JP3402437B2 - Burial method of pipe - Google Patents
[go: Go Back, main page]

JP3402437B2 - Burial method of pipe - Google Patents

Burial method of pipe

Info

Publication number
JP3402437B2
JP3402437B2 JP18005397A JP18005397A JP3402437B2 JP 3402437 B2 JP3402437 B2 JP 3402437B2 JP 18005397 A JP18005397 A JP 18005397A JP 18005397 A JP18005397 A JP 18005397A JP 3402437 B2 JP3402437 B2 JP 3402437B2
Authority
JP
Japan
Prior art keywords
guide member
ground
pipe body
pipe
sunk
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP18005397A
Other languages
Japanese (ja)
Other versions
JPH1122860A (en
Inventor
英二 大西
鉄雄 川人
Original Assignee
ライト工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ライト工業株式会社 filed Critical ライト工業株式会社
Priority to JP18005397A priority Critical patent/JP3402437B2/en
Publication of JPH1122860A publication Critical patent/JPH1122860A/en
Application granted granted Critical
Publication of JP3402437B2 publication Critical patent/JP3402437B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、泥水を用いて地盤
の安定化を図りながら下水道管などの沈設する場合など
における管体の埋設工法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for burying a pipe body when a sewer pipe or the like is sunk while stabilizing the ground by using muddy water.

【0002】[0002]

【従来の技術】下水道管などを敷設するに際して、従
来、大別すると、開削方式、管の推進方式、シールド方
式などがあるが、これらは、施工する道路幅が狭かった
り、軟弱地盤の場合には、近隣家屋への影響防止のため
に止水、土留めなどの補助工法を採る必要があり、これ
らの補助工法の負担が大きく、経済的でない。
Conventionally, when laying sewer pipes, etc., there are roughly divided into open cutting method, pipe propulsion method, shield method, etc., but these are used for narrow roads or soft ground. Need to adopt auxiliary construction methods such as water stoppage and earth retaining to prevent the impact on neighboring houses, and these auxiliary construction methods are heavy and not economical.

【0003】そこで、近年、いわゆる「プラス工法」に
代表される、泥水固化方式による沈埋方式の敷設工法が
急速に普及している。すなわち、沈埋路線を、ベイトナ
イト泥水などの安定液を供給しながらパワーショベルな
どで地上から掘削し、その後、管体をクレーンなどによ
吊り下げて沈設し、次いで、前記安定液にセメントミ
ルクを添加し、安定液の固化を図り、管体を埋設するも
のである。
Therefore, in recent years, a laying method of a submersion method by a mud solidification method, which is typified by the so-called "plus method", has rapidly spread. That is, the submerged route is excavated from the ground with a power shovel while supplying a stable liquid such as baitite muddy water, and then the pipe is removed by a crane or the like .
It is suspended and sunk, and then cement milk is added to the stabilizing solution to solidify the stabilizing solution and the tube body is buried.

【0004】この場合、用いる管体には長さ制限がある
ために、(1)管体と人孔部とを安定液中に沈埋させ固
化した地盤中で順次連結する方法、(2)地上におい
て、複数本の管体、あるいは管体と人孔部とを連結した
上で、沈埋・固化する方法などがある。
In this case, since the length of the pipe used is limited, (1) a method in which the pipe and the human hole are submerged in a stabilizing solution and sequentially connected in the solidified ground, (2) above ground In, there is a method of burying and solidifying after connecting a plurality of pipes or pipes and human holes.

【0005】[0005]

【発明が解決しようとする課題】しかし、前記の(1)
の方法における管体と人孔部とを連結する場合、実際に
は、まず、人孔部を沈埋・固化した後、これに接続させ
る管体を沈埋・固化し、次に沈埋させた人孔部内に作業
員が地上から入り込み、管体方向に狸掘りを行い、管体
と貫通させ、接続部分に接続用短管を挿入し、その周囲
の間隙にモルタル充填し、止水を図る方法が採られてい
る。このように、(1)の方法はきわめて多大な手間を
要する。他方、管体相互を安定液中に沈埋させ固化した
地盤中で連結することも考えられるが、管体の径が小さ
い場合には作業員が入り込むことが困難な場合には、敢
えて、余分な人孔部を沈埋させることが必要となる。
However, the above (1)
In the case of connecting the pipe and the human hole in the above method, in practice, first, the human hole is first submerged and solidified, then the pipe to be connected to this is submerged and solidified, and then the human hole is submerged. There is a method in which a worker enters the section from the ground, digs a raccoon in the direction of the pipe, penetrates the pipe, inserts a short pipe for connection in the connection part, fills the mortar in the gap around it, and stops water. Has been taken. Thus, the method of (1) is that Yosu <br/> very much labor. Other hand, when it is considered that coupling in Soil and solidified by沈埋in stabilizing liquid tube mutually, when the diameter of the tube is small it is difficult to penetrate worker dare extra It is necessary to bury a large human hole.

【0006】この点において、後者の(2)の方法は、
地上部において連結を図っておくので、十分な漏水対策
を施しておくことができ、かつ、一人の作業員にかかる
負担はきわめて小さいなどの利点がある。しかし、沈埋
路線に沿って配設する門型クレーンを多数用意し、か
つ、沈埋時点で多人数の作業員が水平を確保しながら慎
重に沈埋作業を行う必要があり、また、工事のスパンが
長くなるので、長距離分交通遮断を行う必要がある。
In this respect, the latter method (2) is
Since the connection is made on the ground, it is possible to take sufficient measures against water leakage, and there is an advantage that the burden on one worker is extremely small. However, it is necessary to prepare a large number of gate-type cranes to be installed along the submerged route, and at the time of submergence, a large number of workers must carefully perform the submerged work while ensuring the level, and the span of the construction Since it will be long, it is necessary to cut off traffic for long distances.

【0007】したがって、既に沈設した管体に対して管
体1本ごと接続させることが望ましい。
Therefore, it is desirable to connect the pipe body, which has already been sunk, to the whole pipe body.

【0008】この種の管体の接続方法としては、特開昭
54−104603号、特開昭54−104605号、
特公昭61−20754号などの提案がなされている
が、接続方式に関するもので、具体的な接続装置に関す
るものではない。
As a method of connecting this type of tubular body, Japanese Patent Laid-Open Nos. 54-104603 and 54-104605,
Although Japanese Patent Publication No. 61-20754 is proposed, it relates to a connection system, not a specific connection device.

【0009】管体の接続装置自体に関するものは、特開
昭61−45185号がある。しかし、このサクション
力を用いて接続するには、地上での微妙な作業を要し、
その改良が望まれていた。
A device relating to the tube connecting device itself is described in JP-A-61-45185. However, connecting using this suction force requires delicate work on the ground,
The improvement was desired.

【0010】一方、本出願人は、先に特開平8−320
089号公報に記載の接続装置について提案した。この
接続装置は、隣接する管体相互を対応するパッカーにて
保持しながらそれらの離間間隔をシリンダにより収縮さ
せた接続を図るものである。
On the other hand, the applicant of the present invention previously disclosed in Japanese Unexamined Patent Publication No. 8-320.
A connection device described in Japanese Patent No. 089 was proposed. This connection device is intended to achieve a connection in which adjacent pipes are held by corresponding packers and the distance between them is reduced by a cylinder.

【0011】しかし、この接続装置は回収に際しては、
これに接続した回収ロープを地上にたぐりよせることで
回収を図ることができるものの、管体が長い場合や管体
内に異物が残存する場合、これらに引っ掛かって回収で
きないことがある。また、装置自体が高価となり、安定
液やセメント成分の付着などにより繰り返し使用期間が
短いなどの難点もある。
However, when collecting this connection device,
Although it is possible to recover by pulling the recovery rope connected to this to the ground, if the tube is long or foreign matter remains in the tube, it may be caught by these and cannot be recovered. Further, the apparatus itself becomes expensive, and there is a drawback that the period of repeated use is short due to adhesion of stabilizing liquid and cement components.

【0012】したがって、本発明の主たる課題は、回収
が確実であり、装置構成も簡素なものを得ることにあ
る。
[0012] Therefore, a main object of the present invention is to obtain a device which can be reliably collected and has a simple device configuration.

【0013】[0013]

【課題を解決するための手段】上記課題を解決した本発
明の請求項1記載の発明は、第1管体と第2管体を接続
するに際して、前記第1管体の端部外面に対して着脱自
在に設けられ、地上から掘削溝内に沈設される固定ベー
スと、これに固定されたシリンダと、このシリンダロッ
ドと一体化されかつ前記第1管体の軸心と実質的に直交
する位置にある第1ガイド部材と、地上との繋ぎ手段と
を有する接続機本体を用いて、順次以下の工程を経るこ
とを特徴とする管体の埋設工法である。 (1)前記第2管体の対応する端部外面に対して、その
軸心と実質的に直交して着脱自在の第2ガイド部材を地
上側に延在するように固定した状態の第2管体を、地盤
安定用泥水を充満させた埋設路線に沿う掘削溝内に沈設
し、 (2)予め前記接続機本体を固定した前記第1管体を地
上から前記第2管体と連設する掘削溝内位置に沈設し、
この際に前記第1ガイド部材と第2ガイド部材との嵌合
状態を維持しながら、相対的に第2ガイド部材に沿って
沈め、 (3)前記第1ガイド部材と第2ガイド部材との嵌合に
よる連結がなされ、かつ、第1管体が所定の位置に沈設
された状態で、前記シリンダを作動させ、前記第1管体
を第2管体側に移動させて、それらの端部相互を接合
し、 (4)前記第2ガイド部材は第2管体から外し、前記固
定ベースを第1管体から脱着して前記繋ぎ手段を介して
接続機本体を地上に回収する。
The invention according to claim 1 of the present invention which has solved the above-mentioned problems, when connecting the first pipe body and the second pipe body to the outer surface of the end portion of the first pipe body. A fixed base that is removably installed in the excavation groove from the ground, a cylinder fixed to the fixed base, and a cylinder rod that is integral with and is substantially orthogonal to the axis of the first tubular body. A method for burying a pipe is characterized in that the following steps are sequentially performed by using a connector main body having a first guide member in a position and a connecting means for connecting to the ground. (1) A second state in which a detachable second guide member is fixed to the outer surface of the corresponding end portion of the second tubular body so as to extend substantially to the ground side substantially orthogonal to the axis thereof. The pipe body is sunk in the excavation groove along the buried line filled with ground stabilization mud, and (2) the first pipe body to which the main body of the connection machine is fixed in advance is connected to the second pipe body from the ground. It is sunk in the excavation trench
At this time, while maintaining the fitted state of the first guide member and the second guide member, it is relatively sunk along the second guide member, (3) the first guide member and the second guide member With the connection by fitting and the first pipe body being sunk at a predetermined position, the cylinder is operated to move the first pipe body to the second pipe body side so that their ends are mutually connected. (4) The second guide member is removed from the second pipe body, the fixed base is detached from the first pipe body, and the main body of the connection machine is collected on the ground via the connecting means.

【0014】請求項2記載の発明は、第1管体と第2管
体を接続するに際して、前記第1管体の端部外面に対し
て着脱自在に設けられ、地上から掘削溝内に沈設される
固定ベースと、これに固定されたシリンダと、このシリ
ンダロッドと一体化されかつ前記第1管体の軸心と実質
的に直交する位置にある第1ガイド部材と、地上との繋
ぎ手段とを有する接続機本体を用いて、順次以下の工程
を経ることを特徴とする管体の埋設工法である。 (1)前記第2管体の対応する端部外面に対して、その
軸心と実質的に直交して着脱自在の第2ガイド部材を地
上側に延在するように固定した状態の第2管体を、地盤
安定用泥水を充満させた埋設路線に沿う掘削溝内に沈設
するとともに、前記第2ガイド部材に相当する位置に高
さ方向に沿う案内孔を有するロッキングボックスを、そ
の案内孔と前記第2ガイド部材とを嵌合して前記泥水中
に沈設し、 (2)泥水の固化を図り、 (3)前記ロッキングボックスを境にして次の掘削溝を
地盤安定用泥水を供給しながら掘削し、 (4)前記ロッキングボックスを撤去し、 (5)予め前記接続機本体を固定した前記第1管体を地
上から掘削溝内に沈め、この際に前記第1ガイド部材と
第2ガイド部材との嵌合状態を維持しながら、相対的に
第2ガイド部材に沿って沈め、 (6)前記第1ガイド部材と第2ガイド部材との嵌合に
よる連結をなし、第1管体を所定の位置に沈設した状態
で、前記シリンダを作動させ、前記第1管体を第2管体
側に移動させて、それらの端部相互を接合し、 (7)前記第2ガイド部材は第2管体から外し、前記固
定ベースを第1管体から脱着して前記繋ぎ手段を介して
接続機本体を地上に回収する。
According to a second aspect of the present invention, when connecting the first pipe body and the second pipe body, the first pipe body is detachably provided to the outer surface of the end portion of the first pipe body and is set in the excavation groove from the ground. Fixed base, a cylinder fixed to the fixed base, a first guide member that is integrated with the cylinder rod and is located at a position substantially orthogonal to the axis of the first tubular body, and means for connecting to the ground. The method for burying a pipe is characterized in that the following steps are sequentially performed by using a connector main body having (1) A second state in which a detachable second guide member is fixed to the outer surface of the corresponding end portion of the second tubular body so as to extend substantially to the ground side substantially orthogonal to the axis thereof. The pipe is submerged in the excavation groove along the buried line filled with the ground stabilization mud, and the locking box having the guide hole along the height direction at the position corresponding to the second guide member is provided in the guide hole. And the second guide member are fitted to each other to be submerged in the muddy water, (2) solidify the muddy water, and (3) supply the muddy water for ground stabilization to the next excavation groove with the rocking box as a boundary. While excavating, (4) removing the locking box, (5) submerging the first pipe body to which the connector body has been fixed in advance into the excavation groove from the ground, and at this time, the first guide member and the second guide member. While maintaining the fitting state with the guide member, (6) The first guide member and the second guide member are connected by fitting, and the first pipe is sunk at a predetermined position to operate the cylinder, The first pipe body is moved to the second pipe body side and their ends are joined to each other. (7) The second guide member is removed from the second pipe body, and the fixed base is detached from the first pipe body. The main body of the connecting device is collected on the ground via the connecting means.

【0015】[0015]

【発明の実施の形態】以下本発明を図面に示す実施の形
態を参照しながらさらに詳説する。
BEST MODE FOR CARRYING OUT THE INVENTION The present invention will be described in more detail below with reference to the embodiments shown in the drawings.

【0016】まず、本発明に係る接続装置について主に
図1によって説明すると、固定ベース1の両側部にガイ
ド筒2,2が一体化され、これらガイド筒2,2にスラ
イドロッド3,3が遊嵌されている。ガイド筒2,2の
間には、復動油圧シリンダ4が固定されており、そのシ
リンダロッド4Aの先端には、連結板5が一体化されて
いる。連結板5には、スライドロッド3,3の一端部が
固定されている。
First, the connection device according to the present invention will be described mainly with reference to FIG. 1. The guide cylinders 2 and 2 are integrated on both sides of the fixed base 1, and the slide rods 3 are attached to the guide cylinders 2 and 2. It is fitted loosely. A return hydraulic cylinder 4 is fixed between the guide cylinders 2 and 2, and a connecting plate 5 is integrated at the tip of the cylinder rod 4A. One end of the slide rods 3 is fixed to the connecting plate 5.

【0017】スライドロッド3,3の他端部には、第1
ガイド部材としての連結筒6,6が直交して一体化され
ており、これらの連結筒6,6間、スライドロッド3,
3間、および連結筒6とスライドロッド3との間には補
強部材7A,7B,7Cが一体化されている。
At the other end of the slide rods 3, 3, there is a first
The connecting cylinders 6 and 6 as guide members are integrated orthogonally to each other, and between the connecting cylinders 6 and 6, the slide rod 3,
Reinforcing members 7A, 7B and 7C are integrated between the three and between the connecting cylinder 6 and the slide rod 3.

【0018】ガイド筒2,2には支持台8が一体化され
ている。支持台8上には、案内筒10が設けられ、この
案内筒10内には、接合確認用バー11が内装され、図
示していない案内筒10内に設けられたスプリングによ
って進出限度まで、補強部材7A側に付勢されている。
接合確認用バー11の後端には、傾斜面11aが形成さ
れている。案内筒10に一体化された支持部材12に
は、リミットスイッチ13が固定され、その先端部は傾
斜面11aに対応したレベル位置に設置されている。
A support base 8 is integrated with the guide tubes 2 and 2. A guide cylinder 10 is provided on the support base 8, and a joining confirmation bar 11 is provided in the guide cylinder 10, and a spring provided in the guide cylinder 10 (not shown) reinforces the guide cylinder 10 to the advance limit. It is biased to the member 7A side.
An inclined surface 11a is formed at the rear end of the joining confirmation bar 11. A limit switch 13 is fixed to a support member 12 integrated with the guide cylinder 10, and its tip is installed at a level position corresponding to the inclined surface 11a.

【0019】他方、ガイド筒2,2の両側には、挿通孔
9aを有するフランジ9(他方は図示されていない)が
張り出して一体化され、このフランジ9に対応する下方
位置において固定ベース1の両側に、挿通孔14aを有
する止め座14(他方は図1に図示されていない)が形
成されている。
On the other hand, on both sides of the guide cylinders 2 and 2, a flange 9 (another not shown) having an insertion hole 9a is projected and integrated, and the fixed base 1 is located at a lower position corresponding to the flange 9. Stop seats 14 (the other side is not shown in FIG. 1) having insertion holes 14a are formed on both sides.

【0020】かかる接続装置を用いて、管体の埋設が行
われる。この埋設工法について説明すると、まず、図3
に示すように、ガイドウォール60,60を構築し、こ
れらの間をパワーショベルなどにより、地盤安定用のベ
ントナイト泥水Sを供給しながら、掘削溝61を掘削す
る。この掘削溝61の端部に予めまたはその後に人孔6
2を埋設する。
The pipe body is buried by using such a connecting device. Explaining this burial method, first, referring to FIG.
As shown in, the guide walls 60, 60 are constructed, and the excavation trench 61 is excavated while supplying bentonite mud S for ground stabilization between the guide walls 60, 60 by a power shovel or the like. The human hole 6 is formed at the end of the excavation groove 61 in advance or thereafter.
2 is buried.

【0021】他方、地上において、図2および図3に示
すように、第2管体(先行管体)20の沈設準備を行
う。すなわち、先行する第2管体20の下部に、その補
強および浮力に対向する重力を増すための下部H形鋼5
1を、上部に上部溝形鋼52を配置し、第2管体20と
ワイヤー53などにより一体化させる。また、上部溝形
鋼52上面には、カップラー54を長手方向に間隔を置
いて固着しておく。
On the other hand, on the ground, as shown in FIGS. 2 and 3, the second pipe body (preceding pipe body) 20 is prepared for sinking. That is, in the lower portion of the preceding second tubular body 20, a lower H-section steel 5 for increasing gravity against its reinforcement and buoyancy.
1, the upper channel steel 52 is arranged on the upper part, and the second tube body 20 and the wire 53 are integrated with each other. Further, couplers 54 are fixed to the upper surface of the upper channel steel 52 at intervals in the longitudinal direction.

【0022】また、第2管体20の人孔62側開口端に
は仮蓋63を設け、かつ注水エア抜き64を設ける。他
端(後行の第1管体30側)開口には、止水蓋65を設
けておく。この止水蓋65には回収用ワイヤー66を接
続しておく。さらに、後行の第1管体30側において、
図4に示すように、上部溝形鋼52両側にガイド筒6
8,68を一体化させる。
A temporary lid 63 is provided at the opening end of the second tubular body 20 on the side of the human hole 62, and a water injection air vent 64 is provided. A water blocking lid 65 is provided at the opening at the other end (on the side of the subsequent first tubular body 30). A recovery wire 66 is connected to the water stop lid 65. Further, on the trailing side of the first tubular body 30,
As shown in FIG. 4, the guide tube 6 is provided on both sides of the upper channel steel 52.
8.68 are integrated.

【0023】さらに、図6に示すように、各カップラー
54,54…にゲビン棒69,69…を螺合するととも
に、ガイド筒68,68にたとえば鋼管からなる第2ガ
イド部材70,70を挿入しておく。
Further, as shown in FIG. 6, the Gevin rods 69, 69 are screwed into the respective couplers 54, 54 ... And the second guide members 70, 70 made of, for example, steel pipes are inserted into the guide cylinders 68, 68. I'll do it.

【0024】かかる段取りが完了した後、たとえば図3
に示す門型足場クレーン71を用いて、チェーンブロッ
ク72により第2管体20全体をワイヤー73により吊
持しながら、泥水S中に沈設する。
After such setup is completed, for example, as shown in FIG.
Using the gate-type scaffolding crane 71 shown in (1), the entire second pipe body 20 is suspended by the wire 73 by the chain block 72 and submerged in the muddy water S.

【0025】所定位置に沈設したこと、すなわちレベル
および通りが所定位置になったことをゲビン棒69,6
9…の位置により確認する。この場合、図5に示されて
いるように、フロート90を用いて沈設深さを確認でき
る。その後、泥水S中にセメントミルクを注入しエア攪
拌し、泥水Sの固化を図る。
The sinking at the predetermined position, that is, the level and the street being in the predetermined position, are indicated by the Gevin rods 69, 6
Check by the position of 9 ... In this case, as shown in FIG. 5, the float 90 can be used to confirm the deposition depth. After that, cement milk is injected into the muddy water S and the mixture is stirred with air to solidify the muddy water S.

【0026】次に、先行する第2管体20に対して接続
するための第1管体30の端部に、図1によって説明し
た前述の接続装置を地上にて取り付ける。この取付は、
固定用ロッド75を、前記フランジ9の挿通孔9aを通
し、この状態でナット76を嵌め込んだ後、固定ベース
1の止め座14の挿通孔14aを通して、図1に詳細が
示されているように、上部溝形鋼52に一体化された張
出部74に形成されたねじ孔74aに螺入することによ
り行う。
Next, the above-mentioned connecting device described with reference to FIG. 1 is mounted on the ground at the end of the first pipe body 30 for connecting to the preceding second pipe body 20. This installation is
The fixing rod 75 is inserted through the insertion hole 9a of the flange 9, the nut 76 is fitted in this state, and then the insertion hole 14a of the fixing seat 14 of the fixed base 1 is passed through, as shown in detail in FIG. Then, it is carried out by screwing into the screw hole 74a formed in the overhanging portion 74 integrated with the upper channel steel 52.

【0027】他方、第2管体20の場合に同様に、各カ
ップラー54,54…にゲビン棒69,69を装着する
などの段取りを行う。
On the other hand, similarly to the case of the second tubular body 20, setup such as mounting the Gevin rods 69, 69 on the respective couplers 54, 54 ... Is carried out.

【0028】他方、第1管体30の個所を掘削し、泥水
Sで満たす。この工程は、第2管体20の沈設後でもよ
いし、予め、第2管体20と第1管体30との全長分を
掘削しておいてもよい。
On the other hand, the portion of the first pipe body 30 is excavated and filled with the muddy water S. This step may be performed after the second pipe body 20 is sunk, or the entire length of the second pipe body 20 and the first pipe body 30 may be excavated in advance.

【0029】かかる後、第2管体20の沈設と同様に、
第1管体30を門型足場クレーン71を用いて所定位置
に沈設する。
After that, as in the case of the second tube 20 being sunk,
The first pipe body 30 is sunk in a predetermined position by using the portal scaffolding crane 71.

【0030】この沈設の際に、接続装置の連結筒6,6
を第2ガイド部材70,70に外嵌させながら沈設す
る。止水蓋65は回収用ワイヤー66を介して地上に撤
去する。この沈設完了状態が、図6および図7に図示さ
れている。
During this sinking, the connecting tubes 6 and 6 of the connecting device
Is sunk while being fitted onto the second guide members 70, 70. The water stop lid 65 is removed to the ground via the recovery wire 66. This completed state of deposition is shown in FIGS. 6 and 7.

【0031】次に、油圧シリンダ4を作動し、そのシリ
ンダロッド4Aを伸長させる。これにより、スライドロ
ッド3,3に一体化された連結筒6,6は、第2ガイド
部材70,70と嵌合状態にあり、かつ、接続装置は第
1管体30に固定されているので、逆に、第1管体30
が第2管体20側に移動せられる。この移動に伴って、
第1管体30の端部が第2管体20内に嵌合し接合が行
われる。接合部にはシール部材77が予め設けられてい
る。
Then, the hydraulic cylinder 4 is operated to extend the cylinder rod 4A. As a result, the connecting tubes 6 and 6 integrated with the slide rods 3 and 3 are in a fitted state with the second guide members 70 and 70, and the connecting device is fixed to the first tubular body 30. , Conversely, the first tubular body 30
Are moved to the second pipe body 20 side. With this move,
The end portion of the first pipe body 30 is fitted into the second pipe body 20 and is joined. A seal member 77 is provided in advance at the joint.

【0032】接合限になると、接合確認用バー11の先
端が、補強板7Aに当接し、逆に接合確認用バー11は
後方に押し出されるので、その傾斜面11aでリミット
スイッチ13を叩き、その信号が地上に伝達され、地上
にて接合が完了したことを確認できる。
At the joining limit, the tip of the joining confirmation bar 11 comes into contact with the reinforcing plate 7A, and conversely the joining confirmation bar 11 is extruded rearward. Therefore, the limit switch 13 is tapped on the inclined surface 11a thereof. The signal is transmitted to the ground, and it can be confirmed that the joining is completed on the ground.

【0033】接合完了後、固定用ロッド75,75を逆
回転させ、張出部74に形成されたねじ孔74aから外
した後、これをそのまま引き上げると、ナット76,7
6がフランジ9,9下面に当たるので、引き上げを続行
すると、接続装置全体を地上に回収することができる。
したがって、当該接続装置は再使用が可能である。
After the joining is completed, the fixing rods 75, 75 are reversely rotated and removed from the screw holes 74a formed in the overhanging portion 74, and then the nuts 76, 7
Since 6 contacts the lower surfaces of the flanges 9 and 9, if the pulling is continued, the entire connecting device can be collected on the ground.
Therefore, the connection device can be reused.

【0034】第2管体20と第1管体30との接続に際
して、図8〜図11に示すように、ロッキングボックス
80を用いて接続させることができる。すなわち、これ
を説明すると、 (1)図8に示すように、図2〜図5の例と同様に、埋
設路線に沿う掘削溝61内に充満させた地盤安定用泥水
S中において、第2管体20の対応する端部外面に対し
て、その軸心と実質的に直交して着脱自在の第2ガイド
部材70,70を地上側に延在した状態で固定し、かつ
第2管体20を泥水S中に沈設するとともに、第2ガイ
ド部材70,70に相当する位置に高さ方向に沿う案内
孔81,81を有するロッキングボックス80を、その
案内孔81,81と第2ガイド部材70,70とを嵌合
して泥水中に沈設する。
When connecting the second tubular body 20 and the first tubular body 30, a locking box 80 can be used for connection as shown in FIGS. 8 to 11. That is, this will be described. (1) As shown in FIG. 8, in the ground stabilization mud S filled in the excavation trench 61 along the buried line, as in the example of FIGS. A second guide member 70, 70 is detachably fixed to the outer surface of the corresponding end of the tubular body 20 so as to be substantially orthogonal to the axis of the tubular body 20 while extending to the ground side. 20 is submerged in the muddy water S, and a locking box 80 having guide holes 81, 81 along the height direction at positions corresponding to the second guide members 70, 70 is provided with the guide holes 81, 81 and the second guide member. 70, 70 are fitted together and are sunk in muddy water.

【0035】(2)次に、第2管体20を沈設した部分
の泥水Sの固化を図る。
(2) Next, solidification of the muddy water S in the portion where the second pipe 20 is sunk is attempted.

【0036】(3)前記ロッキングボックス80を境に
して次の掘削溝を地盤安定用泥水Sを供給しながら掘削
する。
(3) Excavate the next excavation groove with the rocking box 80 as a boundary while supplying the ground stabilization mud S.

【0037】(4)その後、ロッキングボックス80お
よび止水蓋65を撤去する。
(4) After that, the locking box 80 and the water blocking lid 65 are removed.

【0038】(5)予め前記接続装置本体Xを固定し、
かつ必要により他の端部に人孔部62Aを一体化させた
第1管体30を、地上から掘削溝61内に沈め、この際
に第1ガイド部材としての連結筒6,6と第2ガイド部
材70,70との嵌合状態を維持しながら、相対的に第
2ガイド部材70,70に沿って沈める。
(5) Fix the connecting device body X in advance,
And, if necessary, the first pipe body 30 in which the human hole portion 62A is integrated with the other end portion is sunk from the ground into the excavation groove 61, and at this time, the connecting cylinders 6 and 6 as the first guide member and the second While maintaining the fitted state with the guide members 70, 70, the guide members 70, 70 are relatively sunk along the second guide members 70, 70.

【0039】(6)第1ガイド部材6,6と第2ガイド
部材70,70との嵌合による連結がなされ、第1管体
30が所定の位置に沈設された状態で、シリンダ4を作
動させ、第1管体30を第2管体20側に移動させて、
それらの端部相互を接合する。
(6) The cylinder 4 is operated in a state where the first guide members 6 and 6 and the second guide members 70 and 70 are connected by fitting and the first pipe body 30 is sunk in a predetermined position. Then, the first pipe body 30 is moved to the second pipe body 20 side,
Join their ends together.

【0040】(7)第2ガイド部材70,70は第2管
体20から外し、固定ベース1を第1管体30から脱着
して繋ぎ手段としての固定用ロッド75,75を介して
接続装置Xを地上に回収する。
(7) The second guide members 70, 70 are detached from the second tubular body 20, and the fixed base 1 is detached from the first tubular body 30 and connected via the fixing rods 75, 75 as connecting means. Collect X on the ground.

【0041】ここに用いるロッキングボックス80の第
1の例が、図10および図11に示されている。すなわ
ち、たとえば鋼板からなる薄い箱型のボックス体82
の、第2管体20側部分のみを切欠し(切欠部を符号8
3で示す)、ボックス体82に案内孔81,81を形成
するとともに、止水蓋65の操作用ワイヤーの挿通孔8
4を形成したものである。85は吊り下げ用フックであ
る。図12および図13には、止水蓋65の例を図示し
た。
A first example of the locking box 80 used here is shown in FIGS. 10 and 11. That is, for example, a thin box-shaped box body 82 made of a steel plate
Of the second tubular body 20 is notched (the notched portion is denoted by 8
3), the guide holes 81, 81 are formed in the box body 82, and the operation wire insertion hole 8 of the water blocking lid 65 is formed.
4 is formed. Reference numeral 85 is a hanging hook. 12 and 13 show an example of the water blocking lid 65.

【0042】[0042]

【発明の効果】以上のとおり、本発明によれば、管体の
埋設がきわめて円滑に行うことができるなどの利点がも
たらされる。
As described above , according to the present invention,
There are advantages such as that the burial can be performed very smoothly.

【図面の簡単な説明】[Brief description of drawings]

【図1】接続装置の斜視図である。FIG. 1 is a perspective view of a connection device.

【図2】第2の管体の沈設準備段階の正面図である。FIG. 2 is a front view of a second pipe body at a preparatory stage for sinking.

【図3】第2の管体の沈設段階の側面図である。FIG. 3 is a side view of a second tube body at a sunk stage.

【図4】第2管体の端部の構造の斜視図である。FIG. 4 is a perspective view of a structure of an end portion of a second tubular body.

【図5】第2の管体の沈設終了段階の正面図である。FIG. 5 is a front view of the second tube at the completion of the deposition.

【図6】第1管体の第2管体に対する接合前段階の正面
図である。
FIG. 6 is a front view of a stage before joining the first tubular body to the second tubular body.

【図7】第1管体の第2管体に対する接合前段階の平面
図である。
FIG. 7 is a plan view of a stage before joining the first tubular body to the second tubular body.

【図8】ロッキングボックスを用いる例の第2管体の沈
設終了段階の正面図である。
FIG. 8 is a front view of a second tube at an end stage of the deposition of the example of using the locking box.

【図9】ロッキングボックスを用いる例の第1管体の沈
設段階の正面図である。
FIG. 9 is a front view of the step of sunk the first tubular body of the example using the locking box.

【図10】ロッキングボックスの側面図である。FIG. 10 is a side view of the locking box.

【図11】ロッキングボックスの斜視図である。FIG. 11 is a perspective view of a locking box.

【図12】止水蓋の正面図である。FIG. 12 is a front view of a water blocking lid.

【図13】止水蓋の側面図である。FIG. 13 is a side view of the water blocking lid.

【符号の説明】[Explanation of symbols]

1…固定ベース、2…ガイド筒、3…スライドロッド、
4…シリンダ、6…連結筒(第1ガイド部材)、13…
リミットスイッチ、20…第2管体、30…第1管体、
61…掘削溝、68…ガイド筒、70…第2ガイド部
材、X…接続装置。
1 ... Fixed base, 2 ... Guide tube, 3 ... Slide rod,
4 ... Cylinder, 6 ... Connection tube (first guide member), 13 ...
Limit switch, 20 ... second tube, 30 ... first tube,
61 ... Excavation groove, 68 ... Guide tube, 70 ... Second guide member, X ... Connection device.

───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.7,DB名) F16L 1/024 ─────────────────────────────────────────────────── ─── Continuation of the front page (58) Fields surveyed (Int.Cl. 7 , DB name) F16L 1/024

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】第1管体と第2管体を接続するに際して、
前記第1管体の端部外面に対して着脱自在に設けられ、
地上から掘削溝内に沈設される固定ベースと、これに固
定されたシリンダと、このシリンダロッドと一体化され
かつ前記第1管体の軸心と実質的に直交する位置にある
第1ガイド部材と、地上との繋ぎ手段とを有する接続機
本体を用いて、順次以下の工程を経ることを特徴とする
管体の埋設工法。 (1)前記第2管体の対応する端部外面に対して、その
軸心と実質的に直交して着脱自在の第2ガイド部材を地
上側に延在するように固定した状態の第2管体を、地盤
安定用泥水を充満させた埋設路線に沿う掘削溝内に沈設
し、 (2)予め前記接続機本体を固定した前記第1管体を地
上から前記第2管体と連設する掘削溝内位置に沈設し、
この際に前記第1ガイド部材と第2ガイド部材との嵌合
状態を維持しながら、相対的に第2ガイド部材に沿って
沈め、 (3)前記第1ガイド部材と第2ガイド部材との嵌合に
よる連結がなされ、かつ、第1管体が所定の位置に沈設
された状態で、前記シリンダを作動させ、前記第1管体
を第2管体側に移動させて、それらの端部相互を接合
し、 (4)前記第2ガイド部材は第2管体から外し、前記固
定ベースを第1管体から脱着して前記繋ぎ手段を介して
接続機本体を地上に回収する。
1. When connecting the first tubular body and the second tubular body,
Removably provided on the outer surface of the end of the first tubular body,
A fixed base that is sunk in the excavation groove from the ground, a cylinder fixed to the fixed base, and a first guide member that is integrated with the cylinder rod and is positioned substantially orthogonal to the axis of the first tubular body. A method for burying a pipe body, which comprises sequentially performing the following steps using a main body of a connecting machine having a connecting means with a ground. (1) A second state in which a detachable second guide member is fixed to the outer surface of the corresponding end portion of the second tubular body so as to extend substantially to the ground side substantially orthogonal to the axis thereof. The pipe body is sunk in the excavation groove along the buried line filled with ground stabilization mud, and (2) the first pipe body to which the main body of the connection machine is fixed in advance is connected to the second pipe body from the ground. It is sunk in the excavation trench
At this time, while maintaining the fitted state of the first guide member and the second guide member, it is relatively sunk along the second guide member, (3) the first guide member and the second guide member With the connection by fitting and the first pipe body being sunk at a predetermined position, the cylinder is operated to move the first pipe body to the second pipe body side so that their ends are mutually connected. (4) The second guide member is removed from the second pipe body, the fixed base is detached from the first pipe body, and the main body of the connection machine is collected on the ground via the connecting means.
【請求項2】第1管体と第2管体を接続するに際して、
前記第1管体の端部外面に対して着脱自在に設けられ、
地上から掘削溝内に沈設される固定ベースと、これに固
定されたシリンダと、このシリンダロッドと一体化され
かつ前記第1管体の軸心と実質的に直交する位置にある
第1ガイド部材と、地上との繋ぎ手段とを有する接続機
本体を用いて、順次以下の工程を経ることを特徴とする
管体の埋設工法。 (1)前記第2管体の対応する端部外面に対して、その
軸心と実質的に直交して着脱自在の第2ガイド部材を地
上側に延在するように固定した状態の第2管体を、地盤
安定用泥水を充満させた埋設路線に沿う掘削溝内に沈設
するとともに、前記第2ガイド部材に相当する位置に高
さ方向に沿う案内孔を有するロッキングボックスを、そ
の案内孔と前記第2ガイド部材とを嵌合して前記泥水中
に沈設し、 (2)泥水の固化を図り、 (3)前記ロッキングボックスを境にして次の掘削溝を
地盤安定用泥水を供給しながら掘削し、 (4)前記ロッキングボックスを撤去し、 (5)予め前記接続機本体を固定した前記第1管体を地
上から掘削溝内に沈め、この際に前記第1ガイド部材と
第2ガイド部材との嵌合状態を維持しながら、相対的に
第2ガイド部材に沿って沈め、 (6)前記第1ガイド部材と第2ガイド部材との嵌合に
よる連結をなし、第1管体を所定の位置に沈設した状態
で、前記シリンダを作動させ、前記第1管体を第2管体
側に移動させて、それらの端部相互を接合し、 (7)前記第2ガイド部材は第2管体から外し、前記固
定ベースを第1管体から脱着して前記繋ぎ手段を介して
接続機本体を地上に回収する。
2. When connecting the first tubular body and the second tubular body,
Removably provided on the outer surface of the end of the first tubular body,
A fixed base that is sunk in the excavation groove from the ground, a cylinder fixed to the fixed base, and a first guide member that is integrated with the cylinder rod and is positioned substantially orthogonal to the axis of the first tubular body. A method for burying a pipe body, which comprises sequentially performing the following steps using a main body of a connecting machine having a connecting means with a ground. (1) A second state in which a detachable second guide member is fixed to the outer surface of the corresponding end portion of the second tubular body so as to extend substantially to the ground side substantially orthogonal to the axis thereof. The pipe is submerged in the excavation groove along the buried line filled with the ground stabilization mud, and the locking box having the guide hole along the height direction at the position corresponding to the second guide member is provided in the guide hole. And the second guide member are fitted to each other to be submerged in the muddy water, (2) solidify the muddy water, and (3) supply the muddy water for ground stabilization to the next excavation groove with the rocking box as a boundary. While excavating, (4) removing the locking box, (5) submerging the first pipe body to which the connector body has been fixed in advance into the excavation groove from the ground, and at this time, the first guide member and the second guide member. While maintaining the fitting state with the guide member, (6) The first guide member and the second guide member are connected by fitting, and the first pipe is sunk at a predetermined position to operate the cylinder, The first pipe body is moved to the second pipe body side and their ends are joined to each other. (7) The second guide member is removed from the second pipe body, and the fixed base is detached from the first pipe body. The main body of the connecting device is collected on the ground via the connecting means.
JP18005397A 1997-07-04 1997-07-04 Burial method of pipe Expired - Fee Related JP3402437B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP18005397A JP3402437B2 (en) 1997-07-04 1997-07-04 Burial method of pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP18005397A JP3402437B2 (en) 1997-07-04 1997-07-04 Burial method of pipe

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP2003005820A Division JP3761173B2 (en) 2003-01-14 2003-01-14 Connecting device for pipes in excavation grooves

Publications (2)

Publication Number Publication Date
JPH1122860A JPH1122860A (en) 1999-01-26
JP3402437B2 true JP3402437B2 (en) 2003-05-06

Family

ID=16076674

Family Applications (1)

Application Number Title Priority Date Filing Date
JP18005397A Expired - Fee Related JP3402437B2 (en) 1997-07-04 1997-07-04 Burial method of pipe

Country Status (1)

Country Link
JP (1) JP3402437B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4798600A (en) * 1987-06-12 1989-01-17 Meadows Michael E Condom device and method for using same
LU92917B1 (en) 2015-12-17 2017-06-19 Sms Group Gmbh Extrusion and tube press or metal extrusion press

Also Published As

Publication number Publication date
JPH1122860A (en) 1999-01-26

Similar Documents

Publication Publication Date Title
KR100920256B1 (en) Tip indentation device of steel pipe loop structure
CN113638448B (en) Working well and construction method thereof, underground pipeline working well device and construction method thereof
JP3402437B2 (en) Burial method of pipe
JP3761173B2 (en) Connecting device for pipes in excavation grooves
JPH11303087A (en) Retaining walls using corrosion resistant structural anchors
KR102571807B1 (en) Earth frame for the pipe laying
KR102071647B1 (en) Pipe roof structures and construction method of underground structure using thereof
KR100784201B1 (en) Tunnel construction method using steel pipe loop structure in rock section
JP3292824B2 (en) Burial method of pipe
JP3375867B2 (en) Burial method of pipe
KR100983114B1 (en) Tip indentation device of steel pipe loop structure
JP4049306B2 (en) Subsidence method of underground structure
KR20230047673A (en) the improvement structure and this formation method of the oscillation work outlet facilitating the input of the propulsion pipe
JPH07119866A (en) Underground pipe laying method
JP3504198B2 (en) Pipe burial method and mobile closing device used in the pipe
JP3549808B2 (en) Continuous installation method of flexible blocking plate
JP3281218B2 (en) Pipe connection method and device
KR20010070900A (en) Apparatus laying pipes underground for public engineering and construction
JP2005147781A (en) Boundary stake embedding tool
JP2001164637A (en) Pipe burial method
JP2004162256A (en) Removable buried pipe
JP3403674B2 (en) Method of maintaining the suspension support posture of the tube
JPH09317383A (en) Buried method of main pipe and branch pipe in buried pipe
KR100201488B1 (en) How to build a tunnel
JPH0340169B2 (en)

Legal Events

Date Code Title Description
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090228

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100228

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110228

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120229

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120229

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130228

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130228

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140228

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150228

Year of fee payment: 12

LAPS Cancellation because of no payment of annual fees