 20A and the water blocking film 22 are inserted into the slit H2.
Then, when the engagement between the water blocking film 22 and the water blocking film holding portion 20A is released by a release mechanism (not shown), the inside of the connecting wall groove H becomes
The water blocking film 22 is placed in the slit H2 (FIG. 5). After that, the rebar cage is built in the manner shown in FIG.

【0032】図6、7は本発明の第3実施例を示してい
る。
6 and 7 show a third embodiment of the present invention.

【0033】図6において、連壁溝Hを掘削する掘削装
置10Bは図5中の掘削装置10Aと概略同様な構成で
あり、交差噴流を構成する噴流J1、J2を噴出する一
対のノズル(ノズル事態は明確には図示せず)を有して
いる。そして、該ノズルから噴出される交差噴流(J
1、J2)により、後行パネルと接続される側が所定幅
で且つ所定の奥行寸法にて掘削され、掘削装置10Aが
下降する事によりスリットH2が形成される。このスリ
ットH2は止水膜挿入用のスリットである。
In FIG. 6, the excavating device 10B for excavating the continuous wall groove H has substantially the same structure as the excavating device 10A in FIG. 5, and a pair of nozzles (nozzles) for ejecting jets J1 and J2 forming a cross jet. The situation has not been clearly shown). Then, the cross jet (J
1, J2), the side connected to the trailing panel is excavated with a predetermined width and a predetermined depth dimension, and the slit H2 is formed by lowering the excavating device 10A. This slit H2 is a slit for inserting a water blocking film.

【0034】しかし、図6の掘削装置10Bは、図5の
掘削装置10Aにおける止水膜保持部20Aに相当する
部材を有しておらず、従って、連壁溝H掘削と同時に止
水膜を挿入する事は行わない。
However, the excavating device 10B of FIG. 6 does not have a member corresponding to the water stop film holding portion 20A of the excavating device 10A of FIG. Do not insert.

【0035】この掘削装置10Bによる掘削が終了する
と、スリットH2を有する連壁溝Hが形成される。そし
て、この連壁溝H内に、図7で示す様な条材取付装置1
2Bを挿入する。
When the excavation by the excavator 10B is completed, the continuous wall groove H having the slit H2 is formed. Then, in the connecting wall groove H, the strip material attaching device 1 as shown in FIG.
Insert 2B.

【0036】図7の条材取付装置12Bは、図2で示す
条材取付装置12と概略同様の構成を具備している。す
なわち、複数の縦方向条材6・・・を取り付けてある支
持材14と、モニタ部16とを含み、該モニタ部16に
は止水膜保持部20が設けられており、止水膜22が取
り付けられている。そして止水膜保持部20は、条材取
付装置12Bが連壁溝H内を下降すると同時に、図6の
掘削装置10Bから噴射される前記交差噴流J1、J2
により掘削されたスリットH2内に、止水膜22と共に
挿入される。
The strip attachment device 12B shown in FIG. 7 has substantially the same structure as the strip attachment device 12 shown in FIG. That is, it includes a support member 14 to which a plurality of vertical strips 6 ... Are attached, and a monitor unit 16. The monitor unit 16 is provided with a water stop film holding unit 20, and a water stop film 22. Is attached. Then, in the water stop film holding portion 20, the cross jets J1 and J2 injected from the excavation device 10B of FIG.
It is inserted together with the water stop film 22 into the slit H2 excavated by.

【0037】しかし、この条材取付装置12Bは、図2
の装置12とは異なり、交差噴流を構成する一対のノズ
ルを有しておらず、それに関連して、噴流を構成する液
体を供給するためのホースも不要である。
However, this strip attaching device 12B is shown in FIG.
Unlike the device 12 of No. 1, it does not have a pair of nozzles forming a cross jet and, in connection therewith, no hose for supplying the liquid forming the jet is required.

【0038】上述した様な条材取付装置12Bが連壁溝
Hの底部HBに到達して篭体(図示せず)が建て込まれ
たならば、コンクリートの打設を行う。なお、止水膜2
2は図3で示す様に、連壁溝Hの開口部近傍に設けられ
たリール30に巻回されており、リール30を矢印CW
方向に回動する事により連壁溝H内に挿入・降下され
る。また、篭体の建て込みについては、図4を参照して
説明した様な態様で行われる。
When the strip attaching device 12B as described above reaches the bottom portion HB of the connecting wall groove H and a cage (not shown) is built in, concrete is poured. In addition, the water stop film 2
As shown in FIG. 3, 2 is wound around a reel 30 provided near the opening of the connecting wall groove H, and the reel 30 is indicated by an arrow CW.
By rotating in the direction, it is inserted and lowered into the connecting wall groove H. Further, the building of the cage is performed in the same manner as described with reference to FIG.

【0039】なお、図示の実施例はあくまでも例示出あ
り、本発明の技術範囲を限定するものではない。例え
ば、篭体の建て込みについては図4或いは特願平6−5
534号で開示された技術に限定する必要はない。
It should be noted that the illustrated embodiment is merely an example and does not limit the technical scope of the present invention. For example, for building a cage, see Fig. 4 or Japanese Patent Application No. 6-5.
It is not necessary to limit to the technology disclosed in No. 534.

【0040】[0040]

【発明の効果】本発明の作用効果を以下に列挙する。The effects of the present invention are listed below.

【0041】(1) 止水膜の設置が極めて簡単且つ確
実に行われる。
(1) Installation of the waterproof membrane is extremely easy and reliable.

【0042】(2) 仕切板の設置、採石の投入等の煩
雑な作業を必要としない。
(2) There is no need for complicated work such as installation of a partition plate and introduction of quarry.

【0043】(3) 止水膜を設置するスリットは交差
噴流により掘削されるので、必要以上にスリットの奥行
き寸法が大きくなる事が防止され、後行パネル或いは連
壁全体の強度に悪影響を及ぼす恐れが無い。
(3) Since the slits on which the water blocking film is installed are excavated by a cross jet, it is possible to prevent the depth dimension of the slits from becoming unnecessarily large, which adversely affects the strength of the trailing panel or the entire connecting wall. There is no fear.

【0044】(4) 連壁造成に費やされる労力及びコ
ストが低く抑えられる。
(4) The labor and cost spent for forming the connecting wall can be kept low.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の第1実施例における連壁溝掘削工程を
示す正面図。
FIG. 1 is a front view showing a continuous wall trench excavation process in a first embodiment of the present invention.

【図2】本発明の第1実施例における篭体建て込み工程
を示す正面図。
FIG. 2 is a front view showing a cage building step in the first embodiment of the present invention.

【図3】止水膜挿入の1態様を示す側面図。FIG. 3 is a side view showing one embodiment of insertion of a waterproof membrane.

【図4】篭体建て込みの1態様を示す斜視図。FIG. 4 is a perspective view showing one aspect of building a cage.

【図5】本発明の第2実施例における連壁溝掘削工程を
示す正面図。
FIG. 5 is a front view showing a continuous wall groove excavation process in the second embodiment of the present invention.

【図6】本発明の第3実施例における連壁溝掘削工程を
示す正面図。
FIG. 6 is a front view showing a continuous wall groove excavation process in the third embodiment of the present invention.

【図7】本発明の第3実施例における篭体建て込み工程
を示す正面図。
FIG. 7 is a front view showing a cage building step in the third embodiment of the present invention.

【符号の説明】[Explanation of symbols]

G・・・連壁を造成するべき地盤 H・・・先行パネル用の連壁溝 H2・・・止水膜挿入用スリット C・・・隣接するスペーサの間隔 D・・・篭体 6・・・縦方向条材 10、10A、10B・・・掘削装置 12、12B・・・条材取付装置 14・・・支持材 16・・・モニタ部 18A、18B・・・ノズル J1、J2、JA、JB・・・噴流(交差噴流) 20・・・止水膜保持部 22・・・止水膜 24・・・ホース 30・・・止水膜巻き回し用リール 101・・・スペーサホルダ 102・・・高張力線 110・・・スペーサ 110Z・・・最上部のスペーサ 114・・・透孔 G: The ground where a continuous wall should be constructed H ... Wall groove for preceding panel H2 ... Slit for inserting the waterproof membrane C: Space between adjacent spacers D: cage 6 ... Longitudinal strip 10, 10A, 10B ... Excavator 12, 12B ... Strip attachment device 14 ... Support material 16 ... Monitor section 18A, 18B ... Nozzle J1, J2, JA, JB ... Jet (cross jet) 20 ... Water stop film holding part 22 ... Water stop film 24 ... Hose 30 ... Reel for winding the waterproof film 101: Spacer holder 102 ... High tension wire 110 ... Spacer 110Z ... Top spacer 114 ... through hole

フロントページの続き (58)調査した分野(Int.Cl.7,DB名) E02D 5/20 102 E02D 5/20 103 E02D 5/18 102 Front page continued (58) Fields surveyed (Int.Cl. 7 , DB name) E02D 5/20 102 E02D 5/20 103 E02D 5/18 102

Claims (3)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 先行パネルとなるべき連壁溝を掘削する
連壁溝掘削工程と、掘削された連壁溝中に篭体を建て込
む篭体建て込み工程とを含み、該篭体は連続する縦方向
条材と横方向条材及び間隔保持材とから構成されてお
り、前記篭体建て込み工程の際に、掘削された連壁溝の
後行パネルと接続される側の掘削面の一部を交差噴流に
より所定距離だけ掘削し、該交差噴流により掘削された
部分に止水膜を挿入する事を特徴とする連壁工法。
1. A continuous wall groove excavating step of excavating a continuous wall groove to be a preceding panel, and a cage building step of building a cage in the excavated continuous wall groove, the cage being continuous. It is composed of vertical strips, horizontal strips, and spacing members, and the excavation surface on the side connected with the trailing panel of the excavated wall groove at the time of the cage building step. A continuous wall construction method characterized in that a part of a cross jet is excavated for a predetermined distance, and a water blocking film is inserted into a portion excavated by the cross jet.
【請求項2】 先行パネルとなるべき連壁溝を掘削する
のと同時に、後行パネルと接続される側の掘削面の一部
を交差噴流により所定距離だけ掘削し、該交差噴流によ
り掘削された部分に止水膜を挿入する工程と、掘削され
た連壁溝中に篭体を建て込む篭体建て込み工程とを含
み、該篭体は連続する縦方向条材と横方向条材及び間隔
保持材とから構成されている事を特徴とする連壁工法。
2. At the same time as excavating a continuous wall groove to be a leading panel, a part of an excavation surface on the side connected to a trailing panel is excavated by a cross jet for a predetermined distance, and the cross jet is excavated. Including a step of inserting a water blocking film into the open part and a step of building a cage in the excavated connecting wall groove, wherein the cage has a continuous vertical strip and a horizontal strip. A wall construction method characterized by being composed of a spacing material.
【請求項3】 先行パネルとなるべき連壁溝を掘削する
のと同時に、後行パネルと接続される側の掘削面の一部
を交差噴流により所定距離だけ掘削する工程と、掘削さ
れた連壁溝中に篭体を建て込むのと同時に、前記交差噴
流によって掘削された領域内に止水膜を挿入する工程と
を含み、該篭体は連続する縦方向条材と横方向条材及び
間隔保持材とから構成されている事を特徴とする連壁工
法。
3. A step of excavating a continuous wall groove to be a leading panel, and at the same time, excavating a part of an excavation surface on a side connected to a trailing panel by a cross jet for a predetermined distance, and a step of excavating a continuous wall. At the same time as building the cage in the wall groove, and inserting a waterproofing film in the region excavated by the cross jet, the cage having a continuous longitudinal strip and a lateral strip and A wall construction method characterized by being composed of a spacing material.
JP08281994A 1994-04-21 1994-04-21 Wall construction method Expired - Fee Related JP3395995B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP08281994A JP3395995B2 (en) 1994-04-21 1994-04-21 Wall construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP08281994A JP3395995B2 (en) 1994-04-21 1994-04-21 Wall construction method

Publications (2)

Publication Number Publication Date
JPH07292659A JPH07292659A (en) 1995-11-07
JP3395995B2 true JP3395995B2 (en) 2003-04-14

Family

ID=13785019

Family Applications (1)

Application Number Title Priority Date Filing Date
JP08281994A Expired - Fee Related JP3395995B2 (en) 1994-04-21 1994-04-21 Wall construction method

Country Status (1)

Country Link
JP (1) JP3395995B2 (en)

Also Published As

Publication number Publication date
JPH07292659A (en) 1995-11-07

Similar Documents

Publication Publication Date Title
KR100923078B1 (en) Construction Method of Facade Closure Using Sheet Pile and Band and Underwater Structure Construction Method
KR100913569B1 (en) P. file for retaining wall
JP3705903B2 (en) Earth anchor combined earth retaining structure
JPH0768705B2 (en) Soil retaining method and its retaining pile
JP3395995B2 (en) Wall construction method
US12276075B1 (en) Turning earth anchor structure for suppressing top displacement, and two-row self-supporting temporary earth retaining structure having a manual resistor block
KR20090078687A (en) Composite wall using a support pile with thumb piles in the form of a U-shaped steel and its construction method
JP3473778B2 (en) Continuous wall method and equipment used for it
JP4633273B2 (en) Earth retaining method and equipment
JPH0613770B2 (en) Method of constructing mountain retaining wall with parent pile
JP3009846B2 (en) Method and apparatus for cleaning steel material for underground diaphragm wall
JP2000297590A (en) Drilling wall construction method
JP2842236B2 (en) Grout injection method into back of underground continuous wall and its injection device
KR20090078684A (en) Support pile with thumb pile made of H beam, composite wall using the same and construction method
KR102638676B1 (en) Construction method of earth retaining wall without wale
JP2761531B2 (en) Construction method of guide for underground diaphragm wall
CN214783981U (en) Reinforcing structure between open caisson and existing channel
CN214832721U (en) Open caisson foundation pit supporting construction
JPS63125724A (en) Construction method of underground continuous wall
JP3434011B2 (en) Wall construction method
JP2988516B2 (en) Construction method of shield excavation wall
JPS5845323Y2 (en) Tensioning device for earth retaining sheet piles for trench excavation
KR20250157625A (en) CIP construction method using high-pressure grouting, and CIP retaining wall
KR20250072022A (en) Artificial underground wall earth anchor structure and earth anchor method
JPS62236922A (en) Method of reinforcing sheet pile-wall structure

Legal Events

Date Code Title Description
S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090207

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120207

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140207

Year of fee payment: 11

LAPS Cancellation because of no payment of annual fees