JP3435509B2 - Seismometer installation device and installation method of seismometer installation device - Google Patents
Seismometer installation device and installation method of seismometer installation deviceInfo
- Publication number
- JP3435509B2 JP3435509B2 JP2000307133A JP2000307133A JP3435509B2 JP 3435509 B2 JP3435509 B2 JP 3435509B2 JP 2000307133 A JP2000307133 A JP 2000307133A JP 2000307133 A JP2000307133 A JP 2000307133A JP 3435509 B2 JP3435509 B2 JP 3435509B2
- Authority
- JP
- Japan
- Prior art keywords
- seismograph
- casing
- cement
- vertical
- blade
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009434 installation Methods 0.000 title claims description 52
- 238000000034 method Methods 0.000 title claims description 24
- 230000005540 biological transmission Effects 0.000 claims description 187
- 230000033001 locomotion Effects 0.000 claims description 153
- 239000004568 cement Substances 0.000 claims description 134
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims description 55
- 238000005553 drilling Methods 0.000 claims description 29
- 230000002265 prevention Effects 0.000 claims description 28
- 238000004080 punching Methods 0.000 claims description 23
- 230000002093 peripheral effect Effects 0.000 claims description 21
- 238000012856 packing Methods 0.000 claims description 14
- 230000015572 biosynthetic process Effects 0.000 claims description 12
- 230000008878 coupling Effects 0.000 claims description 7
- 238000010168 coupling process Methods 0.000 claims description 7
- 238000005859 coupling reaction Methods 0.000 claims description 7
- 230000008602 contraction Effects 0.000 description 10
- 238000005516 engineering process Methods 0.000 description 7
- 239000000725 suspension Substances 0.000 description 6
- 230000000694 effects Effects 0.000 description 4
- 238000005192 partition Methods 0.000 description 4
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 239000000696 magnetic material Substances 0.000 description 2
- 229910001220 stainless steel Inorganic materials 0.000 description 2
- 239000010935 stainless steel Substances 0.000 description 2
- 230000000052 comparative effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 230000005389 magnetism Effects 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 229910052751 metal Inorganic materials 0.000 description 1
- 230000000644 propagated effect Effects 0.000 description 1
- 230000001902 propagating effect Effects 0.000 description 1
Landscapes
- Geophysics And Detection Of Objects (AREA)
Description
【0001】[0001]
【発明の属する技術分野】本発明は、既成井戸を利用し
て震源より伝播の地震波記録を地震計設置井での地質断
面において、異なる地質と異なる深度ごとに、同一時間
で同時記録が出来るので、より経済的で効果的地震解明
が出来る、既成井戸活用による地震計設置装置と地震計
設置装置の設置方法に関するものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention enables simultaneous recording of seismic waves propagated from the epicenter using existing wells at the same time for different geological features and different depths in a geological section at a seismometer installed well. , It is related to the seismograph installation device and the installation method of the seismograph installation device by utilizing existing wells, which enables more economical and effective earthquake elucidation.
【0002】[0002]
【従来の技術】従来から行われている新設地震計設置井
だけでは、多くの経済投資と新設地震計設置井の完成に
多くの時間がかかる以外に、井戸ケーシング中間適位置
に位置する地震計内に格納されている地磁気方位計は、
4m以上の磁気干渉のない無磁気帯で方位が確定出来る
非磁気材(SVS316ステンレス等)で覆われている
ことと、さらに、地震計設置傾斜角3°以内で設置する
ことに対応出来る技術と、上下動震動観測技術が未開発
であった。2. Description of the Related Art A seismograph located at an appropriate position in the middle of a well casing is used, in addition to the large amount of economic investment and the long time required to complete a new seismograph installation well with conventional seismograph installation wells. The geomagnetic compass stored inside is
It is covered with a non-magnetic material (SVS316 stainless steel, etc.) whose direction can be determined in a magnetic field of 4 m or more without magnetic interference, and technology that can be installed within a seismometer installation inclination angle of 3 °. , Vertical motion observation technology was not yet developed.
【0003】[0003]
【発明が解決しようとする課題】従来の技術で述べたも
のにあっては、下記のような問題点を有していた。上述
の地震波記録方法では、1孔の地震計設置井で1地震計
の設置なので地震計設置井1孔当たり1地震計設置の観
測の地震波記録方法よりなく、より合理的で効果の上が
る地震動を数多くの比較検討でできる方法の開発によっ
て、地震開発技術解明の結論付けが、急務の要望でもあ
った。上記要望には先に申請した特願2000−133
918、発明の名称〜「多段式地震計設置装置」よりな
く、然も、現在多くの遊休既成井戸が放置されているの
が現状である。すなわち、既成井戸を活用して経済的に
も地震開発技術の短縮にもなる既成井戸による地震計設
置装置と地震計複数設置装置の新規発明である。The problems described in the prior art have the following problems. In the seismic wave recording method described above, one seismometer is installed for each well with one seismograph. It was also an urgent need to conclude the elucidation of earthquake development technology by developing a method that could be conducted through numerous comparative studies. To the above request, Japanese Patent Application 2000-133 previously applied
918, title of the invention-rather than "multi-stage seismograph installation device", it is the current situation that many idle wells are currently left unattended. That is, it is a new invention of a seismograph installation device and a seismograph multiple installation device using an existing well, which can economically and shorten the earthquake development technology by utilizing the existing well.
【0004】本発明は、従来の技術の有するこのような
問題点に鑑みさなれたものであり、その目的とするとこ
ろは、次のようなことのできるものを提供しようとする
ものである。現在、地震動の(直交する)水平動2成分
(以後水平動震動と称す)と、上下動(垂直)成分(以
後上下動震動と称す)とのそれぞれを継続した地中の地
震観測では、観測井戸1井当たり地震計1台の設置で行
われている。地層の震動挙動を解明するため、異なる地
層深度での地震震動観測が効率良い技術開発のため必要
とされている。地震観測井での地層深度の異なる位置に
複数の地震計設置が発明されると、経済的効果も極めて
高いものになる。すなわち、既設井戸を活用し、その適
位置に地震計を複数設置することが可能となり、さら
に、効果のある技術開発が期待できる。なお、地震計設
置において、地震による水平動震動・上下動震動を感度
よく正確に観測記録するには、下記条件を満たさなけれ
ばならない。The present invention has been made in view of the above problems of the prior art, and an object of the present invention is to provide the following things. At present, in the seismic observation in the ground, two horizontal components of the seismic motion (orthogonal) (hereinafter referred to as horizontal motions) and vertical (vertical) components (hereinafter referred to as vertical motions) are continuously observed. One seismometer is installed per well. In order to elucidate the seismic behavior of the strata, seismic seismic observations at different depths are required for efficient technological development. If multiple seismographs are invented at different depths in the seismic well, the economic effect will be extremely high. In other words, it is possible to utilize existing wells and install multiple seismographs at appropriate positions, and further effective technological development can be expected. The following conditions must be met in order to accurately and accurately record and record horizontal and vertical motions caused by an earthquake when installing a seismograph.
【0005】A.地震計内に格納されている地磁気方位
計は、4m以上の磁気干渉のない無磁気帯で方位が確定
出来る非磁気材(SVS316ステンレス等)で覆われ
ている。さらに、地震計設置傾斜角3°以内で設置する
こと。
B.地中に垂直に埋設された井戸中の地震計に伝達され
る地震震動の水平動震動は地震計の上方部には振子状の
計器が内蔵され、横胴体に密接されている地震計の横胴
体で伝達受信が行われ、上下動震動は、地震計の下方部
には上下震動するのを拡大記録する計器が内蔵接続され
ているので、上下震動を地震計底部より伝達受信がされ
て、正確な地震震動の観測記録ができる。
C.地中に垂直に埋設された井戸ケーシングには井戸ケ
ーシングが地層に垂直に交差接触しているので、各地層
ごとの地震震動が伝達されている水平動震動はストレー
トに伝達にされるため、そのケーシング内壁に、水平動
伝達アーム先端にある接触盤を接触させて、地層伝播の
水平動震動を無磁気ケーシング部分に格納されている地
震計に伝達記録される。A. The geomagnetic compass stored in the seismometer is covered with a non-magnetic material (SVS316 stainless steel, etc.) whose orientation can be determined by a magnetic field of 4 m or more without magnetic interference. Furthermore, the seismometer should be installed within an inclination angle of 3 °. B. The horizontal motion of the seismic motion transmitted to the seismograph in the well vertically buried in the ground is a pendulum-like instrument built in the upper part of the seismograph, which is close to the lateral body. Transmission and reception is performed by the body, and vertical vibrations are transmitted and received from the bottom part of the seismograph because an instrument for expanding and recording vertical vibrations is built-in at the bottom of the seismograph. Accurate observation records of earthquake ground motions can be made. C. The well casing vertically buried in the ground crosses the well casing perpendicularly to the stratum, so that the horizontal vibration that is transmitted by each layer is transmitted straight. The contact plate at the tip of the horizontal motion transmission arm is brought into contact with the inner wall of the casing, and the horizontal motion of the stratum propagation is transmitted and recorded to the seismograph stored in the non-magnetic casing part.
【0006】D.上下動震動は地層に垂直に埋設された
井戸ケーシングと平行に地層中を上下動震動として伝達
するので、地震計に記録させるためには井戸ケーシング
に上下動震動を交差伝達させなければならない。そのた
め、台座に取付けられている上下動震動伝達刃を4点フ
レーム式ジャッキ部・4点傘歯車式ジャッキ部によって
押し出し拡張されると、その刃は井戸ケーシングを突破
りその所の地層を突刺すと同時に、井戸ケーシング胴体
に取付けられた鳥の羽根のように拡がる。この部分にセ
メント充填固結部を構成させると、井戸ケーシング外側
の地層を平行伝播する上下動震動を上下動震動伝達刃と
ケーシングセメント充填穴によって堰き止め上下震動受
信を容易にする。D. Since vertical motions are transmitted as vertical motions in the formation parallel to the well casing vertically embedded in the formation, vertical motions must be cross-transmitted to the well casing in order to be recorded by the seismograph. Therefore, when the vertical vibration transmission blade attached to the pedestal is pushed out and expanded by the 4-point frame type jack section and the 4-point bevel gear type jack section, the blade breaks through the well casing and pierces the stratum at that location. At the same time, it spreads out like a bird's wings attached to the well casing body. When the cement-filled and solidified portion is formed in this portion, vertical vibrations that propagate in parallel in the stratum outside the well casing are blocked by the vertical vibration transmission blade and the casing cement filling hole to facilitate vertical vibration reception.
【0007】E.既成井戸は、様々な種類の口径と深度
である井戸ケーシング挿入でできている。その井戸ケー
シング状況に合わせた複数設置の地震計のうち、上部地
震計は上下動震動伝達アーム台座上に、地震計を収納し
た非磁性管の地震計収納筒を上下動伝達アームのバンド
状取付金具によって筒を締付け、その筒より張り出して
いるアーム先端の斜面を上下動震動伝達アーム台座に載
置する。その結果、上部地震計は井戸ケーシング外側の
上下動震動を井戸ケーシング外部の地層まで拡張された
台座の上下動震動伝達刃によって容易に上下動震動を受
信し、井戸ケーシング内壁に設置された上下動震動伝達
アーム台座と、上下動伝達アームによって無磁気ケース
に格納されている地震計底部に伝達され、そこから上下
動震動が地震計に観測記録される。さらに、下部地震計
は井戸ケーシング孔底にある非磁性管の地震計収納筒の
底部と、収納されている地震計底部が一緒に上下動震動
伝達地盤上に密着するように載置すると下部地震計に上
下動震動を記録する。なお、下部地震計収納筒の適2ケ
所に地震計設置傾斜角3°以内になるように水平動伝達
アームのバンド状取付金具によって締付固定させ井戸ケ
ーシング内壁にアーム先端を接触させると、井戸ケーシ
ングに伝達の水平動震動はアームにより伝達、下部地震
計に観測記録される。E. Prefabricated wells are made up of well casing inserts of various sizes and depths. Of the multiple seismometers installed according to the situation of the well casing, the upper seismometer is a vertical motion transmission arm pedestal, and a non-magnetic pipe seismometer housing cylinder that houses the seismometer is attached to the vertical motion transmission arm in a band. Tighten the cylinder with metal fittings, and place the slope of the arm tip that projects from the cylinder on the vertical motion transmission arm base. As a result, the upper seismometer easily receives the vertical motions outside the well casing by the vertical motion transmission blades of the pedestal extended to the stratum outside the well casing, and receives the vertical motions on the inner wall of the well casing. The vibration transmission arm base and the vertical motion transmission arm transmit the vibration to the bottom of the seismograph stored in the non-magnetic case, and the vertical motion is observed and recorded by the seismometer from there. In addition, the lower seismograph is placed when the bottom of the seismograph storage cylinder made of non-magnetic pipe at the bottom of the well casing hole and the bottom of the seismograph stored are closely attached to the vertical motion transmission ground. Record the vertical motions on the total. In addition, when the seismograph installation inclination is within 3 ° in two appropriate places on the lower seismograph storage cylinder, the horizontal motion transmission arm is tightened and fixed by the band-shaped mounting bracket, and the arm tip is brought into contact with the inner wall of the well. The horizontal motions transmitted to the casing are transmitted by the arm and recorded by the lower seismograph.
【0008】[0008]
【課題を解決するための手段】上記目的を達成するため
に、本発明は下記のようになるものである。請求項1記
載の発明は、第1ボーリングロッド2と下部地震計収納
筒部3から構成され、A.第1ボーリングロッド2は、
ボーリングロッド本体2Aとボーリングロッド本体の下
端に取付けられた接続カップリング2Bから構成され、
この接続カップリング2Bの下方外周面には左ネジ2B
1が刻設され、
B.下部地震計収納筒部3は、下部地震計qを収納する
無磁石基礎筒3Aと、その無磁石基礎筒3Aの下方部分
に接続されたセメントが充填された無磁石基礎下筒3B
と、無磁石基礎筒3Aの上端に上方に向け連設されたラ
ッパ口3Cと、当該無磁石基礎筒の上端の内周面に刻設
された左ネジ3Dと、無磁石基礎筒3Aの外周面に、当
該無磁石基礎筒に収納された下部地震計のやや上方にあ
る水平動震動記録位置をもって水平状態で取付けられた
下部地震計用水平動伝達アーム3Eと、無磁石基礎下筒
3Bの上部に接続された無磁石基礎筒3Aとの接続部の
外周面に水平状態で取付けられた下部地震計用上下動伝
達アーム3Fから構成され、下部地震計用水平動伝達ア
ーム3Eと下部地震計用上下動伝達アーム3Fの先端に
は、井戸ケーシングの内壁に接触する接触盤が取付けら
れ、
C.第1ボーリングロッド2と無磁石基礎筒3Aとは、
互いの左ネジ2B1と左ネジ3Dを利用した左ネジ接続
で連結されていることを特徴とするものである。In order to achieve the above object, the present invention is as follows. Claim 1
The invention described in the above is composed of a first boring rod 2 and a lower seismograph storage cylinder portion 3, The first boring rod 2 is
It consists of a boring rod body 2A and a connection coupling 2B attached to the lower end of the boring rod body,
A left screw 2B is provided on the lower outer peripheral surface of the connection coupling 2B.
1 is engraved, B. The lower seismograph storage cylinder part 3 includes a non-magnetic foundation cylinder 3A for accommodating the lower seismograph q, and a cementless non-magnetic foundation lower cylinder 3B connected to a lower part of the non-magnetism basic cylinder 3A.
, A trumpet mouth 3C continuously provided on the upper end of the non-magnet base cylinder 3A, a left screw 3D engraved on the inner peripheral surface of the upper end of the non-magnet base cylinder, and an outer circumference of the non-magnet base cylinder 3A. The horizontal motion transmission arm 3E for the lower seismometer and the non-magnetic foundation lower cylinder 3B, which are mounted in a horizontal state at a horizontal motion record position slightly above the lower seismograph housed in the non-magnetic foundation cylinder, on the surface. It is composed of a vertical motion transmission arm 3F for the lower seismograph mounted horizontally on the outer peripheral surface of the connection with the magnetless foundation cylinder 3A connected to the upper part, and a horizontal motion transmission arm 3E for the lower seismometer and a lower seismometer. A contact plate that comes into contact with the inner wall of the well casing is attached to the tip of the vertical movement transmission arm 3F for the vehicle. The first boring rod 2 and the magnetless basic cylinder 3A are
It is characterized in that they are connected by a left-handed screw connection using the left-handed screw 2B1 and the left-handed screw 3D of each other.
【0009】請求項2記載の発明は、請求項1記載の発
明を用いた下記の各工程から構成されていることを特徴
とするものである。
第1工程
既成井戸の底部分を平坦にする。
第2工程
第1ボーリングロッド2の下端に左ネジ接続で連結した
下部地震計収納筒部3を井戸ケーシング1の井戸孔底ま
で降下させ設置する。
第3工程
頭部に吊下げ用ワイヤWを連結した下部地震計qを、地
上よりラッパ口3Cで誘導しながら降下させ、無磁石基
礎筒3Aに接続されている無磁石基礎下筒3B内の充填
セメントの上面に設置する。[0009] According to a second aspect of the invention, originating in claim 1, wherein
Characterized by being composed of the following steps using light
It is what First step The bottom of the existing well is flattened. Second step The lower seismograph storage cylinder part 3, which is connected to the lower end of the first boring rod 2 by a left-hand screw connection, is lowered to the bottom of the well hole of the well casing 1 and installed. The lower seismograph q in which the wire W for suspension is connected to the head of the third step is lowered while being guided from the ground by the trumpet mouth 3C, and the lower part of the non-magnet foundation lower cylinder 3B connected to the non-magnet foundation cylinder 3A. Install on top of filled cement.
【0010】請求項3記載の発明は、第2ボーリングロ
ッド4と第1ケーシング突破部5と、上下動震動伝達ア
ーム台座6と、コンクリート圧入部7と、上部地震計部
8から構成され、
A.第2ボーリングロッド4は、ボーリングロッド本体
4Aとボーリングロッド本体の下端に取付けられたジャ
ッキ用接続具4Bから構成され、
B.第1ケーシング突破部5は、4点フレーム式ジャッ
キ部5Aと、4点フレーム式ジャッキ部に取付けられた
第1刃物脱落防止枠5Bと、第1刃物脱落防止枠に取付
けられたケーシング穴あけ刃5Cと、上下動震動伝達刃
5Dから構成され、
C.上下動震動伝達アーム台座6は、所定幅の板をもっ
て井戸ケーシング1の内周面に接する程度の直径に構成
された平面円輪状の台座本体6Aと、台座本体6Aの内
周面に形成された載置用斜面6Bと、台座本体6Aの前
後左右に位置するケーシング穴あけ刃5Cと上下動震動
伝達刃5Dが貫入できるよう開口されたコンクリート充
填穴6Cから構成され、
D.コンクリート圧入部7は、第3ボーリングロッド7
Aの下端に着脱自在に連結された連結用ブロック7B
と、この連結用ブロックの外周に溶着された圧入セメン
ト漏洩防止ゴムパッキング7Cからなり、かつこれらに
は第3ボーリングロッド7Aと連通するセメント充填用
の縦通路7C1と、セメント充填用の縦通路の下端から
当該縦通路を中心に前後左右方向に水平状態でセメント
充填用の通路7C2が開設され、
E.上部地震計部8は、上部地震計8Aと、井戸ケーシ
ングの内壁に接触する上部地震計用水平動伝達アーム8
Bと、上下動震動伝達アーム台座に係止する上部地震計
用上下動伝達アーム8Cから構成されていることを特徴
とするものである。The third aspect of the present invention comprises a second boring rod 4, a first casing breakthrough portion 5, a vertical motion vibration transmission arm base 6, a concrete press-fitting portion 7, and an upper seismograph portion 8, . The second boring rod 4 is composed of a boring rod body 4A and a jack connector 4B attached to the lower end of the boring rod body. The first casing break-through portion 5 includes a 4-point frame type jack portion 5A, a first blade fall-out prevention frame 5B attached to the 4-point frame type jack portion, and a casing punching blade 5C attached to the first blade fall-out prevention frame. And a vertical motion vibration transmission blade 5D. The vertical motion transmission arm pedestal 6 is formed on the inner peripheral surface of the pedestal body 6A, and a pedestal main body 6A having a flat circular ring shape with a plate having a predetermined width and having a diameter such that it is in contact with the inner peripheral surface of the well casing 1. The mounting slope 6B, the casing drilling blades 5C located at the front, rear, left and right of the pedestal body 6A and the concrete filling holes 6C opened so that the vertical vibration transmission blades 5D can penetrate therethrough. The concrete press fitting part 7 is the third boring rod 7
Connecting block 7B detachably connected to the lower end of A
And a compression-fitting cement leakage prevention rubber packing 7C welded to the outer periphery of the connecting block, and these are connected to the third boring rod 7A by a cement filling vertical passage 7C1 and a cement filling vertical passage. A cement filling passage 7C2 is opened horizontally from the lower end in the front-rear and left-right directions centering on the vertical passage. The upper seismograph section 8 includes an upper seismograph 8A and a horizontal motion transmission arm 8 for the upper seismometer that contacts the inner wall of the well casing.
Features and B, that is composed of an upper seismograph for vertically moving the transfer arm 8C for locking the vertical movement vibration transmission arm pedestal
It is what
【0011】請求項4記載の発明は、請求項3記載の発
明を用いた下記の各工程から構成されていることを特徴
とするものである。
第1工程
第2ボーリングロッド4により、第1ケーシング突破部
5と上下動震動伝達アーム台座6を井戸ケーシング1に
おける適位置に降下停止する。
第2工程
地上から第1ケーシング突破部5を作動させて、ケーシ
ング穴あけ刃5Cと上下動震動伝達刃5Dにより、井戸
ケーシング1を突破り充填セメント用通路1Aを形成
し、さらにその付近の地層10をも刺しケーシングセメ
ント充填穴10Aを形成する。
第3工程
地上から第1ケーシング突破部5を作動させて、ケーシ
ング穴あけ刃5Cのみを後退させ井戸ケーシング1に充
填セメント用通路1Aを形成すると共に、上下動震動伝
達刃5Dは突刺した状態で、上下動震動伝達アーム台座
6と共に残留させる。
第4工程
コンクリート圧入部7を用いて、セメント11を充填セ
メント用通路1Aを介してケーシングセメント充填穴1
0Aに充填する。
第5工程
上部地震計部8における上部地震計8Aを上下動震動伝
達アーム台座6部分に設置する。[0011] The invention of claim 4, wherein the origination of claim 3, wherein
Characterized by being composed of the following steps using light
It is what In the first step and the second boring rod 4, the first casing breakthrough portion 5 and the vertical vibration transmission arm base 6 are lowered and stopped at appropriate positions in the well casing 1. Second step: The first casing break-through portion 5 is operated from above the ground, and the casing drilling blade 5C and the vertical motion transmission blade 5D break through the well casing 1 to form a channel 1A for filling cement, and further a stratum 10 in the vicinity thereof. To form casing cement filling hole 10A. Third step From the ground, the first casing break-through portion 5 is operated to retract only the casing punching blade 5C to form the filled cement passage 1A in the well casing 1, and the vertical vibration transmission blade 5D is pierced. It is left with the vertical motion transmission arm base 6. Fourth step Concrete press-fitting section 7 is used to fill cement 11 with casing cement filling hole 1 through passage 1A for cement.
Fill to 0A. The upper seismograph 8A in the fifth process upper seismograph section 8 is installed on the pedestal 6 part of the vertical motion vibration transmission arm.
【0012】請求項5記載の発明は、第2ボーリングロ
ッド4と、第2ケーシング突破部9と、上下動震動伝達
アーム台座6と、コンクリート圧入部7と、上部地震計
部8から構成され、
A.第2ボーリングロッド4は、ボーリングロッド本体
4Aとボーリングロッド本体の下端に取付けられたジャ
ッキ用接続具4Bから構成され、
B.第2ケーシング突破部9は、4点傘歯車式ジャッキ
部9Aと、4点傘歯車式ジャッキ部に取付けた第2刃物
脱落防止枠9Bと、第2刃物脱落防止枠9Bに取付けた
ケーシング穴あけ刃9Cと、上下動震動伝達刃9Dから
構成され、
C.上下動震動伝達アーム台座6は、所定幅の板をもっ
て井戸ケーシング1の内周面に接する程度の直径に構成
された平面円輪状の台座本体6Aと、台座本体6Aの内
周面に形成された載置用斜面6Bと、台座本体6Aの前
後左右に位置するケーシング穴あけ刃9Cと上下動震動
伝達刃9Dが貫入できるよう開口されたコンクリート充
填穴6Cから構成され、
D.コンクリート圧入部7は、第3ボーリングロッド7
Aの下端に着脱自在に連結された連結用ブロック7B
と、この連結用ブロックの外周に溶着された圧入セメン
ト漏洩防止ゴムパッキング7Cからなり、これらに第3
ボーリングロッド7Aと連通するセメント充填用の縦通
路7C1と、セメント充填用の縦通路の下端から当該縦
通路を中心に前後左右方向に水平状態でセメント充填用
の縦通路7C2が開設され、
E.上部地震計部8は、上部地震計8Aと、井戸ケーシ
ングの内壁に接触する上部地震計用水平動伝達アーム8
Bと、上下動震動伝達アーム台座に係止する上部地震計
用上下動伝達アーム8Cから構成されていることを特徴
とするものである。 The invention according to claim 5 is composed of a second boring rod 4, a second casing breakthrough portion 9, a vertical motion vibration transmission arm base 6, a concrete press-fitting portion 7, and an upper seismograph portion 8, A. The second boring rod 4 is composed of a boring rod body 4A and a jack connector 4B attached to the lower end of the boring rod body. The second casing break-through portion 9 includes a four-point bevel gear type jack portion 9A, a second blade fall-out prevention frame 9B attached to the four-point bevel gear type jack portion, and a casing punching blade attached to the second blade fall-out prevention frame 9B. 9C and a vertical motion transmission blade 9D. The vertical motion transmission arm pedestal 6 is formed on the inner peripheral surface of the pedestal body 6A, and a pedestal main body 6A having a flat circular ring shape with a plate having a predetermined width and having a diameter such that it is in contact with the inner peripheral surface of the well casing 1. The mounting slope 6B, the casing drilling blades 9C located at the front, rear, left and right of the pedestal body 6A and the concrete filling holes 6C opened so that the vertical vibration transmission blades 9D can penetrate therethrough. The concrete press fitting part 7 is the third boring rod 7
Connecting block 7B detachably connected to the lower end of A
And a press-fitting cement leakage-preventing rubber packing 7C welded to the outer periphery of the connecting block.
A vertical channel 7C1 for cement filling, which communicates with the boring rod 7A, and a vertical channel 7C2 for cement filling are opened horizontally from the lower end of the vertical channel for cement filling in the front-rear and left-right directions centering on the vertical channel. The upper seismograph section 8 includes an upper seismograph 8A and a horizontal motion transmission arm 8 for the upper seismometer that contacts the inner wall of the well casing.
Features and B, that is composed of an upper seismograph for vertically moving the transfer arm 8C for locking the vertical movement vibration transmission arm pedestal
It is what
【0013】請求項6記載の発明は、請求項5記載の発
明を用いた下記の各工程から構成されていることを特徴
とするものである。
第1工程
第2ボーリングロッド4により、第2ケーシング突破部
9と上下動震動伝達アーム台座6を井戸ケーシング1に
おける適位置に降下停止する。
第2工程
地上から第2ケーシング突破部9を作動させることで、
ケーシング穴あけ刃9Cと上下動震動伝達刃9Dを前進
させ、井戸ケーシング1を突破り充填セメント用通路1
Aを形成し、さらにその付近の地層10をも刺しケーシ
ングセメント充填穴10Aを形成する。
第3工程
地上から第2ケーシング突破部9を作動させることで、
ケーシング穴あけ刃9Cのみを後退させ井戸ケーシング
1に充填セメント用通路1Aを形成すると共に、上下動
震動伝達刃9Dは突刺した状態で上下動震動伝達アーム
台座6と共に残留させる。
第4工程
コンクリート圧入部7を用いて、セメント11を充填セ
メント用通路1Aを介してケーシングセメント充填穴1
0Aに充填する。
第5工程
上部地震計部8における上部地震計8Aを上下動震動伝
達アーム台座6部分に設置する。[0013] According to a sixth aspect of the invention, originating in claim 5, wherein
Characterized by being composed of the following steps using light
It is what In the first step and the second boring rod 4, the second casing breakthrough portion 9 and the vertical vibration transmission arm base 6 are lowered and stopped at appropriate positions in the well casing 1. Second step By operating the second casing breakthrough 9 from the ground,
The casing drilling blade 9C and the vertical vibration transmission blade 9D are advanced to break through the well casing 1 and the passage 1 for the filling cement.
A is formed, and the formation 10 in the vicinity is also stabbed to form a casing cement filling hole 10A. Third step By operating the second casing breakthrough 9 from the ground,
Only the casing drilling blade 9C is retracted to form the channel 1A for filling cement in the well casing 1, and the vertical vibration transmission blade 9D is left in the pierced state together with the vertical vibration transmission arm pedestal 6. Fourth step Concrete press-fitting section 7 is used to fill cement 11 with casing cement filling hole 1 through passage 1A for cement.
Fill to 0A. The upper seismograph 8A in the fifth process upper seismograph section 8 is installed on the pedestal 6 part of the vertical motion vibration transmission arm.
【0014】請求項7記載の発明は、請求項1記載の発
明と、請求項3記載の発明を用いた下記の各工程から構
成されていることを特徴とするものである。
第1工程
既成井戸の底部分を平坦にする。
第2工程
第1ボーリングロッド2の下端に左ネジ接続で連結した
下部地震計収納筒部3を井戸ケーシング1の井戸孔底ま
で降下させ設置する。
第3工程
第2ボーリングロッド4により、第1ケーシング突破部
5と上下動震動伝達アーム台座6を井戸ケーシング1に
おける適位置に降下停止する。
第4工程
地上から第1ケーシング突破部5を作動させて、ケーシ
ング穴あけ刃5Cと上下動震動伝達刃5Dにより井戸ケ
ーシング1を突破り充填セメント用通路1Aを形成し、
さらにその付近の地層10をも刺しケーシングセメント
充填穴10Aを形成する。
第5工程
地上から第1ケーシング突破部5を作動させて、ケーシ
ング穴あけ刃5Cのみを後退させ井戸ケーシング1に充
填セメント用通路1Aを形成すると共に、上下動震動伝
達刃5Dは突刺した状態で上下動震動伝達アーム台座6
と共に残留させる。
第6工程
コンクリート圧入部7を用いて、セメントを充填セメン
ト用通路1Aを介してケーシングセメント充填穴10A
に充填する。
第7工程
上部地震計8Aの最上部に吊下げ用ワイヤWを連結し、
上部地震計8Aの底部と下部地震計qを所定長さの吊下
げ用ワイヤWで連結し、下部地震計qから地上より井戸
ケーシング1内を降下させるに際し、当該下部地震計q
はラッパ口3Cで誘導しながら降下させ、無磁石基礎筒
3Aに接続されている無磁石基礎下筒3B内の充填セメ
ントの上面に下部地震計を設置し、ついで、降下してく
る上部地震計部8における上部地震計8Aを上下動震動
伝達アーム台座6部分に設置する。[0014] According to a seventh aspect, the calling of claim 1, wherein
And the following steps using the invention of claim 3 are included . First step The bottom of the existing well is flattened. Second step The lower seismograph storage cylinder part 3, which is connected to the lower end of the first boring rod 2 by a left-hand screw connection, is lowered to the bottom of the well hole of the well casing 1 and installed. Third step By the second boring rod 4, the first casing breakthrough portion 5 and the vertical motion transmission arm base 6 are lowered and stopped at appropriate positions in the well casing 1. Fourth step: The first casing breakthrough portion 5 is operated from above the ground to break through the well casing 1 with the casing drilling blade 5C and the vertical vibration transmission blade 5D to form the filling cement passage 1A,
Further, the formation 10 in the vicinity thereof is also pierced to form a casing cement filling hole 10A. Fifth step From the ground, the first casing break-through portion 5 is operated to retract only the casing punching blade 5C to form the channel 1A for the filled cement in the well casing 1, and the vertical vibration transmission blade 5D is vertically pierced. Vibration transmission arm base 6
To remain with. Sixth step Concrete press-fitting section 7 is used for filling cement with a cement cement filling hole 10A through a cement cement passage 1A.
To fill. The wire W for suspension is connected to the uppermost part of the 7th process upper seismograph 8A,
When the bottom part of the upper seismograph 8A and the lower seismograph q are connected by a suspending wire W having a predetermined length, and the lower seismograph q is lowered from the ground into the well casing 1,
Lowers while guiding with the trumpet mouth 3C, installs the lower seismometer on the upper surface of the filling cement in the magnetless foundation lower cylinder 3B connected to the magnetless foundation cylinder 3A, and then descends the upper seismometer The upper seismograph 8A in the section 8 is installed on the pedestal 6 of the vertical motion transmission arm.
【0015】請求項8記載の発明は、請求項1記載の発
明と、請求項5記載の発明を用いた下記の各工程から構
成されていることを特徴とするものである。
第1工程
既成井戸の底部分を平坦にする。
第2工程
第1ボーリングロッド2の下端に左ネジ接続で連結した
下部地震計収納筒部3を井戸ケーシング1の井戸孔底ま
で降下させ設置する。
第3工程
第2ボーリングロッド4により、第2ケーシング突破部
9と上下動震動伝達アーム台座6を、井戸ケーシング1
における適位置に降下停止する。
第4工程
地上から第2ケーシング突破部9を作動させることで、
ケーシング穴あけ刃9Cと上下動震動伝達刃9Dを前進
させ、井戸ケーシング1を突破り、さらにその付近の地
層10をも刺しケーシングセメント充填穴10Aを形成
する。
第5工程
地上から第2ケーシング突破部9を作動させることで、
ケーシング穴あけ刃9Cのみを後退させ、井戸ケーシン
グ1に充填セメント用通路1Aを形成すると共に、上下
動震動伝達刃9Dは突刺した状態で、上下動震動伝達ア
ーム台座6と共に残留させる。
第6工程
コンクリート圧入部7を用いて、セメントを充填セメン
ト用通路1Aを介してケーシングセメント充填穴10A
に充填する。
第7工程
上部地震計8Aの最上部に吊下げ用ワイヤWを連結し、
上部地震計8Aの底部と下部地震計qを所定長さの吊下
げ用ワイヤWで連結し、下部地震計qから地上より井戸
ケーシング1内を降下させるに際し、当該下部地震計q
はラッパ口3Cで誘導しながら降下させ、無磁石基礎筒
3Aに接続されている無磁石基礎下筒3B内の充填セメ
ントの上面に下部地震計を設置し、ついで、降下してく
る上部地震計部8における上部地震計8Aを上下動震動
伝達アーム台座6部分に設置する。[0015] The invention according to claim 8, the outgoing of claim 1, wherein
And Akira, is characterized in that it is composed of the steps below with the invention of claim 5, wherein. First step The bottom of the existing well is flattened. Second step The lower seismograph storage cylinder part 3, which is connected to the lower end of the first boring rod 2 by a left-hand screw connection, is lowered to the bottom of the well hole of the well casing 1 and installed. In the third step, the second boring rod 4, the second casing breakthrough 9 and the vertical vibration transmission arm pedestal 6 are connected to the well casing 1.
Stop descending to the proper position in. Fourth step By operating the second casing breakthrough 9 from the ground,
The casing drilling blade 9C and the vertical vibration transmission blade 9D are advanced to break through the well casing 1 and also penetrate the formation 10 in the vicinity thereof to form a casing cement filling hole 10A. Fifth step By operating the second casing breakthrough 9 from the ground,
Only the casing drilling blade 9C is retracted to form the channel 1A for the filling cement in the well casing 1, and the vertical vibration transmission blade 9D is left in the pierced state together with the vertical vibration transmission arm pedestal 6. Sixth step Concrete press-fitting section 7 is used for filling cement with a cement cement filling hole 10A through a cement cement passage 1A.
To fill. The wire W for suspension is connected to the uppermost part of the 7th process upper seismograph 8A,
When the bottom part of the upper seismograph 8A and the lower seismograph q are connected by a suspending wire W having a predetermined length, and the lower seismograph q is lowered from the ground into the well casing 1,
Lowers while guiding with the trumpet mouth 3C, installs the lower seismometer on the upper surface of the filling cement in the magnetless foundation lower cylinder 3B connected to the magnetless foundation cylinder 3A, and then descends the upper seismometer The upper seismograph 8A in the section 8 is installed on the pedestal 6 of the vertical motion transmission arm.
【0016】[0016]
【発明の実施の形態】以下、本発明の実施の形態を実施
例にもとづき図面を参照して説明する。第1発明は、既
成井戸の底部分に地震計を設置するのに好適な地震計設
置装置に関するものである。1は地震計が設置される井
戸ケーシングである。イは第1発明の地震計設置装置
で、第1ボーリングロッド2と下部地震計収納筒部3か
ら構成されている。
A.第1ボーリングロッド2は、ボーリングロッド本体
2Aとボーリングロッド本体の下端に取付けられた接続
カップリング2Bから構成され、この接続カップリング
2Bの下方外周面には左ネジ2B1が刻設されている。BEST MODE FOR CARRYING OUT THE INVENTION Embodiments of the present invention will now be described based on examples with reference to the drawings. The first invention relates to a seismograph installation device suitable for installing a seismograph at the bottom of an existing well. 1 is a well casing in which the seismograph is installed. B is the seismograph installation device of the first invention, which is composed of the first boring rod 2 and the lower seismograph storage cylinder 3. A. The first boring rod 2 is composed of a boring rod body 2A and a connection coupling 2B attached to the lower end of the boring rod body, and a left screw 2B1 is engraved on the lower outer peripheral surface of the connection coupling 2B.
【0017】B.下部地震計収納筒部3は、下部地震計
qを収納する無磁石基礎筒3Aと、その無磁石基礎筒3
Aの下方部分に接続されたセメントが充填された無磁石
基礎下筒3Bと、無磁石基礎筒3Aの上端に上方に向け
連設されたラッパ口3Cと、当該無磁石基礎筒の上端の
内周面に刻設された左ネジ3Dと、無磁石基礎筒3Aの
外周面に、当該無磁石基礎筒に収納された下部地震計の
やや上方にある水平動震動記録位置をもって水平状態で
取付けられた下部地震計用水平動伝達アーム3Eと、無
磁石基礎下筒3Bの上部に接続された地震計収納筒3A
との接続部の外周面に水平状態で取付けられた下部地震
計用上下動伝達アーム3Fから構成されている。
a.下部地震計用水平動伝達アーム3Eは、無磁石基礎
筒3Aに対するバンド状取付金具3E1と、バンド状取
付金具より四方に延出されたアーム体3E2と、アーム
体の先端に取付けられた井戸ケーシング1の内壁に接触
する接触盤3E3から構成されている。
b.下部地震計用上下動伝達アーム3Fは、無磁石基礎
筒3Aに対するバンド状取付金具3F1と、バンド状取
付金具より四方に延出されたアーム体3F2と、アーム
体の先端に取付けられた井戸ケーシングの内壁に接触す
る接触盤3F3から構成されている。
C.第1ボーリングロッド2と無磁石基礎筒3Aとは、
互いの左ネジ2B1と左ネジ3Dを利用した左ネジ接続
で連結されている。B. The lower seismograph storage cylinder portion 3 includes a non-magnet base cylinder 3A for storing the lower seismograph q and the non-magnet base cylinder 3
A non-magnetic base lower cylinder 3B filled with cement, which is connected to the lower portion of A, a trumpet port 3C continuously connected to the upper end of the non-magnetic base cylinder 3A, and an upper end of the non-magnetic base cylinder. The left screw 3D engraved on the peripheral surface and the outer peripheral surface of the non-magnet base cylinder 3A are mounted horizontally with the horizontal motion record position slightly above the lower seismograph housed in the non-magnet base cylinder. Horizontal motion transmission arm 3E for the lower seismometer and seismograph storage cylinder 3A connected to the upper part of the magnetless foundation lower cylinder 3B
It is composed of a vertical motion transmission arm 3F for the lower seismograph mounted horizontally on the outer peripheral surface of the connection part with. a. The horizontal seismograph transmission arm 3E for the lower seismometer includes a band-shaped mounting bracket 3E1 for the non-magnet base cylinder 3A, an arm body 3E2 extending in four directions from the band-shaped mounting bracket, and a well casing mounted at the tip of the arm body. It is composed of a contact plate 3E3 that contacts the inner wall of 1. b. The vertical motion transmission arm 3F for the lower seismograph includes a band-shaped mounting bracket 3F1 for the non-magnet base cylinder 3A, an arm body 3F2 extending in four directions from the band-shaped mounting bracket, and a well casing mounted at the tip of the arm body. The contact plate 3F3 is in contact with the inner wall of the. C. The first boring rod 2 and the magnetless basic cylinder 3A are
The left screw 2B1 and the left screw 3D are connected to each other by a left screw connection.
【0018】第2発明は、第1発明の地震計設置装置イ
を用いた地震計設置装置の設置方法に関するものであ
る。
第1工程
既成井戸の底部分を平坦にする。
第2工程
第1ボーリングロッド2の下端に左ネジ接続で連結した
下部地震計収納筒部3を井戸ケーシング1の井戸孔底ま
で降下させ設置する。(図1、図2参照)設置完了後、
第1ボーリングロッドを右に廻し左ネジ接続部分を離脱
させ、第1ボーリングロッドを地上に引揚げ、既成井戸
孔底に下部地震計収納筒部3を設置する。
第3工程
頭部に吊下げ用ワイヤWを連結した下部地震計qを、地
上よりラッパ口3Cで誘導しながら降下させ、無磁石基
礎筒3Aに接続されている無磁石基礎下筒3B内の充填
セメントの上面に設置する。(図3、図4参照)この場
合、吊下げ用ワイヤWには下部キャプタイヤコードW3
が添設され、両者は締付テープTで固定されている。The second invention relates to a method of installing a seismograph installation device using the seismograph installation device a of the first invention. First step The bottom of the existing well is flattened. Second step The lower seismograph storage cylinder part 3, which is connected to the lower end of the first boring rod 2 by a left-hand screw connection, is lowered to the bottom of the well hole of the well casing 1 and installed. (See Figures 1 and 2)
Turn the first boring rod to the right to disconnect the left screw connection part, lift the first boring rod to the ground, and install the lower seismograph storage cylinder part 3 at the bottom of the existing well hole. The lower seismograph q in which the wire W for suspension is connected to the head of the third step is lowered while being guided from the ground by the trumpet mouth 3C, and the lower part of the non-magnet foundation lower cylinder 3B connected to the non-magnet foundation cylinder 3A. Install on top of filled cement. (See FIGS. 3 and 4) In this case, the lower cap tire cord W3 is attached to the hanging wire W.
Are attached, and both are fixed with a fastening tape T.
【0019】下部地震計収納筒部3に格納される下部地
震計qに震源より伝播の地震波を正確に記録するために
は、下部地震計の頭部と下部地震計の底部より上下とも
に4m以上の無磁気帯がないと、下部地震計収納筒部3
に格納されている下部地震計qに正確な震動を伝達する
ことができない。下部地震計収納筒部3の基礎部分であ
る無磁石基礎下筒3Bの充填セメント上面に下部地震計
の底部を載置する。無磁石基礎筒3A内に載置された下
部地震計の底部に設置された上下震動針に震動を伝達さ
せると同時に、下部地震計収納筒部3に格納されている
下部地震計の設置傾斜角3°以内にするため、下部地震
計用上下動伝達アーム3Fが接続されている。下部地震
計用水平動伝達アーム3Eの接触盤3E3と、下部地震
計用上下動伝達アーム3Fの接触盤3F3が井戸ケーシ
ング1の内面に内接するから、無磁石基礎筒3Aと無磁
石基礎下筒3Bは井戸孔底中心に設置されることにな
る。In order to accurately record the seismic wave propagating from the epicenter in the lower seismograph q stored in the lower seismograph storage cylinder 3, the head of the lower seismometer and the bottom of the lower seismometer should be at least 4 m above and below. Without the non-magnetic band, the lower seismograph storage cylinder part 3
Accurate seismic motion cannot be transmitted to the lower seismograph q stored in. The bottom part of the lower seismograph is placed on the top surface of the filling cement of the magnetless base lower cylinder 3B which is the base part of the lower seismograph storage cylinder part 3. The seismic motion is transmitted to the vertical seismic needle installed at the bottom of the lower seismograph placed in the magnetless foundation cylinder 3A, and at the same time, the installation angle of inclination of the lower seismograph stored in the lower seismograph storage cylinder 3 is transmitted. The vertical motion transmission arm 3F for the lower seismograph is connected to keep the angle within 3 °. Since the contact plate 3E3 of the horizontal motion transmission arm 3E for the lower seismometer and the contact plate 3F3 of the vertical motion transmission arm 3F for the lower seismometer are inscribed on the inner surface of the well casing 1, the magnetless foundation cylinder 3A and the magnetless foundation lower cylinder 3B will be installed in the center of the bottom of the well hole.
【0020】第3発明は、既成井戸における井戸ケーシ
ングの適位置に地震計を設置するのに好適な地震計設置
装置に関するものである。1は地震計が設置される井戸
ケーシングである。ロは第3発明の地震計設置装置で、
第2ボーリングロッド4と第1ケーシング突破部5と、
上下動震動伝達アーム台座6と、コンクリート圧入部7
と、上部地震計部8から構成されている。
A.第2ボーリングロッド4は、ボーリングロッド本体
4Aとボーリングロッド本体の下端に取付けられたジャ
ッキ用接続具4Bから構成されている。A third aspect of the present invention relates to a seismograph installation device suitable for installing a seismograph at an appropriate position of a well casing in an existing well. 1 is a well casing in which the seismograph is installed. B is the seismometer installation device of the third invention,
The second boring rod 4, the first casing breakthrough portion 5,
Vertical motion transmission arm base 6 and concrete press fitting part 7
And the upper seismograph section 8. A. The second boring rod 4 is composed of a boring rod body 4A and a jack connector 4B attached to the lower end of the boring rod body.
【0021】B.第1ケーシング突破部5は、4点フレ
ーム式ジャッキ部5Aと、第1刃物脱落防止枠5Bと、
ケーシング穴あけ刃5Cと、上下動震動伝達刃5Dから
構成されている。
a.4点フレーム式ジャッキ部5Aは、上端に固着した
接続頭部5A11がジャッキ用接続具4Bに水平ピンP
で連結されているジャッキ稼働縦ネジ5A1と、ジャッ
キ稼働縦ネジの上下に取付けられた上方支点ブロック5
A2、下方支点ブロック5A3と、上方支点ブロック5
A2と下方支点ブロック5A3間に、当該ジャッキ稼働
縦ネジを中心に平面略十字状に設けられた前後の拡縮脚
5A4と、左右の拡縮脚5A5から構成されている。
a1.前後の拡縮脚5A4は、上端が上方支点ブロック
5A2に左右方向の水平ピンPで連結された上方のリン
ク5A41と、下端が下方支点ブロック5A3に左右方
向の水平ピンPで連結された下方のリンク5A42と、
上方のリンク5A41の下端と下方のリンク5A42の
上端を左右方向のピンPで連結した交差盤5A43で構
成されている。
a2.左右の拡縮脚5A5は、上端が上方支点ブロック
5A2に前後方向の水平ピンPで連結された上方のリン
ク5A51と、下端が下方支点ブロック5A3に前後方
向の水平ピンPで連結された下方のリンク5A52と、
上方のリンク5A51の下端と下方のリンク5A52の
上端を前後方向のピンPで連結した交差盤5A53から
構成されている。
a3.この結果、第2ボーリングロッド4を回転させる
と、ジャッキ稼働縦ネジ5A1が回転し、この回転に応
動して昇降する下方支点ブロック5A3により、前後の
拡縮脚5A4と左右の拡縮脚5A5は、水平方向(井戸
ケーシングの内壁方向)に拡縮することになる。B. The first casing breakthrough portion 5 includes a four-point frame type jack portion 5A, a first blade fall-out prevention frame 5B,
It is composed of a casing punching blade 5C and a vertical vibration transmission blade 5D. a. In the 4-point frame type jack section 5A, the connection head 5A11 fixed to the upper end is attached to the jack connector 4B by the horizontal pin P.
Jacking vertical screw 5A1 connected with the above, and upper fulcrum block 5 attached above and below the jacking vertical screw 5
A2, lower fulcrum block 5A3, and upper fulcrum block 5
Between the A2 and the lower fulcrum block 5A3, the front and rear expansion / contraction legs 5A4 and the left / right expansion / contraction legs 5A5 are provided in a substantially cross shape in a plane with the jack operation vertical screw as a center. a1. The front and rear expansion / contraction legs 5A4 have upper links 5A41 whose upper ends are connected to upper fulcrum blocks 5A2 by horizontal horizontal pins P, and lower links whose lower ends are connected to lower fulcrum blocks 5A3 by horizontal horizontal pins P. 5A42,
It is composed of a cross board 5A43 in which the lower end of the upper link 5A41 and the upper end of the lower link 5A42 are connected by a pin P in the left-right direction. a2. The left and right expansion / contraction legs 5A5 have an upper link 5A51 whose upper end is connected to an upper fulcrum block 5A2 by a horizontal pin P in the front-rear direction, and a lower link whose lower end is connected to a lower fulcrum block 5A3 by a horizontal pin P in the front-rear direction. 5A52,
It is composed of a cross board 5A53 in which the lower end of the upper link 5A51 and the upper end of the lower link 5A52 are connected by a pin P in the front-rear direction. a3. As a result, when the second boring rod 4 is rotated, the jack operation vertical screw 5A1 rotates, and the lower fulcrum block 5A3 that moves up and down in response to this rotation causes the front and rear expansion and contraction legs 5A4 and the left and right expansion and contraction legs 5A5 to move horizontally. Direction (toward the inner wall of the well casing).
【0022】b.第1刃物脱落防止枠5Bは、前後左右
に位置する交差盤5A43、5A53の外方面に外方に
向け設けられた正面方形の防止枠5B1と、この防止枠
内の中央に設けられた縦仕切板5B2で仕切られた穴あ
け刃用受枠5B3と、伝達刃用受枠5B4から構成され
ている。
c.ケーシング穴あけ刃5Cは、内端部分が穴あけ刃用
受枠5B3内に装着できる角柱状体5C1と、この角柱
状体の先端に形成された刃部5C11から構成され、内
端部分は穴あけ刃用受枠を構成する縦仕切板5B2と防
止枠5B1とに水平ピンPによって連結されている。
d.上下動震動伝達刃5Dは、内端部分が伝達刃用受枠
5B4内に装着できる角柱状体5D1と、この角柱状体
の先端に形成された刃部5D11から構成され、内端部
分の内方端面には伝達刃用受枠5B4の底部になる交差
盤5A53に外方に向け植設された水平ピンPを突刺し
た状態で連結されている。したがって、この上下動震動
伝達刃5Dは、縮めると伝達刃用受枠5B4より抜け、
後述上下動震動伝達アーム台座6側に残ることになる。B. The first blade falling prevention frame 5B is a front rectangular prevention frame 5B1 provided outward on the outer surfaces of the crossing boards 5A43, 5A53 located in the front, rear, left and right, and a vertical partition provided in the center of the prevention frame. It is composed of a receiving frame 5B3 for punching blades and a receiving frame 5B4 for transmission blades, which are partitioned by a plate 5B2. c. The casing punching blade 5C is composed of a prismatic body 5C1 whose inner end portion can be mounted in the punching blade receiving frame 5B3 and a blade portion 5C11 formed at the tip of this prismatic body, and the inner end portion of which is the drilling blade receiving frame. Is connected to the vertical partition plate 5B2 and the prevention frame 5B1 which are formed by the horizontal pin P. d. The vertical motion transmission blade 5D is composed of a prismatic body 5D1 whose inner end portion can be mounted in the transmission blade receiving frame 5B4, and a blade portion 5D11 formed at the tip of this prismatic body. A horizontal pin P, which is planted outward, is connected to the end face of a cross plate 5A53 which is the bottom of the transmission blade receiving frame 5B4. Therefore, when this vertical vibration transmission blade 5D is contracted, it falls out of the transmission blade receiving frame 5B4,
It will remain on the side of the pedestal 6 for vertical vibration transmission arm, which will be described later.
【0023】C.上下動震動伝達アーム台座6は、所定
幅の板をもって井戸ケーシング1の内周面に接する程度
の直径に構成された平面円輪状の台座本体6Aと、台座
本体6Aの内周面に形成された載置用斜面6Bと、台座
本体6Aの前後左右に位置するケーシング穴あけ刃5C
と上下動震動伝達刃5Dが貫入できるよう開口されたコ
ンクリート充填穴6Cから構成されている。
D.コンクリート圧入部7は、第3ボーリングロッド7
Aの下端に着脱自在に連結された連結用ブロック7B
と、この連結用ブロックの外周に溶着された圧入セメン
ト漏洩防止ゴムパッキング7Cからなり、圧入セメント
漏洩防止ゴムパッキングは、上下動震動伝達アーム台座
6に上方から着脱自在の略円錐台状に構成されていると
共に、連結用ブロックと圧入セメント漏洩防止ゴムパッ
キング7Cには、第3ボーリングロッド7Aと連通する
セメント充填用の縦通路7C1と、セメント充填用の縦
通路の下端から当該縦通路を中心に前後左右方向に水平
状態でセメント充填用の通路7C2が開設されている。C. The vertical motion transmission arm pedestal 6 is formed on the inner peripheral surface of the pedestal body 6A, and a pedestal main body 6A having a flat circular ring shape with a plate having a predetermined width and having a diameter such that it is in contact with the inner peripheral surface of the well casing 1. Mounting slope 6B and casing drilling blades 5C located at the front, rear, left and right of the base body 6A
And a concrete filling hole 6C opened so that the vertical vibration transmission blade 5D can penetrate. D. The concrete press fitting part 7 is the third boring rod 7
Connecting block 7B detachably connected to the lower end of A
And a press-fitting cement leak-preventing rubber packing 7C welded to the outer periphery of the connecting block, and the press-fitting cement leak-preventing rubber packing is formed in a substantially frustoconical shape that can be attached to and detached from the vertical motion vibration transmission arm base 6 from above. At the same time, the connecting block and the press-fitting cement leakage preventing rubber packing 7C are provided with a vertical channel 7C1 for cement filling which communicates with the third boring rod 7A, and the vertical channel from the lower end of the vertical channel for cement filling to the vertical channel. A cement filling passage 7C2 is opened horizontally in the front-rear and left-right directions.
【0024】E.上部地震計部8は、上部地震計8A
と、上部地震計用水平動伝達アーム8Bと、上部地震計
用上下動伝達アーム8Cから構成されている。
a.上部地震計用水平動伝達アーム8Bは、上部地震計
8Aに対するバンド状取付金具8B1と、バンド状取付
金具より四方に延出されたアーム体8B2と、アーム体
の先端に取付けられた井戸ケーシング1の内壁に接触す
る接触盤8B3から構成されている。
b.上部地震計用上下動伝達アーム8Cは、上部地震計
8Aに対するバンド状取付金具8C1と、バンド状取付
金具より四方に延出されたアーム体8C2と、アーム体
の先端に設けられた上下動震動伝達アーム台座6におけ
る載置用斜面6Bに上方から係止する斜面8C21から
構成されている。E. The upper seismograph section 8 is an upper seismograph 8A.
And a horizontal motion transmission arm 8B for the upper seismograph and a vertical motion transmission arm 8C for the upper seismograph. a. The horizontal motion transmission arm 8B for the upper seismometer includes a band-shaped mounting bracket 8B1 for the upper seismograph 8A, an arm body 8B2 extending in four directions from the band-shaped mounting bracket, and a well casing 1 mounted at the tip of the arm body. It is composed of a contact plate 8B3 that contacts the inner wall of the. b. The vertical motion transmission arm 8C for the upper seismograph includes a band-shaped mounting bracket 8C1 for the upper seismograph 8A, an arm body 8C2 extending in four directions from the band-shaped mounting bracket, and a vertical motion vibration provided at the tip of the arm body. The transmission arm pedestal 6 includes a slope 8C21 which is engaged with the mounting slope 6B from above.
【0025】第4発明は、第3発明の地震計設置装置ロ
を用いた地震計設置装置の設置方法に関するものであ
る。
第1工程
第2ボーリングロッド4により、第1ケーシング突破部
5と上下動震動伝達アーム台座6を井戸ケーシング1に
おける適位置に降下停止する。この場合、上下動震動伝
達アーム台座6は、当該上下動震動伝達アーム台座にお
けるコンクリート充填穴6Cに、第1ケーシング突破部
5におけるケーシング穴あけ刃5Cと上下動震動伝達刃
5Dの先端で係止した状態で支持されている。
第2工程
地上で第2ボーリングロッド4を右回転させて、前後の
拡縮脚5A4と左右の拡縮脚5A5を拡大させながらケ
ーシング穴あけ刃5Cと上下動震動伝達刃5Dにより、
井戸ケーシング1を突破り充填セメント用通路1Aを形
成し、さらにその付近の地層10をも刺しケーシングセ
メント充填穴10Aを形成する。
第3工程
地上で第2ボーリングロッド4を左回転させて、前後の
拡縮脚5A4と左右の拡縮脚5A5を縮小させること
で、ケーシング穴あけ刃5Cのみを後退させ井戸ケーシ
ング1に充填セメント用通路1Aを形成すると共に、上
下動震動伝達刃5Dは突刺した状態で、上下動震動伝達
アーム台座6と共に残留させる。この後、第2ボーリン
グロッド4と第1ケーシング突破部5を地上に引揚げ
る。A fourth invention relates to a method of installing a seismograph installation device using the seismograph installation device b of the third invention. In the first step and the second boring rod 4, the first casing breakthrough portion 5 and the vertical vibration transmission arm base 6 are lowered and stopped at appropriate positions in the well casing 1. In this case, the vertical motion transmission arm base 6 is locked in the concrete filling hole 6C in the vertical motion transmission arm base by the casing drilling blade 5C and the vertical motion transmission blade 5D tip in the first casing breakthrough 5. Supported by the state. Second step By rotating the second boring rod 4 to the right on the ground and expanding the front and rear expansion and contraction legs 5A4 and the left and right expansion and contraction legs 5A5, by the casing drilling blade 5C and the vertical motion transmission blade 5D,
The well casing 1 is pierced to form a channel 1A for filling cement, and the formation 10 in the vicinity thereof is also pierced to form a casing cement filling hole 10A. Third step By rotating the second boring rod 4 counterclockwise on the ground to reduce the front and rear expansion legs 5A4 and the left and right expansion legs 5A5, only the casing drilling blade 5C is retracted and the well casing 1 is filled with a cement cement passage 1A. And the vertical vibration transmission blade 5D is left in the pierced state together with the vertical vibration transmission arm pedestal 6. After this, the second boring rod 4 and the first casing breakthrough 5 are lifted to the ground.
【0026】第4工程
コンクリート圧入部7を用いて、セメント11を充填セ
メント用通路1Aを介してケーシングセメント充填穴1
0Aに充填する。すなわち、地上より降下させる第3ボ
ーリングロッド7Aにより圧入セメント漏洩防止ゴムパ
ッキング7Cのセメント充填用の縦通路7C2を、上下
動震動伝達アーム台座6のコンクリート充填穴6Cに合
致させ、ケーシングセメント充填穴10Aに充填する。
この後、コンクリート圧入部7を地上に引揚げる。
第5工程
上部地震計部8における上部地震計8Aを上下動震動伝
達アーム台座6部分に設置する。すなわち、上部地震計
8Aを地上から吊下げ用ワイヤWにより降下させ、上部
地震計用上下動伝達アーム8Cの斜面8C21を上下動
震動伝達アーム台座6における載置用斜面6Bに当接さ
せ、上部地震計用水平動伝達アーム8Bを井戸ケーシン
グ1の内壁に接触させる。この場合、吊下げ用ワイヤW
には上部キャプタイヤコードW2が添設され、両者は締
付テープTで固定されている。Fourth step: Using the concrete press-fitting section 7, the cement 11 is filled through the cement cement passage 1A.
Fill to 0A. That is, the vertical passage 7C2 for cement filling of the press-fitting cement leakage prevention rubber packing 7C is matched with the concrete filling hole 6C of the vertical vibration transmission arm pedestal 6 by the third boring rod 7A lowered from the ground, and the casing cement filling hole 10A. To fill.
Then, the concrete press-fitting part 7 is lifted to the ground. The upper seismograph 8A in the fifth process upper seismograph section 8 is installed on the pedestal 6 part of the vertical motion vibration transmission arm. That is, the upper seismograph 8A is lowered from the ground by the hanging wire W, the slope 8C21 of the upper seismometer vertical motion transmission arm 8C is brought into contact with the mounting slope 6B of the vertical seismic motion transmission arm base 6, and the upper part The horizontal motion transmission arm 8B for the seismometer is brought into contact with the inner wall of the well casing 1. In this case, the hanging wire W
An upper cap tire cord W2 is attached to the above, and both are fixed with a tightening tape T.
【0027】第5発明は、既成井戸における井戸ケーシ
ングの適位置に地震計を設置するのに好適な地震計設置
装置に関するものである。1は地震計が設置される井戸
ケーシングである。ハは第5発明の地震計設置装置で、
第2ボーリングロッド4と、第2ケーシング突破部9
と、上下動震動伝達アーム台座6と、コンクリート圧入
部7と、上部地震計部8から構成されている。
A.第2ボーリングロッド4は、ボーリングロッド本体
4Aとボーリングロッド本体の下端に取付けられたジャ
ッキ用接続具4Bから構成されている。The fifth aspect of the present invention relates to a seismograph installation device suitable for installing a seismograph at an appropriate position of a well casing in an existing well. 1 is a well casing in which the seismograph is installed. Ha is the seismograph installation device of the fifth invention,
Second boring rod 4 and second casing breakthrough 9
And a vertical motion transmission arm pedestal 6, a concrete press-fitting section 7, and an upper seismograph section 8. A. The second boring rod 4 is composed of a boring rod body 4A and a jack connector 4B attached to the lower end of the boring rod body.
【0028】B.第2ケーシング突破部9は、4点傘歯
車式ジャッキ部9Aと、第2刃物脱落防止枠9Bと、ケ
ーシング穴あけ刃9Cと、上下動震動伝達刃9Dから構
成されている。
a.4点傘歯車式ジャッキ部9Aは、ジャッキ用接続具
4Bの下端に回転自在に取付けられたギヤボックス9A
1と、ギヤボックスの前後左右面に水平に取付けられた
ガイド9A2と、ジャッキ用接続具4Bの下端に下方に
向け連結された親傘歯車9A3と、親傘歯車9A3を中
心に前後左右の位置で噛合わされている子傘歯車9A1
1、9A11、..と、これら前後左右の子傘歯車9A
11、9A11、..よりガイド内に引出されたねじ棒
9A12、9A12、..と、ガイドの外方部分に嵌込
まれた進退筒9A13、9A13、..とからなり、こ
の進退筒はねじ棒の回動により進退するよう構成されて
いる。
b.第2刃物脱落防止枠9Bは、前後左右に位置する各
進退筒9A13の外方面に外方に向け設けられた正面方
形の防止枠9B1と、この防止枠内の中央に設けられた
縦仕切板9B2で仕切られた穴あけ刃用受枠9B3と、
伝達刃用受枠9B4から構成されている。
c.ケーシング穴あけ刃9Cは、内端部分が穴あけ刃用
受枠9B3内に装着できる角柱状体9C1と、この角柱
状体の先端に形成された刃部9C11から構成され、内
端部分は穴あけ刃用受枠を構成する縦仕切板9B2と防
止枠9B1とに水平ピンPによって連結されている。
d.上下動震動伝達刃9Dは、内端部分が伝達刃用受枠
9B4内に装着できる角柱状体9D1と、この角柱状体
の先端に形成された刃部9D11から構成され、内端部
分の内方端面には伝達刃用受枠9B4の底部になる進退
筒9A13の外方壁に外方に向け植設された水平ピンP
を突刺した状態で連結されている。したがって、この上
下動震動伝達刃9Dは、外方に引くと伝達刃用受枠9B
4より抜け、後述上下動震動伝達アーム台座6側に残る
ことになる。B. The second casing breakthrough portion 9 includes a four-point bevel gear type jack portion 9A, a second blade falling-off prevention frame 9B, a casing hole punching blade 9C, and a vertical vibration transmission blade 9D. a. The 4-point bevel gear type jack portion 9A is a gear box 9A rotatably attached to the lower end of the jack connector 4B.
1, a guide 9A2 horizontally attached to the front, rear, left and right surfaces of the gear box, a parent bevel gear 9A3 downwardly connected to the lower end of the jack connector 4B, and front, rear, left and right positions around the parent bevel gear 9A3. Bevel gear 9A1 meshed with
1, 9A11 ,. . And these front, rear, left and right bevel gears 9A
11, 9A11 ,. . The screw rods 9A12, 9A12 ,. . And the retractable cylinders 9A13, 9A13 ,. . The advancing / retreating cylinder is configured to advance / retreat by the rotation of the screw rod. b. The second blade falling-off prevention frame 9B is a front rectangular prevention frame 9B1 provided outwardly on the outer surface of each of the advancing / retreating cylinders 9A13 located at the front, rear, left and right, and a vertical partition plate provided at the center of the prevention frame. A receiving frame 9B3 for a drilling blade partitioned by 9B2,
It is composed of a transmission blade receiving frame 9B4. c. The casing punching blade 9C is composed of a prismatic body 9C1 whose inner end portion can be mounted in the drilling blade receiving frame 9B3, and a blade portion 9C11 formed at the tip of the prismatic body, the inner end portion of which is the drilling blade receiving frame. Is connected to the vertical partition plate 9B2 and the prevention frame 9B1 which are formed by the horizontal pin P. d. The vertical motion transmission blade 9D is composed of a prismatic body 9D1 whose inner end portion can be mounted in the transmission blade receiving frame 9B4, and a blade portion 9D11 formed at the tip of this prismatic body. On the end face, a horizontal pin P is planted outward on the outer wall of the advancing / retreating cylinder 9A13 which is the bottom of the transmission blade receiving frame 9B4.
Are pierced and connected. Therefore, when the vertical vibration transmission blade 9D is pulled outward, the transmission blade receiving frame 9B is formed.
It comes off from No. 4 and remains on the side of the vertical vibration transmission arm base 6 which will be described later.
【0029】C.上下動震動伝達アーム台座6は、図1
1を参照して、所定幅の板をもって井戸ケーシング1の
内周面に接する程度の直径に構成された平面円輪状の台
座本体6Aと、台座本体6Aの内周面に形成された載置
用斜面6Bと、台座本体6Aの前後左右に位置するケー
シング穴あけ刃9Cと上下動震動伝達刃9Dが貫入でき
るよう開口されたコンクリート充填穴6Cから構成され
ている。
D.コンクリート圧入部7は、図14、15を参照し
て、第3ボーリングロッド7Aの下端に着脱自在に連結
された連結用ブロック7Bと、この連結用ブロックの外
周に溶着された圧入セメント漏洩防止ゴムパッキング7
Cからなり、圧入セメント漏洩防止ゴムパッキングは、
上下動震動伝達アーム台座6に上方から着脱自在の略円
錐台状に構成されていると共に、連結用ブロックと圧入
セメント漏洩防止ゴムパッキング7Cには、第3ボーリ
ングロッド7Aと連通するセメント充填用の縦通路7C
1と、セメント充填用の縦通路の下端から当該縦通路を
中心に前後左右方向に水平状態でセメント充填用の縦通
路7C2が開設されている。C. The vertical motion transmission arm base 6 is shown in FIG.
1, a flat ring-shaped pedestal body 6A having a diameter of a plate having a predetermined width and in contact with the inner circumferential surface of the well casing 1, and a mounting body formed on the inner circumferential surface of the pedestal body 6A It is composed of a slope 6B, a casing perforating blade 9C located on the front, rear, left and right of the pedestal body 6A and a concrete filling hole 6C opened so that the vertical vibration transmission blade 9D can penetrate. D. Referring to FIGS. 14 and 15, the concrete press-fitting portion 7 includes a connecting block 7B detachably connected to the lower end of the third boring rod 7A, and a press-fitting cement leak prevention rubber welded to the outer periphery of the connecting block. Packing 7
Made of C, the press-fit cement leakage prevention rubber packing is
The vertical motion vibration transmission arm pedestal 6 is configured to have a substantially truncated cone shape that can be attached and detached from above, and the coupling block and the press-fitting cement leakage prevention rubber packing 7C are for cement filling that communicates with the third boring rod 7A. Vertical passage 7C
1, and a vertical channel 7C2 for cement filling is provided horizontally from the lower end of the vertical channel for cement filling in the front-rear, left-right directions around the vertical channel.
【0030】E.上部地震計部8は、図21、22を参
照して、上部地震計8Aと、上部地震計用水平動伝達ア
ーム8Bと、上部地震計用上下動伝達アーム8Cから構
成されている。
a.上部地震計用水平動伝達アーム8Bは、上部地震計
8Aに対するバンド状取付金具8B1と、バンド状取付
金具より四方に延出されたアーム体8B2と、アーム体
の先端に取付けられた井戸ケーシング1の内壁に接触す
る接触盤8B3から構成されている。
b.上部地震計用上下動伝達アーム8Cは、上部地震計
8Aに対するバンド状取付金具8C1と、バンド状取付
金具より四方に延出されたアーム体8C2と、アーム体
の先端に設けられた上下動震動伝達アーム台座6におけ
る載置用斜面6Bに上方から係止する斜面8C21から
構成されている。E. 21 and 22, the upper seismograph section 8 is composed of an upper seismograph 8A, an upper seismograph horizontal motion transmission arm 8B, and an upper seismometer vertical motion transmission arm 8C. a. The horizontal motion transmission arm 8B for the upper seismometer includes a band-shaped mounting bracket 8B1 for the upper seismograph 8A, an arm body 8B2 extending in four directions from the band-shaped mounting bracket, and a well casing 1 mounted at the tip of the arm body. It is composed of a contact plate 8B3 that contacts the inner wall of the. b. The vertical motion transmission arm 8C for the upper seismograph includes a band-shaped mounting bracket 8C1 for the upper seismograph 8A, an arm body 8C2 extending in four directions from the band-shaped mounting bracket, and a vertical motion vibration provided at the tip of the arm body. The transmission arm pedestal 6 includes a slope 8C21 which is engaged with the mounting slope 6B from above.
【0031】第6発明は、第5発明の地震計設置装置ハ
を用いた地震計設置装置の設置方法に関するものであ
る。
第1工程
第2ボーリングロッド4により、第2ケーシング突破部
9と上下動震動伝達アーム台座6を井戸ケーシング1に
おける適位置に降下停止する。この場合、上下動震動伝
達アーム台座6は、当該上下動震動伝達アーム台座にお
けるコンクリート充填穴6Cに、第2ケーシング突破部
9におけるケーシング穴あけ刃9Cと上下動震動伝達刃
9Dの先端で係止した状態で支持されている。
第2工程
地上で第2ケーシング突破部9を右回転させて、親傘歯
車、子傘歯車、ねじ棒を回転させることで進退筒9A1
3、ケーシング穴あけ刃9Cと上下動震動伝達刃9Dを
前進させ、井戸ケーシング1を突破り充填セメント用通
路1Aを形成し、さらにその付近の地層10をも刺しケ
ーシングセメント充填穴10Aを形成する。
第3工程
地上で第2ボーリングロッド4を左回転させて、進退筒
9A13、第2刃物脱落防止枠9Bを後退させること
で、ケーシング穴あけ刃9Cのみを後退させ井戸ケーシ
ング1に充填セメント用通路1Aを形成すると共に、上
下動震動伝達刃9Dは突刺した状態で上下動震動伝達ア
ーム台座6と共に残留させる。この後、第2ボーリング
ロッド4と第2ケーシング突破部9を地上に引揚げる。The sixth invention relates to a method of installing a seismograph installation device using the seismograph installation device C of the fifth invention. In the first step and the second boring rod 4, the second casing breakthrough portion 9 and the vertical vibration transmission arm base 6 are lowered and stopped at appropriate positions in the well casing 1. In this case, the vertical motion transmission arm pedestal 6 is locked in the concrete filling hole 6C in the vertical motion transmission arm pedestal by the casing drilling blade 9C and the vertical motion transmission blade 9D in the second casing breakthrough portion 9. Supported by the state. Second step By rotating the second casing breakthrough portion 9 to the right on the ground and rotating the parent bevel gear, the bevel gear, and the screw rod, the forward / backward movement cylinder 9A1
3. The casing drilling blade 9C and the vertical vibration transmission blade 9D are advanced to break through the well casing 1 to form a channel 1A for filling cement, and also to pierce the formation 10 in the vicinity thereof to form a casing cement filling hole 10A. Third step By rotating the second boring rod 4 counterclockwise on the ground and retracting the advancing / retreating cylinder 9A13 and the second blade drop-out prevention frame 9B, only the casing hole-punching blade 9C is retracted and the well casing 1 is filled with a cement cement passage 1A. And the vertical vibration transmission blade 9D is left in the pierced state together with the vertical vibration transmission arm pedestal 6. Then, the second boring rod 4 and the second casing breakthrough 9 are lifted to the ground.
【0032】第4工程
コンクリート圧入部7を用いて、セメント11を充填セ
メント用通路1Aを介してケーシングセメント充填穴1
0Aに充填する。すなわち、地上より降下させる第3ボ
ーリングロッド7Aにより、圧入セメント漏洩防止ゴム
パッキング7Cのセメント充填用の縦通路7C2を上下
動震動伝達アーム台座6のコンクリート充填穴6Cに合
致させ、ケーシングセメント充填穴10Aに充填する。
この後、コンクリート圧入部7を地上に引揚げる。
第5工程
上部地震計部8における上部地震計8Aを上下動震動伝
達アーム台座6部分に設置する。すなわち、上部地震計
8Aを地上から吊下げ用ワイヤWにより降下させ、上部
地震計用上下動伝達アーム8Cの斜面8C21を上下動
震動伝達アーム台座6における載置用斜面6Bに当接さ
せ、上部地震計用水平動伝達アーム8Bを井戸ケーシン
グ1の内壁に接触させる。この場合、吊下げ用ワイヤW
には上部キャプタイヤコードW2が添設され、両者は締
付テープTで固定されている。Fourth Step: Using the concrete press-fitting section 7, the cement 11 is filled through the cement cement passage 1A to the casing cement filling hole 1
Fill to 0A. That is, by using the third boring rod 7A that is lowered from the ground, the vertical channel 7C2 for cement filling of the press-fitting cement leakage prevention rubber packing 7C is matched with the concrete filling hole 6C of the vertical motion transmission arm base 6 and the casing cement filling hole 10A. To fill.
Then, the concrete press-fitting part 7 is lifted to the ground. The upper seismograph 8A in the fifth process upper seismograph section 8 is installed on the pedestal 6 part of the vertical motion vibration transmission arm. That is, the upper seismograph 8A is lowered from the ground by the hanging wire W, the slope 8C21 of the upper seismometer vertical motion transmission arm 8C is brought into contact with the mounting slope 6B of the vertical seismic motion transmission arm base 6, and the upper part The horizontal motion transmission arm 8B for the seismometer is brought into contact with the inner wall of the well casing 1. In this case, the hanging wire W
An upper cap tire cord W2 is attached to the above, and both are fixed with a tightening tape T.
【0033】第7発明は、第1発明の地震計設置装置イ
と第3発明の地震計設置装置ロを用いた下記の各工程か
ら構成されている地震計設置装置の設置方法である。
第1工程
既成井戸の底部分を平坦にする。
第2工程
第1ボーリングロッド2の下端に左ネジ接続で連結した
下部地震計収納筒部3を井戸ケーシング1の井戸孔底ま
で降下させ設置する。(図1、図2参照)設置完了後、
第1ボーリングロッドを右に廻し左ネジ接続部分を離脱
させ、第1ボーリングロッドを地上に引揚げ、既成井戸
孔底に下部地震計収納筒部3を設置する。
第3工程
第2ボーリングロッド4により、第1ケーシング突破部
5と上下動震動伝達アーム台座6を井戸ケーシング1に
おける適位置に降下停止する。この場合、上下動震動伝
達アーム台座6は、当該上下動震動伝達アーム台座にお
けるコンクリート充填穴6Cに、第1ケーシング突破部
5におけるケーシング穴あけ刃5Cと上下動震動伝達刃
5Dの先端で係止した状態で支持されている。A seventh invention is a method for installing a seismograph installation device comprising the following steps using the seismograph installation device b of the first invention and the seismograph installation device b of the third invention. First step The bottom of the existing well is flattened. Second step The lower seismograph storage cylinder part 3, which is connected to the lower end of the first boring rod 2 by a left-hand screw connection, is lowered to the bottom of the well hole of the well casing 1 and installed. (See Figures 1 and 2)
Turn the first boring rod to the right to disconnect the left screw connection part, lift the first boring rod to the ground, and install the lower seismograph storage cylinder part 3 at the bottom of the existing well hole. Third step By the second boring rod 4, the first casing breakthrough portion 5 and the vertical motion transmission arm base 6 are lowered and stopped at appropriate positions in the well casing 1. In this case, the vertical motion transmission arm base 6 is locked in the concrete filling hole 6C in the vertical motion transmission arm base by the casing drilling blade 5C and the vertical motion transmission blade 5D tip in the first casing breakthrough 5. Supported by the state.
【0034】第4工程
地上でボーリングロッド4を右回転させて、前後の拡縮
脚5A4と左右の拡縮脚5A5を拡大させながら、ケー
シング穴あけ刃5Cと上下動震動伝達刃5Dにより井戸
ケーシング1を突破り充填セメント用通路1Aを形成
し、さらにその付近の地層10をも刺しケーシングセメ
ント充填穴10Aを形成する。
第5工程
地上で第2ボーリングロッド4を左回転させて、前後の
拡縮脚5A4と左右の拡縮脚5A5を縮小させること
で、ケーシング穴あけ刃5Cのみを後退させ井戸ケーシ
ング1に充填セメント用通路1Aを形成すると共に、上
下動震動伝達刃5Dは突刺した状態で上下動震動伝達ア
ーム台座6と共に残留させる。この後、第2ボーリング
ロッド4と第1ケーシング突破部5を地上に引揚げる。
第6工程
コンクリート圧入部7を用いて、セメントを充填セメン
ト用通路1Aを介してケーシングセメント充填穴10A
に充填する。すなわち、地上より降下させる第3ボーリ
ングロッド7Aにより、圧入セメント漏洩防止ゴムパッ
キング7Cのセメント充填用の縦通路7C2を上下動震
動伝達アーム台座6のコンクリート充填穴6Cに合致さ
せ、ケーシングセメント充填穴10Aに充填する。この
後、コンクリート圧入部7を地上に引揚げる。Step 4 Rotate the boring rod 4 to the right on the ground to expand the front and rear expansion legs 5A4 and the left and right expansion legs 5A5, and break through the well casing 1 with the casing drilling blade 5C and the vertical motion transmission blade 5D. A channel 1A for refilling cement is formed, and the formation 10 in the vicinity thereof is also pierced to form a casing cement filling hole 10A. Fifth step By rotating the second boring rod 4 counterclockwise on the ground to reduce the front and rear expansion and contraction legs 5A4 and the left and right expansion and contraction legs 5A5, only the casing punching blade 5C is retracted and the well casing 1 is filled with a cement cement passage 1A. And the vertical vibration transmission blade 5D is left in the pierced state together with the vertical vibration transmission arm pedestal 6. After this, the second boring rod 4 and the first casing breakthrough 5 are lifted to the ground. Sixth step Concrete press-fitting section 7 is used for filling cement with a cement cement filling hole 10A through a cement cement passage 1A.
To fill. That is, by using the third boring rod 7A that is lowered from the ground, the vertical channel 7C2 for cement filling of the press-fitting cement leakage prevention rubber packing 7C is matched with the concrete filling hole 6C of the vertical motion transmission arm base 6 and the casing cement filling hole 10A. To fill. Then, the concrete press-fitting part 7 is lifted to the ground.
【0035】第7工程
上部地震計8Aの最上部に吊下げ用ワイヤWを連結し、
上部地震計8Aの底部と下部地震計qを所定長さの吊下
げ用ワイヤWで連結し、下部地震計qから地上より井戸
ケーシング1内を降下させるに際し、当該下部地震計q
はラッパ口3Cで誘導しながら降下させ、無磁石基礎筒
3Aに接続されている無磁石基礎下筒3B内の充填セメ
ントの上面に下部地震計を設置し、ついで、降下してく
る上部地震計部8における上部地震計8Aを上下動震動
伝達アーム台座6部分に設置する。すなわち、上部地震
計8Aを地上から吊下げ用ワイヤWにより降下させ、上
部地震計用上下動伝達アーム8Cの斜面8C21を上下
動震動伝達アーム台座6における載置用斜面6Bに当接
させ、上部地震計用水平動伝達アーム8Bを井戸ケーシ
ング1の内壁に接触させる。この場合、吊下げ用ワイヤ
Wには上部キャプタイヤコードW4と、下部キャプタイ
ヤコードW3が添設され、両者は締付テープTで固定さ
れている。The wire W for suspension is connected to the uppermost part of the seventh step upper seismograph 8A,
When the bottom part of the upper seismograph 8A and the lower seismograph q are connected by a suspending wire W having a predetermined length, and the lower seismograph q is lowered from the ground into the well casing 1,
Lowers while guiding with the trumpet mouth 3C, installs the lower seismometer on the upper surface of the filling cement in the magnetless foundation lower cylinder 3B connected to the magnetless foundation cylinder 3A, and then descends the upper seismometer The upper seismograph 8A in the section 8 is installed on the pedestal 6 of the vertical motion transmission arm. That is, the upper seismograph 8A is lowered from the ground by the hanging wire W, the slope 8C21 of the upper seismometer vertical motion transmission arm 8C is brought into contact with the mounting slope 6B of the vertical seismic motion transmission arm base 6, and the upper part The horizontal motion transmission arm 8B for the seismometer is brought into contact with the inner wall of the well casing 1. In this case, an upper cap tire cord W4 and a lower cap tire cord W3 are attached to the hanging wire W, and both are fixed with a tightening tape T.
【0036】第8発明は、第1発明の地震計設置装置イ
と第5発明の地震計設置装置ハを用いた下記の各工程か
ら構成されている地震計設置装置の設置方法である。
第1工程
既成井戸の底部分を平坦にする。
第2工程
第1ボーリングロッド2の下端に左ネジ接続で連結した
下部地震計収納筒部3を井戸ケーシング1の井戸孔底ま
で降下させ設置する。(図1、図2参照)設置完了後、
第1ボーリングロッドを右に廻し左ネジ接続部分を離脱
させ、第1ボーリングロッドを地上に引揚げ、既成井戸
孔底に下部地震計収納筒部3を設置する。
第3工程
第2ボーリングロッド4により、第2ケーシング突破部
9と上下動震動伝達アーム台座6を、井戸ケーシング1
における適位置に降下停止する。この場合、上下動震動
伝達アーム台座6は、当該上下動震動伝達アーム台座に
おけるコンクリート充填穴6Cに、第2ケーシング突破
部9におけるケーシング穴あけ刃9Cと上下動震動伝達
刃9Dの先端で係止した状態で支持されている。An eighth invention is a method of installing a seismograph installation device comprising the following steps using the seismograph installation device a of the first invention and the seismograph installation device c of the fifth invention. First step The bottom of the existing well is flattened. Second step The lower seismograph storage cylinder part 3, which is connected to the lower end of the first boring rod 2 by a left-hand screw connection, is lowered to the bottom of the well hole of the well casing 1 and installed. (See Figures 1 and 2)
Turn the first boring rod to the right to disconnect the left screw connection part, lift the first boring rod to the ground, and install the lower seismograph storage cylinder part 3 at the bottom of the existing well hole. In the third step, the second boring rod 4, the second casing breakthrough 9 and the vertical vibration transmission arm pedestal 6 are connected to the well casing 1.
Stop descending to the proper position in. In this case, the vertical motion transmission arm pedestal 6 is locked in the concrete filling hole 6C in the vertical motion transmission arm pedestal by the casing drilling blade 9C and the vertical motion transmission blade 9D in the second casing breakthrough portion 9. Supported by the state.
【0037】第4工程
地上で第2ケーシング突破部9を右回転させて、親傘歯
車、子傘歯車、ねじ棒を回転させることで、進退筒6D
3、ケーシング穴あけ刃9Cと上下動震動伝達刃9Dを
前進させ、井戸ケーシング1を突破り、さらにその付近
の地層10をも刺しケーシングセメント充填穴10Aを
形成する。
第5工程
地上で第2ボーリングロッド4を左回転させて、進退筒
9A13、第2刃物脱落防止枠9Bを後退させること
で、ケーシング穴あけ刃9Cのみを後退させ、井戸ケー
シング1に充填セメント用通路1Aを形成すると共に、
上下動震動伝達刃9Dは突刺した状態で、上下動震動伝
達アーム台座6と共に残留させる。この後、第2ボーリ
ングロッド4と第2ケーシング突破部9を地上に引揚げ
る。
第6工程
コンクリート圧入部7を用いて、セメントを充填セメン
ト用通路1Aを介してケーシングセメント充填穴10A
に充填する。すなわち、地上より降下させる第3ボーリ
ングロッド7Aにより、圧入セメント漏洩防止ゴムパッ
キング7Cのセメント充填用の縦通路7C2を上下動震
動伝達アーム台座6のコンクリート充填穴6Cに合致さ
せ、ケーシングセメント充填穴10Aに充填する。この
後、コンクリート圧入部7を地上に引揚げる。Fourth Step On the ground, the second casing breakthrough portion 9 is rotated clockwise to rotate the parent bevel gear, the bevel gear, and the screw rod, so that the advancing / retreating cylinder 6D.
3. The casing drilling blade 9C and the vertical vibration transmission blade 9D are advanced to break through the well casing 1 and further penetrate the formation 10 in the vicinity thereof to form a casing cement filling hole 10A. Fifth step By rotating the second boring rod 4 counterclockwise on the ground and retracting the advancing / retreating cylinder 9A13 and the second blade drop-off prevention frame 9B, only the casing punching blade 9C is retracted, and the well casing 1 is filled with a cement passage. 1A is formed,
The vertical motion transmission blade 9D is left in the pierced state together with the vertical motion transmission arm base 6. Then, the second boring rod 4 and the second casing breakthrough 9 are lifted to the ground. Sixth step Concrete press-fitting section 7 is used for filling cement with a cement cement filling hole 10A through a cement cement passage 1A.
To fill. That is, by using the third boring rod 7A that is lowered from the ground, the vertical channel 7C2 for cement filling of the press-fitting cement leakage prevention rubber packing 7C is matched with the concrete filling hole 6C of the vertical motion transmission arm base 6 and the casing cement filling hole 10A. To fill. Then, the concrete press-fitting part 7 is lifted to the ground.
【0038】第7工程
上部地震計8Aの最上部に吊下げ用ワイヤWを連結し、
上部地震計8Aの底部と下部地震計qを所定長さの吊下
げ用ワイヤWで連結し、下部地震計qから地上より井戸
ケーシング1内を降下させるに際し、当該下部地震計q
はラッパ口3Cで誘導しながら降下させ、無磁石基礎筒
3Aに接続されている無磁石基礎下筒3B内の充填セメ
ントの上面に下部地震計を設置し、ついで、降下してく
る上部地震計部8における上部地震計8Aを上下動震動
伝達アーム台座6部分に設置する。すなわち、上部地震
計8Aを地上から吊下げ用ワイヤWにより降下させ、上
部地震計用上下動伝達アーム8Cの斜面8C21を上下
動震動伝達アーム台座6における載置用斜面6Bに当接
させ、上部地震計用水平動伝達アーム8Bを井戸ケーシ
ング1の内壁に接触させる。この場合、吊下げ用ワイヤ
Wには上部キャプタイヤコードW4と、下部キャプタイ
ヤコードW3が添設され、両者は締付テープTで固定さ
れている。The wire W for suspension is connected to the uppermost part of the upper seismograph 8A in the seventh step,
When the bottom part of the upper seismograph 8A and the lower seismograph q are connected by a suspending wire W having a predetermined length, and the lower seismograph q is lowered from the ground into the well casing 1,
Lowers while guiding with the trumpet mouth 3C, installs the lower seismometer on the upper surface of the filling cement in the magnetless foundation lower cylinder 3B connected to the magnetless foundation cylinder 3A, and then descends the upper seismometer The upper seismograph 8A in the section 8 is installed on the pedestal 6 of the vertical motion transmission arm. That is, the upper seismograph 8A is lowered from the ground by the hanging wire W, the slope 8C21 of the upper seismometer vertical motion transmission arm 8C is brought into contact with the mounting slope 6B of the vertical seismic motion transmission arm base 6, and the upper part The horizontal motion transmission arm 8B for the seismometer is brought into contact with the inner wall of the well casing 1. In this case, an upper cap tire cord W4 and a lower cap tire cord W3 are attached to the hanging wire W, and both are fixed with a tightening tape T.
【0039】[0039]
【発明の効果】本発明は、上述の通り構成されているの
で次に記載する効果を奏する。
1.地震観測に是非必要な位置にありながら未利用井戸
として放置されている井戸を活用して地震計を複数設置
する。その井戸ケーシングで、各深度、各地層に伝播の
複数地震動を同時記録すると、今までにない未利用井戸
利用の経済的な地震対策技術で一層の発展飛躍が期待で
きる。
2.既成井戸構成は従来より一般に鉄製パイプを使用し
ているので、地震計設置装置設置個所に非磁性管でその
長さは地震計に格納されている地磁気方位計を中芯とし
て上下とも4m余り必要なので、その長さのある下部地
震計収納筒部に地震計を設置傾斜角3°以内で設置す
る。なお、それぞれが継続して行う地中の地震観測は、
井戸ケーシングの外側地層の地震動の中での上下動震動
は各地震計の底部より受信し、水平動震動は各地震計の
横胴体より受信出来る地震計構成で正確迅速に地震波記
録ができる。
3.既成井戸は様々な口径・深度構成の井戸ケーシング
でできているので、その各井戸ケーシングの適位置にあ
り、その状況に合わせた直径の上下動震動伝達アーム台
座及び上部と下部地震計と水平動伝達アーム、そして、
上下動伝達アームとは制作加工したものを利用すること
ができ、中心核である地震計収納筒は既成品の統一企画
品の使用ができるので、経済的にも効果の高い地震対策
技術が開発される。
4.複数設置の地震計に不振な事柄を生じた場合、複数
設置の地震計を同時に昇降できるので、地上で点検修理
して再び連結懸垂して設置することができる。即ち、既
成井戸活用による地震計複数設置で経済的にも地震解析
技術にも活気的発展になる。
5.このほか、安価に製造できる、部品点数が少ないの
で組立が容易である、経済的である、などの効果をも有
するものである。Since the present invention is configured as described above, it has the following effects. 1. Multiple seismographs will be installed by utilizing wells that are left unused as wells, although they are in positions that are absolutely necessary for seismic observation. Simultaneous recording of multiple seismic motions at each depth and in each layer in the well casing can be expected to make a further leap forward with economical earthquake countermeasure technology using unused wells that has never existed before. 2. Since the existing well structure has generally used iron pipes, a non-magnetic pipe is installed at the location where the seismograph installation device is installed. Therefore, the seismograph will be installed in the lower seismograph storage cylinder part with that length within a tilt angle of 3 °. In addition, each of the underground seismic observations carried out continuously
Vertical and vertical motions of the outer layer of the well casing can be received from the bottom of each seismograph, and horizontal motions can be received from the lateral body of each seismograph, enabling accurate and rapid seismic recording. 3. Since the existing wells are made of well casings with various diameters and depths, they are located at appropriate positions in each well casing. Transmission arm, and
The vertical motion transmission arm can be manufactured and processed, and since the seismograph storage cylinder that is the central core can be used as a unified plan product of existing products, the earthquake countermeasure technology with high economic effect is developed. To be done. 4. If a seismometer with multiple seismometers fails, the seismographs with multiple seismometers can be moved up and down at the same time, so they can be inspected and repaired on the ground and then connected and suspended again. In other words, the installation of multiple seismographs utilizing existing wells will lead to vigorous economic and seismic analysis technology development. 5. In addition, it has the effects of being inexpensively manufactured, being easy to assemble due to the small number of parts, and being economical.
【図1】第1発明を説明する縦断面図である。FIG. 1 is a vertical cross-sectional view illustrating a first invention.
【図2】下部地震計収納筒部を中心とした1部を切欠い
た斜視図である。FIG. 2 is a perspective view in which a part centering on a lower seismograph storage cylinder is cut away.
【図3】第2発明における工程を説明する縦断面図であ
る。FIG. 3 is a vertical cross-sectional view illustrating a step in the second invention.
【図4】第2発明における工程を説明する縦断面図であ
る。FIG. 4 is a vertical cross-sectional view illustrating a step in the second invention.
【図5】第2発明における工程を説明する縦断面図であ
る。FIG. 5 is a vertical cross-sectional view illustrating a step in the second invention.
【図6】第3発明を説明する縦断面図である。FIG. 6 is a vertical sectional view for explaining a third invention.
【図7】4点フレーム式ジャッキ部を中心とした要部拡
大斜視図である。FIG. 7 is an enlarged perspective view of a main part centering around a four-point frame jack.
【図8】4点フレーム式ジャッキ部を中心とした要部拡
大斜視図である。FIG. 8 is an enlarged perspective view of a main part centering on a four-point frame jack.
【図9】4点フレーム式ジャッキ部の1部を省略した分
解斜視図である。FIG. 9 is an exploded perspective view in which a part of a four-point frame jack is omitted.
【図10】同上におけるケーシング穴あけ刃と上下動震
動伝達刃部分を中心とした分解斜視図である。FIG. 10 is an exploded perspective view centering on a casing drilling blade and a vertical vibration transmission blade portion in the above.
【図11】上下動震動伝達アーム台座の1部を切欠いた
斜視図である。FIG. 11 is a perspective view in which a part of a vertical motion transmission arm base is cut away.
【図12】第4発明を説明する縦断面図である。FIG. 12 is a vertical sectional view for explaining a fourth invention.
【図13】4点フレーム式ジャッキ部と上下動震動伝達
アーム台座の関係を説明する縦断面図である。FIG. 13 is a vertical cross-sectional view for explaining the relationship between the four-point frame type jack section and the vertical motion vibration transmission arm base.
【図14】コンクリート圧入部を説明する1部を切欠い
た斜視図である。FIG. 14 is a perspective view showing a concrete press-fitting portion with a part cut away.
【図15】同上における拡大横断面図である。FIG. 15 is an enlarged transverse sectional view of the above.
【図16】コンクリートの圧入状態を説明する縦断面図
である。FIG. 16 is a vertical cross-sectional view illustrating a press-fitted state of concrete.
【図17】ケーシング穴あけ刃と上下動震動伝達刃の作
用を説明する横断面図である。FIG. 17 is a transverse cross-sectional view for explaining the operation of the casing punching blade and the vertical motion transmission blade.
【図18】ケーシング穴あけ刃と上下動震動伝達刃の作
用を説明する横断面図である。FIG. 18 is a transverse cross-sectional view for explaining the operation of the casing punching blade and the vertical motion transmission blade.
【図19】上下動震動伝達刃が残留した状態を説明する
横断面図である。FIG. 19 is a transverse cross-sectional view illustrating a state where the vertical motion transmission blade remains.
【図20】コンクリートの圧入状態を説明する横断面図
である。FIG. 20 is a transverse cross-sectional view illustrating a press-fitted state of concrete.
【図21】上部地震計部の分解斜視図である。FIG. 21 is an exploded perspective view of an upper seismograph section.
【図22】上部地震計部の1部を切欠いた拡大正面図で
ある。FIG. 22 is an enlarged front view in which a part of the upper seismograph section is cut away.
【図23】上部地震計部の装着工程を説明する縦断面図
である。FIG. 23 is a vertical sectional view for explaining a mounting process of the upper seismograph section.
【図24】上部地震計部の装着完了状態を説明する縦断
面図である。FIG. 24 is a vertical cross-sectional view for explaining a state where the upper seismograph section is completely attached.
【図25】第5発明を説明する縦断面図である。FIG. 25 is a vertical sectional view for explaining the fifth invention.
【図26】第2ケーシング突破部の斜視図である。FIG. 26 is a perspective view of a second casing breakthrough portion.
【図27】同上におけるケーシング穴あけ刃と上下動震
動伝達刃部分を中心とした分解斜視図である。FIG. 27 is an exploded perspective view centering on the casing punching blade and the vertical motion vibration transmission blade portion in the above.
【図28】図27における1部を切欠いた拡大正面図で
ある。28 is an enlarged front view with a part cut away in FIG. 27. FIG.
【図29】同上における作用の説明図である。FIG. 29 is an explanatory diagram of an operation in the above.
【図30】第6発明を説明する縦断面図である。FIG. 30 is a vertical sectional view illustrating a sixth invention.
【図31】4点傘歯車式ジャッキ部と上下動震動伝達ア
ーム台座の関係を説明する縦断面図である。FIG. 31 is a vertical cross-sectional view illustrating a relationship between a four-point bevel gear type jack portion and a vertical motion vibration transmission arm base.
【図32】コンクリートの圧入状態を説明する縦断面図
である。FIG. 32 is a vertical cross-sectional view illustrating a press-fitted state of concrete.
【図33】ケーシング穴あけ刃と上下動震動伝達刃の作
用を説明する横断面図である。FIG. 33 is a cross-sectional view illustrating the operation of the casing punching blade and the vertical motion transmission blade.
【図34】ケーシング穴あけ刃と上下動震動伝達刃の作
用を説明する横断面図である。FIG. 34 is a cross-sectional view illustrating the operation of the casing punching blade and the vertical motion transmission blade.
【図35】上下動震動伝達刃が残留した状態を説明する
横断面図である。FIG. 35 is a cross-sectional view illustrating a state in which the vertical motion transmission blade remains.
【図36】コンクリートの圧入状態を説明する横断面図
である。FIG. 36 is a transverse cross-sectional view illustrating a press-fitted state of concrete.
【図37】上部地震計部の装着完了状態を説明する縦断
面図である。FIG. 37 is a vertical cross-sectional view for explaining a state where the upper seismograph section is completely attached.
【図38】第7発明を説明する縦断面図である。FIG. 38 is a vertical sectional view for explaining the seventh invention.
【図39】第8発明を説明する縦断面図である。FIG. 39 is a vertical sectional view for explaining the eighth invention.
【図40】上部地震計部と下部地震計との関係を示す分
解斜視図である。FIG. 40 is an exploded perspective view showing the relationship between the upper seismograph section and the lower seismograph.
【図41】上部地震計部と下部地震計の装着工程を説明
する縦断面図である。FIG. 41 is a vertical sectional view for explaining a mounting process of the upper seismograph section and the lower seismograph.
【図42】上部地震計部と下部地震計の装着完了状態を
説明する縦断面図である。FIG. 42 is a vertical cross-sectional view illustrating a state where the upper seismograph section and the lower seismograph are completely attached.
1 地震計が設置される井戸ケーシング イ 第1発明の地震計設置装置 2 第1ボーリングロッド 3 下部地震計収納筒部 ロ 第3発明の地震計設置装置 4 第2ボーリングロッド 5 第1ケーシング突破部 6 上下動震動伝達アーム台座 7 コンクリート圧入部 8 上部地震計部 ハ 第5発明の地震計設置装置 9 第2ケーシング突破部 1 Well casing where seismograph is installed B seismometer installation device of the first invention 2 1st bowling rod 3 Lower seismograph storage cylinder (3) Seismometer installation device of the third invention 4 second boring rod 5 First casing breakthrough 6 Vertical motion transmission arm base 7 Concrete press fitting section 8 Upper seismograph section C. Fifth invention seismometer installation device 9 Second casing breakthrough
───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.7,DB名) G01V 1/40 G01V 1/20 ─────────────────────────────────────────────────── ─── Continuation of front page (58) Fields surveyed (Int.Cl. 7 , DB name) G01V 1/40 G01V 1/20
Claims (8)
計収納筒部(3)から構成され、 第1ボーリングロッド(2)は、ボーリングロッド本体
(2A)とボーリングロッド本体の下端に取付けられた
接続カップリング(2B)から構成され、この接続カッ
プリング(2B)の下方外周面には左ネジ(2B1)が
刻設され、 下部地震計収納筒部(3)は、下部地震計(q)を収納
する無磁石基礎筒(3A)と、その無磁石基礎筒(3
A)の下方部分に接続されたセメントが充填された無磁
石基礎下筒(3B)と、無磁石基礎筒(3A)の上端に
上方に向け連設されたラッパ口(3C)と、当該無磁石
基礎筒の上端の内周面に刻設された左ネジ(3D)と、
無磁石基礎筒(3A)の外周面に、当該無磁石基礎筒に
収納された下部地震計のやや上方にある水平動震動記録
位置をもって水平状態で取付けられた下部地震計用水平
動伝達アーム(3E)と、無磁石基礎下筒(3B)の上
部に接続された無磁石基礎筒(3A)との接続部の外周
面に水平状態で取付けられた下部地震計用上下動伝達ア
ーム(3F)から構成され、下部地震計用水平動伝達ア
ーム(3E)と下部地震計用上下動伝達アーム(3F)
の先端には、井戸ケーシングの内壁に接触する接触盤が
取付けられ、 第1ボーリングロッド(2)と無磁石基礎筒(3A)と
は、互いの左ネジ(2B1)と左ネジ(3D)を利用し
た左ネジ接続で連結されていることを特徴とする地震計
設置装置。1. A first boring rod (2) and a lower seismograph storage cylinder (3), wherein the first boring rod (2) is attached to a boring rod body (2A) and a lower end of the boring rod body. The connecting seismic coupling (2B) is provided with a left screw (2B1) engraved on the lower outer peripheral surface of the connecting coupling (2B). ), A non-magnet base cylinder (3A) and a non-magnet base cylinder (3A)
A) a magnetless base lower cylinder (3B) connected to the lower part of (A), a trumpet mouth (3C) continuously connected to the upper end of the magnetless base cylinder (3A), and A left screw (3D) engraved on the inner peripheral surface of the upper end of the magnet base cylinder,
A horizontal motion transmission arm for a lower seismometer attached to the outer peripheral surface of the magnetless base cylinder (3A) in a horizontal state at a horizontal motion record position slightly above the lower seismograph housed in the magnetless base cylinder ( 3E) and the vertical motion transmission arm (3F) for the lower seismograph horizontally mounted on the outer peripheral surface of the connection portion between the magnetless foundation lower cylinder (3B) and the magnetless foundation cylinder (3A). The horizontal motion transmission arm (3E) for the lower seismograph and the vertical motion transmission arm (3F) for the lower seismograph.
A contact plate that comes into contact with the inner wall of the well casing is attached to the tip of the first boring rod (2) and the non-magnet base cylinder (3A), and the left screw (2B1) and the left screw (3D) are mutually attached. The seismograph installation device, which is connected by the left-hand screw connection used.
下記の各工程から構成されていることを特徴とする地震
計設置装置の設置方法。 第1工程 既成井戸の底部分を平坦にする。 第2工程 第1ボーリングロッド(2)の下端に左ネジ接続で連結
した下部地震計収納筒部(3)を井戸ケーシング(1)
の井戸孔底まで降下させ設置する。 第3工程 頭部に吊下げ用ワイヤ(W)を連結した下部地震計
(q)を、地上よりラッパ口(3C)で誘導しながら降
下させ、無磁石基礎筒(3A)に接続されている無磁石
基礎下筒(3B)内の充填セメントの上面に設置する。2. A method of installing a seismograph installation device, comprising the following steps using the seismograph installation device according to claim 1 . First step The bottom of the existing well is flattened. Second step Lower seismograph storage cylinder part (3) connected to the lower end of the first boring rod (2) by left-hand screw connection, and well casing (1)
Will be installed down to the bottom of the well hole. The lower seismograph (q) in which the hanging wire (W) is connected to the head of the third step is lowered while being guided from the ground by the trumpet mouth (3C), and is connected to the magnetless foundation cylinder (3A). It is installed on the upper surface of the filling cement in the magnetless base lower cylinder (3B).
シング突破部(5)と、上下動震動伝達アーム台座
(6)と、コンクリート圧入部(7)と、上部地震計部
(8)から構成され、 第2ボーリングロッド(4)は、ボーリングロッド本体
(4A)とボーリングロッド本体の下端に取付けられた
ジャッキ用接続具(4B)から構成され、 第1ケーシング突破部(5)は、4点フレーム式ジャッ
キ部(5A)と、4点フレーム式ジャッキ部に取付けら
れた第1刃物脱落防止枠(5B)と、第1刃物脱落防止
枠に取付けられたケーシング穴あけ刃(5C)と、上下
動震動伝達刃(5D)から構成され、 上下動震動伝達アーム台座(6)は、所定幅の板をもっ
て井戸ケーシング(1)の内周面に接する程度の直径に
構成された平面円輪状の台座本体(6A)と、台座本体
(6A)の内周面に形成された載置用斜面(6B)と、
台座本体(6A)の前後左右に位置するケーシング穴あ
け刃(5C)と上下動震動伝達刃(5D)が貫入できる
よう開口されたコンクリート充填穴(6C)から構成さ
れ、 コンクリート圧入部(7)は、第3ボーリングロッド
(7A)の下端に着脱自在に連結された連結用ブロック
(7B)と、この連結用ブロックの外周に溶着された圧
入セメント漏洩防止ゴムパッキング(7C)からなり、
かつこれらには第3ボーリングロッド(7A)と連通す
るセメント充填用の縦通路(7C1)と、セメント充填
用の縦通路の下端から当該縦通路を中心に前後左右方向
に水平状態でセメント充填用の通路(7C2)が開設さ
れ、 上部地震計部(8)は、上部地震計(8A)と、井戸ケ
ーシングの内壁に接触する上部地震計用水平動伝達アー
ム(8B)と、上下動震動伝達アーム台座に係止する上
部地震計用上下動伝達アーム(8C)から構成されてい
ることを特徴とする地震計設置装置。3. From the second boring rod (4), the first casing breakthrough (5), the vertical motion transmission arm base (6), the concrete press-fitting part (7), and the upper seismograph part (8). The second boring rod (4) is composed of a boring rod body (4A) and a jack connector (4B) attached to the lower end of the boring rod body, and the first casing breakthrough (5) is 4 A point frame type jack part (5A), a first blade drop-off prevention frame (5B) attached to the 4-point frame type jack part, a casing drilling blade (5C) attached to the first blade drop-off prevention frame, and a top and bottom The vertical motion transmission arm base (6) is composed of a motion vibration transmission blade (5D), and has a plate with a predetermined width, and has a diameter of such a degree that it is in contact with the inner peripheral surface of the well casing (1). Book A body (6A), a mounting slope (6B) formed on the inner peripheral surface of the pedestal body (6A),
It consists of a casing drilling blade (5C) located on the front, back, left and right of the pedestal body (6A) and a concrete filling hole (6C) opened so that the vertical vibration transmission blade (5D) can penetrate, and the concrete press fitting part (7) is , A connecting block (7B) removably connected to the lower end of the third boring rod (7A), and a press-fitting cement leakage preventing rubber packing (7C) welded to the outer periphery of the connecting block,
In addition, there is a vertical channel for cement filling (7C1) communicating with the third boring rod (7A), and for cement filling in a horizontal state from the lower end of the vertical channel for cement filling in the front-rear, left-right direction around the vertical channel. The passage (7C2) is opened, and the upper seismograph section (8) transmits the upper seismograph (8A), the horizontal seismometer horizontal motion transmission arm (8B) that contacts the inner wall of the well casing, and the vertical seismic motion transmission. A seismograph installation device comprising an up-and-down motion transmission arm (8C) for an upper seismograph which is locked to an arm pedestal.
下記の各工程から構成されていることを特徴とする地震
計設置装置の設置方法。 第1工程 第2ボーリングロッド(4)により、第1ケーシング突
破部(5)と上下動震動伝達アーム台座(6)を井戸ケ
ーシング(1)における適位置に降下停止する。 第2工程 地上から第1ケーシング突破部(5)を作動させて、ケ
ーシング穴あけ刃(5C)と上下動震動伝達刃(5D)
により、井戸ケーシング(1)を突破り充填セメント用
通路(1A)を形成し、さらにその付近の地層(10)
をも刺しケーシングセメント充填穴(10A)を形成す
る。 第3工程 地上から第1ケーシング突破部(5)を作動させて、ケ
ーシング穴あけ刃(5C)のみを後退させ井戸ケーシン
グ(1)に充填セメント用通路(1A)を形成すると共
に、上下動震動伝達刃(5D)は突刺した状態で、上下
動震動伝達アーム台座(6)と共に残留させる。 第4工程 コンクリート圧入部(7)を用いて、セメント(11)
を充填セメント用通路(1A)を介してケーシングセメ
ント充填穴(10A)に充填する。 第5工程 上部地震計部(8)における上部地震計(8A)を上下
動震動伝達アーム台座(6)部分に設置する。4. A method for installing a seismograph installation device, comprising the following steps using the seismograph installation device according to claim 3 . First step The second boring rod (4) lowers and stops the first casing breakthrough (5) and the vertical motion transmission arm base (6) at an appropriate position in the well casing (1). Second step Actuating the first casing breakthrough (5) from the ground, casing drilling blade (5C) and vertical motion transmission blade (5D)
To form a channel (1A) for filling cement by breaking through the well casing (1), and further forming a stratum (10) in the vicinity thereof.
To form a casing cement filling hole (10A). Third step: Actuating the first casing breakthrough (5) from the ground to retract only the casing punching blade (5C) to form the channel (1A) for filling cement in the well casing (1), and to transmit vertical motion vibrations. The blade (5D) is left in the pierced state together with the vertical motion transmission arm base (6). Cement (11) using the fourth step concrete press-fitting section (7)
Is filled into the casing cement filling hole (10A) through the filling cement passage (1A). The upper seismograph (8A) in the fifth process upper seismograph section (8) is installed on the vertical motion transmission arm base (6).
ーシング突破部(9)と、上下動震動伝達アーム台座
(6)と、コンクリート圧入部(7)と、上部地震計部
(8)から構成され、 第2ボーリングロッド(4)は、ボーリングロッド本体
(4A)とボーリングロッド本体の下端に取付けられた
ジャッキ用接続具(4B)から構成され、 第2ケーシング突破部(9)は、4点傘歯車式ジャッキ
部(9A)と、4点傘歯車式ジャッキ部に取付けた第2
刃物脱落防止枠(9B)と、第2刃物脱落防止枠(9
B)に取付けたケーシング穴あけ刃(9C)と、上下動
震動伝達刃(9D)から構成され、 上下動震動伝達アーム台座(6)は、所定幅の板をもっ
て井戸ケーシング(1)の内周面に接する程度の直径に
構成された平面円輪状の台座本体(6A)と、台座本体
(6A)の内周面に形成された載置用斜面(6B)と、
台座本体(6A)の前後左右に位置するケーシング穴あ
け刃(9C)と上下動震動伝達刃(9D)が貫入できる
よう開口されたコンクリート充填穴(6C)から構成さ
れ、 コンクリート圧入部(7)は、第3ボーリングロッド
(7A)の下端に着脱自在に連結された連結用ブロック
(7B)と、この連結用ブロックの外周に溶着された圧
入セメント漏洩防止ゴムパッキング(7C)からなり、
これらに第3ボーリングロッド(7A)と連通するセメ
ント充填用の縦通路(7C1)と、セメント充填用の縦
通路の下端から当該縦通路を中心に前後左右方向に水平
状態でセメント充填用の縦通路(7C2)が開設され、 上部地震計部(8)は、上部地震計(8A)と、井戸ケ
ーシングの内壁に接触する上部地震計用水平動伝達アー
ム(8B)と、上下動震動伝達アーム台座に係止する上
部地震計用上下動伝達アーム(8C)から構成されてい
ることを特徴とする地震計設置装置。5. A second boring rod (4), a second casing breakthrough (9), a vertical motion transmission arm base (6), a concrete press-fitting part (7), and an upper seismograph part (8). The second boring rod (4) is composed of a boring rod body (4A) and a jack connector (4B) attached to the lower end of the boring rod body, and the second casing breakthrough (9) is 4-point bevel gear type jack (9A) and second attached to 4-point bevel gear type jack
The blade falling prevention frame (9B) and the second blade falling prevention frame (9
It is composed of a casing drilling blade (9C) attached to B) and a vertical vibration transmission blade (9D). The vertical vibration transmission arm pedestal (6) has a plate of a predetermined width and is an inner peripheral surface of the well casing (1). A pedestal body (6A) in the shape of a flat circular ring configured to have a diameter such that the pedestal body is attached to the pedestal body, and a mounting slope (6B) formed on the inner peripheral surface of the pedestal body (6A).
It consists of a casing drilling blade (9C) located on the front, rear, left and right of the pedestal body (6A) and a concrete filling hole (6C) opened so that the vertical vibration transmission blade (9D) can penetrate, and the concrete press fitting part (7) is , A connecting block (7B) removably connected to the lower end of the third boring rod (7A), and a press-fitting cement leakage preventing rubber packing (7C) welded to the outer periphery of the connecting block,
A vertical channel for cement filling (7C1) communicating with the third boring rod (7A), and a vertical channel for cement filling in a horizontal state from the lower end of the vertical channel for cement filling in the front-rear, left-right direction around the vertical channel. The passage (7C2) is opened, and the upper seismograph section (8) includes the upper seismograph (8A), the horizontal seismograph horizontal motion transmission arm (8B) that contacts the inner wall of the well casing, and the vertical seismic vibration transmission arm. A seismograph installation device comprising an up-and-down motion transmission arm (8C) for an upper seismograph which is locked to a pedestal.
下記の各工程から構成されていることを特徴とする地震
計設置装置の設置方法。 第1工程 第2ボーリングロッド(4)により、第2ケーシング突
破部(9)と上下動震動伝達アーム台座(6)を井戸ケ
ーシング(1)における適位置に降下停止する。 第2工程 地上から第2ケーシング突破部(9)を作動させること
で、ケーシング穴あけ刃(9C)と上下動震動伝達刃
(9D)を前進させ、井戸ケーシング(1)を突破り充
填セメント用通路(1A)を形成し、さらにその付近の
地層(10)をも刺しケーシングセメント充填穴(10
A)を形成する。 第3工程 地上から第2ケーシング突破部(9)を作動させること
で、ケーシング穴あけ刃(9C)のみを後退させ井戸ケ
ーシング(1)に充填セメント用通路(1A)を形成す
ると共に、上下動震動伝達刃(9D)は突刺した状態で
上下動震動伝達アーム台座(6)と共に残留させる。 第4工程 コンクリート圧入部(7)を用いて、セメント(11)
を充填セメント用通路(1A)を介してケーシングセメ
ント充填穴(10A)に充填する。 第5工程 上部地震計部(8)における上部地震計(8A)を上下
動震動伝達アーム台座(6)部分に設置する。6. A method for installing a seismograph installation device, comprising the following steps using the seismograph installation device according to claim 5 . First step The second boring rod (4) lowers and stops the second casing breakthrough (9) and the vertical motion transmission arm base (6) at an appropriate position in the well casing (1). Second step By operating the second casing breaching portion (9) from the ground, the casing piercing blade (9C) and the vertical vibration transmission blade (9D) are moved forward to pierce the well casing (1) and the channel for the filling cement. (1A) is formed, and further the formation (10) in the vicinity thereof is stabbed, and the casing cement filling hole (10
A) is formed. Third step By operating the second casing breakthrough (9) from the ground, only the casing punching blade (9C) is retracted to form the filled cement passage (1A) in the well casing (1), and the vertical shaking motion is also performed. The transmission blade (9D) remains in the pierced state together with the vertical vibration transmission arm base (6). Cement (11) using the fourth step concrete press-fitting section (7)
Is filled into the casing cement filling hole (10A) through the filling cement passage (1A). The upper seismograph (8A) in the fifth process upper seismograph section (8) is installed on the vertical motion transmission arm base (6).
3記載の地震計設置装置を用いた下記の各工程から構成
されていることを特徴とする地震計設置装置の設置方
法。 第1工程 既成井戸の底部分を平坦にする。 第2工程 第1ボーリングロッド(2)の下端に左ネジ接続で連結
した下部地震計収納筒部(3)を井戸ケーシング(1)
の井戸孔底まで降下させ設置する。 第3工程 第2ボーリングロッド(4)により、第1ケーシング突
破部(5)と上下動震動伝達アーム台座(6)を井戸ケ
ーシング(1)における適位置に降下停止する。 第4工程 地上から第1ケーシング突破部(5)を作動させて、ケ
ーシング穴あけ刃(5C)と上下動震動伝達刃(5D)
により井戸ケーシング(1)を突破り充填セメント用通
路(1A)を形成し、さらにその付近の地層(10)を
も刺しケーシングセメント充填穴(10A)を形成す
る。 第5工程 地上から第1ケーシング突破部(5)を作動させて、ケ
ーシング穴あけ刃(5C)のみを後退させ井戸ケーシン
グ(1)に充填セメント用通路(1A)を形成すると共
に、上下動震動伝達刃(5D)は突刺した状態で上下動
震動伝達アーム台座(6)と共に残留させる。 第6工程 コンクリート圧入部(7)を用いて、セメントを充填セ
メント用通路(1A)を介してケーシングセメント充填
穴(10A)に充填する。 第7工程 上部地震計(8A)の最上部に吊下げ用ワイヤ(W)を
連結し、上部地震計(8A)の底部と下部地震計(q)
を所定長さの吊下げ用ワイヤ(W)で連結し、下部地震
計(q)から地上より井戸ケーシング(1)内を降下さ
せるに際し、当該下部地震計(q)はラッパ口(3C)
で誘導しながら降下させ、無磁石基礎筒(3A)に接続
されている無磁石基礎下筒(3B)内の充填セメントの
上面に下部地震計を設置し、ついで、降下してくる上部
地震計部(8)における上部地震計(8A)を上下動震
動伝達アーム台座(6)部分に設置する。 7. The seismograph installation device according to claim 1 and claim.
A method for installing a seismograph installation device, comprising the following steps using the seismograph installation device described in 3 . First step The bottom of the existing well is flattened. Second step Lower seismograph storage cylinder part (3) connected to the lower end of the first boring rod (2) by left-hand screw connection, and well casing (1)
Will be installed down to the bottom of the well hole. Third step The second boring rod (4) lowers and stops the first casing breakthrough (5) and the vertical motion transmission arm base (6) at an appropriate position in the well casing (1). Fourth step: Actuating the first casing breakthrough part (5) from the ground, casing drilling blade (5C) and vertical vibration transmission blade (5D)
To break through the well casing (1) to form a channel (1A) for filling cement, and further pierce the formation (10) in the vicinity thereof to form a casing cement filling hole (10A). Fifth step From the ground, the first casing breakthrough (5) is operated to retract only the casing punching blade (5C) to form the channel (1A) for the filled cement in the well casing (1), and the vertical vibration is transmitted. The blade (5D) is left in the pierced state together with the vertical motion transmission arm base (6). Sixth step Cement is filled into the casing cement filling hole (10A) through the filling cement passage (1A) using the concrete press-fitting section (7). Step 7 Connect the hanging wire (W) to the uppermost part of the upper seismograph (8A), and connect the bottom part of the upper seismograph (8A) and the lower seismograph (q).
Are connected by a suspending wire (W) of a predetermined length, and when lowering the lower seismograph (q) into the well casing (1) from the ground, the lower seismograph (q) is connected to the trumpet mouth (3C).
The lower seismometer is installed on the upper surface of the filling cement in the magnetless foundation lower cylinder (3B) connected to the magnetless foundation cylinder (3A), and then descends the upper seismometer. The upper seismograph (8A) in the section (8) is installed on the vertical motion transmission arm base (6).
5記載の地震計設置装置を用いた下記の各工程から構成
されていることを特徴とする地震計設置装置の設置方
法。 第1工程 既成井戸の底部分を平坦にする。 第2工程 第1ボーリングロッド(2)の下端に左ネジ接続で連結
した下部地震計収納筒部(3)を井戸ケーシング(1)
の井戸孔底まで降下させ設置する。 第3工程 第2ボーリングロッド(4)により、第2ケーシング突
破部(9)と上下動震動伝達アーム台座(6)を、井戸
ケーシング(1)における適位置に降下停止する。 第4工程 地上から第2ケーシング突破部(9)を作動させること
で、ケーシング穴あけ刃(9C)と上下動震動伝達刃
(9D)を前進させ、井戸ケーシング(1)を突破り、
さらにその付近の地層(10)をも刺しケーシングセメ
ント充填穴(10A)を形成する。 第5工程 地上から第2ケーシング突破部(9)を作動させること
で、ケーシング穴あけ刃(9C)のみを後退させ、井戸
ケーシング(1)に充填セメント用通路(1A)を形成
すると共に、上下動震動伝達刃(9D)は突刺した状態
で、上下動震動伝達アーム台座(6)と共に残留させ
る。 第6工程 コンクリート圧入部(7)を用いて、セメントを充填セ
メント用通路(1A)を介してケーシングセメント充填
穴(10A)に充填する。 第7工程 上部地震計(8A)の最上部に吊下げ用ワイヤ(W)を
連結し、上部地震計(8A)の底部と下部地震計(q)
を所定長さの吊下げ用ワイヤ(W)で連結し、下部地震
計(q)から地上より井戸ケーシング(1)内を降下さ
せるに際し、当該下部地震計(q)はラッパ口(3C)
で誘導しながら降下させ、無磁石基礎筒(3A)に接続
されている無磁石基礎下筒(3B)内の充填セメントの
上面に下部地震計を設置し、ついで、降下してくる上部
地震計部(8)における上部地震計(8A)を上下動震
動伝達アーム台座(6)部分に設置する。8. claims and claim 1 seismometers installation device according
A method for installing a seismograph installation device, comprising the following steps using the seismograph installation device described in 5 . First step The bottom of the existing well is flattened. Second step Lower seismograph storage cylinder part (3) connected to the lower end of the first boring rod (2) by left-hand screw connection, and well casing (1)
Will be installed down to the bottom of the well hole. Third step By the second boring rod (4), the second casing breakthrough part (9) and the vertical motion transmission arm base (6) are lowered and stopped at appropriate positions in the well casing (1). Fourth step By operating the second casing breakthrough portion (9) from the ground, the casing hole punching blade (9C) and the vertical vibration transmission blade (9D) are advanced to break through the well casing (1),
Further, the formation (10) in the vicinity thereof is also pierced to form a casing cement filling hole (10A). Fifth step By operating the second casing breakthrough part (9) from the ground, only the casing punching blade (9C) is retracted to form the filled cement passage (1A) in the well casing (1) and move up and down. The vibration transmission blade (9D) is left in the pierced state together with the vertical vibration transmission arm base (6). Sixth step Cement is filled into the casing cement filling hole (10A) through the filling cement passage (1A) using the concrete press-fitting section (7). Step 7 Connect the hanging wire (W) to the uppermost part of the upper seismograph (8A), and connect the bottom part of the upper seismograph (8A) and the lower seismograph (q).
Are connected by a suspending wire (W) of a predetermined length, and when lowering the inside of the well casing (1) from the lower seismograph (q), the lower seismometer (q) is connected to the trumpet mouth (3C).
The lower seismograph is installed on the upper surface of the filling cement in the magnetless foundation lower cylinder (3B) connected to the magnetless foundation cylinder (3A), and then descends. The upper seismograph (8A) in the section (8) is installed on the vertical motion transmission arm base (6).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2000307133A JP3435509B2 (en) | 2000-10-06 | 2000-10-06 | Seismometer installation device and installation method of seismometer installation device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2000307133A JP3435509B2 (en) | 2000-10-06 | 2000-10-06 | Seismometer installation device and installation method of seismometer installation device |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2002116264A JP2002116264A (en) | 2002-04-19 |
| JP3435509B2 true JP3435509B2 (en) | 2003-08-11 |
Family
ID=18787693
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2000307133A Expired - Fee Related JP3435509B2 (en) | 2000-10-06 | 2000-10-06 | Seismometer installation device and installation method of seismometer installation device |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3435509B2 (en) |
Families Citing this family (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR101395035B1 (en) | 2013-03-27 | 2014-05-16 | 한국수력원자력 주식회사 | Borehole sidewall seismometer installation device |
| CN106032752B (en) * | 2015-03-18 | 2019-09-20 | 安徽惠洲地质安全研究院股份有限公司 | A kind of one man operation's earthquake coaster scanner and detection method detecting wall quality |
| KR102285806B1 (en) * | 2019-12-17 | 2021-08-04 | 한국지질자원연구원 | Semipermanent optical fiber sensor cable system for vertical seismic profiling |
| KR102285803B1 (en) * | 2019-12-17 | 2021-08-04 | 한국지질자원연구원 | Optical fiber sensor cable system for measuring 3 components vibration of seismic profiling |
| CN114415229B (en) * | 2021-12-30 | 2023-07-18 | 甘肃省地震局(中国地震局兰州地震研究所) | Erection device for field seismic monitoring shallow hole direct burial |
| CN116430440B (en) * | 2023-03-17 | 2026-02-13 | 山东大学 | A wireless seismograph field storage device and its working method |
| CN117950010B (en) * | 2024-03-27 | 2024-05-24 | 甘肃省地震局(中国地震局兰州地震研究所) | Sensor mounting bracket applied to field steep slope seismic observation |
| CN119165526B (en) * | 2024-07-17 | 2025-12-09 | 河北石油职业技术大学 | Seismic signal acquisition device and acquisition method for geophysical exploration |
-
2000
- 2000-10-06 JP JP2000307133A patent/JP3435509B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JP2002116264A (en) | 2002-04-19 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US4775009A (en) | Process and device for installing seismic sensors inside a petroleum production well | |
| JP3435509B2 (en) | Seismometer installation device and installation method of seismometer installation device | |
| EP0918919B1 (en) | Logging method | |
| US6230800B1 (en) | Methods and apparatus for long term monitoring of a hydrocarbon reservoir | |
| US5979588A (en) | Method and apparatus for installing electronic equipment below soft earth surface layer | |
| US5318129A (en) | Method and device for setting up sondes against the wall of a cased well | |
| US4548266A (en) | Method for isolating two aquifers in a single borehole | |
| US4181196A (en) | Method and apparatus for recovery of subsea well equipment | |
| Angemeer et al. | Pile load tests in calcareous soils conducted in 400 feet of water from a semi-submersible exploration rig | |
| US5206840A (en) | Geophone implantation system | |
| CA2261196A1 (en) | Method and device for permanent monitoring of an underground formation | |
| CN211314134U (en) | Oil drilling device with drill bit convenient to replace | |
| CN116697863A (en) | Device for surveying depth of underground cavity or gap of karst landform | |
| CN217811239U (en) | Deep soil body displacement deviational survey pipe installation filling structure of foundation ditch monitoring | |
| CN113639947B (en) | Cross-fault tunnel integral shearing variable flexible boundary power model box | |
| CN216900956U (en) | Novel ramming seismic source in shallow seismic exploration | |
| Hawkins et al. | New Development in Offshore Geotechnical Investigation | |
| FR2564894A2 (en) | Method and device enabling measurements and/or operations to be carried out in a well | |
| JP2001166060A (en) | Multistoried seismometer and installation method therefor | |
| US5560436A (en) | Single drilling guide base for subsea oil wells | |
| CN115032685A (en) | An intelligent monitoring system and monitoring method for microseismic monitoring | |
| CN217060517U (en) | An interwell seismic source test structure | |
| JP3053563B2 (en) | Hydraulic testing method at large depth, drilling rig and packer for the test | |
| JP2001318161A (en) | Multistage type seismometer installing device | |
| CA1267836A (en) | Device and method for effecting provision of an opening in well casing |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120606 Year of fee payment: 9 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130606 Year of fee payment: 10 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130606 Year of fee payment: 10 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| LAPS | Cancellation because of no payment of annual fees |