JP3429576B2 - Hopper for putting concrete and method for producing concrete product using the same - Google Patents
Hopper for putting concrete and method for producing concrete product using the sameInfo
- Publication number
- JP3429576B2 JP3429576B2 JP25872494A JP25872494A JP3429576B2 JP 3429576 B2 JP3429576 B2 JP 3429576B2 JP 25872494 A JP25872494 A JP 25872494A JP 25872494 A JP25872494 A JP 25872494A JP 3429576 B2 JP3429576 B2 JP 3429576B2
- Authority
- JP
- Japan
- Prior art keywords
- concrete
- hopper
- mold
- funnel
- formwork
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Devices For Post-Treatments, Processing, Supply, Discharge, And Other Processes (AREA)
Description
【発明の詳細な説明】Detailed Description of the Invention
【0001】[0001]
【産業上の利用分野】本発明は、コンクリート投入用ホ
ッパー及びこのホッパーを用いた製品の表面に気泡跡が
形成されないコンクリート製品の製造方法に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a hopper for feeding concrete and a method for producing a concrete product in which no bubble mark is formed on the surface of the product using this hopper.
【0002】[0002]
【従来の技術】図2に示すように、例えばコンクリート
製のボックスカルバートを製造する場合には、振動台2
のテーブル3上に設置した型枠1に振動を与えながら、
投入機17よりコンクリートCをこの型枠1の上部まで
投入し、振動締め固めを行った後、さらに二次振動を与
えてコンクリートC内の空隙(気泡)を除去することに
より、製品の外観を良くしていた。2. Description of the Related Art As shown in FIG. 2, for example, when a box culvert made of concrete is manufactured, a vibrating table 2 is used.
While applying vibration to the formwork 1 installed on the table 3 of
Concrete C is thrown into the upper part of the mold 1 from the throwing machine 17, and after vibration compaction, secondary vibration is further applied to remove voids (air bubbles) in the concrete C to improve the appearance of the product. I was doing well.
【0003】[0003]
【発明が解決しようとする問題点】しかし、上記のよう
な従来の方法では、コンクリートCの流動距離が長くな
るので粗骨材の分離が進行し、空気を巻き込みながら型
枠1に充填されるため、特に内型枠1Bの下面1B−1
とコンクリートCの表面Cー1との間に気泡が閉じ込め
られる。その結果、ボックスカルバートの内側表面に気
泡跡が残って外観が悪くなり、商品価値が低下するとい
う問題点があった。However, in the conventional method as described above, since the flow distance of the concrete C becomes long, the separation of the coarse aggregate progresses, and the form 1 is filled while air is entrained. Therefore, especially the lower surface 1B-1 of the inner formwork 1B
Bubbles are trapped between the surface and the surface C-1 of the concrete C. As a result, there remains a problem that air bubbles remain on the inner surface of the box culvert, resulting in poor appearance and reduced commercial value.
【0004】また、上記のように、投入機17よりコン
クリートCを直接型枠1内に投入するか、或いは図2の
一点鎖線で示すような通常のホッパー10Aを介して型
枠1内に投入しているが、前者の場合には、コンクリー
トが周辺に飛散して作業環境を悪化せしめるといった問
題点があるし、また後者の場合には、ホッパー10Aの
漏斗部を構成する傾斜側壁10Bとその下端に連続する
ガイド部を構成する垂直側壁10Cとの連接部分Rが同
一高さの位置に形成されていて、この連接部分Rで急に
狭くなるので、骨材が重なり合ってコンクリートCが下
に流れ落ちて行かない事態が多々発生する場合があると
ゝもに、コンクリートCの流下速度が遅く、非能率であ
るといった問題点もある。Further, as described above, the concrete C is directly put into the mold 1 from the throwing machine 17, or is put into the mold 1 through the ordinary hopper 10A shown by the one-dot chain line in FIG. However, in the case of the former, there is a problem that concrete is scattered around and deteriorates the working environment, and in the case of the latter, the inclined side wall 10B and the inclined side wall 10B constituting the funnel portion of the hopper 10A are not provided. The connecting portion R with the vertical side wall 10C forming the continuous guide portion at the lower end is formed at the same height position, and the connecting portion R sharply narrows, so that the aggregates overlap and the concrete C goes down. In many cases, there is a case where the concrete C does not flow down, and there is also a problem that the flow rate of the concrete C is slow and inefficient.
【0005】[0005]
【問題点を解決するための手段】本発明は上記の如き従
来の問題点を解決するために成されたものであり、その
要旨は、コンクリートを流し込む漏斗部と、該漏斗部の
下端に連接したガイド部とからなるホッパーにおいて、
前記漏斗部の対向する傾斜側壁とその下端に連続するガ
イド部の対向する垂直側壁との連接位置を、互いに上下
方向の異なる位置に形成したことを特徴としたコンクリ
ート投入用ホッパー、及び振動テーブル上に設置した型
枠の上方から前記ホッパーを下降せしめ、その先端を前
記型枠内の底部近傍に配設してコンクリートを前記型枠
の底部に充填した後、前記ホッパーを引き上げて前記振
動テーブルで締め固め、更に前記型枠の上部までコンク
リートを投入することを特徴とするコンクリート製品の
製造方法にある。The present invention has been made to solve the above-mentioned conventional problems, and the gist thereof is to connect a funnel portion into which concrete is poured and a lower end of the funnel portion. In the hopper consisting of the guide part,
On a concrete loading hopper and a vibrating table, the connecting positions of the facing inclined side walls of the funnel section and the facing vertical side walls of the guide section continuous to the lower end of the funnel section are formed at different vertical positions. The hopper is lowered from above the formwork installed in, and the tip is placed near the bottom of the formwork to fill the bottom of the formwork with concrete, and then the hopper is pulled up to the vibration table. A concrete product manufacturing method is characterized by compacting and further pouring concrete into the upper portion of the mold.
【0006】[0006]
【実施例】以下、本発明を図1乃至図5に示す実施例に
より詳細に説明する。なお、図1は本発明に係るコンク
リート製品の製造方法の1実施例を示す第1工程縦断面
図で、図2は同第2工程縦断面図、図3はコンクリート
投入用ホッパーの斜視図であり、図4は同ホッパーの漏
斗部の傾斜角度と段差の組合せによるコンクリート流下
時間のデータ表、図5は図4のデータに基づいて作図し
たグラフである。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will be described in detail below with reference to the embodiments shown in FIGS. 1 is a vertical cross-sectional view of a first step showing one embodiment of the method for producing a concrete product according to the present invention, FIG. 2 is a vertical cross-sectional view of the same second step, and FIG. 3 is a perspective view of a concrete loading hopper. Yes, FIG. 4 is a data table of concrete flow-down time based on the combination of the inclination angle and the step of the funnel of the hopper, and FIG. 5 is a graph drawn based on the data of FIG.
【0007】図において、1は上面が解放されたボック
スカルバート形成用の型枠で、外型枠1Aと内型枠1B
とから構成されており、この型枠1は低振動,低騒音の
振動台2のテーブル3上に設置されている。前記振動台
のテーブル3は、一対のI形鋼単体テーブル3A及び3
Bが互いに平行に配置されているとゝもに、この両単体
テーブル3A及び3Bは長手方向の端部においてそれぞ
れ、床面4に固定された基台5上に一対の防振ゴム6を
介して固定されている。また、前記左右の単体テーブル
3A,3Bは、中央部において一対の連結板7により一
体に連結されており、該連結板7の中央には一個の回転
振動機8が設置してある。なお、この回転振動機8は電
動モータにより偏心カム9を回転せしめて振動を発生す
る。In the figure, reference numeral 1 designates a mold for forming a box culvert whose upper surface is open, which is an outer mold 1A and an inner mold 1B.
The mold 1 is installed on a table 3 of a vibrating table 2 having low vibration and low noise. The table 3 of the vibrating table is composed of a pair of I-shaped steel unit tables 3A and 3A.
Even though B are arranged in parallel with each other, both of the single tables 3A and 3B are provided with a pair of anti-vibration rubbers 6 on the base 5 fixed to the floor 4 at the ends in the longitudinal direction. It is fixed. The left and right unitary tables 3A and 3B are integrally connected at a central portion thereof by a pair of connecting plates 7, and one rotating vibrator 8 is installed at the center of the connecting plates 7. The rotary vibrator 8 rotates the eccentric cam 9 by an electric motor to generate vibration.
【0008】10はコンクリート投入用ホッパーで、図
1及び図3に示すように、コンクリートを投入する漏斗
部11と、該漏斗部11の下端に連続するガイド部12
とから構成されている。前記漏斗部11は、平面視形状
が長方形状で、その長手方向と直交方向の対向する傾斜
側壁13A,13Bは、下方に向かって間隔が次第に幅
狭となるように傾斜しており、前記長手方向の対向する
端部側壁14A,14Bは互いに平行に設定されてい
る。また、前記ガイド部12は対向する垂直側壁15
A,15Bで横断面矩形状に形成されており、前記漏斗
部11の下端部において、その長手方向に沿って3本の
ガイド部12が等間隔で垂下している。A concrete feeding hopper 10 is, as shown in FIGS. 1 and 3, a funnel portion 11 for feeding concrete and a guide portion 12 continuous to the lower end of the funnel portion 11.
It consists of and. The funnel portion 11 has a rectangular shape in a plan view, and the inclined sidewalls 13A and 13B facing each other in the direction orthogonal to the longitudinal direction are inclined so that the interval becomes gradually narrower toward the lower side. The end side walls 14A and 14B facing each other in the direction are set to be parallel to each other. In addition, the guide portion 12 has vertical sidewalls 15 facing each other.
A and 15B are formed in a rectangular cross section, and at the lower end portion of the funnel portion 11, three guide portions 12 hang down at equal intervals along the longitudinal direction thereof.
【0009】つぎに、本発明方法でボックスカルバート
Mを製造する工程について以下に説明する。なお、本実
施例で使用するコンクリートCは、表1に示すように、
スランプ値が20cm程度の高流動性で、且つ粗骨材の分
離が少ないコンクリート、所謂高スランプ分離抵抗性コ
ンクリートを使用する。Next, a process of manufacturing the box culvert M by the method of the present invention will be described below. In addition, as shown in Table 1, the concrete C used in this example is as follows.
Use concrete with high fluidity with a slump value of about 20 cm and less separation of coarse aggregate, so-called high slump separation resistant concrete.
【0010】[0010]
【表1】 [Table 1]
【0011】そして、前記コンクリート投入用ホッパー
10は昇降可能となるように架設されているが、先ずこ
のコンクリート投入用ホッパー10を下降せしめ、その
ガイド部12の先端開口部12Aを振動台2のテーブル
3上に設置した型枠1内の底部近傍に配設する。なお必
要に応じて、コンクリート投入用ホッパー10内に棒バ
イブレータ16を設置してもよい。The concrete charging hopper 10 is erected so that it can be moved up and down. First, the concrete charging hopper 10 is lowered, and the tip opening 12A of the guide 12 is moved to the table of the vibrating table 2. It is arranged in the vicinity of the bottom of the mold 1 installed on the surface 3. If necessary, the bar vibrator 16 may be installed in the concrete charging hopper 10.
【0012】次いで、投入機17からコンクリート投入
用ホッパー10の漏斗部11にコンクリートCを投入す
ると、コンクリートCは漏斗部11からガイド部12を
通って外型枠1Aと内型枠1Bとで形成される型枠1内
の底部に先ず貯留する。そして、コンクリートCの貯留
量が多くなると、コンクリートCは前記外型枠1Aの上
面1Aー1と内型枠1Bの下面1B−1との空間部方向
に流れてこの空間部を完全に充填し、更にその左右の空
間部を下から上に向け次第に充填する。Next, when concrete C is injected from the injection machine 17 into the funnel portion 11 of the concrete injection hopper 10, the concrete C is formed from the funnel portion 11 through the guide portion 12 and the outer mold 1A and the inner mold 1B. First, it is stored at the bottom of the mold 1 to be formed. When the storage amount of the concrete C increases, the concrete C flows toward the space portion between the upper surface 1A-1 of the outer mold 1A and the lower surface 1B-1 of the inner mold 1B to completely fill the space portion. , And fill the left and right spaces from the bottom to the top gradually.
【0013】そして、左右の空間部の約1/2高さがコ
ンクリートCで充填されたら、前記コンクリート投入用
ホッパー10を上昇せしめ、そのガイド部12を型枠1
の外まで引き抜く。なおコンクリート投入時には、コン
クリートCの型枠1内への流下が途切れないように、前
記コンクリート投入用ホッパー10の漏斗部11の上部
までコンクリートCで常時満たされているように調整し
ておく。When about half the height of the left and right spaces is filled with concrete C, the concrete input hopper 10 is raised and the guide portion 12 is moved to the formwork 1.
Pull out to outside. In addition, at the time of concrete injection, it is adjusted so that the upper part of the funnel portion 11 of the concrete injection hopper 10 is always filled with concrete C so that the flow of concrete C into the mold 1 is not interrupted.
【0014】その後、回転振動機8を低周波,低振動数
で駆動すると、テーブル3は主として水平方向の回転振
動をして型枠1内のコンクリートCを締め固める。そし
て、次に図2に示す従来と同じ方法で、投入機17から
型枠1の上部までコンクリートCを投入するが、この際
には二次振動はかけない。After that, when the rotary vibrator 8 is driven at a low frequency and a low frequency, the table 3 mainly performs horizontal rotary vibration to compact the concrete C in the formwork 1. Then, by the same method as the conventional method shown in FIG. 2, concrete C is injected from the injection machine 17 to the upper part of the form 1, but no secondary vibration is applied at this time.
【0015】ここで、前記コンクリート投入用ホッパー
10の漏斗部11における両傾斜側壁13A,13B
と、該漏斗部11に連続するガイド部12における両垂
直側壁15A,15Bとの連接位置R1,R2の高さの
差(段差B)は、コンクリートCの流下時間に大いに関
係するので、その実験データを図4及び図5に示す。こ
の実験データから、漏斗部11における傾斜側壁13
A,13Bの傾斜角度の大小はコンクリートの流下時間
に余り影響を与えない(70°の方が50°の場合より
多少短い)が、段差Bは、0mmの場合と80mmの場合で
はコンクリートの流下時間に大きな影響を与えているこ
とが明確となった。Here, both inclined side walls 13A and 13B in the funnel portion 11 of the concrete charging hopper 10 are described.
And the height difference (step B) between the connecting positions R 1 and R 2 between the vertical side walls 15A and 15B in the guide portion 12 that is continuous with the funnel portion 11 is greatly related to the flowing time of the concrete C, The experimental data are shown in FIGS. 4 and 5. From this experimental data, the inclined side wall 13 in the funnel part 11
The magnitude of the inclination angle of A and 13B has little effect on the concrete flowing time (70 ° is slightly shorter than the case of 50 °), but the step B is 0 mm and 80 mm when the concrete flows down. It became clear that it had a great impact on time.
【0016】[0016]
【発明の効果】本発明に係るコンクリート投入用ホッパ
ーは、上記のように、コンクリートを流し込む漏斗部
と、該漏斗部の下端に連接したガイド部とからなるホッ
パーにおいて、前記漏斗部の対向する傾斜側壁とその下
端に連続するガイド部の対向する垂直側壁との連接位置
を、互いに上下方向の異なる位置に形成した構成である
から、コンクリートが円滑かつ迅速に流下し、充填時間
を大幅に短縮することができる。As described above, the concrete hopper according to the present invention is a hopper comprising a funnel part for pouring concrete and a guide part connected to the lower end of the funnel part. Since the connection position between the side wall and the vertical side wall of the guide portion that is continuous with the lower end of the side wall is formed in different positions in the vertical direction, concrete flows down smoothly and quickly, significantly shortening the filling time. be able to.
【0017】そして又、本発明に係るコンクリート製品
の製造方法は、上記のように、振動テーブル上に設置し
た型枠の上方から前記コンクリート投入用ホッパーをを
下降せしめ、その先端を前記型枠内の底部近傍に配設す
るとゝもに、コンクリートを前記コンクリート投入用ホ
ッパーを介して前記型枠の底部に充填した後、前記コン
クリート投入用ホッパーを引き上げて前記振動テーブル
で締め固め、更に前記型枠の上部までコンクリートを投
入する構成であるから、コンクリート投入時におけるコ
ンクリートの流動距離が極力短くなる。Further, in the method for manufacturing a concrete product according to the present invention, as described above, the concrete feeding hopper is lowered from above the mold installed on the vibrating table, and the tip of the hopper is placed inside the mold. When the bottom of the mold is filled with concrete through the concrete charging hopper, the concrete charging hopper is pulled up and compacted with the vibration table, and the mold is further closed. Since the concrete is poured into the upper part of the concrete, the flow distance of the concrete when the concrete is poured becomes as short as possible.
【0018】したがって、粗骨材の分離が進行すること
なく且つ空気を巻き込むことなくコンクリートが型枠に
充填され、特に気泡が閉じ込められ易い内型枠下面の部
分にも大きな気泡が形成されることなく完全に充填され
るので、製品の表面に気泡跡がない外観良好な製品を得
ることができる。またこの場合に、高スランプ分離抵抗
性コンクリートを使用した時には二次振動をかける必要
がないので、作業工程の省略化を図ることができるとゝ
もに、騒音,振動の問題も解消できる、といった諸効果
がある。Therefore, the concrete is filled into the mold without progressing the separation of the coarse aggregate and without entraining air, and large bubbles are formed especially in the lower part of the inner mold where air bubbles are easily trapped. Since it is completely filled without any bubbles, it is possible to obtain a product having a good appearance with no air bubbles on the surface of the product. Also, in this case, since it is not necessary to apply secondary vibration when using concrete with high slump separation resistance, it can be said that the work process can be omitted and the problems of noise and vibration can be solved. There are various effects.
【図1】本発明に係るコンクリート製品の製造方法を示
す第1工程縦断面図である。FIG. 1 is a vertical cross-sectional view of a first step showing a method for manufacturing a concrete product according to the present invention.
【図2】同第2工程縦断面図である。FIG. 2 is a vertical sectional view of the second step.
【図3】コンクリート投入用ホッパーの斜視図である。FIG. 3 is a perspective view of a concrete input hopper.
【図4】同ホッパーの漏斗部の傾斜角度と段差の組合せ
によるコンクリート流下時間のデータ表である。FIG. 4 is a data table of concrete flow-down time according to a combination of a tilt angle and a step of the funnel portion of the hopper.
【図5】図4のデータに基づいて作図したグラフであ
る。FIG. 5 is a graph drawn based on the data of FIG.
1 型枠 1A 外型枠 1B 内型枠 2 振動台 3 テーブル 8 回転振動機 10 コンクリート投入用ホッパー 11 漏斗部 12 ガイド部 13A,13B 傾斜側壁 15A,15B 垂直側壁 17 投入機 R1 連接位置 R2 連接位置 B 段差B1 Formwork 1A Outer formwork 1B Inner formwork 2 Shaking table 3 Table 8 Rotary vibrator 10 Concrete hopper 11 Funnel part 12 Guide parts 13A, 13B Inclined side walls 15A, 15B Vertical side wall 17 Inserting machine R 1 Connecting position R 2 Connecting position B Step B
───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.7,DB名) B28B 1/08 B28B 13/02 ─────────────────────────────────────────────────── ─── Continuation of front page (58) Fields surveyed (Int.Cl. 7 , DB name) B28B 1/08 B28B 13/02
Claims (2)
斗部の下端に連接したガイド部とからなるホッパーにお
いて、前記漏斗部の対向する傾斜側壁とその下端に連続
するガイド部の対向する垂直側壁との連接位置を、互い
に上下方向の異なる位置に形成したことを特徴としたコ
ンクリート投入用ホッパー。1. A hopper comprising a funnel portion for pouring concrete and a guide portion connected to a lower end of the funnel portion, wherein inclined sidewalls of the funnel portion and vertical sidewalls of the guide portion continuous to the lower end of the funnel portion are opposed to each other. The hopper for concrete throwing, characterized in that the connecting positions of are formed in different positions in the vertical direction.
ら請求項1記載のコンクリート投入用ホッパーを下降せ
しめ、その先端を前記型枠内の底部近傍に配設してコン
クリートを前記型枠の底部に充填した後、前記ホッパー
を引き上げて前記振動テーブルで締め固め、更に前記型
枠の上部までコンクリートを投入することを特徴とする
コンクリート製品の製造方法。2. A concrete loading hopper according to claim 1 is lowered from above a formwork installed on a vibrating table, and the tip of the hopper is disposed in the vicinity of the bottom part of the formwork, so that concrete is supplied to the formwork. A method for producing a concrete product, which comprises filling the bottom portion, pulling up the hopper, compacting it with the vibrating table, and further pouring concrete up to the upper portion of the mold.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP25872494A JP3429576B2 (en) | 1994-09-28 | 1994-09-28 | Hopper for putting concrete and method for producing concrete product using the same |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP25872494A JP3429576B2 (en) | 1994-09-28 | 1994-09-28 | Hopper for putting concrete and method for producing concrete product using the same |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH0890525A JPH0890525A (en) | 1996-04-09 |
| JP3429576B2 true JP3429576B2 (en) | 2003-07-22 |
Family
ID=17324213
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP25872494A Expired - Fee Related JP3429576B2 (en) | 1994-09-28 | 1994-09-28 | Hopper for putting concrete and method for producing concrete product using the same |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3429576B2 (en) |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2885728B2 (en) | 1996-11-05 | 1999-04-26 | 新潟日本電気株式会社 | Electrostatic inkjet recording device |
| JP5164781B2 (en) * | 2008-10-14 | 2013-03-21 | Jx日鉱日石エネルギー株式会社 | Method and apparatus for placing sulfur solidified body |
| CN104742240A (en) * | 2015-02-14 | 2015-07-01 | 绿建科技集团新型建材高技术有限公司 | Full-automatic production method for novel foam slurry core-filling building blocks |
| CN104742243A (en) * | 2015-02-14 | 2015-07-01 | 绿建科技集团新型建材高技术有限公司 | Automatic production method for foam slurry core filling building block |
-
1994
- 1994-09-28 JP JP25872494A patent/JP3429576B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JPH0890525A (en) | 1996-04-09 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN108301618A (en) | Steel-wood combined constructional column template and construction method thereof | |
| JP3429576B2 (en) | Hopper for putting concrete and method for producing concrete product using the same | |
| US3957405A (en) | Slip form having hinged gate means | |
| JP2008285843A (en) | Construction method for tunnel lining concrete | |
| KR20130137420A (en) | Concrete charge tools for column | |
| CN107587637A (en) | The box internal model hollow floor of air-entrained concrete building block and its construction method | |
| CN113265921B (en) | Foam light soil roadbed | |
| RU2044855C1 (en) | Progressive shuttering mold | |
| JP2974605B2 (en) | Manufacturing method of segment for tunnel lining | |
| JPS62273308A (en) | Construction apparatus of water channel | |
| GB2256380A (en) | Device for plaster/mortar mix topping a prefabricated concrete slab. | |
| JP2000345554A (en) | Ground improvement method | |
| JP6711652B2 (en) | Continuous concrete molding method | |
| CN209082535U (en) | Prefabricated mould structure for forming strip-shaped foundation | |
| JPH0139521Y2 (en) | ||
| JPH04357274A (en) | How to compact concrete | |
| JP4392816B2 (en) | Cement product molding method | |
| CN209718080U (en) | Quick forming die for strip-shaped foundation | |
| JPH0985723A (en) | How to make concrete blocks for construction | |
| HU219842B (en) | Concrete unit template for louvre serving for producing slotted channel elements, method and apparatus for producing channel elements and channel element | |
| JPH0539154Y2 (en) | ||
| JPH0422968Y2 (en) | ||
| JP2501665B2 (en) | Bubble removal method for concrete member | |
| JP2001105417A (en) | Method for manufacturing concrete segment and form device for concrete segment | |
| JP2548978B2 (en) | Pile head treatment method for cast-in-place concrete piles |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090516 Year of fee payment: 6 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100516 Year of fee payment: 7 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100516 Year of fee payment: 7 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110516 Year of fee payment: 8 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120516 Year of fee payment: 9 |
|
| LAPS | Cancellation because of no payment of annual fees |