JP3433233B2 - Rain break structure at the seam of the waterproof plate on the ridge side of the unit-type metal tile roof - Google Patents
Rain break structure at the seam of the waterproof plate on the ridge side of the unit-type metal tile roofInfo
- Publication number
- JP3433233B2 JP3433233B2 JP17217297A JP17217297A JP3433233B2 JP 3433233 B2 JP3433233 B2 JP 3433233B2 JP 17217297 A JP17217297 A JP 17217297A JP 17217297 A JP17217297 A JP 17217297A JP 3433233 B2 JP3433233 B2 JP 3433233B2
- Authority
- JP
- Japan
- Prior art keywords
- tile roof
- metal tile
- water
- roof panel
- water stop
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000002184 metal Substances 0.000 title claims description 228
- 229910052751 metal Inorganic materials 0.000 title claims description 228
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 226
- 230000000903 blocking effect Effects 0.000 claims description 70
- 238000012856 packing Methods 0.000 claims description 22
- 238000007789 sealing Methods 0.000 claims description 17
- 238000009434 installation Methods 0.000 claims description 13
- 239000000463 material Substances 0.000 claims description 10
- 239000000853 adhesive Substances 0.000 claims description 9
- 230000001070 adhesive effect Effects 0.000 claims description 9
- 239000002390 adhesive tape Substances 0.000 claims description 9
- 238000005476 soldering Methods 0.000 claims description 7
- 238000000034 method Methods 0.000 claims description 5
- 230000002940 repellent Effects 0.000 claims description 5
- 239000005871 repellent Substances 0.000 claims description 5
- 229920006351 engineering plastic Polymers 0.000 claims description 4
- PCHJSUWPFVWCPO-UHFFFAOYSA-N gold Chemical compound [Au] PCHJSUWPFVWCPO-UHFFFAOYSA-N 0.000 claims description 4
- 239000010931 gold Substances 0.000 claims description 4
- 229910052737 gold Inorganic materials 0.000 claims description 4
- 229920003023 plastic Polymers 0.000 claims 1
- 238000004078 waterproofing Methods 0.000 claims 1
- 238000010276 construction Methods 0.000 description 6
- 206010048744 Fear of falling Diseases 0.000 description 1
- 240000007594 Oryza sativa Species 0.000 description 1
- 235000007164 Oryza sativa Nutrition 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 239000011230 binding agent Substances 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000002250 progressing effect Effects 0.000 description 1
- 235000009566 rice Nutrition 0.000 description 1
- 239000010865 sewage Substances 0.000 description 1
- 229910000679 solder Inorganic materials 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
- 238000009423 ventilation Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Landscapes
- Roof Covering Using Slabs Or Stiff Sheets (AREA)
Description
【0001】[0001]
【発明の属する技術分野】この発明は、小屋組の上に、
ユニット化した金属瓦屋根パネルを順次に吊り込み位置
決め固定すると共に、棟部にはユニット化した棟包みを
吊り込み位置決め固定して構築されるユニット式金属瓦
屋根の技術分野に属し、更に言えば、前記金属瓦屋根パ
ネルの棟側にユニット化されている止水板が、金属瓦屋
根パネル相互の縦目地の近傍位置に形成する、止水板同
士の継ぎ目部分の雨仕舞い処理構造に関する。FIELD OF THE INVENTION The present invention is
It belongs to the technical field of a unit type metal tile roof constructed by sequentially suspending and fixing the unitized metal tile roof panels, and at the same time, suspending and fixing the unitized wing package in the ridge section. The present invention relates to a rain stop treatment structure for a joint portion between water blocking plates, wherein the water blocking plate unitized on the ridge side of the metal tile roof panel is formed at a position near vertical joints between the metal tile roof panels.
【0002】[0002]
【従来の技術】近年、建築を可能な限り工場生産化する
目的で、建築部材のユニット化、機能複合化がめざまし
く進展している。屋根構造に関しても、垂木、野地板を
はじめ屋根葺き材(金属瓦)、止水板その他の必要関連
部品の全てを仕上げたユニット部材としての屋根パネル
が種々公知である。2. Description of the Related Art In recent years, the unitization of building members and the combination of functions have been remarkably progressing for the purpose of manufacturing buildings as much as possible in factories. As for the roof structure, various roof panels are known as unit members obtained by finishing all of rafters, field boards, roofing materials (metal roof tiles), water stop boards and other necessary related parts.
【0003】建物の屋根の構築に関しては、不順な天候
に左右されない施工を行うため1日で完成できることが
是非にも望まれる。また、その施工法としては、屋根の
上に屋根職人が上って作業することを不要とし、特別な
技術や職方(屋根職人)を必要とせず一般作業員による
施工が出来るようにすることも強く望まれている。上述
の開発目標を達成する手段として、金属瓦屋根パネルに
よる屋根の構法としては、まず小屋組を先行して構築
し、その屋根面の母屋の上に金属瓦屋根パネルを予め決
められた順序で規則的に吊り込み、位置決め固定した後
に、棟に棟包みを吊り込んで設置する構法が一般的に採
用される。With regard to the construction of the roof of a building, it is highly desirable that it can be completed in one day because the construction is not affected by unseasonable weather. In addition, as a construction method, it is not necessary for the roofer to work on the roof, and it is possible for general workers to perform construction without the need for special skill or workman (roofer). Is also strongly desired. As a means of achieving the above-mentioned development goals, as a method of constructing a roof using metal tile roof panels, first, a hut structure is constructed in advance, and the metal tile roof panels are arranged on the roof of the roof surface in a predetermined order. A construction method is generally adopted in which the building wrapping is hung and installed after being regularly hung, positioned and fixed.
【0004】[0004]
【本発明が解決しようとする課題】本発明の目的は、上
記のように構築されるユニット式金属瓦屋根において、
金属瓦屋根パネルの棟側に予めユニット化されている止
水板が、当該金属瓦屋根パネルの吊り込み作業に適合す
るように、パネル相互間の縦目地の近傍位置に継ぎ目を
形成する構造形式において、前記継ぎ目部分の雨仕舞い
処理を金属瓦屋根パネルの吊り込み作業と現場での簡単
な組み立て作業により軽便に、且つ完璧な止水性に処理
できる雨仕舞い構造を提供することである。DISCLOSURE OF THE INVENTION An object of the present invention is to provide a unit type metal tile roof constructed as described above,
A structural type in which a water stop plate that is pre-unitized on the ridge side of the metal tile roof panel forms a joint near the vertical joint between the panels so as to be suitable for suspending the metal tile roof panel. In order to provide a rain proof structure capable of treating the joint part in a rain proof process by a work of suspending a metal tile roof panel and a simple assembling work on site, to make the water proof and a perfect waterproof property.
【0005】[0005]
【課題を解決するための手段】上述の課題を解決するた
めの手段として、請求項1記載の発明に係るユニット式
金属瓦屋根の棟側の止水板継ぎ目部分の雨仕舞い構造
は、小屋組の上に、ユニット化した金属瓦屋根パネルを
順次に吊り込み位置決め固定すると共に、棟部にはユニ
ット化した棟包みを吊り込み位置決め固定して構築され
たユニット式金属瓦屋根の前記金属瓦屋根パネルの棟側
に予めユニット化されている止水板が、金属瓦屋根パネ
ル相互の縦目地の近傍位置に形成する止水板同士の継ぎ
目部分の雨仕舞い構造であって、先行する金属瓦屋根パ
ネルの止水板は、金属瓦屋根パネル同士の縦目地側端部
の位置から棟と平行な方向へ後行の金属瓦屋根パネルに
隣接する縦目地側端部に設置された捨樋の幅寸に及ぶ長
さ範囲が切除され、垂直面壁には前記切除された端面に
近い位置にボルト孔を設けた仕口が形成されているこ
と、後行の金属瓦屋根パネルの止水板には、金属瓦屋根
パネル同士の縦目地の位置から前記先行の金属瓦屋根パ
ネルの止水板の端面へ近接する長さの継手部分が突設さ
れ、少なくとも前記継手部分及び水切り桟木の設置幅相
当部分の底面壁は切除され、前記止水板の垂直面壁にボ
ルト孔が設けられ、水切り桟木の棟側端部へ直角に固着
した当て板が前記止水板の前面に接合されていること、
先行する金属瓦屋根パネルの位置決め固定後に吊り込ま
れた後行の金属瓦屋根パネルは、同金属瓦屋根パネルの
止水板の継手部分の先端が、先行の金属瓦屋根パネルの
止水板の仕口における切除された端面へ近接して突き合
わせ状態となる配置とし、一方、双方の止水板の垂直面
壁へ等しく跨がる長さで片面に止水パッキンを備え、且
つボルト孔を設けた継手板が双方の止水板の垂直面壁の
背面側へ前記止水パッキンを介して当てがわれ、各ボル
ト孔へボルトを通しナットを締め付けて双方の止水板が
一連的に接続されていることを特徴とする。[Means for Solving the Problems] As means for solving the above-mentioned problems, the rain-sealing structure at the seam of the water stop plate on the ridge side of the unit type metal tile roof according to the invention as set forth in claim 1 is a roof truss. The metal tile roof of the unit type metal tile roof constructed by suspending and fixing the unitized metal tile roof panels one by one on the above A water blocking plate that is unitized in advance on the ridge side of the panel is a rain-sealing structure of the joints between the water blocking plates that are formed near the vertical joints of the metal tile roof panels. The water stop plate of the panel is a metal tile roof panel that follows in the direction parallel to the ridge from the position of the vertical joint side end of the metal tile roof panels .
A length range that spans the width of the gutter installed at the end of the adjacent vertical joint is cut, and a vertical hole is formed in the vertical wall near the cut end face. That is, in the water stop plate of the subsequent metal tile roof panel, a joint portion of a length that is close to the end face of the water stop plate of the preceding metal tile roof panel protrudes from the position of the vertical joint between the metal tile roof panels. At least the bottom wall of the joint part and the installation width equivalent to the installation width of the drainage pier is cut off, a bolt hole is provided in the vertical surface wall of the water stop plate, and a backing plate fixed at a right angle to the ridge side end of the drainage pier. Is joined to the front surface of the water stop plate,
In the following metal tile roof panel suspended after positioning and fixing the preceding metal tile roof panel, the tip of the joint part of the water stop plate of the metal tile roof panel is Arranged so as to be in close contact with the cut end surface of the joint, and on the other hand, provided with water blocking packing on one side with a length that straddles the vertical surface walls of both water blocking plates equally, and provided with bolt holes The joint plate is applied to the back side of the vertical surface walls of both water blocking plates via the water blocking packing, and bolts are inserted into each bolt hole to tighten the nuts so that both water blocking plates are connected in series. It is characterized by
【0006】請求項2記載の発明は、請求項1に記載し
たユニット式金属瓦屋根の棟側の止水板継ぎ目部分の雨
仕舞い構造において、水切り桟木の棟側端部へ固着され
た当て板は、止水板の垂直面壁のボルト孔と共通な配置
のボルト孔を有し、止水板を接続するボルトで止水板の
前面へ接合されていることを特徴とする。請求項3記載
の発明は、請求項1に記載したユニット式金属瓦屋根の
棟側の止水板継ぎ目部分の雨仕舞い構造において、先行
の金属瓦屋根パネルの縦目地側端部に沿って設置された
捨樋の棟側端部には、金属瓦屋根パネル相互の縦目地に
沿う側壁に一連の続く背面壁が少なくとも止水の用に供
する高さに設けられ、後行の金属瓦屋根パネルの継手部
分の止水板の下部及び当て板の下部に前記捨樋の側壁を
跨ぐ切り欠きが設けられ、先行及び後行の金属瓦屋根パ
ネルの止水板はそれぞれ前記捨樋の背面壁の前面側にお
いて突き合わせ接合されていることを特徴とする。The invention according to claim 2 is the rain at the seam portion of the water stop plate on the ridge side of the unit type metallic tile roof according to claim 1.
In the closing structure, the backing plate fixed to the ridge-side end of the draining pier has bolt holes that are arranged in common with the bolt holes in the vertical wall of the water blocking plate, and the water blocking plate is connected by the bolts that connect the water blocking plate. It is characterized by being joined to the front surface of. The invention according to claim 3 is the unit-type metal tile roof according to claim 1 .
Leading the way in the rain-sealing structure of the water stop plate joints on the ridge side
At the ridge-side end of the gutter installed along the vertical joint side edge of the metal tile roof panel, at least a series of continuous back walls are formed on the side walls along the vertical joints of the metal tile roof panels. It is provided at a height for water stoppage, and cutouts are provided under the water stop plate and the bottom plate of the joint part of the trailing metal tile roof panel, straddling the side wall of the gutter. wherein the waterstop metal tiled roof panel row being respectively joined with the match in the front side of the rear wall of the捨樋.
【0007】請求項4記載の発明に係るユニット式金属
瓦屋根の棟側の止水板継ぎ目部分の雨仕舞い構造は、小
屋組の上に、ユニット化した金属瓦屋根パネルを順次に
吊り込み位置決め固定すると共に、棟部にはユニット化
した棟包みを吊り込み位置決め固定して構築されたユニ
ット式金属瓦屋根の前記金属瓦屋根パネルの棟側に予め
ユニット化されている止水板が、金属瓦屋根パネル相互
の縦目地の近傍位置に形成する止水板同士の継ぎ目部分
の雨仕舞い構造であって、先行する金属瓦屋根パネルの
止水板の水返し部分が、金属瓦屋根パネル同士の縦目地
側端部の位置から棟と平行な方向へ後行の金属瓦屋根パ
ネルに隣接する縦目地側端部に設置された捨樋の幅寸に
及ぶ長さ範囲を切除され、同部分の垂直面壁にボルト孔
を設けた仕口が形成されていること、後行の金属瓦屋根
パネルの止水板には、金属瓦屋根パネル同士の縦目地の
位置から前記先行の金属瓦屋根パネルの止水板の仕口に
おける水返しが切除された端面へ近接する長さの継手部
分が突設され、少なくとも前記継手部分及び水切り桟木
の設置幅相当部分の底面壁は切除し、前記継手部分の止
水板の垂直面壁に前記先行側の止水板の仕口に設けたボ
ルト孔と共通する配置にボルト孔が設けられ、水切り桟
木の棟側端部へ直角に固着した当て板が前記止水板の前
面に接合されていること、先行する金属瓦屋根パネルの
位置決め固定後に吊り込まれた後行の金属瓦屋根パネル
は、同金属瓦屋根パネルの止水板の継手部分の先端が、
先行の金属瓦屋根パネルの止水板の仕口における切除さ
れた水返しの端面へ近接する配置に重ね合わせ、重ね合
わせた止水板の間に止水パッキンを挟み込み、垂直面壁
の各ボルト孔へボルトを通しナットを締め付けて双方の
止水板が重ね状態に接続されていることを特徴とする。According to a fourth aspect of the present invention, in the rain-sealing structure of the water blocking plate seam portion on the ridge side of the unit type metallic tile roof, the unitized metallic tile roof panels are sequentially hung and positioned on the rooftop structure. In addition to fixing, a water stop plate that is unitized in advance on the ridge side of the metal tile roof panel of the unit type metal tile roof constructed by suspending and fixing the unit wrapping in the ridge It is a rain-sealing structure of the joint part of the water stop plates that are formed in the vicinity of the vertical joints of the tile roof panels, and the water return part of the water stop plate of the preceding metal tile roof panel is From the position of the end of the vertical joint to the direction parallel to the building, to the width of the gutter installed at the end of the vertical joint adjacent to the trailing metal tile roof panel.
The length range is cut off and a joint with bolt holes is formed on the vertical wall of the same part.The water stop plate of the subsequent metal tile roof panel has vertical joints between the metal tile roof panels. From this position, a joint portion of a length close to the end face where the water bar in the joint of the water blocking plate of the preceding metal tile roof panel is cut off is projected, and at least the joint portion and the installation width equivalent portion of the drainage pier The bottom wall of the is cut off, and the vertical wall of the water stop plate of the joint is provided with a bolt hole in the same position as the bolt hole provided in the joint of the water stop plate on the preceding side. A backing plate fixed at a right angle to the part is joined to the front surface of the water blocking plate, and the following metal tile roof panel suspended after positioning and fixing the preceding metal tile roof panel is the same metal tile roof panel. The tip of the joint part of the water stop plate of
Stacked in a position close to the end face of the cut water bar in the joint of the water blocking plate of the preceding metal tile roof panel, sandwich the water blocking packing between the stacked water blocking plates, and bolt to each bolt hole of the vertical wall. It is characterized in that both water stop plates are connected in a stacked state by tightening a nut through.
【0008】請求項5記載の発明は、請求項1又は4に
記載したユニット式金属瓦屋根の棟側の止水板継ぎ目部
分の雨仕舞い構造において、水切り桟木の棟側端部へ固
着した当て板は、止水板の垂直面壁の前面へ当接させハ
ンダ付け若しくは接着材又は接着テープなどで接合され
ていることを特徴とする。請求項6記載の発明に係るユ
ニット式金属瓦屋根の棟側の止水板継ぎ目部分の雨仕舞
い構造は、小屋組の上に、ユニット化した金属瓦屋根パ
ネルを順次に吊り込み位置決め固定すると共に、棟部に
はユニット化した棟包みを吊り込み位置決め固定して構
築されたユニット式金属瓦屋根の前記金属瓦屋根パネル
の棟側に予めユニット化されている止水板が、金属瓦屋
根パネル相互の縦目地の近傍位置に形成する止水板同士
の継ぎ目部分の雨仕舞い構造であって、先行する金属瓦
屋根パネルの止水板は、金属瓦屋根パネル同士の縦目地
側端部の位置から棟と平行な方向へ後行の金属瓦屋根パ
ネルに隣接する縦目地側端部に設置された捨樋の幅寸に
及ぶ長さ範囲が切除され、垂直面壁には前記切除された
端面に近い位置にボルト孔を設けた仕口が形成されてい
ること、後行の金属瓦屋根パネルの止水板には、金属瓦
屋根パネル同士の縦目地の位置から前記先行の金属瓦屋
根パネルの止水板の端面へ近接する長さの継手部分が突
設され、少なくとも前記継手部分及び水切り桟木の設置
幅相当部分の底面壁は切除され、前記止水板の垂直面壁
にボルト孔が設けられ、水切り桟木の棟側端部は止水板
の垂直面壁の前面へ当接されハンダ付け又はコーキング
材などで当接部を止水処理して接合されていること、 先
行する金属瓦屋根パネルの位置決め固定後に吊り込まれ
た後行の金属瓦屋根パネルは、同金属瓦屋根パネルの止
水板の継手部分の先端が、先行の金属瓦屋根パネルの止
水板の仕口における切除された端面へ近接して突き合わ
せ状態となる配置とし、一方、双方の止水板の垂直面壁
へ等しく跨がる長さで片面に止水パッキンを備え、且つ
ボルト孔を設けた継手板が双方の止水板の垂直面壁の背
面側へ前記止水パッキンを介して当てがわれ、各ボルト
孔へボルトを通しナットを締め付けて双方の止水板が一
連的に接続されていることを特徴とする。請求項7記載
の発明に係るユニット式金属瓦屋根の棟側の止水板継ぎ
目部分の 雨仕舞い構造は、小屋組の上に、ユニット化し
た金属瓦屋根パネルを順次に吊り込み位置決め固定する
と共に、棟部にはユニット化した棟包みを吊り込み位置
決め固定して構築されたユニット式金属瓦屋根の前記金
属瓦屋根パネルの棟側に予めユニット化されている止水
板が、金属瓦屋根パネル相互の縦目地の近傍位置に形成
する止水板同士の継ぎ目部分の雨仕舞い構造であって、
先行する金属瓦屋根パネルの止水板の水返し部分が、金
属瓦屋根パネル同士の縦目地側端部の位置から棟と平行
な方向へ後行の金属瓦屋根パネルに隣接する縦目地側端
部に設置された捨樋の幅寸に及ぶ長さ範囲を切除され、
同部分の垂直面壁にボルト孔を設けた仕口が形成されて
いること、後行の金属瓦屋根パネルの止水板には、金属
瓦屋根パネル同士の縦目地の位置から前記先行の金属瓦
屋根パネルの止水板の仕口における水返しが切除された
端面へ近接する長さの継手部分が突設され、少なくとも
前記継手部分及び水切り桟木の設置幅相当部分の底面壁
は切除し、前記継手部分の止水板の垂直面壁に前記先行
側の止水板の仕口に設けたボルト孔と共通する配置にボ
ルト孔が設けられ、水切り桟木の棟側端部は、止水板の
垂直面壁の前面へ当接させハンダ付け又はコーキング材
などで当接部を止水処理して接合されていること、先行
する金属瓦屋根パネルの位置決め固定後に吊り込まれた
後行の金属瓦屋根パネルは、同金属瓦屋根パネルの止水
板の継手部分の先端が、先行の金属瓦屋根パネルの止水
板の仕口における切除された水返しの端面へ近接する配
置に重ね合わせ、重ね合わせた止水板の間に止水パッキ
ンを挟み込み、垂直面壁の各ボルト孔へボルトを通しナ
ットを締め付けて双方の止水板が重ね状態に接続されて
いることを特徴とする。 According to a fifth aspect of the present invention, in the rain-sealing structure of the water blocking plate seam portion on the ridge side of the unit type metal tile roof according to the first or fourth aspect, the draining pier is fixed to the ridge side end portion .
Put the applied backing plate into contact with the front surface of the vertical surface wall of the water stop plate.
It is characterized in that it is attached by a binder or an adhesive material or an adhesive tape . Yoo according to the invention of claim 6, wherein
Knit-type metal tile roof water-stop plate on the ridge side
The structure is a unitized metal tile roof pad on the roof
In addition to suspending and positioning the flannel in order,
Is a structure in which the unitized building wrapping is suspended and positioned and fixed.
The metal tile roof panel of the unit type metal tile roof built
A water blocking plate that has been unitized in advance on the side of the building
Waterstops formed near the vertical joints of the root panels
It is a structure that protects the seams of the
The water stop plate of the roof panel is a vertical joint between metal tile roof panels.
A metal tile roof pad that moves backward from the position of the side edge in the direction parallel to the ridge.
The width of the gutter installed at the end of the vertical joint side adjacent to the flannel
A length range spanning was excised and the vertical wall was excised
A joint with bolt holes is formed near the end face.
That the metal roof tiles on the water stop plate
From the position of the vertical joints between the roof panels, the preceding metal tile shop
The joint part of the length close to the end face of the water stop plate of the root panel
Installed at least the joint part and drainer
The bottom wall of the width equivalent part is cut off, and the vertical wall of the water stop plate
There is a bolt hole on the ridge, and the end of the drainage pier on the ridge side is a water stop plate.
Soldered or caulked against the front of the vertical wall of the
That the contact portion in such water stop treatment to wood are joined, previously
It is suspended after positioning and fixing the metal tile roof panel
The metal tile roof panel of the following line is the same as the metal tile roof panel.
The tip of the joint part of the water plate should stop the leading metal tile roof panel.
Butt closely to the excised end face of the water plate connection
The vertical plane wall of both water stop plates
Equipping one side with water-tight packing, and
The joint plates with bolt holes are the backs of the vertical walls of both waterstop plates.
It is applied to the surface side through the water blocking packing, and each bolt
Insert the bolt into the hole and tighten the nut so that both waterstop plates
It is characterized in that they are connected in series . Claim 7
Of the unit type metal tile roof according to the invention of the invention on the ridge side
The rain protection structure of the eyes is unitized on the roof
Metal tile roof panels are hung up in order and positioned and fixed
At the same time, a unitized building package is hung in the building area.
The gold of the unit type metal tile roof constructed by fixing and fixing
Water stop pre-unitized on the ridge side of the generic tile roof panel
Plates are formed near the vertical joints of metal tile roof panels.
It is a structure that protects the seams between the water blocking plates from rain,
The water repellent part of the water stop plate of the preceding metal tile roof panel is made of gold.
Parallel to the ridge from the position of the vertical joint side edge of the generic tile roof panels
Vertical joint side edge adjacent to the metal tile roof panel in the following direction
The length range that spans the width of the gutter installed in the section is cut off,
There is a bolt hole on the vertical wall of the same part.
That the metal plate is installed on the water stop plate of the following metal tile roof panel.
From the position of the vertical joint between the tile roof panels, the preceding metal tile
The water bar at the joint of the water stop plate of the roof panel was cut off
A joint part of a length close to the end face is projected, and at least
Bottom wall of the joint part and the part corresponding to the installation width of the drainage pier
Cut it off and attach it to the vertical wall of the water stop plate at the joint.
On the side of the water stop plate on the side
There is a bolt hole, and the ridge-side end of the drainage pier is
Solder or caulking material by abutting on the front of the vertical wall
That the abutting part is treated with water stop to be joined,
Suspended after positioning and fixing the metal tile roof panel
The trailing metal tile roof panel is a water stop for the metal tile roof panel.
The tip of the joint part of the plate is the water stop of the preceding metal tile roof panel.
The arrangement close to the end face of the excised drainage bar at the joint of the plate
Placed on top of each other, and put a waterproof seal between the stacked waterproof plates.
Pin and insert the bolt into each bolt hole on the vertical wall.
Tighten the bottom of the water
It is characterized by being
【0009】請求項8記載の発明に係るユニット式金属
瓦屋根の棟側の止水板継ぎ目部分の雨仕舞い構造は、小
屋組の上に、ユニット化した金属瓦屋根パネルを順次に
吊り込み位置決め固定すると共に、棟部にはユニット化
した棟包みを吊り込み位置決め固定して構築されたユニ
ット式金属瓦屋根の前記金属瓦屋根パネルの棟側に予め
ユニット化されている止水板が、金属瓦屋根パネル相互
の縦目地の近傍位置に形成する止水板同士の継ぎ目部分
の雨仕舞い構造であって、先行する金属瓦屋根パネルの
止水板は、金属瓦屋根パネル同士の縦目地側端部の位置
から棟と平行な方向へ後行の金属瓦屋根パネルに隣接す
る縦目地側端部に設置された捨樋の幅寸に及ぶ長さ範囲
が切除され、垂直面壁には前記切除された端面に近い位
置にボルト孔を設けた仕口が形成されていること、後行
の金属瓦屋根パネルの止水板には、金属瓦屋根パネル同
士の縦目地の位置から前記先行の金属瓦屋根パネルの止
水板の端面へ近接する長さの継手部分が突設され、少な
くとも前記継手部分及び水切り桟木の設置幅相当部分の
底面壁は切除され、前記止水板の垂直面壁にボルト孔が
設けられ、水切り桟木の棟側端部にはエンジニアリング
プラスチックで製作した止水構造のキャップを被せてあ
り、前記キャップの先端面を止水板の垂直面壁の前面へ
当接させ接着材又は接着テープなどで接合されているこ
と、 先行する金属瓦屋根パネルの位置決め固定後に吊り
込まれた後行の金属瓦屋根パネルは、同金属瓦屋根パネ
ルの止水板の継手部分の先端が、先行の金属瓦屋根パネ
ルの止水板の仕口における切除された端面へ近接して突
き合わせ状態となる配置とし、一方、双方の止水板の垂
直面壁へ等しく跨がる長さで片面に止水パッキンを備
え、且つボルト孔を設けた継手板が双方の止水板の垂直
面壁の背面側へ前記止水パッキンを介して当てがわれ、
各ボルト孔へボルトを通しナットを締め付けて双方の止
水板が一連的に接続されていることを特徴とする。請求
項9記載の発明に係るユニット式金属瓦屋根の棟側の止
水板継ぎ目部分の雨仕舞い構造は、小屋組の上に、ユニ
ット化した金属瓦屋根パネルを順次に吊り込み位置決め
固定すると共に、棟部にはユニット化した棟包みを吊り
込み位置決め固定して構築されたユニット式金属瓦屋根
の前記金属瓦屋根パネルの棟側に予 めユニット化されて
いる止水板が、金属瓦屋根パネル相互の縦目地の近傍位
置に形成する止水板同士の継ぎ目部分の雨仕舞い構造で
あって、先行する金属瓦屋根パネルの止水板の水返し部
分が、金属瓦屋根パネル同士の縦目地側端部の位置から
棟と平行な方向へ後行の金属瓦屋根パネルと隣接する縦
目地側端部に設置された捨樋の幅寸に及ぶ長さ範囲を切
除され、同部分の垂直面壁にボルト孔を設けた仕口が形
成されていること、後行の金属瓦屋根パネルの止水板に
は、金属瓦屋根パネル同士の縦目地の位置から前記先行
の金属瓦屋根パネルの止水板の仕口における水返しが切
除された端面へ近接する長さの継手部分が突設され、少
なくとも前記継手部分及び水切り桟木の設置幅相当部分
の底面壁は切除し、前記継手部分の止水板の垂直面壁に
前記先行側の止水板の仕口に設けたボルト孔と共通する
配置にボルト孔が設けられ、水切り桟木の棟側端部には
エンジニアリングプラスチックで製作した止水構造のキ
ャップを被せてあり、前記キャップの先端面を止水板の
垂直面壁の前面へ当接させ接着材又は接着テープなどで
接合されていること、 先行する金属瓦屋根パネルの位置
決め固定後に吊り込まれた後行の金属瓦屋根パネルは、
同金属瓦屋根パネルの止水板の継手部分の先端が、先行
の金属瓦屋根パネルの止水板の仕口における切除された
水返しの端面へ近接する配置に重ね合わせ、重ね合わせ
た止水板の間に止水パッキンを挟み込み、垂直面壁の各
ボルト孔へボルトを通しナットを締め付けて双方の止水
板が重ね状態に接続されていることを特徴とする。 [0009] unitary metal according to the invention of claim 8
The waterproof structure for the joints of the water stop plates on the tile roof side is small.
Unitized metal tile roof panels are sequentially placed on the roof
Positioned and fixed by hanging, and unitized in the ridge
A unit constructed by suspending the fixed building wrapping and positioning.
In advance on the ridge side of the metal tile roof panel of the
The unitized water stop plates are mutually
Of the waterstops formed near the vertical joint of the
It is a rain-proof structure of the preceding metal tile roof panel
The water stop plate is located at the end of the vertical joint side between the metal tile roof panels.
Adjacent to the trailing metal tile roof panel in the direction parallel to the building.
The length range that extends to the width of the gutter installed at the end of the vertical joint side
Is cut off, and the vertical wall is close to the cut end face.
That there is a bolt hole in the
The water blocking plate of the metal tile roof panel of
From the position of the vertical joint of the master, stop the preceding metal tile roof panel.
A joint part with a length close to the end face of the water plate
At least the joint part and the installation width equivalent part of the drainage pier
The bottom wall was cut off, and the vertical wall of the water stop plate had bolt holes.
A cap with a waterproof structure made of engineering plastic was placed on the ridge side end of the draining pier.
Ri, the distal end surface of the cap to the front face of the vertical wall of the waterstop
That it is joined such as by abutting the not adhesive or adhesive tape, hanging after positioning and fixing of the preceding metal tiled roof panels
The trailing metal tile roof panel is the same as the metal tile roof panel.
Tip of the joint of the water stop plate of the
Protruding close to the cut end face of the water stop plate
Arrange them so that they are in a mated state, while suspending both waterstops.
Equipped with water-tight packing on one side that extends evenly over the facing wall
And the joint plate with the bolt holes is perpendicular to both waterstop plates.
It is applied to the back side of the face wall through the water blocking packing,
Pass the bolt through each bolt hole and tighten the nut to stop both
It is characterized in that the water plates are connected in series . Claim
Item 9: A unit-type metal tile roof according to the invention as set forth in Item 9,
The rain-sealing structure of the water plate seam is
Metal tile roof panels that have been turned into a panel are sequentially hung and positioned.
Along with fixing, the unit wing is hung on the ridge.
Unit type metal tile roof built with fixed positioning
Wherein the ridge side of the metal tile roof panels are pre Me unitized
The water stop plate is located near the vertical joints of the metal tile roof panels.
With a structure that protects the joints between the waterstops that are formed in
Yes, the water return part of the water stop plate of the preceding metal tile roof panel
Minutes from the position of the vertical joint side edge of the metal tile roof panels
Vertically adjacent to the rear metal tile roof panel in the direction parallel to the ridge
Cut the length range that spans the width of the gutter installed at the joint end.
And a connection with a bolt hole in the vertical wall of the same part
Being made, on the water stop plate of the trailing metal tile roof panel
Is the preceding from the position of the vertical joint between the metal tile roof panels
The water return at the joint of the water stop plate of the metal tile roof panel of
The joint part with a length close to the removed end face is
At least the joint and the installation width equivalent to the drainage pier
Cut off the bottom wall of the
It is common with the bolt hole provided in the joint of the water stop plate on the preceding side.
There is a bolt hole in the arrangement, and at the ridge side end of the drainer pier
A waterproof structure key made of engineering plastic
Cap, and attach the tip of the cap to the waterstop plate.
Contact the front of the vertical wall with adhesive or adhesive tape.
Being joined, the position of the leading metal tile roof panel
The trailing metal tile roof panel, which was suspended after being fixed and fixed,
The tip of the joint part of the water stop plate of the metal tile roof panel precedes
Metal tile roof panel cut-off in water plate connection
Superimpose and stack in close proximity to the end face of the drain
Insert the waterproof packing between the waterproof plates and
Pass the bolt through the bolt hole and tighten the nut to stop water on both sides.
It is characterized in that the plates are connected in a stacked state.
【0010】[0010]
【発明の実施形態及び実施例】図1〜図3は、請求項1
記載の発明を説明するため、小屋組の母屋2の上に、ユ
ニット化した金属瓦屋根パネルA,Bを順次に吊り込み
位置決め固定すると共に、棟部にはユニット化した棟包
み4を吊り込み位置決め固定して構築したユニット式金
属瓦屋根を、特には止水板継ぎ目部分の雨仕舞い構造に
焦点を当て、その余の要素は記載を便宜的に省略して示
している。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS FIG. 1 to FIG.
In order to explain the described invention, the unitized metal tile roof panels A and B are sequentially hung and positioned and fixed on the main house 2 of the shed assembly, and the unitized wing package 4 is hung on the ridge portion. The unit type metal tile roof constructed by positioning and fixing is particularly focused on the rain-sealing structure of the water stop plate seam, and the other elements are omitted for convenience.
【0011】ユニット化した金属瓦屋根パネルA,B
は、垂木5、野地板6の上に屋根葺き材として金属瓦7
を葺き、棟側に止水板3まで仕上げられている。棟包み
4には垂直下方へ突き出る固定金具10及び取付け用ボ
ルト11が設けられ、換気用部材8と水切り板9もユニ
ット化されている。金属瓦屋根パネル相互の縦目地C
(図2を参照)を形成する隣接の金属瓦屋根パネルA,
Bの縦縁部に沿ってその全長にわたり、吊り込みが先行
する左側の金属瓦屋根パネルAの右端に、金属瓦7の下
側に位置する捨樋12が設置され、吊り込みが後(右
側)の金属瓦屋根パネルBの左端に水切り屋根桟木13
が設置されている。図2のように両パネルを正規に位置
決め固定した際には、水切り屋根桟木13に形成され
た、前記縦目地Cを越えて捨樋12の上方にまで延び出
した前下り傾斜状の水返し片13aにより、金属瓦7、
7の端部相互の重なり部から思いがけず浸入するかもし
れない雨水を、少なくとも縦目地Cへは落下させないよ
うに止水処理する構造が採用されている。野地板6の上
面は全面にわたり防水処理(ルーフィング)が施されて
いる。Unitized metal tile roof panels A and B
Is a rafter 5 and a base plate 6 and a metal tile 7 as a roofing material.
The roof is finished up to the water stop plate 3 on the ridge side. The ridge wrap 4 is provided with a fixing metal fitting 10 protruding vertically downward and a mounting bolt 11, and a ventilation member 8 and a draining plate 9 are also unitized. Vertical joint C between metal roof panels
Adjacent metal tile roof panels A that form (see FIG. 2),
Along the lengthwise edge of B, the gutter 12 located below the metal tile 7 is installed at the right end of the left side metal tile roof panel A, which is preceded by the hanging, and the hanging is behind (right side). ) Drained roof pier 13 on the left end of the metal tile roof panel B
Is installed. When both panels are properly positioned and fixed as shown in FIG. 2, a water drip formed in the draining roof pier 13 and extending to the upper part of the trough 12 beyond the vertical joint C and extending forward and downward. By the piece 13a, the metal roof 7,
A structure is adopted in which rainwater that may inadvertently enter from the overlapping portions of the end portions of 7 are treated so as not to drop to at least the vertical joint C. The upper surface of the base plate 6 is entirely waterproofed (roofing).
【0012】請求項1記載の発明は、図1〜図3に示し
たように、両隣のパネルA、Bの止水板3、3が形成す
る継ぎ目部分を、金属瓦屋根パネルA,Bの吊り込み作
業で雨仕舞い処理の大半が行われ、その後ボルト締めな
どの現場組み立て作業により完成する雨仕舞い構造であ
る。その手段として、図4〜図6に分かり易く示したよ
うに、各金属瓦屋根パネルA,Bの棟部の止水板3の継
ぎ目部分は、次のように構成されている。[0012] In the invention according to claim 1, as shown in Figs. 1 to 3, the joint portion formed by the water blocking plates 3 of the panels A and B on both sides is formed of metal roof tile panels A and B. Most of the rain-fighting process is carried out by hanging work, and then it is completed by on-site assembly work such as bolt tightening. As a means for this, as clearly shown in FIGS. 4 to 6, the joint portion of the water stop plate 3 in the ridge of each of the metal tile roof panels A and B is configured as follows.
【0013】吊り込みが先行する左側の金属瓦屋根パネ
ルAの止水板3には、金属瓦屋根パネル同士の縦目地側
の端部の位置から棟と平行な方向(以下、棟方向と云
う)へ必要な長さ、本実施例では捨樋12の幅寸に及ぶ
長さの範囲までを切除し(実際には当該止水板3の長さ
を当初から前記のように加工しておく)、垂直面壁3b
には前記端面14に近い位置にボルト孔18を設けた仕
口が形成されている。捨樋12は、図4、図5で明解な
ように、金属瓦屋根パネル同士の縦目地側の端部に起立
する側壁12aとこれに一連の背面壁12bが棟側端部
に起立され、捨樋12の棟側端部方向への雨水の流れ落
ちを完全に防ぐ構成とされている(請求項3記載の発
明)。また、内側のレ状に傾斜した側壁12cのうち前
記背面壁12bの位置から止水板3の底面壁3aの幅相
当部分を切除し、同部分へは止水板3の底面壁3aを少
し載せた組み立てが行われている。In the water stop plate 3 of the left side metal tile roof panel A, which is preceded by hanging, the direction parallel to the ridge from the position of the end of the metal tile roof panels on the vertical joint side (hereinafter referred to as the ridge direction). ) To a necessary length, in this embodiment, a range up to the width of the gutter 12 is cut (actually, the length of the water stop plate 3 is processed as described above from the beginning). ), Vertical wall 3b
At the end, a connection having a bolt hole 18 is formed near the end face 14. As is clear from FIG. 4 and FIG. 5, the drain gutter 12 has a side wall 12a standing at the ends of the metal tile roof panels on the vertical joint side, and a series of back walls 12b standing at the end of the ridge side. It is configured to completely prevent runoff of rainwater toward the ridge side end of the drainage gutter 12 (the invention according to claim 3). In addition, the width-equivalent portion of the bottom wall 3a of the water blocking plate 3 is cut out from the position of the back wall 12b of the side wall 12c inclined inwardly, and the bottom wall 3a of the water blocking plate 3 is slightly moved to the same portion. The assembling is done.
【0014】他方、吊り込みが後(右側)の金属瓦屋根
パネルBの止水板3には、金属瓦屋根パネル同士の縦目
地Cの位置から前記先行の金属瓦屋根パネルAの止水板
3の仕口における切除された端面14へ近接する長さの
継手部分15が突設され、前記継手部分15及び水切り
桟木13の設置幅相当部分の底面壁3aは切除されてい
る。また、前記止水板3の垂直面壁3bにボルト孔19
(図6)が設けられている。On the other hand, in the water stop plate 3 of the metal tile roof panel B after being hung up (on the right side), the water stop plate of the preceding metal tile roof panel A from the position of the vertical joint C between the metal tile roof panels. A joint portion 15 of a length close to the cut end surface 14 of the joint 3 is projectingly provided, and the bottom wall 3a of the joint portion 15 and a portion corresponding to the installation width of the draining splint 13 is cut. Also, the bolt holes 19 are formed in the vertical wall 3b of the water stop plate 3.
(FIG. 6) are provided.
【0015】一方、水切り桟木13の棟側端部には、止
水板3の上部を略直角に屈曲した水返し3cの下から底
面壁3aの上までの間に納まる高さを一辺とする略正方
形状の当て板20が溶接又はハンダ付け等の方法で直角
に固着されている。この当て板20には、前記継手部分
15のボルト孔19と一致するボルト孔21のほかに、
もう一つ(又は複数でも可)のボルト孔22が設けら
れ、該ボルト孔22と一致するボルト孔23(図6)が
止水板3の垂直面壁3bに設けられている。要するに、
本実施例の場合は、水切り桟木13の棟側端部の当て板
20を止水板3の前面へ当接させ、一致したボルト孔2
2と23へボルト24を通し、ナット25をねじ込んで
締め付けて継ぎ目部分の略半分の接合が行われている。On the other hand, at the ridge-side end of the drainage pier 13 , one side has a height that can be set between the bottom of the water return 3c formed by bending the upper part of the water blocking plate 3 at a substantially right angle to the top of the bottom wall 3a. A substantially square patch plate 20 is fixed at a right angle by a method such as welding or soldering. In addition to the bolt holes 21 corresponding to the bolt holes 19 of the joint portion 15, the contact plate 20 has
Another (or more than one) bolt hole 22 is provided, and a bolt hole 23 (FIG. 6) corresponding to the bolt hole 22 is provided in the vertical wall 3 b of the water blocking plate 3. in short,
In the case of the present embodiment, the backing plate 20 at the ridge-side end of the draining tree 13 is brought into contact with the front surface of the water blocking plate 3 so that the matching bolt holes 2 are formed.
2 and passed through a bolt 24 to 23, Ru Tei substantially junction half is made of tightening seam portion by screwing the nut 25.
【0016】なお、図6に示したように、当て板20及
びこれが当接される止水板3の垂直面壁3bの下部に
は、およそ水切り桟木13の内形線に沿って切り欠いた
形状の切り欠き26が設けられ、この切り欠き26が前
記捨樋12の側壁12aを跨ぐ構成とされている(請求
項3記載の発明)。上記の構成に基づき、吊り込みが先
行する左側の金属瓦屋根パネルAの位置決め固定を終え
た後、つづいて吊り込まれた右側の金属瓦屋根パネルB
は、同金属瓦屋根パネルBの止水板3の継手部分15の
先端16が、先行の金属瓦屋根パネルAの止水板3の端
面14へ近接して突き合わせ状態の配置とする。しかも
左右の止水板3、3同士は、捨樋12の背面壁12bの
前面側の位置で突き合わせ、止水板3が受けた雨水は決
して捨樋12の棟側端部の方へ流れ落ちない構成とされ
る。As shown in FIG. 6, the bottom plate 3 and the vertical wall 3b of the water blocking plate 3 against which the pad 20 is abutted have a shape cut out along the inner shape line of the draining pier 13. The notch 26 is provided, and the notch 26 is configured to straddle the side wall 12a of the drainage gutter 12 (the invention according to claim 3). Based on the above configuration, after the positioning and fixing of the left side metal tile roof panel A to which the suspension is preceded, the right side metal tile roof panel B is subsequently suspended.
Is arranged such that the tip 16 of the joint portion 15 of the water blocking plate 3 of the metal tile roof panel B is in close contact with the end surface 14 of the water blocking plate 3 of the preceding metal tile roof panel A. Moreover, the left and right water stop plates 3 and 3 are butted against each other at a position on the front side of the back wall 12b of the drain gutter 12, and the rainwater received by the water stop plate 3 never flows down toward the ridge side end of the drain gutter 12. It is composed.
【0017】上記のように突き合わされた左右の止水板
3、3の垂直面壁3bへ等しく30mm位づつ跨がる長さ
を一辺とする略正方形状(図2の点線図示を参照)で,
片面に止水パッキン27を備え、且つ左右の止水板3、
3に設けられた上記のボルト孔18、19と一致する2
個のボルト孔29、29を設けた継手板28が、前記の
ように突き合わされた左右の止水板3、3の垂直面壁3
bの背面側へ前記止水パッキン27を介して当てがわ
れ、一致した各ボルト孔18と29、19と21及び2
9へそれぞれボルト30を通しナット31を締め付け
て、双方の止水板3、3が継手板28を仲介にして止水
パッキン27による完全な止水性のもとに一連的に接続
されている。その結果、水切り桟木13の棟側端部に固
着した当て板20の残り半分が,ボルト30、ナット3
1により共通に止水板3へ接合される(請求項2記載の
発明)。The right and left water stop plates 3 and 3, which are butted against each other as described above, have a substantially square shape (see a dotted line shown in FIG. 2) having a length of 30 mm equally extending over the vertical surface walls 3b.
The water blocking packing 27 is provided on one side, and the water blocking plates 3 on the left and right,
2 corresponding to the above bolt holes 18 and 19 provided in 3
The joint plate 28 having the individual bolt holes 29, 29 has the vertical surface walls 3 of the left and right water stop plates 3 and 3 abutted against each other as described above.
The bolt holes 18 and 29, 19 and 21 and 2 which are applied to the rear surface side of b through the water blocking packing 27 and are aligned with each other.
The bolts 30 are respectively passed through 9 and the nuts 31 are tightened, so that the water blocking plates 3 and 3 are connected in series with each other through the joint plate 28 under the complete water blocking by the water blocking packing 27. As a result, the remaining half of the backing plate 20 fixed to the ridge-side end of the drainage pier 13 is the bolt 30 and the nut 3.
It is joined to the water stop plate 3 in common by 1 (the invention according to claim 2).
【0018】なお、上記したように水切り桟木13の棟
側端部へ当て板20を固着する構成に限らず、水切り桟
木13の棟側端部を、止水板3の垂直面壁3bの前面へ
直接当接させ、ハンダ付け又はコーキング材などで当接
部を止水処理して接合した構成(請求項6、7記載の発
明)で実施することもできる。また、水切り桟木13の
棟側端部へ固着する当て板20にしても、例えば図8の
ように必要最小限度に小さく形成し、これを止水板3の
垂直面壁3bの前面へ当接させてハンダ付け若しくは接
着材又は接着テープなどで接合した構成(請求項5記載
の発明)で実施することもできる。なお、当て板20の
切り欠き26の形成態様は、図11A、Bに示した形態
で実施することもできる。更に水切り桟木13の棟側端
部に、図12に示したように、エンジニアリングプラス
チックで製作した止水構造のキャップ40を被せ、この
キャップ40の先端面を止水板の垂直面壁3bの前面へ
当接させ接着剤又は接着テープなどで接合した構成(請
求項8、9記載の発明)を適宜に採用実施することがで
きる。これらの事項は、以下に説明する他の実施例にお
いても同様である。It is to be noted that the structure is not limited to the structure in which the pad plate 20 is fixedly attached to the ridge-side end of the water draining timber 13 as described above, but the ridge-side end of the water draining timber 13 is attached to the front surface of the vertical surface wall 3b of the water blocking plate 3. It is also possible to directly carry out the contact, and to carry out the construction in which the contact portion is subjected to the water-stop treatment by soldering or caulking material to be joined (the invention according to claims 6 and 7 ). Further, even if the backing plate 20 fixed to the ridge-side end of the draining pier 13 is formed to be as small as necessary as shown in FIG. 8, for example, it is brought into contact with the front surface of the vertical surface wall 3b of the water blocking plate 3. Alternatively, the present invention can be carried out with a structure in which soldering or bonding with an adhesive material or an adhesive tape (the invention according to claim 5 ) is performed. The cutout 26 of the contact plate 20 may be formed in the form shown in FIGS. 11A and 11B. Further, as shown in FIG. 12, a cap 40 having a waterproof structure made of engineering plastic is put on the ridge-side end of the drainage pier 13, and the tip end surface of the cap 40 is directed to the front surface of the vertical surface wall 3b of the waterproof plate. A configuration in which they are brought into contact with each other and joined by an adhesive or an adhesive tape (the inventions of claims 8 and 9 ) can be appropriately adopted and implemented. These matters are the same in other embodiments described below.
【0019】次に、図7〜図10は、請求項4記載の発
明の実施形態及び実施例を示している。本発明も、小屋
組の母屋2上に、ユニット化した金属瓦屋根パネルA,
Bを順次に吊り込み位置決め固定すると共に、棟部には
ユニット化した棟包み4を吊り込み位置決め固定して構
築されたユニット式金属瓦屋根の前記金属瓦屋根パネル
A,Bの棟側に予めユニット化されている止水板3が、
金属瓦屋根パネル相互の縦目地C(図8)の近傍位置に
形成する止水板同士の継ぎ目部分の雨仕舞い構造であ
る。Next, FIGS. 7 to 10 show an embodiment and an example of the invention described in claim 4. The present invention also includes a unitized metal tile roof panel A, on the main building 2 of the shed.
B is sequentially hung and positioned and fixed, and a unit type ridge wrap 4 is hung and positioned and fixed to the ridge part in advance on the ridge side of the metal tile roof panels A and B of the unit type metal tile roof constructed. The water stop plate 3 which is unitized,
It is a rain-sealing structure of the joint portion between the water blocking plates formed in the vicinity of the vertical joint C (FIG. 8) between the metal tile roof panels.
【0020】本発明の場合、吊り込みが先行する左側の
金属瓦屋根パネルAの止水板3は、金属瓦屋根パネル同
士の縦目地側端部の位置から棟方向へ必要な長さ、本実
施例では捨樋12の全幅に及ぶ長さ範囲まで水返し部分
3cが切除され、同部分の垂直面壁3bの全体に等配し
て4個(但し、個数はこの限りではない。)のボルト孔
32を設けた仕口が形成されている。In the case of the present invention, the water stop plate 3 of the left side metal tile roof panel A, which is preceded by the hanging, has a length required in the ridge direction from the position of the vertical joint side ends of the metal tile roof panels. In the embodiment, the water return portion 3c is cut off to the extent of the entire width of the gutter 12, and four bolts (however, the number is not limited to this) are equally distributed over the entire vertical surface wall 3b of the portion. A joint provided with holes 32 is formed.
【0021】一方、吊り込みが後(右側)の金属瓦屋根
パネルBの止水板3には、金属瓦屋根パネル同士の縦目
地Cの位置から前記先行の金属瓦屋根パネルAの止水板
3の仕口における水返し3cが切除された端面33へ近
接する長さの継手部分34が突設され(図10)、少な
くとも前記継手部分34相当部分の底面壁を切除し、前
記継手部分34の垂直面壁3bに,前記先行側の止水板
3の仕口に設けたボルト孔32と共通する配置で同数の
ボルト孔35が設けられている。本発明の場合、水切り
桟木13の棟側端部には、同端部を塞ぐのに必要最小限
度の大きさ(一辺が45mm位)とした正方形状の当て板
20がハンダ付け等の方法で直角に固着され、同当て板
20は前記止水板3の垂直面壁3bの前面にぴったり当
接され、上述したハンダ付け若しくは接着材又は接着テ
ープなどで接合した構成とされている。On the other hand, in the water stop plate 3 of the metal tile roof panel B after being suspended (on the right side), the water stop plate of the preceding metal tile roof panel A from the position of the vertical joint C between the metal tile roof panels. A joint portion 34 of a length close to the end face 33 where the water return 3c in the joint of No. 3 is cut off is projected (FIG. 10), and the bottom wall of at least the portion corresponding to the joint portion 34 is cut off, and the joint portion 34 is cut off. The same number of bolt holes 35 are provided in the vertical surface wall 3b of the same as the bolt holes 32 provided in the joint of the water blocking plate 3 on the preceding side. In the case of the present invention, at the ridge-side end of the draining pier 13, a square-shaped patch plate 20 having a minimum size (45 mm on a side) necessary to close the ridge-side end is soldered or the like. It is fixed at a right angle, and the contact plate 20 is in close contact with the front surface of the vertical surface wall 3b of the water blocking plate 3 and is joined by the soldering or the adhesive material or the adhesive tape described above.
【0022】上記の構成に基づいて、先行する金属瓦屋
根パネルAの位置決め固定後に,つづいて吊り込まれた
後行の金属瓦屋根パネルBは、同金属瓦屋根パネルBの
止水板3の継手部分34の先端36が、先行の金属瓦屋
根パネルAの止水板3の仕口における切除された水返し
3cの端面33へ近接する配置とする。こうして左右の
止水板3の垂直面壁3b同士が重ね合わされ、中心が一
致した各ボルト孔32と35へはボルト37を通しナッ
ト38を締め付けて左右の止水板3、3が重ね状態に接
続されている。但し、前記のように重ね合わされた止水
板3の垂直面壁3b、3bの間にはシート状の止水パッ
キン39(図8)が挟み込まれ、もって止水性の高い接
続が行われている。On the basis of the above-mentioned structure, after the metal tile roof panel A is positioned and fixed in advance, the subsequent metal tile roof panel B which is subsequently suspended is the same as the water stop plate 3 of the metal tile roof panel B. The tip 36 of the joint portion 34 is arranged to be close to the end surface 33 of the cut water return 3c in the joint of the water blocking plate 3 of the preceding metal tile roof panel A. In this way, the vertical surface walls 3b of the left and right water blocking plates 3 are overlapped with each other, and bolts 37 are passed through the bolt holes 32 and 35 whose centers are coincident with each other and the nut 38 is tightened to connect the left and right water blocking plates 3 and 3 in a stacked state. Has been done. However, a sheet-like waterproof packing 39 (FIG. 8) is sandwiched between the vertical surface walls 3b and 3b of the waterproof plate 3 which are superposed as described above, so that a highly waterproof connection is made.
【0023】本発明によれば、隣合う先行、後行の金属
瓦屋根パネルA,B双方の止水板3、3が形成する継ぎ
目は、金属瓦屋根パネル相互の縦目地Cの位置から棟方
向へ漏水防止に適切な距離を隔てた構成であり、しかも
止水パッキンを使用し強力なボルト締めにより止水処理
が行われるから、棟包みや面戸板(図示省略)が在って
もなお、強風を伴う大雨として吹き込まれてくるかもし
れない雨水も、少なくと金属瓦屋根パネル相互の縦目地
Cへ浸入し落下する心配は皆無の雨仕舞い構造になる。According to the present invention, the joint formed by the water stop plates 3 of both the leading and trailing metal tile roof panels A and B adjacent to each other is located at the position of the vertical joint C between the metal tile roof panels. Since it is configured with a proper distance to prevent water leakage in the direction, and the water-stopping packing is used to perform the water-stopping treatment by strong bolt tightening, even if there is a ridge wrapping or a door panel (not shown), Even if rainwater, which may be blown in as heavy rain accompanied by a strong wind, invades at least vertical joints C between the roof tile panels of the metal tiles, there is no fear of falling into the structure.
【0024】[0024]
【本発明が奏する効果】本発明に係るユニット式金属瓦
屋根の棟側の止水板継ぎ目部分の雨仕舞い構造によれ
ば、ユニット式金属瓦屋根において、金属瓦屋根パネル
の棟部に予めユニット化されている止水板の継ぎ目部分
の雨仕舞いを、金属瓦屋根パネルの吊り込み及び位置決
め固定の作業と共に軽便に、能率良く完璧に処理可能で
ある。EFFECTS OF THE INVENTION According to the present invention, in the unit type metallic tile roof, the structure of the rain-sealing of the seam of the water stop plate on the side of the ridge makes the unit type metallic tile roof have a unit preliminarily installed in the ridge portion of the metallic tile roof panel. It is possible to efficiently and completely treat the rain sewage at the joint part of the water stop plate, which is convenient and efficient, together with the work of suspending and positioning and fixing the metal tile roof panel.
【図1】請求項1記載の発明に係るユニット式金属瓦屋
根の棟部の構造を示した断面図である。FIG. 1 is a cross-sectional view showing a structure of a ridge portion of a unit type metal tile roof according to a first aspect of the invention.
【図2】同上の金属瓦屋根パネルの止水板相互の継ぎ目
を示した正面図である。FIG. 2 is a front view showing a joint between the water blocking plates of the above-described metal tile roof panel.
【図3】同上の金属瓦屋根パネルの止水板相互の継ぎ目
を示した平面図である。FIG. 3 is a plan view showing a joint between water blocking plates of the above-described metal tile roof panel.
【図4】同上の雨仕舞い構造の主要な構成を分解状態で
示した斜視図である。FIG. 4 is a perspective view showing, in an exploded state, a main configuration of the above rain-stopping structure.
【図5】同上の雨仕舞い構造の主要な構成を分解状態で
示した斜視図である。FIG. 5 is a perspective view showing, in an exploded state, a main configuration of the above rain shielding structure.
【図6】同上の雨仕舞い構造の主要な構成を棟側から分
解状態で示した斜視図である。FIG. 6 is a perspective view showing the main configuration of the above rain shielding structure in a disassembled state from the ridge side.
【図7】請求項4記載の発明に係るユニット式金属瓦屋
根の棟部の構造を示した断面図である。FIG. 7 is a cross-sectional view showing a structure of a ridge portion of a unit type metal tile roof according to a fourth aspect of the invention.
【図8】同上の金属瓦屋根パネルの止水板相互の継ぎ目
を示した正面図である。FIG. 8 is a front view showing a joint between water blocking plates of the above-mentioned metal tile roof panel.
【図9】同上の金属瓦屋根パネルの止水板相互の継ぎ目
を示した平面図である。FIG. 9 is a plan view showing a joint between water blocking plates of the above-described metal tile roof panel.
【図10】同上の雨仕舞い構造の主要な構成を分解状態
で示した斜視図である。FIG. 10 is a perspective view showing, in an exploded state, a main configuration of the above rain shielding structure.
【図11】A,Bは水切り桟木と当て板の異なる構成の
例を示した正面図である。FIG. 11A and FIG. 11B are front views showing examples of different configurations of the draining splint and the backing plate.
【図12】A,Bは水切り桟木とキャップの構成の例を
示した正面図である。12A and 12B are front views showing an example of a configuration of a draining splint and a cap.
A 先行の金属瓦屋根パネル B 後行の金属瓦屋根パネル 4 棟包み 3 止水板 C 金属瓦屋根パネル相互の縦目地 3a 底面壁 3b 垂直面壁 3b’ 垂直面壁 12 捨樋 14 切除された端面 18 ボルト孔 15 継手部分 13 水切り桟木 21 ボルト孔 20 当て板 16 継手部分の先端 27 止水パッキン 29 ボルト孔 30 ボルト 31 ナット 12b 背面壁 26 切り欠き 32 ボルト孔 33 端面 34 継手部分 35 ボルト孔 39 止水パッキン 37 ボルト 38 ナット 40 キャップ A leading metal tile roof panel B Subsequent metal tile roof panel Package for 4 buildings 3 water stop plates C Metal tile roof panel vertical joints 3a bottom wall 3b vertical wall 3b 'vertical wall 12 gutters 14 Excised end face 18 bolt holes 15 Joint part 13 Drainers 21 bolt holes 20 Reliable plate 16 Tip of joint 27 Waterproof packing 29 bolt holes 30 volts 31 nuts 12b rear wall 26 Notches 32 bolt holes 33 Edge 34 Joint part 35 bolt holes 39 Water-stop packing 37 Volts 38 nuts 40 cap
───────────────────────────────────────────────────── フロントページの続き (72)発明者 用稲 都世志 東京都江東区木場二丁目8番3号 株式 会社ニッケンビルコン内 (72)発明者 本橋 修一 東京都江東区木場二丁目8番3号 株式 会社ニッケンビルコン内 (72)発明者 石井 実 東京都江東区木場二丁目8番3号 株式 会社ニッケンビルコン内 (56)参考文献 特開 平4−203145(JP,A) 実開 昭60−72820(JP,U) (58)調査した分野(Int.Cl.7,DB名) E04D 3/00 - 3/40 E04B 7/02 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Rice for the inventor Toshishi Koshi 2-8-3 Kiba, Koto-ku, Tokyo Inside Niken Vilcon Inc. (72) Inventor Shuichi Motohashi 2-8-3 Kiba, Koto-ku, Tokyo No. In Niken Vilcon Co., Ltd. (72) Inventor Minoru Ishii 2-8-3 Kiba, Koto-ku, Tokyo In Niken Vilcon Co., Ltd. (56) Reference JP-A-4-203145 (JP, A) 72820 (JP, U) (58) Fields investigated (Int.Cl. 7 , DB name) E04D 3/00-3/40 E04B 7/02
Claims (9)
根パネルを順次に吊り込み位置決め固定すると共に、棟
部にはユニット化した棟包みを吊り込み位置決め固定し
て構築されたユニット式金属瓦屋根の前記金属瓦屋根パ
ネルの棟側に予めユニット化されている止水板が、金属
瓦屋根パネル相互の縦目地の近傍位置に形成する止水板
同士の継ぎ目部分の雨仕舞い構造であって、 先行する金属瓦屋根パネルの止水板は、金属瓦屋根パネ
ル同士の縦目地側端部の位置から棟と平行な方向へ後行
の金属瓦屋根パネルに隣接する縦目地側端部に設置され
た捨樋の幅寸に及ぶ長さ範囲が切除され、垂直面壁には
前記切除された端面に近い位置にボルト孔を設けた仕口
が形成されていること、 後行の金属瓦屋根パネルの止水板には、金属瓦屋根パネ
ル同士の縦目地の位置から前記先行の金属瓦屋根パネル
の止水板の端面へ近接する長さの継手部分が突設され、
少なくとも前記継手部分及び水切り桟木の設置幅相当部
分の底面壁は切除され、前記止水板の垂直面壁にボルト
孔が設けられ、水切り桟木の棟側端部へ直角に固着した
当て板が前記止水板の前面に接合されていること、 先行する金属瓦屋根パネルの位置決め固定後に吊り込ま
れた後行の金属瓦屋根パネルは、同金属瓦屋根パネルの
止水板の継手部分の先端が、先行の金属瓦屋根パネルの
止水板の仕口における切除された端面へ近接して突き合
わせ状態となる配置とし、一方、双方の止水板の垂直面
壁へ等しく跨がる長さで片面に止水パッキンを備え、且
つボルト孔を設けた継手板が双方の止水板の垂直面壁の
背面側へ前記止水パッキンを介して当てがわれ、各ボル
ト孔へボルトを通しナットを締め付けて双方の止水板が
一連的に接続されていることを特徴とする、ユニット式
金属瓦屋根の棟側の止水板継ぎ目部分の雨仕舞い構造。1. A unit-type metal constructed by sequentially suspending and fixing unitized metal tile roof panels on a roof structure and suspending and fixing unitized ridge packages in the ridge section. A water stop plate that is unitized in advance on the ridge side of the metal tile roof panel of the tiled roof is a rain-sealing structure at the joint part of the water stop plates formed near the vertical joints of the metal tile roof panels. The water stop plate of the preceding metal tile roof panel is located on the vertical joint side end adjacent to the trailing metal tile roof panel in the direction parallel to the building from the position of the vertical joint side end of the metal tile roof panels. Installed
The length range that extends to the width of the gutter is cut off, and the vertical wall has a joint with a bolt hole near the cut end face. The water stop plate is provided with a joint portion of a length that is close to the end face of the water stop plate of the preceding metal tile roof panel from the position of the vertical joint between the metal tile roof panels.
At least the bottom wall of the joint portion and the portion corresponding to the installation width of the drainage pier is cut off, a bolt hole is provided in the vertical wall of the water stop plate, and the backing plate fixed at a right angle to the ridge-side end of the water stop pier is used as the stop plate. Being joined to the front of the water plate, the following metal tile roof panel suspended after positioning and fixing the preceding metal tile roof panel, the tip of the joint part of the water stop plate of the metal tile roof panel is It is placed so that it is in close contact with the cut-out end face of the waterstop plate of the preceding metal tile roof panel, while it is stopped on one side with a length that straddles the vertical plane walls of both waterstop plates equally. A joint plate equipped with water packing and having bolt holes is applied to the back side of the vertical surface walls of both water blocking plates through the water blocking packing, and bolts are inserted into each bolt hole to tighten the nuts. The water stop plates are connected in series The feature is that it is a structure that keeps rain out of the seam of the water stop plate on the ridge side of the unit type metal tile roof.
板は、止水板の垂直面壁のボルト孔と共通な配置のボル
ト孔を有し、止水板を接続するボルトで止水板の前面へ
接合されていることを特徴とする、請求項1に記載した
ユニット式金属瓦屋根の棟側の止水板継ぎ目部分の雨仕
舞い構造。2. The backing plate fixed to the ridge-side end of the drainage pier has bolt holes that are arranged in common with the bolt holes in the vertical wall of the water blocking plate, and the water blocking plate is used to connect the water blocking plate. It is joined to the front surface of the board, and the rain shut-off structure of the water-stop board joint part of the ridge side of the unit type metal tile roof according to claim 1 characterized.
に沿って設置された捨樋の棟側端部には、金属瓦屋根パ
ネル相互の縦目地に沿う側壁に一連の続く背面壁が少な
くとも止水の用に供する高さに設けられ、後行の金属瓦
屋根パネルの継手部分の止水板の下部及び当て板の下部
に前記捨樋の側壁を跨ぐ切り欠きが設けられ、先行及び
後行の金属瓦屋根パネルの止水板はそれぞれ前記捨樋の
背面壁の前面側において突き合わせ接合されていること
を特徴とする、請求項1に記載したユニット式金属瓦屋
根の棟側の止水板継ぎ目部分の雨仕舞い構造。3. The ridge side end of the gutter installed along the vertical joint side end of the preceding metal tile roof panel is provided with a series of back wall that is continuous with the side walls along the vertical joints of the metal tile roof panels. Is provided at least at a height to be used for water stoppage, and a cutout that straddles the side wall of the gutter is provided under the waterstop plate and the bottom plate of the joint portion of the trailing metal tile roof panel, And the water blocking plates of the following metal tile roof panels are butt-joined to each other on the front side of the back wall of the gutter, respectively, on the ridge side of the unit type metal tile roof according to claim 1. Rain stop structure at the seam of the water stop plate.
根パネルを順次に吊り込み位置決め固定すると共に、棟
部にはユニット化した棟包みを吊り込み位置決め固定し
て構築されたユニット式金属瓦屋根の前記金属瓦屋根パ
ネルの棟側に予めユニット化されている止水板が、金属
瓦屋根パネル相互の縦目地の近傍位置に形成する止水板
同士の継ぎ目部分の雨仕舞い構造であって、 先行する金属瓦屋根パネルの止水板の水返し部分が、金
属瓦屋根パネル同士の縦目地側端部の位置から棟と平行
な方向へ後行の金属瓦屋根パネルに隣接する縦目地側端
部に設置された捨樋の幅寸に及ぶ長さ範囲を切除され、
同部分の垂直面壁にボルト孔を設けた仕口が形成されて
いること、 後行の金属瓦屋根パネルの止水板には、金属瓦屋根パネ
ル同士の縦目地の位置から前記先行の金属瓦屋根パネル
の止水板の仕口における水返しが切除された端面へ近接
する長さの継手部分が突設され、少なくとも前記継手部
分及び水切り桟木の設置幅相当部分の底面壁は切除し、
前記継手部分の止水板の垂直面壁に前記先行側の止水板
の仕口に設けたボルト孔と共通する配置にボルト孔が設
けられ、水切り桟木の棟側端部へ直角に固着した当て板
が前記止水板の前面に接合されていること、 先行する金属瓦屋根パネルの位置決め固定後に吊り込ま
れた後行の金属瓦屋根パネルは、同金属瓦屋根パネルの
止水板の継手部分の先端が、先行の金属瓦屋根パネルの
止水板の仕口における切除された水返しの端面へ近接す
る配置に重ね合わせ、重ね合わせた止水板の間に止水パ
ッキンを挟み込み、垂直面壁の各ボルト孔へボルトを通
しナットを締め付けて双方の止水板が重ね状態に接続さ
れていることを特徴とする、ユニット式金属瓦屋根の棟
側の止水板継ぎ目部分の雨仕舞い構造。4. A unit-type metal constructed by sequentially suspending and fixing unitized metal tile roof panels on a roof structure, and suspending and fixing unitized wing packages in the ridge section. A water stop plate that is unitized in advance on the ridge side of the metal tile roof panel of the tiled roof is a rain-sealing structure at the joint part of the water stop plates formed near the vertical joints of the metal tile roof panels. The water repellent part of the water stop plate of the preceding metal tile roof panel is located in the vertical joint adjacent to the trailing metal tile roof panel in the direction parallel to the ridge from the position of the vertical joint side end of the metal tile roof panels. Side edge
The length range that spans the width of the gutter installed in the section is cut off,
A joint with bolt holes is formed in the vertical wall of the same part, and the water blocking plate of the subsequent metal tile roof panel has the above-mentioned metal tile from the position of the vertical joint between the metal tile roof panels. A joint portion of a length close to the end surface where the water repellent at the joint of the water stop plate of the roof panel is cut out is projected, and at least the bottom wall of the joint portion and the portion corresponding to the installation width of the draining pier is cut off,
A bolt hole is provided on the vertical wall of the water stop plate of the joint portion in the same arrangement as the bolt hole provided in the joint of the water stop plate on the preceding side, and is fixed at a right angle to the ridge side end of the draining pier. The plate is joined to the front surface of the water blocking plate, and the following metal tile roof panel suspended after positioning and fixing the preceding metal tile roof panel is a joint part of the water blocking plate of the metal tile roof panel. Of the vertical metal wall is placed so that the tip of each of them is close to the end face of the cut water bar in the connection of the water blocking plate of the preceding metal tile roof panel, and the water blocking packing is sandwiched between the stacked water blocking plates. A rain-sealing structure at the seam of the water blocking plate on the ridge side of the unit type metal tile roof, characterized in that both water blocking plates are connected in an overlapping state by inserting bolts through the bolt holes and tightening the nuts.
は、止水板の垂直面壁の前面へ当接させハンダ付け若し
くは接着材又は接着テープなどで接合されていることを
特徴とする、請求項1又は4に記載したユニット式金属
瓦屋根の棟側の止水板継ぎ目部分の雨仕舞い構造。5. The backing plate fixed to the ridge-side end of the drainage pier is brought into contact with the front surface of the vertical surface wall of the water blocking plate and is joined by soldering or an adhesive material or an adhesive tape. The rain-stopping structure of the seam of the water stop plate on the ridge side of the unit-type metal tile roof according to claim 1 or 4.
根パネルを順次に吊り込み位置決め固定すると共に、棟
部にはユニット化した棟包みを吊り込み位置決め固定し
て構築されたユニット式金属瓦屋根の前記金属瓦屋根パ
ネルの棟側に予めユニット化されている止水板が、金属
瓦屋根パネル相互の縦目地の近傍位置に形成する止水板
同士の継ぎ目部分の雨仕舞い構造であって、 先行する金属瓦屋根パネルの止水板は、金属瓦屋根パネ
ル同士の縦目地側端部の位置から棟と平行な方向へ後行
の金属瓦屋根パネルに隣接する縦目地側端部に設置され
た捨樋の幅寸に及ぶ長さ範囲が切除され、垂直面壁には
前記切除された端面に近い位置にボルト孔を設けた仕口
が形成されていること、 後行の金属瓦屋根パネルの止水板には、金属瓦屋根パネ
ル同士の縦目地の位置から前記先行の金属瓦屋根パネル
の止水板の端面へ近接する長さの継手部分が突設され、
少なくとも前記継手部分及び水切り桟木の設置幅相当部
分の底面壁は切除され、前記止水板の垂直面壁にボルト
孔が設けられ、 水切り桟木の棟側端部は止水板の垂直面
壁の前面へ当接されハンダ付け又はコーキング材などで
当接部を止水処理して接合されていること、 先行する金属瓦屋根パネルの位置決め固定後に吊り込ま
れた後行の金属瓦屋根パネルは、同金属瓦屋根パネルの
止水板の継手部分の先端が、先行の金属瓦屋根パネルの
止水板の仕口における切除された端面へ近接して突き合
わせ状態となる配置とし、一方、双方の止水板の垂直面
壁へ等しく跨がる長さで片面に止水パッキンを備え、且
つボルト孔を設けた継手板が双方の止水板の垂直面壁の
背面側へ前記止水パッキンを介して当てがわれ、各ボル
ト孔へボルトを通しナットを締め付けて双方の止水板が
一連的に接続されている ことを特徴とする、ユニット式
金属瓦屋根の棟側の止水板継ぎ目部分の雨仕舞い構造。6. A unitized metal tile roof on top of a shed
Suspend the root panels in order and position and fix them, and
A unitized wing wrapping is hung in the section to position and fix it.
The metal tile roof part of the unit type metal tile roof constructed by
A water stop plate that is unitized in advance on the side of the flannel is made of metal.
Waterstops formed near vertical joints between tile roof panels
It has a rain-sealing structure at the joints between the two, and the water stop plate of the preceding metal tile roof panel is a metal tile roof panel.
Drive in the direction parallel to the building from the position of the vertical joint side end
Installed at the end of the vertical joint side adjacent to the metal tile roof panel of
A length range that spans the width of the gutter is cut off, and the vertical wall
A connection with a bolt hole near the cut end face
The metal tile roof panel is installed on the water stop plate of the subsequent metal tile roof panel.
The metal tile roof panel of the preceding from the position of the vertical joint between the two
A joint part with a length close to the end face of the water stop plate of
At least the joint portion and the installation width equivalent part of the drainage pier
The bottom wall is cut off and the vertical wall of the water stop plate is bolted.
Hole is provided, it ridge-side end portion of the draining桟木is being joined with waterproofing process the abutment or the like which abut the front soldering or caulking material in the vertical wall of the waterstop, the preceding metal After positioning and fixing the tile roof panel, hang it up.
The following metal tile roof panel is
The tip of the joint part of the water stop plate is
Butt closely to the cut end face of the water stop plate connection
And the vertical surface of both water stop plates.
Equipped with water-tight packing on one side that spans the wall equally, and
The joint plate with two bolt holes is
It is applied to the back side through the waterproof packing, and each vol
Insert the bolt into the hole and tighten the nut so that both waterstop plates
A structure that keeps rain out of the seam of the water stop plate on the ridge side of the unit-type metal tile roof , which is connected in series .
根パネルを順次に吊り込み位置決め固定すると共に、棟Suspend the root panels in order and position and fix them, and
部にはユニット化した棟包みを吊り込み位置決め固定しA unitized wing wrapping is hung in the section to position and fix it.
て構築されたユニット式金属瓦屋根の前記金属瓦屋根パThe metal tile roof part of the unit type metal tile roof constructed by
ネルの棟側に予On the ridge side of the flannel めユニット化されている止水板が、金属The unitized water stop plate is made of metal
瓦屋根パネル相互の縦目地の近傍位置に形成する止水板Waterstops formed near vertical joints between tile roof panels
同士の継ぎ目部分の雨仕舞い構造であって、It is a rain-sealing structure of the joint part between each other, 先行する金属瓦屋根パネルの止水板の水返し部分が、金The water repellent part of the water stop plate of the preceding metal tile roof panel is made of gold.
属瓦屋根パネル同士の縦目地側端部の位置から棟と平行Parallel to the ridge from the position of the vertical joint side edge of the generic tile roof panels
な方向へ後行の金属瓦屋根パネルに隣接する縦目地側端Vertical joint side edge adjacent to the metal tile roof panel in the following direction
部に設置された捨樋の幅寸に及ぶ長さ範囲を切除され、The length range that spans the width of the gutter installed in the section is cut off,
同部分の垂直面壁にボルト孔を設けた仕口が形成されてThere is a bolt hole on the vertical wall of the same part.
いること、To be 後行の金属瓦屋根パネルの止水板には、金属瓦屋根パネThe water-blocking plate of the trailing metal tile roof panel has a metal tile roof panel.
ル同士の縦目地の位置から前記先行の金属瓦屋根パネルThe metal tile roof panel of the preceding from the position of the vertical joint between the two
の止水板の仕口における水返しが切除された端面へ近接Proximity to the cut end surface of the water baffle at the water stop plate connection
する長さの継手部分が突設され、少なくとも前記継手部A joint portion having a length of
分及び水切り桟木の設置幅相当部分の底面壁は切除し、Cut off the bottom wall of the portion equivalent to the installation width of the minute and draining pier,
前記継手部分の止水板の垂直面壁に前記先行側の止水板The water blocking plate on the leading side is attached to the vertical wall of the water blocking plate of the joint portion.
の仕口に設けたボルト孔と共通する配置にボルト孔が設The bolt holes are installed in the same location as the bolt holes provided on the
けられ、水切り桟木の棟側端部は、止水板の垂直面壁のThe edge of the drainage pier on the ridge side is the vertical wall of the water stop plate.
前面へ当接させハンダ付け又はコーキング材などで当接Abut on the front and abut with soldering or caulking material
部を止水処理して接合されていること、The parts are treated with water stop and joined, 先行する金属瓦屋根パネルの位置決め固定後に吊り込まIt is suspended after positioning and fixing the preceding metal tile roof panel.
れた後行の金属瓦屋根パネルは、同金属瓦屋根パネルのThe following metal tile roof panel is
止水板の継手部分の先端が、先行の金属瓦屋根パネルのThe tip of the joint part of the water stop plate is
止水板の仕口における切除された水返しの端面へ近接すProximity to the end face of the excised drainage bar at the stop of the water stop plate
る配置に重ね合わせ、重ね合わせた止水板の間に止水パAnd place the water-stop pad between the water-stop plates.
ッキンを挟み込み、垂直面壁の各ボルト孔へボルトを通Insert the bolt into each bolt hole on the vertical wall, and
しナットを締め付けて双方の止水板が重ね状態に接続さTighten the nuts so that both waterstops are
れていることを特徴とする、ユニット式金属瓦屋根の棟Wing with a unitary metal tile roof
側の止水板継ぎ目部分の雨仕舞い構造。Rain stop structure at the side water stop plate seam.
根パネルを順次に吊り込み位置決め固定すると共に、棟
部にはユニット化した棟包みを吊り込み位置決め固定し
て構築されたユニット式金属瓦屋根の前記金属瓦屋根パ
ネルの棟側に予めユニット化されている止水板が、金属
瓦屋根パネル相互の縦目地の近傍位置に形成する止水板
同士の継ぎ目部分の雨仕舞い構造であって、 先行する金属瓦屋根パネルの止水板は、金属瓦屋根パネ
ル同士の縦目地側端部の位置から棟と平行な方向へ後行
の金属瓦屋根パネルに隣接する縦目地側端部に設置され
た捨樋の幅寸に及ぶ長さ範囲が切除され、垂直面壁には
前記切除された端面に近い位置にボルト孔を設けた仕口
が形成されていること、 後行の金属瓦屋根パネルの止水板には、金属瓦屋根パネ
ル同士の縦目地の位置から前記先行の金属瓦屋根パネル
の止水板の端面へ近接する長さの継手部分が突設され、
少なくとも前記継手部分及び水切り桟木の設置幅相当部
分の底面壁は切除され、前記止水板の垂直面壁にボルト
孔が設けられ、 水切り桟木の棟側端部にはエンジニアリ
ングプラスチックで製作した止水構造のキャップを被せ
てあり、前記キャップの先端面を止水板の垂直面壁の前
面へ当接させ接着材又は接着テープなどで接合されてい
ること、 先行する金属瓦屋根パネルの位置決め固定後に吊り込ま
れた後行の金属瓦屋根パネルは、同金属瓦屋根パネルの
止水板の継手部分の先端が、先行の金属瓦屋根パネルの
止水板の仕口における切除された端面へ近接して突き合
わせ状態となる配置とし、一方、双方の止水板の垂直面
壁へ等しく跨がる長さで片面に止水パッキンを備え、且
つボルト孔を設けた継手板が双方の止水板の垂直面壁の
背面側へ前記止水パッキンを介して当てがわれ、各ボル
ト孔へボルトを通しナットを締め付けて双方の止水板が
一連的に接続されている ことを特徴とする、ユニット式
金属瓦屋根の棟側の止水板継ぎ目部分の雨仕舞い構造。8. A unitized metal tile roof on top of a shed
Suspend the root panels in order and position and fix them, and
A unitized wing wrapping is hung in the section to position and fix it.
The metal tile roof part of the unit type metal tile roof constructed by
A water stop plate that is unitized in advance on the side of the flannel is made of metal.
Waterstops formed near vertical joints between tile roof panels
It has a rain-sealing structure at the joints between the two, and the water stop plate of the preceding metal tile roof panel is a metal tile roof panel.
Drive in the direction parallel to the building from the position of the vertical joint side end
Installed at the end of the vertical joint side adjacent to the metal tile roof panel of
A length range that spans the width of the gutter is cut off, and the vertical wall
A connection with a bolt hole near the cut end face
The metal tile roof panel is installed on the water stop plate of the subsequent metal tile roof panel.
The metal tile roof panel of the preceding from the position of the vertical joint between the two
A joint part with a length close to the end face of the water stop plate of
At least the joint portion and the installation width equivalent part of the drainage pier
The bottom wall is cut off and the vertical wall of the water stop plate is bolted.
There is a hole, and the end of the drainage pier on the ridge side is covered with a water-proof structure cap made of engineering plastic.
Te There, the distal end surface of the cap to the front face of the vertical wall of the waterstop are joined like in abutted so adhesive or adhesive tape, incorporated hanging after positioning and fixing of the preceding metal tiled roof panels
The following metal tile roof panel is
The tip of the joint part of the water stop plate is
Butt closely to the cut end face of the water stop plate connection
And the vertical surface of both water stop plates.
Equipped with water-tight packing on one side that spans the wall equally, and
The joint plate with two bolt holes is
It is applied to the back side through the waterproof packing, and each vol
Insert the bolt into the hole and tighten the nut so that both waterstop plates
A structure that keeps rain out of the seam of the water stop plate on the ridge side of the unit-type metal tile roof , which is connected in series .
根パネルを順次に吊り込み位置決め固定すると共に、棟Suspend the root panels in order and position and fix them, and
部にはユニット化した棟包みを吊り込み位置決め固定しA unitized wing wrapping is hung in the section to position and fix it.
て構築されたユニット式金属瓦屋根の前記金属瓦屋根パThe metal tile roof part of the unit type metal tile roof constructed by
ネルの棟側に予めユニット化されている止水板が、金属A water stop plate that is unitized in advance on the side of the flannel is made of metal.
瓦屋根パネル相互の縦目地の近傍位置に形成する止水板Waterstops formed near vertical joints between tile roof panels
同士の継ぎ目部分の雨仕舞い構造であって、It is a rain-sealing structure of the joint part between each other, 先行する金属瓦屋根パネルの止水板の水返し部分が、金The water repellent part of the water stop plate of the preceding metal tile roof panel is made of gold.
属瓦屋根パネル同士の縦目地側端部の位置から棟と平行Parallel to the ridge from the position of the vertical joint side edge of the generic tile roof panels
な方向へ後行の金属瓦屋根パネルと隣接する縦目地側端Edge of vertical joint adjacent to the roof panel with metal tile roof
部に設置された捨樋の幅寸に及ぶ長さ範囲を切除され、The length range that spans the width of the gutter installed in the section is cut off,
同部分の垂直面壁にボルト孔を設けた仕口が形成されてThere is a bolt hole on the vertical wall of the same part.
いること、To be 後行の金属瓦屋根パネルの止水板には、金属瓦屋根パネThe water-blocking plate of the trailing metal tile roof panel has a metal tile roof panel.
ル同士の縦目地の位置から前記先行の金属瓦屋根パネルThe metal tile roof panel of the preceding from the position of the vertical joint between the two
の止水板の仕口における水返しが切除された端面へ近接Proximity to the cut end surface of the water baffle at the water stop plate connection
する長さの継手部分が突設され、少なくとも前記継手部A joint portion having a length of
分及び水切り桟木の設置幅相当部分の底面壁は切除し、Cut off the bottom wall of the portion equivalent to the installation width of the minute and draining pier,
前記継手部分の止水板の垂直面壁に前記先行側の止水板The water blocking plate on the leading side is attached to the vertical wall of the water blocking plate of the joint portion.
の仕口に設けたボルト孔と共通する配置にボルト孔が設The bolt holes are installed in the same location as the bolt holes provided on the
けられ、Kicked 水切り桟木の棟側端部にはエンジニアリングプAt the end of the draining pier side of the ridge
ラスチックで製作した止水構造のキャップを被せてあThe cap is made of plastic and has a waterproof structure.
り、前記キャップの先端面を止水板の垂直面壁の前面へThe tip of the cap to the front of the vertical wall of the waterstop.
当接させ接着材又は接着テープなどで接合されているこMake sure that they are brought into contact with each other and joined with an adhesive or adhesive tape.
と、When, 先行する金属瓦屋根パネルの位置決め固定後に吊り込まIt is suspended after positioning and fixing the preceding metal tile roof panel.
れた後行の金属瓦屋根パネルは、同金属瓦屋根パネルのThe following metal tile roof panel is
止水板の継手部分の先端が、先行の金属瓦屋根パネルのThe tip of the joint part of the water stop plate is
止水板の仕口における切除された水返しの端面へ近接すProximity to the end face of the excised drainage bar at the stop of the water stop plate
る配置に重ね合わせ、重ね合わせた止水板の間に止水パAnd place the water-stop pad between the water-stop plates.
ッキンを挟み込み、垂直面壁の各ボルト孔へボルトを通Insert the bolt into each bolt hole on the vertical wall, and
しナットを締め付けて双方の止水板が重ね状態に接続さTighten the nuts so that both waterstops are
れていることを特徴とする、ユニット式金属瓦屋根の棟Wing with a unitary metal tile roof
側の止水板継ぎ目部分の雨仕舞い構造。Rain stop structure at the side water stop plate seam.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP17217297A JP3433233B2 (en) | 1997-06-27 | 1997-06-27 | Rain break structure at the seam of the waterproof plate on the ridge side of the unit-type metal tile roof |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP17217297A JP3433233B2 (en) | 1997-06-27 | 1997-06-27 | Rain break structure at the seam of the waterproof plate on the ridge side of the unit-type metal tile roof |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH1113222A JPH1113222A (en) | 1999-01-19 |
| JP3433233B2 true JP3433233B2 (en) | 2003-08-04 |
Family
ID=15936913
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP17217297A Expired - Fee Related JP3433233B2 (en) | 1997-06-27 | 1997-06-27 | Rain break structure at the seam of the waterproof plate on the ridge side of the unit-type metal tile roof |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3433233B2 (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN117133517A (en) * | 2022-05-19 | 2023-11-28 | 河南平芝高压开关有限公司 | A basin-type insulator installation structure and GIS |
-
1997
- 1997-06-27 JP JP17217297A patent/JP3433233B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JPH1113222A (en) | 1999-01-19 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP3433233B2 (en) | Rain break structure at the seam of the waterproof plate on the ridge side of the unit-type metal tile roof | |
| JPH07207860A (en) | Waterproof structure of parapet upper bed | |
| JPH0714517Y2 (en) | Waterproof structure for roof panel connections | |
| JP7636208B2 (en) | Waterproofing of buildings | |
| JPH0623622Y2 (en) | Domer mounting structure | |
| JP2688306B2 (en) | Roof eaves ceiling | |
| JP3382562B2 (en) | Joint member and joint structure of exterior material for horizontal roofing | |
| JP2510366B2 (en) | Building decoration structure | |
| JPH0714515Y2 (en) | Waterproof structure for roof panel connections | |
| JP2618559B2 (en) | Joint structure of unit with handrail wall | |
| JP2721565B2 (en) | Roof panel connection structure | |
| JP2705865B2 (en) | Roof panel joint waterproofing method | |
| JPH0623621Y2 (en) | Domer mounting structure | |
| JPH0673851A (en) | Roof structure with rain gutter | |
| JPH0673852A (en) | Construction method for roof | |
| JP2529428B2 (en) | Decorative eaves roof unit | |
| JPH0711743A (en) | Roof panel | |
| JP2852719B2 (en) | Mounting method of exterior material and base material and method of construction of exterior material | |
| JP3097027B2 (en) | Renovation method and roof of roof tile roof | |
| JPH05340041A (en) | Connecting structure for roof panel | |
| JPH0673853A (en) | Roof member with inner gutter | |
| JPH1144034A (en) | Eaves structure and roof construction method | |
| JPH0932183A (en) | Roof panel | |
| JP2001040830A (en) | Waterproof structure at the corner of the external floor | |
| JP2003105937A (en) | Method for constructing eaves, eaves structure, and eaves unit |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20030108 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| LAPS | Cancellation because of no payment of annual fees |